Charisse Lynn Bennett Oklahoma State University Summa Cum Laude May 2005 Bachelor of Architecture Studio Art Minor
Competitions Pella Prize Grand Prize, Spring 2004
Comprehensive Design & Development Studio
Bentley Microstation Freeform Design First Place, Summer 2003 creative use of Bentley Microstation products
Activities ACE Mentor Program
Career Direction for Students in Architecture, Construction and Engineering. Volunteer 2008-2009
ASTEK
Architecture Students Teaching Elementary Kids Past-Coordinator 2004-2005 Coordinator 2003-2004 Assistant Coordinator 2002-2003
Computer-aided Student Design Competition Honorable Mention, Spring 2003 Acme Brick Student Design Competition Grand Prize, Fall 2002 creative use of brick in architecture
AIAS
American Institute of Architecture Students Active Member 2000-2005 Class Representative 2000-2002
NAAB
National Architectural Accrediting Board Visiting team member Spring 2004
Honors / Awards AIA/AAF Scholarship
for Professional Degree Candidates
Architecture Alumni Scholar
for outstanding grades & performance in studio
Success Coach
Mentor for freshmen architecture students Fall 2004
President’s Honor Roll 6 of 9 semesters
Faculty Search Committee
Alumni Book Award 2001, 2002
Oklahoma State University School of Architecture Spring 2003
Link
Mentoring women in architecture Co-Coordinator 2003-2004
CREW
Collegiate Role-Models Educating Women Mentor 2002-2003
for 4.0 GPA
for outstanding performance in studio
Joseph R Reeves Memorial Scholarship for outstanding grades & performance in studio
Regents Distinguished 5 year Scholar for outstanding ACT scores
Experience Pickard Chilton Architects New Haven, Connecticut June 2005 - Present
Selser Schaefer Architects Tulsa, Oklahoma August 1999 - August 2004 (school breaks)
Oklahoma State University Teaching Assistant 1216 Design Studio Spring 2005
1112 Intro to Architecture Fall 2003, 2004 Discover Architecture Summer 2003
Bachelors of Architecture Boston Public Library Guthrie Visitor’s Center The Parachute Pavilion Monza Grandstand ACSA/AISC Design Competition Tulsa Jazz Hall of Fame Art Minor
Abilities / Interests
Windows and Macintosh Adobe Photoshop Adobe InDesign Adobe Illustrator Autodesk AutoCAD Architecture 2008 Autodesk 3ds Max Rhinoceros 4.0 Microsoft Office Word Microsoft Office Excel Microsoft Office PowerPoint Drawing Painting Sculpture Graphic Design Industrial Design Travel
Professional CalPERS Rugs - Sacramento, California Tivoli Gardens - Copenhagen, Denmark California Green - Irvine, California 300 North LaSalle - Chicago, Illinois River Point - Chicago, Illinois Corporate Headquarters - Houston, Texas
The following projects represent my experience thus far. This is only the beginning of a lifetime of designing and exploring.
Site: The northern end of the “Big Dig” in Boston, Massachusetts. The ”Big Dig” is the largest urban construction project in the history of the modern world.
1/32” mass model in context
Boston Public Library
Studio Goals: . present the opportunity to design in a true urban environment . provide the opportunity to participate in an element of the “programming” of the project’s requirements
. provide a sufficient amount of time to enable the student to develop a design solution in greater detail
was the major project of the Urban Design Studio the Fall semester of Fifth year, lasting 9 weeks. This project was designed as a twoperson team . Our primary design process was achieved through physical study models.
Fall 5th Year
. provide the opportunity to orally present design solutions to your client, faculty and peers
The Public Library for Boston’s North End
view of site with context
Oklahoma State University
. provide another opportunity to develop skills for working on a design team
Boston, Massachusetts
9 weeks
. provide the opportunity to experience the process of designing a multi-story building complex in an urban context.
Concept: The main concept behind this project was the library as an information hub for the city. There is a glassy information ribbon that flows through the building inside and out. The main part of the library does not begin until the second floor, leaving the first floor completely open and inviting to the public.
basic diagram
design process study models
process sketch
design process study models
information ribbon
Boston Public Library Oklahoma State University
Fall 5th Year
Boston, Massachusetts
9 weeks
Program Brief: This is an eight story building with over 164,000 square feet of space. Some of the programmatic functions include: gift shop, copy shop, restaurant, internet cafe, art gallery, auditorium, meeting center, large reading room and of course book stacks.
