Fineliner 0.4, Scanner. 420x297mm.
C E RY L E K A N A D I P O R T F O L I O
Ceryle Kanadi. DAM interpretation. 10 April 2015. Digital collage, pencil,
Ceryle Kanadi Phone : +62 822 663 33012 Email: ceryle.kanadi@gmail.com Instagram: cerylestudio
EDUCATION 2012-2016
Bachelor of Interior Architecture (Honours) (Monash University)
2010-2011
Diploma of Art and Design (Monash College)
SKILLS AutoCad Rhinocerous 3Ds Max Revit Sketchup Final Cut Pro
Adobe Illustrator Adobe Photoshop Adobe Indesign Adobe Lightroom Adobe Premiere Handsketch/drawing
EXPERIENCE Feb - May 2017
Intern Architect / Interior Designer IBUKU, Bali
September 2016
Main Back of House Melbourne Spring Fashion Week 2016 (by Melbourne City Council)
March 2016
Event Assitant and Back of House Melbourne Fashion Festival (by Virgin Australia)
October 2015
Event Assistant Melbourne Music Week 2015 (by Melbourne City Council)
September 2015
Front and back of house Melbourne Spring Fashion Week 2015 (by Melbourne City Council)
STUDIO WITH PROFESSIONAL PRACTICE Feb - May 2016
Siblings Architect - Perform Reform Studio
CONTENT
01
Warung Budaya (Indonesia Street Vendor)
02
Public Performance Art Gallery
03
Futuristic Workspace
04
Activists and Breakdancers HUB
05
Student HUB Pavillion
06
“R u ok?” Awareness
07
Modern Flower Kiosk
08
Detailing Plan
09
Other Arts
10
Professional Work / Intern
01.
WARUNG BUDAYA LOCATION: Setiabudi Raya Street, Jakarta.
This project starts with the concern of Joko Widodo concerns of the large number of shopping malls in Jakarta. The governor would like to reduce the number of new developing shopping malls and start building more public spaces. On the other side, the traditional culture of Indonesia are being forgotten by younger generation. Through out the research, the best way to promote culture is by inserting it into community, which is in the form of street vendor.
Setiabudi Raya Street
Social Issue JAKARTA TRAFFIC JAM PROBLEM
Site Diagram JAKARTA HERITAGE HOUSE
JAKARTA TRADITIONAL SYMBOL
JAKARTA SKYSCRAPER
Government has done forcefully reallocate the street vendors failed. One of the reason is because the reallocation planning is on aesthetically rather than physical functional and locational Therefore it has made the vendors return back to
d l Su
irm
an
Str
eet
Setiabudi Ra ya Street
Je
ra nde
Concept Solution:
but it has only based function. 1 the street.
Program Solution: Cityscape Issue
LESS SHOPPING MALLS, CULTURAL PUBLIC SPACE MORE.
SinarMas Tower (Offices) HKBP Christian Church
“ 24 ”
SinarMas Tower (Offices) HKBP Christian Church
Joko Widodo_Indonesia governor
Economy Crisis in 1997 effects
Economic Issue Parking space
Crashing & Coping (1997 - early 1999)
unemployed could survive
GDP downfall many companies close down
informal sector increase
Parking space
Jobless growth (late 1999 - early 2003)
existing street vendors increased wages
insertion culture vendor
formal sectors declining r and Lily Song. “Return to the Streets” Cityscape: A Journal of Policy Development and Research 18 are (2016). Accessed by August 22, 2016. informal sectors increase new law more http://search.proquest.com.ezproxy.lib.monash.edu.au/docview/1788317775?accountid=12528 even more
“ 27 “ existing street vendors Indonesia had great financial crisis in 1997 that caused great impact to economy sector, especially many employers laid off workers and some business closed down.1 Since the unemployed workers could not
insertion culture vendor
“ 27 “
mance attractive since the performance is part of their social life, but people that live in the city are
not interested Concept designto it unless for migrated people to remind them of their village culture.
4
screen
SCREEN JOINT FROM CEILING
audience seats in front of screen light (above puppeteer’s head) puppeteer (as leader)
PUPPET TEMPORARY STORAGE References: 1. The Jakarta Post. “Batik, Kris, and wayang get UNESCO world heritage” Jakarta Post February 19, 2010. Accessed 13 September 2016. http://www.thejakartapost.com/news/2010/02/06/batik-kris-and-wayang-get-unesco-world-heritage-status.html 2. Time Byard Jones. “Development in Performance Practice, the Creations of New Genres and Social Transformations inYogyakarta Wayang Kulit”. Contemporary Theater Review. 2001. 43-54. 3. Anca Doczi. “Puppet Theaters: The beginnings: Wayang Kulit and the Javanese Legacy-Natural Context”. Studia Universitatais Babes-Bolyai-Dramatica. 2010,153-158. 4. S. Haryanto. Seni Kriya Wayang Kulit (Jakarta:Pustaka Utama Grafiti,1991) 4.
