Zhang Chaoyue Architectural Portfolio Selected Works 2016-2019 Pratt Institute GAUD M.Arch I Graduate Student
Contents 01
Ribbon
02
Bubble Tower
03
In The Cloud
04
Vertical Street
05
Porous Stone
06
Box Community
07
Continuous Landscape
08
Professional work
Incinerator with a boat house
Residential building 408 Jay St Downtown BK
Creative Hub Among Skyscrapers
Mixed-use Highrise
Creative Hub in Sheshan International Village
Mixed Aging Residence Zone
Campus Library
01
Ribbon Refuse Incinerator and ISMAR Boathouse
RIBBON
PROJECT: INCINERATOR & BOARHOUSE DESIGN STUDIO IV: CAP-18/SP-ARCH-704 PRATT INSTITUTE, SPRING 2018 STUDIO HENRY SMITH-MILLER
TEAM: YANG LI CHAOYUE ZHANG
DESIGN CONSULTANT: HENRY SMITH-MILLER FACADE CONSULTANT: KATE KULPA STRUCTURAL CONSULTANT: PAUL LAROQUE MEP CONSULTANT: STUART BRIDGEET
SITE LOCATION: VENICE, CERTOSA
SCALE:
DRAWING TITLE:
1/256” = 1’ 0”
SITE PLAN
DRAWING NUMBER: A001
RIBBON
Venice Refuse Incinerator and ISMAR Boathouse
Pratt 2018 Spring CAP Studio Collective Work Partner: Yang Li Instructor: Henry Smith-Miller Venice, Italy
Venice, the city of islands and water, is a city in northeastern Italy and the capital of the Veneto region. The unique geometry characteristic of Venice gives us many inspirations about our projects. The site we chose, Certosa, is a small island located at the Eastside of Venice. The landscape also includes a large area of shallow water and a footpath along the coastline. There is the main canal separates Certosa from a larger island which also provides us a clue about how transportation works in this particular water area. Our main goal is to generate a large architecture system which combines the incinerator with the boathouse program together. In order to incorporate with the surrounding environment, we decided to create a ribbon-like structure, along with the coastline, merges landscape and trail together.
ROOF OPENING STONE PAVERS GFRC PANAL
GLASS FACADE WITH CABLE NET SECOND FLOOR ENTRANCE
The inspiration comes from bionics that we place our project as a species of the ocean. Unlike other incinerator construction, we want visitors to interact with incinerator more. So we build this trail, from the tail of this “organism� to the top of the incinerator to experience the energy production happened. The term of eco-friendly is also an essential point of our design, we want to combine solar panel, green roof and terrace space on the top of our trail. The design of supporting structure and court are also followed our goal of accessibility and experience. At last, we try to restore the reflection of fish scale by using hanging glazed ceramics in specific angles to achieve different light distortion at a different time.
ROOF: TERRACE PLACE AND OPENING
FRAME STRUCTURE
OPAQUE FACADE WITH SMALL OPENING
GLASS FACADE AND TRAILS
3F: LABS AND OFFICES
2F: COMMEND CENTER AND BREAK ROOM
1F: RESTAURANT, CAFE AND DOCK ENTRANCE
DOCK ENTRANCE FOR INCINERATOR INCINERATOR LAYOUT
GFRC PANAL
DOUBLE LAYER GLASS GLASS SOCKET
PRECAST PANAL WITH INSULATION
SCREWS
METAL FRAME PIPES
METAL FRAME JOINTS
04
DN
PRIVATE OFFICE
MEETING ROOM
OPEN OFFICE SPACE
LAB PRIVATE OFFICE
MEETING ROOM
BREAK ROOM
OPEN OFFICE SPACE
3
BREAK ROOM
1
TEAM: YANG LI CHAOYUE ZHANG
DESIGN CONSULTANT: HENRY SMITH-MILLER FACADE CONSULTANT: KATE KULPA STRUCTURAL CONSULTANT: PAUL LAROQUE MEP CONSULTANT: STUART BRIDGEET
