Charles Portfolio High Resoultion

Page 1

P H I L O S O P H Y

ARCH.DESIGNERPORTFOLIO

J O U R N E Y


Curriculum Vitae // AWARDS

// EDUCATION Jul 2012 - Jul 2014 (2 Years)

University of Melbourne│Melbourne Master degree in Architecture Thesis: Cinema of Remembrance

Sep 2013 - Feb 2014 (6 Months)

Delft University of Technology│Delft Melbourne Global Mobility: Exchange Complex Projects: Landmark & Anatomy

Feb 2009 - Dec 2011 (3 Years)

University of New South Wales│Sydney Bachelor degree of Architectural Studies Thesis: Lightning Ridge Museum (Glenn Murcutt)

Jul 2014 2012 - 2014 Jul 2013

// PROFESSIONAL Logan Studio │Melbourne Assistant (Casual) Grannel House (Documentation) David Frazer House (SD & DD) Castlemaine Church Renovation (DD & CD)

Dec 2012 - Feb 2013 (2 Months)

Hassell │Shanghai Intern (Full-time) ONLEAD Industrial Park Headquarters (DD & CD)

Jan 2012 - Jun 2012 (5 Months)

ECADI │Shanghai Intern (Full-time) Havana Riviera Hotel Renovation (SD) Nanjing Commercial Complex Competition (SD) Xinjiang International Airport Competition (SD)

Nov 2009 - Jan 2010 (2 Months)

The Orient Architectural Design│Shanghai Intern (Full-time)

PHYSICAL

Melbourne Global Grant (Scholarship)

Autocad, Rhino, V-Ray (Good) Photoshop, Illustrator, InDesign (Good) Revit, Grasshopper, 3D Max (Basic) Physical Modelling, Laser Cutter (Good)

// PHILOSOPHY & JOURNEY At the beginning of architectural study, I attempted to create own architectural style, but always lost in the dark. I gradually find that architecture language is something that you can not create out of thin air, and they totally could be found from the trace of history. ‘Good artists copy, great artists steal’. What can we ‘steal’? We should not only focus on architectural field; art, film, philosophy and science, all can become our inspiration resources. PHILOSOPHY

// CONTACT 2/100 Balwyn Road, Balwyn, VIC, Australia, 3103 0452 616 383 chals-hu@hotmail.com charles.hu90

First Class Honours Design Studio (2 Years) Average Score: 84/100

// SKILLS COMPUTER

Apr 2013 - Jul 2013 Sep 2014 - Oct 2013 (5 months)

First Class Honours Thesis Score: 90/100

JOURNEY

In recent years, I started to learn some philosophical thoughts. I am really fascinated by these brilliant philosophers, especially when they discussed about social, human and politics relationship and influence each other. These theories and thoughts not only explain the inspiration resources and history background of today’s architecture clearly, also guide us future world far ahead. Architecture, I prefer, focuses not so much by architectural language as by journey of people walking in my buildings, relation between functions and circulation, light and time, color and material, scale and space, building and surround environment. All these things influence architecture quality very much. My goal is to let the visitor to feel the poetic architecture.


Table of Contents

ACADEMIC WORK

01

02

03

Art & Culture Community Infrastructure

Temporary Village For 2016 Melbourne Olympic Games

Boat House in Studley Park

CINEMA OF REMEMBRANCE

OLYMPIC VILLAGE & TRANSFORM

FISH HOUSE

PRACTICAL WORK

04

05

06

New T1 Airport and GTC in Urumchi Competition

Two Renovation Strategies in Cuba

Nanjing Commercial Mall Competition

XINJIANG INTERNATIONAL AIRPORT

HAVANA RIVIERA HOTEL RENOVATION

07

08

Residential Project in Castlemaine

Office & Apartment Renovation Project in Castlemaine

DAVID FRAZER HOUSE

CASTLEMAINE CHURCH RENOVATION

ERBAN BRIDGE COMPLEX

Miscellany INSTALLATION, DETAILS & PHYSICAL MODEL


U

N

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T

01

CINEMA OF REMEMBRANCE

ART & CULTURE COMMUNITY INFRASTRUCTURE Graduate Thesis Melbourne [AU] │ february - june 2014 personal project

The rapid distribution of film on all kinds of devices now allows you to watch films anytime, anywhere. Viewers who go to ‘the movies’ are less worried about the film itself but what else it has to offer such as going into town, meeting with friends and eating in restaurants. My thesis design for a new Design Hub with Cinema, Art House & Film School Complex explores the sensual experience of film and its relationship to a dynamic architecture. The scheme comprises a major new arts and heritage project, designed to provide the Australia with a unique, world class facility for the enjoyment and appreciation of film/television culture. 01

I propose a Film Festival Cinema complex especially adapted to showcase Film Festivals. Its design is different from the conventional cinema. The aisles are wide to allow the free flow of movement of people form one event to another as well as allowing the space to be utilized allows the viewer to truly experience the film making process.

