Professional Consultation Report Study to Evaluate Utility Tunnels
Empire State Plaza Albany, NY
Project No. SE332
prepared for
Office of General Services prepared by
Thien Win, PE Senior Project Manager Elisabeth Bakker Johnson, AIA, NY CEO Senior Project Manager CHA Consulting Inc. OGS Project Manager: Justin Brennan, PE May 17, 2024
KATHY C. HOCHUL
JEANETTE M. MOY
Governor
OGS Commissioner
PROFESSIONAL CONSULTATION REPORT Project Number SE332 Study to Evaluate Utility Tunnels Empire State Plaza Albany, NY 12242
May 17, 2024
TABLE OF CONTENTS PROJECT INTENT:............................................................................................................................................... 2 EXECUTIVE SUMMARY: ................................................................................................................................... 2 PROJECT HISTORY: ............................................................................................................................................ 5 ORIENTATION MEETING / FIELD SURVEY: .................................................................................................... 5 FINDINGS:............................................................................................................................................................ 6 STRUCTURAL: ............................................................................................................................................. 9 MECHANICAL: .......................................................................................................................................... 25 ELECTRICAL:............................................................................................................................................. 28 ENVIRONMENTAL: ................................................................................................................................... 31 RECOMMENDED SCOPE OF WORK:............................................................................................................... 32 STRUCTURAL: ........................................................................................................................................... 32 MECHANICAL: .......................................................................................................................................... 33 ELECTRICAL:............................................................................................................................................. 34 ENVIRONMENTAL: ................................................................................................................................... 34 PHASING / PROJECT GROUPING: ................................................................................................................... 35 KEY ISSUES AND ISSUES TO BE RESOLVED:............................................................................................... 36 ESTIMATE: ........................................................................................................................................................ 38 ESTIMATE OF FEES FOR PROFESSIONAL SERVICES: ................................................................................. 39 APPENDIX: ........................................................................................................................................................ 39 Appendix 1: Cost Estimate ............................................................................................................................ 40 Appendix 2: Structural Detailed Findings .................................................................................................... 249 Appendix 3: Mechanical Detailed Findings ................................................................................................. 508 Appendix 4: Electrical Detailed Findings .................................................................................................... 555 Appendix 5: Limited Survey for ACM’s and PCB’s Report ......................................................................... 605 Appendix 6: Initial Site Visit Minutes ......................................................................................................... 755
Project No. SE332
-2-
May 17, 2024
PROJECT INTENT: The client Request for Services, as stated on OGS Service Request SR000285: “Perform a comprehensive study and provide a Program Assessment Report on the utility tunnels structural condition. The utility tunnels included in this request are the entirety of the tunnels that loop under and around the 99-Acre Empire State Plaza. This tunnel system includes but is not limited to the following segments: - The Upper Tunnel Areas - The North Tunnel to Steam Plant - The River Tunnel to the East Side Organize the study by tunnel segments and provide recommendations in order to mitigate immediate risk areas for manageable associated project phasing. Include, as areas of investigation, the following: Water permeation damage; Stanchion and Bracing Degradation; Pipe Insulation; Piping Integrity; Piping Coating and Painting; Piping Identification; Electrical Assessment; Abatement Opportunities; The report should construct a narrative that prioritizes the short and long-term actions required, the itemized costs of the recommended actions, and consider the short-term safety and long-term functional viability of the tunnels.” EXECUTIVE SUMMARY: The ninety-nine-acre Governor Nelson A. Rockefeller Empire State Plaza consists of ten separate buildings that are integral to an 11th building, the platform. Construction of the Empire State Plaza began in 1966 and continued until the completion of the final structure in 1977. Below the lowest level of the underground parking garages lies an enormous labyrinth of mechanical tunnels, chases and other passages of utility conveyance which are the life’s blood of the Empire State Plaza’s operations. With the completion of the utilities very early on in the complex’s construction, by the time it was fully completed in 1977, some of the installed technology was already outdated. In the forty-seven years since then, continued minor and major repairs of outdated and aging infrastructure have been consistently undertaken to maintain the safety and integrity of the entire system, but OGS has requested that a more systematic prioritized analysis be undertaken to inform future manageable short-term and long-term project planning. One step toward that end was OGS Project SE134 – Provide Lower Levels Infrastructure Master Plan – that was completed in 2023 which studied the Mechanical and Electrical Rooms (MERs). The objective of this Program Assessment Report is for the design team to perform a comprehensive study of the utility tunnels servicing the Empire State Plaza and provide a written report to address the existing deficiencies and provide recommendations on the following utility tunnel systems: • • • •
Architectural/Structural Mechanical/Plumbing Electrical Environmental
The utility tunnels included in this request are the entirety of the tunnels that loop under and around the 99Acre Empire State Plaza. The utility tunnels are approximately 8,300 linear feet. The design team has defined the “hot tunnel” as the 2,300 linear feet of tunnel from Sheridan Avenue to the Chiller Plant. The remaining 6,000 feet south of Chiller Plant to the Cultural Center has been designated as the “cold tunnel” (See Figure 1). Excluded from this report are the previously evaluated MERs, and the Alfred E. Smith Building to Capitol combined Pedestrian/Utility Tunnel that is being studied under Project SF238. The “hot tunnel” is defined as the 2,300 linear feet of tunnel from boiler plant on Sheridan Avenue to the Chiller Plant. The hot tunnel is a narrow, but walkable pathway that allows steam piping and other utilities to pass from the Steam Plant to the Chiller Plant. The steam is used for both heating and cooling in campus operation. The “cold tunnel” is defined as the 6,000 feet south of the Chiller Plant to the Cultural Center. The cold tunnel is an open, cavernous loop with main entrances located underneath the Chiller Plant. The cold tunnels
Project No. SE332
-3-
May 17, 2024
is a pathway for domestic water, chilled water, condenser water and other utilities to traverse around the campus.
STEAM PLANT
CHILLER PLANT
Figure 1: Tunnel System
Project No. SE332
-4-
May 17, 2024
The site surveys and Program Assessment Report were organized by tunnel segments (approximately every 50 feet) and provide recommendations to mitigate immediate risk areas for manageable associated project phasing. The report constructs a narrative that prioritizes the short- and long-term actions required, the itemized costs of the recommended actions, and consider the short-term safety and long-term functional viability of the tunnels. The team categorized each observed deficiency based on the following priority definition. • • •
Priority 1: Most Serious Priority – Must be repaired/replaced immediately. Priority 2: Medium-Level Priority – Must be addressed within the next 3-5 years. Priority 3: Low-Level Priority – Must be addressed within the next 5-10 years. Discipline Structural Mechanical Electrical
Priority Level Quantity of Deficiencies Priority 1 Priority 2 Priority 3 579 1,001 905 44 43 9 46 Table 1: Priority Findings Summary
The majority of the deficiencies observed were structural in nature. These deficiencies include spalls, cracks, efflorescence and general deterioration of concrete and steel support members for utilities and general tunnel structure. There was evidence of high exposure to moisture and water in portions of the tunnels which left the concrete and steel in that respective section in poor condition. In other instances, poor craftsmanship led to incomplete attachments and/or non-finished repairs. Other deficiencies include deterioration of mechanical insulation and jacketing as well as deterioration of electrical appurtenances such as junction boxes and outlets. Some of these deficiencies can be attributed to the same exposure to high moisture as well as lack of care during maintenance/construction in the tunnels. The limited hazardous materials survey identified asbestos-containing materials (ACM’s) from the samples collected and tested. In addition, lead-based paint, and polychlorinated biphenyls (PCB’s) were also identified in the samples collected. ACM’s within the cold tunnel include pipe insulation and plaster fitting insulation on HPS and CPD pipes throughout all sections; plaster fitting insulation on 20” PCHWR pipes within segments 76-82; plaster fitting insulation on 2” water line intermittently within sections 39-82; and overhead duct sealant on the landing within segments 14 and 15. ACM’s within the hot tunnels include pipe insulation on the G-Line, F-Line, and CPD pipes within sections 30003024; pipe insulation on CHWR and CHWS pipes within sections 3016-3024; plaster pipe fitting insulation on 4” overhead pipes within 3004-3015; plaster pipe fitting insulation on CHWR and CHWS pipes within sections 30163019; and black pipe sealant on wall penetration within section 3028. LBP’s are consistent throughout all tunnel sections and include yellow handrail paint and dull grey paint on valving. LCP’s are also consistent throughout all tunnel sections and include green paint on fiberglass paper jackets and, green paint on “Y” valves, blue paint on pipe insulation jackets, orange paint on pipe insulation jackets, and grey paint on doors. No PCB-containing caulks or sealants were identified through analysis.
The design team’s recommendations include grouping segments into larger sections and addressing the deficiencies found in that section. Each section consists of 10 segments. These sections could be treated as separate projects or further combined to create larger remediation projects. Remediation recommendations include cleaning and restoring damaged concrete and steel and applying corrosion inhibitors. Other
Project No. SE332
-5-
May 17, 2024
recommendations include replacing electrical and mechanical appurtenances that have become damaged or corroded. The cost estimate dated May 8, 2024, is $50,000,000. A summary table breaking down the cost estimate per work zone and priority is located in the report. PROJECT HISTORY: In 2023, an intensive study of the Mechanical and Electrical Rooms (MERs) was undertaken under OGS project SE134 – Provide Lower Levels Infrastructure Master Plan. The intent of project SE134 was to identify structural, mechanical, plumbing, and electrical items in need of repair and/or replacement in the MERs. No other comprehensive surveys have been performed until now. ORIENTATION MEETING / FIELD SURVEY: On April 4, 2023, an Introduction Meeting was held at the Empire State Plaza to discuss the scope of work for this project with a preliminary tour of the Scope of Work area. The following persons were present: Mike Hamilton John Lyon Elisabeth Bakker Johnson Narcyz Drzymalski
OGS RPF&M, Project Manager OGS D&C, Project Manager CHA, Senior Project Manager CHA, Senior Engineer
On April 25,2023, an Orientation Meeting was held at the Empire State Plaza to discuss the scope of work for this project, tour of the Scope of Work area and discussion of potential execution, access, and protocols. The following persons were present: Mike Hamilton John Lyon Don Bugbee Ray Sowalski Thien Win Elisabeth Bakker Johnson Lucas Boyer Austin Roggen
OGS, Project Manager OGS D&C, Project Manager OGS D&C, Region 4 CEO OGS D&C, Engineer CHA, Senior Project Manager CHA, Senior Project Manager Colliers, 3D Scanning MTI, 3D Scanning
Prior to the start of the field work, an onsite kick-off meeting was held on December 8, 2023, to discuss site access, security protocols, and safety. The following persons were present: John Lyon Don Bugbee Thien Win Elisabeth Bakker Johnson Lucas Boyer Austin Roggen
OGS D&C, Project Manager OGS D&C, Region 4 CEO CHA, Senior Project Manager CHA, Senior Project Manager Colliers, 3D Scanning MTI, 3D Scanning
The design team continued their site survey investigation from January 17 thru February 17, 2024. The following persons were present during these scheduled field surveys. Thien Win Daniel Olsted Alec O’Hara
CHA, Senior Project Manager CHA, Structural CHA, Structural
Project No. SE332
Peter Schwartz Tarik Zayer Aaron Smith Emily Shields James Morey Robert Burbank Andrew Petrilli Lucas Boyer Logan Mather Jason Swett Austin Roggen Hunter Beaulieu
-6-
May 17, 2024
CHA, Structural CHA, Structural CHA, Mechanical CHA, Electrical CHA, Environmental CHA, Environmental CHA, Environmental Colliers, 3D Scanning Colliers, 3D Scanning Colliers, 3D Scanning MTI, 3D Scanning MTI, 3D Scanning
FINDINGS: For the team to accurately survey the existing conditions of the tunnels and convey the location of findings to OGS, it was decided to scan the tunnels to generate a 3-dimensional map rendering. This provides a map for the team to locate the identified deficiencies and to inform future project planning and repairs. In addition, a data collection tool was utilized to link any found deficiency with its location. The technologies used to scan and generate this 3D map of the tunnels as well as collect data include the following: • • • • •
Leica RTC 360 Terrestrial Laser Scanner Trimble X7 3D Laser Scanning System NavVis VLX Mobile Mapping System ArchGIS Fulcrum
Utilizing the gathered information from the site surveys, this report aims to address the observed deficiencies and provides recommendations for remediation. Each assessment deficiency/recommendation will be categorized in three distinct ways: • • •
Priority 1: Most Serious Priority – Must be repaired/replaced immediately. Priority 2: Medium-Level Priority – Must be addressed within the next 3-5 years. Priority 3: Low-Level Priority – Must be addressed within the next 5-10 years.
For reporting purposes, the tunnel system was subdivided into 50 linear feet sections. In each section, the design team evaluated the structural, mechanical, electrical, and hazardous materials separately. A summary of each respective discipline’s findings can be found in the following sections with the detailed findings in the corresponding Appendices. The “hot tunnel” is defined as the 2,300 linear feet of tunnel from boiler plant on Sheridan Avenue to the Chiller Plant. The hot tunnel is a narrow, but walkable pathway that allows steam piping and other utilities to pass from the Steam Plant to the Chiller Plant. The steam is used for both heating and cooling in campus operation. The “cold tunnel” is defined as the 6,000 feet south of the Chiller Plant to the Cultural Center. The cold tunnel is an open, cavernous loop with main entrances located underneath the Chiller Plant. The cold tunnels is a pathway for domestic water, chilled water, condenser water and other utilities to traverse around the campus.
Project No. SE332
-7-
Please see Key Maps in Figures 2 & 3 for identification of referenced locations.
Figure 2: Cold Tunnel Key Map
May 17, 2024
Project No. SE332
-8-
Figure 3: Hot Tunnel Key Map
May 17, 2024
Project No. SE332
-9-
May 17, 2024
STRUCTURAL: There were (579) Priority 1 conditions, (1,001) Priority 2 conditions, and (905) Priority 3 conditions noted during this survey. The following table summarizes the structural findings. PRIORITY LEVEL Priority 1
# OF INSTANCES 579
CONDITIONS OBSERVED Bolts missing in connections. Large Concrete spalls in walkways Water damage in concrete and steel surfaces
Priority 2
1,001
Cracking on walls and the roof deck
Priority 3
905
Damaged grout under steel columns. Fine cracks and spalls
Corrosion that is currently minor. Overall, the existing concrete slabs, concrete and concrete masonry walls, concrete beams, and concrete columns are in good condition with most of noted deficiencies being cosmetic or minor for most of the tunnel. In portions of the tunnel with high exposure to moisture and water damage, concrete conditions were poor and in need of remediation. No signs of distress including excessive deflections, leaning or differential movement were observed. The following deficiencies are categorized in this section and are identified in Appendix 2.
Project No. SE332
F1)
-10-
May 17, 2024
Concrete Spalls Concrete spalls on underside of decks, walls and floors were noted in many locations. The extent of deterioration varies throughout the tunnels. Identified Problem/Causation: Concrete spalling is caused from water penetration and expansion during freeze-thaw cycles. Concrete spalling was divided into three categories: • • •
Small Spall – Diameter of spalling is less than six inches, and depth of spall is less than one inch. Medium Spall – Diameter of spalling is between six and twelve inches, and depth of spall is less than two inches. Large Spall – Diameter of spalling is greater than twelve inches, with no restriction on depth.
The total amount of small spalling recorded was 4,946 square feet. The total amount of medium spalling recorded was 841 square feet. The total amount of large spalling recorded was 6,770 square feet. TYPE OF SPALLING Small spall Medium spall Large spall
NUMBER OF SQUARE FEET 4,946 SF 841 SF 6,770 SF
Photo 1: Large Spall on Ground Concrete
Project No. SE332
F2)
-11-
May 17, 2024
Concrete Cracking Concrete cracks on underside of decks, walls and floors were noted in many locations. The extent of deterioration varies throughout the tunnels. Identified Problem/Causation: Concrete cracking is caused from the shrinkage of the concrete, or by stresses in the concrete from various loads acting on it. Concrete cracking was divided into three categories: • • •
Fine Crack – Width of cracking is greater than 1/32”, and less than 1/16”. Medium Crack – Width of cracking is greater than 1/16”, and less than 1/8”. Wide Crack – Width of cracking is greater than 1/8”. The total amount of fine cracks recorded was 15,539 linear feet. The total amount of medium cracks recorded was 12,550 linear feet. The total amount of wide cracks recorded was 1,956 linear feet. TYPE OF CRACK Fine cracks Medium cracks Wide Cracks
NUMBER OF LINEAL FEET 15,539 LF 12,550 LF 1,956 LF
Photo 2: Wide Crack in Concrete Pier Foundation
Project No. SE332
F3)
-12-
May 17, 2024
Concrete Scaling Concrete scaling on underside of decks, walls and floors were noted in many locations. The extent of deterioration varies throughout the tunnels. Identified Problem/Causation: Concrete scaling is caused from water penetration and exposure to various chemicals with a lack of protective measures for the concrete. Concrete scaling was divided into three categories: • • •
Light Scaling – Depth of scaling is less than 1/4” deep. Medium Scaling – Depth of scaling is greater than 1/4” deep, and less than 1/2” deep. Large Scaling – Depth of scaling is greater than 1/2" deep.
The total amount of light scaling recorded was 10,833 square feet. The total amount of medium scaling recorded was 1,481 square feet. The total amount of large scaling recorded was 806 square feet. TYPE OF SCALING Light scaling Medium scaling Large scaling
NUMBER OF SQUARE FEET 10,833 SF 1,481 SF 806 SF
Photo 3: Large Scaling on Concrete Roof Deck
Project No. SE332
F4)
-13-
May 17, 2024
Concrete Efflorescence Concrete efflorescence on the walls, floors, and the underside of decks was noted in many locations. The extent of deterioration varies throughout the tunnels. Identified Problem/Causation: Concrete efflorescence is caused from water penetrating and wicking through the concrete to the surface leaving behind lime deposit. The total amount of efflorescence recorded was 26,392 square feet.
Photo 4: Efflorescence on Concrete Wall
Project No. SE332
F5)
-14-
May 17, 2024
Incomplete Concrete Repairs Incomplete concrete repairs were found throughout the tunnel walls and were noted in multiple locations. The extent of the incomplete repairs varies throughout the tunnels. Identified Problem/Causation: Incomplete concrete repairs are locations where a section of the existing concrete was removed for a repair; however, the rebar and section are exposed and are being subjected to further damage in the exposed section. The total amount of exposed incomplete concrete repairs recorded was 179 square feet.
Photo 5: Incomplete Concrete Repair
Project No. SE332
F6)
-15-
May 17, 2024
Organic Growth on Concrete Slab Organic Growth was detected on the floor slab in a single location, and the beginning of growth of algae in standing water was found in other locations. Identified Problem/Causation: The growth of organic material such as moss, algae and mold is from the standing water, environmental conditions (temperature & humidity), and lighting provided in the tunnel. The total amount of organic growth recorded was 45 square feet.
Photo 6: Organic Growth on Concrete Floor
Project No. SE332
F7)
-16-
May 17, 2024
Water Damage Water Damage was found throughout the tunnels in the forms of standing water, ponding, active leaks, and water seeping through concrete surfaces in the roof and walls. Identified Problem/Causation: Water damage is caused by exterior water passing through small cracks in the concrete, leaking pipes, and by water having no way to drain out of the tunnel. The total amount of water damage recorded was 2,830 square feet.
Photo 7: Water Damage on Floor
Project No. SE332
F8)
-17-
May 17, 2024
Deteriorated Expansion Joints Deteriorated Expansion Joints were found throughout the tunnels at key sections, with the deterioration varying at different expansion joints. Identified Problem/Causation: Expansion Joint materials deteriorate from exposure to moisture and salts. As the material deteriorates the expansion joint is not as effective at allowing movement specifically at the tunnel walls and roof deck. The total amount of deteriorated expansion joint material recorded was 518 linear feet.
Photo 8: Deteriorated Expansion Joint
Project No. SE332
-18-
May 17, 2024
Overall, the existing steel beams, steel columns, steel bracing, steel ladders, and steel stairs located in the tunnels are in good condition with most of noted deficiencies being cosmetic or minor for most of the tunnel. In portions of the tunnel with excessive amounts of moisture, the steel was in poor condition and the noted deficiencies indicating a need for remediation. Signs of distress including excessive deflections, leaning or differential movement were observed. The following deficiencies are categorized below and are identified in the appendices. F9)
Steel Corrosion Steel Corrosion was found throughout the tunnels on beams, columns, and bracing. The extent of corrosion varies throughout the tunnels. Identified Problem/Causation: Steel corrosion occurs when steel oxidizes from an exposure to different salts, water, and the air with no coating to protect it. Corrosion was separated into three distinct categories. Minor Corrosion – A light surface rust. Moderate Corrosion – Surface rust that is loose and flaking with some pitting. Severe Corrosion – Heavy, stratified rust. The total amount of minor corrosion recorded was 808 square feet. The total amount of moderate corrosion recorded was 724 square feet. The total amount of severe corrosion recorded was 1,753 square feet. TYPE OF CORROSION Minor corrosion Moderate corrosion Severe corrosion
NUMBER OF SQUARE FEET 808 SF 724 SF 1,753 SF
Photo 9: Severe Steel Column Base Plate Corrosion
Project No. SE332
F10)
-19-
May 17, 2024
Steel Pitting Steel Pitting was found on beams, columns, and bracing. The extent of pitting corrosion varies throughout the tunnels. Identified Problem/Causation: Steel pitting occurs when steel oxidizes from an exposure to different salts, water, and changes in temperature. Pitting corrosion was separated into three distinct categories. • •
•
Minor Pitting – Localized holes, or dimples in the surface of the steel with a diameter less than 1/4”. The depth of the localized corrosion is less than 1/32” deep. Moderate Pitting – Localized holes, or dimples in the surface of the steel with a diameter greater than 1/4” and less than 1/2”. The depth of the localized corrosion is less than 1/8” deep. Severe Pitting – Localized holes, or dimples in the surface of the steel with a diameter greater than 1/2”. The depth of the localized corrosion is greater than 1/8” deep.
The total amount of minor pitting recorded was 27 square feet. The total amount of moderate pitting recorded was 5 square feet. The total amount of severe pitting recorded was 0 square feet. TYPE OF PITTING Minor pitting Moderate pitting Severe pitting
NUMBER OF SQUARE FEET 27 SF 5 SF 0 SF
Project No. SE332
F11)
-20-
May 17, 2024
Missing Bolts and/or Loose Nuts Missing Bolts and/or Loose Nuts were found on beam, column, ladder, and stair connections throughout the tunnels, with connections missing one or more bolts. Identified Problem/Causation: Missing bolts were found, either bolts were not properly installed, or damage to the concrete into which the bolt was installed caused it to loosen and to no longer be effective. The total amount of missing bolts and/or loose nuts recorded was 109 bolts/nuts.
Photo 10: Missing Connection Bolt
F12)
Damaged Grout Damaged Grout underneath the baseplate of steel columns was found throughout the tunnels, the severity of the damage varies throughout. Identified Problem/Causation: Damaged Grout is grout that has cracked or been completely removed from the baseplate resulting from shear loads, and compression loads acting on the grout. The grout can also fail from water damage and damage to the concrete flooring underneath. The total amount of damaged grout recorded was 209 square feet.
Project No. SE332
F13)
-21-
May 17, 2024
Damaged Steel Damaged Steel was found in the form of bent baseplates, bent flanges, beam deflection and section loss. The damage and the severity of the damage varied throughout the tunnel. Identified Problem/Causation: The steel throughout the tunnel had suffered a variety of mechanical damages. The observed damages is typically caused by impact or overstressing of the steel in the case of deflections or bent baseplates. The total amount of damaged steel recorded was 90 square feet.
Photo 11: Bent Steel Beam
Project No. SE332
F14)
-22-
May 17, 2024
Damaged Stairs One of the steel columns supporting the stairs down to the cold tunnels is not being supported by the slab. Identified Problem/Causation: The steel column has severely corroded to the point that it is no longer making supportive contact with the slab. Steel corrosion occurs when steel oxidizes from an exposure to different salts, water, and the air with no coating to protect it. Due to the environment and periods of standing water in the tunnel, the bases of columns, such as the stair support, has corroded.
Photo 12: Damaged Stairs
Project No. SE332
F15)
-23-
May 17, 2024
Damaged Platform A platform that is being used to cross over a large pipe was noted to be resting on the pipe itself. The resultant additional load on the pipe may damage the pipe and its supporting structural integrity. Identified Problem/Causation: The supports for the platform were noted to be severely corroded and missing bolts connections. Steel corrosion occurs when steel oxidizes from an exposure to different salts, water, and the air with no coating to protect it. Due to the environment and periods of standing water in the tunnel, the bases of columns, such as the platform, has corroded.
Photo 13: Damaged Platform
Project No. SE332
F16)
-24-
May 17, 2024
Hanging Concrete Pieces of concrete were observed to be hanging by a thin piece of concrete from the ceiling of the tunnel. This poses a potential strike hazard for personnel in the area. Identified Problem/Causation: The pieces of hanging concrete were created from spalls that did not break off completely. Concrete spalling is caused from water penetration and expansion during freeze-thaw cycles.
Photo 14: Hanging Concrete
Project No. SE332
-25-
May 17, 2024
MECHANICAL: There were (44) Priority 1 conditions, (43) Priority 2 conditions, and (9) Priority 3 conditions noted during this survey. Priority 1 conditions include missing insulation, piping with heavily disintegrated insulation, dented vinyl insulation covering, nonoperational stormwater sump pumps and corroded pipes. Priority 2 conditions observed include frayed insulation and jacketing. Priority 3 conditions include minor wear and tear on the jacketing only, pipe labels. A visual inspection of the mechanical piping where the insulation and jacketing were already removed or where bare pipe was easily accessible was performed. The pipes observed were in good condition with no signs of visible deterioration. It is recommended that a detailed pipe integrity, such as an ultrasonic test be performed. The following Mechanical deficiencies are categorized in this section and are identified in Appendix 3. Pipe support deficiencies are categorized in the Structural section of this report and associated Appendix.
F1)
Missing Insulation Piping Exposed: On multiple locations various piping systems showcase segments with insulation completely missing. The insulation is missing on the piping, pipe fittings and connections, valves, and smaller branch piping. Identified Problem/Causation: The exposed pipework shows clear indication of premature corrosion which can lead to premature leaks, bursts, and deterioration of structural integrity of the piping run. Heat losses through exposed (non-insulated) piping reduces efficiency in energy utilization of systems (boilers, chillers).
Photo 15: Missing Insulation
Project No. SE332
F2)
-26-
May 17, 2024
Frayed and Disintegrating Insulation: The majority of the piping insulation in the tunnels shows clear indications of fraying and deterioration. Much of the insulation is original to the initial construction of the tunnels. Identified Problem/Causation: Holes in the insulation covering makes pipes more susceptible to corrosion. Exposed pipes increase the possibility of injury risk, such as, burns, and skin irritation. Heat loss through exposed piping becomes the cause for an inefficient energy system.
Photo 16: Torn Off Jacketing and Frayed Insulation
Project No. SE332
F3)
-27-
May 17, 2024
Frayed and Disintegrating Jacketing: At some instances, the insulation seemed to be intact but minor wear and tear on the jacketing/covering for the insulation was evident. Identified Problem/Causation: Over time, fraying and disintegration of jacketing leads to damage of insulation and the pipe underneath the jacket. The protective paint coating on the insulation jacket has deteriorated which has led to damage of the insulation and pipe underneath.
Photo 17: Frayed Piping Insulation and Disintegrated Jacketing F4)
Labeling: All piping systems lacked adequate amount of labeling (stickers/stenciled paint) throughout their runs. Lack of tagging causes difficulty of confirming piping systems.
F5)
Aluminum/Metal Jacketing: Aluminum and metal jacketing is utilized to fix original frayed and disintegrated jacketing and/or lack of insulation beneath in some locations. Aluminum jacketing is used as a temporary fix in these instances not as a protective covering for the insulated piping as typical practice would be. However, the purpose of insulating a pipe remains unsatisfied from a thermal and safety (scalding) perspective.
F6)
Pumps: The stormwater sump pumps located in cold tunnels in Section 48 are currently non-operational. This has caused some water to back up and spill on to the floor of the tunnel. Service work on the pumps is ongoing.
Project No. SE332
-28-
May 17, 2024
ELECTRICAL: There were (46) Priority 2 conditions noted during the surveys. Priority 2 conditions observed include missing covers for wall outlets and junction boxes, low lighting levels, damaged hangers, and exposed wires. The existing observed electrical conduits and lighting were in good condition. Most of the noted deficiencies were minor and relatively easy to remediate. The following deficiencies are categorized below and are identified in Appendix 4. Conduit pipe support deficiencies are categorized in the Structural section of this report and associated Appendix.
F1)
Missing Cover Plates for Junction Box & Outlet The majority of the deficiencies found were in the form of missing or non-secured cover plates for junction boxes or receptacles. In some instances, the cover plate was nearby but for most, missing entirely. In some instances, the top cover of raceways was missing exposing the wire within. The survey team identified 35 instances of missing cover plates.
Photo 18: Missing Cover Plate for Junction Box
Project No. SE332
F2)
-29-
May 17, 2024
Damaged / Missing Hangers There were instances where hangers used for supporting conduit and cabling were either damaged or missing. The non-supported cabling has begun to sag and poses potential future issues if not supported correctly. The survey team identified 5 instances of damaged/missing hangers.
Photo 19: Missing Hangers for Cabling Support
Project No. SE332
F3)
-30-
May 17, 2024
Damaged / Rusted Junction Boxes, Conduit, Outlet The survey team noted some junction boxes, conduit and outlets that have signs of rusting. In some instances, the entire structural support of the box has been compromised. The survey team identified 2 instances of damaged/rusted electrical equipment.
Photo 20: Rusted Junction Box
F4)
Low Lighting Levels There are areas in the hot tunnels that do not have sufficient levels of lighting. In some instances, the low lighting levels are attributed to light fixtures not working or due to a missing or burned-out bulb. In other areas, there is not enough installed lighting to provide illumination. It is important to provide at least the minimum levels of lighting to create a safer working environment. The survey team identified 4 instances of low lighting levels in sections 3012, 3018, 3019 and 3024.
Project No. SE332
-31-
May 17, 2024
ENVIRONMENTAL: A Hazardous Materials Survey of the Empire State Plaza utility tunnels was completed per Chapter 9.8 – “Hazardous Materials Guide of the NYSOGS Design Procedures Manual.” This included the visual identification and sampling of suspect asbestos-containing materials, lead-based paints, PCB-containing caulks/sealants, and a visual inspection for Mercury-containing items, PCB-containing items (transformers/ballasts), Chlorofluorocarbons (CFCs), Bird Droppings and Mold. The Hazardous Materials Report can be found in Appendix 5.
F1)
113 suspect asbestos-containing materials were identified during the asbestos survey portion of the hazardous materials survey. A total of 285 individual bulk samples were collected and 18 asbestos-containing materials were confirmed within the tunnels through laboratory analysis.
F2)
Thirty-two (32) paint chip samples were collected from substrates within the tunnels such as railings, structural components, door systems, and insulation jacketing. Upon analysis, dull gray paint to pipe valves, and yellow handrail paint were found to have detectable levels of lead above the 0.5% EPA threshold of lead-based paint. Additionally, the pipe insulation jacketing paints, door system paints, as well as pipe/valve paints were found to have detectable levels of lead below the 0.5% EPA threshold, classifying them as lead-containing paint for having any detectable concentration of lead.
F3)
Eight (8) suspect PCB caulks/sealants were collected during the hazardous materials survey, transmitted to CHEMTECH under proper chain of custody protocol and had them analyzed for PCBs under EPA Method 8082. Upon analysis, the overhead duct sealant, 12” cast iron drain sealant, brown pipe sealant to wall penetration, and red fire caulk to wall penetration were found to have detectable levels of PCBs below the Toxic Substances Control Act (TSCA) regulatory threshold of 50 PPM.
F4)
Sixteen (16) fluorescent light tubes/bulbs were found in Cold Tunnel Section 7B, and no mercury-containing thermostats were observed within the scope areas. Labeled non-PCB containing ballasts were disconnected in a box within the Hot Tunnel. Additionally, there was no mold or bird guano present within the sections of tunnel inspected.
Project No. SE332
-32-
May 17, 2024
RECOMMENDED SCOPE OF WORK: Based on the Findings presented in the previous section, the design team recommends the following remediation scope of works:
STRUCTURAL: The following remediations are recommended for the above structural deficiencies: R1)
All concrete components exhibiting spalling are to be cleaned by either mechanical or water blasting methods to remove all loose concrete, scale, and foreign material. Apply a corrosion inhibitor on any reinforcement exposed by the concrete removal. If reinforcement is already exposed, wire brush clean and replace as required upon further inspection. Patch all spalls to original section dimensions.
R2)
All concrete components exhibiting cracking are to be cleaned by either mechanical or water blasting methods to remove all loose concrete, scale, and foreign material. Apply a corrosion inhibitor on any reinforcement exposed by the concrete removal. Patch all cracks to original section dimensions.
R3)
All concrete components exhibiting scaling are to be cleaned by either mechanical or water blasting methods to remove all loose concrete, scale, and foreign material. Apply a corrosion inhibitor on any reinforcement exposed by the concrete removal. Patch all scaling to original section dimensions.
R4)
Investigate concrete components where efflorescence has occurred and remove built-up efflorescence deposits to expose any potential damage underneath. Repair as required, if concrete needs to be removed to remove efflorescence apply corrosion inhibitor on any reinforcement exposed by the concrete removal. Patch all section loss to original section dimensions.
R5)
Investigate all incomplete concrete repairs on the walls, floors, and roof. If cut out section is in acceptable condition complete repair as required. In cases where the reinforcement or concrete has been damaged further from exposure, clean reinforcement through mechanical methods and replace if required. Apply a corrosion inhibitor to reinforcement if replacement is not required after cleaning. Clean concrete by either mechanical or water blasting methods to remove all lose concrete, scale, and foreign material. Patch the incomplete repair to the original section dimensions.
R6)
Investigate all organic growth on the tunnel floors. Where growth is found, remove any growth that has developed, and remove any water enabling the growth of organic matter.
R7)
Investigate water damage throughout the tunnel. In sections with standing water, remove the water and inspect the concrete underneath for further damage in the forms of scaling or spalling. Where possible, repair the source of water including but not limited to leaking pipe, fittings, and clogged drains. Further water removal may be required by installing sump pumps or additional drains.
R8)
Investigate all expansion joints for material deterioration, at joints with damaged material remove the material and clean the exposed joint of any debris through mechanical methods. In exposed joint apply a new bonding adhesive and insert a foam backing rod. Cover and seal joint.
R9)
All steel components are to be cleaned through mechanical or sand blasting methods until all corrosion has been removed. Remaining steel is to be investigated and the condition of the
Project No. SE332
-33-
May 17, 2024
remaining steel to be assessed for any further repair. Reinforce steel as required, if necessary, replace steel entirely. Coat all steel with corrosion inhibiting paint and finish. R10)
All steel components are to be cleaned through mechanical or sand blasting methods until all corrosion has been removed. Remaining steel is to be investigated and the condition of the remaining steel to be assessed for any further repair. Reinforce steel as required, pitting may also be welded back to the original section size. Coat all steel with corrosion inhibiting paint and finish.
R11)
All connections with missing or loose bolts are to be investigated for further damage at the connection. Replace missing or loose bolts with epoxy injected anchor for connections to concrete, or the appropriate bolt(s) for connections to other steel members.
R12)
All columns with damaged grout are to be inspected for any further damage caused to the column or anchors from the lack of contact with the slab below. Repair damage found as required, in cases where no repairs are needed to the steel chip out any remaining grout and replace.
R13)
Inspect all damaged steel for mechanical failures and investigate the need for further reinforcement or repairs. In the case of severe damage such as section loss or significant plastic deformation, replace steel entirely.
R14)
All steel components of the stairs to be cleaned through mechanical or sand blasting methods until all corrosion has been removed. Remaining steel is to be investigated and the condition of the remaining steel to be assessed for any further repair. Reinforce steel as required, if necessary, replace steel entirely. Secure to the slab with bolts. Coat all steel with corrosion inhibiting paint and finish.
R15)
The steel components of the platform are to be cleaned through mechanical or sand blasting methods until all corrosion has been removed. Remaining steel is to be investigated and the condition of the remaining steel to be assessed for any further repair. Reinforce steel as required, if necessary, replace steel entirely. Resecure the platform to the slab with bolts. Coat all steel with corrosion inhibiting paint and finish.
R16)
Remove hanging pieces of concrete. Concrete components exhibiting spalling are to be cleaned by either mechanical or water blasting methods to remove all loose concrete, scale, and foreign material. Apply a corrosion inhibitor on any reinforcement exposed by the concrete removal. If reinforcement is already exposed, wire brush clean and replace as required upon further inspection. Patch all spalls to original section dimensions.
MECHANICAL: The following remediations are recommended for the above mechanical deficiencies: R1)
Reinsulate pipes that are missing or have heavily damaged insulation that exposes bare pipe. This includes insulation on pipe fitting, connections, valves, and smaller branch piping.
R2)
For pipes that have frayed insulation, reinsulate each section including the jacketing.
R3)
For pipes where the jacketing is showing signs of damage, replace the damaged jacketing section in its entirety.
Project No. SE332
-34-
May 17, 2024
R4)
Install pipe labeling on all pipes in the tunnels. Labels should be installed every 50 feet of straight pipe, on both sides for wall/ceiling penetrations, next to valves/flanges and changes of direction. Pipe labeling should follow ANSI/ASME A13.1 as a standard and best practice.
R5)
For pipes that are using aluminum/metal jacketing as a temporary fix, remove temporary jacketing and replace insulation underneath. Install new jacketing to protect insulation and pipe underneath.
R6)
Stormwater pumps are currently being serviced. Recommend implementing a maintenance/service plan for the pumps to make sure they are operational when needed. This should include spare pumps on premises, frequent testing of pumps, and monitoring pumps during weather events.
ELECTRICAL: The following remediations are recommended for the above electrical deficiencies: R1)
Replace all missing covers for junction boxes, outlets, and raceways. Implement a maintenance schedule to evaluate junction boxes, outlets and raceways and perform corrective action as required.
R2)
Replace all missing hangers and secure existing conduit and cabling. Implement a maintenance schedule to evaluate hangers and perform corrective action as required.
R3)
Replace all rusted electrical equipment including conduit, junction boxes and outlets. Implement a maintenance schedule to evaluate junction boxes, outlets and raceways and perform corrective action as required.
R4)
Replace broken or missing bulbs and/or add lighting fixtures to areas with low lighting levels with light emitting diode (LED) type. Implement a maintenance schedule to continually evaluate lighting and replace as required.
ENVIRONMENTAL: R1)
The Hazardous Materials Survey Report shall not solely serve as an asbestos abatement design document for obtaining bids from abatement contractors. It is recommended that specific abatement design documents be prepared in order to specify procedures and protocols that must be observed in order to ensure that abatement activities are completed in a manner consistent with local, state and federal regulations and requirements.
R2)
Review the Hazardous Materials Survey Report during the planning of and prior to performing any work on the recommended action items of other trades outlined within this report.
Project No. SE332
-35-
May 17, 2024
PHASING / PROJECT GROUPING: The intention of the surveys is to identify the deficiencies found in the tunnels and be able to group them into future projects that can be awarded. Based on what was observed, the majority of the deficiencies were structural in nature and were found throughout the tunnels. The design team recommends grouping the segments into larger sections (each section consists of approximately 10 segments). Project groupings could be further broken down to generate smaller projects or combined to create larger projects. Section Grouping
Total Count Priority 1
Priority 2
Priority 3
STRUC
MECH
ELEC
STRUC
MECH
ELEC
STRUC
MECH
ELEC
1-10
30
2
0
79
15
8
73
0
0
11-20
30
1
0
93
2
6
43
6
0
21-30
25
4
0
69
2
2
51
0
0
31-40
42
3
0
93
5
6
92
0
0
41-50 51-60
64 52
2 11
0 0
89 94
2 0
5 4
90 83
0 0
0 0
61-70
77
5
0
116
7
1
120
0
0
71-82
82
0
0
107
0
4
78
0
0
3000-3010
54
5
0
64
4
3
61
1
0
3011-3020 3021-3030
58 45
5 5
0 0
72 66
4 2
6 1
52 92
2 0
0 0
3031-3038
20
1
0 59 0 Table 2: Section Grouping
0
70
0
0
The number of electrical deficiencies identified are small in comparison to structural and mechanical deficiencies. It is recommended that the electrical deficiencies be remediated as a separate phase/contract to expedite these fixes and avoid being tied to the larger, phased remediations.
Project No. SE332
-36-
May 17, 2024
Priority should be given to groupings that have the most Priority 1 priority levels. This will allow for greater returns as OGS begins to remediate the deficiencies. The following table summarizes how the Section Groupings should be prioritize:
Priority Ranking
Section Grouping
Total Count Priority 1 STRUC
MECH
ELEC
61-70
77
5
0
2 3
71-82
82
0
0
41-50
64
2
0
4
51-60
52
11
0
5
3011-3020
58
5
0
6
3000-3010
54
5
0
7 8
3021-3030
45
5
0
31-40
42
3
0
9
1-10
30
2
0
10
11-20
30
1
0
11
21-30
25
4
0
12
3031-3038 20 1 Table 3: Grouping Priority
0
1
KEY ISSUES AND ISSUES TO BE RESOLVED: The findings and recommendations found in this report were based on visual observation and may not represent the depth of deficiency. Key issues that will need to be resolved are: • Access to confined spaces and secure areas to perform repairs. • Access to piping and equipment to perform repairs, as some of the areas have little to no clearance. • Performing repairs while maintaining services for the complex. At no time during the project can the utilities in the existing tunnels be interrupted. • Phasing & construction timing • Setting strict agreed-upon boundaries for repair scope. • Concurrent projects on the Empire State Plaza and tunnels • A visual inspection to determine pipe integrity was performed. A thorough pipe integrity tests on all utility pipes should be performed utilizing acoustical and/or ultrasonic methods. CODES AND REGULATORY REQUIREMENTS: 1. Related Applicable Codes: a. Building Code of New York State – 2020 b. Existing Building Code of New York State – 2020 c. National Electrical Code – 2017 (NFPA 70) d. Mechanical Code of New York State – 2020
Project No. SE332
2.
3.
4.
5. 6.
7.
-37-
May 17, 2024
e. Plumbing Code of New York State – 2020 f. Energy Conservation Construction Code of New York State – 2020. Existing Building Code a. Chapter 6 Classification of Work: The level of alteration will depend upon the identified Priority Level and its magnitude. b. Section 602: Most repairs will likely be considered Alteration Level One c. Section 603: There may be a rare instance of a space reconfiguration or an extension of a particular system, which would then be an Alteration Level Two. d. It is not expected that there will be any work that is an Alteration Level Three. Existing Occupancy: a. Section 304 (Occupancy classification), Section 508 (Accessory use) & Section 509 (Incidental use): Accessory or incidental use to Business Group B Means of Egress: It is presumed existing egress criteria is per NYS Building Code for original construction. The occupant loads, exiting requirements and other pertinent requirements are unaffected by the alteration work. Materials’ requirements as defined and specified by the 2020 Building Code of New York State. Office of General Service’s Design and Construction, Environmental Programs and Climate Initiative office’s Environmental Product Determination for Embodied Carbon, in response to Executive Order 22 Additional codes which may be applicable to this project include: a. Fire Code of New York State – 2020 b. Property Maintenance Code of New York State – 2020 c. Title 29 of the Code of Federal Regulations (OSHA Law)
During construction, appropriate Department of Labor (DOL) and Occupational Safety and Health Administration (OSHA) regulations will be in place.
Project No. SE332
-38-
May 17, 2024
ESTIMATE: The attached Project Estimate dated May 8, 2024, indicates an estimated bid amount of $50,000,000. Given the preliminary nature of this estimate the anticipated range of construction value is $38,000,000 to $70,000,000. The client’s decision as to what construction value to use for capital planning purposes must factor in considerations which are beyond the scope of this report. Factors include but are not limited to schedule, project priority in the overall capital plan, number, and expertise of stakeholders with input into project scope, etc. TOTAL
Section Grouping
STRUC
MECH
ELEC
1-10
$
3,200,000
$
240,000
$ 23,000
11-20
$
4,500,000
$
450,000
$ 13,000
21-30
$
2,800,000
$
57,000
$
4,900
31-40 41-50
$ $
3,600,000 4,700,000
$ $
180,000 50,000
$ $
8,800 9,400
51-60
$
4,700,000
$
170,000
$
8,300
61-70
$
6,200,000
$
960,000
$
5,500
71-82
$
6,600,000
$
-
$
6,400
3000-3010 3011-3020
$
2,500,000
$
55,000
$ 14,000
$
3,000,000
$
58,000
$ 35,000
3021-3030
$
3,400,000
$
59,000
$
4,300
3031-3038
$
2,600,000
$
1,600
$
-
TOTAL
$
48,000,000 $ 2,300,000 Table 4: Cost Estimate
Section Grouping
$ 130,000
TOTAL Low
High
1-10
$ 2,600,000
$ 4,800,000
11-20
$ 3,700,000
$ 7,000,000
21-30
$ 2,200,000
$ 4,100,000
31-40
$ 2,900,000
$ 5,400,000
41-50
$ 3,500,000
$ 6,600,000
51-60
$ 3,600,000
$ 6,800,000
61-70
$ 5,400,000
$ 10,000,000
71-82
$ 4,900,000
$ 9,100,000
3000-3010
$ 2,000,000
$ 3,600,000
3011-3020
$ 2,400,000
$ 4,400,000
3021-3030
$ 2,600,000
$ 4,900,000
3031-3038
$ 2,000,000
$ 3,700,000
TOTAL
$ 38,000,000 $ 70,000,000 Table 5: Cost Estimate Range
Project No. SE332
-39-
May 17, 2024
Priority Level
Structural
Mechanical
Electrical
Priority 1
$ 15,000,000
$
$
Priority 2
$ 16,000,000
$ 1,100,000
Priority 3
770,000
$ 17,000,000 $ 440,000 Table 6: Priority Cost Estimate
-
$ 130,000 $
-
Please note the Project Estimate is valid until the projected bid date. Beyond that date, the estimate will be subject to escalation and the possibility of further deterioration of existing conditions. The detailed Cost Estimate can be found in Appendix 1. ESTIMATE OF FEES FOR PROFESSIONAL SERVICES: For capital planning purposes our preliminary estimate of the cost for professional services to support this project through the construction phase is $1,300,000. Professional services include design fees, contract administration fees, construction management and inspection fees, and overall project management fees. Professional fees can vary greatly depending on a number of factors that cannot be well-defined at the program phase of a project. Factors include but are not limited to project complexity, hazardous materials, special permitting, design phase and construction phase schedules, scope modifications, level of analysis of alternatives and options, and value engineering efforts. APPENDIX: Appendix 1: Cost Estimate, dated 4/17/2024 Appendix 2: Architectural/Structural Detailed Findings Appendix 3: Mechanical Detailed Findings Appendix 4: Electrical Detailed Findings Appendix 5: Limited Survey for ACM’s and PCB’s Report Appendix 6: Initial Site Visit minutes, dated 5/2/2023.
Project No. SE332
-40-
Appendix 1: Cost Estimate
May 17, 2024
ESTIMATE SUMMARY/HISTORY
Project No.: TO: BASE / ALT: TP Project No:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY BUILDING GSF
$8,395
BID AMOUNT
$1,027,747
ALTERNATES Amount
PREVIOUS
PROGRAM 5/8/2024 $1,019,351
Mechanical P-1
(Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT Bldg $/sf
BUILDING COSTS Construction P-1
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$1,019,351
$41,178
HVAC
$8,395
$356
ESTIMATE RANGE
LOW: HIGH:
$770,810 $1,438,845
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
Revision:
ALBANY COUNTY DIV 1.
CHA CONSULTING INC.
Project No.:
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
CONSTRUCTION REHAB 1
Estimated By: D. Lizak
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 88 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
$17,158 $61,952 $20,589 $13,726 $68,631 $68,631 $6,863 $13,726
$704 /day
017716
Contract Closeout
3.0%
$20,589
012100
FIELD ORDER ALLOWANCE
6.0%
$41,178
CSI NUM
DESCRIPTION:
QUANT
UNIT
M&L TOTAL COST
UNIT PRICE
$7,150.00
$7,150
$14,300.00
178.7500
$80
$14,300
178.8
$21,450.00
$21,450
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL UNIT COST
MATERIAL UNIT TOTAL PRICE COST
TOTAL COST
TOTAL HRS
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete beams
5 SF
$110.00
$550
$315.00
3.9375
$80
$1,575
19.7
$425.00
$2,125
030131
- Concrete deck underside
46 SF
$125.00
$5,750
$375.00
4.6875
$80
$17,250
215.6
$500.00
$23,000
030131
- Concrete pier foundation
23 SF
$110.00
$2,530
$315.00
3.9375
$80
$7,245
90.6
$425.00
$9,775
030131
- Concrete slab
546 SF
$110.00
$60,060
$315.00
3.9375
$80
$171,990
2,149.9
$425.00
$232,050
030131
- Concrete wall
74 SF
$110.00
$8,140
$315.00
3.9375
$80
$23,310
291.4
$425.00
$31,450
Page 2
CSI NUM 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete scaling (Large - x > 1/2" deep)
030131
- Concrete wall
030131
Concrete crack repairs
2 SF
$60.00
$120
$98.00
1.2250
$80
$196
2.5
$158.00
$316
030131
- Medium crack (1/16"< x < 1/8")
58 LF
$45.00
$2,610
$115.00
1.4375
$80
$6,670
83.4
$160.00
$9,280
030131
- Wide crack ( x >1/8")
40 LF
$55.00
$2,200
$125.00
1.5625
$80
$5,000
62.5
$180.00
$7,200
Miscellaneous repairs at water damaged areas (assume 10% of 92 SF)
10 SF
$110.00
$1,100
$315.00
3.9375
$80
$3,150
39.4
$425.00
$4,250
Scaffolding
1 LS
$3,125.00
$3,125
$3,125.00
39.0625
$80
$3,125
39.1
$6,250.00
$6,250
13 SF
$200.00
$2,600
$800.00
10.0000
$80
$10,400
130.0
$1,000.00
$13,000
030131
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
050000
Miscellaneous reinforcing of deteriorated steel beam per location (severe corrosion)
3 EA
$1,200.00
$3,600
$2,560.00
32.0000
$80
$7,680
96.0
$3,760.00
$11,280
050000
Replace missing bolts
3 EA
$25.00
$75
$160.00
2.0000
$80
$480
6.0
$185.00
$555
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
1 SF
$200.00
$200
$800.00
10.0000
$80
$800
10.0
$1,000.00
$1,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
1 EA
$1,200.00
$1,200
$2,560.00
32.0000
$80
$2,560
32.0
$3,760.00
$3,760
050000
Remove and replace base plate including temporary shoring
1 EA
$4,500.00
$4,500
$3,200.00
40.0000
$80
$3,200
40.0
$7,700.00
$7,700
050000
METAL STAIRS
050000
Weld steel at missing weld location
1 EA
$175.00
$175
$480.00
6.0000
$80
$480
6.0
$655.00
$655
050000
Replace missing handrail (assume 5LF/location)
3 EA
$1,250.00
$3,750
$480.00
6.0000
$80
$1,440
18.0
$1,730.00
$5,190
Page 3
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$115,685 on labor only $17,353 $13,038 $291,865 $41,178 $146,075 $540,232 $1,019,351
28.6% 4.0% 14.3% 53.0% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$285,226 $142,613 $64,176 $48,217
3,565.3 hrs.
M&L TOTAL COST
$10,625
$142,613 $81,529 $61,255
SAY:
$1,019,400
$1,019,351
Page 4
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 1 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$59
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
$356 $0
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$148 $800 $208 $119 $267 $504
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
1 LS
$170.00
$170
$175.00
1.8229
$96
$175
1.8
$345.00
$345
230700
- High pressure steam (hps), 14" diameter
30 LF
$44.63
$1,339
$38.40
0.4000
$96
$1,152
12.0
$83.03
$2,491
230700
- Domestic cold water (dcws), 12" diameter
30 LF
$11.20
$336
$19.20
0.2000
$96
$576
6.0
$30.40
$912
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$1,903 $952 $428 $322
19.8 hrs
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor
$1,845 on labor only $277 $208 $2,105 $356 $2,330 $3,604
$952 $705 $530
25.1% 4.2% 27.7% 42.9%
Page 5
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST Total Cost $8,395
ESTIMATOR CHECK
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 100.0%
TOTAL COST
TOTAL UNIT COST
TOTAL HRS SAY:
M&L TOTAL COST $8,400
$8,395
Page 6
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF
$19,784
BID AMOUNT
$1,261,575
ALTERNATES Amount
PREVIOUS
PROGRAM 5/8/2024 $1,241,791
Mechanical P-1
(Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT Bldg $/sf
BUILDING COSTS Construction P-1
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$1,241,791
$50,746
$19,784
$852
LOW: HIGH:
$946,181 $1,766,205
HVAC
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
Revision:
ALBANY COUNTY DIV 1.
CHA CONSULTING INC.
Project No.:
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
CONSTRUCTION REHAB 1
Estimated By: D. Lizak
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 88 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
$21,144 $61,952 $25,373 $16,915 $84,576 $84,576 $8,458 $16,915
$704 /day
017716
Contract Closeout
3.0%
$25,373
012100
FIELD ORDER ALLOWANCE
6.0%
$50,746
CSI NUM
DESCRIPTION:
QUANT
UNIT
M&L TOTAL COST
UNIT PRICE
$7,150.00
$7,150
$14,300.00
178.7500
$80
$14,300
178.8
$21,450.00
$21,450
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL UNIT COST
MATERIAL UNIT TOTAL PRICE COST
TOTAL COST
TOTAL HRS
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete deck underside
65 SF
$125.00
$8,125
$375.00
4.6875
$80
$24,375
304.7
$500.00
$32,500
030131
- Concrete wall
130 SF
$110.00
$14,300
$315.00
3.9375
$80
$40,950
511.9
$425.00
$55,250
Page 8
CSI NUM 030131
DESCRIPTION:
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete scaling (Large - x > 1/2" deep)
030131
- Concrete deck
030131
Concrete crack repairs
030131
QUANT
- Wide crack ( x >1/8")
15 SF
$60.00
$900
$118.00
1.4750
$80
$1,770
22.1
$178.00
$2,670
7 LF
$55.00
$385
$125.00
1.5625
$80
$875
10.9
$180.00
$1,260
030131
Remove efflorescence
030131
- Concrete deck
25 SF
$30.00
$750
$66.00
0.8250
$80
$1,650
20.6
$96.00
$2,400
030131
- Concrete wall
71 SF
$30.00
$2,130
$55.00
0.6875
$80
$3,905
48.8
$85.00
$6,035
030131
Deep surface repair at exposed rebar location
5 SF
$175.00
$875
$220.00
2.7500
$80
$1,100
13.8
$395.00
$1,975
030131
Miscellaneous repairs at water damaged areas (assume 10% of 540 SF)
55 SF
$110.00
$6,050
$315.00
3.9375
$80
$17,325
216.6
$425.00
$23,375
030131
Replace deteriorated grout including associated shoring (avg 5 sf per location)
5 EA
$800.00
$4,000
$1,920.00
24.0000
$80
$9,600
120.0
$2,720.00
$13,600
Scaffolding
1 LS
$3,125.00
$3,125
$3,125.00
39.0625
$80
$3,125
39.1
$6,250.00
$6,250
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
8 SF
$200.00
$1,600
$800.00
10.0000
$80
$6,400
80.0
$1,000.00
$8,000
050000
Miscellaneous reinforcing of deteriorated steel beam per location (severe corrosion)
1 EA
$1,200.00
$1,200
$2,560.00
32.0000
$80
$2,560
32.0
$3,760.00
$3,760
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
26 SF
$150.00
$3,900
$640.00
8.0000
$80
$16,640
208.0
$790.00
$20,540
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
243 SF
$200.00
$48,600
$800.00
10.0000
$80
$194,400
2,430.0
$1,000.00
$243,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
7 EA
$1,200.00
$8,400
$2,560.00
32.0000
$80
$17,920
224.0
$3,760.00
$26,320
050000
Remove and replace base plate including temporary shoring
1 EA
$4,500.00
$4,500
$3,200.00
40.0000
$80
$3,200
40.0
$7,700.00
$7,700
Page 9
CSI NUM
050000
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Remove and replace deteriorated expansion joint material
20 LF
$5.50
$110
$25.00
0.3125
$80
$500
6.3
$30.50
$610
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80%
DESCRIPTION:
QUANT
Tunnel ventilation to accommodate welding, painting etc.
UNIT
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$122,350 on labor only $18,353 $13,789 $345,283 $50,746 $154,491 $691,271 $1,241,791
$364,970 $182,485 $82,118 $61,698 27.8% 4.1% 12.4% 55.7% 100.0%
4,562.1 hrs. $182,485 $100,471 $75,487
SAY:
$1,241,800
$1,241,791
Page 10
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 2 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$142
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
$852 $0
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$355 $1,600 $497 $284 $639 $1,208
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
230700
1 LS
$450.00
$450
$385.00
4.0104
$96
$385
4.0
$835.00
$835
- High pressure steam (hps), 14" diameter
100 LF
$44.63
$4,463
$38.40
0.4000
$96
$3,840
40.0
$83.03
$8,303
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$4,225 $2,113 $951 $714
44.0 hrs
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$4,913 on labor only $737 $554 $4,725 $852 $6,204 $8,002 $19,784
23.9% 4.3% 31.4% 40.4% 100.0%
$2,113 $1,688 $1,268
SAY:
$19,800
Page 11
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
ESTIMATOR CHECK
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
$19,784
Page 12
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF
$39,339
BID AMOUNT
$988,620
ALTERNATES Amount
PREVIOUS
PROGRAM 5/8/2024 $949,281
Mechanical P-1
(Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT Bldg $/sf
BUILDING COSTS Construction P-1
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$949,281
$38,165
HVAC
$39,339
$1,657
LOW: HIGH:
$741,465 $1,384,069
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
Revision:
ALBANY COUNTY DIV 1.
CHA CONSULTING INC.
Project No.:
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
CONSTRUCTION REHAB 1
Estimated By: D. Lizak
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 88 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
$15,902 $61,952 $19,082 $12,722 $63,608 $63,608 $6,361 $12,722
$704 /day
017716
Contract Closeout
3.0%
$19,082
012100
FIELD ORDER ALLOWANCE
6.0%
$38,165
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$7,150.00
$7,150
$14,300.00
178.7500
$80
$14,300
178.8
$21,450.00
$21,450
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete beams
1 SF
$110.00
$110
$315.00
3.9375
$80
$315
3.9
$425.00
$425
030131
- Concrete slab
64 SF
$110.00
$7,040
$315.00
3.9375
$80
$20,160
252.0
$425.00
$27,200
030131
- Concrete wall
316 SF
$110.00
$34,760
$315.00
3.9375
$80
$99,540
1,244.3
$425.00
$134,300
1 SF
$60.00
$60
$118.00
1.4750
$80
$118
1.5
$178.00
$178
73 LF
$55.00
$4,015
$125.00
1.5625
$80
$9,125
114.1
$180.00
$13,140
030131
Concrete scaling (Large - x > 1/2" deep)
030131
- Concrete deck
030131
Concrete crack repairs
030131
- Wide crack ( x >1/8")
Page 14
CSI NUM
DESCRIPTION:
030131
Remove efflorescence
030131
- Concrete slab
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
400 SF
$30.00
$12,000
$55.00
0.6875
$80
$22,000
275.0
$85.00
$34,000
030131
Deep surface repair at exposed rebar location
5 SF
$175.00
$875
$220.00
2.7500
$80
$1,100
13.8
$395.00
$1,975
030131
Miscellaneous repairs at water damaged areas (assume 10% of 10 SF)
1 SF
$110.00
$110
$315.00
3.9375
$80
$315
3.9
$425.00
$425
030131
Replace deteriorated grout including associated shoring (avg 5 sf per location)
1 EA
$800.00
$800
$1,920.00
24.0000
$80
$1,920
24.0
$2,720.00
$2,720
Scaffolding
1 LS
$3,125.00
$3,125
$3,125.00
39.0625
$80
$3,125
39.1
$6,250.00
$6,250
DIVISION 5: METALS 050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
84 SF
$200.00
$16,800
$800.00
10.0000
$80
$67,200
840.0
$1,000.00
$84,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
5 EA
$1,200.00
$6,000
$2,560.00
32.0000
$80
$12,800
160.0
$3,760.00
$18,800
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
8 SF
$200.00
$1,600
$800.00
10.0000
$80
$6,400
80.0
$1,000.00
$8,000
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (light corrosion)
4 SF
$100.00
$400
$320.00
4.0000
$80
$1,280
16.0
$420.00
$1,680
050000
Replace missing bolts
7 EA
$25.00
$175
$80.00
1.0000
$80
$560
7.0
$105.00
$735
050000
Install missing brace (approx. 5 lf)
1 LS
$500.00
$500
$640.00
8.0000
$80
$640
8.0
$1,140.00
$1,140
050000
Replace missing handrail (assume 5LF/location)
1 EA
$1,250.00
$1,250
$480.00
6.0000
$80
$480
6.0
$1,730.00
$1,730
050000
Repair notched stringer
1 LS
$275.00
$275
$640.00
8.0000
$80
$640
8.0
$915.00
$915
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
20 LF
$5.50
$110
$25.00
0.3125
$80
$500
6.3
$30.50
$610
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
Remove and replace deteriorated expansion joint material
Page 15
CSI NUM
DESCRIPTION:
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
UNIT PRICE
MAN HRS PER UNIT
$103,405 on labor only $15,511 $11,654 $275,038 $38,165 $130,569 $505,509 $949,281
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
$266,893 $133,447 $60,051 $45,118 29.0% 4.0% 13.8% 53.3% 100.0%
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
3,336.2 hrs. $133,447 $75,562 $56,772
SAY:
$949,300
$949,281
Page 16
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 5 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$276
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$1,657 $0 M&L TOTAL COST
Estimated By: J. Krull
UNIT
$690 $4,000 $966 $552 $1,242 $2,347
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
1 LS
$640.00
$640
$900.00
9.3750
$96
$900
9.4
$1,540.00
$1,540
230700
- Condenser water (cond), 48" diameter
15 LF
$100.00
$1,500
$144.00
1.5000
$96
$2,160
22.5
$244.00
$3,660
230700
- Primary chilled water supply (pchws), 36" diameter
15 LF
$75.00
$1,125
$96.00
1.0000
$96
$1,440
15.0
$171.00
$2,565
230700
- Condenser water (cond), 48" diameter
30 LF
$100.00
$3,000
$144.00
1.5000
$96
$4,320
45.0
$244.00
$7,320
230700
- Valving station and exposed branch-pipe connections
15 LF
$50.00
$750
$72.00
0.7500
$96
$1,080
11.3
$122.00
$1,830
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$9,900 $4,950 $2,228 $1,674
103.1 hrs
50.0% 15.0% 9.80%
$7,015 on labor only $1,052 $791
$4,950 $3,280 $2,464
Page 17
CSI NUM
DESCRIPTION:
MATERIAL UNIT TOTAL PRICE COST General Conditions & Administration $10,074 Allowance $1,657 Material Cost $8,858 Total Labor $18,751 Total Cost $39,339 QUANT
UNIT
ESTIMATOR CHECK
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 25.6% 4.2% 22.5% 47.7% 100.0%
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
SAY:
M&L TOTAL COST
$39,300
$39,339
Page 18
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF
$54,107
BID AMOUNT
$663,365
ALTERNATES Amount
PREVIOUS
PROGRAM 5/8/2024 $609,258
Mechanical P-1
(Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT Bldg $/sf
BUILDING COSTS Construction P-1
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$609,258
$23,540
HVAC
$54,107
$356
LOW: HIGH:
$497,524 $928,711
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
Revision:
ALBANY COUNTY DIV 1.
CHA CONSULTING INC.
Project No.:
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
CONSTRUCTION REHAB 1
Estimated By: D. Lizak
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 88 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
$9,808 $61,952 $11,770 $7,847 $39,233 $39,233 $3,923 $7,847
$704 /day
017716
Contract Closeout
3.0%
$11,770
012100
FIELD ORDER ALLOWANCE
6.0%
$23,540
CSI NUM
DESCRIPTION:
QUANT
M&L TOTAL COST
UNIT PRICE
$7,150.00
$7,150
$14,300.00
178.7500
$80
$14,300
178.8
$21,450.00
$21,450
2 SF
$85.00
$170
$275.00
3.4375
$80
$550
6.9
$360.00
$720
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL UNIT COST
MATERIAL UNIT TOTAL PRICE COST
UNIT
TOTAL COST
TOTAL HRS
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131 030131 030131
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep) - Concrete slab Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete columns
4 SF
$110.00
$440
$315.00
3.9375
$80
$1,260
15.8
$425.00
$1,700
030131
- Concrete deck underside
6 SF
$125.00
$750
$375.00
4.6875
$80
$2,250
28.1
$500.00
$3,000
030131
- Concrete pier foundation
32 SF
$110.00
$3,520
$315.00
3.9375
$80
$10,080
126.0
$425.00
$13,600
030131
- Concrete slab
86 SF
$110.00
$9,460
$315.00
3.9375
$80
$27,090
338.6
$425.00
$36,550
030131
- Concrete wall
21 SF
$110.00
$2,310
$315.00
3.9375
$80
$6,615
82.7
$425.00
$8,925
Page 20
CSI NUM 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete scaling (Large - x > 1/2" deep)
030131
- Concrete beams
10 SF
$60.00
$600
$98.00
1.2250
$80
$980
12.3
$158.00
$1,580
030131
- Concrete columns
20 SF
$60.00
$1,200
$98.00
1.2250
$80
$1,960
24.5
$158.00
$3,160
030131
- Concrete wall
6 SF
$60.00
$360
$98.00
1.2250
$80
$588
7.4
$158.00
$948
030131
Concrete crack repairs 146 LF
$55.00
$8,030
$125.00
1.5625
$80
$18,250
228.1
$180.00
$26,280
Miscellaneous repairs at water damaged areas (assume 10% of 55 SF)
6 SF
$110.00
$660
$315.00
3.9375
$80
$1,890
23.6
$425.00
$2,550
Scaffolding
1 LS
$3,125.00
$3,125
$3,125.00
39.0625
$80
$3,125
39.1
$6,250.00
$6,250
030131 030131
- Wide crack ( x >1/8")
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
3 SF
$200.00
$600
$800.00
10.0000
$80
$2,400
30.0
$1,000.00
$3,000
050000
Miscellaneous reinforcing of deteriorated steel beam per location (severe corrosion)
3 EA
$1,200.00
$3,600
$2,560.00
32.0000
$80
$7,680
96.0
$3,760.00
$11,280
050000
Replace missing bolts
1 EA
$25.00
$25
$160.00
2.0000
$80
$160
2.0
$185.00
$185
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
5 SF
$150.00
$750
$640.00
8.0000
$80
$3,200
40.0
$790.00
$3,950
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
36 SF
$200.00
$7,200
$800.00
10.0000
$80
$28,800
360.0
$1,000.00
$36,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
4 EA
$1,200.00
$4,800
$2,560.00
32.0000
$80
$10,240
128.0
$3,760.00
$15,040
050000
Reinforcing at bent / damaged flange (per location)
2 EA
$800.00
$1,600
$2,560.00
32.0000
$80
$5,120
64.0
$3,360.00
$6,720
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
10 SF
$200.00
$2,000
$800.00
10.0000
$80
$8,000
100.0
$1,000.00
$10,000
050000
Replace missing bolts
7 EA
$25.00
$175
$80.00
1.0000
$80
$560
7.0
$105.00
$735
Page 21
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
050000
Replace missing handrail (assume 5LF/location)
2 EA
$1,250.00
$2,500
$480.00
6.0000
$80
$960
12.0
$1,730.00
$3,460
050000
Reattach handrail
1 LS
$75.00
$75
$480.00
6.0000
$80
$480
6.0
$555.00
$555
Page 22
CSI NUM
050000
DESCRIPTION:
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
QUANT
Tunnel ventilation to accommodate welding, painting etc.
UNIT
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
Remove and replace deteriorated expansion joint material
42 LF
$5.50
$231
$25.00
0.3125
$80
$1,050
13.1
$30.50
$1,281
079200
Sealant at floor slab
10 LF
$2.75
$28
$10.50
0.1313
$80
$105
1.3
$13.25
$133
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$67,609 on labor only $10,141 $7,619 $193,384 $23,540 $85,369 $306,965 $609,258
$162,068 $81,034 $36,465 $27,398 31.7% 3.9% 14.0% 50.4% 100.0%
2,025.9 hrs. $81,034 $46,607 $35,017
SAY:
$609,300
$609,258
Page 23
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 5 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$391
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$2,349 $0 M&L TOTAL COST
Estimated By: J. Krull
UNIT
$979 $4,000 $1,370 $783 $1,762 $3,327
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
1 LS
$900.00
$900
$1,300.00
13.5417
$96
$1,300
13.5
$2,200.00
$2,200
230700
- Condenser water (cond), 48" diameter
50 LF
$100.00
$5,000
$144.00
1.5000
$96
$7,200
75.0
$244.00
$12,200
230700
- Primary chilled water supply (pchws), 36" diameter
50 LF
$75.00
$3,750
$96.00
1.0000
$96
$4,800
50.0
$171.00
$8,550
230700
- Valving station and exposed valving system (e.g. missing insulation on valves)
1 LS
$250.00
$250
$768.00
8.0000
$96
$768
8.0
$1,018.00
$1,018
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$14,068 $7,034 $3,165 $2,378
146.5 hrs
50.0% 15.0% 9.80% General Conditions & Administration Allowance
$9,900 on labor only $1,485 $1,116 $12,612 $2,349
$7,034 $4,650 $3,494
23.3% 4.3%
Page 24
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST Material Cost $12,501 Total Labor $26,645 Total Cost $54,107
ESTIMATOR CHECK
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 23.1% 49.2% 100.0%
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
SAY:
M&L TOTAL COST
$54,100
$54,107
Page 25
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF
$35,962
BID AMOUNT
$1,912,157
ALTERNATES Amount
PREVIOUS
PROGRAM 5/8/2024 $1,876,196
Mechanical P-1
(Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT Bldg $/sf
BUILDING COSTS Construction P-1
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$1,876,196
$78,032
$35,962
$1,611
LOW: HIGH:
$1,434,118 $2,677,020
HVAC
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
Revision:
ALBANY COUNTY DIV 1.
CHA CONSULTING INC.
Project No.:
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
CONSTRUCTION REHAB 1
Estimated By: D. Lizak
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 88 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
$32,513 $61,952 $39,016 $26,011 $130,053 $130,053 $13,005 $26,011
$704 /day
017716
Contract Closeout
3.0%
$39,016
012100
FIELD ORDER ALLOWANCE
6.0%
$78,032
CSI NUM
DESCRIPTION:
QUANT
UNIT
M&L TOTAL COST
UNIT PRICE
$7,150.00
$7,150
$14,300.00
178.7500
$80
$14,300
178.8
$21,450.00
$21,450
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL UNIT COST
MATERIAL UNIT TOTAL PRICE COST
TOTAL COST
TOTAL HRS
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete pier foundation
68 SF
$110.00
$7,480
$315.00
3.9375
$80
$21,420
267.8
$425.00
$28,900
030131
- Concrete slab
921 SF
$110.00
$101,310
$315.00
3.9375
$80
$290,115
3,626.4
$425.00
$391,425
030131
- Concrete wall
4 SF
$110.00
$440
$315.00
3.9375
$80
$1,260
15.8
$425.00
$1,700
83 SF
$45.00
$3,735
$80.00
1.0000
$80
$6,640
83.0
$125.00
$10,375
030131 030131
Concrete scaling (Light - x < 1/4" deep) - Concrete slab
Page 27
CSI NUM 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete scaling (Large - x > 1/2" deep)
030131
- Concrete pier foundation
31 SF
$30.00
$930
$55.00
0.6875
$80
$1,705
21.3
$85.00
$2,635
030131
- Concrete wall
13 SF
$60.00
$780
$98.00
1.2250
$80
$1,274
15.9
$158.00
$2,054
030131
Concrete crack repairs 108 LF
$55.00
$5,940
$125.00
1.5625
$80
$13,500
168.8
$180.00
$19,440
030131 030131
- Wide crack ( x >1/8") Remove efflorescence
030131
- Concrete pier foundation
82 SF
$30.00
$2,460
$55.00
0.6875
$80
$4,510
56.4
$85.00
$6,970
030131
- Concrete slab
189 SF
$30.00
$5,670
$55.00
0.6875
$80
$10,395
129.9
$85.00
$16,065
030131
- Concrete wall
733 SF
$30.00
$21,990
$55.00
0.6875
$80
$40,315
503.9
$85.00
$62,305
030131
Miscellaneous repairs at water damaged areas (assume 10% of 840 SF)
84 SF
$110.00
$9,240
$315.00
3.9375
$80
$26,460
330.8
$425.00
$35,700
030131
Replace deteriorated grout including associated shoring (avg 5 sf per location)
2 EA
$800.00
$1,600
$1,920.00
24.0000
$80
$3,840
48.0
$2,720.00
$5,440
Scaffolding
1 LS
$3,125.00
$3,125
$3,125.00
39.0625
$80
$3,125
39.1
$6,250.00
$6,250
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
13 SF
$200.00
$2,600
$800.00
10.0000
$80
$10,400
130.0
$1,000.00
$13,000
050000
Miscellaneous reinforcing of deteriorated steel beam per location (severe corrosion)
7 EA
$1,200.00
$8,400
$2,560.00
32.0000
$80
$17,920
224.0
$3,760.00
$26,320
050000
Replace missing bolts
1 EA
$25.00
$25
$160.00
2.0000
$80
$160
2.0
$185.00
$185
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
58 SF
$200.00
$11,600
$800.00
10.0000
$80
$46,400
580.0
$1,000.00
$58,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
6 EA
$1,200.00
$7,200
$2,560.00
32.0000
$80
$15,360
192.0
$3,760.00
$22,560
050000
Reinforcing at bent / damaged flange (per location)
1 EA
$800.00
$800
$2,560.00
32.0000
$80
$2,560
32.0
$3,360.00
$3,360
050000
Replace backwards steel angle connection
1 LS
$550.00
$550
$1,280.00
16.0000
$80
$1,280
16.0
$1,830.00
$1,830
050000
Replace missing bolts
8 EA
$25.00
$200
$80.00
1.0000
$80
$640
8.0
$105.00
$840
Page 28
CSI NUM
DESCRIPTION:
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
QUANT
UNIT
2 SF
MATERIAL UNIT TOTAL PRICE COST
$200.00
$400
UNIT PRICE
$800.00
MAN HRS PER UNIT
10.0000
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
$1,600
TOTAL HRS
20.0
TOTAL UNIT COST
$1,000.00
M&L TOTAL COST
$2,000
Page 29
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
050000
Replace steel ladder
1 EA
$2,500.00
$2,500
$640.00
8.0000
$80
$640
8.0
$3,140.00
$3,140
050000
Remove and replace deteriorated steel bracing (per location)
1 EA
$1,000.00
$1,000
$1,280.00
16.0000
$80
$1,280
16.0
$2,280.00
$2,280
050000
Replace steel sump cover
1 EA
$800.00
$800
$320.00
4.0000
$80
$320
4.0
$1,120.00
$1,120
Remove and replace deteriorated expansion joint material
72 LF
$5.50
$396
$25.00
0.3125
$80
$1,800
22.5
$30.50
$2,196
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$543,594 $271,797 $122,309 $91,895
6,794.9 hrs.