Oklahoma State University
Fall 5th Year
Boston, Massachusetts
final project floor plans
final project elevations
9 weeks
Boston Public Library
1/8� design development section model
Boston Public Library 9 weeks information ribbon at roof level
main vertical circulation stairs
Oklahoma State University
Fall 5th Year
Boston, Massachusetts
1/32� mass model in site
Concept: The overall concept was derived from Oklahoma’s history and the land itself. The prairie grass roof was used to relate to the open prairie that has historically been representative of Oklahoma. The wood-slat entry cube was influenced from old houses found in the open countryside. The final composition combines the history of Oklahoma and the town of Guthrie with the future and all the possibilities it holds.
concept diagram
overall views of 1/8� final model
Guthrie Visitor’s Center view towards entry
Oklahoma State University
Fall 3rd Year
Acme Brick Student Design Competition Grand Prize
Guthrie, Oklahoma
Guthrie Visitor’s Center This visitor’s center of about 4,500 square feet was for the town of Guthrie, Oklahoma. Guthrie has a distinct history as the original capital of Oklahoma and the birth place of the Oklahoma Land Run of 1889.
4 weeks
visual inspirations
final competition board
Spring 5th Year Oklahoma State University
The Parachute Pavilion: an Open Design Competition for Coney Island invited innovative design proposals from designers worldwide.
Brooklyn, New York
7 weeks
The Parachute Pavilion
Project Statement: Emerging from the current inadequate boardwalk, the pavilion focuses the attention of the pedestrians towards the parachute jump. The plaza of the pavilion allows and encourages movement directly in front of the parachute jump, setting up the opportunity for people-watching and interaction. The new flow through the site creates a stronger connection to the boardwalk from the city, subway and Surf Avenue. With the use of modern building technologies and forms, the pavilion becomes a symbol of the future possibilities of rebirth in Coney Island.
final presentation boards
Monza Grandstand
Project Goals: . to study architecture as a cultural phenomenon and how cultural geography affects its relationship with the users and the environment . to study complex architectural circulation systems, both horizontal and vertical . to study the human behavior as people interact with the designed environment
5 weeks
. to further develop new problem solving techniques . to further develop new graphic communication techniques
final presentation boards
Oklahoma State University
Spring 3rd Year
Computer-aided Student Design Competition Honorable Mention
Monza, Italy
Monza Grandstand The schematic design for a new grandstand at the Monza racing circuit in Monza, Italy.
final competition boards
ACSA/AISC Design Competition
ACSA/AISC Student Union Design Competition Steel Monocoque Construction The site Chosen is a university extension campus serving 1,500 - 2,000 students located in a Midwest city of almost 500,000 people. This campus’ growth is projected to reach 20,000 students by the year 2020.
6 weeks
Making use of the existing site contours, the proposed student union provides a sense of a naturally fluid movement serving the movement of the pedestrian across the site. The proposed Student Union is positioned higher on the slope, embraces the slope, and then turns towards the downtown skyline for a stong visual connection back to the city.
study models
Oklahoma State University
Spring 5th Year
This city has a strong connection with the industry of constructing airplanes. The form and structural concepts of this Union evolved from the steel construction system used to enclose the airplane fuselage. The long linear spaces are enclosed in glass and then shaded from the direct sun with stainless steel folded plates. This system allows natural light to be filtered into the entire facility.
Bachelor of Architecture Portfolio 2 weeks Spring 5th Year Oklahoma State University
Portfolio with Box Each project/subject had a folder with individual pages of images and information. As this portfolio was hand-made there is only one copy that was taken to job interviews. In a situation where there were multiple people in the interview this idea worked really well and the folders could be passed around and spread out on the table.
concept sketch
schematic design presentation model
. demonstrate the interdependence between design goals and technological realization
Pella Prize - Grand Prize 17 weeks
. ensure the technical integrity of the design and development process
. illustrate the process of project management - its dependence and influence on design goals
Spring 4th Year
Tulsa, Oklahoma
. as appropriate, emulate current professional practice processes
schematic design presentation board
Oklahoma State University
. ensure that students are immersed in the issues associated with the constructability of their design
Comprehensive Design & Development Studio During this semester one project is focused on from conceptual design all the way through partial construction documents. Structural, acoustics, lighting, HVAC and project management are dealt with during this studio.