. 13.
2000 .6.
700
1500
D01
D03
D02
LAMP WILL BE HUNG
PLAN
1200
STORAGE FOR WAYANG IF NO PERFORMANCE
650
SCALE: 1/20
2000
2000
HANDRAIL FOR PUSHING THE CART
5500
300
550
. 10 .
D.01
D.02
D.01
D.02
DETAIL CEILING (D03) DETAIL CEILING (D03) . 17 .
SCALE: 1/5
SCALE: 1/5 . 16 .
. 19
C
80
E
700
1165
D
BAMBOO THAT WOULD PRODUCE NOISE WHILE
BAMBOO FRAME FOR ANGKLUNG DISPLAY
1180
940
PLAN SCALE: 1/20
STORAGE OF ANGKLUNG
. 28 .
D.02
Angklung Angklung is acknowledged by UNESCO as Indonesian Intangible cultural heritage in nairobi, Kenya on 16 November 2010. 1 The reason is because it has reflection of the mian values of Indonesian culture identity (mutual respect, principles of cooperation, and social harmony. Angklung is a musical instrument made out of bamboo, which it consists of two to four cylindrical bamboo that are tied together with rattan. The cylindrical is sculpted and cut in detail to produce certain notes.2
DETAIL HOW THE BAMBOO COULD BE OPENED D 2.01
rattan tie
PIVOT DETAIL
movement to make sound
DETAIL 2 ( D.02 )
stick to the core
vertical frame horizontal frame
References:
PIVOT
1. Tegar Utama. Ensiklopedia Alat Musik Tradisional (Bandung: Penerbit Angkasa 38. theBandung,2014) bamboo bump the base bamboo bamboo move backward 2.vertical “Indonesian Angklung Acknowledge by UNESCO” States New Service 18 November 2010. and therefore it makes sounds http://go.galegroup.com/ps/i.do?p=AONE &sw=w&u=monash&v=2.1&id=GALE%7CA243886588&it=r&asid=8e56100186dc283db824028c4cb949c3
D 2.01
. 15.
Detail of bamboo structure that allow the rickshaw to make noise by adapting angklung’s structure
base bamboo
. 22 .
. 31 .
ELEVATION E SCALE: 1/10
02.
PUBLIC PERFORMANCE ART GALLERY LOCATION: Thornbury Theater,Thornbury
The project is exploring Thornbury theater of how Thornbury suburban has developed to have more local Melbourne designer art shops. Likewise, in the art world, performance art is now moving into gallery since Marina Abramovic performs at MOMA. Hence, this project is changing into more contemporary theater, which becomes public performance art gallery.
inside to explore local Melbourne designer. From the last 5 CONNECTION years, the suburb has changed to develop into more local artist Melbourne shop owner, and therefore Thornbury theater that I am porposing to turn into more contemporary locailizedNEIGHBOURHOOD theater which it could be occupied for performance art.
Site Diagrams: LOCAL ARTISTS SHOPS Thornbury shops have interesting views that attract you to come inside to explore local Melbourne designer. From the last 5 CONNECTION years, the suburb has changed to develop into more local artist Melbourne shop owner, and therefore Thornbury theater I am porposing Sthat O F GALLER to turn into more contemporary locailized NEIGHBOURHOOD theater which it could be occupied for performance art.
Thornbury theater that I am porposin to turn into more contemporary locailized theater which it could be occupied for performance art.
P R E C E D E N T S O F G A L L E RY The site is Thornbury theater, which is for now has been used for local artists’ concert / private functions / wrestiling performance.
LOCAL ARTISTS SHOPS
REFLECTION Concept Diagrams:
Precedents: DERIVE JOURNEY THORNBURY TO NORTHCOTE
PRECEDENT
Y
The Andalucia - Museum of Memory by Alberto Campo Baeza [ using ramp to connect from one room to another ] CONNECTION
CONCEPT DIAGRAM
Thornbury theater consists of two
R E F L main E C theaters. TION
Thornbury shops have interesting
views that Main theater
attract you to come inside to explore
Red Velvet local theater LOCAL ARTISTS SHOPS
CONNECTION
Melbourne designer. From the last 5 years, the suburb has changed to develop into more local artist Melbourne shop owner, and therefore Thornbury theater that I am porposing to turn into more contemporary locailized theater which it could be occupied for performance art.