View Walking From Victorial M


Market

architecture student - MSD

│Required Area│ calculate floor area based on research and brief

26 500 SQM

required

Education & Institute

Retail & Office

Retail & Residence

Existing Community Infrasructure

Potential Site

│Program Distribution│ divide building by the ratio FILM SCHOOL 11 000 SQM

ART HOUSE 3 500 SQM

CINEMA 3 500 SQM

of each function and order

DESIGN HUB 7 000 SQM

followed by site analysis

10

10 11 │Lane Cutting through Site│

11

lane is created to meet

9

9

melbourne culture and make people easy access and

8

6

8

11

6

through site

8

10

8

3 2

7

refer to site content, create

5

1. Design Hub 2. FTS 3. NGV 4. City Bath

refer to historical victoria bouverie factory, abstract the building for remembrance

│Facade Material Range │ depend on interior functions, range façade with different materials and panel system

North Art Precinct Street Type & Boundary First is the most important, the street type and boundary. Different from South Bank, North Melbourne is quite old industrial district and with amount of heritage buildings. Street is also quite narrow with tram line and not possible to extension. However, the heritage also brings more opportunities for tourism. So based on the existing heritage and important places, I choose the place which connects to city. And plan the three main streets, Victoria St, Elizabeth St and Swanston St as the boundaries of precinct, because they all contains tram line which can bring people in and naturally become the end of precinct. And traffic of rest of streets in precinct will be controlled which make pedestrians feel more comfortable.

5 6

6

9. Theatre 10. Artplay 11. Live Music

4

5

│Shape General Arrangement │

5. RMIT Gallery 6. RMIT Exhibition 7. Art Market 8. Art House

1 7

6

1. Design Hub 2. FTS 3. NGV 4. City Bath

3 2

4

the main entrances for each part of building

6 8

1

│Void and Access│ 4

7

8

2 1

02

9

3

5. RMIT Gallery 6. RMIT Exhibition 7. Art Market 8. Art House

1. Design Hub 9. Theatre 5. RMIT Gallery 2. FTS 10. Artplay 6. RMIT Exhibition 3. NGV 11. Live Music 7. Art Market North Art Precinct Potential Organisations 4. City Bath 8. Art House

9. Theatre 10. Artplay 11. Live Music

Refer to South Bank Art Precinct facilities and institutions, I design North Art Precinct which is basically similar. The most difference is North Melbourne Art Precinct facilities will be more open and free, which is more suitable to the low income artists and students. Based on the North Melbourne functions research, I pointed out the existing Community Infrastructures and potential site which include development pending site, old factory warehouses and factories. Link organisations of potential sites with existing organisations. And my next part design will focus on the CUB site, which will be most important and main landmark in this area.


21

21

19

1 1

18

26

20

2

2-3

30

2

24

19 17

16

1

1

7

8 3

15

2-2

14 7

7 1 13

7

12

8

2

24

10 11

2

9

9

9

9

14 7 16 35

6

2

2

6

1 41

7 5

24

5

1 4

3

4

2

1-1

N Level 1

1. Rest 2. Seminar Room 3. Media Room 4. Archive 5. Open Office


26

21

2

2

2

6

21

21

19

2 2 2

7

28

7

30 19 22

27

19 7

29

6

6 8

31

19

6

7

6

20 7 3t 35 30 31

32

35

19

7 33

7

19

7 19 1

19

25

36

23

26 7

7

5 2

2

7 1

30

14

5

35 5

7 16

7

Level -1

23 19

Level 3

14

23 2

21 21

37

21 2

19

14

20

2

39

39

2

7

7 34

6

8

2 7

8

7

40 39

6

39

6 35

7

8 35

7

8

18

35

38

38

34

18

7

14 16

7

14

16

35 24 23 7

5

24

5

1

1

Level 2

Level 4

Level G 6. Independent Office 7. Storage 8. Communication Room 9. Independent Studio 10. Open Studio

11. Garage Entrance 12. Tech Office 13. Equipment Borrowing 14. Administration 15. Print Room

16. Reception 17. Wardrobe 18. CafĂŠ 19. Mech. 20. Main Stage

21. Classroom 22. Motion Capture Studio 23. Exhibition 24. Lobby 25. Shop

26. Theater 27. Makeup 28. Dress Room 29. Prep Stage 30. Control Room

31. 32. 33. 34. 35.

Edit Suite Sound Studio Computer Lab Walking-in Cinema VRC Immersive Theatre

36. 37. 38. 39. 40.

Workshop Machine Room Library Artist Apartment Celebration Roof Celebration


U

N

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T

Three Roof Materials Dark Metal Panel (Solid)

Copper Panel (Texture Panel)

Clear Glazing Material

│Exhibition/Cafe/Library│

│Platform/Media/Video

L +0.0; +1.0; +5.0

Recorder│ L -1.0; +5.0

Warehouse Truss Stucture (Support Roof weight)

05

│Office/Open Studio│

│Studio/Classroom/

L +0.0; +1.0; +5.0; +9.0; +13.0

Office│ L +10.0; +14.0

Floor System and Overview

L +50.0 View Tower

L +10.0; +14.0 VCA Office

L +10.0; +14.0 VCA Classroom L +14.0 Outdoor Activity Space L +5.0 VCA Media Room

L +10.0; +14.0 VCA Studios L +16.0 Art House Residence

│Urbanscreen/Cafe/

│Club/Shop│

Walkable Cinema│

L +1.0; +9.0

L +1.0

L +16.0 Art House Residence Living L +9.0 Art House Club L -1.0 VCA Foyer L 0.0 Art House Entrance L +5.0 Art House Studio Living Copper Panel (Solid) Existing Blue Stone Heritage Wall Copper Panel (Texture Panel) L 0.0; +5.0 Design Hub Separate Office L +9.0; +13.0 Design Hub Open Office L 0.0; +5.0 Design Hub Library