50.0% 15.0% 9.80%
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$214,571 on labor only $32,186 $24,182 $497,631 $78,032 $270,939 $1,029,594 $1,876,196
26.5% 4.2% 14.4% 54.9% 100.0%
$271,797 $154,494 $116,077
SAY:
$1,876,200
$1,876,196
Page 30
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 2 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$268
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$1,611 $0 M&L TOTAL COST
Estimated By: J. Krull
UNIT
$671 $1,600 $940 $537 $1,208 $2,282
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230800
MISCELLANEOUS SCOPE ITEMS OTHER THAN INSULATION
230800
Mechanical recommendation item R6 Storm Water Pumps (the two (2) pumps are currently being serviced), furnish spare pumps on premises - section 48
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
1 LS
1 ALLOW
$500.00
$500
$768.00
8.0000
$96
$768
8.0
$1,268.00
$1,268
$15,000.00
$15,000
$3,072.00
32.0000
$96
$3,072
32.0
$18,072.00
$18,072
$3,840 $1,920 $864 $649
40.0 hrs
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$15,500 on labor only $2,325 $1,747 $7,506 $1,611 $19,572 $7,273 $35,962
20.9% 4.5% 54.4% 20.2% 100.0%
$1,920 $3,189 $2,396
SAY:
$36,000
Page 31
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
ESTIMATOR CHECK
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
$35,962
Page 32
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,732,717
Mechanical P-1
$166,522
BID AMOUNT
$1,899,239
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-1
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$1,732,717
$71,861
$166,522
$7,731
LOW: HIGH:
$1,424,429 $2,658,935
HVAC
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
Revision:
ALBANY COUNTY DIV 1.
CHA CONSULTING INC.
Project No.:
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
CONSTRUCTION REHAB 1
Estimated By: D. Lizak
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 88 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
$29,942 $61,952 $35,930 $23,954 $119,768 $119,768 $11,977 $23,954
$704 /day
017716
Contract Closeout
3.0%
$35,930
012100
FIELD ORDER ALLOWANCE
6.0%
$71,861
CSI NUM
DESCRIPTION:
QUANT
M&L TOTAL COST
UNIT PRICE
$7,150.00
$7,150
$14,300.00
178.7500
$80
$14,300
178.8
$21,450.00
$21,450
7 SF
$110.00
$770
$315.00
3.9375
$80
$2,205
27.6
$425.00
$2,975
478 SF
$110.00
$52,580
$315.00
3.9375
$80
$150,570
1,882.1
$425.00
$203,150
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL UNIT COST
MATERIAL UNIT TOTAL PRICE COST
UNIT
TOTAL COST
TOTAL HRS
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete pier foundation
030131
- Concrete slab
030131
- Stairs
1 SF
$110.00
$110
$315.00
3.9375
$80
$315
3.9
$425.00
$425
030131
- Concrete wall
27 SF
$110.00
$2,970
$315.00
3.9375
$80
$8,505
106.3
$425.00
$11,475
030131
Concrete scaling (Light - x < 1/4" deep)
030131
- Concrete slab
424 SF
$45.00
$19,080
$80.00
1.0000
$80
$33,920
424.0
$125.00
$53,000
030131
- Concrete wall
82 SF
$45.00
$3,690
$80.00
1.0000
$80
$6,560
82.0
$125.00
$10,250
Page 34
CSI NUM 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete crack repairs
030131
- Wide crack ( x >1/8")
030131
- Fine crack ( 1/32"< x < 1/16")
222 LF
$55.00
$12,210
$125.00
1.5625
$80
$27,750
346.9
$180.00
$39,960
4 LF
$30.00
$120
$95.00
1.1875
$80
$380
4.8
$125.00
$500
030131
Remove efflorescence
030131
- Concrete slab
220 SF
$30.00
$6,600
$55.00
0.6875
$80
$12,100
151.3
$85.00
$18,700
030131
- Concrete wall
159 SF
$30.00
$4,770
$55.00
0.6875
$80
$8,745
109.3
$85.00
$13,515
030131
Repair existing unfinished repair area on concrete wall
29 SF
$60.00
$1,740
$98.00
1.2250
$80
$2,842
35.5
$158.00
$4,582
030131
Replace deteriorated grout including associated shoring (avg 5 sf per location)
5 EA
$800.00
$4,000
$1,920.00
24.0000
$80
$9,600
120.0
$2,720.00
$13,600
Scaffolding
1 LS
$3,125.00
$3,125
$3,125.00
39.0625
$80
$3,125
39.1
$6,250.00
$6,250
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
62 SF
$200.00
$12,400
$800.00
10.0000
$80
$49,600
620.0
$1,000.00
$62,000
050000
Miscellaneous reinforcing of deteriorated steel beam per location (severe corrosion)
6 EA
$1,200.00
$7,200
$2,560.00
32.0000
$80
$15,360
192.0
$3,760.00
$22,560
050000
Replace missing bolts
1 EA
$25.00
$25
$160.00
2.0000
$80
$160
2.0
$185.00
$185
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
150 SF
$200.00
$30,000
$800.00
10.0000
$80
$120,000
1,500.0
$1,000.00
$150,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
10 EA
$1,200.00
$12,000
$2,560.00
32.0000
$80
$25,600
320.0
$3,760.00
$37,600
050000
Remove and replace deteriorated steel bracing (per location)
1 EA
$1,000.00
$1,000
$1,280.00
16.0000
$80
$1,280
16.0
$2,280.00
$2,280
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
6 SF
$200.00
$1,200
$800.00
10.0000
$80
$4,800
60.0
$1,000.00
$6,000
050000
Replace steel ladder
1 EA
$2,500.00
$2,500
$640.00
8.0000
$80
$640
8.0
$3,140.00
$3,140
050000
Remove and replace deteriorated steel bracing (per location)
1 EA
$1,000.00
$1,000
$1,280.00
16.0000
$80
$1,280
16.0
$2,280.00
$2,280
Page 35
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$192,490 on labor only $28,874 $21,694 $463,175 $71,861 $243,057 $954,624 $1,732,717
26.7% 4.1% 14.0% 55.1% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$504,012 $252,006 $113,403 $85,203
6,300.2 hrs.
M&L TOTAL COST
$10,625
$252,006 $142,276 $106,897
SAY:
$1,732,700
$1,732,717
Page 36
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 2 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$1,288
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$7,731 $0 M&L TOTAL COST
Estimated By: J. Krull
$3,221 $1,600 $4,510 $2,577 $5,798 $10,952
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
1 LS
$3,000.00
$3,000
$4,500.00
46.8750
$96
$4,500
46.9
$7,500.00
$7,500
5 LF
$14.90
$75
$19.20
0.2000
$96
$96
1.0
$34.10
$171
UNIT
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
230700
- CWS & CWR, 8" diameter
230700
- RPWS, 8" diameter
150 LF
$14.90
$2,235
$19.20
0.2000
$96
$2,880
30.0
$34.10
$5,115
230700
- Primary chilled water return (pchwr), 20" diameter
150 LF
$42.00
$6,300
$41.90
0.4365
$96
$6,285
65.5
$83.90
$12,585
230700
- Primary chilled water supply (pchws), 20" diameter
150 LF
$42.00
$6,300
$41.90
0.4365
$96
$6,285
65.5
$83.90
$12,585
230700
- RPWS, 8" diameter - valving station
1 LS
$250.00
$250
$768.00
8.0000
$96
$768
8.0
$1,018.00
$1,018
230700
- Primary chilled water return (pchwr), 20" diameter - valving station
1 LS
$250.00
$250
$768.00
8.0000
$96
$768
8.0
$1,018.00
$1,018
230700
- Primary chilled water supply (pchws), 20" diameter - valving station
1 LS
$250.00
$250
$768.00
8.0000
$96
$768
8.0
$1,018.00
$1,018
Page 37
UNIT
200 LF
$44.63
$8,926
$38.40
0.4000
$96
$7,680
80.0
$83.03
$16,606
230700
- Steam condensate pump discharge (cpd), 8" diameter
200 LF
$24.90
$4,980
$25.63
0.2670
$96
$5,126
53.4
$50.53
$10,106
230700
- Domestic cold water (dcws), 12" diameter
200 LF
$11.20
$2,240
$19.20
0.2000
$96
$3,840
40.0
$30.40
$6,080
230700
- Chilled water (chw), 8" diameter
200 LF
$14.90
$2,980
$19.20
0.2000
$96
$3,840
40.0
$34.10
$6,820
$42,836 $21,418 $9,638 $7,241
446.2 hrs
ESTIMATOR CHECK
$37,786 on labor only $5,668 $4,258 $29,946 $7,731 $47,712 $81,134 $166,522
18.0% 4.6% 28.7% 48.7% 100.0%
TOTAL COST
TOTAL HRS
M&L TOTAL COST
- High pressure steam (hps), 14" diameter
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
MAN HRS PER UNIT
TOTAL UNIT COST
230700
50.0% 15.0% 9.80%
UNIT PRICE
LABOR HRLY WAGE OR UNIT COST
DESCRIPTION:
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
QUANT
MATERIAL UNIT TOTAL PRICE COST
CSI NUM
$21,418 $15,306 $11,500
SAY:
$166,500
$166,522
Page 38
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,692,525
Mechanical P-1
$351,626
BID AMOUNT
$2,044,151
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-1
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$1,692,525
$70,132
$351,626
$15,395
LOW: HIGH:
$1,533,113 $2,861,812
HVAC
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
Revision:
ALBANY COUNTY DIV 1.
CHA CONSULTING INC.
Project No.:
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
CONSTRUCTION REHAB 1
Estimated By: D. Lizak
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 88 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
$29,222 $61,952 $35,066 $23,377 $116,887 $116,887 $11,689 $23,377
$704 /day
017716
Contract Closeout
3.0%
$35,066
012100
FIELD ORDER ALLOWANCE
6.0%
$70,132
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$7,150.00
$7,150
$14,300.00
178.7500
$80
$14,300
178.8
$21,450.00
$21,450
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete beams
6 SF
$110.00
$660
$315.00
3.9375
$80
$1,890
23.6
$425.00
$2,550
030131
- Concrete deck underside
37 SF
$125.00
$4,625
$375.00
4.6875
$80
$13,875
173.4
$500.00
$18,500
030131
- Concrete pier foundation
47 SF
$110.00
$5,170
$315.00
3.9375
$80
$14,805
185.1
$425.00
$19,975
030131
- Concrete slab
531 SF
$110.00
$58,410
$315.00
3.9375
$80
$167,265
2,090.8
$425.00
$225,675
030131
- Concrete wall
162 SF
$110.00
$17,820
$315.00
3.9375
$80
$51,030
637.9
$425.00
$68,850
13 SF
$60.00
$780
$118.00
1.4750
$80
$1,534
19.2
$178.00
$2,314
030131 030131
Concrete scaling (Large - x > 1/2" deep) - Concrete deck
Page 40
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
030131
- Concrete slab
3 SF
$60.00
$180
$98.00
1.2250
$80
$294
3.7
$158.00
$474
030131
- Concrete wall
38 SF
$60.00
$2,280
$98.00
1.2250
$80
$3,724
46.6
$158.00
$6,004
030131
Concrete crack repairs 204 LF
$55.00
$11,220
$125.00
1.5625
$80
$25,500
318.8
$180.00
$36,720
030131
- Wide crack ( x >1/8")
030131
Repair existing unfinished repair area on concrete wall
15 SF
$60.00
$900
$98.00
1.2250
$80
$1,470
18.4
$158.00
$2,370
030131
Miscellaneous repairs at water damaged areas (assume 10% of 232 SF)
24 SF
$110.00
$2,640
$315.00
3.9375
$80
$7,560
94.5
$425.00
$10,200
030131
Replace deteriorated grout including associated shoring (avg 5 sf per location)
5 EA
$800.00
$4,000
$1,920.00
24.0000
$80
$9,600
120.0
$2,720.00
$13,600
Scaffolding
1 LS
$3,125.00
$3,125
$3,125.00
39.0625
$80
$3,125
39.1
$6,250.00
$6,250
2 SF
$25.00
$50
$80.00
1.0000
$80
$160
2.0
$105.00
$210
DIVISION 4: MASONRY 040121
Remove and replace deteriorated CMU block
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
15 SF
$200.00
$3,000
$800.00
10.0000
$80
$12,000
150.0
$1,000.00
$15,000
050000
Miscellaneous reinforcing of deteriorated steel beam per location (severe corrosion)
4 EA
$1,200.00
$4,800
$2,560.00
32.0000
$80
$10,240
128.0
$3,760.00
$15,040
050000
Replace damaged / corroded steel angle connection (per location)
1 EA
$800.00
$800
$2,560.00
32.0000
$80
$2,560
32.0
$3,360.00
$3,360
050000
Replace missing bolts
16 EA
$25.00
$400
$160.00
2.0000
$80
$2,560
32.0
$185.00
$2,960
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
145 SF
$200.00
$29,000
$800.00
10.0000
$80
$116,000
1,450.0
$1,000.00
$145,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
10 EA
$1,200.00
$12,000
$2,560.00
32.0000
$80
$25,600
320.0
$3,760.00
$37,600
050000
Replace missing bolts
2 EA
$25.00
$50
$80.00
1.0000
$80
$160
2.0
$105.00
$210
050000
METAL STAIRS
Page 41
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
8 SF
$200.00
$1,600
$800.00
10.0000
$80
$6,400
80.0
$1,000.00
$8,000
050000
Replace steel ladder
1 EA
$2,500.00
$2,500
$640.00
8.0000
$80
$640
8.0
$3,140.00
$3,140
050000
Replace steel sump cover
1 EA
$800.00
$800
$320.00
4.0000
$80
$320
4.0
$1,120.00
$1,120
Page 42
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$180,210 on labor only $27,032 $20,310 $453,523 $70,132 $227,551 $941,318 $1,692,525
26.8% 4.1% 13.4% 55.6% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$496,987 $248,494 $111,822 $84,016
6,212.3 hrs.
M&L TOTAL COST
$10,625
$248,494 $138,854 $104,325
SAY:
$1,692,500
$1,692,525
Page 43
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 29 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$2,566
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$15,395 $0 M&L TOTAL COST
Estimated By: J. Krull
$6,415 $23,200 $8,980 $5,132 $11,546 $21,810
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
1 LS
$5,000.00
$5,000
$7,500.00
78.1250
$96
$7,500
78.1
$12,500.00
$12,500
UNIT
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
230700
- Primary chilled water return (pchwr), 30" diameter
100 LF
$70.00
$7,000
$89.60
0.9333
$96
$8,960
93.3
$159.60
$15,960
230700
- Primary chilled water return (pchwr), 20" diameter
100 LF
$42.00
$4,200
$41.90
0.4365
$96
$4,190
43.6
$83.90
$8,390
230700
- Valving station valves and branch pipes under 14" HPS line
1 LS
$250.00
$250
$768.00
8.0000
$96
$768
8.0
$1,018.00
$1,018
230700
- Primary chilled water return (pchwr), 30" diameter
500 LF
$70.00
$35,000
$89.60
0.9333
$96
$44,800
466.7
$159.60
$79,800
230700
- Primary chilled water return (pchwr), 20" diameter
500 LF
$42.00
$21,000
$41.90
0.4365
$96
$20,950
218.2
$83.90
$41,950
Page 44
CSI NUM
DESCRIPTION: Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
QUANT
UNIT
50.0% 15.0% 9.80%
MATERIAL UNIT TOTAL PRICE COST $72,450 on labor only $10,868 $8,165
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$79,648 $15,395 $91,483 $165,101 $351,626
UNIT PRICE
MAN HRS PER UNIT
22.7% 4.4% 26.0% 47.0% 100.0%
LABOR HRLY WAGE OR UNIT COST
TOTAL TOTAL COST HRS $87,168 908.0 hrs $43,584 $19,613 $14,736
TOTAL UNIT COST
SAY:
M&L TOTAL COST $43,584 $30,480 $22,901
$351,600
$351,626
Page 45
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $2,972,261
BID AMOUNT
$2,972,261
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-1
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$2,972,261
$125,175
LOW: HIGH:
$2,229,196 $4,161,166
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
Revision:
ALBANY COUNTY DIV 1.
CHA CONSULTING INC.
Project No.:
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
CONSTRUCTION REHAB 1
Estimated By: D. Lizak
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 88 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
$52,156 $61,952 $62,587 $41,725 $208,624 $208,624 $20,862 $41,725
$704 /day
017716
Contract Closeout
3.0%
$62,587
012100
FIELD ORDER ALLOWANCE
6.0%
$125,175
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete beams
030131
4 SF
$110.00
$440
$315.00
3.9375
$80
$1,260
15.8
$425.00
$1,700
- Concrete deck underside
356 SF
$125.00
$44,500
$375.00
4.6875
$80
$133,500
1,668.8
$500.00
$178,000
030131
- Concrete pier foundation
5 SF
$110.00
$550
$315.00
3.9375
$80
$1,575
19.7
$425.00
$2,125
030131
- Concrete slab
623 SF
$110.00
$68,530
$315.00
3.9375
$80
$196,245
2,453.1
$425.00
$264,775
030131
- Concrete wall
77 SF
$110.00
$8,470
$315.00
3.9375
$80
$24,255
303.2
$425.00
$32,725
030131
Concrete scaling (Large - x > 1/2" deep)
030131
- Concrete pier foundation
3 SF
$60.00
$180
$98.00
1.2250
$80
$294
3.7
$158.00
$474
030131
- Concrete slab
89 SF
$60.00
$5,340
$98.00
1.2250
$80
$8,722
109.0
$158.00
$14,062
030131
Concrete crack repairs
030131
- Wide crack ( x >1/8")
487 LF
$55.00
$26,785
$125.00
1.5625
$80
$60,875
760.9
$180.00
$87,660
030131
- Medium crack (1/16"< x < 1/8")
224 LF
$45.00
$10,080
$115.00
1.4375
$80
$25,760
322.0
$160.00
$35,840
Page 47
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
030131
Remove efflorescence
030131
- Concrete deck
214 SF
$30.00
$6,420
$66.00
0.8250
$80
$14,124
176.6
$96.00
$20,544
030131
- Concrete slab
842 SF
$30.00
$25,260
$55.00
0.6875
$80
$46,310
578.9
$85.00
$71,570
030131
- Concrete wall
339 SF
$30.00
$10,170
$55.00
0.6875
$80
$18,645
233.1
$85.00
$28,815
030131
Remove organic growth from slab on grade
45 SF
$25.00
$1,125
$45.00
0.5625
$80
$2,025
25.3
$70.00
$3,150
030131
Repair existing unfinished repair area on concrete wall
125 SF
$60.00
$7,500
$98.00
1.2250
$80
$12,250
153.1
$158.00
$19,750
030131
Miscellaneous repairs at water damaged areas (assume 10% of 520 SF)
52 SF
$110.00
$5,720
$315.00
3.9375
$80
$16,380
204.8
$425.00
$22,100
030131
Replace deteriorated grout including associated shoring (avg 5 sf per location)
3 EA
$800.00
$2,400
$1,920.00
24.0000
$80
$5,760
72.0
$2,720.00
$8,160
030131
Deep surface repair at exposed rebar location
5 SF
$175.00
$875
$220.00
2.7500
$80
$1,100
13.8
$395.00
$1,975
Scaffolding
1 LS
$3,125.00
$3,125
$3,125.00
39.0625
$80
$3,125
39.1
$6,250.00
$6,250
2 SF
$25.00
$50
$80.00
1.0000
$80
$160
2.0
$105.00
$210
DIVISION 4: MASONRY 040121
Remove and replace deteriorated CMU block
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
61 SF
$200.00
$12,200
$800.00
10.0000
$80
$48,800
610.0
$1,000.00
$61,000
050000
Miscellaneous reinforcing of deteriorated steel beam per location (severe corrosion)
8 EA
$1,200.00
$9,600
$2,560.00
32.0000
$80
$20,480
256.0
$3,760.00
$30,080
050000
Reinforcing at bent flange (per location)
1 EA
$750.00
$750
$1,920.00
24.0000
$80
$1,920
24.0
$2,670.00
$2,670
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
242 SF
$200.00
$48,400
$800.00
10.0000
$80
$193,600
2,420.0
$1,000.00
$242,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
12 EA
$1,200.00
$14,400
$2,560.00
32.0000
$80
$30,720
384.0
$3,760.00
$45,120
050000
Replace missing bolts
4 EA
$25.00
$100
$80.00
1.0000
$80
$320
4.0
$105.00
$420
Page 48
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
050000
Remove and replace base plate including temporary shoring
1 EA
$4,500.00
$4,500
$3,200.00
40.0000
$80
$3,200
40.0
$7,700.00
$7,700
050000
Reinforcing at bent flange (per location)
2 EA
$750.00
$1,500
$1,920.00
24.0000
$80
$3,840
48.0
$2,670.00
$5,340
050000
METAL STAIRS
050000
Replace steel ladder
1 EA
$2,500.00
$2,500
$640.00
8.0000
$80
$640
8.0
$3,140.00
$3,140
050000
Remove and replace deteriorated steel bracing (per location)
1 EA
$1,000.00
$1,000
$1,280.00
16.0000
$80
$1,280
16.0
$2,280.00
$2,280
Page 49
CSI NUM
050000
DESCRIPTION:
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
50 LF
$3.00
$150
$13.71
0.1714
$80
$686
8.6
$16.71
$836
QUANT
Tunnel ventilation to accommodate welding, painting etc.
UNIT
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
Remove and replace deteriorated joint sealant and backer rod
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$328,870 on labor only $49,331 $37,064 $760,844 $125,175 $415,264 $1,670,979 $2,972,261
$882,226 11,027.8 hrs. $441,113 $198,501 $149,140 25.6% 4.2% 14.0% 56.2% 100.0%
SAY:
$441,113 $247,831 $186,204
$2,972,300
$2,972,261
Page 50
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,164,362 $22,508 $234,286
BID AMOUNT
$1,421,156
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2 Electrical P-2 Mechanical P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction Electrical HVAC
$1,164,362 $22,508 $234,286
$540,400 $1,700 $10,345
LOW: HIGH:
$1,065,867 $1,989,618
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 76 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $19,908 $53,504 $23,889 $15,926 $79,631 $79,631 $7,963 $15,926
$704 /day
017716
Contract Closeout
3.0%
$23,889
012100
FIELD ORDER ALLOWANCE
6.0%
$47,779
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$16,675.00
$16,675
$20,840.00
260.5000
$80
$20,840
260.5
$37,515.00
$37,515
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete deck
4 SF
$125.00
$500
$375.00
4.6875
$80
$1,500
18.8
$500.00
$2,000
030131
- Concrete pier foundation
2 SF
$110.00
$220
$315.00
3.9375
$80
$630
7.9
$425.00
$850
030131
- Concrete slab
66 SF
$110.00
$7,260
$315.00
3.9375
$80
$20,790
259.9
$425.00
$28,050
- Concrete wall
26 SF
$110.00
$2,860
$315.00
3.9375
$80
$8,190
102.4
$425.00
$11,050
030131 030131
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete columns
1 SF
$85.00
$85
$275.00
3.4375
$80
$275
3.4
$360.00
$360
030131
- Concrete deck
10 SF
$98.00
$980
$330.00
4.1250
$80
$3,300
41.3
$428.00
$4,280
030131
- Concrete pier foundation
10 SF
$85.00
$850
$275.00
3.4375
$80
$2,750
34.4
$360.00
$3,600
Page 52
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
030131
- Concrete slab
5 SF
$85.00
$425
$275.00
3.4375
$80
$1,375
17.2
$360.00
$1,800
030131
- Concrete wall
45 SF
$85.00
$3,825
$275.00
3.4375
$80
$12,375
154.7
$360.00
$16,200
030131
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Concrete slab
5 SF
$65.00
$325
$200.00
2.5000
$80
$1,000
12.5
$265.00
$1,325
030131
- Concrete wall
15 SF
$65.00
$975
$200.00
2.5000
$80
$3,000
37.5
$265.00
$3,975
030131
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
22 LF
$30.00
$660
$95.00
1.1875
$80
$2,090
26.1
$125.00
$2,750
030131
- Medium crack (1/16"< x < 1/8")
677 LF
$45.00
$30,465
$115.00
1.4375
$80
$77,855
973.2
$160.00
$108,320
030131
- Wide crack ( x >1/8")
86 LF
$55.00
$4,730
$125.00
1.5625
$80
$10,750
134.4
$180.00
$15,480
28 SF
$45.00
$1,260
$80.00
1.0000
$80
$2,240
28.0
$125.00
$3,500
030131 030131 030131
Concrete scaling (Light - x < 1/4" deep) - Concrete slab Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete slab
42 SF
$50.00
$2,100
$90.00
1.1250
$80
$3,780
47.3
$140.00
$5,880
030131
- Concrete wall
270 SF
$50.00
$13,500
$90.00
1.1250
$80
$24,300
303.8
$140.00
$37,800
- Concrete pier foundation
19 SF
$60.00
$1,140
$98.00
1.2250
$80
$1,862
23.3
$158.00
$3,002
030131
- Concrete slab
5 SF
$60.00
$300
$98.00
1.2250
$80
$490
6.1
$158.00
$790
030131
Remove efflorescence
030131
- Concrete slab
64 SF
$30.00
$1,920
$55.00
0.6875
$80
$3,520
44.0
$85.00
$5,440
- Concrete wall
593 SF
$30.00
$17,790
$55.00
0.6875
$80
$32,615
407.7
$85.00
$50,405
4 EA
$800.00
$3,200
$1,920.00
24.0000
$80
$7,680
96.0
$2,720.00
$10,880
1 SF
$25.00
$25
$80.00
1.0000
$80
$80
1.0
$105.00
$105
2 SF
$150.00
$300
$640.00
8.0000
$80
$1,280
16.0
$790.00
$1,580
030131 030131
030131 030131
Concrete scaling (Large - x > 1/2" deep)
Replace deteriorated grout including associated shoring (avg 5 sf per location)
DIVISION 4: MASONRY 040121
Remove and replace deteriorated CMU block
DIVISION 5: METALS STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
Page 53
CSI NUM
DESCRIPTION:
050000
Reinforcing at bent / damaged flange (per location)
050000
STEEL COLUMNS
050000
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
1 EA
$800.00
$800
$2,560.00
32.0000
$80
$2,560
32.0
$3,360.00
$3,360
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
14 SF
$125.00
$1,750
$480.00
6.0000
$80
$6,720
84.0
$605.00
$8,470
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
15 SF
$150.00
$2,250
$640.00
8.0000
$80
$9,600
120.0
$790.00
$11,850
050000
Remove and replace base plate including temporary shoring
2 EA
$4,500.00
$9,000
$3,200.00
40.0000
$80
$6,400
80.0
$7,700.00
$15,400
050000
Reinforcing at bent flange (per location)
1 EA
$800.00
$800
$2,560.00
32.0000
$80
$2,560
32.0
$3,360.00
$3,360
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Remove and replace deteriorated expansion joint material
15 LF
$5.50
$83
$25.00
0.3125
$80
$375
4.7
$30.50
$458
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 26.12%
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$133,303 on labor only $19,995 $40,041 $320,269 $47,779 $193,339 $602,974 $1,164,362
$277,157 $138,579 $62,360 $124,879 27.5% 4.1% 16.6% 51.8% 100.0%
3,464.5 hrs. $138,579 $82,356 $164,920
SAY:
$1,164,400
$1,164,362
Page 54
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.0% SUPERVISION 1 days Permits 0.0% Insurance 3.0% Home Office Overhead 15.0% Profit 15.0% Equipment 2.0%
SE-332-E
Project No.:
ELECTRIC 1
Estimated By: J. DiRienzo
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $283 $975 $0 $425 $2,125 $2,125 $283
$975 /day
017716
Contract Closeout
3.0%
$425
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
12.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$1,700 $0 M&L TOTAL COST
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
DIVISION 26: ELECTRICAL 260000
Receptacle outlet - provide cover and conceal exposed wire
2 EA
$25.00
$50
$262.50
2.5000
$105
$525
5.0
$287.50
$575
260000
Junction box - provide cover and conceal exposed wire
1 EA
$50.00
$50
$420.00
4.0000
$105
$420
4.0
$470.00
$470
260000
Receptacle outlet - remove and replace impact damaged outlet
1 EA
$75.00
$75
$420.00
4.0000
$105
$420
4.0
$495.00
$495
260000
Conceal exposed wire between columns, at walls, and at ceiling level - including required removals
1 ALLOW
$1,000.00
$1,000
$1,680.00
16.0000
$105
$1,680
16.0
$2,680.00
$2,680
Page 55
CSI NUM
260000
DESCRIPTION: Provide replacement hangers at areas of corrosion, missing, or broken supports
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
QUANT
UNIT
1 ALLOW
MATERIAL UNIT TOTAL PRICE COST
$875.00
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$875
UNIT PRICE
$2,100.00
MAN HRS PER UNIT
20.0000
$2,050 on labor only $308 $616 $6,642 $1,700 $2,973 $11,193 $22,508
29.5% 7.6% 13.2% 49.7% 100.0%
LABOR HRLY WAGE OR UNIT COST
$105
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$2,100
20.0
$2,975.00
$5,145 $2,573 $1,158 $2,318
49.0 hrs
M&L TOTAL COST
$2,975
$2,573 $1,465 $2,934
SAY:
$22,500
Page 56
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 17 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$1,724
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$10,345 $0 M&L TOTAL COST
Estimated By: J. Krull
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
1 LS
$2,000.00
$2,000
$3,000.00
UNIT
$4,310 $13,600 $6,034 $3,448 $7,758 $14,655
$800 /day
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
31.2500
$96
$3,000
31.3
$5,000.00
$5,000
230700
- Primary chilled water supply (pchws), 36" diameter
10 LF
$75.00
$750
$96.00
1.0000
$96
$960
10.0
$171.00
$1,710
230700
- Pipe, 12" diameter
5 LF
$11.20
$56
$19.20
0.2000
$96
$96
1.0
$30.40
$152
230700
- Condenser water (cond), 48" diameter
20 LF
$100.00
$2,000
$144.00
1.5000
$96
$2,880
30.0
$244.00
$4,880
230700
- Steam condensate pump discharge (cpd), 8" diameter
50 LF
$24.90
$1,245
$25.63
0.2670
$96
$1,282
13.3
$50.53
$2,527
230700
- Primary chilled water supply (pchws), 36" diameter
50 LF
$75.00
$3,750
$96.00
1.0000
$96
$4,800
50.0
$171.00
$8,550
230700
- Condenser water (cond), 48" diameter
50 LF
$100.00
$5,000
$144.00
1.5000
$96
$7,200
75.0
$244.00
$12,200
230700
- Primary chilled water return (pchwr), 14" diameter
130 LF
$25.80
$3,354
$25.63
0.2670
$96
$3,332
34.7
$51.43
$6,686
Page 57
UNIT
10 LF
$44.63
$446
$38.40
0.4000
$96
$384
4.0
$83.03
$830
230700
- Condenser water (cond), 48" diameter
50 LF
$100.00
$5,000
$144.00
1.5000
$96
$7,200
75.0
$244.00
$12,200
230700
- Primary chilled water supply (pchws), 36" diameter
50 LF
$75.00
$3,750
$96.00
1.0000
$96
$4,800
50.0
$171.00
$8,550
230700
- Domestic cold water (dcws), 12" diameter
50 LF
$11.20
$560
$19.20
0.2000
$96
$960
10.0
$30.40
$1,520
230700
- High pressure steam (hps), 14" diameter
50 LF
$44.63
$2,232
$38.40
0.4000
$96
$1,920
20.0
$83.03
$4,152
230700
- Domestic cold water (dcws), 6" diameter
250 LF
$5.90
$1,475
$12.77
0.1330
$96
$3,193
33.3
$18.67
$4,668
230700
- Domestic cold water (dcws), 8" diameter
250 LF
$9.70
$2,425
$15.36
0.1600
$96
$3,840
40.0
$25.06
$6,265
230700
- Chilled water supply and return (chws & chwr), 14" diameter
250 LF
$25.80
$6,450
$25.63
0.2670
$96
$6,408
66.7
$51.43
$12,858
$52,253 $26,127 $11,757 $23,544
544.3 hrs
$40,493 on labor only $6,074 $12,163 $51,530 $10,345 $58,730 $113,681 $234,286
22.0% 4.4% 25.1% 48.5% 100.0%
TOTAL COST
TOTAL HRS
M&L TOTAL COST
- High pressure steam (hps), 14" diameter
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
MAN HRS PER UNIT
TOTAL UNIT COST
230700
50.0% 15.0% 26.12%
UNIT PRICE
LABOR HRLY WAGE OR UNIT COST
DESCRIPTION:
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
QUANT
MATERIAL UNIT TOTAL PRICE COST
CSI NUM
$26,127 $17,831 $35,707
SAY:
$234,300
Page 58
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $2,414,329 $12,902 $23,507
BID AMOUNT
$2,450,738
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2 Electrical P-2 Mechanical P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction Electrical HVAC
$2,414,329 $12,902 $23,507
$101,541 $942 $989
LOW: HIGH:
$1,838,054 $3,431,033
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 76 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $42,309 $53,504 $50,770 $33,847 $169,235 $169,235 $16,923 $33,847
$704 /day
017716
Contract Closeout
3.0%
$50,770
012100
FIELD ORDER ALLOWANCE
6.0%
$101,541
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$16,675.00
$16,675
$20,840.00
260.5000
$80
$20,840
260.5
$37,515.00
$37,515
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete pier foundation
68 SF
$110.00
$7,480
$315.00
3.9375
$80
$21,420
267.8
$425.00
$28,900
030131
- Concrete slab
402 SF
$110.00
$44,220
$315.00
3.9375
$80
$126,630
1,582.9
$425.00
$170,850
030131
- Concrete wall
354 SF
$110.00
$38,940
$315.00
3.9375
$80
$111,510
1,393.9
$425.00
$150,450
030131
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete deck
28 SF
$98.00
$2,744
$330.00
4.1250
$80
$9,240
115.5
$428.00
$11,984
030131
- Concrete pier foundation
87 SF
$85.00
$7,395
$275.00
3.4375
$80
$23,925
299.1
$360.00
$31,320
030131
- Concrete slab
21 SF
$85.00
$1,785
$275.00
3.4375
$80
$5,775
72.2
$360.00
$7,560
030131
- Concrete wall
60 SF
$85.00
$5,100
$275.00
3.4375
$80
$16,500
206.3
$360.00
$21,600
Page 60
CSI NUM
DESCRIPTION:
030131
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Concrete pier foundation
030131
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
6 SF
$65.00
$390
$200.00
2.5000
$80
$1,200
15.0
$265.00
$1,590
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
47 LF
$30.00
$1,410
$95.00
1.1875
$80
$4,465
55.8
$125.00
$5,875
030131
- Medium crack (1/16"< x < 1/8")
449 LF
$45.00
$20,205
$115.00
1.4375
$80
$51,635
645.4
$160.00
$71,840
030131
- Wide crack ( x >1/8")
114 LF
$55.00
$6,270
$125.00
1.5625
$80
$14,250
178.1
$180.00
$20,520
5 SF
$58.00
$290
$108.00
1.3500
$80
$540
6.8
$166.00
$830
030131
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete deck
030131
- Concrete pier foundation
10 SF
$50.00
$500
$90.00
1.1250
$80
$900
11.3
$140.00
$1,400
030131
- Concrete slab
123 SF
$50.00
$6,150
$90.00
1.1250
$80
$11,070
138.4
$140.00
$17,220
030131
- Concrete wall
20 SF
$50.00
$1,000
$90.00
1.1250
$80
$1,800
22.5
$140.00
$2,800
146 SF
$60.00
$8,760
$98.00
1.2250
$80
$14,308
178.9
$158.00
$23,068
030131
Concrete scaling (Large - x > 1/2" deep)
030131
- Concrete slab
030131
Remove efflorescence
030131
- Concrete deck
133 SF
$35.00
$4,655
$66.00
0.8250
$80
$8,778
109.7
$101.00
$13,433
030131
- Concrete pier foundation
32 SF
$30.00
$960
$55.00
0.6875
$80
$1,760
22.0
$85.00
$2,720
030131
- Concrete wall
1,364 SF
$30.00
$40,920
$55.00
0.6875
$80
$75,020
937.8
$85.00
$115,940
030131
Miscellaneous repairs at water damaged areas (assume 10% of 20 SF)
2 SF
$110.00
$220
$315.00
3.9375
$80
$630
7.9
$425.00
$850
030131
Replace deteriorated grout including associated shoring (avg 5 sf per location)
4 EA
$800.00
$3,200
$1,920.00
24.0000
$80
$7,680
96.0
$2,720.00
$10,880
DIVISION 5: METALS STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
14 SF
$125.00
$1,750
$480.00
6.0000
$80
$6,720
84.0
$605.00
$8,470
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
8 SF
$150.00
$1,200
$640.00
8.0000
$80
$5,120
64.0
$790.00
$6,320
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
5 SF
$125.00
$625
$480.00
6.0000
$80
$2,400
30.0
$605.00
$3,025
Page 61
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
36 SF
$150.00
$5,400
$640.00
8.0000
$80
$23,040
288.0
$790.00
$28,440
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
50 SF
$200.00
$10,000
$800.00
10.0000
$80
$40,000
500.0
$1,000.00
$50,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
1 EA
$1,200.00
$1,200
$2,560.00
32.0000
$80
$2,560
32.0
$3,760.00
$3,760
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$614,091 $307,046 $138,170 $276,691
7,676.1 hrs.
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$245,694 on labor only $36,854 $73,802 $620,440 $101,541 $356,350 $1,335,998 $2,414,329
25.7% 4.2% 14.8% 55.3% 100.0%
$307,046 $175,025 $350,493
SAY:
$2,414,300
$2,414,329
Page 62
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.0% SUPERVISION 1 days Permits 0.0% Insurance 3.0% Home Office Overhead 15.0% Profit 15.0% Equipment 2.0%
Project No.:
ELECTRIC 1
Estimated By: J. DiRienzo
SE-332-E
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $157 $975 $0 $235 $1,177 $1,177 $157
$975 /day
017716
Contract Closeout
3.0%
$235
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
12.0% 0.0%
$942 $0
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 26: ELECTRICAL 260000
Junction box - remove and replace due to general damage / rust
1 EA
$125.00
$125
$840.00
8.0000
$105
$840
8.0
$965.00
$965
Page 63
CSI NUM
260000
DESCRIPTION: Provide replacement hangers at areas of corrosion, missing, or broken supports
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
QUANT
UNIT
1 ALLOW
MATERIAL UNIT TOTAL PRICE COST
$875.00
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$875
UNIT PRICE
$2,100.00
MAN HRS PER UNIT
20.0000
$1,000 on labor only $150 $300 $4,114 $942 $1,450 $6,396 $12,902
31.9% 7.3% 11.2% 49.6% 100.0%
LABOR HRLY WAGE OR UNIT COST
$105
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$2,100
20.0
$2,975.00
$2,940 $1,470 $662 $1,325
28.0 hrs
M&L TOTAL COST
$2,975
$1,470 $812 $1,625
SAY:
$12,900
Page 64
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 3 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$165
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
$989 $0
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$412 $2,400 $577 $330 $742 $1,402
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
230700 230700
1 LS
$360.00
$360
$450.00
4.6875
$96
$450
4.7
$810.00
$810
- Domestic cold water (dcws), 12" diameter
100 LF
$11.20
$1,120
$19.20
0.2000
$96
$1,920
20.0
$30.40
$3,040
- Steam condensate pump discharge (cpd), 8" diameter
100 LF
$24.90
$2,490
$25.63
0.2670
$96
$2,563
26.7
$50.53
$5,053
$4,933 $2,467 $1,110 $2,223
51.4 hrs
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor
$3,970 on labor only $596 $1,193 $6,028 $989 $5,758 $10,732
$2,467 $1,705 $3,415
25.6% 4.2% 24.5% 45.7%
Page 65
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST Total Cost $23,507
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 100.0%
TOTAL COST
TOTAL HRS
TOTAL UNIT COST SAY:
M&L TOTAL COST $23,500
Page 66
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,240,120 $4,855 $17,993
BID AMOUNT
$1,262,968
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2 Electrical P-2 Mechanical P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction Electrical HVAC
$1,240,120 $4,855 $17,993
$51,037 $306 $768
LOW: HIGH:
$947,226 $1,768,155
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 76 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $21,266 $53,504 $25,519 $17,012 $85,062 $85,062 $8,506 $17,012
$704 /day
017716
Contract Closeout
3.0%
$25,519
012100
FIELD ORDER ALLOWANCE
6.0%
$51,037
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$16,675.00
$16,675
$20,840.00
260.5000
$80
$20,840
260.5
$37,515.00
$37,515
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete deck
44 SF
$125.00
$5,500
$375.00
4.6875
$80
$16,500
206.3
$500.00
$22,000
030131
- Concrete pier foundation
17 SF
$110.00
$1,870
$315.00
3.9375
$80
$5,355
66.9
$425.00
$7,225
030131
- Concrete slab
58 SF
$110.00
$6,380
$315.00
3.9375
$80
$18,270
228.4
$425.00
$24,650
- Concrete wall
33 SF
$110.00
$3,630
$315.00
3.9375
$80
$10,395
129.9
$425.00
$14,025
030131 030131
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete pier foundation
6 SF
$85.00
$510
$275.00
3.4375
$80
$1,650
20.6
$360.00
$2,160
030131
- Concrete slab
24 SF
$85.00
$2,040
$275.00
3.4375
$80
$6,600
82.5
$360.00
$8,640
030131
- Concrete wall
51 SF
$85.00
$4,335
$275.00
3.4375
$80
$14,025
175.3
$360.00
$18,360
Page 68
CSI NUM
030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Concrete deck
30 SF
$75.00
$2,250
$240.00
3.0000
$80
$7,200
90.0
$315.00
$9,450
030131
- Concrete slab
15 SF
$65.00
$975
$200.00
2.5000
$80
$3,000
37.5
$265.00
$3,975
030131
- Concrete wall
4 SF
$65.00
$260
$200.00
2.5000
$80
$800
10.0
$265.00
$1,060
030131
Concrete crack repairs
030131
- Medium crack (1/16"< x < 1/8")
570 LF
$45.00
$25,650
$115.00
1.4375
$80
$65,550
819.4
$160.00
$91,200
030131
- Wide crack ( x >1/8")
90 LF
$55.00
$4,950
$125.00
1.5625
$80
$11,250
140.6
$180.00
$16,200
50 SF
$45.00
$2,250
$80.00
1.0000
$80
$4,000
50.0
$125.00
$6,250
030131 030131 030131
Concrete scaling (Light - x < 1/4" deep) - Concrete columns Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete beams
10 SF
$50.00
$500
$90.00
1.1250
$80
$900
11.3
$140.00
$1,400
030131
- Concrete pier foundation
3 SF
$50.00
$150
$90.00
1.1250
$80
$270
3.4
$140.00
$420
030131
- Concrete slab
100 SF
$50.00
$5,000
$90.00
1.1250
$80
$9,000
112.5
$140.00
$14,000
030131
- Concrete wall
92 SF
$50.00
$4,600
$90.00
1.1250
$80
$8,280
103.5
$140.00
$12,880
1 SF
$60.00
$60
$98.00
1.2250
$80
$98
1.2
$158.00
$158
150 SF
$60.00
$9,000
$98.00
1.2250
$80
$14,700
183.8
$158.00
$23,700
030131
Concrete scaling (Large - x > 1/2" deep)
030131
- Concrete pier foundation
030131
- Concrete slab
030131
Remove efflorescence
030131
- Concrete deck
323 SF
$35.00
$11,305
$66.00
0.8250
$80
$21,318
266.5
$101.00
$32,623
- Concrete wall
391 SF
$30.00
$11,730
$55.00
0.6875
$80
$21,505
268.8
$85.00
$33,235
5 EA
$800.00
$4,000
$1,920.00
24.0000
$80
$9,600
120.0
$2,720.00
$13,600
030131 030131
Replace deteriorated grout including associated shoring (avg 5 sf per location)
DIVISION 5: METALS STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
2 SF
$125.00
$250
$480.00
6.0000
$80
$960
12.0
$605.00
$1,210
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
2 SF
$150.00
$300
$640.00
8.0000
$80
$1,280
16.0
$790.00
$1,580
Page 69
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
6 SF
$125.00
$750
$480.00
6.0000
$80
$2,880
36.0
$605.00
$3,630
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
31 SF
$150.00
$4,650
$640.00
8.0000
$80
$19,840
248.0
$790.00
$24,490
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$300,441 $150,221 $67,599 $135,370
3,755.5 hrs.
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$135,820 on labor only $20,373 $40,798 $338,462 $51,037 $196,991 $653,630 $1,240,120
27.3% 4.1% 15.9% 52.7% 100.0%
$150,221 $87,972 $176,167
SAY:
$1,240,100
$1,240,120
Page 70
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.0% SUPERVISION 1 days Permits 0.0% Insurance 3.0% Home Office Overhead 15.0% Profit 15.0% Equipment 2.0%
SE-332-E
Project No.:
ELECTRIC 1
Estimated By: J. DiRienzo
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $51 $975 $0 $77 $383 $383 $51
$975 /day
017716
Contract Closeout
3.0%
$77
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
12.0% 0.0%
$306 $0
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 26: ELECTRICAL
260000
Conceal exposed wire between columns, at walls, and at ceiling level - including required removals
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
1 ALLOW
$500.00
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$500
$840.00
8.0000
$500 on labor only $75 $150 $1,996 $306 $725 $1,827 $4,855
41.1% 6.3% 14.9% 37.6% 100.0%
$105
$840
8.0
$1,340.00
$840 $420 $189 $378
8.0 hrs
$1,340
$420 $264 $529
SAY:
$4,900
Page 71
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 2 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$128
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
$768 $0
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$320 $1,600 $448 $256 $576 $1,089
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
1 LS
$265.00
$265
$360.00
3.7500
$96
$360
3.8
$625.00
$625
230700
- Condenser water (cond), 48" diameter
15 LF
$100.00
$1,500
$144.00
1.5000
$96
$2,160
22.5
$244.00
$3,660
230700
- Primary chilled water supply (pchws), 36" diameter
15 LF
$75.00
$1,125
$96.00
1.0000
$96
$1,440
15.0
$171.00
$2,565
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$3,960 $1,980 $891 $1,784
41.3 hrs
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor
$2,890 on labor only $434 $868 $4,418 $768 $4,192 $8,615
$1,980 $1,325 $2,652
24.6% 4.3% 23.3% 47.9%
Page 72
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST Total Cost $17,993
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 100.0%
TOTAL COST
TOTAL HRS
TOTAL UNIT COST SAY:
M&L TOTAL COST $18,000
Page 73
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,516,494 $8,818 $133,058
BID AMOUNT
$1,658,371
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2 Electrical P-2 Mechanical P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction Electrical HVAC
$1,516,494 $8,818 $133,058
$62,924 $619 $5,862
LOW: HIGH:
$1,243,778 $2,321,719
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 76 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
SE-332-C
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $26,218 $53,504 $31,462 $20,975 $104,874 $104,874 $10,487 $20,975
$704 /day
017716
Contract Closeout
3.0%
$31,462
012100
FIELD ORDER ALLOWANCE
6.0%
$62,924
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$16,675.00
$16,675
$20,840.00
260.5000
$80
$20,840
260.5
$37,515.00
$37,515
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete deck underside
10 SF
$125.00
$1,250
$375.00
4.6875
$80
$3,750
46.9
$500.00
$5,000
030131
- Concrete slab
32 SF
$110.00
$3,520
$315.00
3.9375
$80
$10,080
126.0
$425.00
$13,600
030131
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete pier foundation
8 SF
$85.00
$680
$275.00
3.4375
$80
$2,200
27.5
$360.00
$2,880
030131
- Concrete slab
49 SF
$85.00
$4,165
$275.00
3.4375
$80
$13,475
168.4
$360.00
$17,640
030131
- Stairs
2 SF
$85.00
$170
$275.00
3.4375
$80
$550
6.9
$360.00
$720
030131
- Concrete wall
59 SF
$85.00
$5,015
$275.00
3.4375
$80
$16,225
202.8
$360.00
$21,240
030131
Concrete crack repairs
Page 75
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
030131
- Medium crack (1/16"< x < 1/8")
961 LF
$45.00
$43,245
$115.00
1.4375
$80
$110,515
1,381.4
$160.00
$153,760
030131
- Wide crack ( x >1/8")
30 LF
$55.00
$1,650
$125.00
1.5625
$80
$3,750
46.9
$180.00
$5,400
030131
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete beams
7 SF
$50.00
$350
$90.00
1.1250
$80
$630
7.9
$140.00
$980
030131
- Concrete columns
7 SF
$50.00
$350
$90.00
1.1250
$80
$630
7.9
$140.00
$980
030131
- Concrete deck
5 SF
$58.00
$290
$108.00
1.3500
$80
$540
6.8
$166.00
$830
030131
- Concrete slab
20 SF
$50.00
$1,000
$90.00
1.1250
$80
$1,800
22.5
$140.00
$2,800
030131
- Stair
5 SF
$50.00
$250
$90.00
1.1250
$80
$450
5.6
$140.00
$700
030131
- Concrete wall
16 SF
$50.00
$800
$90.00
1.1250
$80
$1,440
18.0
$140.00
$2,240
3 SF
$60.00
$180
$98.00
1.2250
$80
$294
3.7
$158.00
$474
121 SF
$35.00
$4,235
$66.00
0.8250
$80
$7,986
99.8
$101.00
$12,221
030131
Concrete scaling (Large - x > 1/2" deep)
030131
- Concrete wall
030131
Remove efflorescence
030131
- Concrete deck
030131
- Concrete pier foundation
2 SF
$30.00
$60
$55.00
0.6875
$80
$110
1.4
$85.00
$170
030131
- Concrete slab
64 SF
$30.00
$1,920
$55.00
0.6875
$80
$3,520
44.0
$85.00
$5,440
- Concrete wall
030131
1,120 SF
$30.00
$33,600
$55.00
0.6875
$80
$61,600
770.0
$85.00
$95,200
030131
Miscellaneous repairs at water damaged areas (assume 10% of 10 SF)
1 SF
$110.00
$110
$315.00
3.9375
$80
$315
3.9
$425.00
$425
030131
Replace deteriorated grout including associated shoring (avg 5 sf per location)
4 EA
$800.00
$3,200
$1,920.00
24.0000
$80
$7,680
96.0
$2,720.00
$10,880
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
5 SF
$150.00
$750
$640.00
8.0000
$80
$3,200
40.0
$790.00
$3,950
050000
Reinforcing at bent / damaged flange (per location)
1 EA
$800.00
$800
$2,560.00
32.0000
$80
$2,560
32.0
$3,360.00
$3,360
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
8 SF
$125.00
$1,000
$480.00
6.0000
$80
$3,840
48.0
$605.00
$4,840
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
48 SF
$150.00
$7,200
$640.00
8.0000
$80
$30,720
384.0
$790.00
$37,920
DIVISION 5: METALS STEEL BEAMS
Page 76
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
050000
Remove and replace base plate including temporary shoring
1 EA
$4,500.00
$4,500
$3,200.00
40.0000
$80
$3,200
40.0
$7,700.00
$7,700
050000
Reinforcing at bent flange (per location)
1 EA
$800.00
$800
$2,560.00
32.0000
$80
$2,560
32.0
$3,360.00
$3,360
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
70 SF
$200.00
$14,000
$800.00
10.0000
$80
$56,000
700.0
$1,000.00
$70,000
050000
Remove and replace deteriorated steel bracing (per location)
1 EA
$450.00
$450
$800.00
10.0000
$80
$800
10.0
$1,250.00
$1,250
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Remove and replace deteriorated expansion joint material
27 LF
$5.50
$149
$25.00
0.3125
$80
$675
8.4
$30.50
$824
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 26.12%
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$158,614 on labor only $23,792 $47,644 $404,831 $62,924 $230,050 $818,689 $1,516,494
$376,310 $188,155 $84,670 $169,554 26.7% 4.1% 15.2% 54.0% 100.0%
4,703.9 hrs. $188,155 $108,462 $217,198
SAY:
$1,516,500
$1,516,494
Page 77
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.0% SUPERVISION 1 days Permits 0.0% Insurance 3.0% Home Office Overhead 15.0% Profit 15.0% Equipment 2.0%
Project No.:
ELECTRIC 1
Estimated By: J. DiRienzo
SE-332-E
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $103 $975 $0 $155 $774 $774 $103
$975 /day
017716
Contract Closeout
3.0%
$155
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
12.0% 0.0%
$619 $0
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 26: ELECTRICAL 260000
Receptacle outlet - provide cover and conceal exposed wire
2 EA
$25.00
$50
$262.50
2.5000
$105
$525
5.0
$287.50
$575
260000
Junction box - provide cover and conceal exposed wire
3 EA
$50.00
$150
$420.00
4.0000
$105
$1,260
12.0
$470.00
$1,410
260000
High voltage junction box - secure / replace cover
1 EA
$50.00
$50
$420.00
4.0000
$105
$420
4.0
$470.00
$470
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$2,205 $1,103 $496 $994
21.0 hrs
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$250 on labor only $38 $75 $3,039 $619 $363 $4,797 $8,818
34.5% 7.0% 4.1% 54.4% 100.0%
$1,103 $534 $1,069
SAY:
$8,800
Page 78
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 10 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$977
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$5,862 $0 M&L TOTAL COST
Estimated By: J. Krull
$2,443 $8,000 $3,420 $1,954 $4,397 $8,305
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
1 LS
$1,500.00
$1,500
$2,000.00
20.8333
$96
$2,000
20.8
$3,500.00
$3,500
UNIT
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
230700
- High pressure steam (hps), 14" diameter
100 LF
$44.63
$4,463
$38.40
0.4000
$96
$3,840
40.0
$83.03
$8,303
230700
- Steam condensate pump discharge (cpd), 8" diameter
100 LF
$24.90
$2,490
$25.63
0.2670
$96
$2,563
26.7
$50.53
$5,053
230700
- Domestic cold water (dcws), 6" diameter
100 LF
$5.90
$590
$12.77
0.1330
$96
$1,277
13.3
$18.67
$1,867
230700
- Chilled water supply (chws), 36" diameter
100 LF
$75.00
$7,500
$96.00
1.0000
$96
$9,600
100.0
$171.00
$17,100
230700
- Chilled water return (chwr), 36" diameter
100 LF
$75.00
$7,500
$96.00
1.0000
$96
$9,600
100.0
$171.00
$17,100
$28,880
300.8 hrs
Subtotals
$24,043
Page 79
CSI NUM
DESCRIPTION: LOGISTICS DESIGN CONTINGENCY ESCALATION
QUANT
UNIT
50.0% 15.0% 26.12%
MATERIAL UNIT TOTAL PRICE COST on labor only $3,606 $7,222
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$29,494 $5,862 $34,871 $62,830 $133,058
UNIT PRICE
MAN HRS PER UNIT
22.2% 4.4% 26.2% 47.2% 100.0%
LABOR HRLY WAGE OR UNIT COST
TOTAL TOTAL COST HRS $14,440 $6,498 $13,012
TOTAL UNIT COST
SAY:
M&L TOTAL COST $14,440 $10,104 $20,234
$133,100
Page 80
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,254,031 $9,352 $14,126
BID AMOUNT
$1,277,510
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2 Electrical P-2 Mechanical P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction Electrical HVAC
$1,254,031 $9,352 $14,126
$51,636 $1,700 -$587
LOW: HIGH:
$958,132 $1,788,513
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 76 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $21,515 $53,504 $25,818 $17,212 $86,059 $86,059 $8,606 $17,212
$704 /day
017716
Contract Closeout
3.0%
$25,818
012100
FIELD ORDER ALLOWANCE
6.0%
$51,636
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$16,675.00
$16,675
$20,840.00
260.5000
$80
$20,840
260.5
$37,515.00
$37,515
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete deck
1 SF
$98.00
$98
$330.00
4.1250
$80
$330
4.1
$428.00
$428
030131
- Concrete slab
6 SF
$85.00
$510
$275.00
3.4375
$80
$1,650
20.6
$360.00
$2,160
030131
- Concrete wall
3 SF
$85.00
$255
$275.00
3.4375
$80
$825
10.3
$360.00
$1,080
030131
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
15 LF
$30.00
$450
$95.00
1.1875
$80
$1,425
17.8
$125.00
$1,875
030131
- Medium crack (1/16"< x < 1/8")
825 LF
$45.00
$37,125
$115.00
1.4375
$80
$94,875
1,185.9
$160.00
$132,000
030131
- Wide crack ( x >1/8")
9 LF
$55.00
$495
$125.00
1.5625
$80
$1,125
14.1
$180.00
$1,620
030131
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
Page 82
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
030131
- Concrete beams
5 SF
$50.00
$250
$90.00
1.1250
$80
$450
5.6
$140.00
$700
030131
- Concrete columns
15 SF
$50.00
$750
$90.00
1.1250
$80
$1,350
16.9
$140.00
$2,100
030131
- Concrete deck
22 SF
$58.00
$1,276
$108.00
1.3500
$80
$2,376
29.7
$166.00
$3,652
030131
- Concrete pier foundation
58 SF
$50.00
$2,900
$90.00
1.1250
$80
$5,220
65.3
$140.00
$8,120
030131
- Concrete slab
7 SF
$50.00
$350
$90.00
1.1250
$80
$630
7.9
$140.00
$980
030131
- Concrete wall
15 SF
$50.00
$750
$90.00
1.1250
$80
$1,350
16.9
$140.00
$2,100
030131
Remove efflorescence
030131
- Concrete deck
421 SF
$35.00
$14,735
$66.00
0.8250
$80
$27,786
347.3
$101.00
$42,521
030131
- Concrete slab
352 SF
$30.00
$10,560
$55.00
0.6875
$80
$19,360
242.0
$85.00
$29,920
030131
- Concrete wall
1,196 SF
$30.00
$35,880
$55.00
0.6875
$80
$65,780
822.3
$85.00
$101,660
43 SF
$110.00
$4,730
$315.00
3.9375
$80
$13,545
169.3
$425.00
$18,275
18 SF
$150.00
$2,700
$640.00
8.0000
$80
$11,520
144.0
$790.00
$14,220
030131
Miscellaneous repairs at water damaged areas (assume 10% of 425 SF)
DIVISION 5: METALS STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
40 SF
$150.00
$6,000
$640.00
8.0000
$80
$25,600
320.0
$790.00
$31,600
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$300,412 $150,206 $67,593 $135,357
3,755.2 hrs.
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$142,739 on labor only $21,411 $42,876 $341,803 $51,636 $207,026 $653,567 $1,254,031
27.3% 4.1% 16.5% 52.1% 100.0%
$150,206 $89,004 $178,233
SAY:
$1,254,000
$1,254,031
Page 83
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.0% SUPERVISION 1 days Permits 0.0% Insurance 3.0% Home Office Overhead 15.0% Profit 15.0% Equipment 2.0%
Project No.:
ELECTRIC 1
Estimated By: J. DiRienzo
SE-332-E
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $110 $975 $0 $165 $827 $827 $110
$975 /day
017716
Contract Closeout
3.0%
$165
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
12.0% 0.0%
$661 $0
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 26: ELECTRICAL 260000
Junction box - provide cover and conceal exposed wire
3 EA
$50.00
$150
$420.00
4.0000
$105
$1,260
12.0
$470.00
$1,410
260000
Conceal exposed wire between columns, at walls, and at ceiling level - including required removals
1 ALLOW
$500.00
$500
$840.00
8.0000
$105
$840
8.0
$1,340.00
$1,340
$2,100 $1,050 $473 $946
20.0 hrs
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$650 on labor only $98 $195 $3,180 $661 $943 $4,569 $9,352
34.0% 7.1% 10.1% 48.9% 100.0%
$1,050 $570 $1,141
SAY:
$9,400
Page 84
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 2 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$98
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
$587 $0
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$245 $1,600 $342 $196 $440 $832
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
1 LS
$210.00
$210
$270.00
2.8125
$96
$270
2.8
$480.00
$480
230700
- Primary chilled water supply (pchws), 30" diameter
10 LF
$70.00
$700
$89.60
0.9333
$96
$896
9.3
$159.60
$1,596
230700
- Primary chilled water return (pchwr), 30" diameter
20 LF
$70.00
$1,400
$89.60
0.9333
$96
$1,792
18.7
$159.60
$3,192
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$2,958 $1,479 $666 $1,333
30.8 hrs
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor
$2,310 on labor only $347 $694 $3,753 $587 $3,350 $6,435
$1,479 $1,012 $2,027
26.6% 4.2% 23.7% 45.6%
Page 85
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST Total Cost $14,126
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 100.0%
TOTAL COST
TOTAL HRS
TOTAL UNIT COST SAY:
M&L TOTAL COST $14,100
Page 86
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,480,118 $8,336
BID AMOUNT
$1,488,453
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2 Electrical P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction Electrical
$1,480,118 $8,336
$61,360 $581
LOW: HIGH:
$1,116,340 $2,083,835
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 76 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
SE-332-C
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $25,567 $53,504 $30,680 $20,453 $102,266 $102,266 $10,227 $20,453
$704 /day
017716
Contract Closeout
3.0%
$30,680
012100
FIELD ORDER ALLOWANCE
6.0%
$61,360
CSI NUM
DESCRIPTION:
QUANT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$16,675.00
$16,675
$20,840.00
260.5000
$80
$20,840
260.5
$37,515.00
$37,515
4 SF
$110.00
$440
$315.00
3.9375
$80
$1,260
15.8
$425.00
$1,700
- Concrete deck
1 SF
$98.00
$98
$330.00
4.1250
$80
$330
4.1
$428.00
$428
- Concrete wall
15 SF
$85.00
$1,275
$275.00
3.4375
$80
$4,125
51.6
$360.00
$5,400
16 SF
$65.00
$1,040
$200.00
2.5000
$80
$3,200
40.0
$265.00
$4,240
1,051 LF
$45.00
$47,295
$115.00
1.4375
$80
$120,865
1,510.8
$160.00
$168,160
UNIT
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131 030131 030131 030131 030131 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth) - Concrete slab Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Concrete wall
030131
Concrete crack repairs
030131
- Medium crack (1/16"< x < 1/8")
Page 88
CSI NUM 030131 030131 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete scaling (Light - x < 1/4" deep) - Concrete wall
174 SF
$45.00
$7,830
$80.00
1.0000
$80
$13,920
174.0
$125.00
$21,750
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete columns
10 SF
$50.00
$500
$90.00
1.1250
$80
$900
11.3
$140.00
$1,400
030131
- Concrete deck
39 SF
$58.00
$2,262
$108.00
1.3500
$80
$4,212
52.7
$166.00
$6,474
030131
- Concrete pier foundation
7 SF
$50.00
$350
$90.00
1.1250
$80
$630
7.9
$140.00
$980
030131
- Concrete slab
9 SF
$50.00
$450
$90.00
1.1250
$80
$810
10.1
$140.00
$1,260
030131
- Concrete wall
78 SF
$50.00
$3,900
$90.00
1.1250
$80
$7,020
87.8
$140.00
$10,920
030131
Remove efflorescence
030131
- Concrete deck
151 SF
$35.00
$5,285
$66.00
0.8250
$80
$9,966
124.6
$101.00
$15,251
030131
- Concrete pier foundation
12 SF
$30.00
$360
$55.00
0.6875
$80
$660
8.3
$85.00
$1,020
030131
- Concrete slab
407 SF
$30.00
$12,210
$55.00
0.6875
$80
$22,385
279.8
$85.00
$34,595
030131
- Concrete wall
1,299 SF
$30.00
$38,970
$55.00
0.6875
$80
$71,445
893.1
$85.00
$110,415
19 SF
$25.00
$475
$80.00
1.0000
$80
$1,520
19.0
$105.00
$1,995
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
40 SF
$150.00
$6,000
$640.00
8.0000
$80
$25,600
320.0
$790.00
$31,600
050000
Reinforcing at bent / damaged flange (per location)
1 EA
$800.00
$800
$2,560.00
32.0000
$80
$2,560
32.0
$3,360.00
$3,360
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
48 SF
$150.00
$7,200
$640.00
8.0000
$80
$30,720
384.0
$790.00
$37,920
050000
Replace missing bolts
4 EA
$25.00
$100
$80.00
1.0000
$80
$320
4.0
$105.00
$420
14 SF
$200.00
$2,800
$800.00
10.0000
$80
$11,200
140.0
$1,000.00
$14,000
DIVISION 4: MASONRY 040121
Remove and replace deteriorated CMU block
DIVISION 5: METALS STEEL BEAMS
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
Page 89
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
050000
Remove and replace deteriorated steel bracing (per location)
1 EA
$450.00
$450
$800.00
10.0000
$80
$800
10.0
$1,250.00
$1,250
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
050000
Reattach loose toe guard
1 LS
$175.00
$175
$320.00
4.0000
$80
$320
4.0
$495.00
$495
Remove and replace deteriorated expansion joint material
45 LF
$5.50
$248
$25.00
0.3125
$80
$1,125
14.1
$30.50
$1,373
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$361,108 $180,554 $81,249 $162,704
4,513.9 hrs.
50.0% 15.0% 26.12%
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$163,438 on labor only $24,516 $49,093 $396,096 $61,360 $237,046 $785,616 $1,480,118
26.8% 4.1% 16.0% 53.1% 100.0%
$180,554 $105,765 $211,798
SAY:
$1,480,100
$1,480,118
Page 90
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.0% SUPERVISION 1 days Permits 0.0% Insurance 3.0% Home Office Overhead 15.0% Profit 15.0% Equipment 2.0%
Project No.:
ELECTRIC 1
Estimated By: J. DiRienzo
SE-332-E
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $97 $975 $0 $145 $726 $726 $97
$975 /day
017716
Contract Closeout
3.0%
$145
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
12.0% 0.0%
$581 $0
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 26: ELECTRICAL 260000
Receptacle outlet - provide cover and conceal exposed wire
1 EA
$25.00
$25
$262.50
2.5000
$105
$263
2.5
$287.50
$288
260000
Junction box - provide cover and conceal exposed wire
3 EA
$50.00
$150
$420.00
4.0000
$105
$1,260
12.0
$470.00
$1,410
260000
Conceal exposed wire between columns, at walls, and at ceiling level - including required removals
1 ALLOW
$250.00
$250
$420.00
4.0000
$105
$420
4.0
$670.00
$670
$1,943 $971 $437 $875
18.5 hrs
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$425 on labor only $64 $128 $2,912 $581 $616 $4,226 $8,336
34.9% 7.0% 7.4% 50.7% 100.0%
$971 $501 $1,003
SAY:
$8,300
Page 91
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,694,362 $5,472 $608,880
BID AMOUNT
$2,308,714
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2 Electrical P-2 Mechanical P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction Electrical HVAC
$1,694,362 $5,472 $608,880
$70,575 $355 $28,466
LOW: HIGH:
$1,731,536 $3,232,200
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 76 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $29,406 $53,504 $35,287 $23,525 $117,624 $117,624 $11,762 $23,525
$704 /day
017716
Contract Closeout
3.0%
$35,287
012100
FIELD ORDER ALLOWANCE
6.0%
$70,575
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$16,675.00
$16,675
$20,840.00
260.5000
$80
$20,840
260.5
$37,515.00
$37,515
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete beams
1 SF
$85.00
$85
$275.00
3.4375
$80
$275
3.4
$360.00
$360
030131
- Concrete columns
1 SF
$85.00
$85
$275.00
3.4375
$80
$275
3.4
$360.00
$360
030131
- Concrete deck
7 SF
$98.00
$686
$330.00
4.1250
$80
$2,310
28.9
$428.00
$2,996
030131
- Concrete pier foundation
2 SF
$85.00
$170
$275.00
3.4375
$80
$550
6.9
$360.00
$720
030131
- Concrete slab
14 SF
$85.00
$1,190
$275.00
3.4375
$80
$3,850
48.1
$360.00
$5,040
030131
- Concrete wall
15 SF
$85.00
$1,275
$275.00
3.4375
$80
$4,125
51.6
$360.00
$5,400
030131
Concrete crack repairs 1,791 LF
$45.00
$80,595
$115.00
1.4375
$80
$205,965
2,574.6
$160.00
$286,560
030131
- Medium crack (1/16"< x < 1/8")
030131
Concrete scaling (Light - x < 1/4" deep)
Page 93
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
030131
- Concrete deck
86 SF
$52.00
$4,472
$96.00
1.2000
$80
$8,256
103.2
$148.00
$12,728
030131
- Concrete slab
1 SF
$45.00
$45
$80.00
1.0000
$80
$80
1.0
$125.00
$125
030131
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete beams
21 SF
$50.00
$1,050
$90.00
1.1250
$80
$1,890
23.6
$140.00
$2,940
030131
- Concrete deck
41 SF
$58.00
$2,378
$108.00
1.3500
$80
$4,428
55.4
$166.00
$6,806
030131
- Concrete pier foundation
31 SF
$50.00
$1,550
$90.00
1.1250
$80
$2,790
34.9
$140.00
$4,340
030131
- Concrete slab
5 SF
$50.00
$250
$90.00
1.1250
$80
$450
5.6
$140.00
$700
030131
- Concrete wall
6 SF
$50.00
$300
$90.00
1.1250
$80
$540
6.8
$140.00
$840
030131
Remove efflorescence
030131
- Concrete deck
148 SF
$35.00
$5,180
$66.00
0.8250
$80
$9,768
122.1
$101.00
$14,948
030131
- Concrete pier foundation
32 SF
$30.00
$960
$55.00
0.6875
$80
$1,760
22.0
$85.00
$2,720
030131
- Concrete slab
738 SF
$30.00
$22,140
$55.00
0.6875
$80
$40,590
507.4
$85.00
$62,730
030131
- Concrete wall
621 SF
$30.00
$18,630
$55.00
0.6875
$80
$34,155
426.9
$85.00
$52,785
3 EA
$800.00
$2,400
$1,920.00
24.0000
$80
$5,760
72.0
$2,720.00
$8,160
030131
Replace deteriorated grout including associated shoring (avg 5 sf per location)
DIVISION 5: METALS STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
8 SF
$125.00
$1,000
$480.00
6.0000
$80
$3,840
48.0
$605.00
$4,840
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
37 SF
$150.00
$5,550
$640.00
8.0000
$80
$23,680
296.0
$790.00
$29,230
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
1 SF
$200.00
$200
$800.00
10.0000
$80
$800
10.0
$1,000.00
$1,000
050000
Miscellaneous reinforcing of deteriorated steel beam per location (severe corrosion)
1 EA
$1,200.00
$1,200
$2,560.00
32.0000
$80
$2,560
32.0
$3,760.00
$3,760
050000
Replace missing bolts
1 EA
$25.00
$25
$160.00
2.0000
$80
$160
2.0
$185.00
$185
050000
Reinforcing at bent / damaged flange (per location)
3 EA
$800.00
$2,400
$2,560.00
32.0000
$80
$7,680
96.0
$3,360.00
$10,080
42 SF
$150.00
$6,300
$640.00
8.0000
$80
$26,880
336.0
$790.00
$33,180
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
Page 94
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 26.12%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$183,041 on labor only $27,456 $54,982 $447,545 $70,575 $265,479 $910,763 $1,694,362
26.4% 4.2% 15.7% 53.8% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$418,632 $209,316 $94,192 $188,623
5,232.9 hrs.
M&L TOTAL COST
$10,625
$209,316 $121,648 $243,605
SAY:
$1,694,400
$1,694,362
Page 95
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.0% SUPERVISION 1 days Permits 0.0% Insurance 3.0% Home Office Overhead 15.0% Profit 15.0% Equipment 2.0%
Project No.:
ELECTRIC 1
Estimated By: J. DiRienzo
SE-332-E
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $59 $975 $0 $89 $444 $444 $59
$975 /day
017716
Contract Closeout
3.0%
$89
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
12.0% 0.0%
$355 $0
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 26: ELECTRICAL 260000
Junction box - provide cover and conceal exposed wire
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
3 EA
$50.00
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$150
$420.00
4.0000
$150 on labor only $23 $45 $2,159 $355 $218 $2,741 $5,472
39.4% 6.5% 4.0% 50.1% 100.0%
$105
$1,260
12.0
$470.00
$1,260 $630 $284 $568
12.0 hrs
$1,410
$630 $306 $613
SAY:
$5,500
Page 96
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
CHA CONSULTING INC.