The Andalucia- -Museum MuseumofofMemory Memory Alberto Campo Baeza The Andalucia (BybyAlberto Campa Baeza) [ using ramp to connect from one room to another ] - using ramp to connect one room to another room NEIGHBOURHOOD
Guggenheim Museum by Frank Llyod
NEIGHBOURHOOD
Guggenheim Museum (by Frank Gehry) [ continuious ramp along the museum - using ramp to connect one level to another level.
Guggenheim Museum by Frank Llyod [ continuious ramp along the museum ]
]
DIAGRAM OF THE SPACE
Bar
Female Toilet
Male Toilet
Ramp to view & go to bar and toilet
Ramp to view & go to first level
PERFORMANCE SPACE 2
BAR
First level
PERFORMANCE SPACE 1
Audience viewing space
Performer going to 1st level Ticket booth Administration office Theater shop
Ramp to view and going to first level
TICKET BOOTH
Ramp to view & go to aisle exit
Bar THEATER SHOP nce could see a glimpse the lower level
Exploded Axonometric Diagram
Ground Floor
Ramp coming through second level Lower level plan
Long sectional People enter and could see the performances
Short Section Elevation The audiences could enter the viewing platform on the first floor
Upper level plan
03.
FUTURISTIC WORKSPACE LOCATION: Level 3 & 4,167 Flinders Lane,Melbourne
This project is exploring the futuristic workspace that how researchers and architects are working together. The main project is exploring to create the most productive workspace for people, which also exploring in argonometric for the body. The workspace is being used for researches to monitor argonometric of the builders and the information will be transfered to interior architects for design development.
supernormal logo -
Site Diagrams:
THE IDEA OF FUSION
interior architect workspace + behaviour lab
anna schwarts gallery
cavendish house furniture
The site is located at level 3 & 4 , 167 Flinders Lane Melbourne. A nice building with big MAPPING OFinside. CONSTRUCTIONS AND OFFICE windows allowing natural light coming
3rd and 4th level for new site
renes dry clean
dining interior design
flinders landing apartment
SIte:
Builders will communicate with the interior architects for updating informa tion how the construction goes along from the process
with japanese character to represent the right and interests of the clients and keep informed with the designers’ actions. mix Australian and japanese
Concept Diagrams:
OFFICE
LA TROBE
Precedents:
LT LONSDALE LONSDALE
RESEARCHERS brief: TO CREATE A FUTURISTIC WORKSPACE with the useSuperstudio for: , Italian young architects that were wellSuperstudio_New York ofmonitoring Brains interiority + behaviour known in 1972, wrote that+ ultimately the grid would research laboratory + design studio + form a “single continuous environment, the world renoffice workplace
LT BOURKE BOURKE LT COLLINS COLLINS
conceptual diagram FLINDERS LANE FLINDERS ST S P R IN G
E X H B IT IO N
R US S E L L
S W A N S T ON
E L IZ A B E T H
Q UE E N
W IL L IA M
K IN G
S P E NC E R
OFFICE/LAB
conceptual diagram
dered uniform by technology, culture, and all the other inevitable forms of imperialism.” This would allow for a truly democratic human experience: because every point on the grid is identical, no place is better than Photomontage_What could have muchof freedom to work and movework according any other. (Ofif office course, likeso all Superstudio’s it to our needs is polemical, in this case being both unrealizable and nightmarish to contemplate.)
CONSTRUCTION page
Graphic Presentation Analysis New York of Brains (by Superstudio) ne w
en e sou rgy r fro ce mb ra in s
n atio gin ima ture fu re of
e wh rld wo ce pea
no
MOCK UP MODEL
loc a Ce ted in ntra Ne
w
lP ar Yo k rk
of ut
o d de vere itive mabe cosens cu hoto d p in w/ r beh e lay
A New World of Controlling Human Brains From the Central of Brain
Working area for Architects and Researchers in Lower level
Diagram showing how the interior architect is being used
Detail plan and elevation for the researchers working space
Plan Lower Level
Plan Upper Level
PRESENTATION ROOM
Long Section
04.
ACTIVISTS AND BREAKDANCERS HUB LOCATION: Front Space of State Library Victoria
Melbourne city is a large community that consists lots of young adults come fron different nations. Besides, the city is well known to be good city for education and creative arts. Therefore, this project is drawn from looking into the educated user group , such as the activists, and the artists (such as breakdancer).