L +1.0 Design Hub Exhibition L +1.0; +9.0; +13.0 Design Hub Studio L +5.0 Design Hub Media Room L +9.0 Design Hub Rest Room

│Office│

│Studio/Residence│

L +1.0

L +5.0; +16.0


architecture student - MSD Whole Circulation Diagram

+4

+3

Tourist Circulation Diagram

Tourist Circulation Comic Map

6. live bar

+4

10

6

+3

10

5. platform

10. view tower

7. ramp down

5 7

+2

4. recording/media

6

+2

10

06

limo arrival

9. red carpet walk 4

+1

+1

3. ramp up/down

5 4 3

4

8 10

9

8. ramp up 2. urbanscreen/walkable cinema

0

8

0

Cinema/Visual Exhibition

3

Design Hub

2 1

2

Art House VCA Film School

1. entrance/box office


U

07

Cross Section

School Section

N

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T


architecture student - MSD

South Elevation

Art House Event Perspective

School Lobby Perspective 08

East Elevation

Cinema Event Hall

West Elevation

Design Hub Lobby Perspective


U

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T

Artists and audiences are able to engage with each other.

ISSUES AND DEMAND RESEARCH 2011

N

2040 CONNECTION

28,400 2016

2021

22,216

23,465

2031

2026

2040+

25,557

23,884

Projected job growth

Artists are able to present, work and live in the City of Melbourne. 2011

12,399

2021

2016

16,888

16,078

2026

2031

18,033

2040+

19,161

22,000

Projected residential population growth

18

living by themselves

30 38 who live in the municipality 5 years ago

48

speaking a language other than English at home

born overseas

Timeline Order Quentin's Edit Order

Artists are able to activate the public realm.

people aged between 18 and 44

FOUR PRINCIPLES OF URBAN RENEWAL IN CITY NORTH

Artists are able to explore, interpret and reinterpret the city’s heritage in dynamic ways.

ACTIVATION

69

POPULATION AND DEMOGRAPGY With expansion of Melbourne City, the residential population will be increasing to 22,000, twice amount of existing now. Half of them born overseas and speaks another languages other than English at home. Majority people is around 16 to 44, which means they are either students or the professional. Moreover it seems to be that they are living alone or strangers who shared home with them. 09

ART STRATEGY

HERITAGE

20,119

SPACES

2011

FOUR DIRECTIONS OF ART STRATEGIES IN CITY NORTH Connection: We would like to design new public realm to encourage new and meaningful connections between artists, audiences and communities. Activation: We will support artists to present work in the public realm; lead and partner in the delivery of significant arts projects. Space: We need to create some

spaces to support and enable affordable, secure and appropriate work spaces for artists; we will facilitate and advocate for affordable living/ work spaces for artists. Heritage: New development respects and integrates with the existing urban heritage fabric and celebrates the stories of City North.

Equivalent EquivalentFull FullTime TimeStudents StudentsLoad Load(EFTSL) (EFTSL)

2008 2008 2008

Music

Art

Music Music

Art Art

FIRST REGULAR FREE-TO-AIR TV TRANSMISSION

Perf

Perf Perf

FTV

FTV FTV

2009 2009 2009

1321

1321 1321

1370 1370 1370

2010 2010 2010

53% 53%

53%

1674 1674 1674

15% 15% 15%

Tschumi’s theories are very interesting and some projects have relationships 25% with film edit method, like Le Fresnoy. 25% I chose the Pulp Fiction by Quentin, because it is the movie also include four 2020 planning student 2020 2020Planning Planning Student Student Percent Percentofof the the Total Total 2020 Planning Student Percent of different stories with different characters; percent of the total the Total also it became a significant landmark work by its new narration way in movie field. 35%

22%

15%

25% 25%

25% 25%

6% 6%

6%

2010 student percent of 2010 2010 Student Student Percent Percent ofofthe theTotal Total 2010tota Student Percent of the Total l

VHS VIDEO HOME SYSTEM

IPHONE

2010

CINEMA ADMISSIONST HIT 110 MILLION

Cultivate a vibrant and distinct

Regenerate the area's public

precinct connected to the

realm

Central City

Suburbanization – from the

mid-1980s until around 2000, new screens were built with smaller seating capacities in multi-screen complexes in suburban and regional shopping centres, especially by the incumbent major exhibitors Hoyts, Village, Greater Union and Birch Caroll and Coyle.

Integrate the area's heritage

Support a culturally and

into urban renewal

socially engaged community

BROADBAND INTERNET

COLOR TV BERAMAX DVD

Diversification – in the 2000s, the expansion slowed but a wider range of cinema types and experiences were offered to audiences. the national art chains Dendy (now owned by Icon) and Palace, and mainstream independents such as Wallis in South Australia, Cineplex in Queensland and Majestic in NSW, built new complexes, renovated and expanded old ones, and acquired some from the majors.

