s a a c C h i n g F u n g
BORN > 11-01-1996 / HKSAR / CHINA (CN)
CONTACT > 07491495760
E-MAIL > cfung.isaac@gmail.com
ADDRESS > Flat 50 / Gosse Court / 19 Downham Road / London /
N1 5BF
VISA > BNO visa (with full right to work)
EDUCATION
2020-2023
2017(Jan-Apr)
2014-2018
AWARDS
2016-2017
2016-2017
2015-2016
2014-2015 PRACTICE
> Architectural Association School of Architecture / Diploma (ARB Part 2)
> University College of Dublin / Exchange Engineering & Architecture
> University of Nottingham, Ningbo China / BEng (Hons) Architecture / 2:1
AWARDS
> Head’s Scholarship (top 10% in Architecture)
> UNNC DABE Award for the Best Design Portfolio (Part 1)
> Head’s Scholarship (top 10% in Architecture)
> Provost’s Scholarship (top 1.5% in Architecture & Built Environment school)
Academic Projects w/ Revit / Enscape / Lumion
QUARANTINE
1500 ppl collective quarantine camp in Hong Kong
Spring 2021 (Revit)
SUNSHINE
80 ppl Residency in Dublin urban context
Spring 2017 (Revit)
Another London
Under-Bridge / Sound Journey Museum of London underground 2022 (Enscape + Lumion)
> Benoy / London Studio / as Architectural Assistant Projects >>>
>Mall of Saudi / RIBA Stage 1-4
> VTN Architects / Vietnam / Vo Trong Nghĩa Projects >>>
> Japanese Language school, Ho Chi Minh City / RIBA Stage 4
> Residence Villa, Hoi An / RIBA Stage 4
> EVA Architects / Chi Chi SO & Alan WANG / as Architectural Assistant Projects >>>
> Star America Kindergarten, Shanghai / RIBA Stage 1-4
> RETTIG Office Building Renovation, Yangzhou / RIBA Stage 1
> Vestibule Addition Project, British International School Shanghai / RIBA Stage 1
> Cummins Beijing Yizhong office / RIBA Stage 1
> Lucton School Shanghai / RIBA Stage 1-4, 6-7
Website Reference >>>
> https://www.evaarchitects.com/
SKILLS
Frequent Use
Revit / Enscape / Lumion / AutoCAD / Rhino / Adobe Photoshop / InDesign / Illustrator / Physical Models
LANGUAGES
> English (Fluent)
Knowledge of ArchiCAD / Grasshopper / Sketchup / Adobe Premiere / Final Cut Pro
> Chinese (Fluent in Writing) / Fluent in Mandarin / Native in Cantonese
PRACTICE Projects involved in companies
Summer 2022 (not yet publish)
2017 / 18 (Revit)
2019 (Revit)
Individual Project 2020 (Revit)
Academic Projects represent me
(NON)PARK 2023
scheme & prototype that helps HK citizens to establish a truly public space by occupying slope
CIRCLE 2018
40000 m2 urban planning in China urban context
INNER
Archive + Ashram
+ C O N T E N T +
+
+
(Rejoin the team after finishing bachelor study)
2022 Jun Sep 2019 2017 / 2018-2019
I
+ Collective Quarantine Holiday
1500 ppl quarantine camp in Hong Kong
Spring 2021
Tutor: Brendon Carlin, James Kwang-Ho Chung
Pandemic measures and quarantine in Hong Kong have long been a strategy of colonisation, production, and control and have shaped the form of the city and buildings. By equal measure spaces of leisure, holiday camps and entertainment have become an increasingly important counterbalance and distraction to imposed division, confinement and imposed order. Rather than naively resisting these unstoppable tendencies might the architectures of quarantine and leisure be reorganised in such a way as to open up experiments with forms of social life?
The combination of densely packed leisure landscape, self tight living units and ambiguous occupiable strip created a new form of leisure for residence to purely engage with, without any means of working and GDP. The extremity of the super strict segregation and extreme amount leisure, might lead the population to fully depend on leisure and get used to even when they finish the holiday, which, might create Potential disruption to the colonial power
+ Nihilist
+ Collective Quarantine Holiday
+ Leisure & Occupiable Strip
+ Leisure & Occupiable Strip
+ Living Units & Leisure on ground
+ Living Units above
+ S U N S H I N E
80 ppl Residency in urban context
Spring 2017
Tutor: Marcus Donagphy
+ LIVING
As share living style is a hot topic recently, not only price is being discussed on the table but also the quality, the flexibility and the sustainability of the society. The impact of share living housing building no longer only affects the residency when such building type has already been isolated from normal residency to form a new typology.