Site:
Site Diagrams: SITE ANALYSIS
DAY TIME (12PM)
Tokyo Plaza Omotesando
Holocaust Memorial (Jewish Memorial) NIGHT TIME (8PM)
The site is in the State Library Victoria which is a place that historically has been known as the brain of the city. Besides, it has become place for activists.
Tokyo Plaza Omotesando
Holocaust Memorial (Jewish Memorial)
RALLY FOR CAUSE STUDENTS
6PM - 11PM
PM
AM STOP RACISM
STOP RACISM
TER HANGER
SKATEBOARDERS
Precedents:
WHERE AND WHEN?
S SHARING ELEMENTS
ER HANGER
ACTIVISTS
ELDERLY POLICES
Concept Diagrams: WHERE AND WHEN?
COUPLE
TOURISTS
Space for discussion of the same issue they agree
Dance practice occur in the evening at hidden corner space around city that has flat surfact and reflective wall
AM
PM
12PM
4PM
To perform, they will go to public space that has flat surface which allowing public to pay attention Public space to disturb and to get attention from public
Tokyo Plaza The tokyo plaza is made out of concrete that is (Omotesando Project) arranged in pattern that could be used as seat-
ing area, thus it looks the landscape design are The tokyo plaza is made out of blend in with the surrounding space, which is suitable forthat the idea of activists that want toin concrete were arranged be accepted The tokyopromote plaza is their madeideas out ofto concrete that isby bigger pattern which also function seatcommunity arranged in pattern that could be used as seating area, it looksthat the landscape ingthusarea looksdesign likeareunited blend in with the surrounding space, which is landscape suitable for the idea ofdesign. activists that want to promote their ideas to be accepted by bigger community
Another idea that was suggested by the teacher is this Holocaust Memorial. From far away they look like the landscape, however it was actually made out of concrete that is arranged in slightly different heigh which is this precedent supports stronger for my idea which is to blend in with the Another idea that was suggested by the teacher community. is this Holocaust Memorial. From far away they
Holocaust Memorial (Jewish)
Another shape idea that is the Hollook like the landscape, however it was actually ocaust away made out Memorial. of concrete that is From arrangedfar in slightly different heighlike whichthe is this flat precedent supports they look landscape, stronger for my idea which is to blend in with the community. however it was actually concretes arranged in slightly different height which is this shape support my idea how activists would blend in with the community to share idea
AXONOMETRIC DIAGRAM
LEVEL 1 - BREAKDANCER PRACTICE SPACE
LEVEL 2 - BREAKDANCER PERFORMANCE / ACTIVISTS LEADER STAGE
LEVEL 3 - BREAKDANCER BEGINNER PRACTICE / ACTIVISTS GROUPS DISCUSSION
LEVEL 4 - CONNECTING STAGE TO THE PEDESTERIANS
Detail plan
Detail elevation
Reflective glass could be attraction for the viewers especially when the breakdancer perform in the group The breakdance usually practice at night time, therefore they could use this space while the mirror that they need could be seen on the mirror on the top.
Plan
Mirror surface to give reflection for the dancer
The stais will be used activists to stand with their posters to be seen by public
Activist protest to get pedestrian attention
Section
SECTIONAL ELEVATION SCALE: 1/200
05.
STUDENT HUB PAVILLION LOCATION: Backyard of Monash University Library Caulfield
NEW PAVILLION FOR STUDENTS STUDY SPACE
Conceptual Model:
Studying are more productive when we receive natural sunlight. Besides, there are limited spaces for Architecture / Interior Architecture students at Monash University. Therefore, this project is proposing a new study / model making space for students that has flexibility for students to work making their models and also by working outdoor (receiving natural light) would help them to work even more creatively.
Site :
Site Diagrams:
Precedents
The site is under Monash Caulfield Library, which a place that people sit there for lunch.
Concept Diagrams:
Communal area
Precedents
- created to draw people togather inside the pavilion - constructed with unique form - used simple material such asfruit basket and straps
Figment 2010 City of Dreams : Precedents:
Living Pavilion
Room
Room Central Point Room
Communal area Room
-study of public & private space -eventhough its temporary, the design still prioritize user’s comfort
Figment 2010 City of Dreams : Modular Hamster inside the Tunnel pavilion Figment 2010 - created to Modular draw people togather City of Dreams Hamster Tunnel Hotel Hotel by Raumlabor - constructed(by with unique form Living Pavilion (Living Pavillion) Ramlabor) - used simple material such asfruit basket and straps
Room
Room Central Point Room
Semi open Semi Opensurface Surface covered on the top) (glass(glass covered on top)
Rotatable Surface Flat surface that could beFlatrotated Medium Storage Medium storage Seating area Seating area
Underseat storage Underseat Storage
Open Open ceiling allowing Semi lights toSurface come in (glass covered on the top)
Seating area The Detailflat Plansurface could be rotated so it could be adjusted whether the users want to use it as working space or not. scale: 1/20
Medium Storage Medium storage
The new workplace will be adjustable to the users whether they want to use the flat surface or not. It could be rotated to outside so it will only be a flat surface for seating.
