Case Study: Collaborative Design Using Digital Modeling

Page 1

Collaborative Design Using Digital Modeling Title client

location date


Rapid Prototyping Rapid prototyping is our unique approach for developing many different ideas very early in the process and using those alternative ideas to inform the design. In conjunction with other brainstorming techniques, we use this process with the project stakeholders, who become active participants in the design, rather than passive observers of its results.

Model the program brief space requirements

Organize by critical adjacencies

We use 3D computer modeling and traditional hand sketching as the primary tools for facilitating this process because they allow us to quickly generate variations and evaluate alternatives from different perspectives. These services can be provided in a cost-effective manner and generally save significant dollars during construction.

Define larger space groupings

Š2012 CH2M HILL Confidential and Proprietary

IAT041312202212PGH

Page | 2


Because new ideas tend to flow from old ones, we look at variations by quickly developing each idea in a simplified 3D model. These sessions are very effective at engaging the users, and work that requires weeks in traditional design can often be accomplished in a two or three hour session. Since the users are engaged, the solutions that come out of the process have immediate buy in, and consensus among a diverse group of stakeholders is usually achieved early, making the entire design process more efficient.

Examine and Refine Multiple Conceptual Designs

Options for overall building organization

Start with concept client used to get board approval for the project

Š2012 CH2M HILL Confidential and Proprietary

IAT041312202212PGH

Page | 3


Atrium as hub to link labs, offices and pilot plant

Closer adjacency with administration facility

Lab/office building organized as a long linear slab

Stack labs and offices over the pilot plant

Rotate facility to open views from existing building

Labs and offices sandwiched between manufacturing and pilot plant

Š2012 CH2M HILL Confidential and Proprietary

IAT041312202212PGH

Page | 4


“L” shaped office/lab wing

“T” shaped lab/office wing

Rotate office/lab wing

Combine “L” shape with rotation and incorporate atrium as circulation hub

Approved scheme combines best features of multiple schemes

©2012 CH2M HILL Confidential and Proprietary

IAT041312202212PGH

Page | 5


Plan for the Space at Hand

Interactive planning of individual lab groups

Use planning module, casework and equipment ‘kit of parts’

Synergies between spaces led to efficiency and area reduction

Stacking options: combine detail lab layouts with office plans

©2012 CH2M HILL Confidential and Proprietary

IAT041312202212PGH

Page | 6


Examine the Envelope

Study building envelope: branding, blending with existing

Š2012 CH2M HILL Confidential and Proprietary

IAT041312202212PGH

Page | 7


Make the Most of Daylight and Views

Maximize daylight & views while controlling heat gain & solar glare

Š2012 CH2M HILL Confidential and Proprietary

IAT041312202212PGH

Page | 8


Determine the Best Options

Combine best features into three preferred options

Š2012 CH2M HILL Confidential and Proprietary

IAT041312202212PGH

Page | 9


Finalize the Design

Approved exterior concept

Concept for interior atrium

Š2012 CH2M HILL Confidential and Proprietary

IAT041312202212PGH

Page | 10


Final concept design: 3 weeks of interactive meetings over a 5-week period

Final design concept

Š2012 CH2M HILL Confidential and Proprietary

IAT041312202212PGH

Page | 11


About CH2M HILL Headquartered near Denver, Colorado, USA, employee-owned CH2M HILL is a global leader in full-service consulting, design, design-build, operations, and program management for public and private clients. With US$6.4 billion in revenue and nearly 30,000 employees worldwide, CH2M HILL delivers innovative, practical, sustainable solutions—helping clients develop and manage infrastructure and facilities that improve efficiency, safety, and quality of life. The firm has long been recognized as a most-admired company and leading employer. CH2M HILL is an industry-leading program management, construction management, and design firm as ranked by Engineering News-Record (2011).

Global Headquarters 9191 South Jamaica Street Englewood, CO 80112 USA Toll-free: 888.CH2M.HILL Tel: +303.771.0900 Fax: +720.286.9250

www.ch2mhill.com

Š2012 CH2M HILL IAT041312202212PGH


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.