Architecture Potfolio

Page 1

BOU ND selected works

CHARLES LENT

The City College of New York Bernard & Anne Spitzer School of Architecture


CHARLES LENT New York, NY

charlesanthonylent@gmail.com

727.515.0861

https://www.linkedin.com/in/charles-lent-67299794 https://issuu.com/charleslent https://www.behance.net/charlesant908e


BOU ND contents

Winter Pasture fall 2016

I

pg. 01-14

Heights Pavilion spring 2016

I

pg. 15-28

Plastic Flowers summer 2015

I

pg. 29-42

NYC Labor Council Summer 2018

I

pg. 43-56

MarketAxess fall-winter 2017-2018

I

pg. 57-70

Vitra Showroom summer 2016

I

pg. 71-78

Google - Pier 57 summer 2016

I

pg. 79-86


health lodge rendering


W I N T E R PA S T U R E EMERGENCE OF A FIXED NENET ARCHITECTURE

DURATION: 7 weeks research + 9 weeks design PROFESSOR: Alberto Foyo TEAM: colaborative research + independent design LOCATION: Siberia, Russia CLIENT: The Nenets [indigenous reindeer herders]


yamal peninsula

migration path key A

K

B

C D E F

G H

J

I

I

MAY - AUG.

J

K

crossing the ob beginning of may crossing the ob middle of december early winter pasture crossing the luribei in september crossing the luribei end of may summer pasture moving towards kharasavei moving towards tivtei lakha crossing the luribei in september migration to vicinity winter pastures northen yamal brigade migration

H G

F

hearding threats APRIL - MAY

D

E

melting permafrost

APRIL - MAY mys-kamenny

climate change

- 1,000

novy port x 1,790

C

yar-sale

kharp

oil infrastructure

x 4,880

x 6,410

salekhard

A

x48,500

B

labythnangi x 26,930

aksarka

x 3,130

DEC. - APRIL

01 03

50 mi


W I N T E R PA S T U R E EMERGENCE OF A FIXED NENET ARCHITECTURE

The Yamal Peninsula stretches some seven

hundred kilometers into the Arctic Ocean from the Russian mainland below the Arctic Circle. Known to it’s indigenous inhabitants as ‘the end of the world’, this area of the Russian federation is arousing international attention.

The nomadic Nenets tribes of this peninsula have

retained their traditional culture and simple way of life for over a thousand years. Surviving Stalinist Russia and the interests of the gas drilling company Gazprom they now face a new threat, climate change and their landscape is dramatically changing. In recent years, this rich, rugged and inaccessible peninsula in Northern Siberia has been the focus of media headlines. The world’s largest energy company Gazprom, is trying to fully exploit Russia’s largest gas field containing an estimated half of the world’s reserves. Gazprom has embarked on an extensive venture to cash in on these gas reserves, the venture becoming Russia’s largest energy project in history.

food source

transportation + shelter

At the same time the landscape in Yamal is

changing as the Arctic permafrost thaws due to warmer Arctic temperatures. Scientists are concerned that millions of tonnes of Ch4 (methane) locked in the thawing permafrost could be a ticking time bomb, a tipping point for the world’s climate system.

JUNE 46 F

DEC.

nenets home

-5 F

arctic circle

JUNE

24 HRS

DEC. 0 HRS

JAN.

GREENLAND

0.2 IN

JULY

1.8 IN

YAMAL RUSSIA

04


INSTITUTED SITE PROGRAM

herd + bregade 100-7,000 reindeer per bregade 5-50 chums per bregade

5-500 nenets per bregade

education PHASE I 120 children in primary +secondary schooling PHASE II 90 children in history theory, and culture PHASE III 90 children in craft, survival, and nutrition

health relief from coldbath house phytotherapyherbs grown on site extended stay health treatment

05


pasture rendering

site section

corral as site protection

operable corral gate

06


ARCHITECTURE AS LAND ART

control snow drifts to collect

maximize solar heat gain

07


B AT H H O U S E + C L I N I C

“WATER” BATH HOUSE: HOT STEAM, STORAGE, HEAT PUMPS

“EARTH” DRY ARID SPACE: SPRING GARDEN(WINTER) FIRE PITS (WINTER)

OPEN PROGRAMABLE SPACE (9 MONTHS) EXTRA SPACE FOR PATIENT BEDS (WINTER)

TH A B GA RD EN

LO

UN

GE

BY B LO

“FIRE” lOUNGE SPACE: COOKING, FIRE PLACE, PANTRY

“EARTH” WARM HUMID SPACE: STORAGE, MOSS RESTROOMS, CIRCULATION

PATIENT ROOMS (YEAR ROUND)

PATIENT ROOMS SERVICE SPACE: SMALL FOOD PREP,TOILETS, STORAGE

08


spring garden rendering interior spring garden rendering

As a way to gain back autonomy, the new winter pasture settlement shall include options for both education (primary/secondary, as well as cultural and survival) trade, nutrient supplements staionary dwellings, and reindeer production facilities.