SITE LOCATION: VENICE, CERTOSA
2
SCALE: 1/128”=1’0”
DRAWING TITLE: THIRD FLOOR
DRAWING NUMBER: A004
PROJECT: INCINERATOR & BOARHOUSE TEAM: DESIGN CONSULTANT: HENRY SMITH-MILLER SITE LOCATION:
GRFC PANEL 2’-3/4” AIR GAP 2” FIBER INSULATION 3” RIGID INSULATION AVB 6” AREATED CONCRETE PANEL AVB 4” RIGID INSULATION 2” FIBER INSULATION 2’-3/4” AIR GAP GRFC PANEL
SEAL 1’-1/2” STONE PAVERS ADJUSTABLE PEDESTAL
8” RIGID INSULATION PROTECTION BOARD AVB DRAINAGE CONCRETE ROOF DECK STEEL PLATE 18X16” STEEL BEAM
SCALE: DRAWING TITLE:
1” DOUBLE GLASS SEAL ALUMIUM SOCKET 6” AREATED CONCRETE PANEL AVB 4” RIGID INSULATION 2” FIBER INSULATION 2’-3/4” AIR GAP GFRC PANEL PANEL HOOK HEXGON FRAME
DRAWING NUMBER: SEAL 1” DOUBLE GLASS 9/16” CABLE CABLE CONNECTION LUG
1” GYPSUM BOARD SKIRTING 1” STEEPING TOP SLEEPER RIGID INSULATION STEEL BOLT STEEL PLATE 2’-2” STEEL DECK
02
Bubble Tower Residential Highrise in Downtown Brooklyn
BUBBLE TOWER
Residential Highrise in Downtown Brooklyn Pratt 2017 Fall Studio Individual Work Instructor: Maria Sieira Brooklyn, US The tower is designed to solve the mixed problem in downtown Brooklyn. People, vehicles, retailers, and historical buildings, any of them can cause a big problem. The bubbles here are designed as a tool to define privacy and public in the modern city. The form of the tower origins from "tornados," which carry particles on the ground up high. In this project, the massing is continuously twisted, bringing the plaza to part of the facade.
Brooklyn Price/SqFt Changes 2012 vs 2004
Increase 174% Increase over 50% Increase 25% to 50% Increase 10% to 25% Stagnation 10% to -10% Decrease -10% to -30% Note: Only residential properties were included in the analysis(single and two family homes, condos and co-ops)
Brooklyn Height Change: +21%
Downtown Brooklyn Change: +37%
Fort Greene Change: +51%
Positive
Negative
Improve housing
Displacement through rent
Reduction in crime
Loss of affordable housing
Stabilization of declining areas
Commercial/industrial displacement
Increased property values
Unsustainable property prices
Increased consumer purchasing power at local businesses
Displacement and housing demand pressures on surrounding poor areas
Reduced vacancy rates
Community resentment and conflict
Increased local fiscal revenues
Homelessness
Encouragement and increased viabili- Secondary psychological costs of ty of further development displacement
Cobble Hill Change: +12%
Boerum Hill Change: +30%
Loss of social diversity (from socially disparate to rich ghettos)
Increased cost and charges to local services
Under occupancy and population loss to gentrified areas
Increased social mix Rehabilitation of property both with and without state sponsorship
cadmapper.com file 4abdfb61-03a3-4c10-8de1-4a9984484190
CONCEPT COLLAGE
Reduced strain on local infrastructure and services
GENTRIFICATION PROBLEM
VIEW FROM EXTERIOR
A A
T.O.PARAPET 450'-11" 7 1/8" 3'-2 1/8"
T.O.PARAPET 450'-11"
1'-2"
2'-9 1/2"
7 7/8"
1'-2"
2'-9 1/2"
7 7/8"
3'-2 1/8"
7 1/8"
2 A-001
T.O.SLAB 435'-6" ROOF 445'-6"
4 1/2"
T.O.SLAB 435'-6"
24 3/8" 1/2"
2 3/8"
6"1'-4"11 5/8" 6"
CEILING 432'-9"
4'-0 1/2"
4'-0 1/2"
2 A-001
11 5/8"
ROOF 445'-6"
1'-4"
CEILING 432'-9"
1 7/8"
3'-10 5/8"
1 7/8"
3'-10 5/8"
FLOOR 10 105'-6" FLOOR 10 105'-6"
4 A-001
3 A-001
4 A-001
3 A-001
2 3/8"