SE-332-H
Project No.:
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
ALBANY, NEW YORK
Revision:
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 2 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$4,744
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$28,466 $0 M&L TOTAL COST
Estimated By: J. Krull
$11,861 $1,600 $16,605 $9,489 $21,350 $40,327
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
1 LS
$8,000.00
$8,000
$12,000.00
125.0000
$96
$12,000
125.0
$20,000.00
$20,000
UNIT
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
230700
- High pressure steam (hps), 14" diameter
500 LF
$44.63
$22,315
$38.40
0.4000
$96
$19,200
200.0
$83.03
$41,515
230700
- Steam condensate pump discharge (cpd), 8" diameter
500 LF
$24.90
$12,450
$25.63
0.2670
$96
$12,815
133.5
$50.53
$25,265
230700
- Domestic cold water (dcws), 12" diameter
500 LF
$11.20
$5,600
$19.20
0.2000
$96
$9,600
100.0
$30.40
$15,200
230700
- Chilled water supply (chws), 8" diameter
500 LF
$14.90
$7,450
$19.20
0.2000
$96
$9,600
100.0
$34.10
$17,050
230700
- Chilled water return (chwr), 8" diameter
500 LF
$14.90
$7,450
$19.20
0.2000
$96
$9,600
100.0
$34.10
$17,050
230700
- Primary chilled water return (pchwr), 30" diameter
500 LF
$70.00
$35,000
$89.60
0.9333
$96
$44,800
466.7
$159.60
$79,800
Page 97
CSI NUM
230700
DESCRIPTION:
QUANT
UNIT
- Primary chilled water return (pchwr), 20" diameter
500 LF
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 26.12%
MATERIAL UNIT TOTAL PRICE COST
$42.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$21,000
UNIT PRICE
$41.90
MAN HRS PER UNIT
0.4365
$119,265 on labor only $17,890 $35,825 $105,976 $28,466 $172,980 $301,458 $608,880
17.4% 4.7% 28.4% 49.5% 100.0%
LABOR HRLY WAGE OR UNIT COST
$96
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$20,950
218.2
$83.90
$138,565 $69,283 $31,177 $62,433
1,443.4 hrs
M&L TOTAL COST
$41,950
$69,283 $49,067 $98,258
SAY:
$608,900
Page 98
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $2,058,533 $6,354
BID AMOUNT
$2,064,887
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2 Electrical P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction Electrical
$2,058,533 $6,354
$86,238 $425
LOW: HIGH:
$1,548,665 $2,890,842
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 76 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $35,932 $53,504 $43,119 $28,746 $143,730 $143,730 $14,373 $28,746
$704 /day
017716
Contract Closeout
3.0%
$43,119
012100
FIELD ORDER ALLOWANCE
6.0%
$86,238
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$12,500.00
$12,500
$15,625.00
195.3125
$80
$15,625
195.3
$28,125.00
$28,125
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete deck
4 SF
$98.00
$392
$330.00
4.1250
$80
$1,320
16.5
$428.00
$1,712
030131
- Concrete slab
5 SF
$85.00
$425
$275.00
3.4375
$80
$1,375
17.2
$360.00
$1,800
030131
Concrete crack repairs 2,166 LF
$45.00
$97,470
$115.00
1.4375
$80
$249,090
3,113.6
$160.00
$346,560
130 SF
$45.00
$5,850
$80.00
1.0000
$80
$10,400
130.0
$125.00
$16,250
33 SF
$58.00
$1,914
$108.00
1.3500
$80
$3,564
44.6
$166.00
$5,478
030131
- Medium crack (1/16"< x < 1/8")
030131
Concrete scaling (Light - x < 1/4" deep)
030131 030131 030131
- Concrete wall Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep) - Concrete deck
Page 100
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
030131
- Concrete pier foundation
3 SF
$50.00
$150
$90.00
1.1250
$80
$270
3.4
$140.00
$420
030131
- Concrete slab
44 SF
$50.00
$2,200
$90.00
1.1250
$80
$3,960
49.5
$140.00
$6,160
030131
- Concrete wall
42 SF
$50.00
$2,100
$90.00
1.1250
$80
$3,780
47.3
$140.00
$5,880
030131
Remove efflorescence
030131
- Concrete beam
12 SF
$30.00
$360
$55.00
0.6875
$80
$660
8.3
$85.00
$1,020
030131
- Concrete deck
485 SF
$35.00
$16,975
$66.00
0.8250
$80
$32,010
400.1
$101.00
$48,985
030131
- Concrete pier foundation
30 SF
$30.00
$900
$55.00
0.6875
$80
$1,650
20.6
$85.00
$2,550
030131
- Concrete slab
594 SF
$30.00
$17,820
$55.00
0.6875
$80
$32,670
408.4
$85.00
$50,490
030131
- Concrete wall
1,690 SF
$30.00
$50,700
$55.00
0.6875
$80
$92,950
1,161.9
$85.00
$143,650
2 EA
$800.00
$1,600
$1,920.00
24.0000
$80
$3,840
48.0
$2,720.00
$5,440
1 SF
$25.00
$25
$80.00
1.0000
$80
$80
1.0
$105.00
$105
25 SF
$150.00
$3,750
$640.00
8.0000
$80
$16,000
200.0
$790.00
$19,750
030131
Replace deteriorated grout including associated shoring (avg 5 sf per location)
DIVISION 4: MASONRY 040121
Remove and replace deteriorated CMU block
DIVISION 5: METALS STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
2 SF
$125.00
$250
$480.00
6.0000
$80
$960
12.0
$605.00
$1,210
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
43 SF
$150.00
$6,450
$640.00
8.0000
$80
$27,520
344.0
$790.00
$33,970
050000
Reinforcing at bent flange (per location)
1 EA
$800.00
$800
$2,560.00
32.0000
$80
$2,560
32.0
$3,360.00
$3,360
050000
METAL STAIRS
050000
Remove and replace deteriorated steel bracing (per location)
1 EA
$450.00
$450
$800.00
10.0000
$80
$800
10.0
$1,250.00
$1,250
050000
Replace steel ladder
1 EA
$2,500.00
$2,500
$640.00
8.0000
$80
$640
8.0
$3,140.00
$3,140
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Page 101
CSI NUM
DESCRIPTION: Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
QUANT
UNIT
50.0% 15.0% 26.12%
MATERIAL UNIT TOTAL PRICE COST $231,831 on labor only $34,775 $69,637
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$534,998 $86,238 $336,243 $1,101,054 $2,058,533
UNIT PRICE
MAN HRS PER UNIT
26.0% 4.2% 16.3% 53.5% 100.0%
LABOR HRLY WAGE OR UNIT COST
TOTAL TOTAL TOTAL UNIT COST HRS COST $506,099 6,326.2 hrs. $253,050 $113,872 $228,033
SAY:
M&L TOTAL COST $253,050 $148,647 $297,670
$2,058,500
$2,058,533
Page 102
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.0% SUPERVISION 1 days Permits 0.0% Insurance 3.0% Home Office Overhead 15.0% Profit 15.0% Equipment 2.0%
Project No.:
ELECTRIC 1
Estimated By: J. DiRienzo
SE-332-E
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $71 $975 $0 $106 $531 $531 $71
$975 /day
017716
Contract Closeout
3.0%
$106
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
12.0% 0.0%
$425 $0
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 26: ELECTRICAL 260000
Junction box - provide cover and conceal exposed wire
1 EA
$50.00
$50
$420.00
4.0000
$105
$420
4.0
$470.00
$470
260000
Conceal exposed wire between columns, at walls, and at ceiling level - including required removals
1 ALLOW
$250.00
$250
$420.00
4.0000
$105
$420
4.0
$670.00
$670
Page 103
CSI NUM
260000
DESCRIPTION: Provide replacement hangers at areas of corrosion, missing, or broken supports
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
QUANT
UNIT
1 ALLOW
MATERIAL UNIT TOTAL PRICE COST
$250.00
50.0% 15.0% 26.12% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$250
UNIT PRICE
$420.00
MAN HRS PER UNIT
4.0000
$550 on labor only $83 $165 $2,391 $425 $798 $2,741 $6,354
37.6% 6.7% 12.6% 43.1% 100.0%
LABOR HRLY WAGE OR UNIT COST
$105
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$420
4.0
$670.00
$1,260 $630 $284 $568
12.0 hrs
M&L TOTAL COST
$670
$630 $366 $733
SAY:
$6,400
Page 104
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $997,326
BID AMOUNT
$997,326
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-3
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$997,326
$41,140
LOW: HIGH:
$747,995 $1,396,257
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 58 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
SE-332-C
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $17,141 $40,832 $20,570 $13,713 $68,566 $68,566 $6,857 $13,713
$704 /day
017716
Contract Closeout
3.0%
$20,570
012100
FIELD ORDER ALLOWANCE
6.0%
$41,140
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 3: CONCRETE 030131 030131 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth) - Concrete slab
52 SF
$110.00
$5,720
$315.00
3.9375
$80
$16,380
204.8
$425.00
$22,100
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete beams
2 SF
$85.00
$170
$275.00
3.4375
$80
$550
6.9
$360.00
$720
030131
- Concrete wall
2 SF
$85.00
$170
$275.00
3.4375
$80
$550
6.9
$360.00
$720
Page 106
CSI NUM
030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Columns
1 SF
$65.00
$65
$200.00
2.5000
$80
$200
2.5
$265.00
$265
030131
- Concrete pier foundation
17 SF
$65.00
$1,105
$200.00
2.5000
$80
$3,400
42.5
$265.00
$4,505
030131
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
534 LF
$30.00
$16,020
$95.00
1.1875
$80
$50,730
634.1
$125.00
$66,750
030131
- Medium crack (1/16"< x < 1/8")
129 LF
$45.00
$5,805
$115.00
1.4375
$80
$14,835
185.4
$160.00
$20,640
030131
Concrete scaling (Light - x < 1/4" deep)
030131
- Beams
4 SF
$45.00
$180
$80.00
1.0000
$80
$320
4.0
$125.00
$500
030131
- Concrete columns
16 SF
$45.00
$720
$80.00
1.0000
$80
$1,280
16.0
$125.00
$2,000
030131
- Concrete deck
2 SF
$52.00
$104
$96.00
1.2000
$80
$192
2.4
$148.00
$296
030131
- Concrete pier foundation
58 SF
$45.00
$2,610
$80.00
1.0000
$80
$4,640
58.0
$125.00
$7,250
030131
- Concrete slab
152 SF
$45.00
$6,840
$80.00
1.0000
$80
$12,160
152.0
$125.00
$19,000
030131
- Concrete wall
21 SF
$45.00
$945
$80.00
1.0000
$80
$1,680
21.0
$125.00
$2,625
030131
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete pier foundation
2 SF
$50.00
$100
$90.00
1.1250
$80
$180
2.3
$140.00
$280
030131
- Concrete slab
1 SF
$50.00
$50
$90.00
1.1250
$80
$90
1.1
$140.00
$140
030131
Remove efflorescence
030131
- Concrete deck
241 SF
$35.00
$8,435
$66.00
0.8250
$80
$15,906
198.8
$101.00
$24,341
030131
- Concrete slab
180 SF
$30.00
$5,400
$55.00
0.6875
$80
$9,900
123.8
$85.00
$15,300
Page 107
CSI NUM 030131
DESCRIPTION:
- Concrete wall
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
453 SF
$30.00
$13,590
$55.00
0.6875
$80
$24,915
311.4
$85.00
$38,505
6 SF
$25.00
$150
$80.00
1.0000
$80
$480
6.0
$105.00
$630
17 SF
$125.00
$2,125
$480.00
6.0000
$80
$8,160
102.0
$605.00
$10,285
DIVISION 4: MASONRY 040121
Remove and replace deteriorated CMU block
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
32 SF
$125.00
$4,000
$480.00
6.0000
$80
$15,360
192.0
$605.00
$19,360
050000
Reinforcing at bent flange (per location)
2 EA
$800.00
$1,600
$2,560.00
32.0000
$80
$5,120
64.0
$3,360.00
$6,720
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (light corrosion)
43 SF
$100.00
$4,300
$320.00
4.0000
$80
$13,760
172.0
$420.00
$18,060
Page 108
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 51.25%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$86,454 on labor only $12,968 $50,954 $270,528 $41,140 $150,376 $535,283 $997,326
27.1% 4.1% 15.1% 53.7% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$205,163 $102,582 $46,162 $181,377
2,564.5 hrs.
M&L TOTAL COST
$10,625
$102,582 $59,130 $232,331
SAY:
$997,300
$997,326
Page 109
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $862,566
Mechanical P-3
$405,891
BID AMOUNT
$1,268,457
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-3
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$862,566
$35,343
HVAC
$405,891
$18,089
LOW: HIGH:
$951,343 $1,775,840
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 58 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $14,726 $40,832 $17,672 $11,781 $58,906 $58,906 $5,891 $11,781
$704 /day
017716
Contract Closeout
3.0%
$17,672
012100
FIELD ORDER ALLOWANCE
6.0%
$35,343
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$20,000.00
$30,000.00
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
$20,000
375.0000
$80
$30,000
375.0
$50,000.00
$50,000
DIVISION 3: CONCRETE
Page 111
CSI NUM
030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Concrete deck
10 SF
$75.00
$750
$240.00
3.0000
$80
$2,400
30.0
$315.00
$3,150
030131
- Concrete pier foundation
12 SF
$65.00
$780
$200.00
2.5000
$80
$2,400
30.0
$265.00
$3,180
030131
- Concrete slab
12 SF
$65.00
$780
$200.00
2.5000
$80
$2,400
30.0
$265.00
$3,180
030131
- Concrete wall
10 SF
$65.00
$650
$200.00
2.5000
$80
$2,000
25.0
$265.00
$2,650
030131
Concrete crack repairs - Fine crack ( 1/32"< x < 1/16")
352 LF
$30.00
$10,560
$95.00
1.1875
$80
$33,440
418.0
$125.00
$44,000
030131
- Medium crack (1/16"< x < 1/8")
10 LF
$45.00
$450
$115.00
1.4375
$80
$1,150
14.4
$160.00
$1,600
030131
Concrete scaling (Light - x < 1/4" deep)
030131
030131
- Concrete pier foundation
52 SF
$45.00
$2,340
$80.00
1.0000
$80
$4,160
52.0
$125.00
$6,500
030131
- Concrete slab
127 SF
$45.00
$5,715
$80.00
1.0000
$80
$10,160
127.0
$125.00
$15,875
- Concrete wall
4 SF
$45.00
$180
$80.00
1.0000
$80
$320
4.0
$125.00
$500
030131 030131
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete deck
2 SF
$58.00
$116
$108.00
1.3500
$80
$216
2.7
$166.00
$332
030131
- Concrete pier foundation
12 SF
$50.00
$600
$90.00
1.1250
$80
$1,080
13.5
$140.00
$1,680
030131
- Concrete slab
33 SF
$50.00
$1,650
$90.00
1.1250
$80
$2,970
37.1
$140.00
$4,620
030131
Remove efflorescence
030131
- Concrete deck
20 SF
$35.00
$700
$66.00
0.8250
$80
$1,320
16.5
$101.00
$2,020
030131
- Concrete pier foundation
335 SF
$30.00
$10,050
$55.00
0.6875
$80
$18,425
230.3
$85.00
$28,475
030131
- Concrete slab
11 SF
$30.00
$330
$55.00
0.6875
$80
$605
7.6
$85.00
$935
Page 112
CSI NUM 030131
DESCRIPTION:
- Concrete wall
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
579 SF
$30.00
$17,370
$55.00
0.6875
$80
$31,845
398.1
$85.00
$49,215
25 SF
$125.00
$3,125
$480.00
6.0000
$80
$12,000
150.0
$605.00
$15,125
17 SF
$125.00
$2,125
$480.00
6.0000
$80
$8,160
102.0
$605.00
$10,285
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
Page 113
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 51.25%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$84,521 on labor only $12,678 $49,815 $238,166 $35,343 $147,014 $442,043 $862,566
27.6% 4.1% 17.0% 51.2% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$169,426 $84,713 $38,121 $149,783
2,117.8 hrs.
M&L TOTAL COST
$10,625
$84,713 $50,799 $199,598
SAY:
$862,600
$862,566
Page 114
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
CHA CONSULTING INC.
SE-332-H
Project No.:
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
ALBANY, NEW YORK
Revision:
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 25 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$3,015
012100
FIELD ORDER ALLOWANCE
6.0%
$18,089
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$7,537 $20,000 $10,552 $6,030 $13,566 $25,626
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$3,146.00
$3,146
$7,940.00
82.7083
$96
$7,940
82.7
$11,086.00
$11,086
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-3 COLD TUNNEL)
1 ALLOW
230700
- High pressure steam (hps), 14" diameter
200 LF
$44.63
$8,926
$38.40
0.4000
$96
$7,680
80.0
$83.03
$16,606
230700
- Domestic cold water (dcws), 12" diameter
200 LF
$11.20
$2,240
$19.20
0.2000
$96
$3,840
40.0
$30.40
$6,080
230700
- RFWS, 10" diameter
200 LF
$17.80
$3,560
$21.98
0.2290
$96
$4,396
45.8
$39.78
$7,956
230700
- Steam condensate pump discharge (cpd), 8" diameter
200 LF
$24.90
$4,980
$25.63
0.2670
$96
$5,126
53.4
$50.53
$10,106
230700
- Condenser water (cond), 48" diameter
200 LF
$100.00
$20,000
$144.00
1.5000
$96
$28,800
300.0
$244.00
$48,800
Page 115
CSI NUM
230700
DESCRIPTION:
QUANT
UNIT
- Primary chilled water supply (pchws), 36" diameter
200 LF
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 51.25%
MATERIAL UNIT TOTAL PRICE COST
$75.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$15,000
UNIT PRICE
$96.00
MAN HRS PER UNIT
1.0000
$57,852 on labor only $8,678 $34,097 $86,325 $18,089 $100,626 $200,851 $405,891
21.3% 4.5% 24.8% 49.5% 100.0%
LABOR HRLY WAGE OR UNIT COST
$96
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$19,200
200.0
$171.00
$76,982 $38,491 $17,321 $68,057
801.9 hrs
M&L TOTAL COST
$34,200
$38,491 $25,999 $102,153
SAY:
$405,900
Page 116
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $684,243
BID AMOUNT
$684,243
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-3
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$684,243
$27,674
LOW: HIGH:
$513,182 $957,940
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 58 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
SE-332-C
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $11,531 $40,832 $13,837 $9,225 $46,123 $46,123 $4,612 $9,225
$704 /day
017716
Contract Closeout
3.0%
$13,837
012100
FIELD ORDER ALLOWANCE
6.0%
$27,674
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 3: CONCRETE 030131 030131 030131 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth) - Concrete slab
9 SF
$110.00
$990
$315.00
3.9375
$80
$2,835
35.4
$425.00
$3,825
22 SF
$85.00
$1,870
$275.00
3.4375
$80
$6,050
75.6
$360.00
$7,920
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep) - Concrete slab
Page 118
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
030131
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Concrete pier foundation
4 SF
$65.00
$260
$200.00
2.5000
$80
$800
10.0
$265.00
$1,060
030131
- Concrete slab
19 SF
$65.00
$1,235
$200.00
2.5000
$80
$3,800
47.5
$265.00
$5,035
030131
- Concrete wall
32 SF
$65.00
$2,080
$200.00
2.5000
$80
$6,400
80.0
$265.00
$8,480
030131
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
263 LF
$30.00
$7,890
$95.00
1.1875
$80
$24,985
312.3
$125.00
$32,875
030131
- Medium crack (1/16"< x < 1/8")
69 LF
$45.00
$3,105
$115.00
1.4375
$80
$7,935
99.2
$160.00
$11,040
030131
Concrete scaling (Light - x < 1/4" deep)
030131
- Concrete pier foundation
27 SF
$45.00
$1,215
$80.00
1.0000
$80
$2,160
27.0
$125.00
$3,375
030131
- Concrete slab
112 SF
$45.00
$5,040
$80.00
1.0000
$80
$8,960
112.0
$125.00
$14,000
030131
- Concrete wall
238 SF
$45.00
$10,710
$80.00
1.0000
$80
$19,040
238.0
$125.00
$29,750
030131
Remove efflorescence
030131
- Concrete deck
147 SF
$35.00
$5,145
$66.00
0.8250
$80
$9,702
121.3
$101.00
$14,847
030131
- Concrete slab
52 SF
$30.00
$1,560
$55.00
0.6875
$80
$2,860
35.8
$85.00
$4,420
Page 119
CSI NUM 030131 030131
DESCRIPTION:
- Concrete wall Replace deteriorated grout including associated shoring (avg 5 sf per location)
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
204 SF
$30.00
$6,120
$55.00
0.6875
$80
$11,220
140.3
$85.00
$17,340
1 EA
$800.00
$800
$1,920.00
24.0000
$80
$1,920
24.0
$2,720.00
$2,720
25 SF
$25.00
$625
$80.00
1.0000
$80
$2,000
25.0
$105.00
$2,625
26 SF
$125.00
$3,250
$480.00
6.0000
$80
$12,480
156.0
$605.00
$15,730
DIVISION 4: MASONRY 040121
Remove and replace deteriorated CMU block
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
16 SF
$125.00
$2,000
$480.00
6.0000
$80
$7,680
96.0
$605.00
$9,680
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
2 SF
$150.00
$300
$640.00
8.0000
$80
$1,280
16.0
$790.00
$1,580
Page 120
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 51.25%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$60,445 on labor only $9,067 $35,625 $195,343 $27,674 $105,137 $356,090 $684,243
28.5% 4.0% 15.4% 52.0% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$136,482 $68,241 $30,708 $120,659
1,706.0 hrs.
M&L TOTAL COST
$10,625
$68,241 $39,775 $156,283
SAY:
$684,200
$684,243
Page 121
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,502,187
BID AMOUNT
$1,502,187
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-3
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$1,502,187
$62,854
LOW: HIGH:
$1,126,640 $2,103,062
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 58 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $26,189 $40,832 $31,427 $20,951 $104,757 $104,757 $10,476 $20,951
$704 /day
017716
Contract Closeout
3.0%
$31,427
012100
FIELD ORDER ALLOWANCE
6.0%
$62,854
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 3: CONCRETE
Page 123
CSI NUM
030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Columns
6 SF
$65.00
$390
$200.00
2.5000
$80
$1,200
15.0
$265.00
$1,590
030131
- Concrete deck
2 SF
$75.00
$150
$240.00
3.0000
$80
$480
6.0
$315.00
$630
030131
- Concrete pier foundation
7 SF
$65.00
$455
$200.00
2.5000
$80
$1,400
17.5
$265.00
$1,855
030131
- Concrete slab
26 SF
$65.00
$1,690
$200.00
2.5000
$80
$5,200
65.0
$265.00
$6,890
030131
- Stairs
4 SF
$65.00
$260
$200.00
2.5000
$80
$800
10.0
$265.00
$1,060
030131
- Concrete wall
4 SF
$65.00
$260
$200.00
2.5000
$80
$800
10.0
$265.00
$1,060
030131
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
1,795 LF
$30.00
$53,850
$95.00
1.1875
$80
$170,525
2,131.6
$125.00
$224,375
030131
- Medium crack (1/16"< x < 1/8")
20 LF
$45.00
$900
$115.00
1.4375
$80
$2,300
28.8
$160.00
$3,200
030131
Concrete scaling (Light - x < 1/4" deep)
030131
- Beams
31 SF
$45.00
$1,395
$80.00
1.0000
$80
$2,480
31.0
$125.00
$3,875
030131
- Concrete columns
28 SF
$45.00
$1,260
$80.00
1.0000
$80
$2,240
28.0
$125.00
$3,500
030131
- Concrete pier foundation
40 SF
$45.00
$1,800
$80.00
1.0000
$80
$3,200
40.0
$125.00
$5,000
030131
- Concrete slab
391 SF
$45.00
$17,595
$80.00
1.0000
$80
$31,280
391.0
$125.00
$48,875
7 SF
$45.00
$315
$80.00
1.0000
$80
$560
7.0
$125.00
$875
186 SF
$45.00
$8,370
$80.00
1.0000
$80
$14,880
186.0
$125.00
$23,250
030131
- Stair
030131
- Concrete wall
030131
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete beams
15 SF
$50.00
$750
$90.00
1.1250
$80
$1,350
16.9
$140.00
$2,100
030131
- Concrete deck
7 SF
$58.00
$406
$108.00
1.3500
$80
$756
9.5
$166.00
$1,162
030131
Remove efflorescence
030131
- Concrete deck
44 SF
$35.00
$1,540
$66.00
0.8250
$80
$2,904
36.3
$101.00
$4,444
Page 124
CSI NUM 030131
DESCRIPTION:
- Concrete wall
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
260 SF
$30.00
$7,800
$55.00
0.6875
$80
$14,300
178.8
$85.00
$22,100
48 SF
$125.00
$6,000
$480.00
6.0000
$80
$23,040
288.0
$605.00
$29,040
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
55 SF
$125.00
$6,875
$480.00
6.0000
$80
$26,400
330.0
$605.00
$33,275
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
5 SF
$150.00
$750
$640.00
8.0000
$80
$3,200
40.0
$790.00
$3,950
050000
Remove and replace base plate including temporary shoring
1 EA
$4,500.00
$4,500
$3,200.00
40.0000
$80
$3,200
40.0
$7,700.00
$7,700
050000
METAL STAIRS
050000
Remove and replace deteriorated steel bracing (per location)
2 EA
$500.00
$1,000
$800.00
10.0000
$80
$1,600
20.0
$1,300.00
$2,600
Page 125
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 51.25%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$124,561 on labor only $18,684 $73,413 $391,767 $62,854 $216,658 $830,908 $1,502,187
26.1% 4.2% 14.4% 55.3% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$318,470 $159,235 $71,656 $281,547
3,980.9 hrs.
M&L TOTAL COST
$10,625
$159,235 $90,340 $354,961
SAY:
$1,502,200
$1,502,187
Page 126
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,534,034
BID AMOUNT
$1,534,034
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-3
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$1,534,034
$64,224
LOW: HIGH:
$1,150,526 $2,147,648
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 58 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $26,760 $40,832 $32,112 $21,408 $107,040 $107,040 $10,704 $21,408
$704 /day
017716
Contract Closeout
3.0%
$32,112
012100
FIELD ORDER ALLOWANCE
6.0%
$64,224
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 3: CONCRETE
Page 128
CSI NUM
030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Beams
1 SF
$65.00
$65
$200.00
2.5000
$80
$200
2.5
$265.00
$265
030131
- Columns
7 SF
$65.00
$455
$200.00
2.5000
$80
$1,400
17.5
$265.00
$1,855
030131
- Concrete deck
3 SF
$75.00
$225
$240.00
3.0000
$80
$720
9.0
$315.00
$945
030131
- Concrete pier foundation
3 SF
$65.00
$195
$200.00
2.5000
$80
$600
7.5
$265.00
$795
030131
- Concrete wall
20 SF
$65.00
$1,300
$200.00
2.5000
$80
$4,000
50.0
$265.00
$5,300
030131
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
1,589 LF
$30.00
$47,670
$95.00
1.1875
$80
$150,955
1,886.9
$125.00
$198,625
030131
- Medium crack (1/16"< x < 1/8")
37 LF
$45.00
$1,665
$115.00
1.4375
$80
$4,255
53.2
$160.00
$5,920
030131
- Wide crack ( x >1/8")
1 LF
$55.00
$55
$125.00
1.5625
$80
$125
1.6
$180.00
$180
030131
Concrete scaling (Light - x < 1/4" deep)
030131
- Beams
15 SF
$45.00
$675
$80.00
1.0000
$80
$1,200
15.0
$125.00
$1,875
030131
- Concrete columns
41 SF
$45.00
$1,845
$80.00
1.0000
$80
$3,280
41.0
$125.00
$5,125
030131
- Concrete deck
6 SF
$52.00
$312
$96.00
1.2000
$80
$576
7.2
$148.00
$888
030131
- Concrete pier foundation
13 SF
$45.00
$585
$80.00
1.0000
$80
$1,040
13.0
$125.00
$1,625
030131
- Concrete slab
361 SF
$45.00
$16,245
$80.00
1.0000
$80
$28,880
361.0
$125.00
$45,125
030131
- Concrete wall
689 SF
$45.00
$31,005
$80.00
1.0000
$80
$55,120
689.0
$125.00
$86,125
030131
Remove efflorescence
030131
- Concrete deck
380 SF
$35.00
$13,300
$66.00
0.8250
$80
$25,080
313.5
$101.00
$38,380
36 SF
$125.00
$4,500
$480.00
6.0000
$80
$17,280
216.0
$605.00
$21,780
39 SF
$125.00
$4,875
$480.00
6.0000
$80
$18,720
234.0
$605.00
$23,595
7 SF
$100.00
$700
$320.00
4.0000
$80
$2,240
28.0
$420.00
$2,940
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (light corrosion)
Page 129
CSI NUM
050000
DESCRIPTION:
Remove and replace deteriorated steel bracing (per location)
QUANT
UNIT
2 EA
MATERIAL UNIT TOTAL PRICE COST
$500.00
$1,000
UNIT PRICE
$800.00
MAN HRS PER UNIT
10.0000
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
$1,600
TOTAL HRS
20.0
TOTAL UNIT COST
$1,300.00
M&L TOTAL COST
$2,600
Page 130
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 51.25%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$132,922 on labor only $19,938 $78,341 $399,415 $64,224 $231,201 $839,195 $1,534,034
26.0% 4.2% 15.1% 54.7% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$321,646 $160,823 $72,370 $284,355
4,020.6 hrs.
M&L TOTAL COST
$10,625
$160,823 $92,309 $362,696
SAY:
$1,534,000
$1,534,034
Page 131
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,464,250
BID AMOUNT
$1,464,250
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-3
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$1,464,250
$61,222
LOW: HIGH:
$1,098,187 $2,049,950
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 58 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $25,509 $40,832 $30,611 $20,407 $102,037 $102,037 $10,204 $20,407
$704 /day
017716
Contract Closeout
3.0%
$30,611
012100
FIELD ORDER ALLOWANCE
6.0%
$61,222
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 3: CONCRETE
Page 133
CSI NUM
030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Columns
36 SF
$65.00
$2,340
$200.00
2.5000
$80
$7,200
90.0
$265.00
$9,540
030131
- Concrete deck
23 SF
$75.00
$1,725
$240.00
3.0000
$80
$5,520
69.0
$315.00
$7,245
030131
- Concrete slab
1 SF
$65.00
$65
$200.00
2.5000
$80
$200
2.5
$265.00
$265
030131
- Concrete wall
174 SF
$65.00
$11,310
$200.00
2.5000
$80
$34,800
435.0
$265.00
$46,110
030131
Concrete crack repairs - Fine crack ( 1/32"< x < 1/16")
1,726 LF
$30.00
$51,780
$95.00
1.1875
$80
$163,970
2,049.6
$125.00
$215,750
030131
- Medium crack (1/16"< x < 1/8")
40 LF
$45.00
$1,800
$115.00
1.4375
$80
$4,600
57.5
$160.00
$6,400
030131
Concrete scaling (Light - x < 1/4" deep)
030131
030131
- Concrete columns
55 SF
$45.00
$2,475
$80.00
1.0000
$80
$4,400
55.0
$125.00
$6,875
030131
- Concrete deck
22 SF
$52.00
$1,144
$96.00
1.2000
$80
$2,112
26.4
$148.00
$3,256
030131
- Concrete pier foundation
17 SF
$45.00
$765
$80.00
1.0000
$80
$1,360
17.0
$125.00
$2,125
030131
- Concrete slab
350 SF
$45.00
$15,750
$80.00
1.0000
$80
$28,000
350.0
$125.00
$43,750
030131
- Stair
8 SF
$45.00
$360
$80.00
1.0000
$80
$640
8.0
$125.00
$1,000
030131
- Concrete wall
211 SF
$45.00
$9,495
$80.00
1.0000
$80
$16,880
211.0
$125.00
$26,375
6 SF
$50.00
$300
$90.00
1.1250
$80
$540
6.8
$140.00
$840
030131 030131
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep) - Concrete pier foundation
030131
Remove efflorescence
030131
- Concrete deck
41 SF
$35.00
$1,435
$66.00
0.8250
$80
$2,706
33.8
$101.00
$4,141
030131
- Concrete slab
17 SF
$30.00
$510
$55.00
0.6875
$80
$935
11.7
$85.00
$1,445
Page 134
CSI NUM 030131 030131
DESCRIPTION:
- Concrete wall Replace deteriorated grout including associated shoring (avg 5 sf per location)
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
18 SF
$30.00
$540
$55.00
0.6875
$80
$990
12.4
$85.00
$1,530
1 EA
$800.00
$800
$1,920.00
24.0000
$80
$1,920
24.0
$2,720.00
$2,720
5 SF
$25.00
$125
$80.00
1.0000
$80
$400
5.0
$105.00
$525
44 SF
$125.00
$5,500
$480.00
6.0000
$80
$21,120
264.0
$605.00
$26,620
16 SF
$125.00
$2,000
$480.00
6.0000
$80
$7,680
96.0
$605.00
$9,680
8 SF
$100.00
$800
$320.00
4.0000
$80
$2,560
32.0
$420.00
$3,360
DIVISION 4: MASONRY 040121
Remove and replace deteriorated CMU block
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (light corrosion)
Page 135
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 51.25%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$117,269 on labor only $17,590 $69,115 $382,656 $61,222 $203,975 $816,397 $1,464,250
26.1% 4.2% 13.9% 55.8% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$312,908 $156,454 $70,404 $276,630
3,911.4 hrs.
M&L TOTAL COST
$10,625
$156,454 $87,995 $345,746
SAY:
$1,464,200
$1,464,250
Page 136
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $2,808,359
BID AMOUNT
$2,808,359
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-3
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$2,808,359
$119,033
LOW: HIGH:
$2,106,269 $3,931,702
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 58 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
SE-332-C
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $49,597 $40,832 $59,517 $39,678 $198,389 $198,389 $19,839 $39,678
$704 /day
017716
Contract Closeout
3.0%
$59,517
012100
FIELD ORDER ALLOWANCE
6.0%
$119,033
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 3: CONCRETE 030131 030131 030131 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth) - Column
9 SF
$110.00
$990
$315.00
3.9375
$80
$2,835
35.4
$425.00
$3,825
3 SF
$85.00
$255
$275.00
3.4375
$80
$825
10.3
$360.00
$1,080
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep) - Concrete wall
Page 138
CSI NUM
030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Beams
1 SF
$65.00
$65
$200.00
2.5000
$80
$200
2.5
$265.00
$265
030131
- Columns
45 SF
$65.00
$2,925
$200.00
2.5000
$80
$9,000
112.5
$265.00
$11,925
030131
- Concrete deck
12 SF
$75.00
$900
$240.00
3.0000
$80
$2,880
36.0
$315.00
$3,780
030131
- Concrete pier foundation
2 SF
$65.00
$130
$200.00
2.5000
$80
$400
5.0
$265.00
$530
030131
- Concrete slab
14 SF
$65.00
$910
$200.00
2.5000
$80
$2,800
35.0
$265.00
$3,710
030131
- Concrete wall
392 SF
$65.00
$25,480
$200.00
2.5000
$80
$78,400
980.0
$265.00
$103,880
030131
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
3,339 LF
$30.00
$100,170
$95.00
1.1875
$80
$317,205
3,965.1
$125.00
$417,375
030131
- Medium crack (1/16"< x < 1/8")
76 LF
$45.00
$3,420
$115.00
1.4375
$80
$8,740
109.3
$160.00
$12,160
030131
- Wide crack ( x >1/8")
1 LF
$55.00
$55
$125.00
1.5625
$80
$125
1.6
$180.00
$180
030131
Concrete scaling (Light - x < 1/4" deep)
030131
- Beams
22 SF
$45.00
$990
$80.00
1.0000
$80
$1,760
22.0
$125.00
$2,750
030131
- Concrete columns
20 SF
$45.00
$900
$80.00
1.0000
$80
$1,600
20.0
$125.00
$2,500
030131
- Concrete deck
25 SF
$52.00
$1,300
$96.00
1.2000
$80
$2,400
30.0
$148.00
$3,700
030131
- Concrete pier foundation
54 SF
$45.00
$2,430
$80.00
1.0000
$80
$4,320
54.0
$125.00
$6,750
030131
- Concrete slab
810 SF
$45.00
$36,450
$80.00
1.0000
$80
$64,800
810.0
$125.00
$101,250
030131
- Concrete wall
516 SF
$45.00
$23,220
$80.00
1.0000
$80
$41,280
516.0
$125.00
$64,500
030131
Remove efflorescence
030131
- Concrete beam
10 SF
$30.00
$300
$55.00
0.6875
$80
$550
6.9
$85.00
$850
030131
- Concrete deck
11 SF
$35.00
$385
$66.00
0.8250
$80
$726
9.1
$101.00
$1,111
030131
- Concrete slab
71 SF
$30.00
$2,130
$55.00
0.6875
$80
$3,905
48.8
$85.00
$6,035
Page 139
CSI NUM 030131 030131
DESCRIPTION:
- Concrete wall Replace deteriorated grout including associated shoring (avg 5 sf per location)
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
221 SF
$30.00
$6,630
$55.00
0.6875
$80
$12,155
151.9
$85.00
$18,785
1 EA
$800.00
$800
$1,920.00
24.0000
$80
$1,920
24.0
$2,720.00
$2,720
8 SF
$25.00
$200
$80.00
1.0000
$80
$640
8.0
$105.00
$840
DIVISION 4: MASONRY 040121
Remove and replace deteriorated CMU block
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
48 SF
$125.00
$6,000
$480.00
6.0000
$80
$23,040
288.0
$605.00
$29,040
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
5 SF
$150.00
$750
$640.00
8.0000
$80
$3,200
40.0
$790.00
$3,950
050000
Reinforcing at bent / damaged flange (per location)
1 EA
$800.00
$800
$2,560.00
32.0000
$80
$2,560
32.0
$3,360.00
$3,360
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
20 SF
$125.00
$2,500
$480.00
6.0000
$80
$9,600
120.0
$605.00
$12,100
050000
Remove and replace base plate including temporary shoring
1 EA
$4,500.00
$4,500
$3,200.00
40.0000
$80
$3,200
40.0
$7,700.00
$7,700
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (light corrosion)
1 SF
$100.00
$100
$320.00
4.0000
$80
$320
4.0
$420.00
$420
Page 140
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 51.25%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$231,935 on labor only $34,790 $136,697 $705,435 $119,033 $403,422 $1,580,468 $2,808,359
25.1% 4.2% 14.4% 56.3% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$605,761 $302,881 $136,296 $535,531
7,572.0 hrs.
M&L TOTAL COST
$10,625
$302,881 $171,086 $672,227
SAY:
$2,808,400
$2,808,359
Page 141
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,463,990
BID AMOUNT
$1,463,990
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-3
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$1,463,990
$61,211
LOW: HIGH:
$1,097,993 $2,049,586
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 58 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $25,505 $40,832 $30,606 $20,404 $102,019 $102,019 $10,202 $20,404
$704 /day
017716
Contract Closeout
3.0%
$30,606
012100
FIELD ORDER ALLOWANCE
6.0%
$61,211
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 3: CONCRETE
Page 143
CSI NUM
030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Concrete wall
030131
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
030131
- Medium crack (1/16"< x < 1/8")
030131
Concrete scaling (Light - x < 1/4" deep)
156 SF
$65.00
$10,140
$200.00
2.5000
$80
$31,200
390.0
$265.00
$41,340
1,535 LF
$30.00
$46,050
$95.00
1.1875
$80
$145,825
1,822.8
$125.00
$191,875
4 LF
$45.00
$180
$115.00
1.4375
$80
$460
5.8
$160.00
$640
030131
- Concrete deck
34 SF
$52.00
$1,768
$96.00
1.2000
$80
$3,264
40.8
$148.00
$5,032
030131
- Concrete pier foundation
40 SF
$45.00
$1,800
$80.00
1.0000
$80
$3,200
40.0
$125.00
$5,000
030131
- Concrete slab
506 SF
$45.00
$22,770
$80.00
1.0000
$80
$40,480
506.0
$125.00
$63,250
030131
- Concrete wall
548 SF
$45.00
$24,660
$80.00
1.0000
$80
$43,840
548.0
$125.00
$68,500
030131
Remove efflorescence 42 SF
$30.00
$1,260
$55.00
0.6875
$80
$2,310
28.9
$85.00
$3,570
1 EA
$800.00
$800
$1,920.00
24.0000
$80
$1,920
24.0
$2,720.00
$2,720
13 SF
$25.00
$325
$80.00
1.0000
$80
$1,040
13.0
$105.00
$1,365
030131 030131
- Concrete slab Replace deteriorated grout including associated shoring (avg 5 sf per location)
DIVISION 4: MASONRY 040121
Remove and replace deteriorated CMU block
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
44 SF
$125.00
$5,500
$480.00
6.0000
$80
$21,120
264.0
$605.00
$26,620
050000
Reinforcing at bent / damaged flange (per location)
1 EA
$800.00
$800
$2,560.00
32.0000
$80
$2,560
32.0
$3,360.00
$3,360
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
14 SF
$125.00
$1,750
$480.00
6.0000
$80
$6,720
84.0
$605.00
$8,470
Page 144
CSI NUM
050000
DESCRIPTION:
QUANT
UNIT
Tunnel ventilation to accommodate welding, painting etc.
1 LS
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 51.25%
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$6,250.00
$4,375.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$6,250
MAN HRS PER UNIT
54.6875
$124,053 on labor only $18,608 $73,114 $382,594 $61,211 $215,775 $804,410 $1,463,990
26.1% 4.2% 14.7% 54.9% 100.0%
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
$4,375
54.7
$10,625.00
$308,314 $154,157 $69,371 $272,569
3,853.9 hrs.
M&L TOTAL COST
$10,625
$154,157 $87,979 $345,683
SAY:
$1,464,000
$1,463,990
Page 145
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF
$27,506
BID AMOUNT
$994,843
ALTERNATES Amount
PREVIOUS
PROGRAM 5/8/2024 $967,337
Mechanical P-1
(Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT Bldg $/sf
BUILDING COSTS Construction P-1
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$967,337
$40,425
HVAC
$27,506
$1,139
LOW: HIGH:
$746,132 $1,392,781
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 39 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $16,844 $27,456 $20,212 $13,475 $67,375 $67,375 $6,737 $13,475
$704 /day
017716
Contract Closeout
3.0%
$20,212
012100
FIELD ORDER ALLOWANCE
6.0%
$40,425
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$3,000.00
$3,000
$4,500.00
56.2500
$80
$4,500
56.3
$7,500.00
$7,500
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete slab
5 SF
$110.00
$550
$315.00
3.9375
$80
$1,575
19.7
$425.00
$2,125
030131
- Concrete wall
2 SF
$110.00
$220
$315.00
3.9375
$80
$630
7.9
$425.00
$850
030131
Concrete crack repairs 78 LF
$55.00
$4,290
$125.00
1.5625
$80
$9,750
121.9
$180.00
$14,040
030131 030131
- Wide crack ( x >1/8") Concrete scaling (Large - x > 1/2" deep)
030131
- Concrete slab
1 SF
$60.00
$60
$98.00
1.2250
$80
$98
1.2
$158.00
$158
030131
- Concrete wall
38 SF
$60.00
$2,280
$98.00
1.2250
$80
$3,724
46.6
$158.00
$6,004
030131
Remove efflorescence
030131
- Concrete deck
87 SF
$35.00
$3,045
$66.00
0.8250
$80
$5,742
71.8
$101.00
$8,787
Page 147
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
030131
- Concrete slab
746 SF
$30.00
$22,380
$55.00
0.6875
$80
$41,030
512.9
$85.00
$63,410
030131
- Concrete wall
596 SF
$30.00
$17,880
$55.00
0.6875
$80
$32,780
409.8
$85.00
$50,660
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
31 SF
$200.00
$6,200
$800.00
10.0000
$80
$24,800
310.0
$1,000.00
$31,000
050000
Miscellaneous reinforcing of deteriorated steel beam per location (severe corrosion)
9 EA
$1,200.00
$10,800
$2,560.00
32.0000
$80
$23,040
288.0
$3,760.00
$33,840
050000
Replace missing bolts
7 EA
$25.00
$175
$160.00
2.0000
$80
$1,120
14.0
$185.00
$1,295
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
126 SF
$200.00
$25,200
$800.00
10.0000
$80
$100,800
1,260.0
$1,000.00
$126,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
9 EA
$1,200.00
$10,800
$2,560.00
32.0000
$80
$23,040
288.0
$3,760.00
$33,840
050000
Replace missing bolts
6 EA
$25.00
$150
$80.00
1.0000
$80
$480
6.0
$105.00
$630
050000
METAL STAIRS
050000
Replace steel ladder
1 EA
$2,500.00
$2,500
$640.00
8.0000
$80
$640
8.0
$3,140.00
$3,140
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
26 LF
$3.00
$78
$13.71
0.1714
$80
$356
4.5
$16.71
$434
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
Remove and replace deteriorated joint sealant and backer rod
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$115,858 on labor only $17,379 $13,057 $253,162 $40,425 $146,294 $527,456 $967,337
$278,480 $139,240 $62,658 $47,077 26.2% 4.2% 15.1% 54.5% 100.0%
3,481.0 hrs. $139,240 $80,037 $60,134
SAY:
$967,300
Page 148
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
ESTIMATOR CHECK
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
$967,337
Page 149
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 4 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$190
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$1,139 $0 M&L TOTAL COST
Estimated By: J. Krull
UNIT
$475 $3,200 $665 $380 $855 $1,614
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
230700
1 LS
$525.00
$525
$565.00
5.8854
$96
$565
5.9
$1,090.00
$1,090
- Valves on the 18" HPS lines
1 LS
$250.00
$250
$768.00
8.0000
$96
$768
8.0
$1,018.00
$1,018
230700
- High pressure steam (F-Line), 18" diameter
5 LF
$55.79
$279
$48.00
0.5000
$96
$240
2.5
$103.79
$519
230700
- Orange pipe, 18" diameter
30 LF
$55.79
$1,674
$48.00
0.5000
$96
$1,440
15.0
$103.79
$3,114
230700
- Valving station between F & G line
1 LS
$250.00
$250
$768.00
8.0000
$96
$768
8.0
$1,018.00
$1,018
230700
- High pressure steam (hps), 18" diameter
50 LF
$55.79
$2,790
$48.00
0.5000
$96
$2,400
25.0
$103.79
$5,190
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$6,181 $3,091 $1,391 $1,045
64.4 hrs
50.0% 15.0% 9.80%
$5,767 on labor only $865 $650
$3,091 $2,256 $1,695
Page 150
CSI NUM
DESCRIPTION:
MATERIAL UNIT TOTAL PRICE COST General Conditions & Administration $7,378 Allowance $1,139 Material Cost $7,282 Total Labor $11,707 Total Cost $27,506 QUANT
UNIT
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 26.8% 4.1% 26.5% 42.6% 100.0%
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
SAY:
M&L TOTAL COST
$27,500
Page 151
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF
$14,790
BID AMOUNT
$1,140,505
ALTERNATES Amount
PREVIOUS
PROGRAM 5/8/2024 $1,125,715
Mechanical P-1
(Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT Bldg $/sf
BUILDING COSTS Construction P-1
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$1,125,715
$47,237
$14,790
$543
LOW: HIGH:
$855,379 $1,596,707
HVAC
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 39 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $19,682 $27,456 $23,618 $15,746 $78,728 $78,728 $7,873 $15,746
$704 /day
017716
Contract Closeout
3.0%
$23,618
012100
FIELD ORDER ALLOWANCE
6.0%
$47,237
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$3,000.00
$3,000
$4,500.00
56.2500
$80
$4,500
56.3
$7,500.00
$7,500
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete deck
2 SF
$125.00
$250
$380.00
4.7500
$80
$760
9.5
$505.00
$1,010
030131
- Concrete slab
28 SF
$110.00
$3,080
$315.00
3.9375
$80
$8,820
110.3
$425.00
$11,900
030131
- Stairs
30 SF
$110.00
$3,300
$315.00
3.9375
$80
$9,450
118.1
$425.00
$12,750
030131
- Concrete wall
175 SF
$110.00
$19,250
$315.00
3.9375
$80
$55,125
689.1
$425.00
$74,375
030131
Concrete crack repairs 37 LF
$55.00
$2,035
$125.00
1.5625
$80
$4,625
57.8
$180.00
$6,660
38 SF
$60.00
$2,280
$98.00
1.2250
$80
$3,724
46.6
$158.00
$6,004
030131 030131
- Wide crack ( x >1/8") Concrete scaling (Large - x > 1/2" deep)
030131
- Concrete wall
030131
Remove efflorescence
Page 153
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
030131
- Concrete slab
1,616 SF
$30.00
$48,480
$55.00
0.6875
$80
$88,880
1,111.0
$85.00
$137,360
030131
- Concrete wall
212 SF
$30.00
$6,360
$55.00
0.6875
$80
$11,660
145.8
$85.00
$18,020
5 SF
$110.00
$550
$315.00
3.9375
$80
$1,575
19.7
$425.00
$2,125
6 SF
$25.00
$150
$110.00
1.3750
$80
$660
8.3
$135.00
$810
030131
Miscellaneous repairs at water damaged areas (assume 10% of 46 SF)
DIVISION 4: MASONRY 040121
Remove and replace deteriorated brick
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
45 SF
$200.00
$9,000
$800.00
10.0000
$80
$36,000
450.0
$1,000.00
$45,000
050000
Miscellaneous reinforcing of deteriorated steel beam per location (severe corrosion)
5 EA
$1,200.00
$6,000
$2,560.00
32.0000
$80
$12,800
160.0
$3,760.00
$18,800
050000
Replace missing bolts
15 EA
$25.00
$375
$160.00
2.0000
$80
$2,400
30.0
$185.00
$2,775
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
1 SF
$150.00
$150
$640.00
8.0000
$80
$640
8.0
$790.00
$790
050000
Remove and replace steel beam with severe deflection
1 LS
$2,500.00
$2,500
$5,120.00
64.0000
$80
$5,120
64.0
$7,620.00
$7,620
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
2 SF
$150.00
$300
$640.00
8.0000
$80
$1,280
16.0
$790.00
$1,580
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
72 SF
$200.00
$14,400
$800.00
10.0000
$80
$57,600
720.0
$1,000.00
$72,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
5 EA
$1,200.00
$6,000
$2,560.00
32.0000
$80
$12,800
160.0
$3,760.00
$18,800
050000
Replace missing bolts
2 EA
$25.00
$50
$80.00
1.0000
$80
$160
2.0
$105.00
$210
050000
METAL STAIRS
050000
Replace steel ladder
1 EA
$2,500.00
$2,500
$640.00
8.0000
$80
$640
8.0
$3,140.00
$3,140
050000
Remove and replace deteriorated steel bracing (per location)
1 EA
$450.00
$450
$640.00
8.0000
$80
$640
8.0
$1,090.00
$1,090
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Page 154
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
Remove and replace deteriorated expansion joint material
10 LF
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80%
$5.50
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$55
$25.00
0.3125
$136,765 on labor only $20,515 $15,413 $291,195 $47,237 $172,693 $614,589 $1,125,715
$80
$250
$324,484 $162,242 $73,009 $54,854 25.9% 4.2% 15.3% 54.6% 100.0%
3.1
$30.50
$305
4,056.1 hrs. $162,242 $93,524 $70,267
SAY:
$1,125,700
$1,125,715
Page 155
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
ALBANY, NEW YORK
Revision:
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 4 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$91
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
$543 $0
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$226 $3,200 $317 $181 $407 $770
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
1 LS
$200.00
$200
$300.00
3.1250
$96
$300
3.1
$500.00
$500
230700
- Chilled water, 20" diameter (overhead) dented vinyl covering over pipe insulation
1 EA
$150.00
$150
$384.00
4.0000
$96
$384
4.0
$534.00
$534
230700
- High pressure steam (hps), 18" diameter
10 LF
$55.79
$558
$48.00
0.5000
$96
$480
5.0
$103.79
$1,038
230700
- Chilled water (chw), 6" diameter
20 LF
$12.20
$244
$15.36
0.1600
$96
$307
3.2
$27.56
$551
230700
- Drain pipe, 2" diameter
20 LF
$3.10
$62
$7.68
0.0800
$96
$154
1.6
$10.78
$216
230700
- Valves located near thermal expansion loop - exposed valves and pipe branches
50 LF
$20.00
$1,000
$33.60
0.3500
$96
$1,680
17.5
$53.60
$2,680
$3,305 $1,652 $744
34.4 hrs
Subtotals LOGISTICS DESIGN CONTINGENCY
50.0% 15.0%
$2,214 on labor only $332
$1,652 $1,076
Page 156
CSI NUM
DESCRIPTION: ESCALATION
QUANT
UNIT
9.80%
MATERIAL UNIT TOTAL PRICE COST $250
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$5,192 $543 $2,795 $6,259 $14,790
UNIT PRICE
MAN HRS PER UNIT
35.1% 3.7% 18.9% 42.3% 100.0%
LABOR HRLY WAGE OR UNIT COST
TOTAL TOTAL COST HRS $559
TOTAL UNIT COST
M&L TOTAL COST $808
SAY:
$14,800
Page 157
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF
$47,058
BID AMOUNT
$598,357
ALTERNATES Amount
PREVIOUS
PROGRAM 5/8/2024 $551,299
Mechanical P-1
(Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT Bldg $/sf
BUILDING COSTS Construction P-1
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$551,299
$22,531
HVAC
$47,058
$2,018
LOW: HIGH:
$448,768 $837,700
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 39 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $9,388 $27,456 $11,265 $7,510 $37,551 $37,551 $3,755 $7,510
$704 /day
017716
Contract Closeout
3.0%
$11,265
012100
FIELD ORDER ALLOWANCE
6.0%
$22,531
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$3,000.00
$3,000
$4,500.00
56.2500
$80
$4,500
56.3
$7,500.00
$7,500
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete deck
11 SF
$125.00
$1,375
$380.00
4.7500
$80
$4,180
52.3
$505.00
$5,555
030131
- Concrete slab
129 SF
$110.00
$14,190
$315.00
3.9375
$80
$40,635
507.9
$425.00
$54,825
030131
- Stairs
6 SF
$110.00
$660
$315.00
3.9375
$80
$1,890
23.6
$425.00
$2,550
030131
- Concrete wall
71 SF
$110.00
$7,810
$315.00
3.9375
$80
$22,365
279.6
$425.00
$30,175
030131
Concrete crack repairs 79 LF
$55.00
$4,345
$125.00
1.5625
$80
$9,875
123.4
$180.00
$14,220
030131 030131
- Wide crack ( x >1/8") Concrete scaling (Large - x > 1/2" deep)
030131
- Stair
1 SF
$60.00
$60
$98.00
1.2250
$80
$98
1.2
$158.00
$158
030131
- Concrete wall
9 SF
$60.00
$540
$98.00
1.2250
$80
$882
11.0
$158.00
$1,422
Page 159
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
030131
Remove efflorescence
030131
- Concrete deck
40 SF
$35.00
$1,400
$66.00
0.8250
$80
$2,640
33.0
$101.00
$4,040
030131
- Concrete slab
410 SF
$30.00
$12,300
$55.00
0.6875
$80
$22,550
281.9
$85.00
$34,850
- Concrete wall
92 SF
$30.00
$2,760
$55.00
0.6875
$80
$5,060
63.3
$85.00
$7,820
2 SF
$110.00
$220
$315.00
3.9375
$80
$630
7.9
$425.00
$850
030131 030131
Miscellaneous repairs at water damaged areas (assume 10% of 20 SF)
DIVISION 4: MASONRY 040121
Remove and replace deteriorated brick
45 SF
$25.00
$1,125
$110.00
1.3750
$80
$4,950
61.9
$135.00
$6,075
040121
Clean brick of efflorescence
98 SF
$30.00
$2,940
$55.00
0.6875
$80
$5,390
67.4
$85.00
$8,330
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
1 SF
$200.00
$200
$800.00
10.0000
$80
$800
10.0
$1,000.00
$1,000
050000
Miscellaneous reinforcing of deteriorated steel beam per location (severe corrosion)
1 EA
$1,200.00
$1,200
$2,560.00
32.0000
$80
$2,560
32.0
$3,760.00
$3,760
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
8 SF
$200.00
$1,600
$800.00
10.0000
$80
$6,400
80.0
$1,000.00
$8,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
4 EA
$1,200.00
$4,800
$2,560.00
32.0000
$80
$10,240
128.0
$3,760.00
$15,040
050000
Replace missing bolts
3 EA
$25.00
$75
$80.00
1.0000
$80
$240
3.0
$105.00
$315
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
2 SF
$200.00
$400
$800.00
10.0000
$80
$1,600
20.0
$1,000.00
$2,000
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
30 LF
$5.50
$165
$25.00
0.3125
$80
$750
9.4
$30.50
$915
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
Remove and replace deteriorated expansion joint material
Page 160
CSI NUM
079200
DESCRIPTION:
Remove and replace deteriorated joint sealant and backer rod
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
QUANT
UNIT
45 LF
MATERIAL UNIT TOTAL PRICE COST
$3.00
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$135
UNIT PRICE
$13.71
MAN HRS PER UNIT
0.1714
$67,550 on labor only $10,133 $7,613 $153,253 $22,531 $85,295 $290,220 $551,299
LABOR HRLY WAGE OR UNIT COST
$80
TOTAL COST
$617
$153,227 $76,613 $34,476 $25,903 27.8% 4.1% 15.5% 52.6% 100.0%
TOTAL UNIT COST
TOTAL HRS
7.7
$16.71
M&L TOTAL COST
$752
1,915.3 hrs. $76,613 $44,609 $33,516
SAY:
$551,300
$551,299
Page 161
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 5 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$336
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$2,018 $0 M&L TOTAL COST
Estimated By: J. Krull
UNIT
$841 $4,000 $1,177 $673 $1,514 $2,859
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
1 LS
$925.00
$925
$1,000.00
10.4167
$96
$1,000
10.4
$1,925.00
$1,925
230700
- High pressure steam (hps), 14" diameter (F and G lines)
150 LF
$44.63
$6,695
$38.40
0.4000
$96
$5,760
60.0
$83.03
$12,455
230700
- Chilled water (chw), 6" diameter
150 LF
$12.20
$1,830
$15.36
0.1600
$96
$2,304
24.0
$27.56
$4,134
230700
- Drain pipe, 2" diameter
150 LF
$3.10
$465
$7.68
0.0800
$96
$1,152
12.0
$10.78
$1,617
230700
- Steam valves, branch pipes
1 LS
$250.00
$250
$768.00
8.0000
$96
$768
8.0
$1,018.00
$1,018
$10,984 $5,492 $2,471 $1,857
114.4 hrs
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80% General Conditions & Administration
$10,165 on labor only $1,525 $1,146 $11,401
$5,492 $3,996 $3,002
24.2%
Page 162
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST Allowance $2,018 Material Cost $12,835 Total Labor $20,804 Total Cost $47,058
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 4.3% 27.3% 44.2% 100.0%
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
SAY:
M&L TOTAL COST
$47,100
Page 163
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF
$1,569
BID AMOUNT
$251,864
ALTERNATES Amount
PREVIOUS
PROGRAM 5/8/2024 $250,295
Mechanical P-1
(Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2025; COMPLETION APRIL 2027; MID-POINT APRIL 2026. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT Bldg $/sf
BUILDING COSTS Construction P-1
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$250,295
$9,584
HVAC
$1,569
$36
ESTIMATE RANGE
LOW: HIGH:
$188,898 $352,609
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 39 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $3,994 $27,456 $4,792 $3,195 $15,974 $15,974 $1,597 $3,195
$704 /day
017716
Contract Closeout
3.0%
$4,792
012100
FIELD ORDER ALLOWANCE
6.0%
$9,584
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$3,000.00
$3,000
$4,500.00
56.2500
$80
$4,500
56.3
$7,500.00
$7,500
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth)
030131
- Concrete deck
2 SF
$125.00
$250
$380.00
4.7500
$80
$760
9.5
$505.00
$1,010
030131
- Concrete slab
1 SF
$110.00
$110
$315.00
3.9375
$80
$315
3.9
$425.00
$425
030131
- Concrete wall
26 SF
$110.00
$2,860
$315.00
3.9375
$80
$8,190
102.4
$425.00
$11,050
030131
Concrete crack repairs 23 LF
$55.00
$1,265
$125.00
1.5625
$80
$2,875
35.9
$180.00
$4,140
030131
- Wide crack ( x >1/8")
DIVISION 5: METALS 050000
STEEL COLUMNS
Page 165
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (severe corrosion)
27 SF
$200.00
$5,400
$800.00
10.0000
$80
$21,600
270.0
$1,000.00
$27,000
050000
Miscellaneous reinforcing of deteriorated steel column per location (severe corrosion)
5 EA
$1,200.00
$6,000
$2,560.00
32.0000
$80
$12,800
160.0
$3,760.00
$18,800
050000
Remove and replace base plate including temporary shoring
1 EA
$4,500.00
$4,500
$3,200.00
40.0000
$80
$3,200
40.0
$7,700.00
$7,700
050000
Replace missing bolts
14 EA
$25.00
$350
$80.00
1.0000
$80
$1,120
14.0
$105.00
$1,470
050000
METAL STAIRS
050000
Replace steel ladder
2 EA
$2,500.00
$5,000
$640.00
8.0000
$80
$1,280
16.0
$3,140.00
$6,280
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$61,015 $30,508 $13,728 $10,315
762.7 hrs.
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$34,985 on labor only $5,248 $3,943 $80,969 $9,584 $44,176 $115,565 $250,295
32.3% 3.8% 17.6% 46.2% 100.0%
$30,508 $18,976 $14,257
SAY:
$250,300
$250,295
Page 166
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
ALBANY, NEW YORK
Revision:
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 1 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$6
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
$36 $0
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$15 $800 $21 $12 $27 $51
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
230700
1 LS
$25.00
$25
$96.00
1.0000
$96
$96
1.0
$121.00
$121
- High pressure steam (hps), 14" diameter (G line)
3 LF
$44.63
$134
$38.40
0.4000
$96
$115
1.2
$83.03
$249
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$211 $106 $48 $36
2.2 hrs
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$159 on labor only $24 $18 $932 $36 $201 $400 $1,569
59.4% 2.3% 12.8% 25.5% 100.0%
$106 $71 $54
SAY:
$1,600
Page 167
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $836,710 $14,353 $13,947
BID AMOUNT
$865,009
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2 Electrical P-2 Mechanical P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction Electrical HVAC
$836,710 $14,353 $13,947
$34,655 $1,056 $579
LOW: HIGH:
$648,757 $1,211,013
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 44 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $14,440 $30,976 $17,328 $11,552 $57,759 $57,759 $5,776 $11,552
$704 /day
017716
Contract Closeout
3.0%
$17,328
012100
FIELD ORDER ALLOWANCE
6.0%
$34,655
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$3,334.00
$3,334
$5,000.00
62.5000
$80
$5,000
62.5
$8,334.00
$8,334
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete deck
1 SF
$98.00
$98
$330.00
4.1250
$80
$330
4.1
$428.00
$428
030131
- Concrete wall
1 SF
$85.00
$85
$275.00
3.4375
$80
$275
3.4
$360.00
$360
Page 169
CSI NUM 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete crack repairs
030131
- Medium crack (1/16"< x < 1/8")
030131
Concrete scaling (Light - x < 1/4" deep)
1,033 LF
$45.00
$46,485
$115.00
1.4375
$80
$118,795
1,484.9
$160.00
$165,280
030131
- Concrete deck
11 SF
$45.00
$495
$80.00
1.0000
$80
$880
11.0
$125.00
$1,375
030131
- Concrete slab
208 SF
$45.00
$9,360
$80.00
1.0000
$80
$16,640
208.0
$125.00
$26,000
030131
- Concrete wall
4 SF
$45.00
$180
$80.00
1.0000
$80
$320
4.0
$125.00
$500
030131
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete deck
23 SF
$58.00
$1,334
$108.00
1.3500
$80
$2,484
31.1
$166.00
$3,818
030131
- Concrete wall
37 SF
$50.00
$1,850
$90.00
1.1250
$80
$3,330
41.6
$140.00
$5,180
030131
Remove efflorescence
030131
- Concrete deck
450 SF
$35.00
$15,750
$66.00
0.8250
$80
$29,700
371.3
$101.00
$45,450
030131
- Concrete slab
385 SF
$30.00
$11,550
$55.00
0.6875
$80
$21,175
264.7
$85.00
$32,725
030131
- Concrete wall
226 SF
$30.00
$6,780
$55.00
0.6875
$80
$12,430
155.4
$85.00
$19,210
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
2 SF
$125.00
$250
$480.00
6.0000
$80
$960
12.0
$605.00
$1,210
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
6 SF
$150.00
$900
$640.00
8.0000
$80
$3,840
48.0
$790.00
$4,740
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
18 SF
$150.00
$2,700
$640.00
8.0000
$80
$11,520
144.0
$790.00
$14,220
050000
Reinforcing at chipped or bent flange (per location)
1 EA
$500.00
$500
$960.00
12.0000
$80
$960
12.0
$1,460.00
$1,460
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$233,014 $116,507 $52,428 $39,391
2,912.7 hrs.
50.0% 15.0% 9.80% General Conditions & Administration
$107,901 on labor only $16,185 $12,160 $224,468
$116,507 $68,613 $51,551
26.8%
Page 170
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST Allowance $34,655 Material Cost $136,247 Total Labor $441,340 Total Cost $836,710
ESTIMATOR CHECK
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 4.1% 16.3% 52.7% 100.0%
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
SAY:
M&L TOTAL COST
$836,700
$836,710
Page 171
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.0% SUPERVISION 1 days Permits 0.0% Insurance 3.0% Home Office Overhead 15.0% Profit 15.0% Equipment 2.0%
Project No.:
ELECTRIC 1
Estimated By: J. DiRienzo
SE-332-E
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $176 $975 $0 $264 $1,320 $1,320 $176
$975 /day
017716
Contract Closeout
3.0%
$264
012100
FIELD ORDER ALLOWANCE
12.0%
$1,056
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 26: ELECTRICAL 260000
Junction box - provide cover and conceal exposed wire
1 EA
260000
Provide replacement hangers at areas of corrosion, missing, or broken supports
1 ALLOW
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$50.00
$50
$420.00
4.0000
$105
$420
4.0
$470.00
$470
$1,250.00
$1,250
$3,360.00
32.0000
$105
$3,360
32.0
$4,610.00
$4,610
$3,780 $1,890 $851 $639
36.0 hrs
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$1,300 on labor only $195 $147 $4,495 $1,056 $1,642 $7,160 $14,353
31.3% 7.4% 11.4% 49.9% 100.0%
$1,890 $1,046 $786
SAY:
$14,400
Page 172
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 2 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$96
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
$579 $0
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$241 $1,600 $338 $193 $434 $820
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
230700
1 LS
$280.00
$280
$280.00
2.9167
$96
$280
2.9
$560.00
$560
- High pressure steam (F-Line), 18" diameter
5 LF
$55.79
$279
$48.00
0.5000
$96
$240
2.5
$103.79
$519
230700
- Chilled water supply and return (chws and chwr), 6" diameter
20 LF
$12.20
$244
$15.36
0.1600
$96
$307
3.2
$27.56
$551
230700
- Chilled water supply and return (chws and chwr), 6" diameter
50 LF
$12.20
$610
$15.36
0.1600
$96
$768
8.0
$27.56
$1,378
230700
- High pressure steam (F-Line), 18" diameter
30 LF
$55.79
$1,674
$48.00
0.5000
$96
$1,440
15.0
$103.79
$3,114
$3,035 $1,518 $683
31.6 hrs
Subtotals LOGISTICS DESIGN CONTINGENCY
50.0% 15.0%
$3,087 on labor only $463
$1,518 $1,146
Page 173
CSI NUM
DESCRIPTION: ESCALATION
QUANT
UNIT
9.80%
MATERIAL UNIT TOTAL PRICE COST $348
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$3,722 $579 $3,898 $5,749 $13,947
UNIT PRICE
MAN HRS PER UNIT
26.7% 4.1% 27.9% 41.2% 100.0%
LABOR HRLY WAGE OR UNIT COST
TOTAL TOTAL COST HRS $513
TOTAL UNIT COST
M&L TOTAL COST $861
SAY:
$13,900
$13,947
Page 174
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $998,969 $34,774 $30,157
BID AMOUNT
$1,063,900
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2 Electrical P-2 Mechanical P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction Electrical HVAC
$998,969 $34,774 $30,157
$41,634 $2,668 $1,264
LOW: HIGH:
$797,925 $1,489,460
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 44 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $17,348 $30,976 $20,817 $13,878 $69,390 $69,390 $6,939 $13,878
$704 /day
017716
Contract Closeout
3.0%
$20,817
012100
FIELD ORDER ALLOWANCE
6.0%
$41,634
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$3,333.00
$3,333
$5,000.00
62.5000
$80
$5,000
62.5
$8,333.00
$8,333
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete deck
8 SF
$98.00
$784
$330.00
4.1250
$80
$2,640
33.0
$428.00
$3,424
030131
- Stair
2 SF
$98.00
$196
$330.00
4.1250
$80
$660
8.3
$428.00
$856
10 SF
$65.00
$650
$200.00
2.5000
$80
$2,000
25.0
$265.00
$2,650
030131 030131
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep) - Concrete wall
Page 176
CSI NUM 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete crack repairs
030131
- Medium crack (1/16"< x < 1/8")
030131
Concrete scaling (Light - x < 1/4" deep)
1,118 LF
$45.00
$50,310
$115.00
1.4375
$80
$128,570
1,607.1
$160.00
$178,880
030131
- Concrete pier foundation
5 SF
$45.00
$225
$80.00
1.0000
$80
$400
5.0
$125.00
$625
030131
- Concrete slab
392 SF
$45.00
$17,640
$80.00
1.0000
$80
$31,360
392.0
$125.00
$49,000
030131
- Concrete wall
29 SF
$45.00
$1,305
$80.00
1.0000
$80
$2,320
29.0
$125.00
$3,625
$300
$90.00
1.1250
$80
$540
6.8
$140.00
$840
030131
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete slab
6 SF
$50.00
030131
- Ramp
8 SF
$50.00
$400
$90.00
1.1250
$80
$720
9.0
$140.00
$1,120
030131
- Concrete wall
45 SF
$50.00
$2,250
$90.00
1.1250
$80
$4,050
50.6
$140.00
$6,300
13 SF
$60.00
$780
$98.00
1.2250
$80
$1,274
15.9
$158.00
$2,054
313 SF
$35.00
$10,955
$66.00
0.8250
$80
$20,658
258.2
$101.00
$31,613
9 SF
$30.00
$270
$55.00
0.6875
$80
$495
6.2
$85.00
$765
291 SF
$30.00
$8,730
$55.00
0.6875
$80
$16,005
200.1
$85.00
$24,735
030131 030131
Concrete scaling (Large - x > 1/2" deep) - Pier
030131
Remove efflorescence
030131
- Concrete deck
030131
- Concrete pier foundation
030131
- Concrete slab
030131
- Stair
31 SF
$30.00
$930
$55.00
0.6875
$80
$1,705
21.3
$85.00
$2,635
030131
- Ramp
14 SF
$30.00
$420
$55.00
0.6875
$80
$770
9.6
$85.00
$1,190
030131
- Concrete wall
340 SF
$30.00
$10,200
$55.00
0.6875
$80
$18,700
233.8
$85.00
$28,900
DIVISION 4: MASONRY 040121
Remove and replace deteriorated CMU block
17 SF
$25.00
$425
$80.00
1.0000
$80
$1,360
17.0
$105.00
$1,785
040121
Remove and replace deteriorated brick
3 SF
$25.00
$75
$110.00
1.3750
$80
$330
4.1
$135.00
$405
040121
Clean brick of efflorescence
39 SF
$30.00
$1,170
$55.00
0.6875
$80
$2,145
26.8
$85.00
$3,315
6 SF
$150.00
$900
$640.00
8.0000
$80
$3,840
48.0
$790.00
$4,740
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
050000
STEEL COLUMNS
Page 177
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
6 SF
$125.00
$750
$480.00
6.0000
$80
$2,880
36.0
$605.00
$3,630
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
41 SF
$150.00
$6,150
$640.00
8.0000
$80
$26,240
328.0
$790.00
$32,390
050000
Reinforcing at chipped or bent flange (per location)
1 EA
$500.00
$500
$960.00
12.0000
$80
$960
12.0
$1,460.00
$1,460
050000
Remove and replace deteriorated steel bracing (per location)
2 EA
$450.00
$900
$640.00
8.0000
$80
$1,280
16.0
$1,090.00
$2,180
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
35 LF
$3.00
$105
$13.71
0.1714
$80
$480
6.0
$16.71
$585
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
Remove and replace deteriorated joint sealant and backer rod
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$126,903 on labor only $19,035 $14,302 $263,433 $41,634 $160,240 $533,662 $998,969
$281,757 $140,878 $63,395 $47,631 26.4% 4.2% 16.0% 53.4% 100.0%
3,522.0 hrs. $140,878 $82,431 $61,933
SAY:
$999,000
$998,969
Page 178
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.0% SUPERVISION 1 days Permits 0.0% Insurance 3.0% Home Office Overhead 15.0% Profit 15.0% Equipment 2.0%
Project No.:
ELECTRIC 1
Estimated By: J. DiRienzo
SE-332-E
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $445 $975 $0 $667 $3,335 $3,335 $445
$975 /day
017716
Contract Closeout
3.0%
$667
012100
FIELD ORDER ALLOWANCE
12.0%
$2,668
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 26: ELECTRICAL 260000
Junction box - provide cover and conceal exposed wire
3 EA
$50.00
$150
$420.00
4.0000
$105
$1,260
12.0
$470.00
$1,410
260000
Light fixture - remove and replace damaged / non-functional fixture
2 EA
$300.00
$600
$630.00
6.0000
$105
$1,260
12.0
$930.00
$1,860
260000
Conceal exposed wire between columns, at walls, and at ceiling level - including required removals
1 ALLOW
$1,750.00
$1,750
$3,360.00
32.0000
$105
$3,360
32.0
$5,110.00
$5,110
260000
Provide replacement hangers at areas of corrosion, missing, or broken supports
1 ALLOW
$1,250.00
$1,250
$3,360.00
32.0000
$105
$3,360
32.0
$4,610.00
$4,610
$9,240 $4,620 $2,079 $1,562
88.0 hrs
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$3,750 on labor only $563 $423 $9,869 $2,668 $4,735 $17,501 $34,774
28.4% 7.7% 13.6% 50.3% 100.0%
$4,620 $2,642 $1,985
SAY:
$34,800
Page 179
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 4 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$211
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
CSI NUM
DESCRIPTION:
QUANT
$1,264 $0 M&L TOTAL COST
Estimated By: J. Krull
UNIT
$526 $3,200 $737 $421 $948 $1,790
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
1 LS
$615.00
$615
$605.00
6.3021
$96
$605
6.3
$1,220.00
$1,220
230700
- High pressure steam (F and G Line), 18" diameter
50 LF
$55.79
$2,790
$48.00
0.5000
$96
$2,400
25.0
$103.79
$5,190
230700
- Chilled water (chw), 6" diameter
50 LF
$12.20
$610
$15.36
0.1600
$96
$768
8.0
$27.56
$1,378
230700
- Chilled water (chw), 20" diameter
50 LF
$42.00
$2,100
$41.90
0.4365
$96
$2,095
21.8
$83.90
$4,195
230700
- Chilled water (chw), 6" diameter
50 LF
$12.20
$610
$15.36
0.1600
$96
$768
8.0
$27.56
$1,378
$6,636 $3,318 $1,493 $1,122
69.1 hrs
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80% General Conditions & Administration
$6,725 on labor only $1,009 $758 $7,833
$3,318 $2,502 $1,880
26.0%
Page 180
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST Allowance $1,264 Material Cost $8,491 Total Labor $12,569 Total Cost $30,157
ESTIMATOR CHECK
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 4.2% 28.2% 41.7% 100.0%
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
SAY:
M&L TOTAL COST
$30,200
$30,157
Page 181
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $780,370 $4,340 $11,988
BID AMOUNT
$796,698
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2 Electrical P-2 Mechanical P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction Electrical HVAC
$780,370 $4,340 $11,988
$32,232 $189 $487
LOW: HIGH:
$597,524 $1,115,378
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 44 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $13,430 $30,976 $16,116 $10,744 $53,720 $53,720 $5,372 $10,744
$704 /day
017716
Contract Closeout
3.0%
$16,116
012100
FIELD ORDER ALLOWANCE
6.0%
$32,232
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$3,333.00
$3,333
$5,000.00
62.5000
$80
$5,000
62.5
$8,333.00
$8,333
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete deck
6 SF
$98.00
$588
$330.00
4.1250
$80
$1,980
24.8
$428.00
$2,568
030131
- Concrete slab
1 SF
$85.00
$85
$275.00
3.4375
$80
$275
3.4
$360.00
$360
030131
- Concrete wall
109 SF
$85.00
$9,265
$275.00
3.4375
$80
$29,975
374.7
$360.00
$39,240
270 SF
$65.00
$17,550
$200.00
2.5000
$80
$54,000
675.0
$265.00
$71,550
030131 030131
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep) - Concrete wall
Page 183
CSI NUM 030131
DESCRIPTION:
- Medium crack (1/16"< x < 1/8")
030131
Concrete scaling (Light - x < 1/4" deep)
030131
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete crack repairs
030131
030131
QUANT
- Concrete wall
581 LF
$45.00
$26,145
$115.00
1.4375
$80
$66,815
835.2
$160.00
$92,960
270 SF
$45.00
$12,150
$80.00
1.0000
$80
$21,600
270.0
$125.00
$33,750
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete slab
45 SF
$50.00
$2,250
$90.00
1.1250
$80
$4,050
50.6
$140.00
$6,300
030131
- Stair
7 SF
$50.00
$350
$90.00
1.1250
$80
$630
7.9
$140.00
$980
030131
- Concrete wall
28 SF
$50.00
$1,400
$90.00
1.1250
$80
$2,520
31.5
$140.00
$3,920
030131
Remove efflorescence
030131
- Concrete deck
47 SF
$35.00
$1,645
$66.00
0.8250
$80
$3,102
38.8
$101.00
$4,747
030131
- Concrete slab
81 SF
$30.00
$2,430
$55.00
0.6875
$80
$4,455
55.7
$85.00
$6,885
030131
- Stair
19 SF
$30.00
$570
$55.00
0.6875
$80
$1,045
13.1
$85.00
$1,615
030131
- Concrete wall
42 SF
$30.00
$1,260
$55.00
0.6875
$80
$2,310
28.9
$85.00
$3,570
2 SF
$25.00
$50
$110.00
1.3750
$80
$220
2.8
$135.00
$270
10 SF
$150.00
$1,500
$640.00
8.0000
$80
$6,400
80.0
$790.00
$7,900
DIVISION 4: MASONRY 040121
Remove and replace deteriorated brick
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
20 SF
$150.00
$3,000
$640.00
8.0000
$80
$12,800
160.0
$790.00
$15,800
050000
Replace missing bolts
1 EA
$25.00
$25
$80.00
1.0000
$80
$80
1.0
$105.00
$105
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
1 SF
$200.00
$200
$800.00
10.0000
$80
$800
10.0
$1,000.00
$1,000
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Page 184
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 7: THERMAL AND MOISTURE PROTECTION 079200
Remove and replace deteriorated joint sealant and backer rod
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
74 LF
$3.00
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
ESTIMATOR CHECK
$222
$13.71
0.1714
$90,268 on labor only $13,540 $10,173 $210,938 $32,232 $113,981 $423,219 $780,370
27.0% 4.1% 14.6% 54.2% 100.0%
$80
$1,015
12.7
$16.71
$223,447 $111,723 $50,275 $37,774
2,793.1 hrs.