Tulsa Jazz Hall of Fame
Studio Goals: . provide a comprehensive design and design development experience
design development model elevations
design development wall presentation
design development entry rendering
Tulsa Jazz Hall of Fame 17 weeks Oklahoma State University
Spring 4th Year
The Oklahoma Jazz Hall of Fame wants to be a strong community focused building, providing a positive step towards revitalization and encouraging activities in the area. The overall concept is to give the building a character all its own. A character that expresses the jazz music that the buildings holds.
Tulsa, Oklahoma
design development interior rendering
Project Statement: Tulsa, Oklahoma has a strong history of jazz musicians and the Oklahoma Jazz Hall of Fame honor’s such musicians and provides educational opportunities for the youth through their music arts programs. The Jazz Hall of Fame serves as a leader for positive community growth within the Historic Greenwood District of North Tulsa, an area that has its own strong history and need for revitalization. The Greenwood District used to be known as the Black Wall Street until the interstate completely cut this area in half. This area is also known for one of the worst race riots in history.
construction documents
materials palette
Spring 4th Year
design development model
Oklahoma State University
Tulsa, Oklahoma
17 weeks
structural calculations Tulsa Jazz Hall of Fame
drawing: paint, ink
oil painting 3’x3’
I am also a strong believer in using one’s hands to create and design. Often people have the ability to design and think, but little to no skill in actually creating. I enjoy adding that extra touch to all of my projects, spending just a little more time to make them one of a kind.
Art Minor: Drawing & Oil Painting
Art Minor: Art has been a strong influence in my life as long as I can remember. I find that I am a very visual thinker and get inspired from everyday sights and experiences.
oil painting 3’x5’
oil painting 3’x3’
Oklahoma State University
Life Drawing Oil Painting Sculpture Jewelry & Metals Welding
Jewelry & Metals: Our final project in this class was to create a “box� or vessel. The vessel lightly floats in the nest of brass rods springing from the birch log. While it was a jewelry and metals class, I truly enjoy combining other materials together. The vessel itself started as a block of basswood and was slowly formed into an egg that was then hollowed out. The birch log came from my grandpa’s farm and serves as the base and starting point for the entire piece. The brass has the ability to compliment the natural colors of the woods.
sculpture: birch, bass wood, brass
bookmark: nickel, copper Oklahoma State University
2005
rings: silver Art Minor: Jewelry & Metals
Art Minor: Sculpture
Sculpture: The final project for sculpture class was to create a pedestal for our stone sculpture. The process sketches below show the evolution of the design. The final idea was inspired by the stone sculpture , but also has it’s own identity.
Oklahoma State University
2004
The final pedestal was constructed with segments of layered plywood. As each layer was slightly different, a computer model was used to extract templates for each piece. The total project stands 3’-6” tall.
©Esto Photographics
8
der every 1” olors as 3
der every 1” olors as 2
t edges.
me color ercentages anged.
4
1 10 9 8
B 7
der every 2” olors as 7
5
7 B
Loop Divider every 2” A Low in the same colors as 3
B
2
A
A
25% Luminous Lime C10235
4
2 75% Sunset C10058
C
25% Blue C10323
8
25% Mid Blue C10325
10 9
6 5 4
10 2
5 8
2
6
6 250% Red C101521 50% Dk Amber C10118
5 2
9 8 9
2
10
10 2
C10205 25% Luminous Lime C10235
* No beveled/cut edges.
C5
Gold 9 75% DkC10030
*
note some color * Please choices and percentages
C10205
have been changed.
10
16’ X 16’
Lemon 10 75% Soft C10201
note some color * Please choices and percentages
25% Lemon C10065 C H I LT O N
A rc h i t e c t s I n c
4
have been changed.
5
50% Dk Amber C10118
7 75% Verge C10207 25% Willow C10206
2
10
7
10
4
5
16’ X 16’ P I C K A R D
3
Green 8 75% Pea C10205
8 B
1
25% Pea GreenC No 5beveled/cut edges.