2 3/8" 2'-9"
CEILING 102'-4"
2'-9"
CEILING 102'-4"
FLOOR 2 5'-6"
5 1/8" 6 7/8"
GROUND FLOOR 0'-0"
1'-3 3/8"
1'-3 3/8"
3'-2 1/8"
3'-2 1/8"
FLOOR 2 5'-6"
5 1/8" 6 7/8"
GROUND FLOOR 0'-0"
1
A-001
1
A-001
WALL SECTION A-A 1/2"=1'-0"
WALL SECTION A-A 1/2"=1'-0"
2"
1 5/8" 1/8"
ADJUSTABLE PEDESTAL 2" STONE PAVERS ADJUSTABLE PEDESTAL RIGID INSULATION ADJUSTABLE PEDESTAL RIGID INSULATION PROTECTION BOARD
1/8"
3 1/4" 3 1/4" 2" 2"
1 3/4"
1 5/8" 1 5/8"
1/8" 1 3/4" 1/8" 1 3/4"
8 1/2" 2%
4 3/8" 433/8" 1/4"
2" STONE PAVERS
8 1/2"
8 1/2" 8 1/2"
1 5/8"1/8" 1 5/8"1/8"
1 3/4" 1 3/4"
8 1/2"
8 1/2" 8 1/2"
1 5/8" 1/8"
1 3/4"
1 5/8" 1/8"
1 3/4"
8 1/2" 2%
2%
2%
2%
2%
8 1/2" 8 1/2" 8 1/2"
T.O
4 3/8"
2" STONE PAVERS
3/8" 1 5/8" 3/8" 3/8" 1 5/8" 3/8" 3/8" 1 1/8" 5/8" 3/8" 1/8"
1 5/8" 1/8"
8 1/2"
1 3/4"
T.O
2 1/2" 6 3/8" 2 1/2"
WATERPROOF MEMBRANE PROTECTION BOARD RIGID INSULATION WATERPROOF MEMBRANE CONCRETE ROOFBOARD DECK PROTECTION
6 3/8" 2 1/2"
WATERPROOF MEMBRANE CONCRETE ROOF DECK
6 3/8"
T.O
CONCRETEROOF ROOFDRAIN DECK ROOF DRAIN
2 2
ROOF DRAIN ROOF DETAIL 1'-1/2"=1'-0" ROOF DETAIL
2
ROOF DETAIL
A-001
1'-1/2"=1'-0" 1'-1/2"=1'-0"
5 5/8"
3 4"
WD STRIP FLOOR
3 4"
3 4" PLYWOOD WD STRIP FLOOR
3/4" 3/4" 1 3/4" 1/2" 3/4" 1 1/2" 3/4" 3/4" 1/8" 1/2" 21 1/8"
3
" PLYWOOD SLEEPER 41" WD STRIP FLOOR 31" SLEEPER 4" PLYWOOD 1-1/2" THICK CONCRETE SLAB 1" SLEEPER 1-1/2" THICK CONCRETE SLAB
1/8" 2 1/8"
3 4"
1/8" 2 1/8"
2 7/8"
5 5/8"
2 7/8"
5 5/8"
2 7/8"
5 5/8"
2 7/8"
5 5/8"
2 7/8" 2 7/8" 22 7/8" 7/8" 2 7/8" 2 7/8" 22 7/8" 7/8" 2 7/8" 2 7/8" 22 7/8" 2 7/8" 22 7/8" 5 5/8" 5 5/8" 5 5/8" 7/8" 2 7/8" 5 5/8" 7/8" 2 7/8" 5 5/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 5 5/8" 2 7/8" 5 5/8" 2 7/8" 5 5/8" 2 7/8" 5 5/8" 2 7/8" 5 5/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8" 2 7/8"
4 3/8" 4 3/8"
A-001
4 3/8"
A-001
THREAD ROD 2'-0 3/4" 2'-0 3/4"2'-0 3/4"
1-1/2" THICK CONCRETE SLAB THREAD ROD ALUMINUM CEILING STUD THREADSTUD ROD ALUMINUM CEILING ALUMINUM CEILING STUD GWB HUNG CEILING
5/8" 5/8"
3 3
FLOOR DETAIL 1'-1/2"=1'-0"DETAIL FLOOR
3
FLOOR DETAIL
A-001 A-001 A-001
5/8"
3 1/8"
GWB HUNG CEILING
3 1/8" 3 1/8"
GWB HUNG CEILING
1'-1/2"=1'-0" 1'-1/2"=1'-0"
GLASS
1/2" 1 3/8" 1/2" 1 3/8" 1/2" 1 3/8"
3/4"
3/4"
3/4"
3/4"3 1/2"
2" 3/4"
3/4"
GLASS
3 1/2" 3/4"
PREFABRICATED UNIT GWB PREFABRICATED UNIT METAL WALL PANEL GWB INSULATION METAL WALL PANEL PREFABRICATED UNIT WATER PROOF MEMBRANE INSULATION GWB PANEL WATERMETAL PROOFWALL MEMBRANE
3 1/2"
1 1/4" 2" 3/4" 3/4" 1 1/4" 2"
INSULATION WATER PROOF MEMBRANE
1 1/4" 3'-0 5/8" 3'-0 5/8"3'-0 5/8"
GLASS
FIREPROOF INTUMESCENT PAINT FIREPROOF INTUMESCENT PAINT
SEALANT ZINC FLASHING & DRIP
2"
1'
2"
2"
1'
2"
2"
1'
2"
3" 3/8" 1 5/8" 3" 3/8" 3/8" 1 5/8" 3" 3/8" 3/8"3" 1 5/8" 3/8"3"
8 5/8" 8 5/8"
SEALANT
7"
SEALANT ZINC FLASHING & DRIP
7"
ZINC FLASHING & DRIP
7"
FIREPROOF INTUMESCENT PAINT
4 4
PANEL DETAIL 1'-1/2"=1'-0"DETAIL PANEL
4
PANEL DETAIL
A-001 A-001
1'-1/2"=1'-0"
8 5/8"
3"
GROU
GROU
GROU
03
In the Cloud CreativeHub among skyscrapers
"IN THE CLOUD"