The site is located in Dublin, Ireland. The site is originally a glass factory at sea shore. With operating into 70 individual sites, the class creates a big puzzle that fill this empty slot. With its typography, the site creates a high risk in terms of flooding. Another problem the project is facing is how to deal with the
+ Another London
Under bridge / sound journey Museum of London Spring 2022
Tutor: Shin Egashira
+ Constantly Changing London
Historical events recording has been focusing on visual through out the past of London. As the museum of London, a institution who record history, is moving to Smithfield Market, where historical events was recorded in space, material, architecture, it created a perfect opportunity to emphasise the importance of sound in terms of recording the present.
The proposal of a new section in the Museum of London aim to archive the void and occupied; noise and silence; demolished, present and future of the London; while the underground void, excess, leftover, become a under bridge to restore the original soundscape of the area which being overlapped, destroyed by the development of the museum, the new station, and the development of the modernity.
https://youtu.be/OXCeiJx41tM
+ Under-bridge / with Museum of London above
+ Animated soundscape journey
Collaboration Project
Projects involved in company (All Revit)
Benoy, London (2022 summer)
Mall of Saudi (stage 1-4)
EVA Architects, Shanghai (2017-2019)
German Brand’s Office Building Renovation, Yangzhou American Brand’s Exhibition Area & office, Chongqing American Brand’s Office Block & exhibition area, Beijing British boarding school, Shanghai
VTN Architects, Ho Chi Minh City (2019)
Residence Villa, Hoi An Japanese Language school, Ho Chi Minh City
Individual Project 2020 (Revit)
Boutique, Shanghai
+ PRACTICE
+Mall of Saudi (RIBA Stage 1-4)
+Part i mainly worked on
design the sunken garden and modify the design to fulfil structural consultant, fire safety consultant and client’s requirement & advices
SERVICE ROAD EXIT ROUTE 4mm MPP MQQ SEP-49 Fan room E106 E107 Changing Changing E114 Reception Valet Drivers Facilities VIP Lounge E104 Passenger BOH Stairs Passenger KS316 Lobby Storage Passenger Passenger REFER DRAWING KSA101001-BNY-MAL-SEP-AR-PLN-BSM-201B01 South Basement Level Sector SCHEMATIC DESIGN - -MPP MQQ PL091 LV TX EMOB IDF PL094 South Basement Level Sector SCHEMATIC DESIGN - -GA South Basement Level Sector M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 MFF MGG MJJ MLL M29' Management Garbage Loading Deck BOH Stairs SEP-55 BOH ELEC Service REFER TO DRAWING KSA101001-BNY-MAL-SEP-AR-PLN-BSM-201B03 SLOPE 12% SCHEMATIC DESIGN - -Scale: GA South Basement Level Sector
LAYOUT PLAN FOR LEVEL 1 FACADE FORMATION THE SUBJECT SITE THE ARCHITECTURAL MASSING IMPOSE OPENINGS SUN SHADING DEVICE CURTAIN WALL INTEGRATION SPACES ALLOCATION + GOUND FLOOR LOBBY + SECOND FLOOR OPEN OFFICE + THIRD FLOOR SHOWROOM + THIRD FLOOR SPECIALISED DEMO + CENTRAL LIGHT WELL + RECEPTION SANDSTONE TILE as Lobby finishing GREY TILE as floor finishing BRUSHED STAIN reception desk + DISPLAY AREA CONCRETE FINISHING as to show the rawness + WASHED METAL as Industrial Design SOUND ABSORBING BOARD + SOUNDPROOFING SOLUTION Sound-proofing solution applied to wall andceiling Display area in order the soundof the exhibiting away from other quite example offices above SCHEMATIC LAYOUT PLAN – 3F 3F ASSEMBLY HALL ATRIUM
+German Brand’s Office Building Renovation, Yangzhou (RIBA Stage 1)
+American Brand’s Office Block, Beijing (RIBA Stage 1-4)
+ American Brand’s Exhibition Area & office, Chongqing (RIBA Stage 1)
+
+
+ SITE PLAN + BLOCK C SECTION + DETAIL DRAWING Bedroom 3/ P.Ngủ3 3.390 B-02 B-02 Bedroom P.Ngủ2 Wc Bedroom 1/ P.Ngủ1 P.Khách Bếp Ăn/ Living T-03 Storage/Kho T-02 F-04 Mặt bằng định vịnội thất tầng -TL 50 1St floor furniture position plan Mặt bằng định vịnội thất Trệt -TL Ground floor furniture position planMẶT BẰNG HIỆUHIỆU TÊN GỌI (WxLxH) SỐLƯỢNG (bộ) ĐỨNG Giường tủđầu giường Tủ870x440x450 Giường tủđầu giường Tủ1350x440x450 bộ Tầng floorHIỆU NOTATION VỊTRÍ VẬT LIỆU SỐLƯỢNG (bộ) QUANTITY (set) Tủquần áo Gỗ Tủquần GỗHIỆU SỐLƯỢNG (bộ) QUANTITY (set) Gỗ, vãi Tầng trệt/ Ground floor Tầng floor Tủđầu giường Tầng floor Giường 1200x2600x750 +
EXTERIOR PHOTOSHOT
INTERIOR PHOTOSHOT
British boarding school, Shanghai (RIBA Stage 1-4 6-7) + Residence Villa, Hoi An
+ Japanese Language school, Ho Chi Minh City (RIBA Stage 1-4)
+ Boutique, Shanghai (RIBA Stage 1-7)
