LOTO 10 Step process

Page 1

1. PREPARE

2. notify NOTIFY ALL AFFECTED EMPLOYEES

IDENTIFY THE TYPES OF ENERGY SOURCES USED, POTENTIAL HAZARDS, AND ALL CONTROL DEVICES

3.turn off / shut down TURN OFF ALL OPERATING CONTROLS

5. lockout LOCKOUT ALL SWITCHES AND ENERGY CONTROLS IN THE “OFF” OR “SAFE” POSITION

7.ZERO ENERGY ENSURE THAT ANY DISSIPATED ENERGY IS SAFETY RELIEVED AND CAN NOT RE-ACCUMULATE

9. completion COMPLETE ALL TASKS, ENSURE VIGILANT OBSERVATION

4. ISOLATE

LOCKOUT TAGOUT This 10 step process will show you the steps and procedures that should be followed to complete a successful isolation.

download our Ebook FROM WWW.SPECTRUM-INDUSTRIAL.CO.UK for your full guide to LOTO

ISOLATE ALL ENERGY SOURCES

6. tagout TAGS ARE TO BE APPLIED IN ALL CASES WHERE A LOCK IS PRESENT

8. TRY OUT TEST THE OPERATING CONTROLS BE SURE NOBODY CAN GET HURT BEFORE TESTING

10. RE-ENERGISE RESTART EQUIPMENT


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.