CreativeHuB Among Skyscrapers JIT 2016 Spring Foundation Studio III Individual Work Instructor: Shaofeng Ge Nanjing, China "In the Cloud" is a public space among skyscrapers, it is a flowing space that can be isolated and connected to provide different types of the workspace. In this project, we use free -flow form instead of straight lines. It is wonderful that imaging you now being in a mountain, you can feel the different atmosphere at the different parts of the hill--on the peak, or on the slopes, or on a valley; however you are actually in the same space. Moreover, the ups and downs of the ground meet the human walking habit -- people don't walk in a straight line. The goal of our architecture is to create a way of the movement as close as possible to the natural physical habit, offering more possibilities of activity styles people working there.
CLOUDS OVER HILL
NATURAL RIVERSTONES
LANDSCAPE PAINTING
MORDERN ARTWORK WHALE
CONCEPT SKETCH
URBAN RELATIONSHIP
HOTEL
HOTEL
SHOPPING MALL
SHOPPING MALL
RESTAURANT
RESTAURANT
OFFICE
OFFICE
CURRENT PROGRAMS
PROPOSED PROGRAMS
GROUND FLOW METRO LINE HIGH ELEVATOR
GROUND FLOW METRO LINE HIGH ELEVATOR
MIDDLE ELEVATOR LOW ELEVATOR
MIDDLE ELEVATOR LOW ELEVATOR
CURRENT CIRCULATION
PROPOSED CIRCULATION
FROM SURROUNDING TO FORM
PLATFORM OVER THE SITE
PROGRAMS
DEFORMATION
FLUCTUATION SURFACE
CREAT ROOF IN THE SAME WAY
ADD ROOF WINDOWS
8
7 3
6 4
2
3
1
5
11
10
9 9
1 RESTAURANT 2 FOOD COURT 3
3 TOILET 4 AUDITORIUM 5 STAGE 6 SPORTS 7 EXHIBITION 8 BOOKSTORE 9 OFFICE 10 MEETING 11 COFFEE
INTERIOR SPACE
OFFICE SPACE
STAGE&ADUTIORIUM
EXHIBITION&BOOKSTORE
RESTAURANT
04
Vertical Street Mixed-use Highrise
"VERTICAL STREET"
SITE PLAN
Multi-Program Highrise JIT 2015 Spring Foundation Studio III Collective Work Instructor: Bing Li, Yan Liu Site: Nanjing, China
The objects of this design is through the concept of vertical streets, to improve the utilization rate of land to facilitate residents life, change the understanding of the street, and resurgent the old street once bustling but now declined. Matai Street, the former street full of history, has a rich urban texture and historical background, is the path connecting the north and south of the city since ancient times.
PROGRAMS IN HORIZONTAL DIRECTION
PROGRAMS IN VERTICAL DIRECTION
IDEAL WALKING TOUR
WALKING TOUR CONNECT PROGRAMS
URBAN RELATIONSHIP
CUT OFF
PUSH OUT
INDEPENDENT TOWERS
RISE UP
OPPOSITE COMMUNICATION
BRIDGES CONNECT TOWERS
ADD BRIDGES
SPACES FLOW BETWEEN TOWERS
OFFICE APARTMENT
CONCERT HALL OFFICE SKY GARDEN
OFFICE SKY GARDEN
MUSUEM OFFICE SKY GARDEN
LIBRARY SKY GARDEN
ROOF GARDEN
COMMERICAL SPACE ENTRY
LIBRARY
SKY GARDEN
READING ROOM
OFFICE
OFFICE
SKY GARDEN
05
Porous Stone Creative Hub in Sheshan International Village
ELEMENTS: CHURCH OBSERVATORY TEA PLANTATION RIVER SHE MOUNTAIN RESPONSE TO THE SITE
MOUNTAIN
WATER
SURROUNDING BUILDINGS
POROUS STONE
Creative Hub in Sheshan International Village JIT 2016 Spring Studio Individual Work Instructor: Ying Han Shanghai, China The creative hub includes an art museum and some other programs. It origins from the idea of the traditional Chinese gardens, containing the concept of "Jin," which means going into spaces with certain senses of ritual. The visitors can have the similar modes of perception as in traditional Chinese gardens. The mass is separated into small pieces while each of them has connections tightly just like the porous stone. In the project, the concept of the holes of stones is designed as different topic courtyards. At the same time, the courtyard which means "yuan" in Chinese, the same pronunciation as the "circle" and "round," has the meaning of smooth and round.
