The Estimators A-Z tendering checklist A. You have made the tender list. The documents have been issued. Carefully unpack and list each uniquely labelled and bound set of documents. Discipline on document control is essential in all phases of project procurement and delivery. B. Look for checklists, including document transmittals, lists of drawings, tables of contents. If you cannot identify a master checklist that contains all items received, create one. C. Is there a set of conditions of tendering? Make sure you identify minimum proposal requirements to avoid a low score or disqualification from participation. D. Is there the requirement for a document deposit? What are the document deposit rules? E. If you are still using paper, date stamp and “Tender Set” stamp all your documents. F. Ditto for receipt of any Notices to Tenders documentation. G. When are tenders closing? Can you meet this date? If not, when should you seek an extension? Or should you withdraw? If you seek an extension immediately, there may be time to replace you on the tender list. Do you wait for the first Notice to Tenders? H. Read through all documents and familiarise yourself with the project requirements. Make notes as you go under key headings. Tender deliverables, bonds, insurances, programme, company resources, financial status, track record, references, probity, form of tender, proposed contract terms, specific conditions (terms subject to customisation of a standard form contract and special conditions – the alteration of standard form terms by adding, deleting or amending), provisional sums, nominated subcontractors and suppliers, sectional completions, warranties, liquidated damages, bonus and retentions. I. Are there long lead items, access issues, existing site conditions/hazards. J. Is there a schedule of quantities? If there is, do a bulk check to see how accurate it is. K. What are the tender assessment rules? Is there a weighted points system? L. Are you the Super Mario Bros? If not, then you will want specialist trade contractors to price their specialist trade works to you as part of your tender proposal.

O. Set up your first draft trade package summary with formulas for adding up your price. P. Setup a digital and physical package pricing filing system so you can orderly review what is received and assessed from specialist trades and record what has been determined to be the basis of each specialist trade input into your tender proposal. Q. Prepare and issue invitations to tender for the trade packages you have identified. R. While you await trade tender queries and prices, measure and estimate the cost of your own direct works, i.e. Preliminary and General, concrete, carpentry, etc. S. Prepare a programme, methodology and possible team. Does your programme meet the tender programme? If your programme is longer, can you better it? What will that cost? Will you offer a saving for a longer programme? T. Draft your tender submission (excluding price) and double check you know the correct date, time and method of delivery allowed/required. U. Notice to Tenders. Receive review and determine, is there time to Price, if not request an extension to closing time. Distribute to relevant specialist trade tenderers. V. Assemble your estimates and quotes on your master summary and list the endorsements it is currently based on for management review. Is something missing? Do a quick estimate and plug that gap with an allowance at your risk or a provisional sum to transfer the risk to the client. W. Use the tender form provided. X. What profit margin to apply? Will your tender comply with principal requirements or will you be submitting an alternative proposal? If you are not submitting a fully compliant tender, make your proposal subject to a list of tender endorsements so it is clear where you are deviating from the scope received. Y. Have someone else review your complete proposal and run their own calculator over the numbers to make sure there are no basic errors. Then deliver your completed and checked tender on time to the designated place. Z. Check that all your workings are carefully filed for easy location and review post tender when your client contacts you with post tender queries or a tender award decision.

M. Define the boundaries of the Trade packages and special material supply items needing external price input/ assessment? Invite prices from specialists. N. Be careful to identify scope that may fit into more than one trade package or not fit any trade package. These are the items you will miss or double up on. Either way it is usually unwelcome news to lose or win a tender by mistake.

28

For more information or help on anything mentioned in this article please contact The New Zealand Building Economist at editor@nzbe.co.nz. Matthew Ensoll FNZIQS Reg.QS, Editor at The New Zealand Building Economist (NZBE). NZBE are National Partners of NZCB and provide residential and light commercial building cost information that can be relied on. Find out more about the New Zealand Building Economist, their technical book selection and Blog at www.nzbe.co.nz


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

What is the difference between our NZCB Partners?

2min
page 54

Solving moss and mould problems

1min
page 49

Cavity sliders in wet areas

2min
page 48

Nine ways to recognise a man’s stress

3min
pages 40-41

Message from our South Island BDM

3min
page 42

Coping with stress during infectious disease outbreaks

5min
pages 38-39

Site Safety and the new normal

3min
pages 36-37

NZCB welcomes new Regional Presidents

2min
page 43

Concrete NZ issues concrete panel lifting anchor warning

2min
pages 34-35

AST Trust update

1min
page 47

Overlapping duties: working with other businesses

2min
pages 32-33

The Estimators A-Z tendering checklist

4min
page 30

Reducing emissions in the building and construction sector

3min
pages 22-23

Halo 10-Year Residential Guarantee is here

3min
pages 28-29

Handle job variations easily with tech

3min
pages 24-25

The payment retentions rules get some teeth

6min
pages 26-27

Dig the well before you are thirsty

2min
page 19

The key to revolutionising your leadership

3min
page 31

Privacy rights in today’s environment

2min
pages 20-21

Jacobsen helps to reduce waste with product stewardship programme

3min
page 18

Message from the Chief Executive

3min
pages 6-7

Contract Works Insurance

2min
page 15

Save the date! NZCB 22nd AGM, Conference and Expo

2min
page 14

NZCB public website – is your business profile up-to-date?

1min
pages 12-13

NZCB Building Trade Professionals Workshop – Exempt Building work

2min
page 10

Apprenticeship support for employers

2min
pages 16-17

Message from the Group Technical Manager

2min
pages 8-9

Message from the NZCB Board

3min
pages 4-5
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.