'The cinema was an obvious source... Flashbacking, crosscutting, jumpcuts, dissolves and other forms of editing provide a rich set of analogies with the time and space nature of architecture.' - Bernard Tschumi

15% 15%

35% 35%

22% 22%

FIRST AUSTRALIA FILM SHOT & SCREENED IN COLOR FIRST CINEMA BUILT IN AUSTRALIA

MONTAGE METHOD STUDY

Equivalent Full Time Students load

Equivalent Full Time Students Load (EFTSL)

IPHONE

FILM SCHOOL EXTENSION The film school is major component added to the program, intersecting the synergy arena to create mitigation between opportunity for ideas and conflicts to collide thus becoming a catalyst for social engagement and collaboration. This experience allows the students to experience the live cinema and theater while projecting the film school to the public. EVENT Amalgamated Holdings (Event Cinemas), in late-2010, said its cinemas were in ‘mature markets with limited growth and expansion opportunity’. Village Roadshow told shareholders in November 2012 that theme parks, not cinemas, were the company’s ‘new foundation business’.


architecture student - MSD

10

Main Entrance Street View


U

OLYMPIC VILLAGE

02

TEMPORARY VILLAGE FOR 2016 MELBOURNE OLYMPIC GAMES Studio: Design a Transformable Architectural Style Ballarat [AU] │ july - november 2012 personal project

Melbourne has won the right to host the 2016 Olympic Games. As in 1956, the rowing will be held on lake wendouree,. In Ballarat, where the rowing team will be housed in their own mini village. The world flocked to Ballarat in the 1850s insearch of gold. Today you can still discover gold everywhere you travel around Ballarat and its historic villages. It’s where history comes to life. The new Olympic Village will improve local economy and it will become the new ‘Golden Mine’.

11

This Village will comprise of 1400 residents for the 16 Day Event. The amenities provided for the participants include a dining hall, gym, commercials, medical and offices. As with all olympic villages design in tent should focus on post games transformation, and how best to accommodate a future program through a master plan. THE RUSH IS STILL ON ...

N

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T


architecture student - MSD

Step 1

max. use the site

Step 2

compact strip volume for local context

Step 3

raise up volume to create ground public space

12

Structure System

Step 4

make the centre court and make a river through the site

(concept

of golden

rush)

The structure is flexible. However no matter how the function interior is changed, the structure was still permanent. The obvious structure become the sign of the building. And the external structure can provide the most efficient using interior. As a river through the site, when the sun set, the golden sun light reflect on the surface of river. It looks light the golden in the river, reflected the local history ‘Golden Rush’ The beautiful phenomenon central courtyard provides more communication opportunity for the residents and visitors.

Step 5

regular the shape and make

46

the entrance 46

14

24

7

Step 6 Main Street View

cut and orientate for environment

Short Section 1:500


U

N

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T

16 15

16

12 11 14

6

4

5

3 7

10

1

2

10

19 17

18

21

20

9 9

22

14

8

12

19

4

13

Master Plan 1:1000 (Olympic Village)

46

46

8

7

Long Section 1:500


architecture student - MSD

43

44

39

39

43

42

5

40

41

39

41

1. Security Check 2. Station Video 3. Office (Security) 4. Waiting Room 5. Reception 6. Storage (Visitor) 7. Press interview 8. Office (Press Staff) 9. Office (Technology Staff)

10. Storage 11. Mech. 12. Toilet 13. Meeting Room 14. Rest Zone 15. Athletes Accommodations Entry Lobby 16. Officials Accommodations Entry Lobby

17. Athletes’ Bus System 18. Registration (Medical) 19. Office (Secretarial) 20. Trauma Room 21. Triage Room 22. Information Center 23. Copy Center 24. NOC Service Center 25. Café

26. Office (Main Street Staff) 27. Post Office 28. Travel Agency 29. Convenience Store 30. Bank 31. Media 32. Olympic Information Center 33. Kitchen

34. Dining Hall 35. Staff Lounge 34. Dining Hall 35. Staff Lounge 36. Nurses’ Work Room 37. Rental Room 38. Reception (GYM) 39. Changing Room 40. GYM

38

41 41

39

40

14 23

24 12

13

12

14 13 34

25

15 36

35

37

33

32

31

30

29

28

27

26

12

14

Level 1 1:1000

14 46

46

13

46

13

12 10

13

Temporary Main Street

34 48

51

Level 2 1:1000

53 52

53

46

45 12 49 50 47

33

Level 3 1:1000

Temporary Olympic Office Lobby Interior


U

BALLARAT UNIVERSITY

02

TEMPORARY VILLAGE FOR 2016 MELBOURNE OLYMPIC GAMES Studio: Design a Transformable Architectural Style Ballarat [AU] │ july - november 2012 personal project

After Olympic Games, the temperate Village will be designed to transform to the Ballarat University Engineer Campus, which include Education Facilities, Student Accommodation, Private Apartment, Boutique Hotel and a small train station. First detail the brief function and draft locate new facilities into existing one. Obviously, the front part transferred to three functions, Offices, Main Campus, Commercial. Then fill in the different system and design the circulation by the new function system. And Olympic Accommodation which is three tower building at the back will be transferred to the three different types of residents, student accommodations, private apartments and a boutique hotel. 15

Due to the flexible structure, the front part will be re-range to meet the floor area requirements. And remove part of temperate slabs and place new slabs. Based on the function, designed the new facade which made by colour PVC material, because of budget and installing easily. The back tower of student accommodations will be designed based on existing athletes’ ones. The front desk of boutique hotel will be created in the foyer on the ground level which is separate from the student accommodation entrance. The hotel public space, such as cafe and gym, will be placed on the top two levels of tower to havethe best view of Ballarat. The apartment tower will be isolate from Campus. It will have its own pedestrian pavement and drive way in order to provide more privacy. Plan will be redesigned, so replace all interior wall to have more suitable living space for local residents in village. All three tower will have opportunities to install the colour PVC panel to protect from sunlight in Ballarat.