Individual Project 2020 (Revit)
F03 F02 F05 F04 F01 02 03 04 04 02 03 01 01 02 03 02 02 02 01 02 03 01 02 04 04 02 02 05 01 05 0 01 01 01 05 05 02 02 02 02 02 02 0 0 05 0
Academic Projects represent me
(NON)PARK 2023
scheme & prototype that helps HK citizens to establish a truly public space by occupying slope
CIRCLE 2018
40000 m2 urban planning in China urban context
INNER
Archive + Ashram
+
(non)Park
scheme & prototype that helps HK citizens to establish a truly public space by occupying slope, Hong Kong Spring 2023
Tutor: Merve Anil and George Massoud
+ Right to the City
The (non)park, tool to provide Hong Kong citizens ‘the right to the city’, is a scheme & prototype that helps establish a truly public space through acquiring underperform privatised lands, using landslide protection as cover.
By reading power through government owned and funded parks, the thesis argues that colonial powers, whether Britain or China, have always used the public parks as tool to colonise culture and identity on Hong Kong.
The project, is a park by Hong Kong and for Hong Kong, that questions the true form of public space which allows Hong Kong identity to emerge through its occupation. The project proposed strips of minimum infrastructure that hold voids in between. And the naturally formed Bamboo forest in the framed void, became a tool for the community to shape their ideal form of public space, that are free from the surveillance and control.
+
+ To Inhabit
+ To Occupy
+ C I R C L E
40000 m² urban planning in urban context Summer 2017
Tutor: Hiroyuki Shinohara
+ ANTI URBANISATION
Urban Village is no longer a new terminology, but in fact, the phenomenal existence of such urban fabric only happened in the recent era. Urban Village, or Village in City, refers to the the spatial urban-phenomenal existence of a rural village surrounded by newly developed urban land during top down development and transformation of a city (Zhou, 2014). The cause of the phenomenon can be categorised into two main reasons. The first reason is economical incentives, i.e. overspeed development where development of fabric unable to catch up with the economical development. The second reason is historical protection measure by the government (Zhou, 2014). The existence of such unique urban fabric had created several negative impact to the local government and also the development of the city. Low city image can be brought by non-hygienic environment, and economic barrier can be created by the constrain of land use for further development.
As the site is located in the urban village, the URBAN PLANNING project aim to stand against the urbanisation that going to immerse and engulf the city’s origin, city’s culture by showing the strong manifesto of protest. The project created a megastructure, visually disconnecting the set from the urbanised surrounding, while introducing different interaction between people to weaken the solid separation.
40000 m² urban planning in urban context
Summer 2017
Tutor: Hiroyuki Shinohara
Team member: Yang ZHANG + PRESENTATION
/1
/1
Nolli Map
Masterplan
The new Nolli Map after intervention is being created to demonstrated the circulation flow of the site after CLEANS UP. Some of the illegal building is demolished and the structure of the road system is now more clear with public to semi private to private road. Some of the open spaces are also being provided to create opportunities for outdoor activities
The new Masterplan after intervention is being created to demonstrated the circulation flow of the site after CLEANS UP. Some of the illegal building is demolished and the structure of the road system is now more clear with public to semi private to private road. Some of the open also being provided to create opportunities for outdoor activities
/2
Sections of the wall +
Criteria & Sections
+ GC4.3
+ C I R C L E
/1 Masterplan
Abstract Ceremonial Journey is important according to the previous research on ashram. The collage drawing of the space was then created by following the abstract form of the ashram, a main journey and other supporting facilities. In order to maximise the symbolism meaning of the ceremonial perception, the functions are being completely isolated form the Journey. In other words, the journey only serves as the journey only. The drawing illustrated the journey on top, with curve element , and the supporting facilities underneath. This does not decrepit the for but only the program relationship.