09


1st floor plan

DN

UP

UP

east section

39’-0” ROOF 1

29’-0” LEVEL 2

19’-0” LEVEL 1 14’-0” UNDER STORY

10


moss wall lobby rendering

interior spring garden rendering

building development axons

11


2nd floor plan

south section

39’-0” ROOF 1

29’-0” LEVEL 2

19’-0” LEVEL 1 14’-0” UNDER STORY

12


winter pasture site model



exterior pavilion rendering


H E I G H T S PAV I L I O N F O R M A S U N K N O W N ( X ) : P O O L A N D B AT H H O U S E

DURATION: 6 weeks research +10 weeks design PROFESSORS: Holger Schulze-Ehring, Corey Wowk, Julio Salcedo TEAM: collaboration with Eric Iversen LOCATION: Washington Heights, New York CLIENT: NYC Parks Department


pavilion site citeria

interior pavilion rendering

1

2

3

17


H E I G H T S PAV I L I O N F O R M A S U N K N O W N ( X ) : P O O L A N D B AT H H O U S E

Structure revitalizes space and social

WIND + SUN PATH

LOCAL SCALE SITE

environments. Novel and in depth investments in structure and technology become means to reexamine N

Wind direction rathered from windfinder.com Location of weather tower: LGA

and revitalize the social infrastructure of the city. This

NW

studio looks at pools as example of touch points and what

NE

June

can be achieved by further understanding the integral structural and architectural disciplines. LEGEND Winter wind Summer wind

6

6 March 7

8

1

12 1 2

11 1

Dec. SE S

Sun path

City planner Robert Moses, known as the

series of recreational swimming pool centers throughout the city. The Highbridge Pool and Bathhouse, opened in 1936 and still in use, is located within Highbridge Park at

9 10 10

Water

“master builder” of mid 20th century New York created a

E

W

Overlap

Amsterdam Avenue between West 172nd and West 174th Streets. Perched high above the city, Highbridge offers extraordinary views of the Harlem River valley, the High

S

1:4000

Bridge, and the stone water tower. Like Moses’ numerous other pools the Highbridge Pool and Bathhouse is an open air pool and its use is limited to a few summer months. The goal is the design of a long span roof and enclosure for this pool.

18


ANALOG FORM FINDING MODELS tensile fabric kast studies

compression ring cast studies

19


D I G I TA L F O R M F I N D I N G

Y X

X

X

Y

X

X

X X

Y

Y

X

Y

X X

X

X

X

X

X

X X

X

X

The advancement of structures through computational methods allows a far more explorative approach which translates to larger enriched designs. By engaging in new ways of understanding structural design we were exposed to basic ideas of structural form finding in combination with the analysis of physical and digital structural models. We will study the design of parametric structures involving cuttingedge theories and techniques. These explorations were supported by tools for parametricized structural design and structural optimization. We were prompted to develop innovative form finding techniques and structural design through digital computation. Ultimately, produced speculative models that integrate the use of contemporary tools for design and fabrication in the production of structural driven forms.

20


computational stress analysis

21


planarity deviation studies

22


C U S T O M D E S I G N E D D E TA I L S

lock in place unit detail

four unit intersection

frited etfe panelization


interior pool rendering

24


cap

cap seal

keder rope base seal

lid profile

aluminum extrusion

stanchion base

canister

25


wall section detail

AIR SUPPLY VALVE EXTRUDED ALUMINUM FRAME HIGH PRESSURE AIR TUBE

WELDED STEEL SUPPORT PLATE

BOLT ROTATION GROOVE UNIT ROTATION POINT SLIP CRITICAL BOLT [TYP] TRIPPLE LAYER ETFE CUSHION

3/8” HIGH STRENGTH STANLESS STEEL

18” CHS COMPRESSION RING ANGLED STEEL FLANGE SUPPORT

GRANITE SETT DRAINAGE DITCH

26


exterior pavilion night rendering

west section perspective

27


north park rendering

south park rendering

28


post production photo in situ


PLASTIC FLOWERS C O M P U TAT I O N A L D E S I G N B U I L D P A V I L I O N

DURATION: 6 weeks design +6 weeks production PROFESSORS: Jonathan Scelsea TEAM: Ermir Gjoka, Tony Fung Cheung, Daniel Escobar, Destiny Conely LOCATION: New York, New York CLIENT: NYC Parks Department


31


PLASTIC FLOWERS C O M P U TAT I O N A L D E S I G N B U I L D P A V I L I O N

Plastic Flowers began as a study of curved

folding as a methodology of creating a volumetric structural unit from sheet material, requiring minimal fastening and maximum space. The pavilion is formed from 100 “petal” units each constructed from an individual piece of .0625” thick density polyethylene. Two petals each were cut from a 2’ x 4’ sheet and etched to .032” depth using a CNC 3 axis router. The figural arc groove contour is created with a V-Groove tool-bit that when folded forms the rigid structure of this “Petal brick.”

Geometrically, the petals each are contained

within an octahedral bounding box which is locked to a geodesic grid around a sphere. The chosen geodesic grid is a triangulation of Goldberg’s Icosahedral Polyhedra of the 3rd order, featuring regular pentagons, and two six sided figures, one regular hexagon and one irregular. As a result of the tessellation, each octahedral and its contained petal, span from a hexagon to a hexagon or from the hexagon to the pentagon resulting in 2 unit types. Three petals, 2 hex units and 1 pent unit, join together at a half-lap joint using nylon socket bolt-screws, to form a cluster of three resembling a flower.

32


33


D I G I TA L + A N A L O G U E A P E R T U R E S T U D I E S

34


petal [unit]

material mock-up

35

flower [component, 3 units]

rose [ c l u s t e r, 1 8 u n i t s ]


cnc cut sheets

unit assembly details

36


view from within pavilion

Five flowers themselves come together to form a larger rose-component, using inner and outer brackets. This staged construction methodology of brick, cluster and larger component makes for easy transport to and from a deployment site, requiring only the 7 roses to be carried and snapped together. The Pavilion meets the ground utilizing custom half-units and feet designed to be scoop seating.

37


exploded cluster

front elevation

38


object nested on site

39


view from within pavilion

40


post production photo in situ



LIMINARY TEST FITS

MENITIES 2ND FLOOR TEST FIT 2nd floor plan test fit

NEW YORK CENTRAL LABOR CO 43


NYC LABOR COUNCIL P R O G R A M M I N G A N A LY I S I S A N D T E S T F I T S

DURATION: 6 weeks OFFICE: Spcaesmith TEAM: Julia Libby, Elisabeth Post Marner LOCATION: 110 William Street - New York, New York CLIENT: New York Central Labor Council

BUILDING CORE CIRCULATION SHARED SPACE STAKEHOLDER 1

58 SEATS

TOTAL

58 SEATS

44


110 WILLIAM STREET pre-programming test fits

low density

LOW DENSITY

VS.