10
6 8 3B
6 50% Red C10152 10
108 75% Pea Green
6 B3
25% Mid Blue C10325
25% Willow C10206
6 5
P I C K A R D
5 75% Blue C10323
10
1
7 75% Verge C10207
4
6
25% Pea Green 6 8 C10205 10 75% Mid Blue 5 94 1 C10325 7 25% Blue C C10323
10
5 75% Blue C10323
9
4
7
Lime 3 75% Luminous C10235
8 2
25% Pea Green C10205
8
5 3 A 4
2
Blue 4 75% Mid C10325
2 10 3 A 9
9
7
25% Luminous Lime C10235
2 75% Sunset C10058
25% Pea Green C10205
6
Lime 3 75% Luminous C10235
Couristan 1 5 1 1 75% 3 Willow 10 C10206 3
3 A
4
9
10
5 1” Low Loop Divider every 25% Pea Green in the same colors as 1
Low Loop Divider every 1” in the same colors as 8
Loop Divider every 1” C inLow 1the same colors as 5
C 2 5
10 5 3 A
Couristan 3 Willow 3 Low Loop Divider every 2” 5 5B 1 75% C10206 in the same colors as 3
C10205
5
8
3 5 3 A A
4
Sacramento Valley
Loop Divider every 1” A Low in the same colors as 3
©Esto Photographics
6
25% Luminous Lime C10235
Gold 9 75% DkC10030
4
25% Lemon C10065 C H I LT O N
A rc h i t e c t s I n c
4
25% Pea Green C10205
Lemon 10 75% Soft C10201
rug 12’designs X 12’
1
Couristan 1 75% Willow C10206
dges.
e color centages ged.
6
4
7 B
9
2 9
8
2
3
1
5
4
8
2
9 2
7 B
3 10 7 B 7 B 7 B
6
25% Luminous Lime C10235
2 75% Sunset C10058 3
25% Pea Green C10205 7
7A
75% Luminous Lime C10235 25% Pea Green C10205
Blue 4 75% Mid C10325
3
10
10
4
10
8
10 1 6
2
Loop Divider every 1” C Low in the same colors as 7
7 8
2
5
4
Loop Divider every 1” B Low in the same colors as 5
5 7 B 7 B
10
every 2” A inLowtheLoopsameDivider 2 colors as 5
10
5
6 10
3 A
7
9 7 5 C
7 C
5
10 3
7 C
2
5
Low Loop Divider every 2” in the same colors as 8
Loop Divider every 1” B Low in the same colors as 3 Loop Divider every 1” C Low in the same colors as 1
25% Blue C10323
6 50% Red C10152
25% Pea Green 6 C10205
10
10
* No beveled/cut edges.4
Green 8 75% Pea C10205
2
4 10 4
12’ X 12’
9
10 4
25% Luminous Lime C10235
10
Gold 9 575% DkC10030
25% Pea Green C10205
Lemon 10 75% Soft C10201 25% Lemon C10065
6 1
10
Blue 4 75% Mid C10325
4 5 9 7
1
50% Dk Amber C10118
25% Willow C10206
6
10
Lime 3 75% Luminous C10235
2 10
5 75% Blue 9 10 C10323
1 C
6 50% Red 9 7 C10152
7
2 10
25% Blue C10323
10
9 4 1
1
25% Mid Blue C10325
10
10
10 2
10 8 A
50% Dk Amber C10118
7 75% Verge C10207
7 75% Verge C10207 4
9
1
25% Luminous Lime C10235
2 75% Sunset C10058
25% Pea Green C10205
6 5 A
5 3
75% Blue C10323 25% Mid Blue C10325
Couristan 1 75% 3Willow C10206
3 B
10 4 5 B
2005
6 5 4
25% Willow C10206
10
10
4
* No beveled/cut5edges.
Green 8 75% Pea C10205
10 6 3
3
10
25% Pea Green C10205
2 10 10
16’ X 16’ P I C K A R D
10
25% Luminous Lime C10235
Gold 9 75% DkC10030
2
Lemon 10 75% Soft C10201 25% Lemon C10065
C H I LT O N
A rc h i t e c t s I n c
4 10
10
rug designs 16’ X 16’ P I C K A R D
Pickard Chilton Architects
er every 2” ors as 3
er every 1” ors as 7
CalPERS Rug Designs Sacramento, California
Project Description: These custom rugs were designed for the new CalPERS Headquarters in Sacramento, California. Initial sketches and paper collages were translated into drawings for fabrication. Coordination with several carpet consultants provided information about the process and secured price quotes for the client. There are a total of six completely individual rugs throughout the complex. The designs were inspired by the Sacramento Valley as seen from above .