Main Lobby View

N

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T


architecture student - MSD

North Elevation 1:500

16

South (Street) Elevation 1:500

Long Section 1:500


U

N

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T

40

3

16

18

19

17

17

15

20

43

41 3 1 2

9

14 9

9

7

11

8

4

11

13 3 13

12

9 9

1. Theater 2. Rest Area 3. Toilet 4. Foyer 5. Seminar Room (S) 6. Seminar Room (M) 7. Seminar Room (L) 8. Bicycle Park Zone 9. Shop 10. Bus Station

6

10

11. Reception 12. Student Center 13. Office 14. Wait Area 15. Sports Hall13. Office 14. Wait Area 15. Sports Hall16. Hotel Entry Lobby 17. Student Accommodation Entry Lobby 18. Student Accommodation Services 19. GYM

20. Apartment Entry Lobby 21. Storage 22. Study Room 23. Reading Zone 24. CafĂŠ 25. Staff Kitchen 26. Museum Reception 27. Exhibition Area 28. Dining Hall 29. Multi-faith Worship

30. Library 31. Return Zone 32. Administration Office 33. Multifunction Indoor Sports Hall 34. Student Entertainment 35. Bar 36. Restaurant 37. Kitchen 38. Student Accommodations 39. Apartments

5

5

40. Train Station 41. Basketball court 42. Vehicle Park Zone 43. Children Playground

Master Plan 1:1000 (Ballarat University Campus)


architecture student - MSD

29

5 1 24

21

2

3

2

13

28

27

26

13

21

5

2

25

3

22

23

22

Level 1 1:1000 Campus Main Lobby View

18 21

3 23

23 30

32

31

3

13

13 34

33

3

33

Level 2 1:1000

38 38 39

Library View

23

23

3

13

35

13

36

Level 3 1:1000

21

37

Food Court Section 1:500

Campus Section 1:500


U Part of Apartment Plans

L9-14: Hotel Typical Level

Tower External Structure System The strucutre of accomdation building was the external structure frames which was easy to refunction and max. using the building interiors space. It is suitable to the transparent requirement.

L15: Hotel Cafe Level

Room types of apartment will refer to the Le Corbusier’s Marseille Modernist Residential Housing, which is two stories and with both south and north face room, cross ventilation and each floor is include some public space for residents. And I designed a ventilation system which can make the cross ventilation more efficient and comfortable.

19

L16: Hotel Gym Level

Apartment Ventilation System

Steel Frame Concrete Slab 120mm Plywood Timber Floor 50mm Steel Beam Bottom Plate 75mm *50mm Steel Column 200mm*200mm (30mm thickness) I-Sharp Steel Frame 150mm*100mm Steel Lurves (10mm thickness) Steel Beam Bottom Plate 100mm*500mm Glass Wood Insulation White Board Ceiling (50mm thickness) PVC (10mm thickness)

Ventilation System Detail

Outique Hotel Section 1:500

N

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T


architecture student - MSD

Athletes Accomadation (Type B) Plan Level 2 1:500

Courtyard Schematic Diagram

Athletes Accomadation (Type B) Plan Level 4 1:500

Detail Apartment View Hotel Restaurant View Athletes Accomadation (Type B) Plan Level 7 1:500

20

Solar Access Diagram

Facade of Apartment Overview The Ballarat Boutique Hotel was located above the secondary student accomdations in order to have the lake and mountain view. But the hotel entrance and lift was septrated from the student accomdations’s. And the top two level was designed for the hotel restaurant, swiming pool and gym. And the resting holl was placed on each two levels . The types of hotel rooms were include the singles, double and twin share. The main student accomdations have the nice shared communcation courtyard and dining room in the centre of building on each level to provide the chance for the student social and touch the local environment. And sun light can come through to every courtyard.

Hotel Rest Area View

Athletes Accomadation (Type B) Long Section 1:500

Short section 1:500


U

FISH HOUSE

BOAT HOUSE IN STUDLEY PARK Studio: Learn from Master (Frank Gehry) Melbourne [AU] │ february - june 2013 personal project

03

“Gehry made himself into another person, a maker of building that aim at the perfection of a fish. For this is what the fish represents in Gehry’s mind: a more perfect creature than he had been able to create so far. Its sharpe had escaped the architect’s imaginative power, but he said:’ I kept drawing it and sketching it and it start to become for me like symbol for a certain kind of perfection that I couldn’t achieve with my buildings.’ The superior qualities of the fish also suggest a triple filiation of meaning: it reperience, and an abstract ideal that required him to exercise his talent over many years before attaining his goal. For Gehry, the antiquity of the fish also evokes the beginning of architecture, the ‘zoomorphic yearning’ of architect.” 21

Fish House is designed based on the works and design philosophies of the post modernism architect, Frank Gehry. Precedents from this master became integral to the design process and very much influenced the outcome – form, materials and façade that resembles Maggie’s Center. Through hundreds of times sketch and modeling, every single curve and line is considered and tested. The whole group of building just like a nice piece sculpture work sitting on the site adjacent the Yarra River. Walk on the different ways of village, they will bring you completely different experience. The shining roof and original timber structure all let you feel the remembrance of boat factories and site history. Such a wonderful place to spend with families during weekends.