111 Seats total

NEW YORK CE

high density 45

VS.

HIGH DENSITY 143 Seats total


NYC LABOR COUNCIL

SURVEY RESULTS

CURRENT WORKPLACE PROGRAMM I N G A N A LY I S I S A N D T E S T F I T S SUPPORT IN PLACE

SUPPORT CURRENTLY IN PLACE

SUPPORT NEEDED

SUPPORT NEEDED

The New York City Central Labor Council

commissioned Spacesmith with the task of designing a space they acquired at 110 William Street. While the

92%

employees surveyed saysome that NYCCLC is comprised of Of many union divisions, only

the design of their workplace is important

participants wanted to become stakeholders in this

“shared space” concept their developer was proposing.

PERSONAL WORK SPACE

DPT. ADJACENCIES

SOCIAL GATHERING

MULTIPURPOSE VENUE

The concept started as a way to give smaller unions the

YOUR CURRENT WORKSPACE

ability to scale don their rentable square footage in terms 69%

It's a place I'm proud to bring visitors to

of workspace and office and gain more space in storage, It creates an enjoyable environment to workspace. in meeting, and amenity LARGE MTG. ROOMS

SMALL PANTRY

HUDDLE / SMALL MEETING ROOMS

PHONE BOOTHS

73% 78%

It enables me to work productively

The exercise started with a series of

73%

pre=programming low density and high density test-fits

It contributes to a sense of community at work

andofamyvisioning session The design workplace is important to mefor

the space at 110 Water Street to

get a sense of which unions would want to participate. The STORAGE

MAIL/ COPY CENTER

SHARED AND CLOUD BASED STORAGE

next exercise was preliminary interviews, surveys, and post programming test-fits for the confirmed stakeholders. High density test-fits were developed to reduced the amount of usable square footage in their workspace and maximize shared/amenity space.

NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018

46


SURVEY RESULTS

PERCENTAGE OF PARTICIPATING STAKEHOL

ONLINE SURVEY SUMMARY

12% 7% 0% 2% 0%

42%

10% 0%

26%

14%

2% 0% 2%

9%

OF ALL STAFF RESPONDED

Did not respond

Responded

STUDY DEMOGRAPHICS

PARTICIPANTS BY UNION

AGE GROUP

Leadership and all staff surveys were sent to 13 unions for a total of +/- 215 people. 56 responses were received for a total of 26%.

24 of 51 5 of 13 1 of 55 0 of 8 1 of 18 8 of 12 0 of 17 6 of 7 0 of 15 1 of 3 0 of 4 4 of 5 7 of 7

2% 30% 33% 35%

EMPLOYEE TYPE 86% Part time 14% Full time 0% Intern or volunteer

CWE Local 210 CWA Local 1180 OPEIU International OPEIU Local 153 CLC NYCOSH ALIGN UAW Region 9A UAW Local 1981 UAW Local 2110 UAW Local 2320 UAW Local 7902

23 or younger (Gen Z) 24-38 (Millennial or Gen Y) 39-53 (Gen X) 54 & up (Baby Boomer)

YEARS WITH UNION 41% 14% 35% 10%

0-5 Years 5-10 Years 10-20 Years 20+ Years

NEW YORK CENTR

47


ONLINE SURVEY SUMMARY

PERCENTAGE OF PARTICIPATING STAKEHOLDERS

N

80 tional 53

A 81 10 20 02

PERCENTAGE OF PARTICIPATING STAKEHOLDERS CWE

12%

Local 210

12%

CWA Local 1180

7%

OPEIU International

7%

2%

OPEIU Local 153

0% 2% 0%

42%

42%

CLC

10%

NYCOSH

10%

ALIGN UAW Region 9A

0%

26%

14%

2% 0% 2%

9%

UAW Local 1981

14%

UAW Local 2110

9%

UAW Local 2320

2%

UAW Local 7902

2%

PERCENTAGE STAKEHOLDERS REFLECTED IN SURVEY

OF ALL STAFF RESPONDED

PERCENTAGE OF PARTICIPATING STAFF PER STAKEHOLDER 100%

UAW LOCAL 7902

AGE GROUP 2% 30% 33% 35%

UAW LOCAL 2110

23 or younger (Gen Z) 24-38 (Millennial or Gen Y) 39-53 (Gen X) 54 & up (Baby Boomer)

YEARS WITH UNION

80%

UAW LOCAL 2320

0% 33%

UAW LOCAL 1981 UAW REGION 9A

0% 86%

ALIGN NYCOSH

0% 67%

CLC

6%

OPEIU LOCAL 153

41% 14% 35% 10%

0-5 Years 5-10 Years 10-20 Years 20+ Years

OPEIU INTERNATIONAL

0%

CWA LOCAL 1180

2% 38%

LOCAL 210

47%

CWE 0%

20%

40%

60%

80%

100%

120%

PERCENTAGE OF PARTICIPATING STAFF PER STAKEHOLDER

NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 6

48


stakeholder surveys

SURVEY RESULTS

WORK MODES

WORK MODES

WORK MODES

WORK MODES

During an average work week, 39% of all staff in the office spend the most time doing focused work, followed by 24% doing collaborative work. 20% spend the most time learning, and about 17% spend the most time on Social Interactions work mode. WORK WORK MODES MODES

COLLABORATIVE

COLLABORATIVE

LEARNING

LEARNING

WORK MODES

39%

24%

20%

17%

Focus

Collaborative

Learning

Social

You work with others to achieve common goals.

Structured and independent learning.

Social activities that improve personal well-being and relationships internally and with outside visitors.