C H I LT O N
A rc h i t e c t s I n c
process models
presentation model
tower rendering
PROW
PROW
I was involved in concept design, models, tower renderings and development of one of three schemes.
Project Description: Pickard Chilton was invited to participate in a design competition for the new Four Seasons Hotel and Residences at Tivoli Gardens in Copenhagen, Denmark.
OPEN TO BELOW BALLROOM
BACK OF HOUSE
OPEN TO BELOW OPEN TO BELOW
Tivoli Gardens Hotel Competition
Project Team: The design team included the following individuals: Jon Pickard, William Chilton, Anthony Markese, James Fullton, David Brown, Benjamin Simmons, Jonathan Stitelman and William Traill.
MEETING ROOMS
OPEN TO BELOW PREFUNCTION
LEVEL 2
LEVEL 28
Banquet and Meeting
Sky Garden
Rigging Crane Philip de Lange
FRONT OFFICE
RESIDENTIAL DESK
OPEN TO BELOW FRONT DESK
RETAIL RESIDENCE
BAR/LOBBY LOUNGE
RESTAURANT
STREET LEVEL
LEVEL 24
Ferry Harbourfront
Lobby and Restaurant
Residential Typical 2 Units
RESIDENCE
OPEN TO BELOW
SPA & FITNESS
Copenhagen, Denmark
RESIDENCE LOBBY
FOOD/BEVERAGE BACK OF HOUSE
SPA & FITNESS ACCOUNTING
RESIDENCE
RESIDENCE
OBSERVATION LOBBY RESIDENCE
EXISTING HIPPODROME
105 M GARDEN LEVEL
LEVEL 21
Spa and Fitness
Residential Typical 4 Units
27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 S
STAFF FACILITIES
MECHANICAL PRIVATE GARDEN
HUMAN RESOURCES
LAUNDRY & HOUSEKEEPING
REPAIRS & MAINTENANCE
LOWER LEVEL Back of House
ROOF GARDEN
RESTAURANT HIPPODROME
LOBBY SPA & FITNESS
1:250
126 Spaces on Two Levels
T IVOLI
5.8 M
21.2 M
LEVEL 13
Hotel Typical Tower
OPEN TO BELOW TERRACE
HOUSEKEEPING
HOUSEKEEPING
G LL P1 P2
BUILDING SECTION
PARKING LEVEL 1
HOUSEKEEPING
7.8 M
presentation boards
BUILDING ELEVATION
LEVEL 6
1:250
Hotel Typical Podium
T IVOLI
Pickard Chilton Architects
LOADING DOCK
SECURITY
2006
SKY GARDEN
initial sketches
concept model
Irvine, California 2006-2008
I was involved in the initial concept phase and then lead the project through master planning and schematic design.
The key feature of the site is a large 2.2 acre central green open space that will provide a unique pedestrian experience with such outdoor amenities as outdoor meeting spaces, food and beverage facilities, dining terraces, a putting green, and an outdoor event tent. The buildings have all been rotated to better reduce solar heat gain on the east and west facades.
concept section
Pickard Chilton Architects
Project Team: The design team included the following individuals: William Chilton, Anthony Markese, Ashton, Allan and Jonathan Stitelman
Hines California Green
Project Description: California Green is a three phased office campus in Orange County California. The final build out is to include over 785,000 gsf of office, a hotel and 50,000 gsf of retail. This project is designed to lead the way in green sustainable developments for the City of Irvine.
Hines California Green
Project Description: California Green’s master plan has been designed for sustainability and quality of experience. The buildings have been designed to take full advantage of Southern California’s temperate climate utilizing such features as operable windows, delicate exterior shades, balconies, and exterior work environments.
Irvine, California
©sabiStudio LLC
2006-2008
presentation renderings
Pickard Chilton Architects
©sabiStudio LLC
©Todd Augustyniak
construction photo
©Image Fiction
This building will be completed in January 2009 and received pre-certified LEED CS-Gold.
ŠImage Fiction
site location - downtown Chicago
Pickard Chilton Architects
2005-2009
Chicago, Illinois
While involved in schematic design, design development and construction administration, the lobby was my main area of focus. The lobby features an intricate decorative stainless steel screen and large stainless steel and stone reception desk.