N

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T


architecture student - MSD

PLACE FUNCTION LOGICALLY ON SITE

ORIENTATION & TWRIST BY VIEW

CHANGE BUILDING SHAPE AND LEVEL BY EXISTING TREE & TERRAIN

East Elevation (Entrance Elevation)

Indicator Diagram 1:250

22


U 1. FOYER 2. CAFE BAR 3. CAFE 4. TOILET 5. CORRIDOR 6. REST (MEZZANINE FLOOR)

7. STORAGE 8. BOAT STORAGE 9. BAR 10. BOILER ROOM 11. KITCHEN 12. FOOD STORAGE

N

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T

13. COLD STORAGE 14. RESERVATION RESTAURANT 24. FOOD LIFT

6

7

5 8

15

1 3

2

4 9

10

24 11

13 7 12 4

14

N Master Plan 1:500


architecture student - MSD

Section From Cafe To Reservation Restaurant 1:250

24

Section From Cafe To Boat Club 1:250


U

2

9 8

7

9 1 4

3

Master Plan 1:1000

25

Section From Cafe to Restaurant 1:250

5

6

1. Cafe 2. Boat and Kayak Club 3. Kitchen, Office & Reservation Restaurant 4. Restaurant & Bar 5. Staff Car Park 6. Reservation Car Park 7. Public Car Park N 8. View Point 9. Kiosk

N

I

V

E

R

S

I

T

Y

P

R

O

J

E

C

T


architecture student - MSD

26

North Elevation (View of Whole Site) 1:250

Section From Boat Club To Restaurant 1:250


A

R C H I T E C T U

R

E P R O J

E C T

XINJIANG INTERNATIONAL AIRPORT

04

NEW T1 AIRPORT AND GTC IN URUMCHI COMPETITION LAST THREE PROPOSAL: competition Urumchi [CN] │ april - june 2012 collaboration as asistant│ECADI

EXTENT OF INVOLVEMENT

• Conceptualization and Sketch Design. (GTC Design) • Preparation of 3D models on Rhino. • Preparation and conceptualization of Architectural Design Drawings. (GTC Design)

REQUIREMENT AND PROGRAM

• North T1 architectural design is based on existing master plan of URC, which has the following key points: The forecasted aviation demand by 2025, passenger throughput 42MAP, cargo throughput 550,000 tons, an¬nual flights 338,700; by 2040, passenger throughput 60MAP. Construction area is set as north T1 280,000 m2, GTC 125,000 m2 (incl. indoor garage 75,000 m2), design scale tuning range is ±5%. 27

DESIGN RESPONSE

AIRPORT • The most important design of airport is form. Roof deisgn was converted the factors of local environment include wind, sun and snow factors into a couple of mathematical formulas. Each module was not folded randomly and purposelessly but underpinned by the complicated and scientific mathematical formula as well as the characteristics of local environment. • As a landmark of Xinjiang, the new terminal needs to express regional customs. The interior is the most suitable part of the building to explore this aspect. Arcade and fringe pattern are inspired from the interiors of mosques to symbolize a vernacular culture within the airport. The resulting arcades become a modern interpretation by filleting clustered piers and slanting beams representing the arcades. The triangle light collecting panels become reinterpretations of fringe pattern. GTC The purpose of Synthesized Traffic Centre is to solve the complex connections between the dif¬ferent transportation networks leading to and from the airport hall. The following are our ideas: • Separate the various modes of arrival and departure (pedestrian, taxi, coach, metro and private vehicles) from one another. •Public transport is the primary circulation mode. •Separating the large amount of passengers arriving and leaving the airport. •Control the passengers’ walking distance. •Design by functions, and achieve a more ergonometric design. •Reasonable commercial design, which not only can service the passengers but also increase the income of airport. •Space design needs to relate to the circulation, which can guide people. (All the following page diagrams was done by myself and also include some levels functions layout and the final documounts layout.)

Interior View


intern - ECADI

Bird View

Connection between Aitport and GTC View

28

Physical Model

+9.0m Level

+0.0m Level

+4.5m Level

-8.0m & -4.0m Level

-14.0m Level

GTC and Airport Section


A

HAVANA RIVIERA HOTEL RENOVATION

R C H I T E C T U

R

E P R O J

E C T

05

TWO RENOVATION STRATEGIES IN CUBA

commission project for China Investment Corporation Havana [CB] │ march - april 2012 collaboration as asistant│ECADI

EXTENT OF INVOLVEMENT

• Conceptualization and Sketch Design. • Make SWOF anaysis PPT. • Preparation of 3D models on Rhino. • Preparation and conceptualization of Architectural Design Drawings.

REQUIREMENT AND PROGRAM

• This project was a one month duration. • The client need two schemes for the future transform. Both need to imporve the old hotel functions to suit for the new customers services. The design had to respond to the height limit regulated by the city with respect to the monument in front of the site. 29

DESIGN RESPONSE

Scheme 1 (Limited Improve) • Improve the two commercial levels function based on the old plan. • Design the new tower building facade. • Limited improve the external services, swiming pool, spa and landscape. • Keep the most of rooms layout . Scheme 2 (Perfect Improve) • Relay the two commercial levels function to suit the new customer requirement. • Design the new building facade. • Design a new open swimming pool and landscape. • Change some part of rooms layout to meet the high requirement hotel. (All the following page diagrams was done by myself and also include some levels functions layout and the final documounts layout.)