FOCUSED

COLLABORATIVE

SOCIAL SOCIAL

FOCUSED FOCUSED

SOCIAL

LEARNING

Individual focused work tasks that require concentration and minimal disruption.

FOCUSED

FOCUSED LEARNING LEARNING

SOCIAL COLLABORATIVE COLLABORATIVE

SOCIAL NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 7

49


COLLABORATIVE

LEARNING

SURVEY RESULTS

WORK f o c u s e dFOCUSED work

47% 47% 62%

71%

SOCIAL

FOCUSED

Of employees surveyed say they spend less than 4 hours per week away from their desk WORK MODES

Of employees surveyed say they spend less than 4 hours per week on confidential discussions

Of employees surveyed say they spend about 4 -10 hours per week on telephone conversations

4%

19%

6%

NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 9

collaborative work SURVEY RESULTS COLLABORATIVE COLLABORATIVE WORK

LEARNING

49%

53% 63% 82% 80% FOCUSED

Of employees surveyed say they spend about 4 hours per week in planned meetings

SOCIAL

Of employees surveyed say they spend about 4 hours per week in informal meetings

Of employees surveyed say they spend less than 4 hours per week in larger group meetings or audiences

Of employees surveyed say they do not spend any time using video conferencing

31%

18%

2%

NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 10

50


stakeholder surveys

SURVEY RESULTS

ROOM TYPES AND USAGE

Chart 5%Title

7% 13% 3% 6%

11%

32%

52%

10-15 p mtg 15-20 p mtg 20-35 p mtg 50-100 p mtg

23%

100+ p mtg

48% 10-15 p mtg

15-20 p mtg

20-35 p mtg

52%

50-100 p mtg

100+ p mtg

Of large reoccurring meetings are 10-15 person meetings

100% Quiet rooms for working alone Informal work / break out zones

During interviews, stakeholders agreed that most large meeting rooms would be part of the shared amenities floor Most expressed the need for smaller meeting rooms and private quiet rooms within their designated space

53%

16%

57%

22%

Meeting rooms (large)

58%

Meeting rooms (small) Room booking system

% Importance of feature

80%

60% 36%

% Satisfaction with current features

82%

65%

NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 15

51


SURVEY RESULTS

LEARNING

47%

learning

LEARNING

18% 51% SOCIAL

Of employees surveyed say they spend about 5-10 hours per week learning from others

Of employees surveyed say they spend about 4 hours per week learning from others

35%

10%

8%

NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 11

LEARNING

SURVEY RESULTS

social

SOCIAL

SOCIAL

35%

59% 90%

Of employees surveyed say they spend about 4 hours per week on informal social interaction

Of employees surveyed say they spend less than 4 hours per week on relaxing or taking a break

29%

20%

16%

NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 12

52


area blocking plans + calculations PRELIMINARY TEST FITS

AMENITIES FLOOR BLOCKING DIAGRAM

KING DIAGRAMS SHARED SPACE

BUILDING CORE CIRCULATION SHARED SPACE

PRELIMINARY TEST FITS

STAKEHOLDER 1

STAKEHOLDER FLOORS BLOCKING DIAGRAMS

TOTAL

15,208 CSF 7,867 CSF 23,075 CSF

TOTAL STAKEHOLDER & SHARED: 23,075 CSF

TOTAL STAKEHOLDER & SHARED: 24,132 CSF

TOTAL S

STAKEHOLDER 1 2ND FLOOR

3RD FLOOR

4TH FL

STAKEHOLDER 2

TOTAL ALL FLOORS: 55,149 CSF

NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 22

STAKEHOLDER 8

BUILDING CORE CIRCULATION SHARED SPACE STAKEHOLDER 3

STAKEHOLDER 7

STAKEHOLDER 5/6

STAKEHOLDER 4

SHARED SPACE

2,262 CSF

STAKEHOLDER 2

7,509 CSF

STAKEHOLDER 3

3,041 CSF

STAKEHOLDER 4

1,463 CSF

STAKEHOLDER 5/6

3,733 CSF

STAKEHOLDER 7

2,290 CSF

STAKEHOLDER 8 TOTAL

TOTAL STAKEHOLDER & SHARED: 24,132 CSF

PRELIMINARY TEST FITS

3RD FLOOR STAKEHOLDER FLOORS BLOCKING DIAGRAMS

NEW YORK CENTRAL LABOR COUNC

3,349 CSF 24,132 CSF

TOTAL STAKEHOLDER & SHARED: 7,942 CSF

NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 18

4TH FLOOR

FUTURE TENANT

NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 24 BUILDING CORE FUTURE TENANT

CIRCULATION SHARED SPACE

53

TOTAL STAKEHOLDER & SHARED: 7,942 CSF STAKEHOLDER 9

4TH FLOOR

STAKEHOLDER 10

SHARED SPACE

2,262 CSF

STAKEHOLDER 9

3,263 CSF

STAKEHOLDER 10

1,416 CSF

TOTAL

7,942 CSF


8'-0"

16'-6" 16'-6" 16'-6"

8'-6"

6'-0" 6'-0"

15'-0"15'-0"

OFFICE TYPE A 250 SF

11'-0" 11'-0"

6'-0"

8'-0" 8'-0" 8'-0"

6'-0"

6'-0"

6'-0"

7'-6"

7'-6"

8'-0" 8'-0" 8'-0" 8'-0" 19'-6"19'-6"

11'-0"

11'-0" 11'-0"

11'-0"

14'-0" 14'-0"

8'-0" 8'-0"

15'-0"

14'-0"

11'-0"

15'-0" 15'-0"

15'-0"

10'-0"

10'-0"

11'-0"

15'-0"

15'-0" 15'-0"

workplace types

8'-6" 8'-6" 7'-6" 7'-6" 8'-6"

10'-0" 10'-0" 10'-0"

8'-6"