THIN STEEL COLUMNS IMITATING BAMBOO FOREST
PROGAM ANALYSIS
EDUCATION
CULTURAL CENTER THEATER INTERACTION CONTEMPORARY EXHIBITION
EXHIBITION
CULTURAL EDUCATION
PERMANENT EXHIBITION OUTDOOR EXHIBITION
MULTI-MEDIA
READING ROOM
COMMUNITY SERVICE
AUDIO INTERPRET SERVICE FOR THE DISABLED PUBLIC ADMINISTRAION
COMMERCE
CULTURAL EDUCATION
BRAILLE TOUR OFFICE/ RESEARCH
STORAGE
STORAGE
SERVICE
MUSEUM WORK
ARTISTS' STUDIOS SHOPPING
SIMILARITY
WHEELED CHAIR RENTAL
VENDING MACHINE ART STORE
DINNING
PRIVATE GALLERIES CAFE
COMMERCIAL LIVES
COURTYARD RELAX
UNIQUE
RIVERSIDE LANDSCAPE
PRIVATE GALLERIES
ARTISTS STUDIO
CONNECTING CORRIDOR
EXHIBITION HALL II
EXHIBITION HALL I
CONTEMPORTY EXHIBITION HALL II
READING ROOM
EXHIBITION HALL III + IV
CONTEMPORTY EXHIBITION HALL I
AUDITORIUM
STORAGE + OFFICE
COURTYARD
LIGHT
BAMBOO
WATER
FOUNTAIN
STORAGE +OFFICE EXHIBITION READING
EXHIBITION
1F CIRCULATION 2F CIRCULATION -1F CIRCULATION STAFF CIRCULATION
06
Box Community Mixed Aging Residential Community
SITE CONDITION
DISTRICT CONNECTION CROWDED
RESIDENTIAL EDUCATIONAL MEDICAL COMMERCIAL
GREEN CONNECTION
MIXED AND DISORDERED
TREE LINE PUBLIC SQUARE COLLEGE
NARROW ALLEY
PUBLIC TRANSPORTATION BUS STOP SUBWAY STATION MAIN ROAD INWARD AND HIGH-DENSITY
BOX COMMUNITY
Mixed Aging Community JIT 2015 Spring Foundation Studio III Collective Work Instructor: Shaofeng Ge Nanjing, China
Mixed Aging Community is a product of making the full use of land to attract young people and protecting the local residencies; I provided public spaces on ground level to house entertaining and medical facilities; there is much open space within the residential units to enhance the communication between people which is lacking in contemporary neighbor life. Additionally, people have their habit of life so that I design the different kinds of the dwelling unit for residents. Several sizes of balconies and room composition consist of the community. With more choices and more composition people, there will have a happier life.