300 North LaSalle
Project Team: The design team included the following individuals: Jon Pickard, William Chilton, Anthony Markese, Benjamin Simmons, David Brown, Maxwell Worrell, Deborah Lukan, Christopher Lee, William Traill and Jonathan Stitelman
Project Description: This is a 60-story 1.3 million gsf office tower in downtown Chicago along the north bank of the Chicago River. The building will include three sub-grade parking levels, retail, a restaurant, and a two level waterfront public garden space. When it opens in early 2009 it will be the 10th tallest building in Chicago. The rich facade is clear low-E glass and stainless steel.
process scheme drawings
inspiration images
initial sketches
300 North LaSalle
Lobby Screen: The lobby is a grand thirty feet tall opening up to a clear view of the Chicago River. The walls wrapping the core are a stained red cherry wood with custom ornamental stainless steel screens floating in front. Each of the six sections of screen is thirty feet tall and fourteen feet wide.
wooden mock-up
partial wooden mock-up
Pickard Chilton Architects
2005-2009
Chicago, Illinois
There were several design options while designing these dramatic screens and drawings, renderings, small scale models and large mock-ups were produced throughout the process.
3 O O
24
24
43
43
9
9
40
40
57
57
23
23
scale model
24
24
43
43
9
9
40
40
57
57
23
23
Pickard Chilton Architects
construction photos 2005-2009
Chicago, Illinois
300 North LaSalle
process renderings/3D models
scale presentation model
process sketches
300 North LaSalle Chicago, Illinois
presentation rendering
2005-2009
construction photos
Pickard Chilton Architects
Reception Desk: While working on the design of the large reception desk for the building, we went through several design options and produced drawings, renderings, and small scale models. The final design uses stainless steel, glass, and marble.
ŠImage Fiction/Pickard Chilton
tower top studies
444 West lake Chicago, Illinois
Construction will start during the first quarter of 2009 . This building has received pre-certified LEED Gold.
site location - downtown Chicago
2005-2009
While involved in concept design, schematic design and design development I concentrated primarily on the lobby. The lobby features a complex articulated ceiling and stone wall.
Pickard Chilton Architects
Project Team: The design team included the following individuals: Jon Pickard, William Chilton, Anthony Markese, Benjamin Simmons, David Brown, Andrea Zalewski, Ashton Allan and Jonathan Stitelman
Project Description: This is a 50-story 1.2 million gsf office tower in downtown Chicago along the bank of the Chicago River where the north and south rivers combine. The building will include sub-grade parking, retail, a restaurant, sundry and cafe. There will be a grand 1.5 acre public plaza connecting the building to the river and concealing the existing railroad tracks.
study models
presentation model
444 West lake Pickard Chilton Architects
2005-2009
Chicago, Illinois
Lobby Ceiling: The sculptural ceiling curves up from 22’-3” to a soaring 39’-0”, focusing the viewer’s attention out across the plaza to the view of the city and the waterfront.
presentation /process renderings
presentation renderings
444 West lake Pickard Chilton Architects
2005-2009
Chicago, Illinois
Lobby Wall: Several design options with drawings, and numerous renderings were produced while working on the design of the articulated lobby wall. The design options ranged between wood, metal, glass, and stone with a red travertine as the favored scheme.
Pickard Chilton Architects
presentation rendering 2005-2009
Chicago, Illinois
444 West lake
process sketches
presentation scale model
444 West lake Pickard Chilton Architects
2005-2009
Chicago, Illinois
Reception Desk: We went through several design options for the unique sculptural reception desk and produced drawings, renderings, and small scale models. The final design is predominately red travertine.
I contributed to concept design, 3D and physical concept models, drawings, area calculations, and attending presentation meetings. This project has completed concept design.
Corporate Headquarters Pickard Chilton Architects
Project Team: The design team included the following individuals: Anthony Markese, Justin Cochran, and Augustus Chan.
2008
Houston, Texas
Project Description: Pickard Chilton was asked to provide a concept design for a new corporate headquarters in Houston, Texas on a site with an existing deteriorating office building. The site has an existing pond and garden that we focused on cleaning up and expanding on. In all the schemes that were developed the central driving element was maintaining a large area of open green space and a connection between the buildings and this green space.
Charisse Lynn Bennett January 2009