OFFICE TYPE B 150 SF

OFFICE TYPE C 120 SF

W O R K S TAT I O N D 64 SF

W O R K S TAT I O N E 36 SF

11'-0"

10'-0" 10'-0"

10'-0"

11'-0" 8'-6"

10'-0"

OFFICE TYPE B 150 SF

8'-0"

15'-0" 15'-0" 15'-0"

7'-6"

8'-0"

8'-6"

6'-0"

15'-0"

6'-0"

7'-6"

11'-0" 15'-0"

16'-6"

6'-0"

11'-0"

14'-0"

15'-0" 15'-0"

15'-0"

15'-0"

15'-0"

14'-0"

10'-0"

15'-0" 14'-0"

8'-0"

8'-0"

19'-6" 19'-6" 19'-6"

25'-0" 25'-0" 25'-0"

19'-6"

8'-0"

OFFICE TYPE C 120 SF

W O R K S TAT I O N D 64 SF

W O R K S TAT I O N E 36 SF

15'-0"

1 -2 P E R S O N 50 SF

7'-6"

11'-0"

15'-0"

25'-0"

2-4 PERSON 125 SF

11'-0"

14'-0"

15'-0"

19'-6" 8'-6"

6'-0"

6'-0"

7'-6"

15'-0"

8'-0"

8'-0"

7'-6"

14'-0"10'-0"

6'-0"

15'-0"

8'-0"

14'-0"

15'-0"

15'-0"

11'-0"

in suite meeting room types

7'-6"

19'-6"

4-8 PERSON 150 SF

8-10 PERSON 300 SF

19'-6"

25'-0"

8'-0"

8'-0"

8'-6" 16'-6"

10'-0"

shared meeting room types

6'-0"

6'-0" 19'-0"

19'-0" 7'-6" 15'-0"

15'-0"

6'-0"

7'-6"

8'-0"

10'-0"

14'-0"

14'-0" 14'-0"

densified workplace types

26'-6" 19'-6"

25'-0"

10-15 PERSON 350 SF

26'-6"

15'-0"

1 5 -2 0 P E R S O N 450 SF 54


“ T Y P I C A L” F L O O R P L A N T E S T F I T

LIMINARY TEST FITS

PICAL FLOOR PRELIMINARY TEST FIT

NEW YORK CENTRAL LABOR CO 55


BUILDING CORE CIRCULATION SHARED SPACE STAKEHOLDER 2

39 SEATS

STAKEHOLDER 3

18 SEATS

STAKEHOLDER 4

14 SEATS

STAKEHOLDER 5

31 SEATS

STAKEHOLDER 6

21 SEATS

STAKEHOLDER 7

29 SEATS

TOTAL

152 SEATS

ABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 21

56


key section perspective

57


M A R K E TA X E S S C O R P O R AT E O F F I C E - D D + C D

DURATION: 5 months OFFICE: Spcaesmith TEAM: Drew Miller, Julia Libby, Elisabeth Post Marner LOCATION: 55 Hudson Yards - New York, New York CLIENT: Market Axess

58


ALIGN

ALIGN

D

BA-01

4

PT-01

PT-01

PT-01

BA-01

BA-01

WD-01

BA-01

PT-01

PT-01

BA-01

BA-01

L16 (M17)_Open Area West 1/4" = 1'-0"

ISSUES NUMBER:

3 1.3

1.8

2.6

3.2

3.3

3.9

4.1

4.8

5.1

5.5

EQ

EQ

EQ

DATE:

12/15/2017 ISSUED FO 02/05/2018 ISSUED FO CONSTRUC

6.1

TYP

6A

______________________________

A-901

C EQ

BA-01

6

PT-01

?

BA-01

EQ

EQ

PT-01

BA-01

PT-01

PT-01 BA-01

EQ

PT-01

BA-01

BA-03

PT-01 BA-01

?

EQ

EQ

EQ

PT-01

BA-01

PT-01 BA-01

?

BA-03

EQ

EQ

PT-01

PT-01

PT-01

BA-01

PT-01

BA-01 BA-03

?

NORTH CORRIDOR

EQ

BA-01

BA-01

PT-01

?

PT-01

L16 (M17)_Core Wall Elevation West 1/4" = 1'-0"

KEY PLAN:

A.6

B.1

B.6

B.8

C.8

6A

D.8

D.9

E.6

E.8

TYP

______________________________

A-901

B

4D

______________________________

A-920

4' - 3 1/2"

?

8

4' - 3 1/2"

PT-01

BA-03

CENTRAL CORRIDOR

EQ

PT-01

EQ

BA-01

PT-01

BA-01

PL-01

?

EQ

EQ

PT-01

BA-01

BA-03

?

L16 (M17)_Core Wall Elevation North 1/4" = 1'-0"

PROJECT:

6.1

5.5 EQ

EQ

5.1

4.8

4.1

3.9

3.3

3.2

2.6

1.8

1.3

MARKET AXES

EQ

55 HUDSON YA NEW YORK, NY DRAWING TITLE:

EQ

ALIGN

ALIGN

EQ

A

LEVEL 16 ( ELEVATIO NORTH CORRIDOR

2' - 0"

42' - 1"

SEAL & SIGNATURE:

2' - 0"

D

P

D

J

S

PT-01

9

WF-05

BA-01

BA-01

PT-01

WF-01

BA-05

BA-05

WF-01

WF-01

BA-05

PT-01

BA-01

BA-03

BA-01

?

L16 (M17)_Core Wall Elevation East 1/4" = 1'-0"

7 ï›™ COPYRIGHT 2017

59

6

5

4

3

2

1

PT-01

D


MARKET AXESS C O R P O R AT E O F F I C E - D D + C D

MarketAxess, a leader in electronic trading of

global credit products, commissioned Spacesmith to design their new NYC office located at 55 Hudson Yards. The concept for this space was derived by the notion of “Warped Speed�, using fragmented geometry to convey changing motion. The 55,000 sqft office is located in the newly developed Hudson Yards and occupies floors 14-16 of 55 Hudson Yards overlooking the Hudson rRver, the Highline and Midtown Manhattan.