ModelSpacious Making space space for model making
Plan
Section
06.
“ R U OK?� AWARENESS LOCATION: MUMA Backyard, Monash Caulfield to Monash HUB
Learning new thing at university could be challenge for some students. Perhaps the students might have learning difficulties but they have not realized it. Therefore in September (in the mental health awarness month) Monash University promotes how students could seek help from professional. The way to promotes by designing routes from students-gathering space into Monash Health Center.
Site:
Site Diagrams: the site surrounded building of the site
Low light (tree shadow) High light (direct sunlight) Medium light (direct sunlight+tree leaves shadow)
m
g
ce spa
diagram
Surro
The project is located in the MUMA Courtyard where it is usally beng used as students gathering during free time and also smoking area.
diagra
u nd in
Light
MUMA gallery Dry plant/bush Long wooden bench
the site ture diagram Tex
Concept Diagrams:
Grass (soft, move along the wind flow) Wood (medium rough, static shape) Stone (rough, dynamic shape)
The puzzle represents our body parts need one another to assemble a healthy body The whole represents something missing in our body equal to unhealthy condition
Precedents:
There will be objects placed on the structure of the pavillion as signage.
Midtown jogging route signage by Monocle (Tokyo) Giving direction using box with the arrow. The other idea could be put a light inside with a transluency materials, thus it could turn on at night.
Omiya Football Space Stadium (Saito, Japan) The graphic looks interesting with some movement which directs they way people go
Bovisa Gallery by Silvia Amaduzzi (Bovisa) The small graphic on the wall interact people to look it closer and it becomes the direction of location they are going.
Pavillion could be used as gathering space for students as well.
smale intimate interaction
touch green bean nature soft texture
Small objects that could be touched as objects to remind them to relax
To promote the design issue, objects that attract attention are placed in several places in the pavillion. The object is inspired by turtle, which means to slow down. Besides, the object could be opened on the top and inside there were beans that could be pat by students since beans are wellknown to stimulate muscle in hands that cause relaxation as well.
stress?
alone? smile?
smile?
( L ) SCALE
sick?
stress?
alone? smile?
smile?
sick?
stress?
happy?
Near the pavillion, the wooden bench will have shade as a way leading students to the ELEVATION Monash Health Center SCALE 1:50
SECTIONAL ELEVATION SCALE 1:50
07.
FLOWER KIOSK LOCATION: Flinders Station
Flinders Street Station has been iconic local central station in Melbourne. People come and go rapidly. In this project, the flower kiosk will be moved to central inside the station. Due to the rapid movement in the station, do people still have time to order at the shop? Or perhaps they prefer to order online and just get the flowers straight away from the shop?
S EAR CH SEARCH SEARCH
P I CK UP
O R DER ORDER
PICK UP
P IC K U P
ORDE R
Site
Site Diagrams: BU S Y HOUR
BU S Y HOUR
CENTER OF S TAT I O N
C E NT E R O F S TAT IO N
BUSY HOUR
CENTER OF STATI ON
QUEUE
The site will be inside LINE Flinders Station,which is estimated replacing Baguette NEAR Kiosk to FlowerWA kiosk. ITING AREA
Legends: New flower Kiosk The flow of people to the Flinders Station Train platform
Concept Diagrams:
QUEUE L INE
NE A R WA IT ING AREA
QUEUE LI NE
NEAR WAI TI NG AREA
Precedents:
De Stijl consists geom et r y of SM ELLp r inc ip le of BUY LO O K of fundamental BUY straight line, square, combined wit h w it h a s t rong SM ELL LO O K as ymmetricality;The predominant us e of p ur e p r im a r y colors with blac k and white; and t he r ela t ions hip b et ween positive and negative elements in a n a r ra ngem ent of n on-objective for ms and lines PICK UP
Flinders Flower
day
order now
?
mon/8
Flinders Flower ?