$1,237
$111,723 $63,816 $47,947
SAY:
$780,400
$780,370
Page 185
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.0% SUPERVISION 2 days Permits 0.0% Insurance 3.0% Home Office Overhead 15.0% Profit 15.0% Equipment 2.0%
Project No.:
ELECTRIC 1
Estimated By: J. DiRienzo
SE-332-E
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $31 $1,950 $0 $47 $236 $236 $31
$975 /day
017716
Contract Closeout
3.0%
$47
012100
FIELD ORDER ALLOWANCE
12.0%
$189
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 26: ELECTRICAL 260000
Light fixture - remove and replace damaged / non-functional fixture
1 EA
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
50.0% 15.0% 9.80%
$300.00
General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$300
$630.00
6.0000
$300 on labor only $45 $34 $2,579 $189 $379 $1,193 $4,340
59.4% 4.3% 8.7% 27.5% 100.0%
$105
$630
6.0
$930.00
$630 $315 $142 $107
6.0 hrs
$930
$315 $187 $140
SAY:
$4,300
Page 186
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 2 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$81
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
$487 $0
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$203 $1,600 $284 $162 $365 $690
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
1 LS
$240.00
$240
$230.00
2.3958
$96
$230
2.4
$470.00
$470
230700
- Drain pipe, 2" diameter
50 LF
$3.10
$155
$7.68
0.0800
$96
$384
4.0
$10.78
$539
230700
- High pressure steam (hps), 14" diameter (F and G lines)
50 LF
$44.63
$2,232
$38.40
0.4000
$96
$1,920
20.0
$83.03
$4,152
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$2,534 $1,267 $570 $428
26.4 hrs
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$2,627 on labor only $394 $296 $3,386 $487 $3,316 $4,800 $11,988
28.2% 4.1% 27.7% 40.0% 100.0%
$1,267 $964 $724
SAY:
$12,000
Page 187
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
ESTIMATOR CHECK
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
$11,988
Page 188
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $660,158
BID AMOUNT
$660,158
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2028; COMPLETION APRIL 2030; MID-POINT SEPTEMBER 2029. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-2
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$660,158
$23,095
LOW: HIGH:
$495,118 $924,221
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
ALBANY, NEW YORK
CHA CONSULTING INC. REHAB
Revision:
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 175 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
SE-332-C
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $9,623 $123,200 $11,547 $7,698 $38,492 $38,492 $3,849 $7,698
$704 /day
017716
Contract Closeout
3.0%
$11,547
012100
FIELD ORDER ALLOWANCE
6.0%
$23,095
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 3: CONCRETE 030131 030131 030131
Concrete spall repair - Large Spall ( x > 12"dia, any depth) - Concrete wall
19 SF
$110.00
$2,090
$315.00
3.9375
$80
$5,985
74.8
$425.00
$8,075
Concrete spall repair - Medium Spall (6"< x <12"dia, x < 2" deep)
030131
- Concrete deck
2 SF
$98.00
$196
$330.00
4.1250
$80
$660
8.3
$428.00
$856
030131
- Concrete slab
3 SF
$85.00
$255
$275.00
3.4375
$80
$825
10.3
$360.00
$1,080
- Concrete stair
10 SF
$85.00
$850
$275.00
3.4375
$80
$2,750
34.4
$360.00
$3,600
030131
- Concrete wall
78 SF
$85.00
$6,630
$275.00
3.4375
$80
$21,450
268.1
$360.00
$28,080
Page 190
CSI NUM 030131 030131 030131 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete crack repairs - Medium crack (1/16"< x < 1/8")
538 LF
$45.00
$24,210
$115.00
1.4375
$80
$61,870
773.4
$160.00
$86,080
- Wide crack ( x >1/8")
16 LF
$55.00
$880
$125.00
1.5625
$80
$2,000
25.0
$180.00
$2,880
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep)
030131
- Concrete deck
3 SF
$58.00
$174
$108.00
1.3500
$80
$324
4.1
$166.00
$498
030131
- Concrete slab
57 SF
$50.00
$2,850
$90.00
1.1250
$80
$5,130
64.1
$140.00
$7,980
030131
- Concrete wall
1 SF
$50.00
$50
$90.00
1.1250
$80
$90
1.1
$140.00
$140
030131
Remove efflorescence
030131
- Concrete deck
303 SF
$35.00
$10,605
$66.00
0.8250
$80
$19,998
250.0
$101.00
$30,603
030131
- Concrete slab
340 SF
$30.00
$10,200
$55.00
0.6875
$80
$18,700
233.8
$85.00
$28,900
030131
- Concrete wall
26 SF
$30.00
$780
$55.00
0.6875
$80
$1,430
17.9
$85.00
$2,210
DIVISION 4: MASONRY 040121
Remove and replace deteriorated brick
4 SF
$25.00
$100
$110.00
1.3750
$80
$440
5.5
$135.00
$540
040121
Clean brick of efflorescence
6 SF
$30.00
$180
$55.00
0.6875
$80
$330
4.1
$85.00
$510
2 SF
$150.00
$300
$640.00
8.0000
$80
$1,280
16.0
$790.00
$1,580
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (moderate corrosion)
12 SF
$150.00
$1,800
$640.00
8.0000
$80
$7,680
96.0
$790.00
$9,480
050000
Replace steel ladder
1 EA
$2,500.00
$2,500
$640.00
8.0000
$80
$640
8.0
$3,140.00
$3,140
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$155,957 $77,979 $35,090 $26,365
1,949.5 hrs.
50.0% 15.0% 9.80% General Conditions & Administration Allowance
$70,900 on labor only $10,635 $7,990 $252,147 $23,095
$77,979 $45,725 $34,355
38.2% 3.5%
Page 191
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST Material Cost $89,525 Total Labor $295,390 Total Cost $660,158
ESTIMATOR CHECK
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 13.6% 44.7% 100.0%
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
SAY:
M&L TOTAL COST
$660,200
$660,158
Page 192
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF
$12,961
BID AMOUNT
$746,416
ALTERNATES Amount
PREVIOUS
PROGRAM 5/8/2024 $733,455
Mechanical P-3
(Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT Bldg $/sf
BUILDING COSTS Construction P-3
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$733,455
$29,154
HVAC
$12,961
$533
LOW: HIGH:
$559,812 $1,044,983
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 79 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $12,148 $55,616 $14,577 $9,718 $48,591 $48,591 $4,859 $9,718
$704 /day
017716
Contract Closeout
3.0%
$14,577
012100
FIELD ORDER ALLOWANCE
6.0%
$29,154
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$1,250.00
$1,250
$2,750.00
34.3750
$80
$2,750
34.4
$4,000.00
$4,000
$65.00
$195
$200.00
2.5000
$80
$600
7.5
$265.00
$795
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131 030131
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep) - Concrete wall
3 SF
Page 194
CSI NUM 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
030131
- Medium crack (1/16"< x < 1/8")
030131
Concrete scaling (Light - x < 1/4" deep)
1,350 LF
$30.00
$40,500
$95.00
1.1875
$80
$128,250
1,603.1
$125.00
$168,750
6 LF
$45.00
$270
$115.00
1.4375
$80
$690
8.6
$160.00
$960
030131
- Concrete deck
33 SF
$45.00
$1,485
$80.00
1.0000
$80
$2,640
33.0
$125.00
$4,125
030131
- Concrete pier foundation
2 SF
$45.00
$90
$80.00
1.0000
$80
$160
2.0
$125.00
$250
030131
- Concrete slab
241 SF
$45.00
$10,845
$80.00
1.0000
$80
$19,280
241.0
$125.00
$30,125
030131
- Concrete wall
53 SF
$45.00
$2,385
$80.00
1.0000
$80
$4,240
53.0
$125.00
$6,625
030131
Remove efflorescence
030131
- Concrete deck
38 SF
$30.00
$1,140
$55.00
0.6875
$80
$2,090
26.1
$85.00
$3,230
030131
- Concrete wall
223 SF
$30.00
$6,690
$55.00
0.6875
$80
$12,265
153.3
$85.00
$18,955
10 SF
$125.00
$1,250
$480.00
6.0000
$80
$4,800
60.0
$605.00
$6,050
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
43 SF
$125.00
$5,375
$480.00
6.0000
$80
$20,640
258.0
$605.00
$26,015
050000
Remove and replace deteriorated steel bracing (per location)
1 EA
$1,000.00
$1,000
$1,280.00
16.0000
$80
$1,280
16.0
$2,280.00
$2,280
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$204,060 $102,030 $45,914 $34,496
2,550.8 hrs.
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$78,725 on labor only $11,809 $8,872 $218,394 $29,154 $99,406 $386,500 $733,455
29.8% 4.0% 13.6% 52.7% 100.0%
$102,030 $57,722 $43,369
SAY:
$733,500
Page 195
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
Revision:
ALBANY, NEW YORK
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 2 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$89
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
$533 $0
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$222 $1,600 $311 $178 $399 $754
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL)
230700
1 LS
$280.00
$280
$240.00
2.5000
$96
$240
2.5
$520.00
$520
- High pressure steam (F and G Line), 18" diameter
50 LF
$55.79
$2,790
$48.00
0.5000
$96
$2,400
25.0
$103.79
$5,190
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$2,640 $1,320 $594 $446
27.5 hrs
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$3,070 on labor only $460 $346 $3,553 $533 $3,876 $5,000 $12,961
27.4% 4.1% 29.9% 38.6% 100.0%
$1,320 $1,054 $792
SAY:
$13,000
Page 196
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF
$12,961
BID AMOUNT
$950,412
ALTERNATES Amount
PREVIOUS
PROGRAM 5/8/2024 $937,450
Mechanical P-3
(Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT Bldg $/sf
BUILDING COSTS Construction P-3
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$937,450
$37,928
HVAC
$12,961
$533
LOW: HIGH:
$712,809 $1,330,576
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 79 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $15,803 $55,616 $18,964 $12,643 $63,214 $63,214 $6,321 $12,643
$704 /day
017716
Contract Closeout
3.0%
$18,964
012100
FIELD ORDER ALLOWANCE
6.0%
$37,928
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
$2,500.00
$2,500
$5,500.00
68.7500
$80
$5,500
68.8
$8,000.00
$8,000
$65.00
$15,275
$200.00
2.5000
$80
$47,000
587.5
$265.00
$62,275
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 1: GENERAL REQUIREMENTS 028213
ASBESTOS ABATEMENT
028213
Unidentified hazardous materials abatement
1 ALLOW
DIVISION 3: CONCRETE 030131 030131
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep) - Concrete wall
235 SF
Page 198
CSI NUM 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
1,551 LF
$30.00
$46,530
$95.00
1.1875
$80
$147,345
1,841.8
$125.00
$193,875
030131
- Medium crack (1/16"< x < 1/8")
53 LF
$45.00
$2,385
$115.00
1.4375
$80
$6,095
76.2
$160.00
$8,480
- Wide crack ( x >1/8")
11 LF
$55.00
$605
$125.00
1.5625
$80
$1,375
17.2
$180.00
$1,980
030131 030131
Concrete scaling (Light - x < 1/4" deep)
030131
- Concrete deck
35 SF
$45.00
$1,575
$80.00
1.0000
$80
$2,800
35.0
$125.00
$4,375
030131
- Concrete pier foundation
5 SF
$45.00
$225
$80.00
1.0000
$80
$400
5.0
$125.00
$625
030131
- Concrete slab
181 SF
$45.00
$8,145
$80.00
1.0000
$80
$14,480
181.0
$125.00
$22,625
030131
- Concrete wall
120 SF
$45.00
$5,400
$80.00
1.0000
$80
$9,600
120.0
$125.00
$15,000
13 SF
$25.00
$325
$80.00
1.0000
$80
$1,040
13.0
$105.00
$1,365
8 SF
$125.00
$1,000
$480.00
6.0000
$80
$3,840
48.0
$605.00
$4,840
39 SF
$125.00
$4,875
$480.00
6.0000
$80
$18,720
234.0
$605.00
$23,595
DIVISION 4: MASONRY 040121
Remove and replace deteriorated brick
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
METAL STAIRS
050000
Remove and replace deteriorated steel bracing (per location)
4 EA
$1,000.00
$4,000
$1,280.00
16.0000
$80
$5,120
64.0
$2,280.00
$9,120
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$267,690 $133,845 $60,230 $45,253
3,346.1 hrs.
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor
$99,090 on labor only $14,864 $11,167 $267,383 $37,928 $125,121 $507,018
$133,845 $75,094 $56,420
28.5% 4.0% 13.3% 54.1%
Page 199
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST Total Cost $937,450
UNIT PRICE
LABOR MAN HRS HRLY WAGE PER UNIT OR UNIT COST 100.0%
TOTAL COST
TOTAL HRS
TOTAL UNIT COST SAY:
M&L TOTAL COST $937,500
Page 200
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
EVALUATE UTILITY TUNNELS
To:
CHA CONSULTING INC.
Project No.:
SE-332-H
EMPIRE STATE PLAZA
Trade:
HVAC
Date:
5/8/2024
EMPIRE STATE PLAZA
New/Rehab:
REHAB
Phase:
PROGRAM
ALBANY, NEW YORK
Revision:
1
Client Agency:
OGS
Prepared By:
Trophy Point, LLC
ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds SUPERVISION Permits Insurance Home Office Overhead Profit
2.5% 2 days 3.5% 2.0% 4.5% 8.5%
017716
Contract Closeout
1.0%
$89
012100
FIELD ORDER ALLOWANCE Other Allowance (describe)
6.0% 0.0%
$533 $0
CSI NUM
DESCRIPTION:
QUANT
Estimated By: J. Krull
UNIT
$222 $1,600 $311 $178 $399 $754
$800 /day
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
DIVISION 23: MECHANICAL
230553
LABELLING AND IDENTIFICATION
230553
Labelling and identification
230700
INSULATION / RE-INSULATION
230700 230700
1 LS
$280.00
$280
$240.00
2.5000
$96
$240
2.5
$520.00
$520
Remove insulation / re-insulation - for sections of tunnel piping ( P-1 COLD TUNNEL) - High pressure steam (F and G Line), 18" diameter
50 LF
$55.79
$2,790
$48.00
0.5000
$96
$2,400
25.0
$103.79
$5,190
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$2,640 $1,320 $594 $446
27.5 hrs
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$3,070 on labor only $460 $346 $3,553 $533 $3,876 $5,000 $12,961
27.4% 4.1% 29.9% 38.6% 100.0%
$1,320 $1,054 $792
SAY:
$13,000
Page 201
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $2,130,399
BID AMOUNT
$2,130,399
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-3
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$2,130,399
$89,238
LOW: HIGH:
$1,597,799 $2,982,559
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 79 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $37,182 $55,616 $44,619 $29,746 $148,730 $148,730 $14,873 $29,746
$704 /day
017716
Contract Closeout
3.0%
$44,619
012100
FIELD ORDER ALLOWANCE
6.0%
$89,238
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 3: CONCRETE 030131
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Beams
4 SF
$65.00
$260
$200.00
2.5000
$80
$800
10.0
$265.00
$1,060
030131
- Concrete deck
58 SF
$65.00
$3,770
$200.00
2.5000
$80
$11,600
145.0
$265.00
$15,370
030131
- Stairs
40 SF
$65.00
$2,600
$200.00
2.5000
$80
$8,000
100.0
$265.00
$10,600
030131
- Concrete wall
1,639 SF
$65.00
$106,535
$200.00
2.5000
$80
$327,800
4,097.5
$265.00
$434,335
Page 203
CSI NUM 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
1,224 LF
$30.00
$36,720
$95.00
1.1875
$80
$116,280
1,453.5
$125.00
$153,000
030131
- Medium crack (1/16"< x < 1/8")
48 LF
$45.00
$2,160
$115.00
1.4375
$80
$5,520
69.0
$160.00
$7,680
030131
Concrete scaling (Light - x < 1/4" deep) 241 SF
$45.00
$10,845
$80.00
1.0000
$80
$19,280
241.0
$125.00
$30,125
8 SF
$45.00
$360
$80.00
1.0000
$80
$640
8.0
$125.00
$1,000
1,123 SF
$45.00
$50,535
$80.00
1.0000
$80
$89,840
1,123.0
$125.00
$140,375
030131
- Concrete deck
030131
- Concrete pier foundation
030131
- Concrete slab
030131
- Stair
33 SF
$45.00
$1,485
$80.00
1.0000
$80
$2,640
33.0
$125.00
$4,125
030131
- Concrete wall
90 SF
$45.00
$4,050
$80.00
1.0000
$80
$7,200
90.0
$125.00
$11,250
13 SF
$50.00
$650
$90.00
1.1250
$80
$1,170
14.6
$140.00
$1,820
030131 030131
Concrete scaling - Medium Scaling ( 1/4"< x <1/2" deep) - Stair
030131
Remove efflorescence
030131
- Concrete slab
34 SF
$30.00
$1,020
$55.00
0.6875
$80
$1,870
23.4
$85.00
$2,890
030131
- Concrete wall
54 SF
$30.00
$1,620
$55.00
0.6875
$80
$2,970
37.1
$85.00
$4,590
DIVISION 4: MASONRY 040121
Remove and replace deteriorated brick
4 SF
$25.00
$100
$80.00
1.0000
$80
$320
4.0
$105.00
$420
040121
Clean brick of efflorescence
50 SF
$30.00
$1,500
$55.00
0.6875
$80
$2,750
34.4
$85.00
$4,250
9 SF
$125.00
$1,125
$480.00
6.0000
$80
$4,320
54.0
$605.00
$5,445
41 SF
$125.00
$5,125
$480.00
6.0000
$80
$19,680
246.0
$605.00
$24,805
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
METAL STAIRS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (light corrosion)
1 SF
$100.00
$100
$320.00
4.0000
$80
$320
4.0
$420.00
$420
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Page 204
CSI NUM
DESCRIPTION:
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
UNIT PRICE
MAN HRS PER UNIT
$236,810 on labor only $35,522 $26,688 $553,861 $89,238 $299,020 $1,188,280 $2,130,399
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
$627,375 $313,688 $141,159 $106,058 26.0% 4.2% 14.0% 55.8% 100.0%
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
7,842.2 hrs. $313,688 $176,681 $132,746
SAY:
$2,130,400
Page 205
ESTIMATE SUMMARY/HISTORY
Project No.:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA EMPIRE STATE PLAZA ALBANY, NEW YORK ALBANY COUNTY
TO: BASE / ALT: TP Project No:
BUILDING GSF Bldg $/sf
PROGRAM 5/8/2024 $1,749,746
BID AMOUNT
$1,749,746
PREVIOUS (Phase) (date)
(Phase) (date)
$0
(Phase) (date)
$0
(Phase) (date)
$0
$0
Description
COMMENTS AND REFERENCES: - BASED ON CHA CONSULTING INC. PROGRAM DOCUMENTS DATED 03/26/2024, RECEIVED ON 03/26/2024. - NEW YORK STATE PREVAILING WAGE RATES FOR ALBANY COUNTY. - CONSTRUCTION START APRIL 2031; COMPLETION FEBRUARY 2034; MID-POINT MARCH 2033. - INCLUDES A PREMIUM FOR A CONDENSED CONSTRUCTION SCHEDULE - NORMAL WORKING HOURS AND CONDITIONS; EXCLUDES ANY PREMIUMS FOR A CONDENSED CONSTRUCTION SCHEDULE. - MULTIPLE PRIME CONTRACTS (COMPETITIVELY BID). - ENTIRE PROJECT BID AT ONE TIME. - PROJECT WILL BE PHASED OVER A 10 YEAR PERIOD. EXCLUSIONS: - SOFT COSTS (DESIGN FEES, ETC.) - CONSTRUCTION CONTINGENCY (OWNER CHANGE ORDER RESERVE) - CONSTRUCTION MANAGER FEES, MARKUPS OR GENERAL CONDITIONS - PROJECT LABOR AGREEMENTS - PLUMBING AND FIRE PROTECTION
BDC 178 Rev07
SE-332
Date: 5/8/2024 Phase: PROGRAM Client Agency: OGS Prepared By: TROPHY POINT, LLC Revision: 1
23-0795a-0447
CURRENT
BUILDING COSTS Construction P-3
ALTERNATES Amount
CHA CONSULTING INC.
CURRENT ESTIMATE SUMMARY ESTIMATED
FIELD ORDER
BID PACKAGE
BID AMOUNT
ALLOWANCE
Construction
$1,749,746
$72,866
LOW: HIGH:
$1,312,310 $2,449,644
ESTIMATE RANGE
EFile:V:\DesignAndConstr\Pxxxxx\30_DesignPhase\57_Estimates
Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Cost Management, 35th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242
ESTIMATE FORM
Phone: (518) 474-6604
To:
EVALUATE UTILITY TUNNELS EMPIRE STATE PLAZA
Trade:
EMPIRE STATE PLAZA
New/Rehab:
CHA CONSULTING INC. REHAB
Revision:
ALBANY, NEW YORK ALBANY COUNTY DIV 1. GENERAL CONDITIONS & ADMINISTRATION Bonds 2.5% SUPERVISION 79 days Permits 3.0% Insurance 2.0% Home Office Overhead 10.0% Profit 10.0% Equipment 1.0% Mobilization/Demobilization 2.0%
Project No.:
CONSTRUCTION 1
Estimated By: D. Lizak
SE-332-C
Date:
5/8/2024
Phase:
PROGRAM
Client Agency:
OGS
Prepared By:
Trophy Point, LLC $30,361 $55,616 $36,433 $24,289 $121,443 $121,443 $12,144 $24,289
$704 /day
017716
Contract Closeout
3.0%
$36,433
012100
FIELD ORDER ALLOWANCE
6.0%
$72,866
CSI NUM
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL HRS
TOTAL UNIT COST
M&L TOTAL COST
DIVISION 3: CONCRETE 030131
Concrete spall repair - Small Spall (x <6"dia, x < 1" deep)
030131
- Concrete deck
10 SF
$65.00
$650
$200.00
2.5000
$80
$2,000
25.0
$265.00
$2,650
030131
- Concrete wall
1,514 SF
$65.00
$98,410
$200.00
2.5000
$80
$302,800
3,785.0
$265.00
$401,210
Page 207
CSI NUM 030131
DESCRIPTION:
QUANT
UNIT
MATERIAL UNIT TOTAL PRICE COST
UNIT PRICE
MAN HRS PER UNIT
LABOR HRLY WAGE OR UNIT COST
TOTAL COST
TOTAL UNIT COST
TOTAL HRS
M&L TOTAL COST
Concrete crack repairs
030131
- Fine crack ( 1/32"< x < 1/16")
030131
Concrete scaling (Light - x < 1/4" deep)
1,119 LF
$30.00
$33,570
$95.00
1.1875
$80
$106,305
1,328.8
$125.00
$139,875
106 SF
$45.00
$4,770
$80.00
1.0000
$80
$8,480
106.0
$125.00
$13,250
1 SF
$45.00
$45
$80.00
1.0000
$80
$80
1.0
$125.00
$125
030131
- Concrete deck
030131
- Concrete pier foundation
030131
- Concrete slab
652 SF
$45.00
$29,340
$80.00
1.0000
$80
$52,160
652.0
$125.00
$81,500
030131
- Stair
45 SF
$45.00
$2,025
$80.00
1.0000
$80
$3,600
45.0
$125.00
$5,625
030131
- Concrete wall
153 SF
$45.00
$6,885
$80.00
1.0000
$80
$12,240
153.0
$125.00
$19,125
030131
Remove efflorescence
030131
- Concrete slab
74 SF
$30.00
$2,220
$55.00
0.6875
$80
$4,070
50.9
$85.00
$6,290
030131
- Stair
1 SF
$30.00
$30
$55.00
0.6875
$80
$55
0.7
$85.00
$85
030131
- Concrete wall
116 SF
$30.00
$3,480
$55.00
0.6875
$80
$6,380
79.8
$85.00
$9,860
6 SF
$125.00
$750
$480.00
6.0000
$80
$2,880
36.0
$605.00
$3,630
DIVISION 5: METALS 050000
STEEL BEAMS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
050000
STEEL COLUMNS
050000
Mechanically remove corrosion and coat with corrosion inhibiting paint (minor corrosion)
18 SF
$125.00
$2,250
$480.00
6.0000
$80
$8,640
108.0
$605.00
$10,890
050000
Tunnel ventilation to accommodate welding, painting etc.
1 LS
$6,250.00
$6,250
$4,375.00
54.6875
$80
$4,375
54.7
$10,625.00
$10,625
Subtotals LOGISTICS DESIGN CONTINGENCY ESCALATION
$514,065 $257,033 $115,665 $86,903
6,425.8 hrs.
50.0% 15.0% 9.80% General Conditions & Administration Allowance Material Cost Total Labor Total Cost
$190,675 on labor only $28,601 $21,489 $462,450 $72,866 $240,765 $973,665 $1,749,746
26.4% 4.2% 13.8% 55.6% 100.0%
$257,033 $144,266 $108,392
SAY:
$1,749,700
Page 208
Project No. SE332
-249-
Appendix 2: Structural Detailed Findings
May 17, 2024
82
81
79
1 2
80
78
3
4 5
77 76 73
60 57 58
17
63 62
Dat eSav ed:2/ 15/ 2024• Aut hor :E. But t er f i el d
22
64
61
23 24
33 49
25
35
26
44
50
53
56
21
19
68
52
55
10
20
18
69
59
54
7
16
65
67
1 1
15
70
9
14
74
71
8
13
75
72
66
6
12
27
43 51
28
45
29
46 47 48
39 42
41
40
34
30
36
31
37
32
38
OGS Cold Tunnel Structural Section Maps Utility Tunnel Evaluation
Scale 1" = 280'
CHA Project No. 080577
Image Courtesy of the NYS Office of Information Technology Services, GIS Program Office Photo Date: 2021
Project No. SE332
-251-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
1
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground Concrete Pier Foundation Concrete Roof Deck Steel Column Concrete Slab-On-Ground
57 SF 6 LF 48 LF 4 SF 2 5 SF 30 SF 6 SF 4 LF 2 SF 22 LF 1 SF 1 SF 3 SF 41 LF 50 LF 17 SF 5 SF 4 LF 2 SF 49 LF 10 LF 2 SF 80 SF 13 SF 1 SF 2 SF 80 SF 1 SF 1 SF
S-1 S-2
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Water Damage Wide Crack Medium Crack Severe Corrosion Missing bolts and/or Loose Nuts Large Scaling Efflorescence Large Spall Medium Crack Large Spall Medium Crack Damaged Grout Moderate Corrosion Light Scaling Fine Crack Fine Crack Light Scaling Small Spall Medium Crack Medium Scaling Fine Crack Medium Crack Medium Spall Efflorescence Light Scaling Small Spall Medium Spall Efflorescence Minor Corrosion Minor Corrosion
Concrete Pier Foundation Concrete Wall Steel Column
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Pier Foundation
Concrete Wall
Concrete Column Concrete Beam Concrete Roof Deck Steel Column Metal Stair
S-3
Project No. SE332
-252-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
2
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Steel Column Concrete Beam Concrete Pier Foundation Concrete Slab-On-Ground
Medium Crack Wide Crack Large Spall Missing Bolts Medium Crack Fine Crack Medium Spall Efflorescence Medium Crack Wide Crack Efflorescence Moderate Corrosion Light Scaling Efflorescence Small Spall Light Scaling Light Scaling Fine Crack Fine Crack Minor Corrosion Minor Corrosion Bent Flange
10 LF 2 LF 218 SF 1 16 LF 17 LF 1 SF 34 SF 147 LF 20 LF 38 SF 1 SF 1 SF 42 SF 8 SF 37 SF 8 SF 12 LF 68 LF 35 SF 4 SF 1
Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Beam Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Metal Stair Steel Column
PHOTO NO.
S-4 S-5
Project No. SE332
-253-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground
Medium Crack Large Spall Light Scaling Large Spall Efflorescence Medium Scaling Moderate Corrosion Fine Crack
60 LF 5 SF 28 SF 9 SF 255 SF 270 SF 1 SF 8 LF
Bent Flange Minor Corrosion
1 LF 5 SF
Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Concrete Pier Foundation Steel Column
PHOTO NO.
S-6 S-7
Project No. SE332
-254-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
4
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground
Large Spall
10 SF
Concrete Wall Expansion Joint
Efflorescence Wide Crack Deteriorated Expansion Joint
240 SF 12 LF 15 LF
Steel Beam
Moderate Corrosion
1 SF
Steel Column
Minor Corrosion
5 SF
Concrete Roof Deck Concrete Slab-On-Ground
Efflorescence Medium Crack
72 SF 12 LF
Concrete Pier Foundation
Small Spall
1 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
PHOTO NO.
Project No. SE332
-255-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
5
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground
Large Spall
168 SF
S-8
Concrete Wall
Wide Crack
25 LF
S-9
Steel Column
Bent Base Plate
1
S-10
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Pier Foundation Concrete Slab-On-Ground
Medium Crack Large Scaling Medium Crack
10 LF 19 SF 33 LF
Concrete Wall
Medium Crack
16 LF
Steel Column
Minor Corrosion
4 SF
Concrete Roof Deck
Fine Crack
16 LF
Concrete Slab-On-Ground
Efflorescence
180 SF
Concrete Wall
Efflorescence
250 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Project No. SE332
-256-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
6
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Pier Foundation
Medium Spall
10 SF
S-11
Concrete Slab-On-Ground
Large Spall Medium Scaling Wide Crack Wide Crack Medium Crack Large Spall Moderate Corrosion
41 SF 12 SF 5 LF 19 LF 35 LF 2 SF 1 SF
Concrete Slab-On-Ground
Fine Crack Efflorescence Fine Crack
3 LF 3 SF 5 LF
Concrete Wall
Efflorescence
115 SF
Metal Stair
Minor Corrosion
7 SF
Steel Column
Minor Corrosion
5 SF
Concrete Wall
Steel Column P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck
S-12
Project No. SE332
-257-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
7
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck
Concrete Pier Foundation
Large Spall Medium Crack Fine Crack Large Spall
4 SF 30 LF 5 LF 2 SF
Concrete Slab-On-Ground
Medium Spall
4 SF
Concrete Wall
Concrete Pier Foundation
Large Spall Medium Spall Medium Crack Efflorescence Minor Corrosion Moderate Corrosion Small Spall
8 SF 20 SF 10 LF 50 SF 5 SF 2 SF 2 SF
Steel Beam
Minor Corrosion
3 SF
Steel Column P3 – Low-level priority – must be addressed within the next 5-10 years.
PHOTO NO.
Project No. SE332
-258-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
8
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Metal Stair Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Large Spall Large Spall Large Spall Missing Weld Medium Crack Medium Scaling Large Spall Wide Crack Medium Spall Efflorescence Moderate Corrosion Damaged Grout Fine Crack Fine Crack Minor Corrosion Minor Corrosion
36 SF 20 SF 140 SF 1 60 LF 30 SF 16 SF 30 LF 25 SF 10 SF 2 SF 9SF 6 LF 30 LF 12 SF 7 SF
S-13
Steel Column P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
S-14 S-15
S-16
Project No. SE332
-259-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
9
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Pier Foundation
Large Spall Wide Crack Large Scaling Large Spall Severe Corrosion Medium Crack Medium Spall
1 SF 5 LF 2 SF 64 SF 8 SF 100 LF 4 SF
S-17
Medium Crack Bent Baseplate Damaged Grout Moderate Corrosion Efflorescence Light Scaling Medium Scaling Medium Crack Fine Crack Large Spall Light Scaling Light Scaling Efflorescence Fine Crack
95 LF 2 2 SF 6 SF 114 SF 4 SF 1 SF 47 SF 50 LF 52 SF 75 SF 20 SF 5 SF 95 LF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall Steel Column Concrete Roof Deck Concrete Wall Steel Column
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall
Project No. SE332
-260-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
10
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Beam Concrete Roof Deck Concrete Masonry Unit Wall Concrete Pier Foundation Concrete Slab-On-Ground
Large Spall Large Spall Wide Crack Large Spall Large Spall Water Damage Large Spall Severe Corrosion Severe Corrosion Medium Spall Medium Crack Medium Crack Medium Spall Medium Crack Medium Spall Small Spall Small Spall Bent Flange Damaged Grout Moderate Corrosion Moderate Corrosion Light Scaling Light Scaling Efflorescence Light Scaling Small Spall Fine Crack Small Spall Fine Crack Light Scaling
5 SF 10 SF 2 LF 2 SF 20 SF 35 SF 10 SF 1 SF 1 SF 1 SF 2 LF 27 LF 6 SF 10 LF 1 SF 5 SF 15 SF 1 1 2 SF 20 SF 3 SF 3 SF 5 SF 2 SF 3 SF 3 LF 1 SF 53 LF 66 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall Steel Beam Steel Column Concrete Column Concrete Roof Deck Concrete Masonry Unit Wall Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Wall Framing Concrete Beam Concrete Column Concrete Roof Deck Concrete Masonry Unit Wall Concrete Pier Foundation Concrete Slab-On-Ground
PHOTO NO.
S-18
Project No. SE332
-261-
Concrete Wall 10 cont.
P3 cont. Concrete Wall cont. Steel Beam Steel Column
May 17, 2024
Fine Crack Medium Crack Light Scaling Efflorescence Minor Corrosion Minor Corrosion
48 LF 48 LF 1 SF 3 SF 2 SF 10 SF
Project No. SE332
-262-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
11
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Wall
Large Scaling Wide Crack Large Spall Severe Corrosion Severe Corrosion Damaged Grout Bent Baseplate Medium Scaling Medium Crack Efflorescence Efflorescence Medium Crack Medium Spall Water Damage Moderate Corrosion Moderate Corrosion Small Spall Light Scaling Fine Crack Small Spall Minor Corrosion Minor Corrosion
15 SF 7 LF 10 SF 8 SF 14 SF 14 SF 3 5 SF 20 LF 5 SF 714 SF 69 LF 30 SF 20 SF 2 SF 2 SF 10 SF 96 SF 91 LF 10 SF 7 SF 2 SF
S-19
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column
Concrete Roof Deck
Concrete Wall
Steel Beam Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
S-20
Project No. SE332
-263-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
12
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Large Spall
28 SF
Steel Column
Moderate Corrosion
26 SF
Concrete Column Concrete Roof Deck
Fine Crack Fine Crack Efflorescence Medium Crack Small Spall Wide Crack Large Spall Large Spall Large Scaling Medium Crack Fine Crack Medium Spall Medium Scaling Fine Crack Medium Scaling Efflorescence Minor Corrosion Minor Corrosion Small Spall
4 LF 6 LF 6 SF 6 LF 6 SF 6 LF 4 SF 171 SF 130 SF 34 LF 15 LF 6 SF 18 SF 20 LF 20 SF 100 SF 1 SF 5 SF 2 SF
Concrete Pier Foundation
Concrete Slab-On-Ground
Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Roof Deck
PHOTO NO.
S-21
S-22
Project No. SE332
-264-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
13
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck
Large Spall
65 SF
S-23
Steel Column
Damaged Grout Severe Corrosion
10 SF 12 SF
S-24
Wide Crack Large Spall Medium Crack Large Spall Wide Crack Medium Crack Wide Crack Large Spall Moderate Corrosion Moderate Corrosion Efflorescence Efflorescence Medium Scaling Efflorescence Minor Corrosion
16 LF 42 SF 6 LF 130 SF 6 LF 30 LF 25 LF 98 SF 3 SF 4 SF 10 SF 110 SF 18 SF 375 SF 3 SF
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Column
S-25
Project No. SE332
-265-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
14
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Steel Column
Damaged Grout Severe Corrosion Missing Bolt
10 SF 44 SF 1
S-26
Medium Spall Medium Spall Large Spall Medium Crack Medium Spall Medium Crack Efflorescence Medium Scaling Efflorescence Medium Scaling Efflorescence Efflorescence Minor Corrosion
37 SF 4 SF 12 SF 12 LF 30 SF 30 LF 10 SF 12 SF 25 SF 12 SF 9 SF 200 SF 7 SF
Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam
Project No. SE332
-266-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
15
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Wall
Exposed Rebar Water Damage Large Spall Efflorescence Severe Corrosion Medium Crack Medium Crack Medium Spall Medium Crack Damaged Grout Light Scaling Small Spall Fine Crack Light Scaling Light Scaling Efflorescence Minor Corrosion Minor Corrosion
5 SF 100 SF 32 SF 63 SF 6 SF 10 LF 1 LF 2 SF 54 LF 2 SF 35 SF 6 SF 50 LF 24 SF 4 SF 4 SF 5 SF 3 SF
S-27 S-28
P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Roof Deck Concrete Pier Foundation Concrete Wall Steel Column Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
Project No. SE332
-267-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
16
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Medium Crack Medium Scaling Efflorescence Medium Crack Moderate Corrosion Damaged Grout Small Spall Fine Crack Light Scaling Small Spall Fine Crack Minor Corrosion Minor Corrosion
22 LF 5 SF 30 SF 10 LF 10 SF 6 SF 6 SF 156 LF 1 SF 12 SF 40 LF 4 SF 3 SF
Steel Column P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-29 S-30
Project No. SE332
-268-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
17
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Wall
Concrete Slab-On-Ground
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Pier Foundation
25 SF 440 SF 8 SF 1 SF 2 1 SF 10 SF 46 SF 2 SF 2 SF 1 SF 17 SF 2 LF 6 SF 3 SF 2 SF 15 LF 6 SF
S-31 S-32
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Efflorescence Water Damage Efflorescence Severe Corrosion Missing Bolts Medium Spall Large Spall Large Spall Minor Corrosion Moderate Corrosion Damaged Grout Light Scaling Medium Crack Light Scaling Medium Scaling Efflorescence Fine Crack Minor Corrosion
Steel Column
Concrete Wall Steel Beam Steel Column
Concrete Slab-On-Ground
Concrete Wall Steel Column
Project No. SE332
-269-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
18
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Large Spall
60 SF
S-33
Steel Column
Severe Corrosion Damaged Grout
22 SF 10 SF
S-34
Concrete Roof Deck Concrete Pier Foundation
Medium Spall Medium Spall Medium Scaling Efflorescence Large Spall Wide Crack Medium Crack Large Scaling Large Spall Efflorescence Moderate Corrosion Twisted Beam End Moderate Corrosion Minor Corrosion
24 SF 22 SF 10 SF 32 SF 79 SF 8 LF 4 LF 16 SF 210 SF 520 SF 5 SF 1 SF 7 SF 2 SF
Concrete Slab-On-Ground
Concrete Wall Steel Beam
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Steel Beam
S-35
Project No. SE332
-270-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
19
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck
Medium Crack Efflorescence Medium Spall Large Spall Wide Crack Medium Crack Minor Corrosion Severe Corrosion Moderate Corrosion Damaged Grout Medium Crack
16 LF 32 SF 10 SF 22 SF 37 LF 10 LF 6 SF 50 SF 3 SF 12 SF 8 LF
Concrete Pier Foundation Concrete Wall Steel Beam Steel Column
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground
PHOTO NO.
S-36 S-37
Project No. SE332
-271-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
20
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Steel Column
Severe Corrosion Damaged Grout
54 SF 10 SF
S-38
Concrete Roof Deck
Medium Crack Efflorescence Medium Spall Medium Spall Fine Crack Medium Spall Medium Crack Wide Crack Minor Corrosion Moderate Corrosion
90 LF 90 SF 4 SF 16 SF 2 LF 10 SF 25 LF 16 LF 5 SF 8 SF
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
S-39
Project No. SE332
-272-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
21
P1 – Most serious priority – must be repaired/ replaced immediately.
Metal Stair
1 2 SF 4 SF 1 24 SF
S-40
Steel Column
Damaged Stringer Severe Corrosion Minor Corrosion Missing Brace Severe Corrosion
Concrete Roof Deck
Small Spall
30 SF
Concrete Pier Foundation Concrete Wall
Medium Spall Large Spall Small Spall
6 SF 17 SF 4 SF
Steel Beam
Minor Corrosion
2 SF
Steel Column
Moderate Corrosion Damaged Grout Medium Spall
12 SF 8 SF 1 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground
S-41
Project No. SE332
-273-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
22
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Beam Concrete Wall Expansion Joint Steel Column
P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck Concrete Wall
Large Spall Wide Crack Deteriorated Expansion Joint Severe Corrosion Damaged Grout Efflorescence Medium Crack Efflorescence Moderate Corrosion Light Scaling Light Scaling Fine Crack Light Scaling
1 SF 25 LF 20 LF 24 SF 8 SF 3 SF 43 LF 6 SF 2 SF 8 SF 1 SF 78 LF 15 SF
Steel Column Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
PHOTO NO.
S-42 S-43
Project No. SE332
-274-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
23
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Steel Column
Severe Corrosion
8 SF
Concrete Roof Deck
Wide Crack Efflorescence Large Scaling Medium Scaling Medium Crack Light Scaling Fine Crack Light Scaling Efflorescence
40 LF 50 SF 1 SF 3 SF 51 LF 10 SF 52 LF 10 SF 102 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Pier Foundation Concrete Wall Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
PHOTO NO.
S-44
Project No. SE332
-275-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
24
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Beam Concrete Wall Metal Stair
Wide Crack Large Spall Severe Corrosion Missing Bolts Missing Handrail Severe Corrosion Medium Scaling
30 LF 116 SF 6 SF 7 1 8 SF 10 SF
Medium Crack Medium Crack Large Spall Medium Crack Medium Scaling Efflorescence Light Scaling Efflorescence Light Scaling Fine Crack Efflorescence
8 LF 2 LF 56 SF 66 LF 10 SF 23 SF 4 SF 52 SF 3 SF 12 LF 67 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Stair Handrail Steel Column Concrete Beam Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall
PHOTO NO.
S-45 S-46
Project No. SE332
-276-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
25
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Column Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Roof Deck
Large Scaling Wide Crack Efflorescence Large Spall Water Damage Wide Crack Severe Corrosion Light Scaling Medium Crack Medium Crack
1 SF 14 LF 400 SF 64 SF 4 SF 4 LF 20 SF 50 SF 3 LF 25 LF
Concrete Pier Foundation
Medium Crack
2 LF
Concrete Wall
Concrete Column
Efflorescence Medium Scaling Large Spall Medium Spall Fine Crack
160 SF 10 SF 1 SF 1 SF 9 LF
Concrete Roof Deck
Efflorescence
40 SF
Concrete Pier Foundation
Small Spall Light Scaling Fine Crack Small Spall Fine Crack Light Scaling Light Scaling Fine Crack
4 SF 5 SF 2 LF 3 SF 23 LF 1 SF 143 SF 39 LF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall Steel Column Concrete Column
Concrete Slab-On-Ground
Concrete Wall
PHOTO NO.
S-47 S-48 S-49
Project No. SE332
-277-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
26
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck
Large Spall Large Scaling Medium Spall Medium Crack Medium Scaling Medium Crack Efflorescence Small Spall Medium Spall Large Spall Efflorescence Minor Corrosion Minor Corrosion Moderate Corrosion Damaged Grout
12 SF 150 SF 2 SF 37 LF 72 SF 69 LF 84 SF 10 SF 9 SF 9 SF 35 SF 4 SF 5 SF 2 SF 5 SF
Concrete Slab-On-Ground
Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-50
S-51
Project No. SE332
-278-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
27
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck
Medium Crack Efflorescence Medium Crack Medium Crack Medium Spall Large Spall Minor Corrosion Moderate Corrosion Damaged Grout Light Scaling
104 LF 104 SF 5 LF 30 LF 4 SF 24 SF 6 SF 8 SF 2 SF 85 SF
Concrete Slab-On-Ground Concrete Wall
Steel Column
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground
PHOTO NO.
S-52
S-53
Project No. SE332
-279-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
28
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck
Medium Crack Efflorescence Small Spall Large Spall Medium Crack Wide Crack Medium Spall Moderate Corrosion Damaged Grout Light Scaling Fine Crack Light Scaling Minor Corrosion Minor Corrosion
96 LF 60 SF 16 SF 8 SF 18 LF 10 LF 20 SF 2 SF 5 SF 2 SF 14 LF 4 SF 8 SF 3 SF
Concrete Slab-On-Ground Concrete Wall
Steel Column P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-54
S-55
Project No. SE332
-280-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
29
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground
Efflorescence Medium Crack Wide Crack Moderate Corrosion Damaged Grout Medium Spall Small Spall Small Spall Light Scaling Fine Crack Minor Corrosion Minor Corrosion
88 SF 48 LF 40 LF 3 SF 8 SF 12 SF 6 SF 32 SF 76 SF 34 LF 12 SF 5 SF
Steel Column
Concrete Wall
Steel Beam Steel Column
PHOTO NO.
Project No. SE332
-281-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
30
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Large Spall
200 SF
S-56
Concrete Roof Deck
Efflorescence Medium Crack Large Spall Medium Spall Large Spall Medium Scaling Medium Spall Efflorescence Moderate Corrosion
72 SF 32 LF 32 SF 24 SF 2 SF 100 SF 24 SF 225 SF 2 SF
Concrete Slab-On-Ground
Moderate Corrosion Damaged Grout Light Scaling
4 SF 7 SF 10 SF
Steel Beam
Minor Corrosion
2 SF
Steel Column
Minor Corrosion
3 SF
Concrete Slab-On-Ground
Concrete Wall Steel Beam Steel Column P3 – Low-level priority – must be addressed within the next 5-10 years.
S-57
Project No. SE332
-282-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
31
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Deck
Wide Crack
40 LF
S-58
Concrete Deck
Medium Crack Efflorescence Large Spall Medium Spall Medium Crack Medium Spall Efflorescence Wide Crack Moderate Corrosion
70 LF 48 SF 9 SF 42 SF 12 LF 24 SF 254 SF 22 LF 1 SF
Concrete Slab-On-Ground
Moderate Corrosion Damaged Grout Minor Corrosion Bent Baseplate Bent Flange Small Spall
5 SF 10 SF 8 SF 3 1 6 SF
Concrete Wall
Light Scaling
16 SF
Steel Beam
Minor Corrosion
6 SF
Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
P3 – Low-level priority – must be addressed within the next 5-10 years.
S-59
Project No. SE332
-283-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
32
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Column Concrete Roof Deck
Wide Crack Large Spall Large Spall Severe Corrosion Efflorescence Medium Spall Medium Crack Medium Spall Efflorescence Moderate Corrosion Damaged Grout Fine Crack Small Spall Fine Crack Minor Corrosion Minor Corrosion
10 LF 160 SF 20 SF 5 SF 30 SF 20 SF 4 LF 4 SF 450 SF 7 SF 8 SF 16 LF 12 SF 20 LF 9 SF 1 SF
Concrete Slab-On-Ground Concrete Wall Steel Column
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-60
S-61
Project No. SE332
-284-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
33
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Pier Foundation
Large Spall Large Spall
6 SF 16 SF
S-62 S-63
Concrete Slab-On-Ground
Large Spall
16 SF
Concrete Roof Deck
Large Spall Efflorescence Medium Crack Large Spall Efflorescence Wide Crack Medium Spall Moderate Corrosion
1 SF 8 SF 8 LF 32 SF 32 SF 4 LF 4 SF 6 SF
Moderate Corrosion Damaged Grout Fine Crack Small Spall Fine Crack Minor Corrosion Minor Corrosion
8 SF 15 SF 10 LF 8 SF 44 LF 3 SF 9 SF
Concrete Slab-On-Ground Concrete Wall
Steel Bracing Steel Column P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
Project No. SE332
-285-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
34
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Beam Concrete Column Concrete Deck Concrete Pier Foundation Concrete Beam Concrete Pier Foundation
Wide Crack Large Scaling Wide Crack Large Spall Medium Crack Medium Crack Wide Crack Medium Crack Efflorescence Medium Crack Medium Spall Bent Flange Moderate Corrosion Moderate Corrosion Medium Scaling Light Scaling
8 LF 20 SF 4 LF 10 SF 32 LF 2 LF 1 LF 10 LF 56 SF 85 LF 2 SF 1 1 SF 4 SF 15 SF 26 SF
Efflorescence Fine Crack Small Spall Light Scaling Light Scaling
2 SF 6 LF 2 SF 1 SF 278 SF
Fine Crack Efflorescence Light Scaling Small Spall Minor Corrosion
149 LF 105 SF 8 SF 3 SF 2 SF
Concrete Slab-On-Ground Concrete Wall Steel Beam
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Beam Concrete Column Concrete Deck Concrete Pier Foundation
Concrete Slab-On-Ground Concrete Wall
Steel Beam
PHOTO NO.
S-64, S-65
Project No. SE332
-286-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
35
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall Steel Column Sump Pump Concrete Slab-On-Ground
Wide Crack Wide Crack Moderate Corrosion Flooding Medium Crack
12 LF 12 LF 5 SF 1 12 LF
Concrete Wall
Medium Crack Efflorescence Efflorescence Fine Crack Light Scaling Fine Crack Fine Crack Minor Corrosion Minor Corrosion
70 LF 25 SF 20 SF 3 LF 5 SF 40 LF 85 LF 4 SF 6 SF
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Bracing Steel Column
PHOTO NO.
S-66 S-67
Project No. SE332
-287-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
36
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Beam Concrete Slab-On-Ground
Large Scaling Water Damage Large Spall Large Scaling Deteriorated Expansion Joint Medium Scaling Medium Scaling Medium Crack Efflorescence Medium Scaling Medium Scaling Medium Crack Medium Spall Efflorescence Medium Scaling Moderate Corrosion Moderate Corrosion Fine Crack Light Scaling Light Scaling Light Scaling Fine Crack Small Spall Minor Corrosion Minor Corrosion
10 SF 50 SF 10 SF 6 SF 52 LF 2 SF 5 SF 17 LF 5 SF 5 SF 5 SF 476 SF 11 SF 326SF 16 SF 2 SF 6 SF 25 LF 18 SF 12 SF 28 SF 70 LF 1 SF 6 SF 4 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall Expansion Joint Concrete Beam Concrete Column Concrete Roof Deck
Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
PHOTO NO.
S-68
S-69
Project No. SE332
-288-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
37
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall
Wide Crack
60 LF
Steel Column
Bent Flange
1
Concrete Deck
Medium Crack Efflorescence Medium Crack Large Scaling Medium Scaling Fine Crack Fine Crack Light Scaling Fine Crack Efflorescence Minor Corrosion Bent Baseplate
22 LF 25 SF 10 LF 3 SF 5 SF 1 LF 32 LF 3 SF 205 LF 80 SF 13 SF 1 SF
Concrete Wall Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Column
PHOTO NO.
S-70
S-71
Project No. SE332
-289-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
38
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Pier Foundation Concrete Wall Metal Stair Steel Column Concrete Roof Deck
Large Spall Large Spall Severe Corrosion Severe Corrosion Medium Crack
2 SF 1 SF 4 SF 9 SF 7 LF
S-72 S-73
Concrete Wall
Medium Crack
60 LF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck
Medium Scaling
2 SF
Concrete Pier Foundation
Light Scaling Medium Crack Fine Crack Medium Crack Light Scaling Fine Crack Efflorescence Light Scaling Moderate Corrosion Minor Corrosion
4 SF 1 SF 52 LF 15 LF 7 SF 181 LF 50 SF 2 SF 5 SF 2 SF
Concrete Slab-On-Ground
Concrete Wall
Steel Column
Project No. SE332
-290-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
39
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Pier Foundation Steel Beam
Water Damage Large Spall Severe Corrosion Missing Bolt Severe Corrosion Medium Scaling Medium Spall Medium Crack Medium Spall Medium Spall Efflorescence Efflorescence Medium Crack Medium Spall Deteriorated Expansion Joint Moderate Corrosion Light Scaling Light Scaling Small Spall Fine Crack Efflorescence Fine Crack Small Spall Light Scaling Light Scaling Fine Crack Medium Crack Fine Crack Light Scaling Minor Corrosion Minor Corrosion
5 SF 2 SF 2 SF 1 14 SF 2 SF 3 SF 22 LF 6 SF 2 SF 8 SF 33 SF 16 SF 18 SF 22 LF 8 SF 1 SF 1 SF 5 SF 20 LF 22 SF 30 LF 5 SF 5 SF 39 SF 16 LF 5 SF 30 LF 14 SF 2 SF 8 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Steel Column Concrete Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Expansion Joint Steel Column Concrete Beam Concrete Column
Concrete Roof Deck Concrete Pier Foundation
Concrete Slab-On-Ground
Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-74 S-75
Project No. SE332
-291-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
40
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Column Concrete Pier Foundation Concrete Slab-On-Ground Metal Stair
Concrete Wall Expansion Joint
Large Spall Large Spall Medium Spall Missing Bolts Severe Corrosion Missing Handrail Detached Handrailing Severe Corrosion Severe Corrosion Bent Flange Medium Scaling Medium Crack Wide Crack Medium Crack Medium Spall Medium Crack Efflorescence Medium Spall Efflorescence Water Damage Medium Spall Medium Scaling Medium Scaling Medium Spall Medium Crack Medium Crack Deteriorated Expansion Joint
4 SF 2 SF 2 SF 7 6 SF 2 1 1 SF 8 SF 1 5 SF 3 LF 3 LF 1 LF 1 SF 15 LF 5 SF 8 SF 2 SF 4 SF 3 SF 15 SF 5 SF 2 SF 3 LF 4 LF 5 LF
Metal Stair
Moderate Corrosion
70 SF
Steel Beam
Moderate Corrosion
1 SF
Stair Handrail Steel Beam Steel Column P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Beam Concrete Column
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Stair
PHOTO NO.
S-76
S-77
Project No. SE332
-292-
Steel Column 40 cont.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Beam Concrete Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Stair Concrete Wall
Steel Beam Steel Bracing Steel Column
May 17, 2024
Moderate Corrosion Light Scaling Fine Crack Small Spall Light Scaling Fine Crack Small Spall Light Scaling Fine Crack Light Scaling Fine Crack Light Scaling Small Spall Fine Crack Light Scaling Efflorescence Minor Corrosion Minor Corrosion Minor Corrosion
10 SF 30 SF 15 LF 1 SF 1 SF 5 LF 2 SF 12 SF 2 LF 47 SF 54 LF 7 SF 4 SF 54 LF 118 SF 25 SF 20 SF 1 SF 12 SF
Project No. SE332
-293-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
41
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Pier Foundation
Large Spall
3 SF
S-78
Steel Column
Severe Corrosion
2 SF
Concrete Column Concrete Roof Deck
Medium Crack Medium Crack Medium Scaling Medium Crack Medium Spall Efflorescence Moderate Corrosion Light Scaling Light Scaling Fine Crack Efflorescence Light Scaling Fine Crack Light Scaling Fine Crack Light Scaling Fine Crack Medium Crack Minor Corrosion Minor Pitting
6 LF 6 LF 8 SF 20 LF 6 SF 67 SF 8 SF 10 SF 20 SF 20 LF 380 SF 5 SF 40 LF 46 SF 3 LF 25 SF 54 LF 8 LF 12 SF 14 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Column Concrete Beam Concrete Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
S-79
Project No. SE332
-294-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
42
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Pier Foundation
Large Scaling Large Spall Efflorescence Deteriorated Expansion Joint Medium Crack
10 SF 10 SF 136 SF 72 LF 11 LF
Medium Crack Medium Scaling Medium Scaling
8 LF 15 SF 5 SF
Medium Scaling Medium Crack Medium Crack
5 SF 15 LF 36 LF
Light Scaling Small Spall Light Scaling Small Spall Small Spall Fine Crack Light Scaling Fine Crack Fine Crack Minor Corrosion Minor Corrosion
5 SF 1 SF 10 SF 2 SF 1 SF 10 LF 22 SF 7 LF 213 LF 2 SF 2 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall Expansion Joint Concrete Beam Concrete Column Concrete Roof Deck Concrete Pier Foundation Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Beam Concrete Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-80 S-81
Project No. SE332
-295-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
43
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Pier Foundation Concrete Wall Steel Column
4 SF 3 SF 3 SF 4 1 18 SF 5 LF 5 SF 10 LF 2 SF 35 SF 1 SF 3 SF 5 LF 15 LF 14 LF 167 SF 3 SF 14 SF 3 SF 10 LF 1 SF 40 LF 5 SF 25 SF 77 LF 29 LF 4 SF
S-82
Steel Beam
Large Spall Large Scaling Damaged Grout Missing Bolt Bent Flange Severe Corrosion Medium Crack Medium Scaling Medium Crack Medium Scaling Efflorescence Medium Spall Medium Scaling Medium Crack Fine Crack Medium Crack Efflorescence Moderate Corrosion Moderate Corrosion Light Scaling Fine Crack Small Spall Fine Crack Light Scaling Light Scaling Fine Crack Medium Crack Minor Pitting
Steel Bracing Steel Column
Minor Corrosion Minor Corrosion
1 SF 6 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Beam Concrete Roof Deck
Concrete Pier Foundation
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column Concrete Column Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
S-83
Project No. SE332
-296-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
44
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground Concrete Wall Metal Stair Steel Beam Steel Column
Concrete Pier Foundation
Steel Beam
186 SF 2 SF 2 SF 1 SF 4 SF 3 SF 4 6 SF 1 LF 26 SF 16 LF 115 SF 17 LF 1 SF
S-84
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Large Spall Large Scaling Severe Corrosion Severe Corrosion Severe Corrosion Damaged Grout Missing Bolt Medium Scaling Medium Crack Efflorescence Medium Crack Efflorescence Medium Crack Moderate Corrosion
Steel Column
Moderate Corrosion
12 SF
Concrete Pier Foundation
Light Scaling Wide Crack Light Scaling Fine Crack Light Scaling Fine Crack Minor Corrosion Minor Corrosion Minor Corrosion
1 SF 1 LF 20 SF 89 LF 37 SF 90 SF 7 SF 4 SF 2 SF
Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall Metal Stair Steel Beam Steel Column
Project No. SE332
-297-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
45
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Pier Foundation
Wide Crack Wide Crack Large Spall Large Spall Severe Corrosion Severe Corrosion Medium Crack Efflorescence Medium Crack Medium Scaling Efflorescence Medium Crack Efflorescence Medium Crack Fine Crack Light Scaling Small Spall Light Scaling Fine Crack Light Scaling Light Scaling Fine Crack Minor Corrosion Minor Corrosion
12 LF 7 LF 41 SF 518 SF 1 SF 10 SF 5 LF 36 SF 7 LF 5 SF 46 SF 8 LF 292 SF 21 LF 20 LF 8 SF 5 SF 1 SF 6 LF 1 SF 336 SF 131 LF 4 SF 1 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground Steel Beam Steel Column Concrete Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Column
Concrete Roof Deck Concrete Pier Foundation Concrete Wall Steel Beam Steel Bracing
PHOTO NO.
S-85 S-86
Project No. SE332
-298-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
46
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Pier Foundation
Wide Crack Large Spall Efflorescence Large Spall Severe Corrosion Clear Cover Backwards Angle Connection Efflorescence Medium Scaling Water Damage Medium Crack Medium Scaling Efflorescence Medium Crack Water Damage Efflorescence Medium Scaling Medium Crack Small Spall Fine Crack Fine Crack Light Scaling Fine Crack Minor Corrosion Minor Corrosion
26 LF 5 SF 12 SF 30 SF 2 SF 1 1 124 SF 1 SF 5 SF 5 LF 6 SF 190 SF 84 LF 420 SF 272 SF 9 SF 53 LF 2 SF 5 LF 6 LF 58 SF 185 LF 2 SF 1 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground Steel Beam Steel Column Concrete Roof Deck
Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-87
S-88
Project No. SE332
-299-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
47
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Pier Foundation
Wide Crack Wide Crack Large Scaling Efflorescence Large Spall Efflorescence Water Damage Efflorescence Incomplete Repair Severe Corrosion Efflorescence
12 LF 19 LF 10 SF 30 SF 42 SF 59 SF 600 SF 222 SF 8 SF 2 SF 100 SF
Concrete Slab-On-Ground
Medium Crack Medium Scaling Medium Crack
6 LF 15 SF 57 SF
Concrete Wall
Medium Crack
31 LF
Steel Beam
Moderate Corrosion
2 SF
Concrete Pier Foundation
Fine Crack Light Scaling Light Scaling Fine Crack Minor Corrosion Minor Corrosion
11 LF 1 SF 20 SF 112 LF 3 SF 8 SF
Concrete Slab-On-Ground
Concrete Wall
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Concrete Roof Deck Concrete Pier Foundation
Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-89 S-90
Project No. SE332
-300-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
48
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Pier Foundation
Wide Crack Large Scaling Efflorescence Large Spall Water Damage Efflorescence Efflorescence Wide Crack Large Spall Severe Corrosion Severe Corrosion Severe Corrosion Severe Corrosion Severe Corrosion Efflorescence Medium Scaling Medium Crack Medium Scaling Medium Crack Medium Spall Moderate Corrosion Moderate Corrosion Fine Crack Small Spall Light Scaling Fine Crack Small Spall Light Scaling Minor Corrosion Minor Corrosion
5 LF 10 SF 40 SF 2 SF 240 SF 130 SF 375 SF 22 LF 4 SF 8 SF 4 SF 14 SF 4F 20 SF 40 SF 6 SF 9 LF 7 SF 79 LF 3 SF 1 SF 2 SF 3 LF 2 SF 12 SF 50 LF 20 SF 40 SF 1 SF 2 SF
Concrete Slab-On-Ground Concrete Wall
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Bracing Steel Beam Steel Column Steel Ladder Sump Cover Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
PHOTO NO.
S-91
S-92
Project No. SE332
-301-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
49
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Pier Foundation
Large Spall Large Scaling Large Spall Severe Corrosion Efflorescence Medium Crack Medium Crack Wide Crack Medium Scaling Efflorescence Medium Crack Efflorescence Medium Scaling Medium Crack Moderate Corrosion Moderate Corrosion Light Scaling Fine Crack Light Scaling Light Scaling Fine Crack Minor Corrosion Minor Corrosion
3 SF 1 SF 145 SF 1 SF 50 SF 50 LF 8 SF 9 LF 12 SF 49 SF 33 LF 132 SF 6 SF 42 LF 6 SF 4 SF 6 SF 3 LF 220 SF 86 SF 158 LF 1 SF 2 SF
S-93
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground Steel Beam Concrete Roof Deck Concrete Pier Foundation
Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
S-94
Project No. SE332
-302-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
50
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Pier Foundation Concrete Slab-On-Ground Steel Beam Steel Column Concrete Roof Deck
Wide Crack Light Scaling Severe Corrosion Severe Corrosion Efflorescence Medium Crack Medium Crack Medium Scaling Efflorescence Medium Crack Efflorescence Medium Crack Moderate Corrosion
5 LF 83 SF 2 SF 10 SF 36 SF 54 LF 6 LF 12 SF 41 SF 16 LF 151 SF 81 LF 5 SF
Fine Crack Light Scaling Light Scaling Fine Crack Light Scaling Fine Crack Minor Corrosion Minor Corrosion
2 LF 4 SF 36 SF 60 LF 62 SF 184 LF 3 SF 2 SF
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
PHOTO NO.
Project No. SE332
-303-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
51
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Pier Foundation Concrete Slab-On-Ground
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck
Wide Crack Large Spall Efflorescence Large Scaling Severe Corrosion Severe Corrosion Severe Corrosion Damaged Grout Medium Crack Efflorescence Medium Scaling Efflorescence Medium Crack Medium Scaling Medium Crack Medium Scaling Efflorescence Medium Crack Moderate Corrosion Moderate Corrosion Moderate Corrosion Light Scaling Medium Scaling Light Scaling Fine Crack Light Scaling Minor Corrosion Minor Corrosion Minor Corrosion
5 LF 209 SF 220 SF 2 SF 6 SF 2 SF 38 SF 1 SF 46 LF 52 SF 4 SF 12 SF 1 LF 9 SF 25 LF 4 SF 202 SF 137 LF 14 SF 12 SF 8 SF 5 SF 6 SF 66 SF 264 LF 107 SF 8 SF 16 SF 2 SF
Concrete Wall Metal Stair Steel Beam Steel Column
Concrete Pier Foundation
Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Metal Stair Steel Beam Steel Column Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Metal Stair Steel Beam Steel Column
PHOTO NO.
S-95 S-96
Project No. SE332
-304-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
52
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Stair
Wide Crack Wide Crack Large Spall Wide Crack Large Spall Damaged Grout Severe Corrosion Medium Scaling Medium Crack Medium Scaling Medium Crack Efflorescence Medium Crack Toe Guard Loose Efflorescence Light Scaling Medium Crack Moderate Corrosion Small Spall Fine Crack Light Scaling Efflorescence Fine Crack Light Scaling Light Scaling Fine Crack Fine Crack Light Scaling Fine Crack Minor Corrosion Minor Corrosion
6 LF 6 LF 173 SF 6 LF 1 SF 2 SF 8 SF 10 SF 31 LF 6 SF 14 LF 183 SF 12 LF 1 176 SF 24 SF 35 LF 4 SF 8 SF 7 LF 32 SF 25 SF 6 LF 3 SF 31 SF 24 LF 6 LF 8 SF 245 LF 4 SF 4 SF
Steel Column P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Stair Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Column
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Stair Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-97
S-98
Project No. SE332
-305-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
53
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Slab-On-Ground
Wide Crack Large Spall Fine Crack Light Scaling Large Spall Severe Corrosion Severe Corrosion Damaged Grout Efflorescence Efflorescence Medium Crack Moderate Corrosion Moderate Corrosion Efflorescence Light Scaling Light Scaling Small Spall Fine Crack
14 LF 24 SF 4 LF 27 SF 2 SF 1 SF 8 SF 1 SF 26 SF 176 SF 27 LF 3 SF 8 SF 12 SF 6 SF 16 SF 1 SF 126 LF
Concrete Wall Steel Beam Steel Column
P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
PHOTO NO.
S-99 S-100
Project No. SE332
-306-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
54
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground
Large Spall
72 SF
S-101
Steel Column
Severe Corrosion Grout
16 SF 1 SF
S-102
Concrete Roof Deck
Medium Crack Efflorescence Efflorescence Medium Scaling Moderate Corrosion Moderate Corrosion Light Scaling Light Scaling Fine Crack Light Scaling Fine Crack Medium Crack Small Spall Minor Corrosion Minor Corrosion
44 LF 34 SF 143 SF 3 SF 4 SF 2 SF 4 SF 8 SF 41 LF 26 SF 166 LF 39 LF 55 SF 2 SF 2 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall Steel Beam Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
Project No. SE332
-307-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
55
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground
Light Scaling
316 SF
S-103
Steel Column
Severe Corrosion Damaged Grout
10 SF 1 SF
S-104
Concrete Slab-On-Ground Concrete Wall
Medium Crack Medium Crack Efflorescence
4 LF 59 LF 71 SF
Steel Beam Concrete Roof Deck
Moderate Corrosion Light Scaling Small Spall Fine Crack Efflorescence Fine Crack Light Scaling Small Spall Efflorescence Minor Corrosion
2 SF 2 SF 1 SF 19 LF 17 SF 160 LF 31 SF 33 SF 18 SF 2 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall
Steel Column
Project No. SE332
-308-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
56
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Wide Crack Large Scaling Incomplete Repair Large Spall Efflorescence Severe Corrosion Severe Corrosion Severe Corrosion Medium Crack Medium Scaling Medium Crack Medium Crack Large Spall Medium Scaling Light Scaling Medium Crack Moderate Corrosion Moderate Corrosion Efflorescence Small Spall Light Scaling Light Scaling Small Spall Small Spall Fine Crack
4 LF 108 SF 29 SF 20 SF 159 SF 8 SF 16 SF 90 SF 2 LF 12 SF 1 LF 44 LF 4 SF 71 SF 150 SF 132 LF 2 SF 4 SF 4 SF 2 SF 7 SF 14 SF 1 SF 8 SF 23 LF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Steel Beam Steel Column Steel Ladder Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
PHOTO NO.
S-105 S-106
S-107
Project No. SE332
-309-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
57
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Pier Foundation Concrete Wall Steel Beam Steel Column Concrete Column Concrete Roof Deck
Wide Crack Wide Crack Severe Corrosion Severe Corrosion Medium Crack Medium Crack Efflorescence Medium Crack Efflorescence Medium Crack Efflorescence Medium Crack Medium Spall Deteriorated Expansion Joint Moderate Corrosion Fine Crack Light Scaling Small Spall Light Scaling Fine Crack Mortar Scaling Fine Crack Light Scaling Light Scaling Fine Crack Fine Crack Light Scaling Minor Corrosion
8 LF 5 LF 48 SF 10 SF 6 LF 29 LF 10 SF 24 LF 48 SF 17 LF 86 SF 27 LF 5 SF 45 LF 8 SF 9 LF 23 SF 28 SF 10 SF 4 LF 1 SF 10 LF 2 SF 108 SF 65 LF 103 LF 24 SF 5 SF
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Expansion Joint Steel Column Concrete Column
Concrete Roof Deck Concrete Masonry Unit Wall Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam
PHOTO NO.