The layout of the space is meant to maximize

workspace, daylighting, accessible amenities, and meeting space while promoting a healthy work environment with lots of natural light. The buildings core acts as a central meeting space where the offices support space is located. Huddle rooms, wellness rooms, telephone booths, and storage space can be found within the central core while private offices, workstations, and conference rooms line the perimeter.

60


programmatic floor plans

Reception Meeting/Collaboration Private Office Open Office Support

Reception Meeting/Collaboration Private Office Open Office Support

Reception Meeting/Collaboration Private Office Reception Meeting/Collaboration Private Office Open Office Support

61

Open Office Support


felt panel seaming diagram

6

5

6

4

5

3

4

2

3

1

2

1

UNIKA VAEV PANEL SIZE IS 3'-11.5" X 8'-11" (THICKNESS IS UNIKA VAEV PANEL SIZE ISTHIS 3'-11.5" X 8'-11" (THICKNESS IS 0.53"). SEAM LAYOUT IS BASED ON PRODUCT. IF 0.53"). SEAM LAYOUT IS BASED ON THIS PRODUCT. IF ALTERNATE PRODUCT IS SELECTED, ARCHITECT TO ALTERNATE PRODUCT IS SELECTED, ARCHITECT TO VERIFY NEW LAYOUT. VERIFY NEW LAYOUT.

ARCH

PROJECT MANAGE PROJE

CBRE | NE C 200 PARK 2 NEW YOR N (212) 984(2 https://www h

M.E.P. ENGINEER: M.E.P.

ROBERT D 19 WESTR4 1 NEW YOR N (212) 764(2 http://www h

EQ

EQ

C.8

B.8

D.8 D.9

C.8

EQ

EQ

1' - 6" 9"

EQ

3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2"

LIGHTING DESIGN LIGHT

LIGHTING L 20 JAY ST 2 BROOKLY B (212) 796(2 www.ltgwo w

D.8 D.9

3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"

EQ

STRUCTURAL ENG STRU

1' - 6" 9"

EQ 1' - 6" 9"

B.8

B.6

EQ

WSP USA W ONE PENN O NEW YOR N (212) 687(2 http://www h

1' - 6" 9"

B.6

EQ

3' - 11 1/2" EQ EQ 3' - 11 1/2"

EQ

EQ

8' - 6"

3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2"

EQ

8' - 6"

CLOSET HALLWAY NO FELTHALLWAY NO FELTCLOSET NO FELT NO FELT

EQ 3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"

EQ

EQ

FILE ROOM FILE ROOM NO FELT NO FELT

CLOSET HALLWAY NO FELTCLOSET NO FELTHALLWAY NO FELT NO FELT

3' - 11 1/2" EQ EQ 3' - 11 1/2"

EQ

EQ

3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"

3' - 11 1/2" EQ EQ 3' - 11 1/2"

KITCHEN CONSUL KITCH

CLEVENG C 39 WESTM 3 WHITE PL W (914) 997(9 http://www h

EQ

WELLNESS WELLNESS NO FELT NO FELT

LEVEL 15 (M 16) LEVEL 15 (M 16) DIMENSION PLAN DIMENSION 253' - 1" PLAN 253' - 1" EQ

8' - 6"

EQ

SHEN MIL 417 5TH S A 4 NEW YOR N 212-710-30 2 http://www h

1' - 6" 9"

EQ

AV + ACOUSTICAL AV + A

8' - 6"

3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2"

EQ

1' - 6" 9"

EQ

LEVEL 16 (M 17) LEVEL 16 (M 17) DIMENSION PLAN DIMENSION 266' - 7" PLAN 266' - 7"

3' - 11 1/2" EQ EQ 3' - 11 1/2"

1' - 6" 9"

EQ

PRO4IA P 55 BROAD 5 NEW YOR N 212-710-30 2 http://www h

8' - 6"

RESTROOM RESTROOM NO FELT NO FELT

8' - 6"

HALLWAY NO FELTHALLWAY NO FELT

1' - 6" 9"

8' - 6"

8' - 6"

IT CONSULTANT: IT CO

INFRASTRUCTURE BUILDINFRASTRUCTURE AREA BUILD AREA NO FELT NO FELT

LEVEL 14 (M 15) LEVEL 14 (M 15) DIMENSION PLAN DIMENSION 239' - 7" PLAN 239' - 7"

NUMBER:

3

1.8

2.6

1.8

3' - 11 1/2" EQ EQ 3' - 11 1/2"

3.3

3.2

3.9

3.3

4.1

3.9

4.8

4.1

5.1

4.8

5.5

5.1

5.5

EQ EQ

1' - 6" 9"

1' - 6" 9"

EQ

3.2

2.6

D

NUMB 02/0 3 18

EQ

3' - 11 1/2" EQ 3' - 11 1/2"

EQ

EQ

EQ

EQ

EQ

EQ

EQ

3' - 11 1/2" EQ 3' - 11 1/2"

EQ

EQ

EQ EQ

EQ

EQ

EQ

EQ

EQ

EQ

3' - 11 1/2" EQ EQ 3' - 11 1/2"

EQ

EQ

EQ EQ

EQ

EQ

EQ

3' - 11 1/2" EQ 3' - 11 1/2"

EQ

EQ

EQ EQ

EQ

EQ

3' - 11 1/2" EQ EQ 3' - 11 1/2"

EQ

OUTLET AND PLATE OUTLET AND PLATE COVER TO MATCH COVER ADJACENT WALLTO MATCH ADJACENT 3' - 11 1/2" EQ EQ WALL 3' - 11 1/2" EQ EQ 3' - 11 1/2" EQ EQ 3' - 11 1/2"