Bird View (Scheme 2)


intern - ECADI

Plan Scheme 2

Plan Scheme 1 30

Entertainment View (Scheme 2)

Bird View (Scheme 1)

Entertainment View (Scheme 2)

Main Street View(Scheme 1)


A

R C H I T E C T U

R

E P R O J

E C T

06

ERBAN BRIDGE COMPLEX

NANJING COMMERCIAL MALL COMPETITION competition Nanjing [CN] │ january - march 2012 collaboration as asistant│ECADI

EXTENT OF INVOLVEMENT

• Conceptualization and Sketch Design. • Preparation of 3D models on Rhino. • Preparation and conceptualization of Architectural Design Drawings.

REQUIREMENT AND PROGRAM

31

• This project was a one month duration competition. • This project had complex requirements to respond to --- such as connection to an underground subway system, integration of a bus terminal, separate office, residential and shopping retail entrance. • The design had to respond to the height limit regulated by the city with respect to the monument in front of the site. •The program area requirements of office retail and commercial had to be reached with no compromise.

DESIGN RESPONSE

•The retail shops all have valuable street frontage. This creates a lively shopping atmosphere and helps retailers maximize profits. •The entrances of the office and residential towers were AERIAL VIEW discrete and have been blended seamlessly into the podium. •There are two main atriums in the design. They both serve as a focal point around which circulation takes place. •The atrium for the retail section helps visitors visually connect and orient themselves within the space. •The atrium in the residential section brings in green gardens at different levels with triple height spaces. The atrium is also opened towards the east. This brings in soft morning light during the day. This gives residents a pleasant experience just before entering their apartments. • Every apartment has a balcony. This helps in the salability of each unit. •The gradual twist and shape of the tower and podium is inspired from a ship. This imagery was drawn from the naval dock yards located close to the site. (All the following page diagrams was done by myself and also include some levels functions layout and the final documounts layout.)

Main Entrance View


intern - ECADI

Commercial Function And Circulation

Section A-A

Section B-B

Offices Function And Circulation

32

Elevations Function Diagram

Master Plan

Apartments Function And Circulation

Bsement Carpark Function And Circulation

Terminal Bus Side View

Night Effect Street View


A

DAVID FRAZER HOUSE

R C H I T E C T U

R

E P R O J

E C T

07

RESIDENTIAL PROJECT IN CASTLEMAINE LOGAN STUDIO commission Castlemaine [AU] │ june - august 2013 collaboration as asistant│Logan Studio

EXTENT OF INVOLVEMENT

• Conceptualization and Sketch Design. • Preparation of 3D models on Sketchup • Preparation and conceptualization of Architectural Design Drawings. • Preparation of 3D physical model

REQUIREMENT AND PROGRAM

33

• This new green and environmental friend house was designed for the renowned Australian printmaker, David Frazer. • The program and structure will be flexible for future extension. • Living space should be considered the privacy between kids and parents. • The house outlook should blend with its surroundings. • Exist flash flooding, extreme heat and fire issues.

DESIGN RESPONSE

• We used recycled timber and brick as main facade material. And others we used local materials as much as possible. • We actually designed two stages for clients, which include the proposal to build now and 5 years later. And all structure system is installed at first stage to save budget in next extension. • In the plan, we designed two separated zone for both kids and parents. And some detail removal wall to make the living space more flexible. • We made physical model and took amount of site images to find the best shape and outlook to make the house blend with its beautiful surroundings. • Energy efficiency was a high consideration given the extreme winters and summers in Castlemaine. And the exterior wall and roof was heavily insulated to create a complete thermal barrier to external temperatures.

Courtyard View

Facade Detail

Part of Physical Model Test 1:200


intern - Logan Studio

CASTLEMAINE CHURCH RENOVATION

08

OFFICE & APARTMENT RENOVATION PROJECT IN CASTLEMAINE LOGAN STUDIO commission Castlemaine [AU] │ april - june 2013 collaboration as asistant│Logan Studio

EXTENT OF INVOLVEMENT

• Conceptualization and Sketch Design. • Preparation of 3D models on Rhino. • Preparation and conceptualization of Architectural Design Drawings.

REQUIREMENT AND PROGRAM

3D Viual Model View

• This project is about renovating a local church school to Logan Studio Office and living apartment. • Keep the facade outlook and street view. • Design a liveable space based on the existing structure and ceiling height. • Consider the issue of serious noise from the main street. • Consider energy efficiency, especially extremely cold in winter. • Work out steps of processing renovation in existing building.

DESIGN RESPONSE

• Depend on existing situation, design the best proposal to meet living and commercial requirements. • Referred some renovation churches cases, design suitable and dramatic foyer and living space. • Keep facade and only replace window glass to double one. And create the fence with beautiful courtyard to protect the noise and improve the privacy. • Energy efficiency was a high consideration given the extreme winters and summers in Castlemaine. And the exterior wall and roof was heavily insulated to create a complete thermal barrier to external temperatures.