S-108
Project No. SE332
-310-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
58
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Wide Crack
48 LF
S-109
Steel Column
Severe Corrosion
22 SF
Concrete Roof Deck
Efflorescence Medium Crack Medium Scaling Efflorescence Medium Crack Efflorescence Medium Crack Moderate Corrosion Small Spall Light Scaling Fine Crack Small Spall Light Scaling Fine Crack Minor Corrosion
12 SF 30 LF 3 SF 85 SF 11 LF 162 SF 91 LF 1 SF 20 SF 30 SF 28 LF 35 SF 8 SF 172 SF 6 SF
Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Steel Beam
Project No. SE332
-311-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
59
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall Steel Beam Steel Bracing Steel Column Concrete Roof Deck
Wide Crack Severe Corrosion Severe Corrosion Severe Corrosion Medium Crack Efflorescence Medium Scaling Medium Spall Medium Crack Efflorescence Medium Crack Efflorescence Medium Crack Moderate Corrosion Moderate Corrosion Moderate Corrosion Light Scaling Light Scaling Small Spall Fine Crack Minor Corrosion
120 LF 2 SF 2 SF 14 SF 5 LF 2 SF 12 SF 5 SF 14 LF 37 SF 6 LF 151 SF 137 LF 8 SF 1 SF 2 SF 42 SF 15 SF 42 SF 129 LF 3 SF
S-110
Concrete Masonry Unit Wall Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Bracing Steel Column Concrete Slab-On-Ground Concrete Wall
Steel Beam
S-111
S-112
Project No. SE332
-312-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
60
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Pier Foundation Concrete Wall
Large Spall Light Scaling Large Spall Severe Corrosion Severe Corrosion Medium Scaling Efflorescence Medium Crack Medium Spall Medium Scaling Efflorescence Medium Crack Efflorescence Medium Spall Small Spall Bent Flange Moderate Corrosion Missing Bolts Moderate Corrosion Fine Crack Medium Crack Light Scaling Fine Crack Fine Crack Minor Corrosion Minor Corrosion
7 SF 53 SF 5 SF 1 SF 8 SF 6 SF 41 SF 29 LF 1 SF 3 SF 28 SF 25 LF 132 SF 10 SF 16 SF 2 8 SF 4 12 SF 1 LF 1 LF 35 SF 75 LF 47 LF 8 SF 6 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Steel Beam Steel Column Concrete Roof Deck
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-113
S-114
Project No. SE332
-313-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
61
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Steel Column
Severe Corrosion
2 SF
S-115
Concrete Roof Deck
Medium Crack Efflorescence Medium Spall Medium Scaling Light Scaling Medium Scaling Medium Crack Medium Crack Efflorescence Efflorescence Moderate Corrosion Moderate Corrosion Fine Crack Fine Crack Light Scaling Fine Crack Medium Crack Light Scaling Small Spall Minor Corrosion Minor Corrosion
70 LF 17 SF 1 SF 2 SF 2 SF 17 SF 3 LF 17 LF 114 SF 195 SF 5 SF 12 SF 1 LF 164 LF 248 SF 110 LF 17 LF 35 SF 53 SF 19 SF 6 SF
Concrete Pier Foundation Concrete Slab-On-Ground
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall Steel Beam Steel Column Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
S-116
Project No. SE332
-314-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
62
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Pier Foundation
Wide Crack Large Spall Large Spall Damaged Angle Severe Corrosion Missing Bolts Severe Corrosion Missing Bolts Damaged Grout Medium Scaling Medium Crack Efflorescence Medium Crack Medium Spall Efflorescence Medium Scaling Medium Crack Moderate Corrosion Moderate Corrosion Light Scaling Wide Crack Light Scaling Small Spall Fine Crack Light Scaling Efflorescence Small Spall Medium Spall Moderate Corrosion Minor Corrosion
3 LF 6 SF 37 SF 1 1 SF 5 12 SF 1 1 SF 7 SF 58 LF 3 SF 1 LF 10 SF 26 SF 2 SF 32 LF 4 SF 6 SF 3 SF 1 LF 122 SF 2 SF 10 LF 158 SF 221 SF 25 SF 3 SF 5 SF 4 SF
Concrete Slab-On-Ground Steel Beam
Steel Column
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck
Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall Steel Beam Steel Column Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall
Steel Beam Steel Column
PHOTO NO.
S-117 S-118
Project No. SE332
-315-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
63
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck
Large Scaling Large Spall Wide crack Large Spall Wide Crack Large Scaling Large Spall Large Spall Severe Corrosion Severe Corrosion Missing Bolts Bent Baseplate Efflorescence Medium Scaling Light Scaling Medium Crack Medium Spall Medium Scaling Medium Crack Medium Scaling Medium Crack Efflorescence Moderate Corrosion Small Spall Light Scaling Fine Crack Light Scaling Efflorescence Fine Crack Light Scaling Small Spall Minor Corrosion Minor Corrosion
12 SF 17 SF 3 SF 21 SF 8 LF 3 SF 34 SF 120 SF 3 SF 28 SF 1 5 43 SF 17 SF 84 SF 46 LF 3 SF 3 SF 6 LF 3 SF 65 LF 75 SF 4 SF 3 SF 8 SF 70 LF 54 SF 17 SF 92 LF 23 SF 13 SF 4 SF 1 SF
Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall Steel Beam Steel Column
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall
Steel Beam Steel Column
PHOTO NO.
S-119
S-120
Project No. SE332
-316-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
64
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck
Wide Crack Large Scaling Large Spall Large Spall Water Damage Wide Crack Large Spall Severe Corrosion Missing Bolts Severe Corrosion Missing Bolts Severe Corrosion Bent Baseplate Medium Crack Medium Scaling Medium Spall Medium Scaling Efflorescence Medium Spall Medium Scaling Efflorescence Moderate Corrosion Damaged Grout Efflorescence Small Spall Light Scaling Fine Crack Fine Crack Medium Crack Light Scaling Small Spall Minor Corrosion Minor Corrosion
16 LF 1 SF 14 SF 18 SF 192 SF 6 LF 2 SF 8 SF 4 3 SF 11 24 SF 2 11 LF 5 SF 3 SF 6 SF 60 SF 2 SF 3 SF 22 SF 4 SF 5 SF 10 SF 1 SF 3 SF 28 LF 151 LF 58 LF 64 SF 28 SF 1 SF 2 SF
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Metal Stair Steel Beam Steel Column
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
Metal Stair Steel Beam
PHOTO NO.
S-121
S-122 S-123
Project No. SE332
-317-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
65
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Beam Concrete Wall
Large Spall Incomplete Repair Large Scaling Wide Crack Severe Corrosion Damaged Grout Medium Crack Medium Spall Medium Scaling Medium Crack Efflorescence Medium Crack Medium Scaling Medium Crack Large Scaling Efflorescence Medium Crack Light Scaling Fine Crack Large Spall Light Scaling Small Spall Light Scaling Fine Crack Small Spall Efflorescence Light Scaling Fine Crack Light Scaling Fine Crack Minor Corrosion Minor Corrosion
6 SF 15 SF 34 SF 17 LF 6 SF 3 SF 6 LF 1 SF 9 SF 3 LF 2 SF 25 LF 2 SF 3 LF 1 SF 34 SF 37 LF 14 SF 8 LF 9 SF 7 SF 2 SF 5 SF 7 LF 1 SF 12 SF 9 SF 62 LF 9 SF 501 LF 2 SF 2 SF
Steel Column P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Beam
Concrete Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Beam Concrete Column
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-124
S-125
Project No. SE332
-318-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
66
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground Concrete Wall
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Beam
Large Spall Large Spall Wide Crack Damage Grout Severe Corrosion Medium Crack Medium Scaling Medium Crack Medium Crack Medium Crack Efflorescence Medium Crack Moderate Corrosion Moderate Corrosion Small Spall Light Scaling Fine Crack Efflorescence Light Scaling Fine Crack Light Scaling Fine Crack Efflorescence Light Scaling Light Scaling Fine Crack Minor Corrosion Minor Corrosion
4 SF 38 SF 25 LF 7 SF 10 SF 1 LF 3 SF 6 LF 44 LF 60 LF 51 SF 36 LF 1 SF 4 SF 18 SF 3 SF 7 LF 1 SF 1 SF 13 LF 6 SF 130 LF 42 SF 54 SF 53 SF 103 LF 6 SF 2 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column
Concrete Column Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column Concrete Column
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-126 S-127
Project No. SE332
-319-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
67
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Masonry Unit Wall Concrete Wall Steel Column
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Beam
Large Spall Large Spall Severe Corrosion Damaged Grout Medium Scaling Medium Crack Medium Crack Medium Crack Efflorescence Medium Spall Medium Spall Medium Crack Moderate Corrosion Moderate Corrosion Small Spall Small Spall Fine Crack Light Scaling Light Scaling Efflorescence Small Spall Light Scaling Fine Crack Light Scaling Fine Crack Small Spall Small Spall Light Scaling Fine Crack Minor Corrosion Minor Corrosion
2 SF 2 SF 12 SF 7 SF 9 SF 5 LF 69 LF 213 LF 36 SF 2 SF 6 SF 205 LF 3 SF 4 SF 1 SF 23 SF 17 LF 2 SF 5 SF 5 SF 3 SF 4 SF 10 LF 186 SF 77 LF 12 SF 39 SF 2 SF 91 LF 2 SF 2 SF
Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Beam Concrete Column
Concrete Roof Deck Concrete Masonry Unit Wall Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall
Steel Beam Steel Column
PHOTO NO.
Project No. SE332
-320-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
68
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground
Large Spall Large Spall Water Damage Large Spall Wide Crack Large Scaling Severe Corrosion Damaged Grout Severe Corrosion Efflorescence Medium Scaling Medium Crack Medium Spall Medium Crack Efflorescence Medium Spall Medium Crack Efflorescence Severe Corrosion Moderate Corrosion Moderate Corrosion Light Scaling Fine Crack Light Scaling Fine Crack Light Scaling Fine Crack Small Spall Fine Crack Light Scaling Bent Flange Minor Corrosion
6 SF 2 SF 10 SF 197 SF 19 LF 4 SF 19 SF 11 SF 10 SF 66 SF 6 SF 31 LF 2 SF 2 LF 23 SF 3 SF 150 LF 55 SF 1 SF 1 SF 2 SF 4 SF 29 LF 3 SF 1 LF 16 SF 33 LF 13 LF 252 LF 64 SF 1 8 SF
Concrete Wall Steel Column
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Sump Pit Cover Concrete Roof Deck
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
Steel Beam
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Beam Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
Steel Beam
PHOTO NO.
S-128
S-129
Project No. SE332
-321-
SECTION NO.
PRIORITY LEVEL
LOCATION
69
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Pier Foundation Concrete Slab-On-Ground
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Beam Concrete Column Concrete Roof Deck Concrete Pier Foundation
Concrete Wall Steel Beam Steel Column
Concrete Slab-On-Ground Concrete Wall
Steel Beam
Steel Column P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Beam
Concrete Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground
May 17, 2024
DESCRIPTION Wide Crack Large Spall Water Damage Wide Crack Severe Corrosion Severe Corrosion Bent Baseplate Medium Crack Medium Spall Medium Crack Medium Crack Efflorescence Medium Scaling Efflorescence Medium Crack Medium Crack Efflorescence Medium Spall Moderate Corrosion Bent Flange Missing Bolts Moderate Corrosion Damaged Grout Fine Crack Light Scaling Efflorescence Light Scaling Small Spall Fine Crack Small Spall Light Scaling Light Scaling Fine Crack
QUANTITY
PHOTO NO.
3 SF 259 SF 30 SF 104 LF 8 SF 32 SF 1 30 LF 1 SF 22 LF 4 LF 12 SF 2 SF 173 SF 28 LF 184 LF 105 SF 3 SF 3 SF 2 1 11 SF 7 SF 6 LF 2 SF 10 SF 8 SF 2 SF 43 LF 6 SF 15 SF 4 SF 22 LF
S-130
S-131
Project No. SE332
69 cont.
-322-
P3 cont.
Concrete Slab-On-Ground cont.
May 17, 2024
Project No. SE332
-323-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
70
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Pier Foundation Concrete Slab-On-Ground
Large Spall Efflorescence Large Spall Water Damage Large Spall Large Scaling Wide Crack Deteriorated Expansion Joint Severe Corrosion Missing Bolts Severe Corrosion Medium Crack Medium Scaling Medium Crack Efflorescence Medium Scaling Medium Crack Efflorescence Medium Crack Efflorescence Medium Spall Medium Scaling Medium Crack Efflorescence Moderate Corrosion Moderate Corrosion Light Scaling Light Scaling Small Spall Fine Crack Light Scaling
2 SF 110 SF 63 SF 32 SF 69 SF 8 SF 85 LF 17 LF 38 SF 1 22 SF 13 LF 4 SF 23 LF 17 SF 1 SF 3 LF 20 SF 119 LF 306 SF 3 SF 3 SF 160 LF 84 SF 12 SF 3 SF 2 SF 15 SF 2 SF 6 LF 12 SF
S-132 S-133
Concrete Wall
Expansion Joint Steel Beam
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Steel Column Concrete Beam Concrete Roof Deck
Concrete Pier Foundation
Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Beam Concrete Roof Deck Concrete Pier Foundation
S-134
Project No. SE332
70 cont.
-324-
P3 cont.
Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
May 17, 2024
Small Spall Fine Crack Light Scaling Small Spall Fine Crack Light Scaling Minor Corrosion Minor Corrosion
1 SF 8 LF 117 SF 69 SF 108 LF 80 SF 3 SF 1 SF
Project No. SE332
-325-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
71
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground
Efflorescence Large Spall Large Spall Water Damage Wide Crack Severe Corrosion Severe Corrosion Efflorescence Medium Crack Medium Spall Efflorescence Medium Crack Efflorescence Moderate Corrosion Moderate Corrosion Light Scaling Fine Crack Light Scaling Light Scaling Fine Crack Minor Corrosion Minor Corrosion
130 SF 2 SF 133 SF 28 SF 101 LF 5 SF 20 SF 101 SF 307 LF 1 SF 12 SF 113 LF 19 SF 4 SF 4 SF 15 SF 73 LF 27 SF 16 SF 96 LF 3 SF 2 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall Steel Beam Steel Column Concrete Roof Deck
Concrete Pier Foundation Concrete Wall Steel Beam Steel Column Concrete Roof Deck Concrete Pier Foundation Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-135 S-136
Project No. SE332
-326-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
72
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck
Medium Crack Large Spall Large Spall Efflorescence Large Spall Wide Crack Wide Crack Severe Corrosion Severe Corrosion Efflorescence Medium Scaling Medium Crack Efflorescence Medium Crack Light Scaling Medium Scaling Efflorescence Medium Crack Moderate Corrosion Moderate Corrosion Light Scaling Light Scaling Fine Crack Fine Crack Minor Corrosion
224 LF 220 SF 2 SF 94 SF 68 SF 1 LF 23 LF 7 SF 22 SF 86 SF 15 SF 3 LF 22 SF 37 LF 130 SF 12 SF 1 SF 122 LF 2 SF 2 SF 5 SF 11 SF 37 LF 84 LF 1 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall Steel Beam Steel Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam
PHOTO NO.
S-137
S-138
Project No. SE332
-327-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
73
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Pier Foundation
Large Scaling
1 SF
Steel Column
Severe Corrosion
8 SF
Concrete Roof Deck
Efflorescence Medium Crack Efflorescence Medium Scaling Medium Crack Efflorescence Efflorescence Medium Crack Moderate Crack Moderate Crack Light Scaling Fine Crack Light Scaling Light Scaling Small Spall Fine Crack Minor Corrosion Minor Corrosion
32 SF 69 LF 7 SF 3 SF 14 LF 170 SF 53 SF 51 LF 5 SF 4 SF 4 SF 28 LF 80 SF 27 SF 16 SF 208 LF 3 SF 4 SF
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
PHOTO NO.
S-139
Project No. SE332
-328-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
74
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Beam Concrete Roof Deck Concrete Pier Foundation
Large Spall Wide Crack Large Spall Large Scaling Wide Crack Damaged Grout Organic Growth Efflorescence Large Spall Wide Crack Incomplete Repair Large Spall Deteriorated Expansion Joint Severe Corrosion Severe Corrosion Efflorescence Medium Crack Medium Scaling Efflorescence Medium Crack Medium Spall Efflorescence Medium Crack Medium Crack Efflorescence Moderate Corrosion Moderate Corrosion Moderate pitting Bent Flange Light Scaling Light Scaling
4 SF 12 LF 1 SF 2 SF 1 LF 1 SF 45 SF 748 SF 161 SF 42 LF 26 SF 32 SF 50 LF 11 SF 16 SF 12 SF 3 LF 4 SF 18 SF 30 LF 3 SF 11 SF 6 SF 109 LF 257 SF 7 SF 4 SF 2 SF 1 4 SF 4 SF
Concrete Slab-On-Ground
Concrete Wall
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Expansion Joint Steel Beam Steel Column Concrete Beam Concrete Roof Deck
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
P3 – Low-level priority – must be addressed
Concrete Roof Deck Concrete Pier Foundation
PHOTO NO.
S-140 S-141
S-142 S-143
Project No. SE332
74 cont.
-329-
within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
May 17, 2024
Fine Crack Light Scaling Fine Crack Light Scaling Minor Corrosion Minor Corrosion
16 LF 76 SF 108 LF 22 SF 2 SF 2 SF
Project No. SE332
-330-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
75
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground Concrete Wall
Concrete Roof Deck
140 SF 18 LF 33 SF 2 SF 21 SF 3 SF 1 63 LF 34 SF 334 SF 124 LF 225 SF 4 SF 131 SF 29 LF
S-144
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Large Spall Wide Crack Large Spall Severe Corrosion Severe Corrosion Damaged Grout Missing Bolts Medium Crack Efflorescence Efflorescence Medium Crack Efflorescence Moderate Corrosion Light Scaling Fine Crack Fine Crack Light Scaling Small Spall Minor Corrosion
102 LF 114 SF 128 SF 9 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column
Concrete Slab-On-Ground Concrete Wall Steel Column Concrete Slab-On-Ground Concrete Wall
Steel Beam
S-145
Project No. SE332
-331-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
76
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Column
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck
Wide Crack Large Spall Wide Crack Severe Corrosion Bent Baseplate Damaged Grout Missing Bolts Bent Flange Medium Crack Efflorescence Medium Scaling Efflorescence Efflorescence Medium Crack Moderate Corrosion Moderate Corrosion Moderate Corrosion Moderate Corrosion Fine Crack Medium crack Light Scaling Light Scaling Fine Crack Minor Corrosion
31 LF 208 SF 2 LF 20 SF 9 4 SF 2 1 42 LF 45 SF 4 SF 5 SF 116 SF 91 LF 2 SF 1 SF 2 SF 1 SF 27 LF 4 LF 17 SF 180 SF 66 LF 4 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Bracing Steel Column Steel Ladder Concrete Slab-On-Ground
Concrete Wall Steel Beam
PHOTO NO.
S-146
S-147
Project No. SE332
-332-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
77
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground
Large Spall Water Damage Incomplete Repair Wide Crack Severe Corrosion Severe Corrosion Missing Bolts Medium Crack Efflorescence Efflorescence
46 SF 29 SF 18 SF 8 LF 2 SF 21 SF 1 63 LF 34 SF 15 SF
Efflorescence Medium Crack Moderate Corrosion Damaged Grout Light Scaling Fine Crack Fine Crack Minor Corrosion
88 SF 72 LF 4 SF 1 SF 27 SF 62 LF 64 LF 9 SF
Concrete Wall Steel Beam Steel Column
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Column
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall Steel Beam
PHOTO NO.
S-148
Project No. SE332
-333-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
78
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Large Spall Wide Crack Incomplete Repair Severe Corrosion Medium Crack Efflorescence Medium Scaling Medium Scaling Medium Crack Medium Spall Medium Crack Efflorescence Medium Scaling Moderate Corrosion Damaged Grout Light Scaling Efflorescence Light Scaling Minor Corrosion Minor Corrosion
12 SF 57 SF 32 SF 6 SF 91 LF 78 SF 10 SF 16 SF 32 LF 4 SF 43 LF 178 SF 15 SF 4 SF 2 SF 47 SF 12 SF 110 SF 4 SF 4 SF
Steel Column Concrete Roof Deck
Concrete Slab-On-Ground
Concrete Wall
Steel Column P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-149 S-150
Project No. SE332
-334-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
79
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column Concrete Roof Deck
Wide Crack Incomplete Repair Severe Corrosion Severe Corrosion Medium Crack Efflorescence Medium crack Efflorescence Medium Scaling Efflorescence Medium Crack Moderate Corrosion Light Scaling Fine Crack Light Scaling Light Scaling Fine Crack Minor Corrosion Minor Corrosion
5 LF 49 SF 10 SF 24 SF 72 LF 36 SF 19 LF 8 SF 6 SF 155 SF 105 LF 3 SF 8 SF 65 LF 52 SF 19 SF 122 LF 2 SF 2 SF
Concrete Slab-On-Ground
Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-151 S-152
Project No. SE332
-335-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
80
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Beam
Wide Crack Water Damage Wide Crack Severe Corrosion Bent Flange Severe Corrosion Bent Flange Severe Corrosion Medium Crack Efflorescence Medium Crack Medium Crack Efflorescence Medium Scaling Moderate Corrosion Minor Corrosion Light Scaling Efflorescence Light Scaling Fine Crack Fine Crack Light Scaling Minor Corrosion
72 LF 197 SF 115 LF 2 SF 1 2 SF 2 28 SF 71 LF 21 SF 28 LF 90 LF 234 SF 15 SF 6 SF 2 SF 3 SF 30 SF 53 SF 24 LF 112 LF 19 SF 1 SF
Steel Bracing Steel Column P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Steel Column P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck Concrete Slab-On-Ground
Concrete Wall Steel Beam
PHOTO NO.
S-153
S-154
Project No. SE332
-336-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
81
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck
Large Spall Efflorescence Large Scaling Water Damage Severe Corrosion Severe Corrosion Severe Corrosion Medium Crack Medium Crack Efflorescence Medium Scaling Medium Spall Medium Crack Efflorescence Moderate Corrosion Moderate Corrosion Fine Crack Light Scaling Fine Crack Light Scaling Minor Corrosion
12 SF 84 SF 89 SF 166 SF 22 SF 38 SF 1 SF 98 LF 6 LF 20 SF 18 SF 1 SF 6 LF 364 SF 5 SF 4 SF 29 LF 6 SF 6 LF 32 SF 4 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground Steel Beam Steel Column Steel Ladder Concrete Roof Deck Concrete Slab-On-Ground
Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Slab-On-Ground Concrete Wall Steel Beam
PHOTO NO.
S-155
S-156 S-157
Project No. SE332
-337-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
82
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Column Concrete Roof Deck Concrete Masonry Unit Wall Concrete Slab-On-Ground
Efflorescence Water Damage Efflorescence Severe Corrosion Medium Crack Medium Spall Medium Scaling Efflorescence Medium Crack Light Scaling Light Scaling Small Spall Efflorescence Light Scaling Fine Crack Small Spall Light Scaling Minor Corrosion Bent Flange
24 SF 100 SF 339 SF 18 SF 14 LF 1 SF 4 SF 20 SF 172 LF 4 SF 5 SF 3 SF 5 SF 6 SF 111 LF 12 SF 9 SF 2 SF 1
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall Concrete Roof Deck Concrete Masonry Unit Wall
Concrete Slab-On-Ground Concrete Wall
Steel Beam
PHOTO NO.
S-158 S-159
3037
3038
3036 3035 3034 3033 3032 3031 3015
3028
3030
3014
3027
3029
3013
3006 3005
3010
3012
3009
301 1
3026 3025
3019
3024
3008
3023
3007
3022
3004
3021
3003 3016
3020 3017
3002
3018
3001
Dat eSav ed:3/ 6/ 2024• Aut hor :E. But t er f i el d
3000
OGS Hot Tunnel Structural Section Map Utility Tunnel Evaluation
Scale 1" = 200'
CHA Project No. 080577
Image Courtesy of the NYS Office of Information Technology Services, GIS Program Office Photo Date: 2021
Project No. SE332
-339-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3000
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground Concrete Wall Steel Beam
Large Scaling Wide Crack Severe Corrosion
1 SF 16 LF 1 SF
S-160 S-161
Concrete Roof Deck
Medium Crack Efflorescence Medium crack Efflorescence Medium Crack Efflorescence Fine Crack Light Scaling Fine Crack Light Scaling Small Spall Minor Corrosion
26 LF 10 SF 10 LF 1 SF 96 LF 3 SF 36 LF 5 SF 40 LF 1 SF 1 SF 2 SF
Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall
Steel Column
Project No. SE332
-340-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3001
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Wide Crack Large Scaling
27 LF 15 SF
S-162
Concrete Roof Deck
Medium Crack Efflorescence
42 LF 17 SF
Concrete Slab-On-Ground
Efflorescence Medium Crack
68 SF 10 LF
Concrete Wall
Efflorescence Medium Crack Medium Scaling Light Scaling Fine Crack
14 SF 58 LF 5 SF 51 SF 15 LF
Fine Crack
66 LF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall
S-163
Project No. SE332
-341-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3002
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground Concrete Wall
Efflorescence Efflorescence Large Scaling Wide Crack Severe Corrosion Medium Crack Efflorescence Medium Scaling Light Scaling Medium Crack Medium Scaling Medium Spall Bent Flange Fine Crack Light Scaling Fine Crack Small Spall Minor Corrosion
132 SF 132 SF 20 SF 10 LF 14 SF 25 LF 10 SF 15 SF 80 SF 60 LF 10 SF 1 SF 1 22 LF 5 SF 80 LF 1 SF 8 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Roof Deck
Concrete Slab-On-Ground Concrete Wall
Steel Column Concrete Slab-On-Ground Concrete Wall
Steel Column
PHOTO NO.
S-164
Project No. SE332
-342-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3003
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Wide Crack Efflorescence Efflorescence Wide Crack Large Scaling Large Spall Deteriorated Expansion Joint Severe Corrosion Missing Bolts Severe Corrosion Missing Bolts Moderate Corrosion Warping Severe Corrosion Medium Crack Efflorescence Medium Scaling Medium Crack Medium Scaling Minor Corrosion
8 LF 285 SF 362 SF 12 LF 3 SF 1 SF 10 LF 2 SF 2 16 SF 4 8 SF 2 SF 2 SF 12 LF 15 SF 8 SF 97 LF 22 SF 2 SF
Light Scaling Fine Crack Fine Crack Light Scaling Small Spall
10 SF 12 LF 54 LF 19 SF 1 SF
Expansion Joint Steel Beam Steel Column Steel Grating
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Ladder Concrete Roof Deck
Concrete Wall Steel Beam-Platform Landing Concrete Slab-On-Ground Concrete Wall
PHOTO NO.
S-165 S-166
S-167
Project No. SE332
-343-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3004
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Large Spall Wide Crack Severe Corrosion Severe Corrosion Efflorescence Medium Crack Large Scaling Medium Spall Efflorescence Medium Crack Efflorescence Medium Crack Light Scaling Light Scaling Fine Crack Minor Corrosion
2 SF 4 LF 5 SF 10 SF 64 SF 46 LF 11 SF 1 SF 19 SF 6 LF 70 SF 11 LF 21 SF 10 SF 92 LF 6 SF
Steel Beam Steel Column Concrete Roof Deck
Concrete Slab-On-Ground Concrete Wall P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Wall Steel Column
PHOTO NO.
Project No. SE332
-344-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3005
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Slab-On-Ground Steel Beam Steel Column Concrete Roof Deck Concrete Slab-On-Ground
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck
Efflorescence Large Spall Severe Corrosion Severe Corrosion Medium Crack Light Scaling Efflorescence Efflorescence Light Scaling Light Scaling Fine Crack Light Scaling Fine Crack Minor Corrosion
87 SF 4 SF 10 SF 18 SF 101 LF 66 SF 105 SF 107 SF 4 SF 10 SF 75 LF 2 SF 103 LF 10 SF
Concrete Wall
Concrete Pier Foundation Concrete Wall Steel Column
PHOTO NO.
Project No. SE332
-345-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3006
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column Concrete Roof Deck
Wide Crack Efflorescence Efflorescence Severe Corrosion Severe Corrosion Medium Crack Efflorescence Light Scaling Moderate Corrosion Moderate Corrosion Fine Crack Light Scaling Efflorescence Fine Crack Minor Corrosion
1 LF 129 SF 58 SF 5 SF 20 SF 51 LF 86 SF 62 SF 1 SF 4 SF 84 LF 10 SF 31 SF 71 LF 3 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Steel Beam Steel Column Concrete Roof Deck Concrete Wall Steel Column
PHOTO NO.
S-168
S-169
Project No. SE332
-346-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3007
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall Steel Beam
Efflorescence Severe Corrosion Missing Bolts Severe Corrosion Medium Crack Efflorescence Efflorescence Efflorescence Moderate Corrosion Moderate Corrosion Fine Crack Light Scaling Light Scaling Fine Crack Medium Crack Minor Corrosion Minor Corrosion Minor Corrosion
12 SF 5 SF 3 4 SF 63 LF 84 SF 67 SF 19 SF 1 SF 8 SF 98 LF 1 SF 31 SF 138 LF 6 LF 1 SF 5 SF 8 SF
S-170
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Bracing Steel Column
S-171
Project No. SE332
-347-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3008
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Steel Beam
Severe Corrosion
1 SF
Steel Column
Severe Corrosion
14 SF
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Medium Crack Efflorescence Efflorescence Medium Crack Moderate Corrosion Moderate Corrosion Fine Crack Efflorescence Light Scaling Light Scaling Fine Crack Minor Corrosion Minor Pitting
52 LF 125 SF 13 SF 3 LF 2 SF 6 SF 46 LF 38 SF 2 SF 28 SF 86 LF 3 SF 4 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Roof Deck
Concrete Slab-On-Ground Concrete Wall Steel Beam
PHOTO NO.
S-172
S-173
Project No. SE332
-348-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3009
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck
Efflorescence Efflorescence Severe Corrosion Severe Corrosion Missing Bolts Medium Crack Efflorescence Medium Crack Moderate Corrosion Light Scaling Light Scaling Fine Crack Efflorescence Fine Crack Minor Pitting Minor Corrosion
83 SF 5 SF 1 SF 16 SF 2 73 LF 55 SF 14 LF 2 SF 10 SF 62 SF 39 LF 4 SF 32 LF 2 SF 2 SF
Concrete Wall Steel Beam Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-174 S-175
Project No. SE332
-349-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3010
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground Concrete Wall Expansion Joint Steel Beam
Efflorescence Efflorescence Deteriorated Expansion Joint Severe Corrosion Missing Bolts Severe Corrosion Medium Crack Efflorescence Medium Crack
117 SF 27 SF 16 LF 1 SF 2 14 SF 159 LF 109 SF 18 LF
Fine Crack Light Scaling Efflorescence Light Scaling Fine Crack Minor Corrosion
125 LF 33 SF 18 SF 16 SF 36 LF 4 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Roof Deck Concrete Wall Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Steel Column
PHOTO NO.
S-176
S-177
Project No. SE332
-350-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3011
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground Concrete Wall Steel Beam
Efflorescence Efflorescence Severe Corrosion Missing Bolts Severe Corrosion Medium Crack Efflorescence Medium Scaling Medium Crack Deteriorated Expansion Joint Moderate Corrosion Moderate Pitting Moderate Corrosion Light Scaling Fine Crack Light Scaling Fine Crack Light Scaling Minor Pitting Minor Corrosion
160 SF 31 SF 1 SF 4 18 SF 98 LF 44 SF 6 SF 19 LF 22 LF 2 SF 2 SF 2 SF 12 SF 27 LF 30 SF 141 LF 11 SF 3 SF 1 SF
S-178
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Expansion Joint Steel Beam Steel Bracing Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Bracing
S-179
Project No. SE332
-351-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3012
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck
Wide Crack Efflorescence Wide Crack Severe Corrosion Missing Bolts Medium Crack Efflorescence Medium Crack Moderate Corrosion Minor Corrosion Moderate Pitting Fine Crack
2 LF 125 SF 1 LF 2 SF 2 115 LF 22 SF 47 LF 12 SF 6 SF 1 SF 69 LF
Concrete Slab-On-Ground
Light Scaling
50 SF
Concrete Wall
Fine Crack
122 LF
Concrete Wall Steel Beam
Concrete Wall Steel Column
PHOTO NO.
S-180 S-181
Project No. SE332
-352-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3013
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground
Efflorescence Large Spall Severe Corrosion Moderate Corrosion Missing Bolts Severe Deflection Severe Corrosion Missing Bolts Medium Crack Efflorescence Efflorescence Medium Crack Medium Crack Efflorescence Moderate Corrosion Fine Crack Light Scaling Light Scaling Fine Crack Light Scaling
152 SF 22 SF 3 SF 1 SF 2 1 SF 14 SF 1 84 LF 4 SF 5 SF 6 LF 47 LF 7 SF 2 SF 53 LF 2 SF 24 SF 118 LF 25 SF
S-182 S-183
Steel Beam
Steel Column P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
S-184
Project No. SE332
-353-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3014
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground Concrete Wall Steel Beam
Large Spall Large Spall Severe Corrosion Missing Bolts Severe Corrosion Moderate Corrosion Medium Crack Efflorescence Wide Crack Efflorescence Efflorescence Efflorescence Light Scaling Medium Crack Fine Crack Light Scaling Light Scaling Fine Crack Minor Corrosion
2 SF 23 SF 11 SF 3 8 SF 2 SF 136 LF 14 SF 11 LF 4 SF 134 SF 76 SF 29 SF 57 LF 86 LF 3 SF 6 SF 102 LF 2 SF
Steel Column P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck
Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall Steel Bracing
PHOTO NO.
S-185
Project No. SE332
-354-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3015
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck
Wide Crack Large Spall Deteriorated Expansion Joint Severe Corrosion Missing Bolts Severe Corrosion Missing Bolts Severe Corrosion Medium Crack Efflorescence Medium Spall Medium Spall Efflorescence Damaged Mortar Efflorescence Medium Crack Efflorescence Medium Crack Moderate Corrosion Moderate Corrosion Light Scaling Fine Crack Light Scaling Fine Crack Light Scaling Fine Crack
3 LF 2 SF 10 LF 28 SF 4 30 SF 1 16 SF 127 LF 229 SF 8 SF 2 SF 9 SF 6 LF 69 SF 4 LF 181 SF 42 LF 4 SF 2 SF 23 SF 123 LF 15 SF 7 LF 53 SF 82 LF
Expansion Joint Steel Beam Steel Column
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Tunnel Framing Concrete Roof Deck
Concrete Masonry Unit Wall
Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
PHOTO NO.
S-186 S-187
Project No. SE332
-355-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3016
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground
Efflorescence
151 SF
S-188
Concrete Wall
Wide Crack
8 LF
S-189
Concrete Slab-On-Ground Concrete Wall
Efflorescence Medium Scaling Efflorescence Small Spall Damaged Flange Fine Crack Medium Crack Light Scaling Fine Crack Medium Crack
13 SF 10 SF 30 SF 10 SF 1 7 LF 10 LF 6 SF 165 LF 43 LF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Slab-On-Ground
Concrete Wall
Project No. SE332
-356-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3017
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground
Efflorescence
260 SF
S-190
Concrete Wall
Large Spall
22 SF
S-191
Concrete Slab-On-Ground Concrete Wall
Medium Crack Efflorescence Medium Crack
5 LF 28 SF 52 LF
Steel Column Concrete Slab-On-Ground
Moderate Corrosion Fine Crack Light Scaling Small Spall Fine Crack Minor Corrosion Minor Corrosion Minor Corrosion
1 SF 75 LF 12 SF 35 SF 88 LF 3 SF 1 SF 6 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall Steel Beam Steel Bracing Steel Column
Project No. SE332
-357-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3018
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground
Efflorescence
400 SF
S-192
Concrete Wall
Efflorescence Large Spall
46 SF 16 SF
S-193
Concrete Wall
Medium Crack
151 LF
Concrete Wall
Small Spall Fine Crack Light Scaling
5 SF 23 LF 9 SF
Project No. SE332
-358-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3019
P1 – Most serious priority – must be repaired/ replaced immediately.
Brick Wall Concrete Slab-On-Ground
Wide Crack Wide Crack Efflorescence Large Spall Water Damage Large Spall Large Spall Large Scaling Efflorescence Wide Crack Severe Corrosion Severe Corrosion Medium Spall Efflorescence Large Scaling Medium Scaling Efflorescence Medium Crack Medium Spall Efflorescence Medium Scaling Medium Crack Deteriorated Expansion Joint Large Spall Light Scaling Small Spall Fine Crack Minor Corrosion Minor Corrosion
6 LF 3 LF 268 SF 20 SF 40 SF 30 SF 74 SF 32 SF 135 SF 5 LF 1 SF 2 SF 3 SF 39 SF 3 SF 8 SF 14 SF 12 LF 2 SF 31 SF 31 SF 42 LF 13 LF 13 SF 38 SF 57 SF 98 LF 2 SF 2 SF
Concrete Stair Concrete Wall
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Steel Handrail Steel Ladder Brick Wall Concrete Pier Foundation Concrete Ramp Concrete Slab-On-Ground Concrete Stair Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Expansion Joint Brick Wall Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-194 S-195 S-196
Project No. SE332
-359-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3020
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Slab-On-Ground
Steel Bracing
Wide Crack Large Spall Water Damage Large Scaling Large Spall Severe Corrosion Severe Corrosion Light Scaling Large Scaling Medium Crack Efflorescence Light Scaling Efflorescence Medium Scaling Medium Crack Moderate Corrosion
15 LF 6 SF 6 SF 6 SF 18 SF 3 SF 2 SF 5 SF 10 SF 12 SF 75 SF 392 SF 18 SF 4 SF 62 LF 9 SF
Steel Column
Moderate Corrosion
21 SF
Concrete Wall
Light Scaling Small Spall Fine Crack Minor Corrosion Minor Corrosion
22 SF 138 SF 158 LF 15 SF 31 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall Steel Bracing Steel Column Concrete Pier Foundation Concrete Slab-On-Ground
Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Bracing Steel Column
PHOTO NO.
S-197
S-198
Project No. SE332
-360-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3021
P1 – Most serious priority – must be repaired/ replaced immediately.
Brick Wall
Wide Crack Large Spall Efflorescence Wide Crack Efflorescence Severe Corrosion Medium Crack Medium Crack Medium Crack Medium Crack Efflorescence Moderate Corrosion Small Spall Small Spall Light Scaling Fine Crack Small Spall Minor Corrosion Minor Corrosion
1 LF 35 SF 83 SF 1 LF 300 SF 2 SF 2 LF 2 LF 13 LF 5 LF 6 SF 1 SF 2 SF 4 SF 4 SF 162 LF 4 SF 2 SF 4 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Pier Foundation Concrete Slab-On-Ground Steel Column Brick Wall Concrete Beam Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Brick Wall Concrete Beam Concrete Slab-On-Ground Concrete Wall Steel Beam Steel Column
PHOTO NO.
S-199
S-200
Project No. SE332
-361-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3022
P1 – Most serious priority – must be repaired/ replaced immediately.
Brick Wall
Large Scaling Wide Crack Efflorescence Large Spall Wide Crack Severe Corrosion Severe Corrosion Medium Spall Medium Scaling Medium Crack Medium Crack Medium Spall Moderate Corrosion Efflorescence Small Spall Light Scaling Small Spall Efflorescence Light Scaling
8 SF 1 SF 110 SF 128 SF 40 LF 1 SF 4 SF 1 SF 45 SF 26 LF 41 LF 9 SF 2 SF 32 SF 5 SF 18 SF 2 SF 18 SF 176 SF
Fine Crack Small Spall Efflorescence Minor Corrosion Minor Corrosion
36 LF 108 SF 1 SF 2 SF 4 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground
Steel Beam Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Column Brick Wall Concrete Roof Deck Concrete Masonry Unit Wall Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
PHOTO NO.
S-201 S-202
Project No. SE332
-362-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3023
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck
Large Spall Wide Crack Large Spall Wide Crack Large Scaling Severe Corrosion Efflorescence Medium Crack Medium Crack Medium Spall Medium Spall Medium Crack Medium Scaling Moderate Corrosion Small Spall Light Scaling Light Scaling Small Spall Efflorescence Fine Crack Light Scaling Minor Corrosion Minor Corrosion
2 SF 10 SF 27 SF 9 LF 6 SF 1 SF 27 SF 20 LF 19 LF 1 SF 24 SF 35 LF 1 SF 2 SF 3 SF 2 SF 150 SF 118 SF 3 SF 58 SF 10 SF 2 SF 2 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
PHOTO NO.
S-203 S-204
Project No. SE332
-363-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3024
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Stair Concrete Wall
Large Scaling Large Spall Large Scaling Severe Corrosion Medium Spall Medium Crack Medium Scaling Medium Spall Medium Crack Medium Scaling Moderate Corrosion Moderate Corrosion Moderate Corrosion Small Spall Light Scaling Light Scaling Efflorescence Fine Crack Small Spall Light Scaling Efflorescence Minor Corrosion
1 SF 6 LF 2 SF 1 SF 5 SF 7 LF 3 SF 34 SF 88 LF 10 SF 1 SF 1 SF 4 SF 6 SF 185 SF 200 SF 34 SF 118 LF 348 SF 52 SF 16 SF 10 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Metal Stair Concrete Roof Deck Concrete Slab-On-Ground Concrete Stair Concrete Wall
Metal Stair Steel Beam Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Steel Column
PHOTO NO.
S-205 S-206
Project No. SE332
-364-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3025
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground Concrete Wall Expansion Joint Steel Column Concrete Roof Deck
Wide Crack Large Spall Deteriorated Expansion Joint Missing Bolts Efflorescence
2 LF 27 SF 36 LF 2 2 SF
Concrete Slab-On-Ground
Efflorescence Medium Crack Light Scaling Small Spall Medium Crack Moderate Corrosion Light Scaling Small Spall Light Scaling Fine Crack Light Scaling Fine Crack Minor Corrosion
20 SF 7 LF 270 SF 270 SF 3 LF 4 SF 3 SF 3 SF 250 SF 9 LF 2 SF 43 LF 2 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall
Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Column
PHOTO NO.
S-207 S-208
Project No. SE332
-365-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3026
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground
Large Spall
1 SF
S-209
Expansion Joint
Deteriorated Expansion Joint
9 LF
S-210
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall Steel Column Concrete Roof Deck
Medium Crack Efflorescence Medium Crack Moderate Corrosion Light Scaling Small Spall Light Scaling Fine Crack Medium Crack Light Scaling Small Spall Fine Crack Minor Corrosion Minor Corrosion
5 LF 12 SF 35 LF 4 SF 3 SF 4 SF 150 SF 51 LF 24 LF 7 SF 405 SF 73 LF 1 SF 5 SF
Concrete Slab-On-Ground
Concrete Wall
Steel Beam Steel Column
Project No. SE332
-366-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3027
P1 – Most serious priority – must be repaired/ replaced immediately.
Brick Wall Concrete Roof Deck Concrete Wall
Efflorescence Efflorescence Efflorescence Large Spall Deteriorated Expansion Joint Efflorescence
15 SF 40 SF 92 SF 5 SF 30 LF 43 SF
S-211 S-212
Concrete Wall
Medium Crack Medium Scaling
38 LF 5 SF
Concrete Roof Deck
Small Spall Light Scaling Light Scaling Fine Crack Small Spall Light Scaling Minor Corrosion
18 SF 5 SF 90 SF 37 LF 155 SF 7 SF 3 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Expansion Joint Concrete Slab-On-Ground
Concrete Slab-On-Ground Concrete Wall
Steel Column
Project No. SE332
-367-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3028
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years.
Metal Stair
Severe Corrosion
1 SF
S-213
Steel Column
Severe Corrosion Missing Bolts
1 SF 1
S-214
Medium Crack Medium Crack Medium Scaling Medium Spall Small Spall Light Scaling Light Scaling Fine Crack Light Scaling Small Spall Efflorescence Minor Corrosion Minor Corrosion Minor Corrosion
15 LF 28 LF 12 SF 42 SF 3 SF 16 SF 80 SF 43 LF 7 SF 173 SF 34 SF 1 SF 2 SF 2 SF
Concrete Slab-On-Ground Concrete Wall
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Metal Stair Steel Beam Steel Column
Project No. SE332
-368-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3029
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Stair Concrete Wall
Large Spall Water Damage Large Spall Large Scaling Large Spall Wide Crack Medium Crack Medium Crack Efflorescence Medium Scaling Medium Crack Efflorescence Medium Crack Deteriorated Expansion Joint Moderate Corrosion Missing Bolts Light Scaling Small Spall Fine Crack Light Scaling Light Scaling Fine Crack Small Spall Fine Crack Minor Corrosion
9 SF 20 SF 4 SF 1 SF 6 SF 5 LF 8 LF 20 LF 8 SF 4 SF 1 LF 21 SF 85 LF 37 LF 4 SF 1 7 SF 6 SF 21 LF 23 SF 16 SF 2 LF 216 SF 102 LF 4 SF
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Stair
Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Expansion Joint Steel Beam Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Stair Concrete Wall Steel Column
PHOTO NO.
S-215
S-216
Project No. SE332
-369-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3030
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Stair
Large Spall
2 SF
S-217
Concrete Wall
Wide Crack
12 LF
Concrete Roof Deck
Medium Crack Efflorescence Efflorescence Efflorescence Efflorescence Medium Crack Deteriorated Expansion Joint Moderate Corrosion Moderate Corrosion Light Scaling Small Spall Fine Crack Medium Crack Fine Crack Medium Crack Small Spall Light Scaling Medium Scaling Small Spall Light Scaling Fine Crack Minor Corrosion
18 LF 18 SF 6 SF 11 SF 15 SF 62 LF 37 LF 4 SF 4 SF 2 SF 10 SF 12 LF 12 LF 15 LF 12 LF 40 SF 17 SF 13 SF 112 SF 5 SF 442 LF 5 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Slab-On-Ground Concrete Stair Concrete Wall Expansion Joint Steel Beam Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Stair
Concrete Wall
Steel Column
S-218
Project No. SE332
-370-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3031
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Wide Crack
8 LF
Concrete Roof Deck
Efflorescence Medium Crack Medium Scaling Medium Spall Medium Crack Efflorescence Medium Crack Moderate Corrosion Light Scaling Light Scaling Fine Crack Light Scaling Fine Crack Small Spall Light Scaling Fine Crack Minor Corrosion
250 SF 8 LF 1 SF 4 SF 6 LF 10 SF 22 LF 6 SF 5 SF 10 SF 18 LF 27 SF 8 LF 45 SF 15 SF 354 LF 2 SF
Concrete Stair Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Stair Concrete Wall
Steel Column
PHOTO NO.
S-219
S-220
Project No. SE332
-371-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3032
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Large Spall
2 SF
Steel Column
Missing Bolts
3
Concrete Roof Deck Concrete Slab-On-Ground Concrete Stair
Efflorescence Medium Crack Medium Spall Medium Crack Medium Crack Wide Crack Medium Scaling Moderate Corrosion Light Scaling Small Spall Fine Crack Light Scaling Fine Crack Fine Crack Efflorescence Light Scaling Small Spall Minor Corrosion
40 SF 2 LF 6 SF 7 LF 62 LF 16 LF 1 SF 1 SF 14 SF 2 SF 36 LF 12 SF 13 LF 142 LF 2 SF 6 SF 396 SF 4 SF
Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Beam Concrete Roof Deck Concrete Slab-On-Ground Concrete Stair Concrete Wall
Steel Column
PHOTO NO.
S-221
S-222
Project No. SE332
-372-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3033
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Steel Column
Missing Bolts Plate Pullout Loose Bolts
8 1 3
S-223 S-224
Brick Wall
Medium Spall Efflorescence Efflorescence Medium Crack Moderate Corrosion Moderate Corrosion Light Scaling Small Spall Fine Crack Light Scaling Light Scaling Small Spall Fine Crack Minor Corrosion
4 SF 6 SF 16 SF 35 SF 1 SF 1 SF 15 SF 2 SF 39 LF 10 SF 4 SF 405 SF 120 SF 6 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall Steel Beam Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Steel Column
Project No. SE332
-373-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
3034
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Slab-On-Ground
Large Spall
1 SF
Steel Column
Severe Corrosion
6 SF
Concrete Roof Deck
Medium Scaling Medium Crack
1 SF 22 LF
Concrete Slab-On-Ground
Efflorescence Medium Crack Medium Scaling Medium Spall Medium Crack Large Spall Medium Spall Light Scaling Small Spall Light Scaling Fine Crack Light Scaling Efflorescence Minor Corrosion Minor Corrosion
200 SF 9 LF 40 SF 3 SF 46 SF 19 SF 16 SF 27 SF 3 SF 62 SF 91 LF 50 SF 27 SF 2 SF 2 SF
Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
PHOTO NO.
S-225
S-226
Project No. SE332
-374-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3035
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Large Spall
6 SF
S-227
Steel Column
Severe Corrosion
6 SF
S-228
Concrete Roof Deck
Medium Crack Medium Spall Medium Scaling Medium Crack Efflorescence Medium Crack Medium Spall Light Scaling Light Scaling Light Scaling Fine Crack Small Spall Efflorescence Minor Corrosion
4 LF 1 SF 14 SF 27 LF 92 SF 43 LF 16 SF 14 SF 136 SF 28 SF 52 LF 93 SF 13 SF 1 SF
Concrete Slab-On-Ground
Concrete Wall P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Steel Beam
Project No. SE332
-375-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3036
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Large Spall
5 SF
S-229
Steel Column
Severe Corrosion
4 SF
S-230
Concrete Roof Deck Concrete Slab-On-Ground
Medium Crack Medium Crack Efflorescence Medium Crack Medium Spall Small Spall Light Scaling Light Scaling Light Scaling Fine Crack Efflorescence Small Spall Minor Corrosion
7 LF 4 SF 48 SF 34 LF 35 SF 3 SF 25 SF 200 SF 25 SF 112 LF 24 SF 124 SF 1 SF
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall Concrete Roof Deck Concrete Slab-On-Ground Concrete Wall
Steel Beam
Project No. SE332
-376-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3037
P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Concrete Wall
Large Spall Wide Crack Severe Corrosion
5 SF 9 LF 8 SF
S-231
Medium Scaling Medium Crack Medium Crack Medium Scaling Medium Crack Medium Crack Medium Spall Moderate Corrosion Light Scaling Fine Crack Efflorescence Light Scaling Light Scaling Efflorescence Light Scaling Efflorescence Small Spall Fine Crack Minor Corrosion
1 SF 2 LF 14 LF 3 SF 2 LF 138 LF 3 SF 3 SF 4 SF 36 LF 38 SF 147 SF 6 SF 1 SF 25 SF 40 SF 112 SF 76 LF 2 SF
Steel Column Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Stair Concrete Wall
P3 – Low-level priority – must be addressed within the next 5-10 years.
Steel Column Concrete Roof Deck Concrete Slab-On-Ground Concrete Stair Concrete Wall
Steel Column
S-232
Project No. SE332
-377-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3038
P1 – Most serious priority – must be repaired/ replaced immediately.
Concrete Roof Deck
Wide Crack Large Spall Large Spall Severe Corrosion Severe Corrosion Medium crack Efflorescence Medium Spall Medium Crack Medium Spall Medium Crack Moderate Corrosion Moderate Corrosion Light Scaling Light Scaling Light Scaling Efflorescence Small Spall Fine Crack Efflorescence Minor Corrosion Minor Corrosion
6 LF 2 SF 8 SF 3 SF 1 SF 15 LF 13 LF 1 SF 12 LF 8 SF 17 LF 2 SF 1 SF 2 SF 1 SF 87 SF 36 SF 96 SF 22 LF 10 SF 2 SF 2 SF
S-233
P2 – Medium-level priority – must be addressed within the next 3-5 years.
P3 – Low-level priority – must be addressed within the next 5-10 years.
Concrete Wall Steel Column Steel Ladder Concrete Roof Deck
Concrete Slab-On-Ground Concrete Wall Steel Column Steel Ladder Concrete Roof Deck Concrete Pier Foundation Concrete Slab-On-Ground Concrete Wall
Steel Beam Steel Column
S-234
Project No. SE332
-378-
Structural Photo Log
May 17, 2024
Project No. SE332
PHOTO NO. S-1 SECTION NO. 1 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Water Damage
PHOTO NO. S-2 SECTION NO. 1 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Wide Crack
-379-
May 17, 2024
Project No. SE332
-380-
PHOTO NO. S-3 SECTION NO. 1 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion and Missing Bolts and/or Loose Nuts
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-4 SECTION NO. 2 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-5 SECTION NO. 2 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Missing Bolts and/or Loose Nuts
-381-
May 17, 2024
Project No. SE332
PHOTO NO. S-6 SECTION NO. 3 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-7 SECTION NO. 3 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Medium Scaling
-382-
May 17, 2024
Project No. SE332
PHOTO NO. S-8 SECTION NO. 5 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-9 SECTION NO. 5 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
-383-
May 17, 2024
Project No. SE332
-384-
PHOTO NO. S-10 SECTION NO. 5 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Bent Baseplate
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-11 SECTION NO. 6 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Medium Spall
PHOTO NO. S-12 SECTION NO. 6 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-385-
May 17, 2024
Project No. SE332
PHOTO NO. S-13 SECTION NO. 8 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Roof Deck DESCRIPTION: Large Spall
PHOTO NO. S-14 SECTION NO. 8 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
-386-
May 17, 2024
Project No. SE332
PHOTO NO. S-15 SECTION NO. 8 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Metal Stair DESCRIPTION: Missing Weld
PHOTO NO. S-16 SECTION NO. 8 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-387-
May 17, 2024
Project No. SE332
-388-
PHOTO NO. S-17 SECTION NO. 9 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
-389-
PHOTO NO. S-18 SECTION NO. 10 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-19 SECTION NO. 11 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Roof Deck DESCRIPTION: Large Scaling
PHOTO NO. S-20 SECTION NO. 11 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Damaged Grout
-390-
May 17, 2024
Project No. SE332
PHOTO NO. S-21 SECTION NO. 12 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Moderate Corrosion
PHOTO NO. S-22 SECTION NO. 12 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
-391-
May 17, 2024
Project No. SE332
PHOTO NO. S-23 SECTION NO. 13 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Roof Deck DESCRIPTION: Large Spall
PHOTO NO. S-24 SECTION NO. 13 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-392-
May 17, 2024
Project No. SE332
-393-
PHOTO NO. S-25 SECTION NO. 13 PRIORITY LEVEL: P2 – Medium Level Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
-394-
PHOTO NO. S-26 SECTION NO. 14 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion and Missing Bolt
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-27 SECTION NO. 15 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Exposed Rebar
PHOTO NO. S-28 SECTION NO. 15 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Water Damage
-395-
May 17, 2024
Project No. SE332
PHOTO NO. S-29 SECTION NO. 16 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Steel Grout DESCRIPTION: Damaged Grout
PHOTO NO. S-30 SECTION NO. 16 PRIORITY LEVEL: P3 – Low-Level Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Small Spall
-396-
May 17, 2024
Project No. SE332
PHOTO NO. S-31 SECTION NO. 17 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Roof Deck DESCRIPTION: Efflorescence
PHOTO NO. S-32 SECTION NO. 17 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Water Damage
-397-
May 17, 2024
Project No. SE332
PHOTO NO. S-33 SECTION NO. 18 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-34 SECTION NO. 18 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-398-
May 17, 2024
Project No. SE332
-399-
PHOTO NO. S-35 SECTION NO. 18 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-36 SECTION NO. 19 PRIORITY LEVEL: P2 – Medium Level Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
PHOTO NO. S-37 SECTION NO. 19 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Medium Crack
-400-
May 17, 2024
Project No. SE332
PHOTO NO. S-38 SECTION NO. 20 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
PHOTO NO. S-39 SECTION NO. 20 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Medium Crack
-401-
May 17, 2024
Project No. SE332
PHOTO NO. S-40 SECTION NO. 21 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Metal Stair DESCRIPTION: Damaged Stringer
PHOTO NO. S-41 SECTION NO. 21 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-402-
May 17, 2024
Project No. SE332
PHOTO NO. S-42 SECTION NO. 22 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Expansion Joint DESCRIPTION: Deteriorated Expansion Joint
PHOTO NO. S-43 SECTION NO. 22 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-403-
May 17, 2024
Project No. SE332
-404-
PHOTO NO. S-44 SECTION NO. 23 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Scaling
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-45 SECTION NO. 24 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-46 SECTION NO. 24 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Metal Stair DESCRIPTION: Severe Corrosion
-405-
May 17, 2024
Project No. SE332
PHOTO NO. S-47 SECTION NO. 25 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Wide Crack
PHOTO NO. S-48 SECTION NO. 25 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
-406-
May 17, 2024
Project No. SE332
-407-
PHOTO NO. S-49 SECTION NO. 25 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Water Damage
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-50 SECTION NO. 26 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Scaling
PHOTO NO. S-51 SECTION NO. 26 PRIORITY LEVEL: P3 – Low-Level Priority LOCATION: Concrete Roof Deck DESCRIPTION: Medium Crack
-408-
May 17, 2024
Project No. SE332
PHOTO NO. S-52 SECTION NO. 27 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Roof Deck DESCRIPTION: Efflorescence
PHOTO NO. S-53 SECTION NO. 27 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-409-
May 17, 2024
Project No. SE332
PHOTO NO. S-54 SECTION NO. 28 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Roof Deck DESCRIPTION: Efflorescence
PHOTO NO. S-55 SECTION NO. 28 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Steel Column DESCRIPTION: Damaged Grout
-410-
May 17, 2024
Project No. SE332
PHOTO NO. S-56 SECTION NO. 30 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-57 SECTION NO. 30 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Roof Deck DESCRIPTION: Large Spall
-411-
May 17, 2024
Project No. SE332
PHOTO NO. S-58 SECTION NO. 31 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Roof Deck DESCRIPTION: Wide Crack
PHOTO NO. S-59 SECTION NO. 31 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Steel Column DESCRIPTION: Bent Baseplate
-412-
May 17, 2024
Project No. SE332
PHOTO NO. S-60 SECTION NO. 32 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-61 SECTION NO. 32 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
-413-
May 17, 2024
Project No. SE332
PHOTO NO. S-62 SECTION NO. 33 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Roof Deck DESCRIPTION: Large Spall
PHOTO NO. S-63 SECTION NO. 33 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
-414-
May 17, 2024
Project No. SE332
PHOTO NO. S-64 SECTION NO. 34 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
PHOTO NO. S-65 SECTION NO. 34 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
-415-
May 17, 2024
Project No. SE332
PHOTO NO. S-66 SECTION NO. 35 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Moderate Corrosion
PHOTO NO. 67 SECTION NO. 35 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Sump Pump DESCRIPTION: Flooding *OGS was notified of damage item during inspection due to immediate safety concerns. OGS to confirm if item has been resolved.
-416-
May 17, 2024
Project No. SE332
PHOTO NO. S-68 SECTION NO. 36 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Water Damage
PHOTO NO. S-69 SECTION NO. 36 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Expansion Joint DESCRIPTION: Deteriorated Expansion Joint
-417-
May 17, 2024
Project No. SE332
PHOTO NO. S-70 SECTION NO. 37 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Bent Flange
PHOTO NO. S-71 SECTION NO. 37 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Large Scaling
-418-
May 17, 2024
Project No. SE332
PHOTO NO. S-72 SECTION NO. 38 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
PHOTO NO. S-73 SECTION NO. 38 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-419-
May 17, 2024
Project No. SE332
PHOTO NO. S-74 SECTION NO. 39 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
PHOTO NO. S-75 SECTION NO. 39 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Beam DESCRIPTION: Missing Bolt
-420-
May 17, 2024
Project No. SE332
PHOTO NO. S-76 SECTION NO. 40 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Metal Stair DESCRIPTION: Missing Bolt
PHOTO NO. S-77 SECTION NO. 40 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Stair Handrail DESCRIPTION: Detached Handrailing
-421-
May 17, 2024
Project No. SE332
PHOTO NO. S-78 SECTION NO. 41 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
PHOTO NO. S-79 SECTION NO. 41 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
-422-
May 17, 2024
Project No. SE332
PHOTO NO. S-80 SECTION NO. 42 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
PHOTO NO. S-81 SECTION NO. 42 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Expansion Joint DESCRIPTION: Deteriorated Expansion Joint
-423-
May 17, 2024
Project No. SE332
PHOTO NO. S-82 SECTION NO. 43 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
PHOTO NO. S-83 SECTION NO. 43 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Bent Flange
-424-
May 17, 2024
Project No. SE332
-425-
PHOTO NO. S-84 SECTION NO. 44 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-85 SECTION NO. 45 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
PHOTO NO. S-86 SECTION NO. 45 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
-426-
May 17, 2024
Project No. SE332
PHOTO NO. S-87 SECTION NO. 46 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Clear Cover
PHOTO NO. S-88 SECTION NO. 46 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
-427-
May 17, 2024
Project No. SE332
PHOTO NO. S-89 SECTION NO. 47 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Water Damage
PHOTO NO. S-90 SECTION NO. 47 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Incomplete Repair
-428-
May 17, 2024
Project No. SE332
PHOTO NO. S-91 SECTION NO. 48 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
PHOTO NO. S-92 SECTION NO. 48 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Sump Cover DESCRIPTION: Severe Corrosion
-429-
May 17, 2024
Project No. SE332
PHOTO NO. S-93 SECTION NO. 49 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
PHOTO NO. S-94 SECTION NO. 49 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
-430-
May 17, 2024
Project No. SE332
PHOTO NO. S-95 SECTION NO. 51 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-96 SECTION NO. 51 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
-431-
May 17, 2024
Project No. SE332
PHOTO NO. S-97 SECTION NO. 52 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-98 SECTION NO. 52 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
-432-
May 17, 2024
Project No. SE332
PHOTO NO. S-99 SECTION NO. 53 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Damaged Grout
PHOTO NO. S-100 SECTION NO. 53 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
-433-
May 17, 2024
Project No. SE332
PHOTO NO. S-101 SECTION NO. 54 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-102 SECTION NO. 54 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-434-
May 17, 2024
Project No. SE332
PHOTO NO. S-103 SECTION NO. 55 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Light Scaling *Dust from scaling and other dirt impaired the assessment of the slab in this section
PHOTO NO. S-104 SECTION NO. 55 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-435-
May 17, 2024
Project No. SE332
PHOTO NO. S-105 SECTION NO. 56 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Scaling
PHOTO NO. S-106 SECTION NO. 56 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Incomplete Repair
-436-
May 17, 2024
Project No. SE332
-437-
PHOTO NO. S-107 SECTION NO. 56 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Ladder DESCRIPTION: Severe Corrosion *Access to the ladder is restricted due to the adjacent pipes.
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
-438-
PHOTO NO. S-107 SECTION NO. 57 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
-439-
PHOTO NO. S-109 SECTION NO. 58 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-110 SECTION NO. 59 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
PHOTO NO. S-111 SECTION NO. 59 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-440-
May 17, 2024
Project No. SE332
-441-
PHOTO NO. S-112 SECTION NO. 59 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-113 SECTION NO. 60 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-114 SECTION NO. 60 PRIORITY LEVEL: P2 – Medium Level Priority LOCATION: Steel Column DESCRIPTION: Missing Bolts
-442-
May 17, 2024
Project No. SE332
PHOTO NO. S-115 SECTION NO. 61 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
PHOTO NO. S-116 SECTION NO. 61 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Slab-OnGrade DESCRIPTION: Efflorescence
-443-
May 17, 2024
Project No. SE332
PHOTO NO. S-117 SECTION NO. 62 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-118 SECTION NO. 62 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Beam DESCRIPTION: Damaged Angle
-444-
May 17, 2024
Project No. SE332
PHOTO NO. S-119 SECTION NO. 63 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-120 SECTION NO. 63 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
-445-
May 17, 2024
Project No. SE332
PHOTO NO. S-121 SECTION NO. 64 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Roof Deck DESCRIPTION: Large Spall *OGS was notified of damage item during inspection due to immediate safety concerns. OGS to confirm if item has been resolved.
PHOTO NO. S-122 SECTION NO. 64 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
-446-
May 17, 2024
Project No. SE332
-447-
PHOTO NO. S-123 SECTION NO. 64 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Metal Stair DESCRIPTION: Severe Corrosion *OGS was notified of damage item during inspection due to immediate safety concerns. OGS to confirm if item has been resolved.
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-124 SECTION NO. 65 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Incomplete Repair
PHOTO NO. S-125 SECTION NO. 65 PRIORITY LEVEL: P3 – Low-Level Priority LOCATION: Concrete Wall DESCRIPTION: Fine Crack
-448-
May 17, 2024
Project No. SE332
PHOTO NO. S-126 SECTION NO. 66 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-127 SECTION NO. 66 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
-449-
May 17, 2024
Project No. SE332
PHOTO NO. S-128 SECTION NO. 68 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-129 SECTION NO. 68 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-450-
May 17, 2024
Project No. SE332
PHOTO NO. S-130 SECTION NO. 69 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
PHOTO NO. S-131 SECTION NO. 69 PRIORITY LEVEL: P3 – Low-Level Priority LOCATION: Steel Beam DESCRIPTION: Bent Flange
-451-
May 17, 2024
Project No. SE332
PHOTO NO. S-132 SECTION NO. 70 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Pier Foundation DESCRIPTION: Large Spall
PHOTO NO. S-133 SECTION NO. 70 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
-452-
May 17, 2024
Project No. SE332
-453-
PHOTO NO. S-134 SECTION NO. 70 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-135 SECTION NO. 71 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-136 SECTION NO. 71 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Water Damage
-454-
May 17, 2024
Project No. SE332
PHOTO NO. S-137 SECTION NO. 72 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Roof Deck DESCRIPTION: Large Spall
PHOTO NO. S-138 SECTION NO. 72 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
-455-
May 17, 2024
Project No. SE332
-456-
PHOTO NO. S-139 SECTION NO. 73 PRIORITY LEVEL: P2 – Medium Level Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-140 SECTION NO. 74 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Organic Growth
PHOTO NO. S-141 SECTION NO. 74 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
-457-
May 17, 2024
Project No. SE332
PHOTO NO. S-142 SECTION NO. 74 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Incomplete Repair
PHOTO NO. S-143 SECTION NO. 74 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-458-
May 17, 2024
Project No. SE332
PHOTO NO. S-144 SECTION NO. 75 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-145 SECTION NO. 75 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-459-
May 17, 2024
Project No. SE332
PHOTO NO. S-146 SECTION NO. 76 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
PHOTO NO. S-147 SECTION NO. 76 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Roof Deck DESCRIPTION: Efflorescence
-460-
May 17, 2024
Project No. SE332
-461-
PHOTO NO. S-148 SECTION NO. 77 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Incomplete Repair
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-149 SECTION NO. 78 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Incomplete Repair
PHOTO NO. S-150 SECTION NO. 78 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Roof Deck DESCRIPTION: Medium Crack
-462-
May 17, 2024
Project No. SE332
PHOTO NO. S-151 SECTION NO. 79 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Incomplete Repair
PHOTO NO. S-152 SECTION NO. 79 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Beam DESCRIPTION: Severe Corrosion
-463-
May 17, 2024
Project No. SE332
PHOTO NO. S-153 SECTION NO. 80 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Water Damage
PHOTO NO. S-154 SECTION NO. 80 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
-464-
May 17, 2024
Project No. SE332
PHOTO NO. S-155 SECTION NO. 81 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Roof Deck DESCRIPTION: Efflorescence
PHOTO NO. S-156 SECTION NO. 81 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Beam DESCRIPTION: Severe Corrosion
-465-
May 17, 2024
Project No. SE332
-466-
PHOTO NO. S-157 SECTION NO. 81 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Ladder DESCRIPTION: Severe Corrosion
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-158 SECTION NO. 82 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Water Damage
PHOTO NO. S-159 SECTION NO. 82 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
-467-
May 17, 2024
Project No. SE332
PHOTO NO. S-160 SECTION NO. 3000 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
PHOTO NO. S-161 SECTION NO. 3000 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Beam DESCRIPTION: Severe Corrosion
-468-
May 17, 2024
Project No. SE332
PHOTO NO. S-162 SECTION NO. 3001 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
PHOTO NO. S-163 SECTION NO. 3001 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
-469-
May 17, 2024
Project No. SE332
-470-
PHOTO NO. S-164 SECTION NO. 3002 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Steel Column DESCRIPTION: Bent Flange
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-165 SECTION NO. 3003 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
PHOTO NO. S-166 SECTION NO. 3003 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
-471-
May 17, 2024
Project No. SE332
-472-
PHOTO NO. S-167 SECTION NO. 3003 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Expansion Joint DESCRIPTION: Deteriorated Expansion Joint
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-168 SECTION NO. 3006 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
PHOTO NO. S-169 SECTION NO. 3006 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-473-
May 17, 2024
Project No. SE332
PHOTO NO. S-170 SECTION NO. 3007 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
PHOTO NO. S-171 SECTION NO. 3007 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Beam DESCRIPTION: Missing Bolts
-474-
May 17, 2024
Project No. SE332
PHOTO NO. S-172 SECTION NO. 3008 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
PHOTO NO. S-173 SECTION NO. 3008 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
-475-
May 17, 2024
Project No. SE332
PHOTO NO. S-174 SECTION NO. 3009 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
PHOTO NO. S-175 SECTION NO. 3009 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Missing Bolts
-476-
May 17, 2024
Project No. SE332
PHOTO NO. S-176 SECTION NO. 3010 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
PHOTO NO. S-177 SECTION NO. 3010 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Beam DESCRIPTION: Missing Bolts
-477-
May 17, 2024
Project No. SE332
PHOTO NO. S-178 SECTION NO. 3011 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
PHOTO NO. S-179 SECTION NO. 3011 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-478-
May 17, 2024
Project No. SE332
PHOTO NO. S-180 SECTION NO. 3012 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
PHOTO NO. S-181 SECTION NO. 3012 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
-479-
May 17, 2024
Project No. SE332
PHOTO NO. S-182 SECTION NO. 3013 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
PHOTO NO. S-183 SECTION NO. 3013 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
-480-
May 17, 2024
Project No. SE332
-481-
PHOTO NO. S-184 SECTION NO. 3013 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Beam DESCRIPTION: Severe Deflection
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
-482-
PHOTO NO. S-185 SECTION NO. 3014 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-186 SECTION NO. 3015 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Expansion Joint DESCRIPTION: Deteriorated Expansion Joint
PHOTO NO. S-187 SECTION NO. 3015 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Beam DESCRIPTION: Missing Bolt
-483-
May 17, 2024
Project No. SE332
PHOTO NO. S-188 SECTION NO. 3016 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
PHOTO NO. S-189 SECTION NO. 3016 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
-484-
May 17, 2024
Project No. SE332
PHOTO NO. S-190 SECTION NO. 3017 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
PHOTO NO. S-191 SECTION NO. 3017 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-485-
May 17, 2024
Project No. SE332
PHOTO NO. S-192 SECTION NO. 3018 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
PHOTO NO. S-193 SECTION NO. 3018 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-486-
May 17, 2024
Project No. SE332
PHOTO NO. S-194 SECTION NO. 3019 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Stair DESCRIPTION: Large Spall
PHOTO NO. S-195 SECTION NO. 3019 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-487-
May 17, 2024
Project No. SE332
-488-
PHOTO NO. S-196 SECTION NO. 3019 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. S-197 SECTION NO. 3020 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-198 SECTION NO. 3020 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-489-
May 17, 2024
Project No. SE332
PHOTO NO. S-199 SECTION NO. 3021 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Brick Wall DESCRIPTION: Large Spall
PHOTO NO. S-200 SECTION NO. 3021 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
-490-
May 17, 2024
Project No. SE332
PHOTO NO. S-201 SECTION NO. 3022 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Efflorescence
PHOTO NO. S-202 SECTION NO. 3022 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
-491-
May 17, 2024
Project No. SE332
PHOTO NO. S-203 SECTION NO. 3023 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-204 SECTION NO. 3023 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Wide Crack
-492-
May 17, 2024
Project No. SE332
PHOTO NO. S-205 SECTION NO. 3024 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-206 SECTION NO. 3024 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Metal Stair DESCRIPTION: Severe Corrosion
-493-
May 17, 2024
Project No. SE332
PHOTO NO. S-207 SECTION NO. 3025 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-208 SECTION NO. 3025 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Expansion Joint DESCRIPTION: Deteriorated Expansion Joint
-494-
May 17, 2024
Project No. SE332
PHOTO NO. S-209 SECTION NO. 3026 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Large Spall
PHOTO NO. S-210 SECTION NO. 3026 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Expansion Joint DESCRIPTION: Deteriorated Expansion Joint
-495-
May 17, 2024
Project No. SE332
PHOTO NO. S-211 SECTION NO. 3027 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Efflorescence
PHOTO NO. S-212 SECTION NO. 3027 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-496-
May 17, 2024
Project No. SE332
PHOTO NO. S-213 SECTION NO. 3028 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Metal Stair DESCRIPTION: Severe Corrosion
PHOTO NO. S-214 SECTION NO. 3028 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Missing Bolts
-497-
May 17, 2024
Project No. SE332
PHOTO NO. S-215 SECTION NO. 3029 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Slab-OnGround DESCRIPTION: Water Damage *Note steam pipe is pouring steam/water directly onto concrete
PHOTO NO. S-216 SECTION NO. 3029 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-498-
May 17, 2024
Project No. SE332
PHOTO NO. S-217 SECTION NO. 3030 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Stair DESCRIPTION: Large Spall
PHOTO NO. S-218 SECTION NO. 3030 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Steel Beam DESCRIPTION: Moderate Corrosion
-499-
May 17, 2024
Project No. SE332
PHOTO NO. S-219 SECTION NO. 3031 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Deck DESCRIPTION: Efflorescence
PHOTO NO. S-220 SECTION NO. 3031 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Steel Column DESCRIPTION: Moderate Corrosion
-500-
May 17, 2024
Project No. SE332
PHOTO NO. S-221 SECTION NO. 3032 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Missing Bolt
PHOTO NO. S-222 SECTION NO. 3032 PRIORITY LEVEL: P3 – Low-Level Priority LOCATION: Concrete Wall DESCRIPTION: Small Spall
-501-
May 17, 2024
Project No. SE332
PHOTO NO. S-223 SECTION NO. 3033 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Missing Bolts
PHOTO NO. S-224 SECTION NO. 3033 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Plate Pullout
-502-
May 17, 2024
Project No. SE332
PHOTO NO. S-225 SECTION NO. 3034 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
PHOTO NO. S-226 SECTION NO. 3034 PRIORITY LEVEL: P2 – Medium-Level Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
-503-
May 17, 2024
Project No. SE332
PHOTO NO. S-227 SECTION NO. 3035 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-228 SECTION NO. 3035 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-504-
May 17, 2024
Project No. SE332
PHOTO NO. S-229 SECTION NO. 3036 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-230 SECTION NO. 3036 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-505-
May 17, 2024
Project No. SE332
PHOTO NO. S-231 SECTION NO. 3037 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Wall DESCRIPTION: Large Spall
PHOTO NO. S-232 SECTION NO. 3037 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Column DESCRIPTION: Severe Corrosion
-506-
May 17, 2024
Project No. SE332
PHOTO NO. S-233 SECTION NO. 3038 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Concrete Deck DESCRIPTION: Wide Crack
PHOTO NO. S-234 SECTION NO. 3038 PRIORITY LEVEL: P1 – Most Serious Priority LOCATION: Steel Ladder DESCRIPTION: Severe Corrosion
-507-
May 17, 2024
Project No. SE332
-508-
Appendix 3: Mechanical Detailed Findings
May 17, 2024
82
81
79
1 2
80
78
3
4 5
77 76 73
60 57 58
17
63 62
Dat eSav ed:2/ 15/ 2024• Aut hor :E. But t er f i el d
22
64
61
23 24
33 49
25
35
26
44
50
53
56
21
19
68
52
55
10
20
18
69
59
54
7
16
65
67
1 1
15
70
9
14
74
71
8
13
75
72
66
6
12
27
43 51
28
45
29
46 47 48
39 42
41
40
34
30
36
31
37
32
38
OGS Cold Tunnel Mechanical Section Maps Utility Tunnel Evaluation
Scale 1" = 280'
CHA Project No. 080577
Image Courtesy of the NYS Office of Information Technology Services, GIS Program Office Photo Date: 2021
Project No. SE332
SECTION NO. 1
SECTION NO. 2
SECTION NO. 3
-510-
PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years. PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years. PRIORITY LEVEL
Piping System & Size:
May 17, 2024
DESCRIPTION
QUANTITY
PHOTO NO.