EQ

EQ

OUTLET AND PLATE OUTLET AND PLATE COVER TO MATCH COVER ADJACENT WALLTO MATCH WALL EQ 3' - 11 1/2" 3' - 11 1/2" ADJACENT EQ EQ 3' - 11 1/2" 3' - 11 1/2" EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

+/EQ

3' - 11 1/2" DOOR 3' - 11 1/2" +/+/3' - 11 1/2" DOOR 3' - 11 1/2" WIDTH WIDTH

3' - 11 1/2" EQ EQ 3' - 11 1/2"

+/-

EQ EQ

EQ

EQ

8' - 6"

3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"

OUTLET AND PLATE AND PLATE COVEROUTLET TO MATCH COVER TO MATCH ADJACENT WALL ADJACENT WALL EQ 3' - 11 1/2" EQ EQ EQ 3' - 11 1/2"

FLUSH DOOR TO HAVE FLUSH APPLIED FELTDOOR PANELTO HAVE APPLIED FELT PANEL EQ

EQ

3' - 11 1/2" EQ EQ 3' - 11 1/2"

EQ

EQ

STORAGE ROOM STORAGE ROOM NO FELT NO FELT

3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"

LEVEL 15 (M 16) LEVEL 15 (M 16) DIMENSION PLAN DIMENSION 253' - 1" PLAN 253' - 1"

EQ 0"1' - 6" 9"

EQ

OUTLET AND PLATE OUTLET AND PLATE COVER TO MATCH COVER ADJACENT WALLTO MATCH ADJACENT WALL 3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"

8' - 6"

EQ

LEVEL 16 (M 17) LEVEL 16 (M 17) DIMENSION PLAN DIMENSION 266' - 7" PLAN 266' - 7"

EQ

1' - 6" 9"

EQ

EQ

1' - 6" 9"

EQ

EQ

8' - 6"

EQ

EQ

8' - 6"

EQ EQ

PROJECT:

0"1' - 6" 9"

EQ

EQ

PROJ

MA

8' - 6"

3' - 11 1/2" EQ EQ 3' - 11 1/2"

8' - 6"

1' - 6" 9" 8' - 6"

EQ

8' - 6"

3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"

1' - 6" 9"

1' - 6" 9"

EQ

8' - 6"

8' - 6"

3' - 11 1/2" EQ EQ 3' - 11 1/2"

1' - 6" 9"

EQ

EQ

KEY

8' - 6"

8' - 6"

KEY PLAN:

PREACTION ROOMPREACTION NO FELT ROOM NO FELT

DRAWING TITLE: DRAW

FE

LEVEL 14 (M 15) LEVEL 14 (M 15) DIMENSION PLAN DIMENSION 239' - 7" PLAN 239' - 7"

SEAL & SIGNATUR SEAL

6

6

5

5

4

4

3

3

2

2

1

1

62


7

5

6

VIF

VIF

VIF

VIF

3 3' - 7 1/2"

1D A-902

VIF

4' - 3"

ALIGN

VIF

4

EQC

F

SP

F4

C L

15

EQ

EQ

______________________________

VS EQ

5' - 0"

MIC C L

EQ

A-922

F4

PT-01

CUSHION SEAMS TO ALIGN WITH CENTER OF MULLIONS

BA-01

F4

PT-01

1D

BOARD ROOM WEST ELEVATION 1/2" = 1'-0"

___________________

A-90 F

6B

EQ

______________________________

A-920

EQ

5' - 0"

6

6"

BA-01

E

5' - 0"

SP

DS

SP F4

7D A-902

1A

MIC

TYP

VS

5' - 0"

15' - 6"

______________________________

A-901

EQ

WF-04

EQC

F4

WF-04

EQ

SP

1A

______________________________

A-901

D

1C

______________________________

7

ALIGN

A-920

5

6

4

3

LEVEL 14 (M15) BOARD ROOM ENLARGE 3/8" = 1'-0"

3 WD-01 VIF

5

VIF

VIF

VIF

BA-04

BA-04

PT-01

VIF

VIF

BOARD ROOM SOUTH ELEVATION 1/2" = 1'-0"

3' - 7 1/2"

1D A-902

______________________________

EQ

EQ

EQ

A-920

EQ

ALIGN

EQ

4' - 3"

2A A-901

1B A-901

6B

7D A-902

TYP EQ

F

ALIGN

EQC

EQ

C

SP

F4

WF-04

UP

MIC

EQ

______________________________

VS

5' - 0"

C L

15

EQ

DS

5' - 0"

EQ C L

EQ

EQ

A-922

15

______________________________

A-922

1C

______________________________

A-920

F4

SP

4

BOARD ROOM NORTH ELEVATION 1/2" = 1'-0"6B

CUSHION SEAMS TO ALIGN WITH CENTER OF MULLIONS

BA-01 BA-04

PT-01

WD-01

F4

1D

___________________

A-90 F

EQ

______________________________

A-920

EQ

5' - 0"

PT-01 BOARD ROOM WEST BA-04 ELEVATION 1/2" = 1'-0"

+/- 25' - 0" VIF

B

PT-01

6

6"

BA-01

E

6

SP F4

MIC

TYP

VS

______________________________

ALIGN

7D A-902

1A

5' - 0"

15' - 6"

A-901

EQ

EQ

UP

SP

ALIGN

WF-04

EQC

F4

EQ

CF-05

WF-04

EQ

1A

______________________________

A-901

D

EQ

1C A-920 WD-01

ALIGN

______________________________

A 5C

______________________________

A-901 2A

LEVEL 14 (M15) BOARDA-901 ROOM ENLARGE 3/8" = 1'-0"

3 WD-01 WD-01

63

EQ B

EQ

EQ

EQ

BA-04 EQ

EQ

BA-04

BOARD ROOM SOUTH EAST ELEVATION ELEVATION 2 5 1/2" = 1'-0"

7 ï›™ COPYRIGHT 2017

TYP

PT-01 EQ

EQ

EQ B 1B A-901

6B

______________________________

EQ

EQ

EQ

6

EQ

EQ

A-920

5

4

1

2A LEVEL 14 (M15) BOARD ROOM ENLARG A-901 3/8" = 1'-0"

3


CANTILEVERED OVER OPENING. SEE ELEVATIONS, PLANS, RCP 5

6

VIF

VIF

VIF

VIF

3' - 7 1/2"

1D A-902

VIF

WOOD END CAP, PT-01

3

2

4' - 3"

1' - 9 1/2"

FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.