CARE-NEED PEOPLE
CAFE
KIDS' COURTYARD ELDERLY'S COURTYARD
READING CORNER
KINDERGARDEN GYM
MULTI-GENERATION INDEPENDENT OLD PEOPLE
DIVERSE GROUPS OF PEOPLE
DAY CARE CENTER
TEA
HEALTH CARE RECOVER CENTER
PUBLIC PROGRAMS IN THE FIRST FLOOR
CONCEPT DEVELOPMENT
Ancient Nanjing with public courtyard
DWELLING UNIT
STRUCTURE
PERSONAL REQUIREMENT
WORK
COOK
LISTEN TO MUSIC READ
PLANT
PAINT
PARTITION OFFICE
TEA ROOM
KITCHEN
RECORDING ROOM STUDY
BEDROOM
GREENHOUSE
ART STUDIO
PLAY ROOM
UNIT COMPOSITION
SELECTED ONES
PLANS
GROUND FLOOR PLAN
PLAN COMBINATION
PUBLIC SPACES AMONG DEWLLING UNITS
LIBRARY
CAFE
SAUNA
MUSIC ROOM
07
Continuous Landscape
campus library
SITE PLAN SPACE CENCEPT CURRENT SITUATION
PROPOSED SITUATION
SHORTEN THE ROUTE
ACHIEVE A NEW PERSPECTIVE OF CAMPUS
IMPROVE CAMPUS LIVILY LEVEL
CONTINUOUS LANDSCAPE Campus Library
JIT 2015 Spring Foundation Studio III Individual Work Instructor: Shaofeng Ge Suzhou, China A full campus needs penetration of space and new public experience, which is the origin of this library. The new construction is lifted up from the ground, giving the ground floor back to the public as continuous landscape and shortening students' route through the site. Continuous formation and slope roof allow people to reach the top-roof and have a fresh perspective on the campus. The ground and the roof turn into a uniformed landscape, creating more common space for users. Besides, the cantilevered space changes the previous library's inherent calm spatial quality and increases the vitality of the campus. Slidable grille design is inspired by ancient Chinese casement which can be changed adapting to various climate. In this design, the arrangement of different size and combination of grille meet the requirement of different programs in the library. With the diversification of interiors programs as well as weather, the exterior appearance will change accordingly. DIVERSITY OF SPACE
BOOK STORAGE
READING ROOM
FORM DEVELOPMENT
GROUP DISCUSSION
EXHIBITION
STRUCTURE DETAIL
HANDRAIL
PLANTING ROOF
DRIPPING EAVES
SLIDE GUIDE GREY MEDAL TRIM STRIP
WOODEN GRILLING
1
3
10 V 2
+1.500 PLAN
12
5
9 11 8
9
7
4
12 6 7
6
4
+6.000 PLAN
1 LECTURE HALL 2 CATALOGUE SEARCHING HALL 3 READER SERVICE CENTER 4 READING ROOM 5 STACK 6 EDUCATIONAL RESEARCH 7 OFFICE 8 MEETING ROOM 9 CATALOG ROOM 10 SECURITY ROOM 11 STORE 12 TOILET
12
5 4
4
+10.500 PLAN
Open Call for Urban Design Optimization Shenzhen Bay Super Headquarters Base Urban Planning
Jurong Central Emporium Mixed Use Project 雨润句容中央商场综合体项目
日景透视图 Daytime Street Perspective 4 地下空间开发策略
1 商业专篇 总体布局 影
院
百
货
9F 8F 环形流线串联市民广场,下沉景观将商 业人流引入地下。
7F 百
货
零
售
6F 5F 4F
百
货
零
售
餐
饮
娱
乐
3F
2F
1F
精品超市 -1F B1层设置庭院,将地面人流和景观导入 地下,打造地下精品商业空间。 -2F 地下停车
2
5 主题商业策略
功能分析
Jurong Central Emporium Mixed Use Project 雨润句容中央商场综合体项目
Jurong Central Emporium Mixed Use Project 雨润句容中央商场综合体项目 住宅共计39层(150M)
住宅
Residential
Residential
住宅共计21层(100M) Residential
引入主题娱乐设施,构建游乐体验中 心。
住宅
Residential
住宅
Residential
百货共计6层 Department store
商业街+百货共计3层
Street Retail +Department store
地下商业
Underground Retail
地下一层商业
Underground Retail
地面与-1层结合布置娱乐设施,地上地 下形成活力氛围。
商业街
Street Retail
百货 Department store
地下二层车库
Underground Parking
Jurong Central Emporium Mixed Use Project 雨润句容中央商场综合体项目
Jurong Central Emporium Mixed Use Project 雨润句容中央商场综合体项目
Jurong Central Emporium Mixed Use Project
4.3 三维效果图
Urban Design of Mingjue Station Surrounding Area (S1 Metro Line)
石湫站
4.3 三维效果图
宁高城际线石湫站综合开发特定规划区城市设计 2016.06
Urban Design of Shiqiu Station Surrounding Area (S1 Metro Line)
6.3 透视效果
科普教育区 花海梦境区 餐饮娱乐区 生态休憩区 运动健身区 休闲养生区
6.4 景观分析
6.4 景观分析
6.4 景观分析
6.4.1 结构分析
6.4.3 交通分析
6.4.4 视线分析
重要绿色景观节点 次要绿色景观节点 蓝色水系连接 水景观节点 重要绿色景观连接 次要绿色景观连接
游船停靠点 园区出入口道路(8M) 主要道路(包含摆渡车和自行车道,8M) 次要道路(4M)
景观节点
支路(1.5M)
视线
Meilonghu Landscape Design in Chuanhua urban design
Tangshan Resort Resettlement Community Center Planning and Design Project
KUSHNER STUDIOS 390 BROADWAY 4TH FLOOR NEW YORK CITY 10013
25'-0" New Steel Frame
6'-6"
1'-0" 8'-6"
8'-6"
6'-0"
6'-0" 6'-0" 2
2
2
1486 DEKALB AVE. N.I.C (3 STORIES)
2
EL:
3
3
2'-6"
TYPE 5
TYPE 6
N.T.S.