36” PCHWS
Frayed Jacketing
10 LF
M-1
12” Pipe – Fiberglass insulation
Frayed Jacketing
5 LF
M-2
Piping System & Size: 48” Cond
Piping System & Size:
P1 – Most serious priority – must be repaired/ replaced immediately.
14” HPS
P2 – Medium-level priority – must be addressed within the next 3-5 years.
DESCRIPTION Heavily damaged Insulation
DESCRIPTION
QUANTITY 20 LF
PHOTO NO. M-3
QUANTITY
PHOTO NO.
30 LF
M-4
30 LF
M-4
8” CPD
Insulation missing at one segment and frayed jacketing elsewhere. Insulation missing at one segment and frayed jacketing elsewhere. Frayed insulation
50 LF
M-4
36” PCHWS
Frayed Insulation
50 LF
-
48” COND.
Frayed Insulation
50 LF
-
12” DCWS
Project No. SE332
SECTION NO. 4
SECTION NO. 6
SECTION NO. 10, 11
-511-
PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years. PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years.
PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years.
Piping System & Size:
May 17, 2024
DESCRIPTION
QUANTITY
PHOTO NO.
14” PCHWR
Frayed Insulation
130 LF
M-5
14” HPS
Frayed Insulation
10 LF
-
Piping System & Size:
DESCRIPTION
QUANTITY
PHOTO NO.
48” Condensate pipe
Frayed Insulation
50 LF
M-6
36” PCHWS
Frayed Insulation
50 LF
M-6
12” DCHWS
Wear and tear on the jacketing
50 LF
M-6
14” HPS
Wear and tear on the jacketing
50 LF
M-6
Piping System & Size:
DESCRIPTION
QUANTITY
PHOTO NO.
2 x 6” DCWS
Frayed Insulation
250 LF
M-8
8” DCWS
Frayed Insulation
250 LF
M-8
14” CHWS & 14” CHWR
Frayed Insulation
250 LF
M-8
Project No. SE332
SECTION NO. 17
-512-
PRIORITY LEVEL
Piping System & Size:
P1 – Most serious priority – must be repaired/ replaced immediately.
14” HPS
P2 – Medium-level priority – must be addressed within the next 3-5 years.
12” DCHWS
8” CPD
May 17, 2024
DESCRIPTION Wear and tear on the jacketing and spots of frayed insulation.
QUANTITY
PHOTO NO.
100 LF
M-9
Wear and tear on the jacketing and spots of frayed insulation.
100 LF
M-9
Wear and tear on the jacketing and spots of frayed insulation.
100 LF
M-9
Missing insulation at elbow joints
Project No. SE332
SECTION NO. 18
SECTION NO. 21
-513-
PRIORITY LEVEL P3 – Low-level priority – must be addressed within the next 5-10 years.
PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately.
Piping System & Size:
May 17, 2024
DESCRIPTION
QUANTITY
PHOTO NO.
14” HPS
Frayed insulation jacketing.
200 LF
M-10
12” DCHWS
Frayed insulation jacketing.
200 LF
M-10
10” RFWS
Frayed insulation jacketing.
200 LF
-
8” CPD
Frayed insulation jacketing.
200 LF
M-10
48” COND.
Frayed insulation jacketing.
200 LF
M-11
36”PCHWS
Frayed insulation jacketing.
200 LF
M-11
Piping System & Size:
DESCRIPTION
QUANTITY
PHOTO NO.
48” Cond.
Missing Insulation.
15 LF
M-12
36” PCHWS
Missing Insulation.
15 LF
M-12
Project No. SE332
SECTION NO. 25
SECTION NO. 28
SECTION NO. 35
-514-
PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately. PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years. PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately.
Piping System & Size: 48” Cond.
Piping System & Size:
May 17, 2024
DESCRIPTION Missing Insulation.
DESCRIPTION
QUANTITY 30 LF
QUANTITY
PHOTO NO. M-13
PHOTO NO.
Valving Station and exposed branch-pipe connections.
Missing Insulation
15 LF
M-14
48” Cond
Missing Insulation
15 LF
M-15
36” PCHWS
Missing Insulation
15 LF
M-15
Piping System & Size:
DESCRIPTION
QUANTITY
PHOTO NO.
48” Cond
Torn off jacketing, frayed insulation.
50 LF
M-16
36” PCHWS
Torn off jacketing, frayed insulation.
50 LF
M-16
Project No. SE332
SECTION NO. 35
SECTION NO. 38
SECTION NO. 47
-515-
PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years.
PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately.
PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years.
Piping System & Size:
May 17, 2024
DESCRIPTION
QUANTITY
PHOTO NO.
14” HPS
Frayed Insulation
100 LF
-
8” CPD
Frayed Insulation
100 LF
-
2 x 6” DCWS
Frayed Insulation
100 LF
-
36” CHS
Frayed Insulation
100 LF
-
36” CHR
Frayed Insulation
100 LF
-
Piping System & Size: Valving station. Exposed valving system.
Piping System & Size: 30” PCHWS
DESCRIPTION Missing insulation on the valves.
DESCRIPTION Frayed Insulation
QUANTITY -
PHOTO NO. M-17
QUANTITY 10 LF
PHOTO NO. M-18
Project No. SE332
SECTION NO. 48
-516-
PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately. P2 – Medium-level priority – must be addressed within the next 3-5 years.
Piping System & Size:
May 17, 2024
DESCRIPTION
QUANTITY
PHOTO NO.
Storm drain pump
Dysfunctional pump
1
M-19
Storm drain pump
Dysfunctional pump
1
M-20
30” PCHWR
Frayed insulation and jacketing.
20 LF
M-21
Project No. SE332
SECTION NO. 60
-517-
PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately.
Piping System & Size: 8” CWS & CWR
May 17, 2024
DESCRIPTION
QUANTITY
PHOTO NO.
Missing pipe and transition pipe fitting insulation Exposed piping is rusted, needs insulation.
5 LF
M-22
150 LF
M-23
20” PCHWR
Exposed piping is rusted, needs insulation.
150 LF
M-23
20” PCHWS
Exposed piping is rusted, needs insulation.
150 LF
M-23
8” RPWS
-
M-24
-
M-24
-
M-24
14” HPS
Valving station by the pipes mentioned here are exposed. Need insulation. Valving station by the pipes mentioned here are exposed. Need insulation. Valving station by the pipes mentioned here are exposed. Need insulation. Frayed Insulation
200 LF
M-25
8” CPD
Frayed Insulation
200 LF
M-25
12” DCWS
Frayed Insulation
200 LF
M-25
2 x 8” CHW
Frayed Insulation
200 LF
M-25
8” RPWS
20” PCHWR
20” PCHWS
Project No. SE332
SECTION NO. 61
SECTION NO. 63
-518-
PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately. PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately.
Piping System & Size:
May 17, 2024
DESCRIPTION
QUANTITY
PHOTO NO.
30” PCHWR
Frayed insulation
100 LF
M-26
20” PCHWR
Frayed insulation
100 LF
M-26
Piping System & Size:
DESCRIPTION
Valving station valves and branch pipes under 14” HPS line 30” PCHWR
Valving station valves and branch pipes are exposed. Need new insulation Frayed piping insulation and disintegrated jacketing. Frayed piping insulation and disintegrated jacketing.
20” PCHWR
QUANTITY
PHOTO NO.
-
M-27
500 LF
M-27
500 LF
M-27
Project No. SE332
SECTION NO. 68
-519-
PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years.
Piping System & Size: 14” HPS 8” CPD 12” DCWS 8” CHWS 8” CHWR 30” PCHWR 20” PCHWR
May 17, 2024
DESCRIPTION Frayed piping insulation and disintegrated jacketing. Frayed piping insulation and disintegrated jacketing. Frayed piping insulation and disintegrated jacketing. Frayed piping insulation and disintegrated jacketing. Frayed piping insulation and disintegrated jacketing. Frayed piping insulation and disintegrated jacketing. Frayed piping insulation and disintegrated jacketing.
QUANTITY
PHOTO NO.
500 LF
-
500 LF
-
500 LF
-
500 LF
-
500 LF
-
500 LF
-
500 LF
-
3037
3038
3036 3035 3034 3033 3032 3031 3015
3028
3030
3014
3027
3029
3013
3006 3005
3010
3012
3009
301 1
3026 3025
3019
3024
3008
3023
3007
3022
3004
3021
3003 3016
3020 3017
3002
3018
3001
Dat eSav ed:3/ 6/ 2024• Aut hor :E. But t er f i el d
3000
OGS Hot Tunnel Mechanical Section Map Utility Tunnel Evaluation
Scale 1" = 200'
CHA Project No. 080577
Image Courtesy of the NYS Office of Information Technology Services, GIS Program Office Photo Date: 2021
Project No. SE332
SECTION NO. 3001
SECTION NO. 3002
SECTION NO. 3003
-521-
PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years. PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years. PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately.
Piping System & Size:
May 17, 2024
DESCRIPTION
QUANTITY
PHOTO NO.
18” HPS F-LINE
Frayed insulation.
5 LF
M-29
6” CHWS & CHWR
Wear and tear on the jacketing.
20 LF
M-30
Piping System & Size: 6” CHWS & CHWR
DESCRIPTION Wear and tear on the insulation jacketing.
QUANTITY 50 LF
QUANTITY
PHOTO NO. M-31
Piping System & Size:
DESCRIPTION
PHOTO NO.
Valves on the 18” HPS lines.
Exposed valves, no insulation on pipes connecting the valves.
-
M-32
F-LINE 18” HPS
Frayed insulation on the elbow up section.
5 LF
M-33
18” Orange Pipe
Frayed insulation on the orange pipe.
30 LF
M-34
Project No. SE332
SECTION NO. 3004
SECTION NO. 3007
SECTION NO. 3010
-522-
PRIORITY LEVEL
May 17, 2024
Piping System & Size:
DESCRIPTION
P1 – Most serious priority – must be repaired/ replaced immediately.
Valving station between F & G Line
Exposed valves and pipes at the connection points.
-
M-36
P2 – Medium-level priority – must be addressed within the next 3-5 years.
18” HPS F-Line
F line has frayed insulation.
30 LF
M-35
PRIORITY LEVEL P3 – Low-level priority – must be addressed within the next 5-10 years. PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately.
Piping System & Size:
DESCRIPTION
18” HPS white wrapping. F & The insulation jacketing has G Line. wear and tear.
Piping System & Size: 18” HPS
DESCRIPTION Missing insulation jacketing.
QUANTITY
QUANTITY 50 LF
PHOTO NO.
PHOTO NO. M-37
QUANTITY 50 LF
PHOTO NO. M-38
Project No. SE332
SECTION NO. 3011
SECTION NO. 3012
SECTION NO. 3013
-523-
PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately.
PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately. PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years.
May 17, 2024
Piping System & Size:
DESCRIPTION
Overhead, 20” Chilled Water Pipe.
Dented Vinyl covering over pipe insulation.
1
M-39
18” HPS branch elbow up.
Exposed piping, jacketing wear, and tear.
10 LF
M-39
Piping System & Size:
DESCRIPTION
6” CHW pipe
Piping System & Size: 18” HPS F & G Line 2x6” CHW pipes
The CHW pipe has exposed sections, no insulation jacketing.
DESCRIPTION Temporary jacketing starting to disintegrate in this section. Temporary jacketing starting to disintegrate in this section.
QUANTITY
QUANTITY 20 LF
QUANTITY
PHOTO NO.
PHOTO NO. M-40
PHOTO NO.
50 LF
M-41
50 LF
M-41
Project No. SE332
SECTION NO. 3015
SECTION NO. 3017
SECTION NO. 3020
SECTION NO. 3024
-524-
PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years. P3 – Low-level priority – must be addressed within the next 5-10 years. PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately. PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately. PRIORITY LEVEL P2 – Medium-level priority – must be addressed within the next 3-5 years.
Piping System & Size:
May 17, 2024
DESCRIPTION
QUANTITY
PHOTO NO.
2 x 20” CHW (bottom)
Wear and Tear on the jacketing
50 LF
M-42
2 x 6” CHW (ceiling)
Wear and Tear on the jacketing
50LF
M-42
18” HPS F line 18” HPS G line
Wear and Tear on the jacketing
50 LF
M-43
Piping System & Size: 2” Drainpipe (Bottom).
DESCRIPTION Deteriorated insulation and jacketing falling off.
Piping System & Size:
DESCRIPTION
Valves by the expansion loop
Exposed valves and pipe branches.
Piping System & Size:
DESCRIPTION
QUANTITY 20 LF
QUANTITY 50 LF
QUANTITY
PHOTO NO. M-44
PHOTO NO. M-45
PHOTO NO.
2” Drainpipe.
Disintegrating insulation.
50 LF
M-46
14” HPS H&G Line
No Insulation jacketing
50 LF
M-46
Project No. SE332
SECTION NO. 3030
SECTION NO. 3034
-525-
PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately.
PRIORITY LEVEL P1 – Most serious priority – must be repaired/ replaced immediately.
Piping System & Size:
May 17, 2024
DESCRIPTION
QUANTITY
PHOTO NO.
14” HPS F line 14” HPS G line
Frayed insulation and wear, and tear on the jacketing.
150 LF
M-47
2 x 6 ” CHW system
Frayed insulation and wear, and tear on the jacketing.
150 LF
M-48
2” Drainpipe
Frayed insulation and wear, and tear on the jacketing.
150 LF
M-48
Steam Valves, branch pipes.
There is a leak at this valve station. Branch pipes to the valves are exposed.
-
M-49
Piping System & Size: 14” HPS G line
DESCRIPTION Hole in the insulation and the canvas covering as well
QUANTITY 3 LF
PHOTO NO. M-50
Project No. SE332
-526-
Mechanical Photo Log
May 17, 2024
Project No. SE332
PHOTO NO. M-1 SECTION NO. 1 PRIORITY LEVEL: P2 Piping System & Size: 36 “ PCHWS DESCRIPTION: Frayed jacketing. 20 ft
PHOTO NO. M-2 SECTION NO. 1 PRIORITY LEVEL: P2 Piping System & Size: 12” Pipe with fiberglass – unknown system. DESCRIPTION: Frayed insulation 10 ft
-527-
May 17, 2024
Project No. SE332
PHOTO NO. M-3 SECTION NO. 2 PRIORITY LEVEL: P1 Piping System & Size: 48” condensate. DESCRIPTION: Heavily damaged. 20 ft
PHOTO NO. M-4 SECTION NO. 3 PRIORITY LEVEL: P-1 Piping System & Size: 14” HPS – Right Wall DESCRIPTION: Insulation missing at one segment and frayed jacketing elsewhere. 30 ft.
-528-
May 17, 2024
Project No. SE332
PHOTO NO. M-4 SECTION NO. 3 PRIORITY LEVEL: P1 Piping System & Size: 12” DCWS – Right Wall DESCRIPTION: Insulation missing at one segment and frayed jacketing elsewhere. 30 ft.
PHOTO NO. M-4 SECTION NO. 3 PRIORITY LEVEL: P2 Piping System & Size: 8” CPD DESCRIPTION: Frayed insulation
-529-
May 17, 2024
Project No. SE332
-530-
May 17, 2024
PHOTO NO. M-5 SECTION NO. 4,5,6 PRIORITY LEVEL: P2 Piping System & Size: 14” PCHWR DESCRIPTION: Frayed Insulation 130 ft
PHOTO NO. SECTION NO. 4 PRIORITY LEVEL P2 Piping System & Size: 14” HPS DESCRIPTION: Frayed Insulation. 10 ft
No Picture
Project No. SE332
PHOTO NO. M-6 SECTION NO. 6 PRIORITY LEVEL: P2 Piping System & Size: 48” Condensate pipe 36” PCHWS DESCRIPTION: Frayed Insulation 50 ft
PHOTO NO. M-7 SECTION NO. 6 PRIORITY LEVEL:
Piping System & Size: 12” DCHWS 14” HPS DESCRIPTION: Wear and tear on the jacketing.
-531-
May 17, 2024
Project No. SE332
PHOTO NO. M-8 SECTION NO. 10,11 PRIORITY LEVEL: P2 Piping System & Size: 2 x 6” DCWS 8” DCWS 14” CHWS & 14” CHWR DESCRIPTION: Frayed Insulation 250 LF
PHOTO NO. M-9 SECTION NO. 17 PRIORITY LEVEL:
Piping System & Size: 14” HPS 12” DCHWS 8” CPD DESCRIPTION: Wear and tear on the jacketing and spots of frayed insulation. Missing insulation at elbow joints 100 ft
-532-
May 17, 2024
Project No. SE332
PHOTO NO. M-10 SECTION NO. 18 PRIORITY LEVEL: P3 Piping System & Size: 14” HPS, 12” DCHWS, 10” RFWS, 8” CPD DESCRIPTION: Frayed insulation jacketing.
200 LF
PHOTO NO. M-11 SECTION NO. 18 PRIORITY LEVEL: P3 Piping System & Size: 48” Cond. & 36” PCHWS DESCRIPTION: Frayed insulation jacketing.
200 LF
-533-
May 17, 2024
Project No. SE332
PHOTO NO.M-12 SECTION NO. 21 PRIORITY LEVEL P1 Piping System & Size: 48” Cond. & 36” PCHWS DESCRIPTION: Missing Insulation. 30 ft
PHOTO NO. M-13 SECTION NO. 25 PRIORITY LEVEL: P1 Piping System & Size: 48” Cond. DESCRIPTION: Missing Insulation. 30 ft
-534-
May 17, 2024
Project No. SE332
-535-
May 17, 2024
PHOTO NO. M-14 SECTION NO. 28 PRIORITY LEVEL: P1 Piping System & Size: Valving Station and exposed pipe connections. DESCRIPTION: Missing Insulation
PHOTO NO. M-15 SECTION NO. 28 PRIORITY LEVEL: P2 Piping System & Size: 48” Cond & 36” PCHWS DESCRIPTION: Frayed Insulation. 15 ft
No picture
Project No. SE332
-536-
May 17, 2024
PHOTO NO. M-16 SECTION NO. 35 PRIORITY LEVEL: P1 Piping System & Size: 48” Cond. & 36” PCHWS DESCRIPTION: Torn off jacketing, frayed insulation. 50 ft
PHOTO NO. SECTION NO. 35 PRIORITY LEVEL: P2 Piping System & Size: 14” HPS, 8” CPD, 2 x 6” DCWS, 36” CHS & 36” CHR DESCRIPTION: Frayed Insulation 100 ft.
No Picture
Project No. SE332
PHOTO NO. M-17 SECTION NO. 38 PRIORITY LEVEL: P1 Piping System & Size: Valving station. Exposed valving system. DESCRIPTION: Missing insulation on the valves.
PHOTO NO. M-18 SECTION NO. 47 PRIORITY LEVEL: P2 Piping System & Size: 30” PCHWS DESCRIPTION: Frayed Insulation 10 LF
-537-
May 17, 2024
Project No. SE332
PHOTO NO. M-19 SECTION NO. 48 PRIORITY LEVEL: P1 System & Size: Stormwater Sump Pump DESCRIPTION: Not operational duplex pump
PHOTO NO. M-20 SECTION NO. 48 PRIORITY LEVEL: P1 System & Size: Pump DESCRIPTION: Not operational duplex pump being serviced.
-538-
May 17, 2024
Project No. SE332
PHOTO NO. M-21 SECTION NO. 48 PRIORITY LEVEL: P2 Piping System & Size: Left wall bottom pipe (PCHWR) DESCRIPTION: Frayed insulation and jacketing. 20 ft
PHOTO NO. M-22 SECTION NO. 60 PRIORITY LEVEL: P1 Piping System & Size: 8” CWS & CWR DESCRIPTION: Missing pipe and transition pipe fitting insulation
-539-
May 17, 2024
Project No. SE332
PHOTO NO. M-23 SECTION NO. 60 PRIORITY LEVEL: P1 Piping System & Size 8” RPWS, 20” PCHWR, 20” PCHWS DESCRIPTION: Exposed piping is rusted, needs insulation. 150 ft
PHOTO NO. M-24 SECTION NO. 60 PRIORITY LEVEL: P1 Piping System & Size 8” RPWS, 20” PCHWR, 20” PCHWS DESCRIPTION: Valving station by the pipes mentioned here are exposed. Need insulation.
-540-
May 17, 2024
Project No. SE332
PHOTO NO. M-25 SECTION NO. 60 PRIORITY LEVEL: P1 Piping System & Size: 14” HPS, 8” CPD, 12” DCWS & 2 x 8” CHW DESCRIPTION: Frayed insulation. 200 LF
PHOTO NO. M-26 SECTION NO. 61 PRIORITY LEVEL: P1 Piping System & Size: 30” PCHWR & 20” PCHWR DESCRIPTION: Frayed Insulation. 100 ft.
-541-
May 17, 2024
Project No. SE332
PHOTO NO. M-27 SECTION NO. 63 PRIORITY LEVEL: P1 Piping System & Size: Valving station valves and branch pipes. DESCRIPTION: Valving station valves and branch pipes are exposed.
PHOTO NO. M-28 SECTION NO. 63 PRIORITY LEVEL: P1 Piping System & Size: 30” PCHWR & 20” PCHWR DESCRIPTION: Frayed piping insulation and disintegrated jacketing. 500 ft.
-542-
May 17, 2024
Project No. SE332
PHOTO NO. M-29 SECTION NO. 3001 PRIORITY LEVEL: P-2 Piping System & Size: 18” HPS F-LINE DESCRIPTION: Frayed insulation. 5 ft
PHOTO NO. M-30 SECTION NO. 3001 PRIORITY LEVEL: P-2 Piping System & Size: 6” Chilled water system DESCRIPTION: Chilled water supply and return pipes have wear and tear on the jacketing. 20 ft
-543-
May 17, 2024
Project No. SE332
PHOTO NO. M-31 SECTION NO. 3002 PRIORITY LEVEL: P2
Piping System & Size: 6” Chilled Water Supply and Return DESCRIPTION: Wear and tear on the insulation jacketing.
PHOTO NO. M-32 SECTION NO. 3003 PRIORITY LEVEL: P1 Piping System & Size: Valves on the 18” HPS lines. DESCRIPTION: Exposed valves, no insulation on pipes connecting the valves.
-544-
May 17, 2024
Project No. SE332
PHOTO NO. M-33 SECTION NO. 3003 PRIORITY LEVEL: P1 Piping System & Size: F-LINE 18” HPS DESCRIPTION: Frayed insulation on the elbow up section. 10 ft.
PHOTO NO. M-34 SECTION NO. 3003 PRIORITY LEVEL: P1 Piping System & Size: 18” Orange Pipe. DESCRIPTION: Frayed insulation on the orange pipe. The pipe elbows up in this section. 20 ft
-545-
May 17, 2024
Project No. SE332
PHOTO NO. M-35 SECTION NO. 3004 PRIORITY LEVEL: P-2 Piping System & Size: 18” HPS F-Line DESCRIPTION: F line has frayed insulation. 20 ft.
PHOTO NO. M-36 SECTION NO. 3004 PRIORITY LEVEL: P-1 Piping System & Size: Valving station between F & G Line DESCRIPTION: Exposed valves and pipes at the connection points.
-546-
May 17, 2024
Project No. SE332
PHOTO NO. M-37 SECTION NO. 3007 PRIORITY LEVEL: P3 Piping System & Size: 18” HPS white wrapping. F & G Line. DESCRIPTION: The insulation jacketing has wear and tear. 50 ft.
PHOTO NO. M-38 SECTION NO. 3010 PRIORITY LEVEL: P-1 Piping System & Size: 18” HPS below 6” CHWS DESCRIPTION: Missing insulation jacketing. 50 ft.
-547-
May 17, 2024
Project No. SE332
PHOTO NO. M-39 SECTION NO. 3011 PRIORITY LEVEL: P1 Piping System & Size: Overhead, 20” Chilled Water Pipe. DESCRIPTION: Dented Vinyl covering
PHOTO NO. M-39 SECTION NO. 3011 PRIORITY LEVEL: P-1 Piping System & Size: 18” HPS branch elbow up. DESCRIPTION: Exposed piping, jacketing wear, and tear. 10 ft.
-548-
May 17, 2024
Project No. SE332
PHOTO NO. M-40 SECTION NO. 3012 PRIORITY LEVEL: P-1 Piping System & Size: 6” CHW piping. DESCRIPTION: The CHW pipe has exposed sections, no insulation jacketing. 20 ft.
PHOTO NO. M-41 SECTION NO. 3013 PRIORITY LEVEL: P2 Piping System & Size: 18” HPS F & G Line, 2x6” CHW pipes. DESCRIPTION: Temporary jacketing starting to disintegrate in this section. 50 ft.
-549-
May 17, 2024
Project No. SE332
PHOTO NO. M-42 SECTION NO. 3015 PRIORITY LEVEL: P2 Piping System & Size: 2 x 20” CHW (bottom) 2 x 6” CHW (ceiling) DESCRIPTION: Wear and Tear on the jacketing 50 ft.
PHOTO NO. M-43 SECTION NO. 3015 PRIORITY LEVEL: P3 Piping System & Size: 18” HPS F line 18” HPS G line DESCRIPTION: Wear and Tear on the jacketing 50 ft.
-550-
May 17, 2024
Project No. SE332
PHOTO NO. M-44 SECTION NO. 3017 PRIORITY LEVEL: P1 Piping System & Size: 2” Drainpipe (Bottom). DESCRIPTION: Deteriorated insulation and jacketing falling off. 20 ft.
PHOTO NO. M-45 SECTION NO. 3020 PRIORITY LEVEL: P1 Piping System & Size: Valves by the expansion loop DESCRIPTION: Exposed valves and pipe branches.
-551-
May 17, 2024
Project No. SE332
PHOTO NO. M-46 SECTION NO. 3024 PRIORITY LEVEL: P1 Piping System & Size: 2” Drainpipe. 14” HPS H&G Line DESCRIPTION: Disintegrating insulation. 50 ft.
PHOTO NO. M-47 SECTION NO. 3030 PRIORITY LEVEL: P1 Piping System & Size: 14” HPS F line 14” HPS G line DESCRIPTION: Frayed insulation and wear, and tear on the jacketing. 150 ft
-552-
May 17, 2024
Project No. SE332
PHOTO NO. M-48 SECTION NO. 3030 PRIORITY LEVEL: P1 Piping System & Size: 2x6” CHW system 2” Drainpipe DESCRIPTION: Frayed insulation and wear, and tear on the jacketing. 150 ft.
PHOTO NO. M-49 SECTION NO. 3030 PRIORITY LEVEL: P1 Piping System & Size: Steam Valves, branch pipes. DESCRIPTION: There is a leak at this valve station. Branch pipes to the valves are exposed.
-553-
May 17, 2024
Project No. SE332
PHOTO NO. M-50 SECTION NO. 3034 PRIORITY LEVEL: P1 Piping System & Size: 14” HPS G line DESCRIPTION: Hole in the insulation and the canvas covering as well
-554-
May 17, 2024
Project No. SE332
-555-
Appendix 4: Electrical Detailed Findings
May 17, 2024
82
81
79
1 2
80
78
X = DEFICIENCY FOUND 3
4 5
77 76 73
60 57 58
17
63 62
Dat eSav ed:2/ 15/ 2024• Aut hor :E. But t er f i el d
22
64
61
23 24
33 49
25
35
26
44
50
53
56
21
19
68
52
55
10
20
18
69
59
54
7
16
65
67
1 1
15
70
9
14
74
71
8
13
75
72
66
6
12
27
43 51
28
45
29
46 47 48
39 42
41
40
34
30
36
31
37
32
38
OGS Cold Tunnel Electrical Section Maps Utility Tunnel Evaluation
Scale 1" = 280'
CHA Project No. 080577
Image Courtesy of the NYS Office of Information Technology Services, GIS Program Office Photo Date: 2021
Project No. SE332
-557-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
1
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Column
Outlet – loose/missing cover with exposed wire Outlet – missing cover
1
E-1
1
E-2
Wall
Junction Box – loose/missing cover with exposed wire
1
E-3
Column
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Column
Outlet – impact damage
1
E-4
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
4
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between Columns
Exposed wire
10 feet
E-5
Between Columns
Broken/damaged hanger caused conduit to break apart and leaving wire exposed Broken hanger led to broken conduit and exposed wire
1
E-6
1
E-7
Between Columns
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
9
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between Columns
Top of raceway missing. Exposed Wires
8 feet
E-8
Project No. SE332
-558-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
11
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Wall
Junction box rusted
1
E-9
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
12
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
Raceway is beginning to split
1
E-10
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
14
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
Exposed wire
1
E-11
Between columns
Raceway has general damage leading to exposed wires.
3 feet
E-12
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
16
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
Broken hanger, general damage, and exposed wiring
1
E-13
Project No. SE332
-559-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
19
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
Top of raceway not secured in place
1
E-14
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
21
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
General damage, exposed wiring
1
E-15
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
25
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
General damage, exposed wiring
1
E-16
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
31
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
High voltage junction box open
1
E-17
Between columns
General damage, rust
1
E-18
Project No. SE332
-560-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
35
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Wall
Junction Box – loose/missing cover with exposed wire Junction Box – loose/missing cover with exposed wire
1
E-19
1
E20
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
37
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Column
Outlet – loose/missing cover with exposed wire
1
E-21
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
38
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Column
Outlet – loose/missing cover with exposed wire
1
E-22
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
45
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Ceiling
Junction Box – loose/missing cover with exposed wire
1
E-23
Wall
Project No. SE332
-561-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
48
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Ground
Junction Box – loose/missing cover with exposed wire Junction Box – loose/missing cover with exposed wire
1
E-24
1
E-25
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
49
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Ceiling
Exposed wires
1
E-26
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
50
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
Exposed “Danger” wires
1
E-27
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
52
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Wall
Junction Box – loose/missing cover with exposed wire Junction Box – loose/missing cover with exposed wire
1
E-28
1
E-29
Wall
Ceiling
Project No. SE332
-562-
LOCATION
May 17, 2024
SECTION NO.
PRIORITY LEVEL
DESCRIPTION
QUANTITY
55
P2 – Medium-level priority – must be addressed within the next 3-5 years.
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
60
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Column
Outlet – loose/missing cover with exposed wire
1
E-31
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
62
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Wall
Raceway missing cover. Exposed wiring
1
E-32
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
74
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
Junction Box – loose/missing cover with exposed wire
1
E-33
High moisture in area due to nonoperational pumps
PHOTO NO. E-30
Project No. SE332
-563-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
75
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Ceiling
Junction box- general damage
1
E-34
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
78
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
Conduit damage. Exposed wire
1
E-35
Ceiling
Junction box- general damage
1
E-36
3037
3038
3036 3035 3034 3033 3032 3031 3015
3028
3030
3014
3027
3029
3013
3006 3005
3010
3012
3009
301 1
3026 3025
3019
3024
3008
3023
3007
3022
3004
3021
3003 3016
3020 3017
3002
3018
3001
Dat eSav ed:3/ 6/ 2024• Aut hor :E. But t er f i el d
3000
OGS Hot Tunnel Electrical Section Map Utility Tunnel Evaluation
Scale 1" = 200'
CHA Project No. 080577
Image Courtesy of the NYS Office of Information Technology Services, GIS Program Office Photo Date: 2021
Project No. SE332
-565-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3001
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Wall
Junction Box – loose/missing cover with exposed wire
1
E-37
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3004
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
Most hangers and supports are insufficient – or damaged along the line.
1
E-38
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3010
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Between columns
Missing support hangers
1
E-39
Project No. SE332
-566-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3012
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Ceiling
1
E-40
1
E-41
Ceiling
Junction Box – loose/missing cover with exposed wire Junction Box – loose/missing cover with exposed wire Lowlighting levels in area
1
E-42
Ceiling
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3013
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Ceiling
Junction Box – loose/missing cover with exposed wire
1
E-43
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3018
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Wall
Light is out
1
E-44
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3019
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Wall
Light is out
1
-
Project No. SE332
-567-
May 17, 2024
SECTION NO.
PRIORITY LEVEL
LOCATION
DESCRIPTION
QUANTITY
PHOTO NO.
3024
P2 – Medium-level priority – must be addressed within the next 3-5 years.
Wall
Light is out
1
E-45
Project No. SE332
-568-
Electrical Photo Log
May 17, 2024
Project No. SE332
PHOTO NO. E-1 SECTION NO. 1 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Column DESCRIPTION: Outlet – loose/missing cover with exposed wire
PHOTO NO. E-2 SECTION NO. 1 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Column DESCRIPTION: Outlet – loose/missing cover with exposed wire
-569-
May 17, 2024
Project No. SE332
-570-
PHOTO NO. E-3 SECTION NO. 1 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Wall DESCRIPTION: Junction Box – loose/missing cover with exposed wire
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
-571-
PHOTO NO. E-4 SECTION NO. 3 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Column DESCRIPTION: Outlet – impact damage
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION:
DESCRIPTION:
PAGE INTENTIONALLY BLANK
May 17, 2024
Project No. SE332
PHOTO NO. E-5 SECTION NO. 4 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Exposed wire
PHOTO NO. E-6 SECTION NO. 4 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Broken/damaged hanger caused conduit to break apart and leaving wire exposed
-572-
May 17, 2024
Project No. SE332
-573-
PHOTO NO. E-7 SECTION NO. 4 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Broken hanger led to broken conduit and exposed wire
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-574-
PHOTO NO. E-8 SECTION NO. 9 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Top of raceway missing. Exposed Wires
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-575-
PHOTO NO. E-9 SECTION NO. 11 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Wall DESCRIPTION: Junction box rusted
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-576-
PHOTO NO. E-10 SECTION NO. 12 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Raceway is beginning to split
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
PHOTO NO. E-11 SECTION NO. 14 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Exposed wire
PHOTO NO. E-12 SECTION NO. 14 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Raceway has general damage leading to exposed wires.
-577-
May 17, 2024
Project No. SE332
-578-
PHOTO NO. E-13 SECTION NO. 16 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Broken hanger, general damage, and exposed wiring
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-579-
PHOTO NO. E-14 SECTION NO. 19 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Top of raceway not secured in place
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-580-
PHOTO NO. E-15 SECTION NO. 21 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: General damage, exposed wiring
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-581-
PHOTO NO. E-16 SECTION NO. 25 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: General damage, exposed wiring
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
PHOTO NO. E-17 SECTION NO. 31 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: High voltage junction box open
PHOTO NO. E-18 SECTION NO. 31 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: General damage, rust.
-582-
May 17, 2024
Project No. SE332
PHOTO NO. E-19 SECTION NO. 35 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Wall DESCRIPTION: Junction Box – loose/missing cover with exposed wire
PHOTO NO. E-20 SECTION NO. 35 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Wall DESCRIPTION: Junction Box – loose/missing cover with exposed wire
-583-
May 17, 2024
Project No. SE332
-584-
PHOTO NO. E-21 SECTION NO. 37 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Column DESCRIPTION: Outlet – loose/missing cover with exposed wire
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-585-
PHOTO NO. E-22 SECTION NO. 38 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Column DESCRIPTION: Outlet – loose/missing cover with exposed wire
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-586-
PHOTO NO. E-23 SECTION NO. 45 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Ceiling DESCRIPTION: Junction Box – loose/missing cover with exposed wire
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
PHOTO NO. E-24 SECTION NO. 48 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Ground DESCRIPTION: Junction Box – loose/missing cover with exposed wire
PHOTO NO. E-25 SECTION NO. 48 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Wall DESCRIPTION: Junction Box – loose/missing cover with exposed wire
-587-
May 17, 2024
Project No. SE332
-588-
PHOTO NO. E-26 SECTION NO. 49 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Ceiling DESCRIPTION: Exposed wires
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-589-
PHOTO NO. E-27 SECTION NO. 50 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Exposed “Danger” wires
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
PHOTO NO. E-28 SECTION NO. 52 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Wall DESCRIPTION: Junction Box – loose/missing cover with exposed wire
PHOTO NO. E-29 SECTION NO. 52 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Ceiling DESCRIPTION: Junction Box – loose/missing cover with exposed wire
-590-
May 17, 2024
Project No. SE332
-591-
PHOTO NO. E-30 SECTION NO. 55 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Floor DESCRIPTION: High moisture due to non-operational pumps
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-592-
PHOTO NO. E-31 SECTION NO. 60 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Column DESCRIPTION: Outlet – loose/missing cover with exposed wire
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-593-
PHOTO NO. E-32 SECTION NO. 62 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Wall DESCRIPTION: Raceway missing cover. Exposed wiring
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-594-
PHOTO NO. E-33 SECTION NO. 74 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Junction Box – loose/missing cover with exposed wire
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-595-
PHOTO NO. E-34 SECTION NO. 75 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Ceiling DESCRIPTION: Junction box- general damage
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
PHOTO NO. E-35 SECTION NO. 78 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Conduit damage. Exposed wire
PHOTO NO. E-36 SECTION NO. 78 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Ceiling DESCRIPTION: Junction box- general damage
-596-
May 17, 2024
Project No. SE332
-597-
PHOTO NO. E-37 SECTION NO. 3001 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Wall DESCRIPTION: Junction Box – loose/missing cover with exposed wire
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-598-
PHOTO NO. E-38 SECTION NO. 3004 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Most hangers and supports are insufficient – or damaged along the line.
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-599-
PHOTO NO. E-39 SECTION NO. 3010 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Between columns DESCRIPTION: Missing support hangers
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
PHOTO NO. E-40 SECTION NO. 3012 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Ceiling DESCRIPTION: Junction Box – loose/missing cover with exposed wire
PHOTO NO. E-41 SECTION NO. 3012 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Ceiling DESCRIPTION: Junction Box – loose/missing cover with exposed wire
-600-
May 17, 2024
Project No. SE332
-601-
PHOTO NO. E-42 SECTION NO. 3012 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Ceiling DESCRIPTION: Lowlighting levels in area
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-602-
PHOTO NO. E-43 SECTION NO. 3013 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Ceiling DESCRIPTION: Junction Box – loose/missing cover with exposed wire
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-603-
PHOTO NO. E-44 SECTION NO. 3018 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Wall DESCRIPTION: Light is out
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-604-
PHOTO NO. E-45 SECTION NO. 3024 PRIORITY LEVEL: P2 – Medium-level Priority LOCATION: Wall DESCRIPTION: Light is out
PHOTO NO. SECTION NO. PRIORITY LEVEL:
LOCATION: PAGE INTENTIONALLY BLANK DESCRIPTION:
May 17, 2024
Project No. SE332
-605-
Appendix 5: Limited Survey for ACM’s and PCB’s Report
May 17, 2024
HAZARDOUS MATERIALS SURVEY REPORT Study to Evaluate Utility Tunnels Empire State Plaza Albany, New York Project Site # SE332 CHA Project Number: 080577 March 2024
Prepared for:
NYS Office of General Services Empire State Plaza Albany, New York 12203 Prepared by: CHA Consulting, Inc. 3 Winners Circle Albany, New York 12205 : (518) 453-3915
This document is intended for the use of the individual or entity for which it was prepared and may contain information that is privileged, confidential, and exempt from disclosure under applicable law. Any dissemination, distribution, or copying of this document is strictly prohibited.
QUALIFICATIONS AND CERTIFICATION STATEMENT This Hazardous Materials Survey Report was compiled by a qualified environmental scientist who is also an EPA-trained and a NYSDOL certified asbestos building inspector employed by CHA. This report has been prepared expressly for the use of The New York State Office of General Services. No other parties are entitled to rely upon this report unless our express written consent is first obtained. All conclusions drawn were based on CHA’s review of available historical data, field inspection and analytical results from sampling performed during the course of this project. Recommendations are submitted based on CHA's knowledge, experience, and professional judgment. This inspection report shall not solely serve as an asbestos abatement design document for obtaining bids from abatement contractors. It is recommended that specific abatement design documents be prepared in order to specify procedures and protocols that must be observed in order to ensure that abatement activities are completed in a manner consistent with local, state and federal regulations and requirements prior to any planned mechanical and/or structural work within the tunnel system. Inspection and Report Completed By:
Robert G. Burbank Scientist II
Report Reviewed By:
James Morey Senior Scientist V
PAGE i OGS | EMPIRE STATE PLAZA UTILITY TUNNELS CHA PROJECT NUMBER 085077.000
TABLE OF CONTENTS 1.0
INTRODUCTION .............................................................................................................1
2.0
SCOPE OF WORK ..........................................................................................................1 2.1 Limitations............................................................................................................2
3.0
HAZARDOUS MATERIALS SURVEY .............................................................................2 3.1 Record Review ....................................................................................................2 3.2 ACM Survey.........................................................................................................2 3.2.1 Cold Tunnel ..............................................................................................3 3.2.2 Hot Tunnel................................................................................................3 3.2.3 OGS Hot Tunnel .......................................................................................3 3.3 Lead-Based Paint Survey ....................................................................................4 3.4 PCB Caulk / Sealant Inventory .............................................................................4 3.5 Additional Hazardous Materials Inventory ............................................................4
4.0
RESULTS........................................................................................................................4
5.0
CONCLUSIONS AND RECOMMENDATIONS ................................................................8 5.1 Conclusions .........................................................................................................8 5.2 Recommendations ...............................................................................................8
LIST OF TABLES Table 4-1
Asbestos-Containing Material Summary
LIST OF FIGURES Figure 1 Figure 2
Cold Tunnel Sample Location Plan Hot Tunnel Sample Location Plan
LIST OF APPENDICES Appendix A-1 Appendix A-2
Asbestos Bulk Sample Summary Table Room by Room Table
Appendix B Appendix C Appendix D Appendix E
Lead Sample Summary Table PCB Sample Summary Table Photo Log Asbestos Bulk Sample Analytical Report
Appendix F Appendix G Appendix H
PCB Analytical Report LBP Analytical Report Personnel and Laboratory
V:\Projects\ANY\K6\080577.000\08_Reports\Hazmat Assessment\FINAL\OGS ESP Utility Tunnel Study Hazardous Material Report.docx PAGE ii OGS | EMPIRE STATE PLAZA UTILITY TUNNELS CHA PROJECT NUMBER 085077.000
1.0
INTRODUCTION
CHA was retained by the New York State Office of General Services to complete a hazardous material survey of the Empire State Plaza utility tunnels in Albany, New York. The scope areas within the utility tunnels are shown on Figures 1 and 2, attached to this report. This survey was performed to support the overall existing conditions assessment of the tunnel system and ensure that hazardous materials are properly identified prior to any work that will impact them. This survey report consists of five sections, including this Introduction. Section 2.0 presents the Scope of Work, which outlines the parameters by which this project was performed and the limitations that were encountered. Section 3.0 – Hazardous Materials Survey, details the findings of the inspection and suspect materials identified. Section 4.0 presents a brief overview of the inspection results while Section 5.0 presents CHA’s conclusions and recommendations regarding the hazardous building materials identified as part of this survey and any additional investigations that are recommended.
2.0
SCOPE OF WORK
CHA’s survey of the ESP “hot” and “cold” tunnels was completed per Chapter 9.8 – “Hazardous Materials Guide of the NYSOGS Design Procedures Manual”. This includes the visual identification and sampling of suspect asbestos-containing materials, lead-based paints, PCBcontaining caulks/sealants, and a visual inspection for Mercury-containing items, PCB-containing items (transformers/ballasts), Chlorofluorocarbons (CFCs), Bird Droppings and Mold. During the asbestos inspection, bulk samples of identified suspect asbestos-containing materials were collected based on the protocols referenced in 40 CFR Part 763.86 Subpart E (AHERA). All bulk samples collected by CHA as part of this current inspection effort were transmitted under chain of custody protocol to Atlas Environmental Lab, Corp. (Atlas), a laboratory accredited by the NYSDOH Environmental Laboratory Approval Program (ELAP-11999) for asbestos analysis. An investigation was conducted for lead-based paint (LBP) associated with the utility tunnels. Paint chip samples were also transmitted to Atlas for laboratory analysis via Flame Atomic Absorption. CHA also performed an inspection of the project scope areas for the presence of caulks and sealants suspected to contain polychlorinated biphenyls (PCBs). CHA Collected grab samples of the identified suspect caulks and sealants and those samples were analyzed for PCB content via EPA Method 8082 by CHEMTECH (now Alliance) (NELAP – 11376).
PAGE 1 OGS | EMPIRE STATE PLAZA UTILITY TUNNELS CHA PROJECT NUMBER 085077.000
2.1
Limitations
This Hazardous Materials Survey is limited to the utility tunnel areas servicing the Empire State Plaza as shown in Figures 1 and 2. Areas not shown on the attached figures are considered out of scope and were not inspected as part of this survey. Regarding the lead-based paint inspection portion of this hazardous materials survey; The purpose of the lead-based paint inspection and sample collection was for worker exposure during any repair/replacement work and is not a surface-by-surface inspection or a risk assessment for building occupants.
3.0
HAZARDOUS MATERIALS SURVEY
CHA performed the survey site visit from January 17, 2024, and January 22 ,2024. CHA’s background research and field observations during the site inspection with regard to suspect hazardous materials are discussed below. 3.1
Record Review
CHA was not provided any applicable historical records (reports, abatement records, etc.) prior to this survey. 3.2
ACM Survey
The survey was completed by Robert Burbank (#23-61GTF-SHAB) and Andrew Petrilli (#236L7P8-SHAB), NYS Department of Labor certified asbestos inspectors. Copies of Mr. Burbank’s and Mr. Petrilli’s licenses and the laboratory certifications can be found in Appendix I. The objective of this survey is to identify and sample all suspect asbestos-containing materials (SACMs) prior to any recommended repairs of the utility tunnel walls and ceiling, piping, and associated structural supports. For the purpose of this stand-alone report the utility tunnels were broken up into three segments with multiple sections. These three segments and their sections can be seen in figures 1 and 2. : 1. Cold Tunnels 2. Hot Tunnels 3. OGS Hot Tunnels
PAGE 2 OGS | EMPIRE STATE PLAZA UTILITY TUNNELS CHA PROJECT NUMBER 085077.000
3.2.1
Cold Tunnel
The Cold Tunnels consist of concrete walls and ceilings, and intermittent CMU (Concrete Masonry Unit) walls throughout with multiple sections of piping of various diameters running alongside perimeter walls on both sides throughout. Within the cold tunnel, CHA observed a CDST line with a canvas overwrap and rubber fittings; HPS and CPS pipes with a canvas overwrap and plaster pipe insulation and fitting insulation within; a smaller water line with fiberglass insulation and canvas wrapped plaster fitting insulation; as well as DCWS, PCHWR&S, CHWR&S, RWPS, EDP and other unnamed pipes with a paper/foil jacket to fiberglass insulation and plastic fittings. Within the last section of the cold tunnel, CHA also observed large job-molded plaster fittings on a 20” PCHWR line that was unique to that section. In addition to various pipe insulation, CHA observed red and green flange gaskets, tar sealant on a remnant section of overhead piping, overhead duct sealant on a single section of ductwork, and a 12” cast iron drain sealant. 3.2.2
Hot Tunnel
The Hot Tunnel consists of concrete walls and ceilings with multiple sections of piping of various diameters running alongside the perimeter walls and ceiling throughout. Within the hot tunnel, CHA observed an F and G line with wet lagging and canvas overwrap on plaster pipe insulation and fitting insulation; overhead pipes with a canvas overwrap on plaster insulation and 4” bare job molded plaster fitting insulation; an 8” unmarked line with canvas overwrap on fiberglass insulation and plastic fittings; as well as a 20” CHWS&R pipes with a paper/foil jacket on fiberglass insulation and plastic fittings that also has intermittent places with canvas and an underlying tar/felt paper jacket. 3.2.3
OGS Hot Tunnel
The OGS Hot Tunnel consists of concrete walls and ceilings, with intermittent CMU walls, and brick window coverings. Various sealants were observed at concrete wall expansion joints, along where concrete walls meet the concrete floor, and at pipe penetrations. CHA also observed multiple sections of piping of various diameters running alongside the perimeter walls and ceiling throughout. CHA observed an F and G line that is primarily canvas overwrap to fiberglass insulation and plaster fittings, that at the last two sections converts to plaster pipe insulation and fittings. Additionally, CHA observed a CHWS&R line, and a drain line with a paper/foil jacket on fiberglass insulation and plastic fittings. All suspect materials not previously sampled, were quantified, sampled, and transmitted under proper chain of custody protocol for asbestos laboratory analysis and analytical results can be found in Appendix E. All of the bulk samples that were collected from each of the utility tunnels and their sections are PAGE 3 OGS | EMPIRE STATE PLAZA UTILITY TUNNELS CHA PROJECT NUMBER 085077.000
summarized in Table A-1 located in Appendix A. Table A-1 lists each bulk sample, the location from which it was collected, and also provides the analytical result for each sample. Table A-1 is not intended to outline all locations throughout the scope areas where ACMs exist. Table A-2, the Room-by-Room Inventory, summarizes all suspect, assumed, and confirmed asbestos materials that were observed. For each suspect material in each location, the asbestos content is provided. If the asbestos content is greater than 1.0% asbestos by weight the material is considered an asbestos-containing material. An estimated quantity is provided in Table A-2 for each confirmed or assumed asbestos-containing material in each area or section of utility tunnel. 3.3
Lead-Based Paint Survey
The project scope areas were inspected for the presence of painted surfaces. Multiple painted surfaces were observed that could be impacted as a result of any repairs/replacements/renovations. 32 paint chip samples were collected by CHA on walls, pipe insulation jackets, pipe supports, mechanical and structural components, and etc. and analyzed by Atlas for % lead by weight. See Appendix G for analytical results as well as Table B-1 appended to this report for a sample summary.
3.4
PCB Caulk / Sealant Inventory
CHA performed an inspection of the utility tunnels for the presence of caulks and sealants suspected to contain PCBs. CHA collected eight samples of eight different caulks and/or sealants observed on a ductwork seam, pipe seams, expansion joints and wall penetrations. All caulks/sealants were analyzed for PCBs under EPA Method 8082. See Appendix F for analytical results as well as Table C-1 appended to this report for a sample summary. 3.5
Additional Hazardous Materials Inventory
CHA also inspected the subject area for the presence lighting fixtures, PCB-containing ballasts, mercury-containing thermostat switches and controls. Fluorescent bulbs were observed in Cold Tunnel section 7B and labeled non-PCB containing ballasts were found disconnected in a box within the Hot Tunnels. There were no CFC-containing equipment observed, nor any mold growth or bird droppings/guano observed either.
4.0
RESULTS
CHA identified 113 suspect asbestos-containing materials during the asbestos survey. A total of 285 individual bulk samples were collected and 18 asbestos-containing materials were confirmed through laboratory analysis. All confirmed ACMs are summarized in Table 4-1 below along with quantities present and the condition of the materials observed. PAGE 4 OGS | EMPIRE STATE PLAZA UTILITY TUNNELS CHA PROJECT NUMBER 085077.000
PAGE 5 OGS | EMPIRE STATE PLAZA UTILITY TUNNELS CHA PROJECT NUMBER 085077.000
Table 4-1. Asbestos-Containing Material Summary Material
Location
Estimated Quantity
Friability / Condition
Cold Tunnel Overhead Duct Sealant
Tunnel 3 Landing on Ductwork Seam
20" PCHWR Elbow Plaster Insulation
Tunnel 11
2" Water Line Plaster Fitting Insulation Plaster Pipe Insulation to CPD Pipes (and any associated ancillary pipes) Plaster Fitting Insulation to CPD Pipes (and any associated ancillary pipes) Linear Plaster Pipe and Fitting insulation to HPS Pipes (and any associated ancillary pipes) Linear Plaster Fitting insulation to HPS Pipes (and any associated ancillary pipes)
5 LF (Sealant)
Non-Friable, Good
5 EA
Friable, Good
10 EA
Friable, Good
Entire Tunnel System
5,790 LF
Friable, Good
Entire Tunnel System
159 EA
Friable, Good
Entire Tunnel System
5,690 LF
Friable, Good
Entire Tunnel System
206 EA
Friable, Good
Tunnel 6-11
Hot Tunnel CPD Line Plaster Pipe Insulation G-Line Plaster Pipe Insulation G-Line Plaster Fitting Insulation
Entire Tunnel System Entire Tunnel System Entire Tunnel System
F-Line Plaster Pipe Insulation F-Line Plaster Fitting Insulation
1594 LF
Friable, Good
1594 LF
Friable, Good
15 EA
Friable, Good
Entire Tunnel System
1594 LF
Friable, Good
Entire Tunnel System
15 EA
Friable, Good
PAGE 6 OGS | EMPIRE STATE PLAZA UTILITY TUNNELS CHA PROJECT NUMBER 085077.000
Material
Location
Estimated Quantity
Friability / Condition
4" Overhead Line Bare Job Molded Plaster Fitting
Hot Tunnel Upper South and Upper North
24 EA
Friable, Good
OGS Hot Tunnels CHWS and CHWR Linear Plaster Pipe Insulation
Section 5 and 6
268 LF
Friable, Good
Section 6
4 EA
Friable, Good
G-Line Plaster Pipe and Fitting Insulation
Section 5 and 6
268 LF
Friable, Good
F-Line Plaster Pipe and Fitting Insulation
Section 5 and 6
268 LF
Friable, Good
Black Pipe Sealant on Wall Penetration
Section 4
1 SF
Non-Friable, Good
CHWS and CHWR Linear Plaster Fitting Insulation
CHA identified eight suspect PCB caulks/sealants during the survey. . A total of eight individual grab samples were collected and transmitted to CHEMTECH under proper chain of custody protocol and analyzed for PCBs under EPA Method 8082. Upon analysis, the Overhead Duct Sealant, 12” Cast Iron Drain Sealant, Brown Pipe Sealant to Wall Penetration, and Red Fire Caulk to Wall Penetration were found to have detectable levels of PCBs of 4.3, 6.3, 1, and 0.89 parts per million (PPM) respectively. All of which are below the Toxic Substances Control Act (TSCA) regulatory threshold of 50 PPM. CHA collected thirty-two paint chip samples from subject areas. Upon analysis, Dull Gray Paint to Valve CW58 and Yellow Hand Rail Paint were found to have detectable levels of lead above the 0.5% EPA threshold of lead-based paint. Additionally, the Green Paint to Paper Jacket FG Insulation on 36" Pipe, Dark Green Paint to Paper Jacket on 36" Pipe, Beige Paint on "Y" Valve, Blue Painted 20" PCHWR Elbow, Orange Paint to 4" CPD Line, Green Girder Paint, and Grey Paint to Metal Door / Door Jamb / Door Frame were found to have detectable levels of lead below the 0.5% EPA threshold, which classifies them as lead-containing paint for having any detectable concentration of lead. The remaining samples were found to have no detectable levels of lead above the laboratory detection limit (Less than 0.03% by weight). All of the paint chip samples collected throughout the subject tunnels are summarized in Appendix B, including the collection location, paint description, and the analytical result for each sample. The lead paint chip analytical report is provided as Appendix G. PAGE 7 OGS | EMPIRE STATE PLAZA UTILITY TUNNELS CHA PROJECT NUMBER 085077.000
5.0
CONCLUSIONS AND RECOMMENDATIONS
Based upon the scope of work outlined in Section 2.0 of this report and CHA’s review of the analytical results and observations made during the inspection, the following conclusions and recommendations have been developed. 5.1
Conclusions
•
A total of 18 ACMs were confirmed to be present within the subject sections of tunnel through laboratory analysis.
•
Lead-based paints coat the pipe valves and handrails. Additionally, lead-containing paints were confirmed on green fiberglass paper jackets, “Y” valves, blue pipe insulation jackets, orange pipe insulation jackets, and metal doors.
•
Eight suspect caulks/sealants were found within the project scope areas. Non were found to be PCB-containing with levels that exceed the TSCA threshold of 50 PPM.
•
Sixteen fluorescent light tubes/bulbs were found in Cold Tunnel Section 7B, and no mercury-containing thermostats are located in the scope area. Labeled non-PCB containing ballasts were disconnected in a box within the Hot Tunnel. Additionally, there was no mold or bird guano present within the sections of tunnel inspected.
5.2
Recommendations
Based on the site inspection and analysis of samples, CHA has developed the following recommendations: •
18 ACMs were identified throughout the subject tunnels. These ACMs may be impacted or disturbed by future projects and will require removal prior to that work by a licensed asbestos abatement contractor.
•
EPA and HUD consider paint greater than 0.5% lead by weight to be a lead-based paint. In addition, any measurable amount of lead in paint requires compliance with the OSHA Lead in Construction Standard. As a result, any work that impacts painted surfaces containing lead, the OSHA Lead in Construction Standard must be followed by the contractor and all waste should be characterized to determine lead content for disposal.
•
If additional suspect materials are discovered during future projects within the subject
PAGE 8 OGS | EMPIRE STATE PLAZA UTILITY TUNNELS CHA PROJECT NUMBER 085077.000
tunnels that have not been identified within this hazardous materials survey report, those materials should be assumed to be asbestos-containing and treated as such until they have been sampled by a NYS-certified asbestos building inspector and analyzed for asbestos. •
Per New York State Code Rule 56-5.1(g) Transmittal of Building/Structure Asbestos Survey Information, information from the building survey shall be immediately transmitted by the government or the Contracting Officer to the entity charged with issuing a permit for such demolition, renovation, remodeling, or repair work under applicable State or local laws. New York State considers any removal of load bearing structural supports as a demolition activity. If load bearing structural supports are impacted by future projects within the subject tunnels, it is also the building owner’s responsibility to transmit this report to the local asbestos control bureau district office. Asbestos Control Bureau District Office New York State Department of Labor Division of Safety and Health State Office Campus, Room 157, Albany, NY 12240
PAGE 9 OGS | EMPIRE STATE PLAZA UTILITY TUNNELS CHA PROJECT NUMBER 085077.000
FIGURES
02B 14A 14D 17A
01 02 03
31B 31C 31E
1
21 11A 11B 11C 11D
30A 30B 30C
11E 11F 34B 34E
30D 30E 30F
2
10
09 10 11
29AA 29BB 29CC 29A 29B 29C 29D 29E 29F
12 13
14 15 16
4
09A 16A 16B 18A 18B 18C 17
5
5a
6
31F
12A 12D 13A
08A 08B PCB-01234-03
14B 14C
6a
6b 15A 15B 33A
34D 38B
20B 21B 38A
39A 39B
32A 32B 32C 32D 32E 32F 33C 33E
7 18 19
7a
6c
28D 28E 28F
2b
3
07A 07B PCB-01234-01 PCB-01234-02
7b
12B 12C 12E 12F 13B PCB-01234-04
28A 28B 28C 07 08
2a
8
19A 19B 37A 37B
31A 31D
04 05 06
20
36D 36E 36F 40A 40B
31A 31D 33B
11
9 01A 01B 02A 36A 36B 36C
21A 22A 22B 23A
18D 18E 18F 20A 34A 34F
03A 03B 04A 04B 05A 05B 06A
10A 10B 25A 25B 35A 35B
5b
26A 26B 26C 27A 27B 34C
24A 24B 24C 24D 24E 24F
LEGEND
ASBESTOS BULK SAMPLE
01A
PCB BULK SAMPLE
PCB-01234-01
LEAD BASED PAINT SAMPLE
01A SCALE: 1" = 150' Drawing Copyright © 2024
III Winners Circle, PO Box 5269 Albany, NY 12205-0269 518.453.4500 . www.chasolutions.com
SAMPLE LOCATION PLAN COLD TUNNEL UTILITY TUNNEL EVALUATION EMPIRE STATE PLAZA ALBANY, NEW YORK
PROJECT NO. 080577
DATE: 03/2024 FIGURE 2
82A 83A 84A 85A 86A 87A
87B 91B 88A 92B 88B 93B 89A 108A 89B 108B 90B 108C PCB-01234-06 PCB-01234-07
PCB-01234-05 PCB-01234-08 30 31 32
3
1 2
"OGS HOT TUNNEL"
91A 91C 92A 93A 93C 110A
82B 83B 84B 85B 86B 90A 90C 94A 94B 94C 95A 95B
62B 64A 64B 65B 67A 67B 68A
62C 64C 65C 67C 69B
69A 70A 71A 81A 81B 81C
69C 70B 70C 71A 71B 78C 78D 79A 79B
56B 57B 80A 80B
98A 98B 98C 99A 109A 109B
6
UPPER NORTH
UPPER SOUTH
95C 96A 96B 97A 97B 97C
110B 111A 111B 112A 112B 113A 113B
22 23 24 25 26 27 28 29
4
5 99B 100A 100B 100C 101A 101B 101C 102A
102B 102C 103A 103B 103C 104A 104B 104C
105A 107C 105B 105C 106A 106B 106C 107A 107B
"HOT TUNNEL"
SOUTH
56A 57A 58A 58B 59A 59B 60A 60B 60C 61A 61B 61C
72A 72B 72C 73A 73B 74A 75A 76A 77A 77B 77C 78A 78B
62A 63A 63B 63C 65A 66A
66B 66C 75B 75C 76B
LEGEND
ASBESTOS BULK SAMPLE
01A
PCB BULK SAMPLE
PCB-01234-01
LEAD BASED PAINT SAMPLE
01A
SCALE: 1" = 150' Drawing Copyright © 2024
III Winners Circle, PO Box 5269 Albany, NY 12205-0269 518.453.4500 . www.chasolutions.com
SAMPLE LOCATION PLAN HOT TUNNEL UTILITY TUNNEL EVALUATION EMPIRE STATE PLAZA ALBANY, NEW YORK
PROJECT NO. 080577
DATE: 03/2024 FIGURE 1
APPENDIX A-1 Asbestos Bulk Sample Summary Table
CHA Consulting, Inc.
SAMPLE NUMBER
SUSPECT MATERIAL DESCRIPTION
SAMPLE LOCATION
01A 01B 02A 02B 03A 03B 04A 04B 05A 05B 06A 06B 07A 07B 08A 08B 09A 11A 11B 11C 11D 11E 11F 12A 12B 12C 12D 12E 12F
Parge Coat (Wall) Parge Coat (Wall) CMU (Wall) CMU (Wall) Red Gasket Material to Vertical 24" Fitting Red Gasket Material to Vertical 24" Fitting Red Gasket Material to 48" Cleanout Red Gasket Material to 48" Cleanout Y Drain Green Gasket Material Y Drain Green Gasket Material Y" Drain Red Gasket Material Y" Drain Red Gasket Material Overhead Duct Sealant Overhead Duct Sealant 2" PVC Penetrations to Wall Sealant 2" PVC Penetrations to Wall Sealant Bulk Debris 20" PCHWR Elbow Plaster Insulation 20" PCHWR Elbow Plaster Insulation 20" PCHWR Elbow Plaster Insulation 20" PCHWR Elbow Canvas Wrap 20" PCHWR Elbow Canvas Wrap 20" PCHWR Elbow Canvas Wrap 2" Water Line Plaster Fitting Insulation 2" Water Line Plaster Fitting Insulation 2" Water Line Plaster Fitting Insulation Canvas Overwrap to 2" Water Line Fitting Canvas Overwrap to 2" Water Line Fitting Canvas Overwrap to 2" Water Line Fitting
Tunnel 7B Tunnel 7B Tunnel 7B Tunnel 1 Tunnel 4 (Left) Tunnel 4 (Left) Tunnel 4 (Left) Tunnel 4 (Left) Tunnel 4 (Left) Tunnel 4 (Right) Tunnel 4 (Right) Tunnel 2 Tunnel 3 Landing Tunnel 3 Landing Tunnel 6B Tunnel 6B Tunnel 4 (Left) Tunnel 11 Tunnel 11 Tunnel 11 Tunnel 11 Tunnel 11 Tunnel 11 Tunnel 6 Tunnel 6 (Far End) Tunnel 6 (Far End) Tunnel 6 (Far End) Tunnel 6 (Far End) Tunnel 6 (Far End)
ASBESTOS CONTENT (%) NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD 11% CHRY NA/PS NAD NAD NAD 8.5% CHRY NA/PS NA/PS NA/PS NA/PS NA/PS NAD (Positive due to 12B) 11% CHRY NA/PS NAD (Positive due to 12B) NAD (Positive due to 12B) NAD (Positive due to 12B)
Pre-Demolition ACM Survey
CHA Consulting, Inc.
SAMPLE NUMBER
SUSPECT MATERIAL DESCRIPTION
SAMPLE LOCATION
13A 13B 14A 14B 14C 14D 15A 15B 16A 16B 17A 17B 18A 18B 18C 18D 18E 19A 19B 20A 20B 21A 21B 22A 22B 23A 23B 24A 24B 24C 24D 24E 24F 25A 25B 26A
Paper / Foil to Linear FG Insulation on 2" Waterline Paper / Foil to Linear FG Insulation on 2" Waterline Concrete (Floor) Concrete (Floor) Concrete (Wall) Concrete (Wall) Paper / Foil to FG on 4-Way MPS Line Paper / Foil to FG on 4-Way MPS Line New Far 12" Line Paper / Foil to FG New Far 12" Line Paper / Foil to FG Paper / Foil to FG on 14" Pipe Above LD Condensate Paper / Foil to FG on 14" Pipe Above Plaster Fitting to Valve CW58 Plaster Fitting to Valve CW58 Plaster Fitting to Valve CW58 Paper / Foil to FG to Plaster Fitting to Valve CW58 Paper / Foil to FG to Plaster Fitting to Valve CW58 12" Cast Iron Drain Sealant 12" Cast Iron Drain Sealant Paper / Foil to FG on 48" Pipe Paper / Foil to FG on 48" Pipe Overwrap to Foam on 48" Pipe Overwrap to Foam on 48" Pipe Canvas Overwrap on 36" Pipe Canvas Overwrap on 36" Pipe Paper / Foil to FG on 36" Pipe Paper / Foil to FG on 36" Pipe Plaster Insulation on 4"-6" Fitting DWCS Plaster Insulation on 4"-6" Fitting DWCS Plaster Insulation on 4"-6" Fitting DWCS Canvas Overwrap on 4"-6" Fitting DWCS Canvas Overwrap on 4"-6" Fitting DWCS Canvas Overwrap on 4"-6" Fitting DWCS Paper / Foil to FG on 4" OM Pipe Paper / Foil to FG on 4" OM Pipe 10" RWPS Mudded Fitting
Tunnel 6 Tunnel 6 (Far End) Tunnel 1 (Threshold / Doorway) Tunnel 2A (Far End) Tunnel 2A (Far End) Tunnel 1 (Threshold / Doorway) Tunnel 6A Tunnel 6A Tunnel 5 Tunnel 5 Tunnel 1 (Left) Tunnel 2 (Left) Tunnel 5 Tunnel 5 Tunnel 5 Tunnel 5 Tunnel 5 Tunnel 7 Tunnel 7 Tunnel 5 (Right) Tunnel 2B (Far End) Tunnel 1 Tunnel 2B (Far End) Tunnel 1 (Left Tunnel 1 (Left) Tunnel 1 (Left) Tunnel 2 (Left) Tunnel 5A (Left) Tunnel 5A (Left) Tunnel 5A (Left) Tunnel 5A (Left) Tunnel 5A (Left) Tunnel 5A (Left) Tunnel 4 (Left) Tunnel 4 (Left) Tunnel 5 (Right)
ASBESTOS CONTENT (%) NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD
Pre-Demolition ACM Survey
CHA Consulting, Inc.
SAMPLE NUMBER
SUSPECT MATERIAL DESCRIPTION
SAMPLE LOCATION
26B 26C 27A 27B 28A 28B 28C 28D 28E 28F 29AA 29BB 29CC 29A 29B 29C 29D 29E 29F 30A 30B 30C 30D 30E 30F 31A 31B 31C 31D 31E 31F 32A 32B 32C 32D 32E 32F 33A 33B 33C 33D 33E 33F
10" RWPS Mudded Fitting 10" RWPS Mudded Fitting 10" RWPS Paper / Foil to Linear FG Insulation 10" RWPS Paper / Foil to Linear FG Insulation 8" Horizontal MPS Line Plaster Elbow 8" Horizontal MPS Line Plaster Elbow 8" Horizontal MPS Line Plaster Elbow 8" MPS Horizontal Line Canvas to Elbow 8" MPS Horizontal Line Canvas to Elbow 8" MPS Horizontal Line Canvas to Elbow 4" Horizontal Pipe Across Platform Plaster Insulation 4" Horizontal Pipe Across Platform Plaster Insulation 4" Horizontal Pipe Across Platform Plaster Insulation 4" Horizontal Pipe Across Platform Inner Layer Fabric Wrap 4" Horizontal Pipe Across Platform Inner Layer Fabric Wrap 4" Horizontal Pipe Across Platform Middle Layer Fabric Wrap 4" Horizontal Pipe Across Platform Middle Layer Fabric Wrap 4" Horizontal Pipe Across Platform Outer Layer Fabric Wrap 4" Horizontal Pipe Across Platform Outer Layer Fabric Wrap Linear Plaster Insulation to Orange OH 2" Drain Line Linear Plaster Insulation to Orange OH 2" Drain Line Linear Plaster Insulation to Orange OH 2" Drain Line Canvas Wrap to Plaster Insulation to Orange 2" Drain Canvas Wrap to Plaster Insulation to Orange 2" Drain Canvas Wrap to Plaster Insulation to Orange 2" Drain Linear Plaster Insulation To 4" CPD Line Linear Plaster Insulation to 8" CPD Line Linear Plaster Insulation to 8" CPD Line Linear 4" CDP Canvas Overwrap Linear 8" CDP Canvas Overwrap Linear 8" CDP Canvas Overwrap Plaster Insulation To Orange 8" CDP Elbow Plaster Insulation To Orange 8" CDP Elbow Plaster Insulation To Orange 8" CDP Elbow Canvas Overwrap to Orange 8" CDP Elbow Canvas Overwrap to Orange 8" CDP Elbow Canvas Overwrap to Orange 8" CDP Elbow 14" HPS Plaster Fitting Insulation 14" HPS Plaster Fitting Insulation 14" HPS Plaster Fitting Insulation Canvas to 14" HPS Fitting Canvas to 14" HPS Fitting Canvas to 14" HPS Fitting
Tunnel 5 (Right) Tunnel 5 (Right) Tunnel 5 (Right) Tunnel 5 (Right) Tunnel 2A (Landing) Tunnel 2A (Landing) Tunnel 2A (Landing) Tunnel 2A (Landing) Tunnel 2A (Landing) Tunnel 2A (Landing) Tunnel 2A (Mid) Tunnel 2A (Mid) Tunnel 2A (Mid) Tunnel 2A (Mid) Tunnel 2A (Mid) Tunnel 2A (Mid) Tunnel 2A (Mid) Tunnel 2A (Mid) Tunnel 2A (Mid) Tunnel 10 Tunnel 10 Tunnel 10 Tunnel 10 Tunnel 10 Tunnel 10 Tunnel 1 (Right) Tunnel 11 (Left / Upper) Tunnel 11 (Left / Upper) Tunnel 1 (Right) Tunnel 11 Tunnel 11 Tunnel 2A Tunnel 2A Tunnel 2A Tunnel 2A Tunnel 2A Tunnel 2A Tunnel 6A Tunnel 6A Tunnel 6A Tunnel 1 (Right) Tunnel 2A (Right) Tunnel 2A (Right)
ASBESTOS CONTENT (%) NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD 1.8%CHRY 3.8%AMO NA/PS NA/PS NA/PS NA/PS NA/PS NA/PS NA/PS NA/PS 3.4%AMO NA/PS NA/PS NA/PS NA/PS NA/PS NAD (Positive due to 31B) 3.6% CHRY NA/PS NA/PS NA/PS NA/PS 4.3% CHRY NA/PS NA/PS NA/PS NA/PS NA/PS 4.2% CHRY NA/PS NA/PS NA/PS NA/PS NA/PS
Pre-Demolition ACM Survey
CHA Consulting, Inc.
SAMPLE NUMBER
SUSPECT MATERIAL DESCRIPTION
SAMPLE LOCATION
34A 34B 34C 34D 34E 34F 35A 35B 36A 36B 36C 36D 36E 36F 37A 37B 38A 38B 39A 39B 40A 40B 56A 56B 57A 57B 58A 58B 59A 59B 60A 60B 60C 61A 61B 61C
14" HPS Linear Plaster Insulation 14" HPS Linear Plaster Insulation 14" HPS Linear Plaster Insulation 14" HPS Linear Canvas Overwrap 14" HPS Linear Canvas Overwrap 14" HPS Linear Canvas Overwrap Paper / Foil to FG on 24" Vertical Pipe Paper / Foil to FG on 24" Vertical Pipe 6" Vertical HPS Line Linear Plaster Insulation 6" Vertical HPS Line Linear Plaster Insulation 6" Vertical HPS Line Linear Plaster Insulation 6" Vertical MPS Line Linear Canvas Overwrap 6" Vertical MPS Line Linear Canvas Overwrap 6" Vertical MPS Line Linear Canvas Overwrap Paper / Foil to FG on HPS Line Paper / Foil to FG on HPS Line 14" CHWS Horizontal Paper / Foil to FG 14" CHWS Horizontal Paper / Foil to FG Paper / Foil to FG 6" Horizontal Line Paper / Foil to FG 6" Horizontal Line Paper / Foil to 8" MPS Line Paper / Foil to 8" MPS Line 6" CHWR Line Paper/Foil to FG Insulation 6" CHWR Line Paper/Foil to FG Insulation 6" CHWS Line Paper/Foil to FG Insulation 6" CHWS Line Paper/Foil to FG Insulation 14" F-Line Paper/Foil to FG 14" F-Line Paper/Foil to FG 14" G-Line Paper/Foil to FG 14" G-Line Paper/Foil to FG 4" CPD Line Plaster Insulation 4" CPD Line Plaster Insulation 4" CPD Line Plaster Insulation 4" CPD Line Canvas Overwrap 4" CPD Line Canvas Overwrap 4" CPD Line Canvas Overwrap
Tunnel 5 (Right) Tunnel 11 Tunnel 5 (Left / Upper) Tunnel 6A Tunnel 11 Tunnel 5 (Left / Upper) Tunnel 4 (Left) Tunnel 4 (Left) Tunnel 7B Tunnel 7B Tunnel 7B Tunnel 7B Tunnel 7B Tunnel 7B Tunnel 7 Tunnel 7 Tunnel 2B (Far End) Tunnel 6A (Far End) Tunnel 2B (Far End) Tunnel 2B (Far End) Tunnel 7B Tunnel 7B Hot Tunnel South Hot Tunnel Upper South Hot Tunnel South Hot Tunnel Upper South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South
ASBESTOS CONTENT (%) NAD (Positive due to 34B) 4.2% AMO NA/PS NA/PS NA/PS NA/PS NAD NAD 6% CHRY NA/PS NA/PS NA/PS NA/PS NA/PS NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD 4.5%AMO NA/PS NA/PS NA/PS NA/PS NA/PS
Pre-Demolition ACM Survey
CHA Consulting, Inc.