order now
SEARCH SEARCH
time
8am-10am
UP tue/9 PICK 11am-2pm
wed/10
done
3pm-5pm time day
other mon/86pm 8am-10am tue/9
11am-2pm
wed/10
3pm-5pm
other
6pm
done
O RDER O RDER
PICK UP PICK UP
BU SY H OBU U RSY HOUR
D e St i j l c o ns i s ts o f f und a m e nta l p r i nc i p l e o f ge o m e tr y o f s t ra ig ht l i ne, s q ua r e, c o m b i ne d w i th w i th a s tro ng a s ymm e tr i c a l i ty ;The p r e d o m i na nt us e o f p ur e p r i m a r y c olor s w i th b l a c k a nd w hi te ; a nd the r e l a ti o ns hi p b e twe e n p os it iveD e a nd ti ve e nts r rat nge f l e of geom et St ne i j l ga c on s i setlse mof f uinndaanmaen a l pm reintn coi p n on - ob j e c ti ve fo r m s a nd l i ne s
s t ra i g h t l i n e, s q u a r e, c om b i n ed w i t h w i t h a s t ron g a s ym m et r i c a l i t y; T h e p r ed om i n a n t u s e of p u r e p r i m a c ol or s w i t h b l a c k a n d w h i t e; a n d t h e r el a t i on s h i p b e
ION & DESIGN 1.
the new flower shop is designed to look like modern gallery that also educate people using digital media, so the customers would be able to understand more the meaning behind the flower they are going to buy. besides there are four entrances which indicates welcoming customers from four different directions.
APPLICATION & WEBSITE DESIGN
0
40
2.
3.
the new flower shop is designed to look like modern gallery that also educate people using digital media, so the customers would be able to understand more the meaning behind the flower they are going to buy. besides there are four entrances which indicates welcoming customers from four different directions.
Plan detail of Plan Detail the information Information / Self Servebooth Booth
80
120
160
browing, smelling, interacting media: 3Ds max 2009, photoshop
smelling, the newbrowing, flower shop designed to interacting look like modern gallery that media: 3Dsismax 2009, photoshop also educate people using digital media, so the customers would be able to understand more the meaning behind the flower they are going to buy. besides there are four entrances which indicates welcoming customers from four different directions.
Floor Plan FLOOR PLAN SCALE:1/100
FLOOR PLAN
ELEVATION A Short elevation
Long elevation ELEVATION B SCALE:1/100
SCALE:1/100
08.
DETAILING PLAN REMOVE 900MM EXISTING WALL TO HAVE A DOUBLE FIXED GLASS WINDOW WITH 900MM HEIGHT AND 900MM WIDTH. REMOVE 720MM EXISTING WALL TO HAVE A FIXED GLASS WINDOW WITH 1000MM HEIGHT AND 720MM WIDTH.
RETAIN METER BOARD (688mm x 485mm x 278mm)
B
A 5055
4730
4730
D
C 4115
E 3950
1660
REMOVE KITCHEN INCLUDING REFRIGERATOR, BENCTOP, UNDERBENCH, OVERHEAD CUPBOARDS.
GENERAL NOTES
1 1000
REMOVE ALUMINIUM-FRAMED GLAZED DOORS AND SIDE LIGHTS
3420
2000
2
REMOVE ALL THE SKIRTING THROUGH ALL THE INTERIOR WALLS REMOVE ALUMINIUM-FRAMED GLAZED DOOR AND SIDE LIGHTS AT EAST AND WEST ENDS. REMOVED ALL LIGHTING AND POWER FITTINGS AND FIXTURES, EXCEPT THE METER BOARD. REMOVE ALUMINIUM-FRAMED WALL AND CEILING PANELS
REMOVE POWDER ROOM (TOILET),STAIR, AND BASIN, INCLUDING ALL PLASTERBOARD PARTITION WALL AND CEILING.
1570
RETAIN HYDRONIC HEATING PANELS
INSTALL THE EXISTING DOOR EXIT WITH LOCKABLE DOOR.
01 ID2000
COPYRIGHT
DEMOLITION PLAN
SCALE: 1/100
KANADI
MONASH UNIVERSITY,BUILDING CONSTRUCTION C
A
B
D
C
E
MICROWAVE TO BE PROVIDED BY THE OWNER 4795
4730
4730
4115
3950
2
1980
1203
273
1250
1085
1510
ID5100
2250
840
1855
1001
815
2562
1188
LF:03
1
ID3000
LF:06
LF:08
E.05
LF:01
STORE
ALLOW TO PAINT ALL EXISTING WALLS, EXPOSED CEILINGS/SLABS, PLASTERBOARD CEILINGS, COLUMNS AND DOORS. PAINT FINISH AS SPECIFIED. PREPARE FLOOR READY FOR NEW FLOOR FINISHES. APPLY SELF LEVELLING COMPOUND TO ENSURE 2 - 3 mm TOLERANCE
4
ID2300
DR 02
120 450
3
2
ID3000
LF:01
JO:02
E.05
2000
LF:07
NEW METAL LOCKABLE STATIONARY CABINET WITH TWO DOORS.