Final Spec to be Provided by Owner. Install as per Manufacturer Specifications
TYPE 7
N.T.S.
N.T.S.
Final Spec to be Provided by Owner. Install as per Manufacturer Specifications CELLAR FLOOR EL:
-6'-10"
INSIDE
TYPE 8
Final Spec to be Provided by Owner. In per Manufacturer Specifications
OUTSIDE
Proposed Back Elevation
AV
EN
UE
Scale: 1/4" = 1'-0"
DE
KA
LB
2 A-107
10'-6"
3'-0"
Final Spec to be Provided by Owner. Install as per Manufacturer Specifications
2'-7"
Metal Drip Edge Set in Sealant
7'-10"
3'-0"
1-8"
AVG. GRADE EL: 0'-0"
These Drawings & The Ideas They Convey Are Instruments Of Service For Kushner Studios Architecture + Design, P.c. & Remain Their Property. Neither This Drawing, Nor Any Ideas, Arrangments, Designs Or Plans That They Convey Shall Be Appropriated By, Or Disclosed To Any Person, Firm Or Corporation For Any Use Whatsoever,Except By The Specific Written Permission Of Kushner Studios Architecture + Design, P.c. To Breach This Will Allow Kushner Studios Architecture + Design, P.c. The Right To Collect Damages For, But Not Limited To, Design & Architectural Fees, Legal Reimbursements Resulting From Pursuit Of Fees, Marketing & Potential Future Income, Etc.
Flashing 1/2 In. Back From Brick Face Weeps at 16 In. O.C 1'-0"
Repaint Exist'g Facade
2018 G.C. to Provide Wateproofing All Rights Reserved Sealant, Sil Pan and Drip Edge Flashing on All New Windows
2'-1"
2
6'-6"
6'-0"
8'-6"
2
© Kushner Studios Architecture + Design, P.C.
New Window in Existing Opening G.C. to Ensure Compliance with BC 2406 as No Glazing is Located in Hazardous Areas New Door in New Opening Existing Stairs to Remain New Transom Window in Existing Opening - G.C. to Provide all Necessary Protections as Req.'d by Code New Non-Combustable Stair with Non-Combustable Railing to Rear Yard FIRST FLOOR
4
3
New Handrail New Tempered Glass
SECOND FLOOR EL: 13'-2"
New Steel Lintel on New Opening
New Steel Lintel on New Opening Infill Portion of Masonry Wall in Existing Opening to Match Stucco New Door in New Opening Existing Portion of Masonry Wall to be Demo'd for New Door Opening New Transom Window in Existing Opening - G.C. to Provide all Necessary Protections as Req.'d by Code New Non-Combustable Stair with Non-Combustable Railing to Rear Yard
6'-6"
Existing Concrete Stair to Remain New Transom Windows in Existing Opening - G.C. to Ensure Compliance with BC 2406 as No Glazing is Located in Hazardous Areas
Infill Portion of Masonry Wall in Existing Opening to Match Stucco
New Windows in Existing Opening - G.C. to Ensure Compliance with BC 2406 as No Glazing is Located in Hazardous Areas
2'-6"
New Header as Req’d. TYP New Windows in Existing Opening - G.C. to Ensure Compliance with BC 2406 as No Glazing is Located in Hazardous Areas New Entry Door to & Fixed Window in Existing Opening Existing Metal Railing to Remain
1'-0"
Repaint Existing Fire Escape
New Fire Escape Ladder
N.T.S.
777 Surise HWY, Suite 300
Lynbrooke, NY, Final Spec to11563 be Provided by Owner.byInstall as In 516.561.5922 Final Spec to be Provided Owner. per Manufacturer Specifications per Manufacturer Specifications
KN
IC
KE
RB
OC
KE
R
Double Hung Window, Final Spec to be Provided by Owner. Install as per Manufacturer Specifications
Flashing 1/2 In. Back From Brick Face Weeps at 16 In. O.C
AV
EN
UE
DEMOLITION D
G.C. to Provide Wateproofing Sealant, Sil Pan and Drip Edge Flashing on All New Windows
1'-1"
2
N.T.S. N.T.S.