Condtruction Process

34


U

09

N

I

V

E

R

S

NEW WIND TOWER SYSTEM BK CITY RENOVATION

Studio: Delft Technology Delft [NL] │ october - december 2013 personal project

35

And the second question is how to design wind tower which air can be sucked both in and out in the same time. The tower is separated into two parts without any gap between. And the inlet tube is sitting in the middle of tower and made by the double layers of tube with air gap insulation, which maintain the income air temperature. The rest of space become the outlet ventilation zone. Therefore when in the windy day, first the indoor air will suck out through the outlet zone and provide the lower pressure inside. Then the outside air starts to transfer into building through the inlet tube to balance the pressure difference. The natural ventilation circulation is built. Since on the 2nd level, the original building form is only attach on the bottom part. I designed a skylight which can be opened to fix this situation but keep the same form of building.

T

Y

P

R

O

J

E

C

T

3

1

Summer Climate Situation 1. High pressure outside, suck the interior air out through the vent. 2. To keep the pressure balance, air outside is sucked into the tube. 3. The inlet air temperature is reduced through the cooling pipes. 4. High temperature water is reduced by using the Geothermal energy. 5. Bioclina system provides the cooling air by the cold water inside the pipes from floor and wall. 6. The HVLS Fan can provide more climate system efficiency.

2

We are asked to renovate a fragment of BK City (TU Delft Architecture Faculty). And the new design should be a low-energy building which is include new structure, new façade, and new climate concept. My design is a new wind tower system. A wind tower is a tradi-8 tional Persian architectural element to create natural ventilation in buildings. And it has been used in many countries, especially Egypt. Do lots of research on traditional wind tower, and try to use new materials and techniques to improve it and better suit to the Netherland environment and architectural language. The strategy is using the existing staircase tower. Since the fragment only exists one stair tower at the end of fragment. The 12 natural ventilation system will be hardly working in the whole fragment, and the size of air movement quantity is not totally enough. Also the system will be too much complex and ventilation might not be work with so much turning point.13So instead, build the couples of small tower next to the fragment. In order to keep the building’s monumental, use the same brick structure as the part of continue external facade. The temperature of inlet air need to maintain, therefore the tower should be well insulated by a high thermal mass layer between brick and concrete.

I

3

4

5

1 6 5 2

4

Windy Climate Ventilation System

11 9

10 6

7

Winter Climate Situation 1. Control by shutter, interior air is sucked out through the vent. 2. To keep the pressure balance, air outside is taken inside by the mechanical fans. 3. Heat is absorbed from the energy of outlet air, and transfer using as the energy of heating pipes. 4. Cold temperature water is rised by using the Geothermal energy. 5. Bioclina system provides the warm air by the hot water inside the pipes from floor and wall. 6. The HVLS Fan can provide more climate system efficiency.

Wind Tower Composition 1. Cover Cap 2. Venturi Curve 3. Turbine Holder 4. Air Turbine Inlet 5. Cooling/Heating Pipes 6. Inlet Tube 7. AIr Turbine Outlet

3

1 6

5 2

4

No Wind Climate Ventilation System


architecture student - TUD

CC Longitudinal Section 1:20

B

B

SOLAR PANEL

VENTURI CAP

Elevation 1:20

BB Cross Section 1:20

AIR INLET AIR TURBINE INLET COMPOSITE WIND DIRECTOR AIR OUTLET

C AIR TURBINE OUTLET

Detail 1

215/102.5/75MM WATERSTUCK BRICK FACE; 80MM VENTILATIN GAP; 120MM THERMAL INSULATION (MINERAL WOOL); 200MM PREFABRICATED REINFORCED CONCRETE

REFELCTIVE SHUTTERS

Detail 2

REFLECTIVE SHUTTERS

COOLING/HEATING PIPES

0.7MM ZINC PANEL; 20MM ROOF GAP COVER; GLASS FIBRE BLANKET (ISOLATE HEAT); 24MM TIMBER PANEL; 60MM VENTILATION GAP; WATERPROOF MEMBRANE; 130MM THERMAL INSULATION (MINERAL WOOL); GLASS FIBRE BLANKET (ISOLATE VAPOUR); 24MM TIMBER PANEL; 20MM SOUND INSULATION (MINERAL WOOL); 15MM CEILING BOARD 120MM I-SHAPE STEEL TRUSS

120MM I-SHAPE STEEL TRUSS

36

Detail 3 140MM I-SHAPE STEEL FRAME VALVE

A

Double Glazing Window (High Performance)

A

AIR INLET VENT

120mm I-SHAPE STEEL FRMAE (ROOF) 10MM MASTIC ASPHALT; 20MM GROUTING COMPONENT HEATING/COOLING MAT FOLIMET; 50MM CONCRETE SCREED; 100MM THERMAL INSULATION (MINERAL WOOD); 100MM CONCRETE SLAB; 350MM TRESTLE SPAN; 15MM CEILING BOARD

AIR INLET VENT

140mm I-SHAPE STEEL FRMAE (LOFT)

Detail 4

B

C B

AA Floorplan over facade fragment 1:20 AIR INLET VENT

DOUBLE-GLZAING 8MM TEMPERED GLASS 15MM AIR GAP 8MM LOW-E GLASS

215/102.5/75MM WATERSTUCK BRICK FACE; 80MM VENTILATIN GAP; 120MM THERMAL INSULATION (MINERAL WOOL); 200MM PREFABRICATED REINFORCED CONCRETE

Detail 1 1:5

Detail 2 1:5

Detail 3 1:5

Detail 4 1:5


37


Thank you for your time and consideration.


CHARLES HU Graduate Architect P: 0452 616 383 E: chals-hu@hotmail.com S: charles.hu90


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.