1
230
1070
JO:03
JO:03
KITCHEN
ID5300
LF:06
BUILDER TO ALLOW FOR CO-ORDINATION & INSTALLATION OF ALL EQUIPMENTS SUPPLIED BY CLIENT
LF:02
LF:01
2
LF:01
PHOTOCOPIER TO BE PROVIDED BY THE OWNER
LF:03
JO:01
JO:01
OFFICE
3138
2714
2000
1003
GENERAL NOTES E.04
ID3000
1
504
JO:02
FRIDGE TO BE PROVIDED BY THE OWNER
590
2230
1403
1
DR 05
594
ID3001
256
1
ID5300
JO:01
ID5100
JOINERY TO ENSURE STRUCTURAL INTEGRITY OF ALL JOINERY.
TV IS PROVIDED BY THE OWNER
3
2660
JOINERY NOTES
JO:01
2
ID5300
1810
602
LF:04
DR 04
450
LF:05
2420
1562
1043
2607
PROVIDE ADEQUATE SKIRTING CLEARANCE AT ALL EXISTING BUILDING WALLS. 1944
199
901
900
1500
744
441
490
540
2229
01 2200
GENERAL ARRANGEMENT PLAN SCALE: 1:100
PROVIDE ADEQUATE CABLE ACCESS TO ALL ELECTRICAL UNITS & AREAS INCLUDING CABLE ACCESS COVERS.
3141
3541
401
1475
900
210 123
1080
890
610
458
458
870
600
125
SINGLE DISHWASHER TALL DD60SDFTX7
486 384 236 1400
ALLEGRO CERAMIC TILES 300mmX300mm FINISH FOR THE BENCHTOP
E.02
PULL TYPE STORAGE DOOR KNOB
329
MICROWAVE TO BE PROVIDED BY THE OWNER
954
SATIN LIMESTONE CERAMIC TILES 300mmX300mm
E.01
1695
840
E.03
FRIDGE TO BE PROVIDED BY THE OWNER
OVERHEAD SHELVING MADE OUT OF MDF SHEET
486
"BLACKBUTT" LAMINEX TIMBER VENEER FOR STORAGE
705
"BLACKBUTT" LAMINEX TIMBER VENEER FOR STORAGE
385
540
WHITE MATT LAMINATES WALL CABINET WITH 300MM DEPTH
1501
434
1499
E.03
100
DR
02 ID7003
01
KITCHEN ELEVATION
ID3000
02 SCALE: 1/50
ID3000
MAGNETIC WHITEBOARD 600mmX450mm
STORE ROOM ELEVATION
SCALE: 1/50
MITSUBISHI 8.0 KW REVERSE CYCLE INVERTERSPLIT SYSTEM AIR CONDITIONER
METER BOARD
720
140
299
538
278
200
3750
486
486
141
HEXAGONAL DESIGN PINBOARD WITH SAND AND NAVY BLUE COLOUR
900
900 255
10MM MDF SHEET AS THE SEATING BASE
03 ID3000
OFFICE ELEVATION
1000
1200
SEATING FILL WITH POLYUTHREANE FOAM
743
OFFICE CHAIR FROM DEST3000 WITH ALUMINIUM WITH BLACK LACQUER FINISH.
688
425 NARROW LINE ALUMINIUM FRAME DOUBLE GLAZED WINDOW
SINGLE GLAZED AWNING WINDOW WITH CAPRAL ALUMINIUM FRAME
OFFICE DESK FROM ZUSTER WITH WOODEN TIMBER BLACK COLOUR FINISH.
626
614
2
ID5100
04 SCALE: 1/50
ID3000
STORE ROOM ELEVATION
SCALE: 1/50
1
ID5100
ADJUSTABLE SUSPENSION ROD-CONCRETE (RONDO 547 SERIES)
SINGLE-SIDED- PARTITION / FR L 120/120/120 WITH CSR055 FROM FLOOR TO CEILING. DESCRIPTION:SINGLE PLASTERBOARD LINING TO EACH SIDE OF THE STUDWORK.