SAMPLE NUMBER
SUSPECT MATERIAL DESCRIPTION
SAMPLE LOCATION
62A 62B 62C 63A 63B 63C 64A 64B 64C 65A 65B 65C 66A 66B 66C 67A 67B 67C 68A 68B 68C 69A 69B 69C
14" G-Line Plaster Insulation 14" G-Line Plaster Insulation 14" G-Line Plaster Insulation 14" G-Line Canvas Overwrap 14" G-Line Canvas Overwrap 14" G-Line Canvas Overwrap 14" G-Line Wet Lagging 14" G-Line Wet Lagging 14" G-Line Wet Lagging 14" F-Line Plaster Insulation 14" F-Line Plaster Insulation 14" F-Line Plaster Insulation 14" F-Line Canvas Overwrap 14" F-Line Canvas Overwrap 14" F-Line Canvas Overwrap 14" F-Line West Lagging 14" F-Line West Lagging 14" F-Line Wet Lagging 4" to 8" CPD (Bottom Pipe) Plaster Insulation 4" to 8" CPD (Bottom Pipe) Plaster Insulation 4" to 8" CPD (Bottom Pipe) Plaster Insulation 4" to 8" CPD (Bottom Pipe) Cloth Wrap 4" to 8" CPD (Bottom Pipe) Cloth Wrap 4" to 8" CPD (Bottom Pipe) Cloth Wrap
Hot Tunnel South Hot Tunnel Upper South Hot Tunnel Upper North Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel Upper South Hot Tunnel Upper South Hot Tunnel Upper North Hot Tunnel South Hot Tunnel Upper South Hot Tunnel Upper North Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel Upper South Hot Tunnel Upper South Hot Tunnel Upper North Hot Tunnel Upper South Hot Tunnel Upper North Hot Tunnel Upper North Hot Tunnel Upper South Hot Tunnel Upper North Hot Tunnel Upper North
70A
4" to 8" CPD (Top Pipe) Plaster Insulation
Hot Tunnel Upper South
70B 70C 71A 71B 71C 72A 72B 72C 73A 73B 74A 74B 74C
4" to 8" CPD (Top Pipe) Plaster Insulation 4" to 8" CPD (Top Pipe) Plaster Insulation 4" to 8" CPD (Top Pipe) Cloth Wrap 4" to 8" CPD (Top Pipe) Cloth Wrap 4" to 8" CPD (Top Pipe) Cloth Wrap OH 8" Condensate Line (Left) Canvas to FG OH 8" Condensate Line (Right) Canvas to FG OH 8" Condensate Line (Right) Canvas to FG 20" CHW Line (Bottom) Paper/Foil to FG 20" CHW Line (Bottom) Paper/Foil to FG 20" CHW Line (Bottom) Canvas to Paper/Foil to FG 20" CHW Line (Bottom) Canvas to Paper/Foil to FG 20" CHW Line (Bottom) Canvas to Paper/Foil to FG
Hot Tunnel Upper North Hot Tunnel Upper North Hot Tunnel Upper South Hot Tunnel Upper North Hot Tunnel Upper North Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South
ASBESTOS CONTENT (%) 4.9%AMO NA/PS NA/PS NA/PS NA/PS NA/PS NA/PS NA/PS NA/PS 5.3% AMO NA/PS NA/PS NA/PS NA/PS NA/PS NA/PS NA/PS NA/PS 5.3%AMO NA/PS NA/PS NA/PS NA/PS NA/PS 2.5%CHRY 5.6%AMO Total= 8.1% NA/PS NA/PS NA/PS NA/PS NA/PS NAD NAD NAD NAD NAD NAD NAD NAD
Pre-Demolition ACM Survey
CHA Consulting, Inc.
SAMPLE NUMBER
SUSPECT MATERIAL DESCRIPTION
SAMPLE LOCATION
75A 75B 75C 76A 76B 77A 77B 77C 78A 78B 78C 78D 79A 79B 80A 80B 81A 81B 81C 82A 82B 83A 83B 84A 84B 85A 85B 86A 86B 87A 87B 88A 88B
20" CHW Line (Top) Tar/Felt to FG 20" CHW Line (Top) Tar/Felt to FG 20" CHW Line (Top) Tar/Felt to FG 20" CHW Line (Top) Paper/Foil to Tar/Felt to FG 20" CHW Line (Top) Paper/Foil to Tar/Felt to FG 20" CHW Line (Top) Canvas to Paper/Foil to Tar/Felt to FG 20" CHW Line (Top) Canvas to Paper/Foil to Tar/Felt to FG 20" CHW Line (Top) Canvas to Paper/Foil to Tar/Felt to FG Concrete (Wall) Concrete (Wall) Concrete (Ceiling) Concrete (Ceiling) 4" Overhead Line Brown Cloth Wrap 4" Overhead Line Brown Cloth Wrap 4" Overhead Line Paper/Foil 4" Overhead Line Paper/Foil 4" Overhead Line Bare Job Molded Plaster Fitting 4" Overhead Line Bare Job Molded Plaster Fitting 4" Overhead Line Bare Job Molded Plaster Fitting HPS 14" Line (F) Paper/Foil to FG HPS 14" Line (F) Paper/Foil to FG HPS 14" Line (G) Paper/Foil to FG HPS 14" Line (G) Paper/Foil to FG CWS G Line Paper/Foil to FG CWS G Line Paper/Foil to FG CWR G Line Paper/Foil to FG CWR G Line Paper/Foil to FG 2" Drain Paper/Foil to FG 2" Drain Paper/Foil to FG Vertical Expansion Joint Caulk (Black) Vertical Expansion Joint Caulk (Black) Horizontal Seam Sealant (Grey) Horizontal Seam Sealant (Grey)
Hot Tunnel South Hot Tunnel Upper South Hot Tunnel Upper South Hot Tunnel South Hot Tunnel Upper South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel South Hot Tunnel Upper North Hot Tunnel Upper North Hot Tunnel Upper North Hot Tunnel Upper North Hot Tunnel Upper South Hot Tunnel Upper South Hot Tunnel Upper North Hot Tunnel Upper North Hot Tunnel Upper North Section 1 Section 4 Section 1 Section 4 Section 1 Section 4 Section 1 Section 4 Section 1 Section 4 Section 1 Section 1 Section 1 Section 1
ASBESTOS CONTENT (%) NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD 3.7% CHRY NA/PS NA/PS NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD
Pre-Demolition ACM Survey
CHA Consulting, Inc.
SAMPLE NUMBER
SUSPECT MATERIAL DESCRIPTION
SAMPLE LOCATION
89A 89B 90A 90B 90C 91A 91B 91C 92A 92B 92C 93A 93B 93C
Embedded Textured Material to Black Exp. Joint Embedded Textured Material to Black Exp. Joint HPS 14" G-Line Mudded Plaster Elbow Insulation HPS 14" G-Line Mudded Plaster Elbow Insulation HPS 14" G-Line Mudded Plaster Elbow Insulation HPS 14" G-Line Canvas Wrap to Pipe Elbow HPS 14" G-Line Canvas Wrap to Pipe Elbow HPS 14" G-Line Canvas Wrap to Pipe Elbow HPS 14" F-Line Mudded Plaster Elbow Insulation HPS 14" F-Line Mudded Plaster Elbow Insulation HPS 14" F-Line Mudded Plaster Elbow Insulation HPS 14" F-Line Canvas Wrap to Pipe Elbow HPS 14" F-Line Canvas Wrap to Pipe Elbow HPS 14" F-Line Canvas Wrap to Pipe Elbow
Section 1 Section 1 Section 4 Section 1 Section 5 Section 4 Section 1 Section 4 Section 4 Section 1 Section 5 Section 4 Section 1 Section 4
94A
CHWS Linear Plaster Pipe Insulation
Section 5
94B 94C 95A 95B 95C 96A 96B
CHWS Linear Plaster Pipe Insulation CHWS Linear Plaster Pipe Insulation CHWS Linear Over Wrap to Plaster Pipe Insulation CHWS Linear Over Wrap to Plaster Pipe Insulation CHWS Linear Over Wrap to Plaster Pipe Insulation CHWS Linear Paper/Foil to FG CHWS Linear Paper/Foil to FG
Section 5 Section 5 Section 5 Section 5 Section 5 Section 5 Section 5
97A
CHWR Linear Plaster Pipe Insulation
Section 5
97B 97C 98A 98B 98C 99A 99B
CHWR Linear Plaster Pipe Insulation CHWR Linear Plaster Pipe Insulation CHWR Linear Over Wrap to Plaster Pipe Insulation CHWR Linear Over Wrap to Plaster Pipe Insulation CHWR Linear Over Wrap to Plaster Pipe Insulation CHWR Linear Paper/Foil to FG CHWR Linear Paper/Foil to FG
Section 5 Section 5 Section 5 Section 5 Section 5 Section 5 Section 5
100A
CHWS Pipe Elbow Plaster Insulation
Section 5
100B 100C 101A 101B 101C
CHWS Pipe Elbow Plaster Insulation CHWS Pipe Elbow Plaster Insulation CHWS Canvas Wrap to Pipe Elbow CHWS Canvas Wrap to Pipe Elbow CHWS Canvas Wrap to Pipe Elbow
Section 5 Section 5 Section 5 Section 5 Section 5
102A
CHWR Pipe Elbow Plaster Insulation
Section 5
102B 102C 103A 103B 103C
CHWR Pipe Elbow Plaster Insulation CHWR Pipe Elbow Plaster Insulation CHWR canvas Wrap to Pipe Elbow CHWR canvas Wrap to Pipe Elbow CHWR canvas Wrap to Pipe Elbow
Section 5 Section 5 Section 5 Section 5 Section 5
ASBESTOS CONTENT (%) NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD 2.4%CHRY 5.1%AMO Total= 7.5% NA/PS NA/PS NA/PS NA/PS NA/PS NAD NAD 2.4%CHRY 5.1%AMO Total= 7.5% NA/PS NA/PS NA/PS NA/PS NA/PS NAD NAD 2.5%CHRY 5%AMO Total= 7.5% NA/PS NA/PS NA/PS NA/PS NA/PS 2.3%CHRY 8.2%AMO Total=11% NA/PS NA/PS NA/PS NA/PS NA/PS
Pre-Demolition ACM Survey
SAMPLE NUMBER
SUSPECT MATERIAL DESCRIPTION
SAMPLE LOCATION
104A 104B 104C 105A 105B 105C 106A 106B 106C 107A 107B 107C 108A 108B 108C 108D 109A 109B 10A 10B 110A 110B 111A 111B 112A 112B 113A 113B
G-Line Plaster Pipe Insulation G-Line Plaster Pipe Insulation G-Line Plaster Pipe Insulation G-Line Canvas Wrap to Pipe Insulation G-Line Canvas Wrap to Pipe Insulation G-Line Canvas Wrap to Pipe Insulation F-Line Plaster Pipe Insulation F-Line Plaster Pipe Insulation F-Line Plaster Pipe Insulation F-Line Canvas Wrap to Pipe Insulation F-Line Canvas Wrap to Pipe Insulation F-Line Canvas Wrap to Pipe Insulation Concrete (Floor) Concrete (Floor) Concrete (Wall) Concrete (Wall) CMU Wall CMU Wall 4" Pipe Overhead Black Sealant 4" Pipe Overhead Black Sealant Grout to Red Brick Inlay @ Tunnel Grout to Red Brick Inlay @ Tunnel Black Pipe Sealant on Wall Penetration Black Pipe Sealant on Wall Penetration Red Fire Caulk to Wall Penetration Red Fire Caulk to Wall Penetration Parge Coat to CMU Parge Coat to CMU
Section 5 Section 5 Section 5 Section 5 Section 5 Section 5 Section 5 Section 5 Section 5 Section 5 Section 5 Section 5 Section 1 Section 1 Section 1 Section 1 Section 5 Section 5 Tunnel 4 (Left) Tunnel 4 (Left) Section 4 Section 4 Section 4 Section 4 Section 4 Section 4 Section 4 Section 4
ASBESTOS CONTENT (%) 4.9%CHRY NA/PS NA/PS NA/PS NA/PS NA/PS 6.6%AMO NA/PS NA/PS NA/PS NA/PS NA/PS NAD NAD NAD NAD NAD NAD NAD NAD NAD NAD 9.2% CHRY NA/PS NAD NAD NAD NAD
lf- linear feet NA/PS- Not analyzed positive stop NAD- No Asbestos Detected sf- square feet
CHA Consulting, Inc.
Pre-Demolition ACM Survey
APPENDIX A-2 Room By Room Table
TABLE A-2 ROOM BY ROOM SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242
ROOM
NAME
SUSPECT MATERIALS
ASBESTOS CONTENT (%)
WALLS (SF)
CEILINGS (SF)
PIPE FITTING INSULATION (EA)
PIPE INSULATION (LF)
Cold Tunnel
Tunnel 1
CMU (Wall)
NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Overwrap to Foam on 48" Pipe (CDST Line)
NAD
Paper / Foil to FG on 48" Pipe (CDST Line)
NAD
Canvas Overwrap on 36" Pipe (PCHWR Line)
NAD
Paper / Foil to FG (PCHWR &S, DCWS, Unmarked)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
CMU (Wall)
NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Overwrap to Foam on 48" Pipe (CDST Line)
NAD
Paper / Foil to FG on 48" Pipe (CDST Line)
NAD
Canvas Overwrap on 36" Pipe (PCHWR Line)
Tunnel 2
Tunnel 2a
Tunnel 2b
285 13 285 6
NAD
Paper / Foil to FG (PCHWR &S, DCWS, Unmarked)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Y Drain Green Gasket Material Y Drain Red Gasket Material CMU (Wall)
NAD NAD NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Paper / Foil to FG (PCHWR &S, DCWS)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Y Drain Green Gasket Material Y Drain Red Gasket Material CMU (Wall)
NAD NAD NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
180 13 180 2
297 12 297 10
Paper / Foil to FG (PCHWR &S, DCWS)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
2
Plaster Pipe Insulation to CPD Line Plaster Pipe Fitting Insulation to CPD Line
3.6% CHRY 4.3% CHRY
2
Y Drain Green Gasket Material Y Drain Red Gasket Material
NAD NAD
168 168
OTHER THERMAL SYSTEM INSULATION (SF)
MISCELLANEOUS MATERIALS (LF/SF)
TABLE A-2 ROOM BY ROOM SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242
ROOM
NAME
Cold Tunnel
Tunnel 3
Tunnel 4
Tunnel 5
Tunnel 5a
SUSPECT MATERIALS
ASBESTOS CONTENT (%)
CMU (Wall)
NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Overwrap to Foam on 48" Pipe (CDST Line)
NAD
Paper / Foil to FG on 48" Pipe (CDST Line)
NAD
Canvas Overwrap on 36" Pipe (PCHWR Line)
NAD
Paper / Foil to FG (PCHWR &S, DCWS)
NAD
Overhead Duct Sealant
11% CHRY
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Y Drain Green Gasket Material Y Drain Red Gasket Material CMU (Wall)
NAD NAD NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Overwrap to Foam on 48" Pipe (CDST Line)
NAD
Paper / Foil to FG on 48" Pipe (CDST Line)
NAD
Canvas Overwrap on 36" Pipe (PCHWR Line)
NAD
Paper / Foil to FG (PCHWR &S, DCWS, Unmarked)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Y Drain Green Gasket Material Y Drain Red Gasket Material Red Gasket Material to 48" Cleanout Red Gasket Material to Vertical 24" Fitting CMU (Wall)
NAD NAD NAD NAD NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
10" RWPS Mudded Fitting
NAD
Paper / Foil to FG (PCHWR &S, DCWS, RPWS)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Y Drain Green Gasket Material Y Drain Red Gasket Material CMU (Wall)
NAD NAD NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Paper / Foil to FG (PCHWR &S, DCWS, RPWS)
NAD
Plaster Insulation on 4"-6" Fitting DWCS
NAD
Canvas Overwrap on 4"-6" Fitting DWCS
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Y Drain Green Gasket Material Y Drain Red Gasket Material
NAD NAD
WALLS (SF)
CEILINGS (SF)
PIPE FITTING INSULATION (EA)
PIPE INSULATION (LF)
OTHER THERMAL SYSTEM INSULATION (SF)
MISCELLANEOUS MATERIALS (LF/SF)
5 LF 440 15 440 12
210 7 210 3
600 2 600 2
125 9 135 9
TABLE A-2 ROOM BY ROOM SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242
ROOM
NAME
Cold Tunnel
Tunnel 5b
Tunnel 6
Tunnel 6a
Tunnel 6b
SUSPECT MATERIALS
ASBESTOS CONTENT (%)
CMU (Wall)
NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Paper / Foil to FG (DCWS, CWS)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Y Drain Green Gasket Material
NAD
Y Drain Red Gasket Material CMU (Wall)
NAD NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Paper / Foil to FG (PCHWR&S, DCWS, RPWS EDP Lines)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
WALLS (SF)
CEILINGS (SF)
PIPE FITTING INSULATION (EA)
160 12 160 5
378 15
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
8
2" Paper/Foil Jacket (Water Line) 2" Plaster Fitting Insulation (Water Line) 2" Canvas Wrap (Water Line)
6 6
CMU (Wall)
NAD NAD NAD NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Paper / Foil to FG (DCWS, RPWS, PCHWR&S)
NAD
10" RWPS Mudded Fitting
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Y Drain Green Gasket Material
NAD
Y Drain Red Gasket Material CMU (Wall)
NAD NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Paper / Foil to FG (DCWS, RPWS, PCHWR&S)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
PIPE INSULATION (LF)
378
230 15 230 8
342 2
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
2
2" Paper/Foil Jacket (Water Line) 2" Plaster Fitting Insulation (Water Line) 2" Canvas Wrap (Water Line)
NAD NAD NAD
2 2
Y Drain Green Gasket Material
NAD
Y Drain Red Gasket Material
NAD
342
OTHER THERMAL SYSTEM INSULATION (SF)
MISCELLANEOUS MATERIALS (LF/SF)
TABLE A-2 ROOM BY ROOM SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242
ROOM
NAME
Cold Tunnel
Tunnel 6c
Tunnel 7
Tunnel 7a
Tunnel 7b
SUSPECT MATERIALS
ASBESTOS CONTENT (%)
CMU (Wall)
NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Paper / Foil to FG (DCWS, RPWS, PCHWR&S)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
12" Cast Iron Drain Sealant
NAD
Y Drain Green Gasket Material
NAD
Y Drain Red Gasket Material
NAD
Paper / Foil to FG (PCHWR&S, DCWS, RPWS EDP Lines)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Y Drain Green Gasket Material Y Drain Red Gasket Material
NAD NAD
Paper / Foil to FG (PCHWR&S, DCWS, RPWS EDP Lines)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Paper / Foil to Linear FG Insulation on 2" Water line
NAD
2" Water Line Plaster Fitting Insulation
11% CHRY
Canvas Overwrap to 2" Water Line Fitting Y Drain Green Gasket Material Y Drain Red Gasket Material
NA/PS NAD NAD
Paper / Foil to FG (PCHWR&S, DCWS, RPWS EDP Lines)
NAD
10" RWPS Mudded Fitting
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Y Drain Green Gasket Material Y Drain Red Gasket Material
NAD NAD
WALLS (SF)
CEILINGS (SF)
PIPE FITTING INSULATION (EA)
PIPE INSULATION (LF)
325 13 325 10
351 4 351 4
205 4 205 5
1 1
150 8 150 8
OTHER THERMAL SYSTEM INSULATION (SF)
MISCELLANEOUS MATERIALS (LF/SF)
TABLE A-2 ROOM BY ROOM SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242
ROOM
NAME
Cold Tunnel
Tunnel 8
SUSPECT MATERIALS
ASBESTOS CONTENT (%)
Paper / Foil to FG (PCHWR&S, DCWS, EDP Lines)
NAD
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Y Drain Green Gasket Material Y Drain Red Gasket Material
NAD NAD NAD
Paper / Foil to FG (PCHWR&S, DCWS, EDP Lines)
Tunnel 9
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Paper / Foil to Linear FG Insulation on 2" Water line
NAD
2" Water Line Plaster Fitting Insulation
11% CHRY
Canvas Overwrap to 2" Water Line Fitting Y Drain Green Gasket Material Y Drain Red Gasket Material
NA/PS NAD NAD NAD
Paper / Foil to FG (PCHWR&S, DCWS, EDP Lines)
Tunnel 10
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Paper / Foil to Linear FG Insulation on 2" Water line
NAD
Y Drain Green Gasket Material Y Drain Red Gasket Material
NAD NAD NAD
Paper / Foil to FG (PCHWR&S, DCWS, EDP Lines)
WALLS (SF)
CEILINGS (SF)
PIPE FITTING INSULATION (EA)
PIPE INSULATION (LF)
102 2 102 2
297 7 312 7
1 1
297 7 327 10
20" PCHWR Elbow Plaster Insulation 20" PCHWR Elbow Canvas Wrap
Tunnel 11
Plaster Pipe Insulation to HPS Line
4.2% AMO
Plaster Fitting Insulation to HPS Line
4.2% CHRY
Plaster Pipe Insulation to CPD Line
3.6% CHRY
Plaster Pipe Fitting Insulation to CPD Line
4.3% CHRY
Paper / Foil to Linear FG Insulation on 2" Water line
NAD
Y Drain Green Gasket Material Y Drain Red Gasket Material
NAD NAD
525 45 565 44
OTHER THERMAL SYSTEM INSULATION (SF)
MISCELLANEOUS MATERIALS (LF/SF)
TABLE A-2 ROOM BY ROOM SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242
ROOM
NAME
SUSPECT MATERIALS
ASBESTOS CONTENT (%)
WALLS (SF)
CEILINGS (SF)
PIPE FITTING INSULATION (EA)
PIPE INSULATION (LF)
Cold Tunnel Hot Tunnel
South
Concrete Floor
NAD
Concrete Ceiling
NAD
14" G-Line Paper/Foil to FG (G-Line)
NAD
14" F-Line Paper/Foil to FG (F-Line)
NAD
6" CHWS Line Paper/Foil to FG Insulation (CHWS Line) 6" CHWR Line Paper/Foil to FG Insulation (CHWR Line) OH 8" Condensate Line (Left) Canvas to FG (OH Line) OH 8" Condensate Line (Right) Canvas to FG (OH Line) 20" CHW Line (Bottom) Canvas to Paper/Foil to FG (CHW Line) 20" CHW Line (Top) Canvas to Paper/Foil to Tar/Felt to FG (CHW Line)
NAD NAD NAD NAD NAD
4" CPD Line Plaster Insulation (CPD Line)
4.5% AMO
4" CPD Line Canvas Overwrap (CPD Line)
NA/PS
14" G-Line Plaster Insulation (G-Line) 14" G-Line Canvas Overwrap (G-line) 14" F-Line Plaster Insulation (F-Line) 14" F-Line Canvas Overwrap (F-line) Concrete Floor
4.9% AMO NA/PS 5.3% AMO NA/PS NAD
Concrete Ceiling
NAD
6" CHWS Line Paper/Foil to FG Insulation (CHWS Line) 6" CHWR Line Paper/Foil to FG Insulation (CHWR Line) 4" Overhead Line Paper/Foil
Upper South
NAD
NAD
14" G-Line Plaster Insulation (G-Line) 14" G-Line Canvas Overwrap (G-line) 14" G-Line Wet Lagging (G-line) 14" F-Line Plaster Insulation (F-Line) 14" F-Line Canvas Overwrap (F-line) 14" F-Line Wet Lagging
4.9% AMO NA/PS NA/PS 5.3% AMO NA/PS NA/PS 2.5% CHRY 5.6%AMO Total=8.1%
4" Overhead Line Bare Job Molded Plaster Fitting
5
240 240 240 240
NAD
NAD
4" to 8" CPD (Bottom Pipe) Plaster Insulation (CPD Line) 4" to 8" Canvas Overwrap (CPD Line)
240 5
NAD
4" Overhead Line Brown Cloth Wrap 20" CHW Line (Bottom) Canvas to Paper/Foil to FG (CHW Line) 20" CHW Line (Top) Canvas to Paper/Foil to Tar/Felt to FG (CHW Line)
4" to 8" CPD (Top Pipe) Plaster Insulation (CPD Line)
240
NAD NAD 5
5
448 448 10 448 448 10 448
5.3%AMO
448
NA/PS
448 x 2
3.7% CHRY
12
OTHER THERMAL SYSTEM INSULATION (SF)
MISCELLANEOUS MATERIALS (LF/SF)
TABLE A-2 ROOM BY ROOM SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242
ROOM
NAME
Cold Tunnel
SUSPECT MATERIALS
ASBESTOS CONTENT (%)
Concrete Floor
NAD
Concrete Ceiling
NAD
6" CHWS Line Paper/Foil to FG Insulation (CHWS Line) 6" CHWR Line Paper/Foil to FG Insulation (CHWR Line) 4" Overhead Line Paper/Foil
Upper North
PIPE INSULATION (LF)
5
458 458 10 458 458 458
NAD
14" G-Line Plaster Insulation (G-Line) 14" G-Line Canvas Overwrap (G-line) 14" G-Line Wet Lagging (G-line) 14" F-Line Plaster Insulation (F-Line) 14" F-Line Canvas Overwrap (F-line) 14" F-Line Wet Lagging (F-line)
4.9% AMO NA/PS NA/PS 5.3% AMO NA/PS NA/PS 2.5% CHRY 5.6%AMO Total=8.1%
NAD NAD
5
458
5.3%AMO
458
NA/PS
458x 2
4" Overhead Line Bare Job Molded Plaster Fitting
3.7% CHRY
Vertical Expansion Joint Caulk (Black)
NAD
Horizontal Seam Sealant (Grey)
NAD
Embedded Textured Material to Black Exp. Joint
NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Grout to Red Brick Inlay @ Tunnel
NAD
2" Drain Paper/Foil to FG
NAD
HPS 14" G-Line Mudded Plaster Elbow Insulation
NAD
HPS 14" G-Line Canvas Wrap to Pipe Elbow
NAD
HPS 14" Line (G) Paper/Foil to FG HPS 14" G-Line Mudded Plaster Elbow Insulation HPS 14" G-Line Canvas Wrap to Pipe Elbow CHWS Linear Paper/Foil to FG CHWR Linear Paper/Foil to FG
NAD NAD NAD NAD NAD
OGS Hot Tunnel
Tunnel 1
PIPE FITTING INSULATION (EA)
NAD
NAD
4" to 8" CPD (Bottom Pipe) Plaster Insulation (CPD Line) 4" to 8" Canvas Overwrap (CPD Line)
CEILINGS (SF)
NAD
4" Overhead Line Brown Cloth Wrap 20" CHW Line (Bottom) Canvas to Paper/Foil to FG (CHW Line) 20" CHW Line (Top) Canvas to Paper/Foil to Tar/Felt to FG (CHW Line)
4" to 8" CPD (Top Pipe) Plaster Insulation (CPD Line)
WALLS (SF)
12
OTHER THERMAL SYSTEM INSULATION (SF)
MISCELLANEOUS MATERIALS (LF/SF)
TABLE A-2 ROOM BY ROOM SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242
ROOM
NAME
Cold Tunnel
Tunnel 2
Tunnel 3
Tunnel 4
SUSPECT MATERIALS
ASBESTOS CONTENT (%)
Vertical Expansion Joint Caulk (Black)
NAD
Horizontal Seam Sealant (Grey)
NAD
Embedded Textured Material to Black Exp. Joint
NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Grout to Red Brick Inlay @ Tunnel
NAD
2" Drain Paper/Foil to FG
NAD
HPS 14" G-Line Mudded Plaster Elbow Insulation
NAD
HPS 14" G-Line Canvas Wrap to Pipe Elbow
NAD
HPS 14" Line (G) Paper/Foil to FG HPS 14" G-Line Mudded Plaster Elbow Insulation HPS 14" G-Line Canvas Wrap to Pipe Elbow CHWS Linear Paper/Foil to FG CHWR Linear Paper/Foil to FG Vertical Expansion Joint Caulk (Black)
NAD NAD NAD NAD NAD NAD
Horizontal Seam Sealant (Grey)
NAD
Embedded Textured Material to Black Exp. Joint
NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Grout to Red Brick Inlay @ Tunnel
NAD
2" Drain Paper/Foil to FG
NAD
HPS 14" G-Line Mudded Plaster Elbow Insulation
NAD
HPS 14" G-Line Canvas Wrap to Pipe Elbow
NAD
HPS 14" Line (G) Paper/Foil to FG HPS 14" G-Line Mudded Plaster Elbow Insulation HPS 14" G-Line Canvas Wrap to Pipe Elbow CHWS Linear Paper/Foil to FG CHWR Linear Paper/Foil to FG Vertical Expansion Joint Caulk (Black)
NAD NAD NAD NAD NAD NAD
Horizontal Seam Sealant (Grey)
NAD
Embedded Textured Material to Black Exp. Joint
NAD
Black Pipe Sealant on Wall Penetration
9.2% CHRY
Red Fire Caulk to Wall Penetration
NAD
Parge Coat to CMU
NAD
CMU Wall
NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Grout to Red Brick Inlay @ Tunnel
NAD
2" Drain Paper/Foil to FG
NAD
HPS 14" G-Line Mudded Plaster Elbow Insulation
NAD
HPS 14" G-Line Canvas Wrap to Pipe Elbow
NAD
HPS 14" Line (G) Paper/Foil to FG HPS 14" G-Line Mudded Plaster Elbow Insulation HPS 14" G-Line Canvas Wrap to Pipe Elbow CHWS Linear Paper/Foil to FG CHWR Linear Paper/Foil to FG CHWR Linear Paper/Foil to FG
NAD NAD NAD NAD NAD NAD
WALLS (SF)
CEILINGS (SF)
PIPE FITTING INSULATION (EA)
PIPE INSULATION (LF)
OTHER THERMAL SYSTEM INSULATION (SF)
MISCELLANEOUS MATERIALS (LF/SF)
1 SF
TABLE A-2 ROOM BY ROOM SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242
ROOM
NAME
Cold Tunnel
Tunnel 5
SUSPECT MATERIALS
ASBESTOS CONTENT (%)
Vertical Expansion Joint Caulk (Black)
NAD
WALLS (SF)
CEILINGS (SF)
PIPE FITTING INSULATION (EA)
PIPE INSULATION (LF)
Horizontal Seam Sealant (Grey)
NAD
Embedded Textured Material to Black Exp. Joint
NAD
CMU Wall
NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
Grout to Red Brick Inlay @ Tunnel
NAD
2" Drain Paper/Foil to FG
NAD
HPS 14" G-Line Mudded Plaster Elbow Insulation
NAD
HPS 14" G-Line Canvas Wrap to Pipe Elbow
NAD
HPS 14" Line (G) Paper/Foil to FG HPS 14" G-Line Mudded Plaster Elbow Insulation HPS 14" G-Line Canvas Wrap to Pipe Elbow CHWS Linear Paper/Foil to FG CHWR Linear Paper/Foil to FG
NAD NAD NAD NAD NAD
CHWS Linear Plaster Pipe Insulation
2.4%CHRY 5.1%AMO Total= 7.5%
70
CHWS Linear Over Wrap to Plaster Pipe Insulation
NA/PS
70
CHWR Linear Plaster Pipe Insulation
2.4%CHRY 5.1%AMO Total= 7.5%
70
NA/PS
70
4.9%CHRY NA/PS
70 70
CHWS Linear Over Wrap to Plaster Pipe Insulation G-Line Plaster Pipe Insulation G-Line Canvas Wrap to Pipe Insulation HPS 14" G-Line Mudded Plaster Elbow Insulation
NAD
F-Line Plaster Pipe Insulation F-Line Canvas Wrap to Pipe Insulation
6.6%AMO NA/PS
HPS 14" F-Line Mudded Plaster Elbow Insulation
NAD
14 70 70 14
OTHER THERMAL SYSTEM INSULATION (SF)
MISCELLANEOUS MATERIALS (LF/SF)
TABLE A-2 ROOM BY ROOM SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242
ROOM
NAME
Cold Tunnel
Tunnel 6
SUSPECT MATERIALS
ASBESTOS CONTENT (%)
Vertical Expansion Joint Caulk (Black)
NAD
WALLS (SF)
CEILINGS (SF)
PIPE FITTING INSULATION (EA)
PIPE INSULATION (LF)
Horizontal Seam Sealant (Grey)
NAD
Embedded Textured Material to Black Exp. Joint
NAD
Concrete (Floor)
NAD
Concrete (Wall)
NAD
2" Drain Paper/Foil to FG
NAD
HPS 14" G-Line Mudded Plaster Elbow Insulation
NAD
HPS 14" G-Line Canvas Wrap to Pipe Elbow
NAD
HPS 14" Line (G) Paper/Foil to FG HPS 14" G-Line Mudded Plaster Elbow Insulation HPS 14" G-Line Canvas Wrap to Pipe Elbow CHWS Linear Paper/Foil to FG CHWR Linear Paper/Foil to FG
NAD NAD NAD NAD NAD
CHWS Pipe Elbow Plaster Insulation
2.5%CHRY 5%AMO Total= 7.5%
4
CHWS Canvas Wrap to Pipe Elbow
NA/PS
4
CHWS Linear Plaster Pipe Insulation
2.4%CHRY 5.1%AMO Total= 7.5%
198
CHWS Linear Over Wrap to Plaster Pipe Insulation
NA/PS
198
CHWR Pipe Elbow Plaster Insulation
2.3%CHRY 8.2%AMO Total=11%
4
CHWR canvas Wrap to Pipe Elbow
NA/PS
4
CHWR Linear Plaster Pipe Insulation
2.4%CHRY 5.1%AMO Total= 7.5%
198
NA/PS
198
4.9%CHRY NA/PS
198 198
CHWR Linear Over Wrap to Plaster Pipe Insulation G-Line Plaster Pipe Insulation G-Line Canvas Wrap to Pipe Insulation HPS 14" G-Line Mudded Plaster Elbow Insulation
NAD
F-Line Plaster Pipe Insulation F-Line Canvas Wrap to Pipe Insulation
6.6%AMO NA/PS
HPS 14" F-Line Mudded Plaster Elbow Insulation
NAD
2 198 198 2
OTHER THERMAL SYSTEM INSULATION (SF)
MISCELLANEOUS MATERIALS (LF/SF)
APPENDIX B Lead-Based Paint Sample Summary
TABLE B-1 LEAD PAINT SAMPLE SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242
SAMPLE ID
SUSPECT MATERIAL DESCRIPTION
SAMPLE LOCATION
LEAD CONTENT (% by wieght)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Brown/Green Painted Overwrap to Foam on Condensate Line Green Paint to Paper Jacketed FG Insul. on 36" Pipe Green Paint to Structural Steel on Concrete Pad Green Painted Paper Jacket to 48" Pipe Dark Green Paint to Paper Jacket on 36" Pipe Green Paint on Steel Girder Red / White Painted Canvas Overwrap to 4" OH Pipe Yellow Paint to Canvas Overwrap on 14" Pipe Turquoise Paint to Paper Jacket on 24" Vertical Line Beige Paint to Plastic Fitting on 48" Pipe White Paint on 30" Cast Iron Pipe / Drain Beige Paint on "Y" Valve Dark Green Paint on Metal Strut Red / Orange Paint on Metal Panel to 14" HPS Line Primer Under Dark Green Paint on Metal Strut Pea Green Paint to Canvas Overwrap on DWCS Line Dull Gray Paint to Valve CW58 Red Paint to 8" Cast Iron Drain / Pipe Yellow Paint to Paper Jacket to HPS Line Light Brown Paint to 12" Cast Iron Pipes Blue Painted 20" PCHWR Elbow Gray Paint to 6" CHW Lines Yellow Paint to 14" F Line Yellow Paint to 14" G Line Orange Paint to 4" CPD Line Dark Orange Paint to Overhead 8" Condensate Lines Marine Paint to 20" CHW Lines Green Girder Paint White Painted Concrete (Wall) Grey Paint to Metal Door / Door Jamb / Door Frame Yellow Hand Rail Paint Green Girder Paint
Cold Tunnel Section 1 West Cold Tunnel Section 1 West Cold Tunnel Section 1 West Cold Tunnel Section 2 West Cold Tunnel Section 2 West Cold Tunnel Section 2 West Cold Tunnel Section 2A Landing Cold Tunnel Section 2A "Mid" Cold Tunnel Section 4 (Left) Cold Tunnel Section 4 (Left) Cold Tunnel Section 4 (Left) Cold Tunnel Section 4 (Left) Cold Tunnel Section 4 (Left) Cold Tunnel Section 5 (Left) Cold Tunnel S5 (Left) Cold Tunnel S5 (Left) Cold Tunnel Section 5 Cold Tunnel Section 7 Cold Tunnel Section 7 Cold Tunnel Section 8 Cold Tunnel Section 11 Hot Tunnel 1 Hot Tunnel 1 Hot Tunnel 1 Hot Tunnel 1 Hot Tunnel 1 Hot Tunnel 1 Hot Tunnel 1 Hot Tunnel 1 Hot Tunnel 2 Hot Tunnel 2 Hot Tunnel 2
<0.03 0.4 <0.03 <0.03 0.1 0.03 <0.03 <0.03 <0.03 <0.03 <0.03 0.08 <0.03 <0.03 <0.03 <0.03 1.29 <0.03 <0.03 <0.03 0.09 <0.03 <0.03 <0.03 0.21 <0.03 <0.03 0.19 <0.03 0.36 13.7 <0.03
Notes: ND = Not Detected
APPENDIX C PCB Sample Summary Table
TABLE C-1 PCB BULK SAMPLE SUMMARY Empire State Plaza Utility Tunnels Albany, New York 12242 SAMPLE NUMBER
PCB CAULK DESCRIPTION
SAMPLE LOCATION
PCB-012324-01 PCB-012324-02 PCB-012324-03 PCB-012324-04 PCB-012324-05 PCB-012324-06 PCB-012324-07 PCB-012324-08
Overhead Duct Sealant Black Tar to 4" Overhead Pipe Length 2" PVC Sealant to Wall Penetration 12" Cast Iron Drain Sealant Black Expansion Joint Caulk Grey Sealant to Horizontal Concrete Slab Brown Pipe Sealant to Wall Penetration Red Fire Caulk to Wall Penetration
Cold Tunnel Section 3 Cold Tunnel Section 4 Cold Tunnel Section 6B Cold Tunnel Section 7 Hot Tunnel Section 1 Hot Tunnel Section 1 Hot Tunnel Section 4 Hot Tunnel Section 4
Notes: ND - Not Detected
PCB CONTENT (mg/Kg) (ppm) 4.3 ND ND 6.3 ND ND 1 0.89
APPENDIX D Photo Log
PCB Sample Analytical Report
Photo 1: Typical HPS and CPD Pipes with Asbestos-containing Plaster Pipe and Fitting Insulation and Typical DCWS Pipes with Non- asbestos Paper/foil jacket to Fiberglass Insulation in Cold Tunnel
Photo Log Empire State Plaza Utility Tunnel Study Albany, New York
Photo 2: Typical Asbestos-Containing Plaster Fitting Insulation to CPD and HPS Pipes in Cold Tunnel
Photo 3: Asbestos-Containing Elbow Plaster Insulation on 20” PCHWR Pipes in Cold Tunnel Photo Log Empire State Plaza Utility Tunnel Study Albany, New York
Photo 4: Asbestos-Containing Plaster Fitting Insulation to 2” Water Pipes in Cold Tunnel
Photo 5: Asbestos-Containing Overhead Duct Sealant in Cold Tunnel Photo Log Empire State Plaza Utility Tunnel Study Albany, New York
Photo 6: Typical HPS and CPD Pipes with Asbestos-containing Plaster Pipe and Fitting Insulation and Typical DCWS and CDST Pipes with Non- asbestos Paper/foil jacket to Fiberglass Insulation in Cold Tunnel Gasket
Photo 7: Typical PCHWS and PCHWR Pipes with Non- asbestos Paper/foil jacket to Fiberglass Insulation in Cold Tunnel Photo Log Empire State Plaza Utility Tunnel Study Albany, New York
Photo 8: Non-Asbestos Wall Sealant to 2” PVC Penetrations in Cold Tunnel
Photo 9: Non-Asbestos 12” Cast Iron Drain Sealant in Cold Tunnel Photo Log Empire State Plaza Utility Tunnel Study Albany, New York
Photo 10: G-Line, F-Line and Overhead CPD pipes with Asbestos-Containing Plaster Insulation and CHW and CHWS and CHWR Pipes with Non-Asbestos Paper/Foil Jacket to Fiberglass Insulation Photo Log Empire State Plaza Utility Tunnel Study Albany, New York
Photo 11: G-line Pipes with Asbestos-Containing Plaster Pipe insulation in Hot Tunnel
Photo 12 F-line Pipes with Asbestos-Containing Plaster Pipe insulation in Hot Tunnel Photo Log Empire State Plaza Utility Tunnel Study Albany, New York
Photo 13: Non-Asbestos Tar/felt to Fiberglass on CHW Pipes in Hot Tunnel
Photo 14: Non-PCB Containing Ballasts in Hot Tunnel Photo Log Empire State Plaza Utility Tunnel Study Albany, New York
Photo 15: G-Line, F-line, CHWS and CHWR Pipes with Asbestos-Containing Plaster Pipe Insulation and 2” Drainpipes with Non-Asbestos Paper/Foil to Fiberglass in OGS Hot Tunnels
Photo Log Empire State Plaza Utility Tunnel Study Albany, New York
Photo 16 : G-Line, F-line, CHWS and CHWR Pipes with Asbestos-Containing Plaster Fitting Insulation in OGS Hot Tunnels
Photo 17: Non-Asbestos Canvas Overwrap to G-Line, F-line, CHWS and CHWR Pipes in OGS Hot Tunnels Photo Log Empire State Plaza Utility Tunnel Study Albany, New York
Photo 18: Asbestos-Containing Black Pipe Sealant on Wall Penetration in OGS Hot Tunnels
Photo 19: Non-Asbestos Black Expansion Joint Sealant in OGS Hot Tunnels Photo Log Empire State Plaza Utility Tunnel Study Albany, New York
APPENDIX E Asbestos Bulk Sample Analytical Report
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date:
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
01A
BK0124337-1
Tunnel 7B - Parge Coat (Wall)
Grey, Homogeneous, Friable
01B
BK0124337-2
Tunnel 7B - Parge Coat (Wall)
02A
BK0124337-3
02B
PLM
TEM
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD Inconclusive
NAD
X
X
100%
NAD Inconclusive
NAD
X
X
0%
100%
NAD Inconclusive
NAD
X
X
8.4
0%
100%
NAD Inconclusive
NAD
X
X
3.7
0%
100%
NAD Inconclusive
NAD
X
X
Fibrous%
Non Fibrous%
Asbestos% &Type
Not Applicable
0%
100%
NAD
X
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
Tunnel 7B - CMU (Wall)
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
BK0124337-4
Tunnel 1 - CMU (Wall)
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
03A
BK0124337-5
Tunnel 4 (Left) - Red Gasket Material to Vertical 24" Fitting
Red, Homogeneous, Non-Fibrous
35.7 45.9 18.4
0%
100%
NAD Inconclusive
03B
BK0124337-6
Tunnel 4 (Left) - Red Gasket Material to Vertical 24" Fitting
Red, Homogeneous, Non-Fibrous
35.7 45.9 18.4
0%
100%
04A
BK0124337-7
Tunnel 4 (Left) - Red Gasket Material to 48" Cleanout
Red, Homogeneous, Non-Fibrous
35.8 50.4 13.8
0%
04B
BK0124337-8
Tunnel 4 (Left) - Red Gasket Material to 48" Cleanout
Red, Homogeneous, Non-Fibrous
34.1 50.0 15.9
05A
BK0124337-9
Tunnel 4 (Left) - "Y" Drain Green Gasket Material
Green, Homogeneous, Non-Fibrous
29.2 62.4
05B
BK0124337-10
Tunnel 4 (Right) - "Y" Drain Green Gasket Material
Green, Homogeneous, Non-Fibrous
30.6 65.7
Page 1 of 14
Asbestos% &Type
PLM 198.1
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date:
Client ID#
Lab ID#
Description/ Location
Analyst Description
ORG ASI AII% % %
06A
BK0124337-11
Tunnel 4 (Right) - "Y" Drain Red Gasket Material
Red, Homogeneous, Non-Fibrous
30.9
2.1
06B
BK0124337-12
Tunnel 2 - "Y" Drain Red Gasket Material
Red, Homogeneous, Non-Fibrous
31.5
07A
BK0124337-13
Tunnel 3 Landing - Overhead Duct Sealant
07B
BK0124337-14
08A
PLM
TEM
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD Inconclusive
NAD
X
X
100%
NAD Inconclusive
11%CHRY
X
X
0%
100%
NAD Inconclusive
Not Analyzed
X
18.7
0%
100%
NAD Inconclusive
NAD
X
X
18.5
0%
100%
NAD Inconclusive
NAD
X
X
Beige, Homogeneous, Friable
Not Applicable
0%
100%
NAD
Tunnel 4 (Left) - 4" Pipe Overhead Black Sealant
Black, Homogeneous, Non-Fibrous
81.4
2.5
16.1
0%
100%
NAD Inconclusive
NAD
X
X
BK0124337-19
Tunnel 4 (Left) - 4" Pipe Overhead Black Sealant
Black, Homogeneous, Non-Fibrous
82.6
2.1
15.3
0%
100%
NAD Inconclusive
NAD
X
X
BK0124337-20
Tunnel 11 - 20" PCHWR Elbow Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
5%FBGL
86.5%
8.5%CHRY
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
67.1
0%
100%
NAD Inconclusive
2.4
66.1
0%
100%
Grey, Homogeneous, Non-Fibrous
37.6 54.9
7.5
0%
Tunnel 3 Landing - Overhead Duct Sealant
Grey, Homogeneous, Non-Fibrous
36.7 56.3
7.0
BK0124337-15
Tunnel 6B - 2" PVC Penetrations to Wall Sealant)
Beige, Homogeneous, Non-Fibrous
74.4
7.0
08B
BK0124337-16
Tunnel 6B - 2" PVC Penetrations to Wall Sealant)
Beige, Homogeneous, Non-Fibrous
75.2
6.3
09A
BK0124337-17
Tunnel 5 Hall (Right) - Bulk Debris
10A
BK0124337-18
10B
11A
Page 2 of 14
PLM 198.1
X
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date: PLM
TEM
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
11B
BK0124337-21
Tunnel 11 - 20" PCHWR Elbow Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
11C
BK0124337-22
Tunnel 11 - 20" PCHWR Elbow Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
11D
BK0124337-23
Tunnel 11 - 20" PCHWR Elbow Canvas Wrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
11E
BK0124337-24
Tunnel 11 - 20" PCHWR Elbow Canvas Wrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
11F
BK0124337-25
Tunnel 11 - 20" PCHWR Elbow Canvas Wrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
12A
BK0124337-26
Tunnel 6 - 2" Water Line Plaster Fitting Insulation
Grey, Homogeneous, Friable
Not Applicable
30%CELL
70%
NAD
X
12B
BK0124337-27
Tunnel 6 (Far End) - 2" Water Line Plaster Fitting Insulation
Grey, Homogeneous, Friable
Not Applicable
0%
89%
11%CHRY
X
12C
BK0124337-28
Tunnel 6 (Far End) - 2" Water Line Plaster Fitting Insulation
Grey, Homogeneous, Friable
Not Applicable
12D
BK0124337-29
Tunnel 6 - Canvas Overwrap to 2" Water Line Fitting
Beige, Homogeneous, Friable
Not Applicable
100%CELL
0%
NAD
X
12E
BK0124337-30
Tunnel 6 (Far End) - Canvas Overwrap to 2" Water Line Fitting
Beige, Homogeneous, Friable
Not Applicable
100%CELL
0%
NAD
X
Page 3 of 14
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
PLM 198.1
PLM NOB 198.6
TEM 198.4
NA/PS
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date:
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
12F
BK0124337-31
Tunnel 6 (Far End) - Canvas Overwrap to 2" Water Line Fitting
Beige, Homogeneous, Friable
Not Applicable
13A
BK0124337-32
Tunnel 6 - Paper / Foil to Linear FG Insulation on 2" Waterline
Silver, Homogeneous, Non-Fibrous
71.5 24.6
13B
BK0124337-33
Tunnel 6 (Far End) - Paper / Foil to Linear FG Insulation on 2" Waterline
14A
BK0124337-34
14B
PLM
TEM
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD
X
X
NAD
X
X
NAD Inconclusive
NAD
X
X
NAD Inconclusive
NAD
X
X
Fibrous%
Non Fibrous%
Asbestos% &Type
100%CELL
0%
NAD
3.9
0%
100%
NAD Inconclusive
Silver, Homogeneous, Non-Fibrous
47.5 32.6 19.9
0%
100%
NAD Inconclusive
Tunnel 1 (Threshold / Doorway) Concrete (Floor)
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
BK0124337-35
Tunnel 2A (Far End) - Concrete (Floor)
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
14C
BK0124337-36
Tunnel 2A (Far End) - Concrete (Wall)
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
14D
BK0124337-37
Tunnel 1 (Threshold / Doorway) Concrete (Wall)
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
15A
BK0124337-38
Tunnel 6A - Paper / Foil to FG on 4Way MPS Line
Silver, Homogeneous, Non-Fibrous
64.5 21.0 14.5
0%
100%
NAD Inconclusive
15B
BK0124337-39
Tunnel 6A - Paper / Foil to FG on 4Way MPS Line
Silver, Homogeneous, Non-Fibrous
61.4 13.4 25.2
0%
100%
16A
BK0124337-40
Tunnel 5 - New Far 12" Line Paper / Foil to FG
Silver, Homogeneous, Non-Fibrous
61.0 21.7 17.3
0%
100%
Page 4 of 14
Asbestos% &Type
PLM 198.1
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date:
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
16B
BK0124337-41
Tunnel 5 - New Far 12" Line Paper / Foil to FG
Silver, Homogeneous, Non-Fibrous
17A
BK0124337-42
Tunnel 1 (Left) - Paper / Foil to FG on 14" Pipe Above LD Condensate
17B
BK0124337-43
18A
PLM
TEM
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD Inconclusive
NAD
X
X
100%
NAD Inconclusive
NAD
X
X
30%FBGL
70%
NAD
X
Not Applicable
30%FBGL
70%
NAD
X
Grey, Homogeneous, Friable
Not Applicable
30%FBGL
70%
NAD
X
Tunnel 5 - Paper / Foil to FG to Plaster Fitting to Valve CW58
Silver, Homogeneous, Non-Fibrous
26.5 31.2 42.3
0%
100%
NAD Inconclusive
NAD
X
X
BK0124337-48
Tunnel 5 - Paper / Foil to FG to Plaster Fitting to Valve CW58
Silver, Homogeneous, Non-Fibrous
31.7 29.4 38.8
0%
100%
NAD Inconclusive
NAD
X
X
19A
BK0124337-49
Tunnel 7 - 12" Cast Iron Drain Sealant
Grey, Homogeneous, Non-Fibrous
27.7 60.5 11.8
0%
100%
NAD Inconclusive
NAD
X
X
19B
BK0124337-50
Tunnel 7 - 12" Cast Iron Drain Sealant
Grey, Homogeneous, Non-Fibrous
49.2 39.4 11.5
0%
100%
NAD Inconclusive
NAD
X
X
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
62.7 17.1 20.2
0%
100%
NAD Inconclusive
Silver, Homogeneous, Non-Fibrous
26.5 56.7 16.8
0%
100%
Tunnel 2 (Left) - Paper / Foil to FG on 14" Pipe Above
Silver, Homogeneous, Non-Fibrous
47.6 18.6 33.8
0%
BK0124337-44
Tunnel 5 - Plaster Fitting to Valve CW58
Grey, Homogeneous, Friable
Not Applicable
18B
BK0124337-45
Tunnel 5 - Plaster Fitting to Valve CW58
Grey, Homogeneous, Friable
18C
BK0124337-46
Tunnel 5 - Plaster Fitting to Valve CW58
18D
BK0124337-47
18E
Page 5 of 14
PLM 198.1
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date:
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
20A
BK0124337-51
Tunnel 5 (Right) - Paper / Foil to FG on 48" Pipe
Silver, Homogeneous, Non-Fibrous
20B
BK0124337-52
Tunnel 2B (Far End) - Paper / Foil to FG on 48" Pipe
21A
BK0124337-53
21B
PLM
TEM
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD Inconclusive
NAD
X
X
100%
NAD Inconclusive
NAD
X
X
0%
100%
NAD Inconclusive
NAD
X
X
Not Applicable
30%CELL
70%
NAD
X
Beige, Homogeneous, Friable
Not Applicable
30%CELL
70%
NAD
X
Tunnel 1 (Left) - Paper / Foil to FG on 36" Pipe
Silver, Homogeneous, Non-Fibrous
57.4 28.1 14.5
0%
100%
NAD Inconclusive
NAD
X
X
BK0124337-58
Tunnel 2 (Left) - Paper / Foil to FG on 36" Pipe
Silver, Homogeneous, Non-Fibrous
56.8 18.6 24.6
0%
100%
NAD Inconclusive
NAD
X
X
24A
BK0124337-59
Tunnel 5A (Left) - Plaster Insulation on 4"-6" Fitting DWCS
Grey, Homogeneous, Friable
Not Applicable
30%FBGL
70%
NAD
X
24B
BK0124337-60
Tunnel 5A (Left) - Plaster Insulation on 4"-6" Fitting DWCS
Grey, Homogeneous, Friable
Not Applicable
30%FBGL
70%
NAD
X
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
56.4 20.7 22.9
0%
100%
NAD Inconclusive
Silver, Homogeneous, Non-Fibrous
68.1 21.3 10.6
0%
100%
Tunnel 1 - Overwrap to Foam on 48" Pipe
Beige, Homogeneous, Non-Fibrous
55.6 33.9 10.5
0%
BK0124337-54
Tunnel 2B (Far End) - Overwrap to Foam on 48" Pipe
Beige, Homogeneous, Non-Fibrous
54.8 29.8 15.4
22A
BK0124337-55
Tunnel 1 (Left) - Canvas Overwrap on 36" Pipe
Beige, Homogeneous, Friable
22B
BK0124337-56
Tunnel 1 (Left) - Canvas Overwrap on 36" Pipe
23A
BK0124337-57
23B
Page 6 of 14
PLM 198.1
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date:
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
24C
BK0124337-61
Tunnel 5A (Left) - Plaster Insulation on 4"-6" Fitting DWCS
Grey, Homogeneous, Friable
24D
BK0124337-62
Tunnel 5A (Left) - Canvas Overwrap on 4"-6" Fitting DWCS
24E
BK0124337-63
24F
PLM
TEM
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD
X
X
X
X
Fibrous%
Non Fibrous%
Asbestos% &Type
Not Applicable
30%FBGL
70%
NAD
X
Beige, Homogeneous, Friable
Not Applicable
100%CELL
0%
NAD
X
Tunnel 5A (Left) - Canvas Overwrap on 4"-6" Fitting DWCS
Beige, Homogeneous, Friable
Not Applicable
100%CELL
0%
NAD
X
BK0124337-64
Tunnel 5A (Left) - Canvas Overwrap on 4"-6" Fitting DWCS
Beige, Homogeneous, Friable
Not Applicable
100%CELL
0%
NAD
X
25A
BK0124337-65
Tunnel 4 (Left) - Paper / Foil to FG on 4" OM Pipe
Silver, Homogeneous, Non-Fibrous
54.4 13.4 32.2
0%
100%
NAD Inconclusive
25B
BK0124337-66
Tunnel 4 (Left) - Paper / Foil to FG on 4" OM Pipe
Silver, Homogeneous, Non-Fibrous
50.5 24.3 25.2
0%
100%
NAD Inconclusive
26A
BK0124337-67
Tunnel 5 (Right) - 10" RWPS Mudded Fitting
Grey, Homogeneous, Friable
Not Applicable
30%FBGL
70%
NAD
X
26B
BK0124337-68
Tunnel 5 (Right) - 10" RWPS Mudded Fitting
Grey, Homogeneous, Friable
Not Applicable
30%FBGL
70%
NAD
X
26C
BK0124337-69
Tunnel 5 (Right) - 10" RWPS Mudded Fitting
Grey, Homogeneous, Friable
Not Applicable
30%FBGL
70%
NAD
X
27A
BK0124337-70
Tunnel 5 (Right) - 10" RWPS Paper / Silver, Homogeneous, Foil to Linear FG Insulation Non-Fibrous
32.5 48.3 19.3
0%
100%
NAD Inconclusive
Page 7 of 14
Asbestos% &Type
NAD
PLM 198.1
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date:
Analyst Description
ASI ORG AII% % %
BK0124337-71
Tunnel 5 (Right) - 10" RWPS Paper / Silver, Homogeneous, Foil to Linear FG Insulation Non-Fibrous
28A
BK0124337-72
Tunnel 2A (Landing) - 8" Horizontal MPS Line Plaster Elbow
28B
BK0124337-73
28C
Client ID#
Lab ID#
27B
Description/ Location
PLM
TEM
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
46.3 13.1 40.7
0%
100%
NAD Inconclusive
NAD
Grey, Homogeneous, Friable
Not Applicable
30%FBGL
70%
NAD
X
Tunnel 2A (Landing) - 8" Horizontal MPS Line Plaster Elbow
Grey, Homogeneous, Friable
Not Applicable
30%FBGL
70%
NAD
X
BK0124337-74
Tunnel 2A (Landing) - 8" Horizontal MPS Line Plaster Elbow
Grey, Homogeneous, Friable
Not Applicable
30%FBGL
70%
NAD
X
28D
BK0124337-75
Tunnel 2A (Landing) - 8" MPS Horizontal Line Canvas to Elbow
Beige, Homogeneous, Friable
Not Applicable
100%CELL
0%
NAD
X
28E
BK0124337-76
Tunnel 2A (Landing) - 8" MPS Horizontal Line Canvas to Elbow
Beige, Homogeneous, Friable
Not Applicable
100%CELL
0%
NAD
X
28F
BK0124337-77
Tunnel 2A (Landing) - 8" MPS Horizontal Line Canvas to Elbow
Beige, Homogeneous, Friable
Not Applicable
100%CELL
0%
NAD
X
29AA
BK0124337-78
Tunnel 2A (Mid) - 4" Horizontal Pipe Across Platform Plaster Insulation
White, Homogeneous, Friable
Not Applicable
5%FBGL
89.4%
1.8%CHRY 3.8%AMO Total= 5.6%
X
29BB
BK0124337-79
Tunnel 2A (Mid) - 4" Horizontal Pipe Across Platform Plaster Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
29CC
BK0124337-80
Tunnel 2A (Mid) - 4" Horizontal Pipe Across Platform Plaster Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
Page 8 of 14
PLM 198.1
PLM NOB 198.6
TEM 198.4
X
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date: PLM
TEM
Analyst Description
ORG ASI AII% % %
Beige, Homogeneous, Friable
Not Applicable
NA/PS
Beige, Homogeneous, Friable
Not Applicable
NA/PS
Beige, Homogeneous, Friable
Not Applicable
NA/PS
Beige, Homogeneous, Friable
Not Applicable
NA/PS
Beige, Homogeneous, Friable
Not Applicable
NA/PS
Beige, Homogeneous, Friable
Not Applicable
NA/PS
Tunnel 10 - Linear Plaster Insulation to Orange OH 2" Drain Line
White, Homogeneous, Friable
Not Applicable
BK0124337-88
Tunnel 10 - Linear Plaster Insulation to Orange OH 2" Drain Line
White, Homogeneous, Friable
Not Applicable
NA/PS
30C
BK0124337-89
Tunnel 10 - Linear Plaster Insulation to Orange OH 2" Drain Line
White, Homogeneous, Friable
Not Applicable
NA/PS
30D
BK0124337-90
Tunnel 10 - Canvas Wrap to Plaster Insulation to Orange 2" Drain
Beige, Homogeneous, Friable
Not Applicable
NA/PS
Client ID#
Lab ID#
29A
BK0124337-81
29B
BK0124337-82
29C
BK0124337-83
29D
BK0124337-84
29E
BK0124337-85
29F
BK0124337-86
30A
BK0124337-87
30B
Description/ Location Tunnel 2A (Mid) - 4" Horizontal Pipe Across Platform Inner Layer Fabric Wrap Tunnel 2A (Mid) - 4" Horizontal Pipe Across Platform Inner Layer Fabric Wrap Tunnel 2A (Mid) - 4" Horizontal Pipe Across Platform Middle Layer Fabric Wrap Tunnel 2A (Mid) - 4" Horizontal Pipe Across Platform Middle Layer Fabric Wrap Tunnel 2A (Mid) - 4" Horizontal Pipe Across Platform Outer Layer Fabric Wrap Tunnel 2A (Mid) - 4" Horizontal Pipe Across Platform Outer Layer Fabric Wrap
Page 9 of 14
Fibrous%
5%FBGL
Non Fibrous%
91.6%
Asbestos% &Type
3.4%AMO
Asbestos% &Type
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP PLM 198.1
PLM NOB 198.6
TEM 198.4
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date: PLM
TEM
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
30E
BK0124337-91
Tunnel 10 - Canvas Wrap to Plaster Insulation to Orange 2" Drain
Beige, Homogeneous, Friable
Not Applicable
NA/PS
30F
BK0124337-92
Tunnel 10 - Canvas Wrap to Plaster Insulation to Orange 2" Drain
Beige, Homogeneous, Friable
Not Applicable
NA/PS
31A
BK0124337-93
Tunnel 1 (Right) - Linear Plaster Insulation To 4" CPD Line
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
31B
BK0124337-94
Tunnel 11 - Left / Upper Linear Plaster Insulation to 8" CPD Line
Grey, Homogeneous, Friable
Not Applicable
5%FBGL
91.4%
3.6%CHRY
X
31C
BK0124337-95
Tunnel 11 (Left / Upper) - Linear Plaster Insulation to 8" CPD Line
Grey, Homogeneous, Friable
Not Applicable
NA/PS
31D
BK0124337-96
Tunnel 1 (Right) - Linear 4" CDP Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
31E
BK0124337-97
Tunnel 11 - Linear 8" CDP Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
31F
BK0124337-98
Tunnel 5 (Left / Upper) - Linear 8" CDP Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
32A
BK0124337-99
Tunnel 2A - Plaster Insulation To Orange 8" CDP Elbow
Grey, Homogeneous, Friable
Not Applicable
32B
BK0124337-100
Tunnel 2A - Plaster Insulation To Orange 8" CDP Elbow
Grey, Homogeneous, Friable
Not Applicable
Page 10 of 14
Fibrous%
5%FBGL
Non Fibrous%
90.7%
Asbestos% &Type
4.3%CHRY
Asbestos% &Type
PLM 198.1
PLM NOB 198.6
TEM 198.4
X
NA/PS
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date: PLM
TEM
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
32C
BK0124337-101
Tunnel 2A - Plaster Insulation To Orange 8" CDP Elbow
Grey, Homogeneous, Friable
Not Applicable
NA/PS
32D
BK0124337-102
Tunnel 2A - Canvas Overwrap to Orange 8" CDP Elbow
Beige, Homogeneous, Friable
Not Applicable
NA/PS
32E
BK0124337-103
Tunnel 2A - Canvas Overwrap to Orange 8" CDP Elbow
Beige, Homogeneous, Friable
Not Applicable
NA/PS
32F
BK0124337-104
Tunnel 2A - Canvas Overwrap to Orange 8" CDP Elbow
Beige, Homogeneous, Friable
Not Applicable
NA/PS
33A
BK0124337-105
Tunnel 6A - 14" MPS Plaster Fitting Insulation
Grey, Homogeneous, Friable
Not Applicable
33B
BK0124337-106
Tunnel 1 (Right) - 14" MPS Plaster Fitting Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
33C
BK0124337-107
Tunnel 2A (Right) - 14" MPS Plaster Fitting Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
33D
BK0124337-108
Tunnel 1 (Right) - Canvas to 14" MPS Fitting
Beige, Homogeneous, Friable
Not Applicable
NA/PS
33E
BK0124337-109
Tunnel 2A (Right) - Canvas to 14" MPS Fitting
Beige, Homogeneous, Friable
Not Applicable
NA/PS
33F
BK0124337-110
Tunnel 1 (Right) - Canvas to 14" MPS Fitting
Beige, Homogeneous, Friable
Not Applicable
NA/PS
Page 11 of 14
Fibrous%
0%
Non Fibrous%
95.8%
Asbestos% &Type
4.2%CHRY
Asbestos% &Type
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP PLM 198.1
PLM NOB 198.6
TEM 198.4
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date:
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
34A
BK0124337-111
Tunnel 5 (Right) - 14" MPS Linear Plaster Insulation
White, Homogeneous, Friable
34B
BK0124337-112
Tunnel 11 - 14" MPS Linear Plaster Insulation
34C
BK0124337-113
34D
PLM
TEM
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD
X
X
Fibrous%
Non Fibrous%
Asbestos% &Type
Not Applicable
5% SYNTHETIC
95%
NAD
X
White, Homogeneous, Friable
Not Applicable
0%
95.8%
4.2%AMO
X
Tunnel 5 (Left / Upper) - 14" MPS Linear Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
BK0124337-114
Tunnel 6A - 14" WPS Linear Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
34E
BK0124337-115
Tunnel 11 - 14" WPS Linear Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
34F
BK0124337-116
Tunnel 5 (Left / Upper) - 14" WPS Linear Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
35A
BK0124337-117
Tunnel 4 (Left) - Paper / Foil to FG on 24" Vertical Pipe
Silver, Homogeneous, Non-Fibrous
68.4 15.8 15.8
0%
100%
NAD Inconclusive
35B
BK0124337-118
Tunnel 4 (Left) - Paper / Foil to FG on 24" Vertical Pipe
Silver, Homogeneous, Non-Fibrous
74.3 16.8
8.9
0%
100%
NAD Inconclusive
36A
BK0124337-119
Tunnel 7B - 6" Vertical MPS Line Linear Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
0%
94%
6%CHRY
36B
BK0124337-120
Tunnel 7B - 6" Vertical MPS Line Linear Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
Page 12 of 14
Asbestos% &Type
PLM 198.1
X
NA/PS
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date: PLM
TEM
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
36C
BK0124337-121
Tunnel 7B - 6" Vertical MPS Line Linear Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
36D
BK0124337-122
Tunnel 7B - 6" Vertical MPS Line Linear Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
36E
BK0124337-123
Tunnel 7B - 6" Vertical MPS Line Linear Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
36F
BK0124337-124
Tunnel 7B - 6" Vertical MPS Line Linear Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
37A
BK0124337-125
Tunnel 7 - Paper / Foil to FG on MPS Line
Silver, Homogeneous, Non-Fibrous
59.3 37.9
2.8
0%
100%
NAD Inconclusive
37B
BK0124337-126
Tunnel 7 - Paper / Foil to FG on MPS Line
Silver, Homogeneous, Non-Fibrous
64.5 33.0
2.5
0%
100%
38A
BK0124337-127
Tunnel 2B (Far End) - 14" CHWS Horizontal Paper / Foil to FG
Silver, Homogeneous, Non-Fibrous
59.6
7.0
33.4
0%
38B
BK0124337-128
Tunnel 6A (Far End) - 14" CHWS Horizontal Paper / Foil to FG
Silver, Homogeneous, Non-Fibrous
65.5 27.2
7.3
39A
BK0124337-129
Tunnel 2B (Far End) - Paper / Foil to FG 6" Horizontal Line
Silver, Homogeneous, Non-Fibrous
39B
BK0124337-130
Tunnel 2B (Far End) - Paper / Foil to FG 6" Horizontal Line
Silver, Homogeneous, Non-Fibrous
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD Inconclusive
NAD
X
X
100%
NAD Inconclusive
NAD
X
X
0%
100%
NAD Inconclusive
NAD
X
X
43.2 29.9 26.9
0%
100%
NAD Inconclusive
NAD
X
X
43.6 26.3 30.1
0%
100%
NAD Inconclusive
NAD
X
X
Page 13 of 14
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
PLM 198.1
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc. Client OGS Utility Tunnels Hazmat Inspection / 080577 100 S Mall Arterial Albany, NY 12242 Empire State Plaza / Cold Tunnels
Lab ID: Date Received: PLM Date Analyzed: TEM Date Analyzed: Report Date: PLM
TEM
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
40A
BK0124337-131
Tunnel 7B - Paper / Foil to 8" MPS Line
Silver, Homogeneous, Non-Fibrous
59.9 26.5 13.6
0%
100%
NAD Inconclusive
40B
BK0124337-132
Tunnel 7B - Paper / Foil to 8" MPS Line
Silver, Homogeneous, Non-Fibrous
52.7 36.0 11.2
0%
100%
NAD Inconclusive
BK01244337 1/29/2024 1/30/2024 2/1/2024 2/3/2024 Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD
X
X
PLM 198.1
TC Quantitative Analysis (Semi/Full):Bulk Asbestos Analysis-PLM by EPA 600/M4-82-020 per 40 CFR or ELAP198.1 (friable) and 198.6 (NOB) samples for New York. NAD=no asbestos detected, NA/PS=Not Analyzed/Positive Stop, Trace=<1%,FBGL=Fiberglass, CELL=Cellulose,CHRY=Chrysotile,Amo=Amosite,CRO=Crocidolite,ANTH=Anthophylite, TRE=Tremolite, ACT=Actinolite, NA=not applicable.
PLM is not consistently reliable in detecting Asbestos in floor coverings and similar non friable organically bound materials. NAD or Trace results by PLM are inconclusive. TEM is currently the only method that can be used to determine if this material can be considered or treated as non asbestos containing in NY State. All samples were prepared and analyzed in accordance with the EPA "TEM Method for Identifying and Quantifying Asbestos in Non-Fibrous Organically Bound Bulk Samples" ELAP 198.4". ORG%=Ashed Organic%, AII= Acid Insoluble Inorganic%, ASI= Acid Soluble Inorganic% This "Summary of Analytical Results "shall not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, ELAP or any agency of the U.S Government. The results relate only to the items tested. This report may not be reproduced, except in full, without the written approval of AEL .Atlas Environmental lab did not collect the analyzed samples and thus accepts no liability with regard to their collection and/or maintenance . AEL relies on client's data. The liability of Atlas Environmental Lab corp with respect to the services charged, shall in no event exceed the amount of the invoice.