Final Spec to be Provided by Owner.byInstall asInstall as Final Spec to be Provided Owner. per Manufacturer Specifications per Manufacturer Specifications
5'-0"
Structural Engineer TYPE 6 P.C. 4 Becker Engineering, TYPE
RISER RR
2
N.T.S.
2'-6"
THIRD FLOOR EL: 24'-0"
ARCHITECTURALS A
TYPE 2
TYPETYPE 5 3
MEP ENGINEER: Concord Consulting Engineering, PC 28 Concord Dr. Livingston, NJ 07039 W: 917.756.1507 F: 973.533.0548
ELECTRICAL E
Existing Stucco Facade to Remain New Windows in Existing Opening 3'-0"Compliance with - G.C. to Ensure BC 2406 as No Glazing is 5'-2" Located in Hazardous Areas
Final Spec to be Provided by Owner. Install as per Manufacturer Specifications
1482 DEKALB AVE. N.I.C (3 STORIES)
New Windows in Existing Opening - G.C. to Ensure Compliance with BC 2406 as No Glazing is Located in Hazardous Areas
2'-6"
2
9'-10"
2
5'-0"
N.T.S.
1482 DEKALB AVE. N.I.C (3 STORIES)
2
ISSUE REV. #: FOR CLIENT REVIEW
TYPE 1
Final Spec to be Provided by Owner. Install as per Manufacturer Specifications
2
DATE: 6/14/18
5'-2"
New Windows in New Openings - G.C. to Ensure Compliance with BC 2406 as No Glazing is Located in Hazardous Areas New Window in Existing Opening - G.C. to Ensure Compliance with BC 2406 as No Glazing is Located in Hazardous Areas
2
35'-2 7/8"
New Windows in Existing Opening - G.C. to Ensure Compliance with BC 2406 as No Glazing is Located in Hazardous Areas
Expeditor: KUSHNER studios 390 Broadway, 4th Floor New York, NY 10023 W: 212.965.0914 F: 212.965.0649
Syntetic Stucco 2
1'-0"
Painted Steel Frame
Painted Aluminum Fencing
N.T.S.
Client: 1484 DEKALB AVE, LLC 930 Eastern Parkway, Suite #4 Brooklyn, NY 11213
9'-10"
2'-3 7/8"
Tempered Glass
ROOF EL: 34'-10"
Metal Parapet
2'-6" 2'-6"
New Windows in New Openings - G.C. to Ensure Compliance with BC 2406 as No Glazing is Located in Hazardous Areas New Windows in Existing Opening - G.C. to Ensure Compliance with BC 2406 as No Glazing is Located in Hazardous Areas Existing Fire Escape to Remain
New Windows in Existing Opening - G.C. to Ensure Compliance with BC 2406 as No Glazing is Located in Hazardous Areas
2'-3 7/8"
New Fixed Spandrel Glass
Wooden Window Sill
ZONING Z
PROPOSED ELEVATIONS
20 of 23
06/14/18
86R18
as noted
Stone Coping or Metal Flashing Double Hung Window, Final Spec to be Provided by Owner. Install as per Manufacturer Specifications
Metal Drip Edge Set in Sealant
INSIDE
1
Window Detail
T-006 NOT TO SCALE Wooden Window Sill
1484 Dekalb Ave, Brooklyn, New York
Stone Coping or Metal Flashing
Exterior Masonry Wall
NOTES N
# OF PAGES:
G.C. to Provide Wateproofing Sealant, Sil Pan and Drip Edge Flashing on All New Windows
OUTSIDE
Double Hung Window, Final Spec to be Provided by Owner. Install as per Manufacturer Specifications
DATE:
JOB #:
Exterior Masonry Wall SCALE:
F F
212.965.0914 F.: 212.965.0649 E.: INFO@KUSHNERSTUDIOS.COM W.: WWW.KUSHNERSTUDIOS.COM
8'-6"
New Gate New FDNY Access Platform New Roof Curb Existing Gooseneck Ladder to Remain
8'-6"
F
6'-2 1/8"
6'-2 1/8"
New FDNY Access Platform
KUSHNER studio
BROOKLYN, NY 11237
Final Spec to be Provided by Owner. Install as per Manufacturer Specifications
A-100.00 A-103.00 A-201.00
F
TYPE 2
N.T.S.
SCHEDULES X
F
2'-0"
F
2'-0"
F
2'-0"
2'-0"
TYPE 1
Final Spec to be Provided by Owner. Install as per Manufacturer Specifications
T-
See More www.chaoyuearch.com Thank you!