DESCRIPTION: SINGLE-SIDED-PARTITION LINING TO EACH SIDE OF THE STUDWORK FROM FLOOR TO CEILING EXPRESS JOINT TO THE EXISTING WALL.
16mm GYPROCK PLASTERBOARD GYPROCK TRIO CORNICE
16mmGYPROCK PLASTERBOARD
75MM GLASSWOOL PARTITION WITH RN45 RATING
STUDWORK: PROPRIET Y STEE L STUD FRAMING 90MM WIDE LIPPED X 0.75 GA LVANIZED STEEL FRAMING AT 600MM MAX CENTERS
16mm GYPROCK PLASTERBOARD
INSUL ATION: ACOUSTIC INSUL ATION BETWEEN THE STUD SYSTEM WITH 75 GLASS WOOL PARTITION FOR ACOUSTIC SYSTEM WITH RN 45 R ATING.
GYPROCK TRIO CORNICE
INSULATION: NIL
EXISTING BRICK WALL
LINING: 13mm GYPROCK SOUNDCHECK PLASTERBOARD. SKIRTING: TIMBER SKIRTING 180mmx25mm WITH WHITE PAINT FINISH FINISH: THREE COAT PAINT SYSTEM ON TOP OF THE PLASTERBOARD.
LINING: 16mm GYPROCK F RYCHEK PLASTERBOARD WITH CSR055. SKIRTING: TIMBER SKI RTING 180mmx25mm WITH WHITE PAINT FINISH
STUDWORK: RONDO 155 EXPRESS JOINT FURRING CHANNEL FRAMING 48MM WIDE WITH A 10mm WIDE CENTRAL STRIP AT 600MM MAX CENTERS
1 ID5101 13mm GYPROCK SOUNDCHECK PLASTERBOARD
155 RONDO SERIES-WIDE FURRING CHANNEL WITH 10MM EXPRESS JOINT
TIMBER SKIRTING 180mmX25mm WTIH WHITE PAINT FINISH SELECTED FLOOR FINISH TIMBER SKIRTING 180mmX25mm WTIH WHITE PAINT FINISH SELECTED FLOOR FINISH LEVELLING COMPOUND AS REQUIRED
1
PARTITION TYPE 01
ID5000
COPYRIGHT
2
CONSTRUCTOR NOTES
PARTITION TYPE 02
ID5000
SCALE: 1/10
KANADI design
SCALE: 1/10
MONASH UNIVERSITY, BUILDING CONSTRUCTION C Partition Types (section Detail)
RTIST
CK
8 OCT 2013
1:10
ID5100
09.
5.
OTHER ARTS
Ceryle Kanadi. Tunnel going up to the centre. 10 April 2015. Digital collage, Fineliner 0.4, Scanner. 420x297mm.
Ceryle Kanadi. Waltz impression. 12March2015. Paper print, pasteboard, tracing paper, glue, double tap, fineliner pen. 420 x 594 mm.
Ceryle Kanadi. Tunnel going up to the center. 10 April Ceryle Kanadi. Tunnel going to the 2015. Digital collage, Fineliner 0.4up , glue, Scanner. centre. 10 April 2015. Digital collage, 420x297mm Fineliner 0.4, Scanner. 420x297mm.
Ceryle Kanadi. Dam. 10DAM April 2015. Digital collage, 10 Ceryle Kanadi. interpretation. Fineliner 0.4 ,pencil, glue, Scanner. 420x297mm
April 2015. Digital collage, pencil, tracing paper, fineliner. 420x297mm.
Ceryle Kanadi. Waltz Impression. 12 March 2015. Paper pencil, plaster board, tracing paper, double tape, fineliner paper. 420x594mm
BY: Jennifer Chung CHORUS: I remember all the times that I had spent with my friends Taking BART to San Francisco just for 350 cents Talking, laughing, joking, didn't quite know what was to come Years of memories, irreplaceable fun I remember telling mom that I'd make her proud one day She would smile and knew exactly all the right things to say
Ceryle Kanadi. Lyrics of Common, Simple, Beautiful. 11 April 2014. Bread, Nutella, Pocky, Chocolate, Dry peanut, Nori, Ritz, Banana, Broccoli, Mushroom, Cream Cheese. 420x297mm.
Ceryle Kanadi. Blue Collection. 12 March 2017. Paper, pencil, copic marker, watercolour, fineliner.
Ceryle Kanadi. Water Colour. 12 March 2017. Paper, pencil, copic marker, watercolour, fineliner.
10.
PROFESSIONAL WORKS
sketches during internship
render interior for tropical contemporary modern living room