NYS-ELAP#11999, NVLAP Lab Code: 500092-0, NJ ID: NY034 "ELCP on NJ won't apply to TEM", CT Reg. ID: PH-0154 PLM Analyst: EM
TEM Analyst: VR
Approved by:
Page 14 of 14
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Client ID#
Lab ID#
Description/ Location
56A
BK0124336-1
Hot Tunnel South - 6" CHWR Line Paper/Foil to FG Insulation
56B
BK0124336-2
Hot Tunnel Upper South - 6" CHWR Line Paper/Foil to FG Insulation
57A
BK0124336-3
Hot Tunnel South - 6" CHWS Line Paper/Foil to FG Insulation
57B
BK0124336-4
Hot Tunnel Upper South - 6" CHWS Line Paper/Foil to FG Insulation
58A
BK0124336-5
Hot Tunnel South - 14" F-Line Paper/Foil to FG
58B
BK0124336-6
Hot Tunnel South - 14" F-Line Paper/Foil to FG
59A
BK0124336-7
Hot Tunnel South - 14" G-Line Paper/Foil to FG
59B
BK0124336-8
Hot Tunnel South - 14" G-Line Paper/Foil to FG
60A
BK0124336-9
Hot Tunnel South - 4" CPD Line Plaster Insulation
60B
BK0124336-10
Hot Tunnel South - 4" CPD Line Plaster Insulation
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024 ASI ORG AII% % %
PLM
TEM
Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD Inconclusive
NAD
X
X
100%
NAD Inconclusive
NAD
X
X
0%
100%
NAD Inconclusive
NAD
X
X
64.2 29.6 6.2
0%
100%
NAD Inconclusive
NAD
X
X
73.6 12.0 14.4
0%
100%
NAD Inconclusive
NAD
X
X
57.5 39.5 3.0
0%
100%
NAD Inconclusive
NAD
X
X
52.0 44.6 3.3
0%
100%
NAD Inconclusive
NAD
X
X
White, Homogeneous, Friable
Not Applicable
10%FBGL
85.5%
4.5%AMO
White, Homogeneous, Friable
Not Applicable
Analyst Description Silver/Green, Homogeneous, Non-Fibrous Silver/Beige, Homogeneous, Non-Fibrous Silver/Green, Homogeneous, Non-Fibrous Silver/Beige, Homogeneous, Non-Fibrous Silver/Yellow, Homogeneous, Non-Fibrous Silver/White, Homogeneous, Non-Fibrous Silver/White, Homogeneous, Non-Fibrous Silver/White, Homogeneous, Non-Fibrous
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
59.3 19.0 21.7
0%
100%
NAD Inconclusive
60.8 13.7 25.5
0%
100%
55.3 22.6 22.0
0%
50.7 16.6 32.7
Page 1 of 16
PLM 198.1
X
NA/PS
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 1/29/2024 Date Received: PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 2/3/2024 Report Date: PLM
TEM
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
60C
BK0124336-11
Hot Tunnel South - 4" CPD Line Plaster Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
61A
BK0124336-12
Hot Tunnel South - 4" CPD Line Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
61B
BK0124336-13
Hot Tunnel South - 4" CPD Line Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
61C
BK0124336-14
Hot Tunnel South - 4" CPD Line Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
62A
BK0124336-15
Hot Tunnel South - 14" G-Line Plaster Insulation
White, Homogeneous, Friable
Not Applicable
62B
BK0124336-16
Hot Tunnel Upper South - 14" G-Line Plaster Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
62C
BK0124336-17
Hot Tunnel Upper North - 14" G-Line Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
63A
BK0124336-18
Hot Tunnel South - 14" G-Line Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
63B
BK0124336-19
Hot Tunnel South - 14" G-Line Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
63C
BK0124336-20
Hot Tunnel South - 14" G-Line Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
Page 2 of 16
Fibrous%
10%FBGL
Non Fibrous%
85.1%
Asbestos% &Type
4.9%AMO
Asbestos% &Type
Method By ELAP PLM 198.1
PLM NOB 198.6
TEM 198.4
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024 PLM
TEM
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
64A
BK0124336-21
Hot Tunnel Upper South - 14" G-Line Wet Lagging
White, Homogeneous, Friable
Not Applicable
NA/PS
64B
BK0124336-22
Hot Tunnel Upper South - 14" G-Line Wet Lagging
White, Homogeneous, Friable
Not Applicable
NA/PS
64C
BK0124336-23
Hot Tunnel Upper North - 14" G-Line Wet Lagging
White, Homogeneous, Friable
Not Applicable
NA/PS
65A
BK0124336-24
Hot Tunnel South - 14" F-Line Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
65B
BK0124336-25
Hot Tunnel Upper South - 14" F-Line Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
65C
BK0124336-26
Hot Tunnel Upper North - 14" F-Line Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
66A
BK0124336-27
Hot Tunnel South - 14" F-Line Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
66B
BK0124336-28
Hot Tunnel South - 14" F-Line Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
66C
BK0124336-29
Hot Tunnel South - 14" F-Line Canvas Overwrap
Beige, Homogeneous, Friable
Not Applicable
NA/PS
67A
BK0124336-30
Hot Tunnel Upper South - 14" F-Line West Lagging
White, Homogeneous, Friable
Not Applicable
NA/PS
Page 3 of 16
Fibrous%
10%FBGL
Non Fibrous%
84.7%
Asbestos% &Type
5.3%AMO
Asbestos% &Type
Method By ELAP PLM 198.1
PLM NOB 198.6
TEM 198.4
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024 PLM
TEM
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
67B
BK0124336-31
Hot Tunnel Upper South - 14" F-Line West Lagging
White, Homogeneous, Friable
Not Applicable
NA/PS
67C
BK0124336-32
Hot Tunnel Upper North - 14" F-Line West Lagging
White, Homogeneous, Friable
Not Applicable
NA/PS
68A
BK0124336-33
Hot Tunnel Upper South - 4" to 8" CPD (Bottom Pipe) Plaster Insulation
White, Homogeneous, Friable
Not Applicable
68B
BK0124336-34
Hot Tunnel Upper North - 4" to 8" CPD (Bottom Pipe) Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
68C
BK0124336-35
Hot Tunnel Upper North - 4" to 8" CPD (Bottom Pipe) Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
69A
BK0124336-36
Hot Tunnel Upper South - 4" to 8" CPD (Bottom Pipe) Cloth Wrap
White, Homogeneous, Friable
Not Applicable
NA/PS
69B
BK0124336-37
Hot Tunnel Upper North - 4" to 8" CPD (Bottom Pipe) Cloth Wrap
White, Homogeneous, Friable
Not Applicable
NA/PS
69C
BK0124336-38
Hot Tunnel Upper North - 4" to 8" CPD (Bottom Pipe) Cloth Wrap
White, Homogeneous, Friable
Not Applicable
NA/PS
70A
BK0124336-39
Hot Tunnel Upper South - 4" to 8" CPD (Top Pipe) Plaster Insulation
White, Homogeneous, Friable
Not Applicable
70B
BK0124336-40
Hot Tunnel Upper North - 4" to 8" CPD (Top Pipe) Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
Page 4 of 16
Fibrous%
10%FBGL
10%FBGL
Non Fibrous%
84.7%
81.9%
Asbestos% &Type
5.3%AMO
2.5%CHRY 5.6%AMO Total= 8.1%
Asbestos% &Type
Method By ELAP PLM 198.1
PLM NOB 198.6
TEM 198.4
X
X
NA/PS
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024 PLM
TEM
Method By ELAP
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
70C
BK0124336-41
Hot Tunnel Upper North - 4" to 8" CPD (Top Pipe) Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
71A
BK0124336-42
Hot Tunnel Upper South - 4" to 8" CPD (Top Pipe) Cloth Wrap
White, Homogeneous, Friable
Not Applicable
NA/PS
71B
BK0124336-43
Hot Tunnel Upper North - 4" to 8" CPD (Top Pipe) Cloth Wrap
White, Homogeneous, Friable
Not Applicable
NA/PS
71C
BK0124336-44
Hot Tunnel Upper North - 4" to 8" CPD (Top Pipe) Cloth Wrap
White, Homogeneous, Friable
Not Applicable
NA/PS
72A
BK0124336-45
Hot Tunnel South - OH 8" Condensate Line (Left) Canvas to FG
Beige, Homogeneous, Friable
Not Applicable 100%CELL
0%
NAD
X
72B
BK0124336-46
Hot Tunnel South - OH 8" Condensate Line (Right) Canvas to FG
Beige, Homogeneous, Friable
Not Applicable 100%CELL
0%
NAD
X
72C
BK0124336-47
Hot Tunnel South - OH 8" Condensate Line (Right) Canvas to FG
Beige, Homogeneous, Friable
Not Applicable 100%CELL
0%
NAD
X
73A
BK0124336-48
Hot Tunnel South - 20" CHW Line (Bottom) Paper/Foil to FG
46.5 2.0 51.5
0%
100%
NAD Inconclusive
73B
BK0124336-49
Hot Tunnel South - 20" CHW Line (Bottom) Paper/Foil to FG
45.1 3.2 51.7
0%
100%
NAD Inconclusive
74A
BK0124336-50
Hot Tunnel South - 20" CHW Line (Bottom) Canvas to Paper/Foil to FG
0%
NAD
Silver/Brown, Homogeneous, Non-Fibrous Silver/Brown, Homogeneous, Non-Fibrous
Beige, Homogeneous, Friable
Fibrous%
Not Applicable 100%CELL
Page 5 of 16
Non Fibrous%
Asbestos% &Type
PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD
X
X
Asbestos% &Type
PLM 198.1
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
74B
BK0124336-51
Hot Tunnel South - 20" CHW Line (Bottom) Canvas to Paper/Foil to FG
Beige, Homogeneous, Friable
74C
BK0124336-52
Hot Tunnel South - 20" CHW Line (Bottom) Canvas to Paper/Foil to FG
75A
BK0124336-53
75B
PLM
TEM
Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD Inconclusive
NAD
X
X
100%
NAD Inconclusive
NAD
X
X
0%
100%
NAD Inconclusive
NAD
X
X
0%
100%
NAD Inconclusive
NAD
X
X
Non Fibrous%
Asbestos% &Type
Not Applicable 100%CELL
0%
NAD
X
Beige, Homogeneous, Friable
Not Applicable 100%CELL
0%
NAD
X
Hot Tunnel South - 20" CHW Line (Top) Tar/Felt to FG
Black, Homogeneous, Non-Fibrous
95.9 3.4
0.7
0%
100%
NAD Inconclusive
BK0124336-54
Hot Tunnel Upper South - 20" CHW Line (Top) Tar/Felt to FG
Black, Homogeneous, Non-Fibrous
94.5 1.1
4.4
0%
100%
75C
BK0124336-55
Hot Tunnel Upper South - 20" CHW Line (Top) Tar/Felt to FG
Black, Homogeneous, Non-Fibrous
75.2 7.9 16.9
0%
76A
BK0124336-56
Hot Tunnel South - 20" CHW Line (Top) Paper/Foil to Tar/Felt to FG
45.6 2.6 51.8
76B
BK0124336-57
Hot Tunnel Upper South - 20" CHW Line (Top) Paper/Foil to Tar/Felt to FG
17.5 9.3 73.2
77A
77B
77C
Hot Tunnel South - 20" CHW Line BK0124336-58 (Top) Canvas to Paper/Foil to Tar/Felt to FG Hot Tunnel South - 20" CHW Line BK0124336-59 (Top) Canvas to Paper/Foil to Tar/Felt to FG Hot Tunnel South - 20" CHW Line BK0124336-60 (Top) Canvas to Paper/Foil to Tar/Felt to FG
Silver/White, Homogeneous, Non-Fibrous Silver/Beige, Homogeneous, Non-Fibrous
Fibrous%
Asbestos% &Type
PLM 198.1
Beige, Homogeneous, Friable
Not Applicable 100%CELL
0%
NAD
X
Beige, Homogeneous, Friable
Not Applicable 100%CELL
0%
NAD
X
Beige, Homogeneous, Friable
Not Applicable 100%CELL
0%
NAD
X
Page 6 of 16
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
78A
BK0124336-61
Hot Tunnel South - Concrete (Wall)
Grey, Homogeneous, Friable
78B
BK0124336-62
Hot Tunnel South - Concrete (Wall)
78C
BK0124336-63
78D
PLM
TEM
Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
NAD
X
X
Fibrous%
Non Fibrous%
Asbestos% &Type
Not Applicable
0%
100%
NAD
X
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
Hot Tunnel Upper North - Concrete (Ceiling)
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
BK0124336-64
Hot Tunnel Upper North - Concrete (Ceiling)
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
79A
BK0124336-65
Hot Tunnel Upper North - 4" Overhead Line Brown Cloth Wrap
Brown, Homogeneous, Friable
Not Applicable 100%CELL
0%
NAD
X
79B
BK0124336-66
Hot Tunnel Upper North - 4" Overhead Line Brown Cloth Wrap
Brown, Homogeneous, Friable
Not Applicable 100%CELL
0%
NAD
X
80A
BK0124336-67
Hot Tunnel Upper South - 4" Overhead Line Paper/Foil
37.7 25.3 37.0
0%
100%
NAD Inconclusive
80B
BK0124336-68
Hot Tunnel Upper South - 4" Overhead Line Paper/Foil
32.6 2.7 64.7
0%
100%
NAD Inconclusive
81A
BK0124336-69
Grey, Homogeneous, Friable
Not Applicable
0%
96.3%
3.7%CHRY
81B
BK0124336-70
Grey, Homogeneous, Friable
Not Applicable
Hot Tunnel Upper North - 4" Overhead Line Bare Job Molded Plaster Fitting Hot Tunnel Upper North - 4" Overhead Line Bare Job Molded Plaster Fitting
Silver/Beige, Homogeneous, Non-Fibrous Silver/Brown, Homogeneous, Non-Fibrous
Page 7 of 16
Asbestos% &Type
PLM 198.1
X
NA/PS
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
81C
BK0124336-71
Hot Tunnel Upper North - 4" Overhead Line Bare Job Molded Plaster Fitting
Grey, Homogeneous, Friable
Not Applicable
82A
BK0124336-72
Section 1 - HPS 14" Line (F) Paper/Foil to FG
82B
BK0124336-73
Section 4 - HPS 14" Line (F) Paper/Foil to FG
83A
BK0124336-74
Section 1 - HPS 14" Line (G) Paper/Foil to FG
83B
BK0124336-75
Section 4 - HPS 14" Line (G) Paper/Foil to FG
84A
BK0124336-76
Section 1 - CWS G Line Paper/Foil to FG
84B
BK0124336-77
Section 4 - CWS G Line Paper/Foil to FG
85A
BK0124336-78
Section 1 - CWR G Line Paper/Foil to FG
85B
BK0124336-79
Section 4 - CWR G Line Paper/Foil to FG
86A
BK0124336-80 Section 1 - 2" Drain Paper/Foil to FG
Silver/Beige, Homogeneous, Non-Fibrous Silver/Beige, Homogeneous, Non-Fibrous Silver/Beige, Homogeneous, Non-Fibrous Silver/Beige, Homogeneous, Non-Fibrous Silver/Brown, Homogeneous, Non-Fibrous Silver/Beige, Homogeneous, Non-Fibrous Silver/Beige, Homogeneous, Non-Fibrous Silver/Beige, Homogeneous, Non-Fibrous Silver/Beige, Homogeneous, Non-Fibrous
PLM Fibrous%
Non Fibrous%
TEM Asbestos% &Type
Asbestos% &Type
Method By ELAP PLM 198.1
PLM NOB 198.6
TEM 198.4
NA/PS
35.2 4.2 60.7
0%
100%
NAD Inconclusive
NAD
X
X
54.0 23.1 22.9
0%
100%
NAD Inconclusive
NAD
X
X
29.5 2.8 67.7
0%
100%
NAD Inconclusive
NAD
X
X
30.2 46.0 23.8
0%
100%
NAD Inconclusive
NAD
X
X
19.2 26.6 54.2
0%
100%
NAD Inconclusive
NAD
X
X
27.2 2.0 70.8
0%
100%
NAD Inconclusive
NAD
X
X
10.6 6.6 82.8
0%
100%
NAD Inconclusive
NAD
X
X
34.2 25.7 40.1
0%
100%
NAD Inconclusive
NAD
X
X
17.5 65.3 17.3
0%
100%
NAD Inconclusive
NAD
X
X
Page 8 of 16
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area: Client ID#
Lab ID#
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Description/ Location
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024
Analyst Description
ASI ORG AII% % %
Silver/Beige, Homogeneous, Non-Fibrous
PLM
TEM
Method By ELAP PLM NOB 198.6
TEM 198.4
NAD
X
X
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
36.5 13.2 50.3
0%
100%
NAD Inconclusive
PLM 198.1
86B
BK0124336-81 Section 4 - 2" Drain Paper/Foil to FG
87A
BK0124336-82
Section 1 - Vertical Expansion Joint Caulk (Black)
Black, Homogeneous, Non-Fibrous
32.2 7.1 60.7
0%
100%
NAD Inconclusive
NAD
X
X
87B
BK0124336-83
Section 1 - Vertical Expansion Joint Caulk (Black)
Black, Homogeneous, Non-Fibrous
96.2 1.8
2.0
0%
100%
NAD Inconclusive
NAD
X
X
88A
BK0124336-84
Section 1 - Horizontal Seam Sealant (Grey)
Grey, Homogeneous, Non-Fibrous
78.0 3.5 18.5
0%
100%
NAD Inconclusive
NAD
X
X
88B
BK0124336-85
Section 1 - Horizontal Seam Sealant (Grey)
Grey, Homogeneous, Non-Fibrous
88.1 1.3 10.6
0%
100%
NAD Inconclusive
NAD
X
X
89A
BK0124336-86
Section 1 - Embedded Textured Material to Black Exp. Joint
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
89B
BK0124336-87
Section 1 - Embedded Textured Material to Black Exp. Joint
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
90A
BK0124336-88
Section 4 - HPS 14" G-Line Mudded Plaster Elbow Insulation
Grey, Homogeneous, Friable
Not Applicable
20%FBGL
80%
NAD
X
90B
BK0124336-89
Section 1 - HPS 14" G-Line Mudded Plaster Elbow Insulation
Grey, Homogeneous, Friable
Not Applicable
20%FBGL
80%
NAD
X
90C
BK0124336-90
Section 5 - HPS 14" G-Line Mudded Plaster Elbow Insulation
Grey, Homogeneous, Friable
Not Applicable
20%FBGL
80%
NAD
X
Page 9 of 16
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
91A
BK0124336-91
Section 4 - HPS 14" G-Line Canvas Wrap to Pipe Elbow
Beige, Homogeneous, Friable
91B
BK0124336-92
Section 1 - HPS 14" G-Line Canvas Wrap to Pipe Elbow
91C
BK0124336-93
92A
PLM
TEM Asbestos% &Type
Not Applicable 100%CELL
0%
NAD
X
Beige, Homogeneous, Friable
Not Applicable 100%CELL
0%
NAD
X
Section 4 - HPS 14" G-Line Canvas Wrap to Pipe Elbow
Beige, Homogeneous, Friable
Not Applicable 100%CELL
0%
NAD
X
BK0124336-94
Section 4 - HPS 14" F-Lien Mudded Plaster Elbow Insulation
Grey, Homogeneous, Friable
Not Applicable
20%FBGL
80%
NAD
X
92B
BK0124336-95
Section 1 - HPS 14" F-Lien Mudded Plaster Elbow Insulation
Grey, Homogeneous, Friable
Not Applicable
20%FBGL
80%
NAD
X
92C
BK0124336-96
Section 5 - HPS 14" F-Lien Mudded Plaster Elbow Insulation
Grey, Homogeneous, Friable
Not Applicable
20%FBGL
80%
NAD
X
93A
BK0124336-97
Section 4 - HPS 14" F-Line Canvas Wrap to Pipe Elbow
Beige, Homogeneous, Friable
Not Applicable 100%FBGL
0%
NAD
X
93B
BK0124336-98
Section 1 - HPS 14" F-Line Canvas Wrap to Pipe Elbow
Beige, Homogeneous, Friable
Not Applicable 100%FBGL
0%
NAD
X
93C
BK0124336-99
Section 4 - HPS 14" F-Line Canvas Wrap to Pipe Elbow
Beige, Homogeneous, Friable
Not Applicable 100%FBGL
0%
NAD
X
94A
BK0124336-100
Section 5 - CHWS Linear Plaster Pipe Insulation
White, Homogeneous, Friable
Not Applicable
87.5%
2.4%CHRY 5.1%AMO Total= 7.5%
X
Page 10 of 16
Fibrous%
5%FBGL
Asbestos% &Type
Method By ELAP
Non Fibrous%
PLM 198.1
PLM NOB 198.6
TEM 198.4
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024 PLM
TEM
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
94B
BK0124336-101
Section 5 - CHWS Linear Plaster Pipe Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
94C
BK0124336-102
Section 5 - CHWS Linear Plaster Pipe Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
95A
BK0124336-103
Section 5 - CHWS Linear Over Wrap to Plaster Pipe Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
95B
BK0124336-104
Section 5 - CHWS Linear Over Wrap to Plaster Pipe Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
95C
BK0124336-105
Section 5 - CHWS Linear Over Wrap to Plaster Pipe Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
96A
BK0124336-106
Section 5 - CHWS Linear Paper/Foil to FG
96B
BK0124336-107
Section 5 - CHWS Linear Paper/Foil to FG
97A
BK0124336-108
Section 5 - CHWR Linear Plaster Pipe Insulation
97B
BK0124336-109
97C
BK0124336-110
Silver/White, Homogeneous, Non-Fibrous Silver/White, Homogeneous, Non-Fibrous
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
Method By ELAP PLM 198.1
PLM NOB 198.6
TEM 198.4
10.5 23.2 66.3
0%
100%
NAD Inconclusive
NAD
X
X
23.4 6.1 70.5
0%
100%
NAD Inconclusive
NAD
X
X
Grey, Homogeneous, Friable
Not Applicable
5%FBGL
87.5%
2.4%CHRY 5.1%AMO Total= 7.5%
Section 5 - CHWR Linear Plaster Pipe Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
Section 5 - CHWR Linear Plaster Pipe Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
Page 11 of 16
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024 PLM
TEM
Client ID#
Lab ID#
Description/ Location
Analyst Description
ORG ASI AII% % %
98A
BK0124336-111
Section - CHWR Linear Over Wrap to Plaster Pipe Insulation
Beige, Homogeneous, Friable
Not Applicable
NA/PS
98B
BK0124336-112
Section - CHWR Linear Over Wrap to Plaster Pipe Insulation
Beige, Homogeneous, Friable
Not Applicable
NA/PS
98C
BK0124336-113
Section - CHWR Linear Over Wrap to Plaster Pipe Insulation
Beige, Homogeneous, Friable
Not Applicable
NA/PS
99A
BK0124336-114
Section 5 - CHWR Linear Paper/Foil to FG
99B
BK0124336-115
Section 5 - CHWR Linear Paper/Foil to FG
100A
BK0124336-116
Section 5 - CHWS Pipe Elbow Plaster Insulation
100B
BK0124336-117
100C
Silver/beige, Homogeneous, Non-Fibrous Silver/beige, Homogeneous, Non-Fibrous
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
Method By ELAP PLM 198.1
PLM NOB 198.6
TEM 198.4
37.7 28.4 33.9
0%
100%
NAD Inconclusive
NAD
X
X
34.2 18.7 47.1
0%
100%
NAD Inconclusive
NAD
X
X
Grey, Homogeneous, Friable
Not Applicable
5%FBGL
87.5%
2.5%CHRY 5%AMO Total= 7.5%
Section 5 - CHWS Pipe Elbow Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
BK0124336-118
Section 5 - CHWS Pipe Elbow Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
101A
BK0124336-119
Section 5 - CHWS Canvas Wrap to Pipe Elbow
White, Homogeneous, Friable
Not Applicable
NA/PS
101B
BK0124336-120
Section 5 - CHWS Canvas Wrap to Pipe Elbow
White, Homogeneous, Friable
Not Applicable
NA/PS
Page 12 of 16
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024 PLM
TEM
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
101C
BK0124336-121
Section 5 - CHWS Canvas Wrap to Pipe Elbow
White, Homogeneous, Friable
Not Applicable
102A
BK0124336-122
Section 5 - CHWR Pipe Elbow Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
102B
BK0124336-123
Section 5 - CHWR Pipe Elbow Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
102C
BK0124336-124
Section 5 - CHWR Pipe Elbow Plaster Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
103A
BK0124336-125
Section 5 - CHWR canvas Wrap to Pipe Elbow
White, Homogeneous, Friable
Not Applicable
NA/PS
103B
BK0124336-126
Section 5 - CHWR canvas Wrap to Pipe Elbow
White, Homogeneous, Friable
Not Applicable
NA/PS
103C
BK0124336-127
Section 5 - CHWR canvas Wrap to Pipe Elbow
White, Homogeneous, Friable
Not Applicable
NA/PS
104A
BK0124336-128
Section 5 - G-Line Plaster Pipe Insulation
White, Homogeneous, Friable
Not Applicable
104B
BK0124336-129
Section 5 - G-Line Plaster Pipe Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
104C
BK0124336-130
Section 5 - G-Line Plaster Pipe Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
Page 13 of 16
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
Method By ELAP PLM 198.1
PLM NOB 198.6
TEM 198.4
NA/PS
5%FBGL
5%FBGL
84.0%
90.1%
2.3%CHRY 8.2%AMO Total=11%
4.9%CHRY
X
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024 PLM
TEM
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
105A
BK0124336-131
Section 5 - G-Line Canvas Wrap to Pipe Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
105B
BK0124336-132
Section 5 - G-Line Canvas Wrap to Pipe Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
105C
BK0124336-133
Section 5 - G-Line Canvas Wrap to Pipe Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
106A
BK0124336-134
Section 5 - F-Line Plaster Pipe Insulation
Grey, Homogeneous, Friable
Not Applicable
106B
BK0124336-135
Section 5 - F-Line Plaster Pipe Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
106C
BK0124336-136
Section 5 - F-Line Plaster Pipe Insulation
Grey, Homogeneous, Friable
Not Applicable
NA/PS
107A
BK0124336-137
Section 5 - F-Line Canvas Wrap to Pipe Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
107B
BK0124336-138
Section 5 - F-Line Canvas Wrap to Pipe Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
107C
BK0124336-139
Section 5 - F-Line Canvas Wrap to Pipe Insulation
White, Homogeneous, Friable
Not Applicable
NA/PS
108A
BK0124336-140
Section 1 - Concrete (Floor)
Grey, Homogeneous, Friable
Not Applicable
Page 14 of 16
Fibrous%
5%FBGL
0%
Non Fibrous%
88.4%
100%
Asbestos% &Type
6.6%AMO
NAD
Asbestos% &Type
Method By ELAP PLM 198.1
PLM NOB 198.6
TEM 198.4
X
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
108B
BK0124336-141
Section 1 - Concrete (Floor)
Grey, Homogeneous, Friable
108C
BK0124336-142
Section 1 - Concrete (Wall)
108D
BK0124336-143
109A
PLM
TEM
Method By ELAP PLM NOB 198.6
TEM 198.4
NAD 9.2%CHRY Inconclusive
X
X
NAD Inconclusive
Not Analyzed
X
NAD Inconclusive
NAD
X
Fibrous%
Non Fibrous%
Asbestos% &Type
Not Applicable
0%
100%
NAD
X
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
Section 1 - Concrete (Wall)
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
BK0124336-144
Section 5 - CMU Wall
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
109B
BK0124336-145
Section 5 - CMU Wall
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
110A
BK0124336-146
Section 4 - Grout to Red Brick Inlay @ Tunnel
Red, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
110B
BK0124336-147
Section 4 - Grout to Red Brick Inlay @ Tunnel
Red, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
111A
BK0124336-148
Section 4 - Black Pipe Sealant on Wall Penetration
Grey, Homogeneous, Non-Fibrous
32.6 46.1 21.3
0%
100%
111B
BK0124336-149
Section 4 - Black Pipe Sealant on Wall Penetration
Grey, Homogeneous, Non-Fibrous
32.2 40.5 27.3
0%
100%
112A
BK0124336-150
Section 4 - Red Fire Caulk to Wall Penetration
Red, Homogeneous, Non-Fibrous
39.1 44.1 16.8
0%
100%
Page 15 of 16
Asbestos% &Type
PLM 198.1
X
PM20 REV3, Jan 2022
Atlas Environmental Lab, Corp. 255 West 36th Street, Suite# 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(212) 563-0401 www.atlasenvironmentallab.com
Bulk Asbestos Report by PLM-TEM Client: Collected by: Project Name/No.: Project Address: Work Area:
CHA Solutions, Inc Client OGS Utility Tunnels HAZMAT Inspection / 080577 Empire State Plaza; 100 S Mall Arterial, Albany, NY Hot Tunnel South / Upper South / Upper North
Lab ID: BK0124336 Date Received: 1/29/2024 PLM Date Analyzed: 1/30/2024 TEM Date Analyzed: 2/1/2024 Report Date: 2/3/2024
Client ID#
Lab ID#
Description/ Location
Analyst Description
ASI ORG AII% % %
112B
BK0124336-151
Section 4 - Red Fire Caulk to Wall Penetration
Red, Homogeneous, Non-Fibrous
113A
BK0124336-152
Section 4 - Parge Coat to CMU
113B
BK0124336-153
Section 4 - Parge Coat to CMU
PLM
TEM
Method By ELAP
Fibrous%
Non Fibrous%
Asbestos% &Type
Asbestos% &Type
35.0 53.6 11.4
0%
100%
NAD Inconclusive
NAD
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
Grey, Homogeneous, Friable
Not Applicable
0%
100%
NAD
X
PLM 198.1
PLM NOB 198.6
TEM 198.4
X
X
MG/AH Quantitative Analysis (Semi/Full):Bulk Asbestos Analysis-PLM by EPA 600/M4-82-020 per 40 CFR or ELAP198.1 (friable) and 198.6 (NOB) samples for New York. NAD=no asbestos detected, NA/PS=Not Analyzed/Positive Stop, Trace=<1%,FBGL=Fiberglass, CELL=Cellulose,CHRY=Chrysotile,Amo=Amosite,CRO=Crocidolite,ANTH=Anthophylite, TRE=Tremolite, ACT=Actinolite, NA=not applicable.
PLM is not consistently reliable in detecting Asbestos in floor coverings and similar non friable organically bound materials. NAD or Trace results by PLM are inconclusive. TEM is currently the only method that can be used to determine if this material can be considered or treated as non asbestos containing in NY State. All samples were prepared and analyzed in accordance with the EPA "TEM Method for Identifying and Quantifying Asbestos in Non-Fibrous Organically Bound Bulk Samples" ELAP 198.4". ORG%=Ashed Organic%, AII= Acid Insoluble Inorganic%, ASI= Acid Soluble Inorganic% This "Summary of Analytical Results "shall not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, ELAP or any agency of the U.S Government. The results relate only to the items tested. This report may not be reproduced, except in full, without the written approval of AEL .Atlas Environmental lab did not collect the analyzed samples and thus accepts no liability with regard to their collection and/or maintenance . AEL relies on client's data. The liability of Atlas Environmental Lab corp with respect to the services charged, shall in no event exceed the amount of the invoice.
NYS-ELAP#11999, NVLAP Lab Code: 500092-0, NJ ID: NY034 "ELCP on NJ won't apply to TEM", CT Reg. ID: PH-0154 PLM Analyst: BH
TEM Analyst: VR
Approved by:
Page 16 of 16
PM20 REV3, Jan 2022
APPENDIX F PCB Sample Analytical Report
DATA PACKAGE GC SEMI-VOLATILES
PROJECT NAME : OGS UTILITY TUNNELS HAZMAT INSPECTION
CHA COMPANIES, INC. III Winners Circle P.O. Box 5269 Albany, NY - 12205-0269 Phone No: 518-453-4500
ORDER ID : P1274 ATTENTION : James Morey
Laboratory Certification ID # 20012 P1274
1 of 22
Table Of Contents for P1274 1) Signature Page
3
1
2) Case Narrative
4
2
4
3
3) Qualifier Page
6
4
4) QA Checklist
7
5
5) PCB Data
8
6
6) Shipping Document
20
2.1) PCB- Case Narrative
P1274
6.1) CHAIN OF CUSTODY
21
6.2) Lab Certificate
22
2 of 22
1 284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
Cover Page Order ID : Project ID : Client :
P1274 OGS UTILITY TUNNELS HAZMAT INSPECTION CHA Companies, Inc.
Lab Sample Number
Client Sample Number
P1274-01 P1274-02 P1274-03 P1274-04 P1274-05 P1274-06 P1274-07 P1274-08
PCB-012324-01 PCB-012324-02 PCB-012324-03 PCB-012324-04 PCB-012324-05 PCB-012324-06 PCB-012324-07 PCB-012324-08
I certify that the data package is in compliance with the terms and conditions of the contract,both technically and for completeness, for other than the conditions detailed above. Release of the data contained in this hard copy data package has been authorized by the laboratory manager or his designee, as verified by the following signature. Signature :
2/12/2024 Date: By Sohil Jodhani, QA/QC Director at 9:03 am, Feb 12, 2024
NYDOH CERTIFICATION NO - 11376
P1274
NJDEP CERTIFICATION NO - 20012
3 of 22
2 284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
CASE NARRATIVE CHA Companies, Inc. Project Name: OGS UTILITY TUNNELS HAZMAT INSPECTION Project # N/A Chemtech Project # P1274 Test Name: PCB A. Number of Samples and Date of Receipt: 8 Solid samples were received on 01/29/2024. B. Parameters According to the Chain of Custody document, the following analyses were requested: PCB. This data package contains results for PCB. C. Analytical Techniques: The analyses were performed on instrument GCECD_O. The front column is ZB-MR1 which is 30 meters, 0.32 mm ID, 0.5 um df, Catalogue # 7HM-G016-17. The rear column is ZB-MR2 which is 30 meters, 0.32 mm ID, 0.25 µm; Catalogue # 7HM-G017-11.The analysis of PCBs was based on method 8082A and extraction was done based on method 3541. D. QA/ QC Samples: The Holding Times were met for all analysis. The Surrogate recoveries met the acceptable criteria except for PCB-012324-02 [Tetrachloro-m-xylene(2) - 38%],AS per method one surrogate allowed to fail to meet the criteria per column, No further corrective action was taken while, PCB-012324-07 [Decachlorobiphenyl(1) - 268%, Decachlorobiphenyl(2) - 207%], PCB012324-07RE [Decachlorobiphenyl(1) - 264% and Decachlorobiphenyl(2) - 215%] the failure sample in surrogates with both columns were reanalyzed to confirm the results as per method and reported in the data. The Retention Times were acceptable for all samples. The Blank Spike met requirements for all samples . The Blank analysis did not indicate the presence of lab contamination. The Initial Calibration met the requirements . The Continuous Calibration File ID PO101476.D met the requirements except for Decachlorobiphenyl is failing in 2nd column but it is passing in 1st column therefore no corrective action taken. E. Additional Comments: The temperature of the samples at the time of receipt was 18.2°C.
P1274
4 of 22
2.1
2 284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
All samples received as Caulk matrix, therefore less volume was taken at the time of extraction. No MSMSD performed as samples are caulk matrix. F. Manual Integration Comments: Please refer to the Manual integration Report included with the Run Logs for information on the manual integrations performed. I certify that the data package is in compliance with the terms and conditions of the contract, both technically and for completeness, for other than the conditions detailed above. The laboratory manager or his designee, as verified by the following signature has authorized release of the data contained in this hard copy data package.
Signature__________________________
P1274
By Sohil Jodhani, QA/QC Director at 9:04 am, Feb 12, 2024
5 of 22
2.1
3 284 Sheffield Street, Mountainside NJ 07092 Tel. 908-789-8900 Fax: 908-789-8922
DATA REPORTING QUALIFIERS- ORGANIC
For reporting results, the following “ Results Qualifiers” are used:
Value
If the result is a value greater than or equal to the detection limit, report the value
U
Indicates the compound was analyzed for but was not detected. Report the minimum detection limit for the sample with the U, i.e. “10 U”. This is not necessarily the instrument detection limit attainable for this particular sample based on any concentration or dilution that may have been required.
ND
Indicates the analyte was analyzed for, but not detected
J
Indicates an estimated value. This flag is used: (1) When estimating a concentration for a tentatively identified compound (library search hits, where a 1:1 response is assumed.) (2) When the mass spectral data indicated the identification, however the result was less than the specified detection limit greater than zero. If the detection limit was 10ug/L and a concentration of 3 ug/L was calculated report as 3 J. This is flag is used when similar situation arise on any organic parameter i.e. Pest, PCB and others. Indicates the analyte was found in the blank as well as the sample report as “12 B”.
B
E
Indicates the analyte ‘s concentration exceeds the calibrated range of the instrument for that specific analysis.
D
This flag identifies all compounds identified in an analysis at a secondary dilution factor.
P
This flag is used for Pesticide/PCB target analyte when there is >25% difference for detected concentrations between the two GC columns. The lower of the two values is reported on Form 1 and flagged with a “P”.
N
This flag indicates presumptive evidence of a compound. This is only used for tentatively identified compounds (TICs), where the identification is based on a mass spectral library search. It applies to all TIC results. For generic characterization of a TIC, such as chlorinated hydrocarbon, the flag is not used.
A
This flag indicates that a Tentatively Identified Compound is a suspected aldolcondensation product.
Q
Indicates the LCS did not meet the control limits requirements
QA Control # A3040960 P1274
6 of 22
4
284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
APPENDIX A QA REVIEW GENERAL DOCUMENTATION
Project #:
P1274 Completed
For thorough review, the report must have the following:
GENERAL: Are all original paperwork present (chain of custody, record of communication,airbill, sample management lab chronicle, login page)
ü
Check chain-of-custody for proper relinquish/return of samples
ü
Is the chain of custody signed and complete
ü
Check internal chain-of-custody for proper relinquish/return of samples /sample extracts
ü
Collect information for each project id from server. Were all requirements followed
ü
COVER PAGE: Do numbers of samples correspond to the number of samples in the Chain of Custody on login page
ü
Do lab numbers and client Ids on cover page agree with the Chain of Custody
ü
CHAIN OF CUSTODY: Do requested analyses on Chain of Custody agree with form I results
ü
Do requested analyses on Chain of Custody agree with the log-in page
ü
Were the correct method log-in for analysis according to the Analytical Request and Chain of Castody
ü
Were the samples received within hold time
ü
Were any problems found with the samples at arrival recorded in the Sample Management Laboratory Chronicle
ü
ANALYTICAL: Was method requirement followed?
ü
Was client requirement followed?
ü
Does the case narrative summarize all QC failure?
ü
All runlogs and manual integration are reviewed for requirements
ü
All manual calculations and /or hand notations verified
ü
1st Level QA Review Signature:
MOHAMMAD AHMED
Date:
2nd Level QA Review Signature:
P1274
02/12/2024
Date: By Sohil Jodhani, QA/QC Director at 9:04 am, Feb 12, 2024
7 of 22
5
284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
Hit Summary Sheet SW-846
SDG No.:
P1274
Order ID:
Client:
CHA Companies, Inc.
Project ID:
Sample ID
Client ID
Client ID : P1274-01
PCB-012324-01 PCB-012324-01
Matrix
Parameter
A
P1274
Concentration
B
OGS UTILITY TUNNELS HAZMAT INSPECT C
MDL
RDL
Units
D
CAULK
4300 P
Aroclor-1260 Total Concentration:
51.9
264
ug/kg
4,300.000
Client ID : P1274-04
PCB-012324-04 PCB-012324-04
CAULK
Aroclor-1254
6200 P
163
739
ug/kg
P1274-04
PCB-012324-04
CAULK
Aroclor-1260
6300
145
739
ug/kg
55.1
280
ug/kg
55.1
280
ug/kg
Total Concentration:
Client ID : P1274-07
PCB-012324-07 PCB-012324-07
CAULK
PCB-012324-07RE PCB-012324-07RE
CAULK
1,000.000
892 P
Aroclor-1260 Total Concentration:
P1274
12,500.000
1000 P
Aroclor-1260 Total Concentration:
Client ID : P1274-07RE
C
8 of 22
892.000
5
A B C D
SA AM MPL LE DA ATA A
P1274
9 of 22
5
284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
Report of Analysis A
Client:
CHA Companies, Inc.
Date Collected:
01/23/24
Project:
OGS UTILITY TUNNELS HAZMAT INSPECTION
Date Received:
01/29/24
Client Sample ID:
PCB-012324-01
SDG No.:
P1274
Lab Sample ID:
P1274-01
Matrix:
CAULK
Analytical Method:
SW8082A
% Solid:
100
Decanted:
Sample Wt/Vol:
1.93
g
Final Vol:
10000
uL
uL
Test:
PCB
B
Units:
Soil Aliquot Vol: Extraction Type:
C D
Injection Volume :
GPC Factor :
1.0
Prep Method :
SW3541B
File ID/Qc Batch:
Dilution:
Prep Date
Date Analyzed
Prep Batch ID
PO101467.D
1
01/30/24 10:10
01/30/24 13:56
PB158706
CAS Number
PH :
Parameter
Conc.
Qualifier MDL
LOQ / CRQL
Units
Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1262 Aroclor-1268 Aroclor-1260
55.6 91.2 70.3 48.7 43.8 58.4 42.3 51.3 4300
U U U U U U U U P
55.6 91.2 70.3 48.7 43.8 58.4 42.3 51.3 51.9
264 264 264 264 264 264 264 264 264
ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg
Tetrachloro-m-xylene Decachlorobiphenyl
19.0 24.4
40 - 162 32 - 175
95% 122%
SPK: 20 SPK: 20
TARGETS
12674-11-2 11104-28-2 11141-16-5 53469-21-9 12672-29-6 11097-69-1 37324-23-5 11100-14-4 11096-82-5 SURROGATES
877-09-8 2051-24-3
Comments: U = Not Detected LOQ = Limit of Quantitation MDL = Method Detection Limit LOD = Limit of Detection E = Value Exceeds Calibration Range P = Indicates >25% difference for detected concentrations between the two GC columns Q = indicates LCS control criteria did not meet requirements M = MS/MSD acceptance criteria did not meet requirements
P1274
J = Estimated Value B = Analyte Found in Associated Method Blank N = Presumptive Evidence of a Compound * = Values outside of QC limits D = Dilution S = Indicates estimated value where valid five-point calibration was not performed prior to analyte detection in sample. () = Laboratory InHouse Limit
10 of 22
5
284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
Report of Analysis A
Client:
CHA Companies, Inc.
Date Collected:
01/23/24
Project:
OGS UTILITY TUNNELS HAZMAT INSPECTION
Date Received:
01/29/24
Client Sample ID:
PCB-012324-02
SDG No.:
P1274
Lab Sample ID:
P1274-02
Matrix:
CAULK
Analytical Method:
SW8082A
% Solid:
100
Decanted:
Sample Wt/Vol:
2.04
g
Final Vol:
10000
uL
uL
Test:
PCB
B
Units:
Soil Aliquot Vol: Extraction Type:
C D
Injection Volume :
GPC Factor :
1.0
Prep Method :
SW3541B
File ID/Qc Batch:
Dilution:
Prep Date
Date Analyzed
Prep Batch ID
PO101468.D
1
01/30/24 10:10
01/30/24 14:12
PB158706
CAS Number
PH :
Parameter
Conc.
Qualifier MDL
LOQ / CRQL
Units
Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1262 Aroclor-1268 Aroclor-1260
52.6 86.3 66.5 46.0 41.5 55.3 40.0 48.5 49.1
U U U U U U U U U
52.6 86.3 66.5 46.0 41.5 55.3 40.0 48.5 49.1
250 250 250 250 250 250 250 250 250
ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg
Tetrachloro-m-xylene Decachlorobiphenyl
10.4 9.08
40 - 162 32 - 175
52% 45%
SPK: 20 SPK: 20
TARGETS
12674-11-2 11104-28-2 11141-16-5 53469-21-9 12672-29-6 11097-69-1 37324-23-5 11100-14-4 11096-82-5 SURROGATES
877-09-8 2051-24-3
Comments: U = Not Detected LOQ = Limit of Quantitation MDL = Method Detection Limit LOD = Limit of Detection E = Value Exceeds Calibration Range P = Indicates >25% difference for detected concentrations between the two GC columns Q = indicates LCS control criteria did not meet requirements M = MS/MSD acceptance criteria did not meet requirements
P1274
J = Estimated Value B = Analyte Found in Associated Method Blank N = Presumptive Evidence of a Compound * = Values outside of QC limits D = Dilution S = Indicates estimated value where valid five-point calibration was not performed prior to analyte detection in sample. () = Laboratory InHouse Limit
11 of 22
5
284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
Report of Analysis A
Client:
CHA Companies, Inc.
Date Collected:
01/23/24
Project:
OGS UTILITY TUNNELS HAZMAT INSPECTION
Date Received:
01/29/24
Client Sample ID:
PCB-012324-03
SDG No.:
P1274
Lab Sample ID:
P1274-03
Matrix:
CAULK
Analytical Method:
SW8082A
% Solid:
100
Decanted:
Sample Wt/Vol:
0.81
g
Final Vol:
10000
uL
uL
Test:
PCB
B
Units:
Soil Aliquot Vol: Extraction Type:
C D
Injection Volume :
GPC Factor :
1.0
Prep Method :
SW3541B
File ID/Qc Batch:
Dilution:
Prep Date
Date Analyzed
Prep Batch ID
PO101469.D
1
01/30/24 10:10
01/30/24 14:29
PB158706
CAS Number
PH :
Parameter
Conc.
Qualifier MDL
LOQ / CRQL
Units
Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1262 Aroclor-1268 Aroclor-1260
133 217 167 116 104 139 101 122 124
U U U U U U U U U
133 217 167 116 104 139 101 122 124
630 630 630 630 630 630 630 630 630
ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg
Tetrachloro-m-xylene Decachlorobiphenyl
19.3 22.1
40 - 162 32 - 175
96% 110%
SPK: 20 SPK: 20
TARGETS
12674-11-2 11104-28-2 11141-16-5 53469-21-9 12672-29-6 11097-69-1 37324-23-5 11100-14-4 11096-82-5 SURROGATES
877-09-8 2051-24-3
Comments: U = Not Detected LOQ = Limit of Quantitation MDL = Method Detection Limit LOD = Limit of Detection E = Value Exceeds Calibration Range P = Indicates >25% difference for detected concentrations between the two GC columns Q = indicates LCS control criteria did not meet requirements M = MS/MSD acceptance criteria did not meet requirements
P1274
J = Estimated Value B = Analyte Found in Associated Method Blank N = Presumptive Evidence of a Compound * = Values outside of QC limits D = Dilution S = Indicates estimated value where valid five-point calibration was not performed prior to analyte detection in sample. () = Laboratory InHouse Limit
12 of 22
5
284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
Report of Analysis A
Client:
CHA Companies, Inc.
Date Collected:
01/23/24
Project:
OGS UTILITY TUNNELS HAZMAT INSPECTION
Date Received:
01/29/24
Client Sample ID:
PCB-012324-04
SDG No.:
P1274
Lab Sample ID:
P1274-04
Matrix:
CAULK
Analytical Method:
SW8082A
% Solid:
100
Decanted:
Sample Wt/Vol:
0.69
g
Final Vol:
10000
uL
uL
Test:
PCB
B
Units:
Soil Aliquot Vol: Extraction Type:
C D
Injection Volume :
GPC Factor :
1.0
Prep Method :
SW3541B
File ID/Qc Batch:
Dilution:
Prep Date
Date Analyzed
Prep Batch ID
PO101470.D
1
01/30/24 10:10
01/30/24 14:46
PB158706
CAS Number
PH :
Parameter
Conc.
Qualifier MDL
LOQ / CRQL
Units
Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1262 Aroclor-1268 Aroclor-1260
156 255 197 136 123 6200 118 143 6300
U U U U U P U U
156 255 197 136 123 163 118 143 145
739 739 739 739 739 739 739 739 739
ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg
Tetrachloro-m-xylene Decachlorobiphenyl
20.3 21.7
40 - 162 32 - 175
101% 108%
SPK: 20 SPK: 20
TARGETS
12674-11-2 11104-28-2 11141-16-5 53469-21-9 12672-29-6 11097-69-1 37324-23-5 11100-14-4 11096-82-5 SURROGATES
877-09-8 2051-24-3
Comments: U = Not Detected LOQ = Limit of Quantitation MDL = Method Detection Limit LOD = Limit of Detection E = Value Exceeds Calibration Range P = Indicates >25% difference for detected concentrations between the two GC columns Q = indicates LCS control criteria did not meet requirements M = MS/MSD acceptance criteria did not meet requirements
P1274
J = Estimated Value B = Analyte Found in Associated Method Blank N = Presumptive Evidence of a Compound * = Values outside of QC limits D = Dilution S = Indicates estimated value where valid five-point calibration was not performed prior to analyte detection in sample. () = Laboratory InHouse Limit
13 of 22
5
284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
Report of Analysis A
Client:
CHA Companies, Inc.
Date Collected:
01/23/24
Project:
OGS UTILITY TUNNELS HAZMAT INSPECTION
Date Received:
01/29/24
Client Sample ID:
PCB-012324-05
SDG No.:
P1274
Lab Sample ID:
P1274-05
Matrix:
CAULK
Analytical Method:
SW8082A
% Solid:
100
Decanted:
Sample Wt/Vol:
1.15
g
Final Vol:
10000
uL
uL
Test:
PCB
B
Units:
Soil Aliquot Vol: Extraction Type:
C D
Injection Volume :
GPC Factor :
1.0
Prep Method :
SW3541B
File ID/Qc Batch:
Dilution:
Prep Date
Date Analyzed
Prep Batch ID
PO101471.D
1
01/30/24 10:10
01/30/24 15:02
PB158706
CAS Number
PH :
Parameter
Conc.
Qualifier MDL
LOQ / CRQL
Units
Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1262 Aroclor-1268 Aroclor-1260
93.4 153 118 81.7 73.6 98.1 71.0 86.1 87.1
U U U U U U U U U
93.4 153 118 81.7 73.6 98.1 71.0 86.1 87.1
443 443 443 443 443 443 443 443 443
ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg
Tetrachloro-m-xylene Decachlorobiphenyl
20.2 22.4
40 - 162 32 - 175
101% 112%
SPK: 20 SPK: 20
TARGETS
12674-11-2 11104-28-2 11141-16-5 53469-21-9 12672-29-6 11097-69-1 37324-23-5 11100-14-4 11096-82-5 SURROGATES
877-09-8 2051-24-3
Comments: U = Not Detected LOQ = Limit of Quantitation MDL = Method Detection Limit LOD = Limit of Detection E = Value Exceeds Calibration Range P = Indicates >25% difference for detected concentrations between the two GC columns Q = indicates LCS control criteria did not meet requirements M = MS/MSD acceptance criteria did not meet requirements
P1274
J = Estimated Value B = Analyte Found in Associated Method Blank N = Presumptive Evidence of a Compound * = Values outside of QC limits D = Dilution S = Indicates estimated value where valid five-point calibration was not performed prior to analyte detection in sample. () = Laboratory InHouse Limit
14 of 22
5
284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
Report of Analysis A
Client:
CHA Companies, Inc.
Date Collected:
01/23/24
Project:
OGS UTILITY TUNNELS HAZMAT INSPECTION
Date Received:
01/29/24
Client Sample ID:
PCB-012324-06
SDG No.:
P1274
Lab Sample ID:
P1274-06
Matrix:
CAULK
Analytical Method:
SW8082A
% Solid:
100
Decanted:
Sample Wt/Vol:
2.5
g
Final Vol:
10000
uL
uL
Test:
PCB
B
Units:
Soil Aliquot Vol: Extraction Type:
C D
Injection Volume :
GPC Factor :
1.0
Prep Method :
SW3541B
File ID/Qc Batch:
Dilution:
Prep Date
Date Analyzed
Prep Batch ID
PO101472.D
1
01/30/24 10:10
01/30/24 15:19
PB158706
CAS Number
PH :
Parameter
Conc.
Qualifier MDL
LOQ / CRQL
Units
Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1262 Aroclor-1268 Aroclor-1260
43.0 70.4 54.2 37.6 33.8 45.1 32.6 39.6 40.1
U U U U U U U U U
43.0 70.4 54.2 37.6 33.8 45.1 32.6 39.6 40.1
204 204 204 204 204 204 204 204 204
ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg
Tetrachloro-m-xylene Decachlorobiphenyl
16.5 25.6
40 - 162 32 - 175
82% 128%
SPK: 20 SPK: 20
TARGETS
12674-11-2 11104-28-2 11141-16-5 53469-21-9 12672-29-6 11097-69-1 37324-23-5 11100-14-4 11096-82-5 SURROGATES
877-09-8 2051-24-3
Comments: U = Not Detected LOQ = Limit of Quantitation MDL = Method Detection Limit LOD = Limit of Detection E = Value Exceeds Calibration Range P = Indicates >25% difference for detected concentrations between the two GC columns Q = indicates LCS control criteria did not meet requirements M = MS/MSD acceptance criteria did not meet requirements
P1274
J = Estimated Value B = Analyte Found in Associated Method Blank N = Presumptive Evidence of a Compound * = Values outside of QC limits D = Dilution S = Indicates estimated value where valid five-point calibration was not performed prior to analyte detection in sample. () = Laboratory InHouse Limit
15 of 22
5
284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
Report of Analysis A
Client:
CHA Companies, Inc.
Date Collected:
01/23/24
Project:
OGS UTILITY TUNNELS HAZMAT INSPECTION
Date Received:
01/29/24
Client Sample ID:
PCB-012324-07
SDG No.:
P1274
Lab Sample ID:
P1274-07
Matrix:
CAULK
Analytical Method:
SW8082A
% Solid:
100
Decanted:
Sample Wt/Vol:
1.82
g
Final Vol:
10000
uL
uL
Test:
PCB
B
Units:
Soil Aliquot Vol: Extraction Type:
C D
Injection Volume :
GPC Factor :
1.0
Prep Method :
SW3541B
File ID/Qc Batch:
Dilution:
Prep Date
Date Analyzed
Prep Batch ID
PO101473.D
1
01/30/24 10:10
01/30/24 15:36
PB158706
CAS Number
PH :
Parameter
Conc.
Qualifier MDL
LOQ / CRQL
Units
Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1262 Aroclor-1268 Aroclor-1260
59.0 96.8 74.5 51.6 46.5 62.0 44.8 54.4 1000
U U U U U U U U P
59.0 96.8 74.5 51.6 46.5 62.0 44.8 54.4 55.1
280 280 280 280 280 280 280 280 280
ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg
Tetrachloro-m-xylene Decachlorobiphenyl
16.2 53.6
*
40 - 162 32 - 175
81% 268%
SPK: 20 SPK: 20
TARGETS
12674-11-2 11104-28-2 11141-16-5 53469-21-9 12672-29-6 11097-69-1 37324-23-5 11100-14-4 11096-82-5 SURROGATES
877-09-8 2051-24-3
Comments: U = Not Detected LOQ = Limit of Quantitation MDL = Method Detection Limit LOD = Limit of Detection E = Value Exceeds Calibration Range P = Indicates >25% difference for detected concentrations between the two GC columns Q = indicates LCS control criteria did not meet requirements M = MS/MSD acceptance criteria did not meet requirements
P1274
J = Estimated Value B = Analyte Found in Associated Method Blank N = Presumptive Evidence of a Compound * = Values outside of QC limits D = Dilution S = Indicates estimated value where valid five-point calibration was not performed prior to analyte detection in sample. () = Laboratory InHouse Limit
16 of 22
5
284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
Report of Analysis A
Client:
CHA Companies, Inc.
Date Collected:
01/23/24
Project:
OGS UTILITY TUNNELS HAZMAT INSPECTION
Date Received:
01/29/24
Client Sample ID:
PCB-012324-07RE
SDG No.:
P1274
Lab Sample ID:
P1274-07RE
Matrix:
CAULK
Analytical Method:
SW8082A
% Solid:
100
Decanted:
Sample Wt/Vol:
1.82
g
Final Vol:
10000
uL
uL
Test:
PCB
B
Units:
Soil Aliquot Vol: Extraction Type:
C D
Injection Volume :
GPC Factor :
1.0
Prep Method :
SW3541B
File ID/Qc Batch:
Dilution:
Prep Date
Date Analyzed
Prep Batch ID
PO101475.D
1
01/30/24 10:10
01/30/24 16:26
PB158706
CAS Number
PH :
Parameter
Conc.
Qualifier MDL
LOQ / CRQL
Units
Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1262 Aroclor-1268 Aroclor-1260
59.0 96.8 74.5 51.6 46.5 62.0 44.8 54.4 892
U U U U U U U U P
59.0 96.8 74.5 51.6 46.5 62.0 44.8 54.4 55.1
280 280 280 280 280 280 280 280 280
ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg
Tetrachloro-m-xylene Decachlorobiphenyl
16.2 52.7
*
40 - 162 32 - 175
81% 264%
SPK: 20 SPK: 20
TARGETS
12674-11-2 11104-28-2 11141-16-5 53469-21-9 12672-29-6 11097-69-1 37324-23-5 11100-14-4 11096-82-5 SURROGATES
877-09-8 2051-24-3
Comments: U = Not Detected LOQ = Limit of Quantitation MDL = Method Detection Limit LOD = Limit of Detection E = Value Exceeds Calibration Range P = Indicates >25% difference for detected concentrations between the two GC columns Q = indicates LCS control criteria did not meet requirements M = MS/MSD acceptance criteria did not meet requirements
P1274
J = Estimated Value B = Analyte Found in Associated Method Blank N = Presumptive Evidence of a Compound * = Values outside of QC limits D = Dilution S = Indicates estimated value where valid five-point calibration was not performed prior to analyte detection in sample. () = Laboratory InHouse Limit
17 of 22
5
284 Sheffield Street, Mountainside, NJ 07092 Phone: 908 789 8900 Fax: 908 789 8922
Report of Analysis A
Client:
CHA Companies, Inc.
Date Collected:
01/23/24
Project:
OGS UTILITY TUNNELS HAZMAT INSPECTION
Date Received:
01/29/24
Client Sample ID:
PCB-012324-08
SDG No.:
P1274
Lab Sample ID:
P1274-08
Matrix:
CAULK
Analytical Method:
SW8082A
% Solid:
100
Decanted:
Sample Wt/Vol:
2.63
g
Final Vol:
10000
uL
uL
Test:
PCB
B
Units:
Soil Aliquot Vol: Extraction Type:
C D
Injection Volume :
GPC Factor :
1.0
Prep Method :
SW3541B
File ID/Qc Batch:
Dilution:
Prep Date
Date Analyzed
Prep Batch ID
PO101474.D
1
01/30/24 10:10
01/30/24 15:53
PB158706
CAS Number
PH :
Parameter
Conc.
Qualifier MDL
LOQ / CRQL
Units
Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1262 Aroclor-1268 Aroclor-1260
40.8 67.0 51.6 35.7 32.2 42.9 31.0 37.6 38.1
U U U U U U U U U
40.8 67.0 51.6 35.7 32.2 42.9 31.0 37.6 38.1
194 194 194 194 194 194 194 194 194
ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg
Tetrachloro-m-xylene Decachlorobiphenyl
17.9 25.9
40 - 162 32 - 175
90% 130%
SPK: 20 SPK: 20
TARGETS
12674-11-2 11104-28-2 11141-16-5 53469-21-9 12672-29-6 11097-69-1 37324-23-5 11100-14-4 11096-82-5 SURROGATES
877-09-8 2051-24-3
Comments: U = Not Detected LOQ = Limit of Quantitation MDL = Method Detection Limit LOD = Limit of Detection E = Value Exceeds Calibration Range P = Indicates >25% difference for detected concentrations between the two GC columns Q = indicates LCS control criteria did not meet requirements M = MS/MSD acceptance criteria did not meet requirements
P1274
J = Estimated Value B = Analyte Found in Associated Method Blank N = Presumptive Evidence of a Compound * = Values outside of QC limits D = Dilution S = Indicates estimated value where valid five-point calibration was not performed prior to analyte detection in sample. () = Laboratory InHouse Limit
18 of 22
5
284 Sheffield Street, Mountainside, New Jersey - 07092 Phone: (908) 789 8900 Fax: (908) 789 8922
A
LAB CHRONICLE OrderID: Client: Contact: LabID
ClientID
P1274-01
PCB-012324-01
P1274-02
P1274-03
P1274-04
P1274-05
P1274-06
P1274-07
P1274-07RE
P1274-08
P1274
P1274 CHA Companies, Inc. James Morey
PCB-012324-02
PCB-012324-03
PCB-012324-04
PCB-012324-05
PCB-012324-06
PCB-012324-07
PCB-012324-07RE
PCB-012324-08
B
OrderDate: Project: Location: Matrix
Test
Method
PCB
8082A
PCB
8082A
PCB
8082A
PCB
8082A
PCB
8082A
CAULK
1/29/2024 12:15:00 PM OGS UTILITY TUNNELS HAZMAT INSPECTION D11 Sample Date
Prep Date
Anal Date
01/30/24
01/30/24
01/30/24
01/30/24
01/30/24
01/30/24
01/30/24
01/30/24
01/30/24
01/30/24
01/23/24
CAULK
01/29/24
01/23/24
CAULK
01/29/24
01/23/24
CAULK
01/29/24
01/23/24
CAULK
01/29/24
01/23/24
CAULK
01/29/24
01/23/24 PCB
8082A
PCB
8082A
CAULK
01/29/24 01/30/24
01/30/24
01/30/24
01/30/24
01/23/24
CAULK
01/29/24
01/23/24 PCB
8082A
PCB
8082A
CAULK
01/29/24 01/30/24
01/30/24
01/30/24
01/30/24
01/23/24
19 of 22
Received
01/29/24
C D
6
SH HIP PPIN NG DOC D CUM ME ENT TS
P1274
20 of 22
6 6.1
P1274
21 of 22
284 Sheffield Street, Mountainside NJ 07092 (908)-789-8900 Fax : 908 789 8922
Laboratory Certification Certified By
License No.
CAS EPA CLP Contract
68HERH20D0011
Connecticut
PH-0649
DOD ELAP (L-A-B)
L2219
Maine
2022022
Maryland
296
New Hampshire
255423
New Jersey
20012
New York
11376
Pennsylvania
68-00548
Soil Permit
P330-21-00137
Texas
T104704488-23-16
QA Control Code: A2070148
P1274
22 of 22
6 6.2
APPENDIX G LBP Sample Analytical Report
Atlas Environmental Lab, Corp 255 W 36th Street Suite 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(718) 563-0401 www.atlasenvironmentallab.com
REPORT OF ANALYSIS FOR LEAD PAINT Client: CHA Solutions, Inc. Collected by: Client Project Name/No.: OGS Utility Tunnels Hazmat Inspection / C80577 Project Address: 100 S Mall Arterial Work Area: Empire State Plaza / Cold/Hot Tunnels
Lab ID: LP01241794 Date Sampled: 1/23/2024 Date Received: 1/29/2024 Date Analyzed: 1/30/2024 Report Date: 2/3/2024
Client ID #
Lab ID #
Location/Description
Result (% Pb W/W)
01
LP01241794-1
Cold Tunnel Section 1 West - Brown / Green Painted Overwrap to Foam on Condensate Line
<0.03
02
LP01241794-2
Cold Tunnel Section 1 West - Green Paint to Paper Jacketed FG Insul. on 36" Pipe
0.40
03
LP01241794-3
Cold Tunnel Section 1 West - Green Paint to Structural Steel on Concrete Pad
<0.03
04
LP01241794-4
Cold Tunnel Section 2 West - Green Painted Paper Jacket to 48" Pipe
<0.03
05
LP01241794-5
Cold Tunnel Section 2 West - Dark Green Paint to Paper Jacket on 36" Pipe
0.10
06
LP01241794-6
Cold Tunnel Section 2 West - Green Paint on Steel Girder
0.03
07
LP01241794-7
Cold Tunnel Section 2A Landing - Red / White Painted Canvas Overwrap to 4" OH Pipe
<0.03
08
LP01241794-8
Cold Tunnel Section 2A "Mid" - Yellow Paint to Canvas Overwrap on 14" Pipe
<0.03
09
LP01241794-9
Cold Tunnel Section 4 (Left) - Turquoise Paint to Paper Jacket on 24" Vertical Line
<0.03
10
LP01241794-10
Cold Tunnel Section 4 (Left) - Beige Paint to Plastic Fitting on 48" Pipe
<0.03
11
LP01241794-11
Cold Tunnel Section 4 (Left) - White Paint on 30" Cast Iron Pipe / Drain
<0.03
12
LP01241794-12
Cold Tunnel Section 4 (Left) - Beige Paint on "Y" Valve
0.08
13
LP01241794-13
Cold Tunnel Section 4 (Left) - Dark Green Paint on Metal Strut
<0.03
14
LP01241794-14
Cold Tunnel Section 5 (Left) - Red / Orange Paint on Metal Panel to 14" HPS Line
<0.03
15
LP01241794-15
Cold Tunnel S5 (Left) - Primer Under Dark Green Paint on Metal Strut
<0.03
16
LP01241794-16
Cold Tunnel S5 (Left) - Pea Green Paint to Canvas Overwrap on DWCS Line
<0.03
17
LP01241794-17
Cold Tunnel Section 5 - Dull Gray Paint to Valve CW58
<0.03
18
LP01241794-18
Cold Tunnel Section 7 - Red Paint to 8" Cast Iron Drain / Pipe
1.29
19
LP01241794-19
Cold Tunnel Section 7 - Yellow Paint to Paper Jacket to HPS Line
<0.03
20
LP01241794-20
Cold Tunnel Section 8 - Light Brown Paint to 12" Cast Iron Pipes
<0.03
Page 1 of 2
L3 REV3, July 2019
Atlas Environmental Lab, Corp 255 W 36th Street Suite 1503 New York, NY 10018 Phone:(212) 563-0400 Fax:(718) 563-0401 www.atlasenvironmentallab.com
REPORT OF ANALYSIS FOR LEAD PAINT Client: CHA Solutions, Inc. Collected by: Client Project Name/No.: OGS Utility Tunnels Hazmat Inspection / C80577 Project Address: 100 S Mall Arterial Work Area: Empire State Plaza / Cold/Hot Tunnels
Lab ID: LP01241794 Date Sampled: 1/23/2024 Date Received: 1/29/2024 Date Analyzed: 1/30/2024 Report Date: 2/3/2024
Client ID #
Lab ID #
Location/Description
Result (% Pb W/W)
21
LP01241794-21
Cold Tunnel Section 11 - Blue Painted 20" PCHWR Elbow
0.09
22
LP01241794-22
Hot Tunnel 1 - Gray Paint to 6" CHW Lines
<0.03
23
LP01241794-23
Hot Tunnel 1 - Yellow Paint to 14" F Line
<0.03
24
LP01241794-24
Hot Tunnel 1 - Yellow Paint to 14" G Line
<0.03
25
LP01241794-25
Hot Tunnel 1 - Orange Paint to 4" CPD Line
0.21
26
LP01241794-26
Hot Tunnel 1 - Dark Orange Paint to Overhead 8" Condensate Lines
<0.03
27
LP01241794-27
Hot Tunnel 1 - Marine Paint to 20" CHW Lines
<0.03
28
LP01241794-28
Hot Tunnel 1 - Green Girder Paint
0.19
29
LP01241794-29
Hot Tunnel 1 - White Painted Concrete (Wall)
<0.03
30
LP01241794-30
Hot Tunnel 2 - Grey Paint to Metal Door / Door Jamb / Door Frame
0.36
31
LP01241794-31
Hot Tunnel 2 - Yellow Hand Rail Paint
13.70
32
LP01241794-32
Hot Tunnel 2 - Green Girder Paint
<0.03 CO
Analysis Method: EPA 7000B
Prep Method: EPA 3050B
RL (Reporting limit): 0.03% by weights (based upon 100 mg sampled) HUD Guideline define lead based paint, when lead levels are equal or greater than 0.5% by weight. NYS - ELAP#11999, AIHA-LAP, LLC ID: 208306, CT Reg. # PH-0154
Analyst: HF
Approved by:
Collection procedure, protocols and sample locations are based on information provided by the client submitting the samples; and as such, Atlas Environmental Labs disclaims any knowledge of and liability for the accuracy and completeness of this information. The results apply to the sample as received. Lead results are not corrected for blank.
Page 2 of 2
L3 REV3, July 2019
APPENDIX H Personnel and Laboratory Certifications
DIVISION OF SAFETY & HEALTH LICENSE AND CERTIFICATE UNIT, STATE OFFICE CAMPUS, BLDG. 12, ALBANY, NY 12226
ASBESTOS HANDLING LICENSE CHA Consulting, Inc. III Winners Circle, Albany, NY, 12205 License Number: 60318 License Class: RESTRICTED Date of Issue: 12/05/2023 Expiration Date: 12/31/2024 Duly Authorized Representative: Seth Fowler This license has been issued in accordance with applicable provisions of Article 30 of the Labor Law of New York State and of the New York State Codes, Rules and Regulations (12 NYCRR Part 56). It is subject to suspension or revocation for a (1) serious violation of state, federal or local laws with regard to the conduct of an asbestos project, or (2) demonstrated lack of responsibility in the conduct of any job involving asbestos or asbestos material. This license is valid only for the contractor named above and this license or a photocopy must be prominently displayed at the asbestos project worksite. This license verifies that all persons employed by the licensee on an asbestos project in New York State have been issued an Asbestos Certificate, appropriate for the type of work they perform, by the New York State Department of Labor.
Amy Phillips, Director For the Commissioner of Labor
SH 432 (12/21)
April 01, 2023
LAB ID: 11376 MR. EMANUEL HEDVAT CHEMTECH 284 SHEFFIELD STREET MOUNTAINSIDE, NJ 07092
Certificate Expiration Date: April 01, 2024
Dear Mr. Hedvat, Enclosed are certificate(s) of approval issued to your environmental laboratory for the current permit year. The certificate(s) supersede(s) any previously issued one(s) and is(are) in effect through the expiration date listed. Please carefully examine the certificate(s) to insure that the categories, subcategories, analytes, and methods for which your laboratory is approved are correct. In addition, verify that your laboratory's name, address, lead technical director, and identification number are accurate.
Pursuant to NYCRR Subpart 55-2.2, original certificates must be posted conspicuously in the laboratory and copies shall be made available to any client of the laboratory upon request. Pursuant to NYCRR Subpart 55-2.6, any misrepresentation of the fields of accreditation (category - method analyte) for which your laboratory is approved may result in denial, suspension, or revocation of your certification. Any use of the Environmental Laboratory Approval Program (ELAP) or National Environmental Laboratory Accreditation Program (NELAP) name, reference to the laboratory's approval status, and/or using the NELAP logo in any catalogs, advertising, business solicitations, proposals, quotations, laboratory analytical reports, or other materials must include the laboratory's ELAP identification number and distinguish between testing for which the laboratory is approved and testing for which the laboratory is not approved. If you have any questions, please contact us at the Environmental Laboratory Approval Program, Wadsworth Center, New York State Department of Health, Empire State Plaza, Albany NY, 12237; by phone at (518) 485-5570; by facsimile at (518) 485-5568; and by email at elap@health.ny.gov.
Sincerely,
Amy J. Steuerwald, Ph.D. Director, Environmental Laboratory Approval Program
NEW YORK STATE DEPARTMENT OF HEALTH WADSWORTH CENTER
Expires 12:01 AM April 01, 2024 Issued April 01, 2023
CERTIFICATE OF APPROVAL FOR LABORATORY SERVICE Issued in accordance with and pursuant to section 502 Public Health Law of New York State
MR. EMANUEL HEDVAT CHEMTECH 284 SHEFFIELD STREET MOUNTAINSIDE, NJ 07092
NY Lab Id No: 11376
is hereby APPROVED as an Environmental Laboratory in conformance with the National Environmental Laboratory Accreditation Conference Standards (2016) for the category ENVIRONMENTAL ANALYSES NON POTABLE WATER All approved analytes are listed below: Phthalate Esters Benzyl butyl phthalate
EPA 8270E
Bis(2-ethylhexyl) phthalate
EPA 625.1 EPA 8270E
Diethyl phthalate
EPA 625.1 EPA 8270E
Dimethyl phthalate
EPA 625.1 EPA 8270E
Di-n-butyl phthalate
EPA 625.1 EPA 8270E
Di-n-octyl phthalate
EPA 625.1 EPA 8270E
Polychlorinated Biphenyls Aroclor 1016 (PCB-1016)
EPA 8082A EPA 608.3
Aroclor 1221 (PCB-1221)
EPA 8082A EPA 608.3
Aroclor 1232 (PCB-1232)
EPA 8082A EPA 608.3
Aroclor 1242 (PCB-1242)
EPA 8082A EPA 608.3
Aroclor 1248 (PCB-1248)
EPA 8082A EPA 608.3
Aroclor 1254 (PCB-1254)
EPA 8082A EPA 608.3
Aroclor 1260 (PCB-1260)
EPA 8082A EPA 608.3
Aroclor 1262 (PCB-1262)
EPA 8082A
Serial No.: 67730 Property of the New York State Department of Health. Certificates are valid only at the address shown and must be conspicuously posted by the laboratory. Continued accreditation depends on the laboratory's successful ongoing participation in the Program. Consumers may verify a laboratory's accreditation status online at https://apps.health.ny.gov/pubdoh/applinks/wc/elappublicweb/, by phone (518) 485-5570 or by email to elap@health.ny.gov.
Page 13 of 22
NEW YORK STATE DEPARTMENT OF HEALTH WADSWORTH CENTER
Expires 12:01 AM April 01, 2024 Issued April 01, 2023
CERTIFICATE OF APPROVAL FOR LABORATORY SERVICE Issued in accordance with and pursuant to section 502 Public Health Law of New York State
MR. EMANUEL HEDVAT CHEMTECH 284 SHEFFIELD STREET MOUNTAINSIDE, NJ 07092
NY Lab Id No: 11376
is hereby APPROVED as an Environmental Laboratory in conformance with the National Environmental Laboratory Accreditation Conference Standards (2016) for the category ENVIRONMENTAL ANALYSES NON POTABLE WATER All approved analytes are listed below: Polychlorinated Biphenyls Aroclor 1268 (PCB-1268)
EPA 8082A
Polynuclear Aromatics Acenaphthene
EPA 625.1 EPA 8270E
Acenaphthylene
EPA 625.1 EPA 8270E
Anthracene
EPA 625.1 EPA 8270E
Benzo(a)anthracene
EPA 625.1 EPA 8270E
Benzo(a)pyrene
EPA 625.1 EPA 8270E
Benzo(b)fluoranthene
EPA 625.1 EPA 8270E
Benzo(g,h,i)perylene
EPA 625.1 EPA 8270E
Benzo(k)fluoranthene
EPA 625.1 EPA 8270E
Chrysene
EPA 625.1 EPA 8270E
Dibenzo(a,h)anthracene
EPA 625.1 EPA 8270E
Fluoranthene
EPA 625.1 EPA 8270E
Fluorene
EPA 625.1 EPA 8270E
Indeno(1,2,3-cd)pyrene
EPA 625.1
Serial No.: 67730 Property of the New York State Department of Health. Certificates are valid only at the address shown and must be conspicuously posted by the laboratory. Continued accreditation depends on the laboratory's successful ongoing participation in the Program. Consumers may verify a laboratory's accreditation status online at https://apps.health.ny.gov/pubdoh/applinks/wc/elappublicweb/, by phone (518) 485-5570 or by email to elap@health.ny.gov.
Page 14 of 22
NEW YORK STATE DEPARTMENT OF HEALTH WADSWORTH CENTER
Expires 12:01 AM April 01, 2024 Issued April 01, 2023
CERTIFICATE OF APPROVAL FOR LABORATORY SERVICE Issued in accordance with and pursuant to section 502 Public Health Law of New York State
MR. EMANUEL HEDVAT CHEMTECH 284 SHEFFIELD STREET MOUNTAINSIDE, NJ 07092
NY Lab Id No: 11376
is hereby APPROVED as an Environmental Laboratory in conformance with the National Environmental Laboratory Accreditation Conference Standards (2016) for the category ENVIRONMENTAL ANALYSES SOLID AND HAZARDOUS WASTE All approved analytes are listed below: Phthalate Esters Diethyl phthalate
EPA 8270E
Dimethyl phthalate
EPA 8270E
Di-n-butyl phthalate
EPA 8270E
Di-n-octyl phthalate
EPA 8270E
Polychlorinated Biphenyls Aroclor 1016 (PCB-1016)
EPA 8082A
Aroclor 1016 (PCB-1016) in Oil
EPA 8082A
Aroclor 1221 (PCB-1221)
EPA 8082A
Aroclor 1221 (PCB-1221) in Oil
EPA 8082A
Aroclor 1232 (PCB-1232)
EPA 8082A
Aroclor 1232 (PCB-1232) in Oil
EPA 8082A
Aroclor 1242 (PCB-1242)
EPA 8082A
Aroclor 1242 (PCB-1242) in Oil
EPA 8082A
Aroclor 1248 (PCB-1248)
EPA 8082A
Aroclor 1248 (PCB-1248) in Oil
EPA 8082A
Aroclor 1254 (PCB-1254)
EPA 8082A
Aroclor 1254 (PCB-1254) in Oil
EPA 8082A
Aroclor 1260 (PCB-1260)
EPA 8082A
Aroclor 1260 (PCB-1260) in Oil
EPA 8082A
Aroclor 1262 (PCB-1262)
EPA 8082A
Aroclor 1268 (PCB-1268)
EPA 8082A
Polynuclear Aromatic Hydrocarbons Acenaphthene
EPA 8270E
Acenaphthylene
EPA 8270E
Anthracene
EPA 8270E
Benzo(a)anthracene
EPA 8270E
Serial No.: 67731 Property of the New York State Department of Health. Certificates are valid only at the address shown and must be conspicuously posted by the laboratory. Continued accreditation depends on the laboratory's successful ongoing participation in the Program. Consumers may verify a laboratory's accreditation status online at https://apps.health.ny.gov/pubdoh/applinks/wc/elappublicweb/, by phone (518) 485-5570 or by email to elap@health.ny.gov.
Page 8 of 13
www.chasolutions.com
Project No. SE332
-748-
Appendix 6: Utility Tunnels Scan Images
May 17, 2024
Project No. SE332
-749-
Overall Scanned Tunnel Sample Images
May 17, 2024
Project No. SE332
-750-
Sample Scanned Cold Tunnel 1
May 17, 2024
Project No. SE332
-751-
Sample Scanned Cold Tunnel 2
May 17, 2024
Project No. SE332
-752-
Sample Scanned Cold Tunnel 3
May 17, 2024
Project No. SE332
-753-
Sample Scanned Hot Tunnel 1
May 17, 2024
Project No. SE332
-754-
Sample Scanned Hot Tunnel 2
May 17, 2024
Project No. SE332
-755-
Appendix 7: Initial Site Visit Minutes
May 17, 2024