2' - 0 1/2"

B O A R D R O O1EMDETAIL R E NATDHUDDLE E R I N ROOM G , P OPEN L A NCEILING S , E L E V AT I O N S + D E TA I L

AV + ACOUSTICAL CONSULTANT:

SHEN MILSOM & WILKE LLC 417 5TH AVENUE, NEW YORK, NY 10016 212-710-3008 http://www.smwllc.com/

ALIGN

1 1/2" = 1'-0"

F6A

3' - 4 1/2"

1D

______________________________

A-902

ARC

One

PROJECT MANA

CBRE | N 200 PAR NEW YO (212) 984 https://ww

VS

EQC

KITCHEN CONSULTANT: SPK

M.E.P. ENGINEER

EQB

F4

5' - 0"

VS

EQ

EQ

SURFACE MOUNTEDF4C LED FILM ST 2' - 6"

SPK

F4

3' - 2"

NEWMAT ALUMINUM FIN EXTRUSION

F4

IT CONSULTANT

PRO4IA 55 BROA NEW YO 212-710http://ww

F4C

AV + ACOUSTIC

SPK

MIC

VS

SHEN MI 417 5TH NEW YO 212-710http://www

3' - 2"

NEWMAT DOUBLE GHOST ALUMINUM F4C RAIL

KITCHEN CONS

CLEVEN 39 WEST WHITE P (914) 997 http://ww

EQA

8"

EQ

SPK

SPK

SEE RCP

3' - 5"

3 1/2"

EQ

EQC

F4

1" 1/2"

10"

ARCHITECTURAL RETURN SLOT

WF-04

VS

3"

A-901

5' - 0"

7D A-902

1A

______________________________

WSP US ONE PEN NEW YO (212) 687 http://www

2"X3" ALUMINUM STRUCTURAL TUBEF4C

MIC

TYP

1' - 6"

15' - 6"

THREADED ROD

SPK 3' - 2"

POCKET FRAMING AS REQ, MUST NOT EQ INTERFERE WITH MOTOR UNIT AND MUST ALLOW FOR EASY ACCESS VIA ACT PANELS

2' - 6"

F

2' - 6"

5' - 0"

A-902

STRUCTURAL E

2' - 6"

1D

______________________________

EQB

PT-01

SPK

2' - 6"

3' - 2"

BA-01

LIGHTIN 20 JAY S BROOKL (212) 796 www.ltgw

F4C BLOCKING AND FRAMING AS REQUIRED TO SUPPORT NEWMAT CLG COMPONENTS PER F4C MANUFACTURER INSTALLATION DETAILS.

5' - 0"

DS

NEWMAT WALL GHOST ALUMINUM RAIL

ACT CEILING AS SCHEDULED

LIGHTING DESIG

21' - 9 1/4"

F4

GWB; PT-01

CUSHION SEAMS TO ALIGN WITH CENTER OF MULLIONS

CROSS BRACING AS F4C REQUIRED TYP. 2' - 6"

______________________________

3' - 2"

C L

15 SURFACE MOUNTED A-922 LED FILM

MIC

3' - 2"

MIC

ACT INFILL CEILING

CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD ROBERT 19 WEST WHITE PLAINS, NY 10606 NEW YO (212) 764 http://ww (914) 997-9660 http://www.cfldesign.com

SPK

EQA

EXISTING BUILDING STRUCTURE

3"

F6A

1C

ALIGN

2' - 6 1/2"

DOUBLE LAYER ACT0B6 MICROPERFORATED ACOUSTIC, SEMITRANSPARENT WHITE MEMBRANE

SKYFOLD PANELS WITH COM FABRIC FINISH TBD

PT-01

1' - 9 1/2"

FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT. 1B A-901

2' - 0 1/2"

6B

______________________________

VIF

2A A-901

VIF

PLANNING

PROJECT MANAGER:

EQA

3

UP

. 1 5/16"

A-901

1' - 6"

EQ

EQ

D

1A

EQ

WF-04

DRAWING TITLE

ALIGN

MIC

VS

______________________________

A-901

EQ

A

3

CAM

V

A-920 3

A

V

6

F4

5C

______________________________

LEVEL EQ 14 (M15) BOARD ROOM ENLARGED RCP EQ EQ 3/8" = 1'-0"

EQ

15' - 6" ALIGN

1A

WF-04

EQ

6"

ALIGN

1' - 6 1/2"

A-901

UP

7D A-902

F

EQ

SEE RCP WF-04

4 2

CORNER BEAD WITH SPACKLE

+/- 25' - 0" VIF

FINISHED WALL AS SCHEDULED TO CONTINUE INTO COVE

2B

ST

3' - 2"

CORNER BEAD

3

PT-01

BA-04

BA-04

PT-01

6B

______________________________

EQ

EQ

EQ

EQ

ALIGN

3 ALIGN

A-920

CORNER BEAD WITH SPACKLE

F7 LIGHT DETAIL 3" = 1'-0" EQ

F6A 1C

______________________________

SEE RCP 2 1/4"

A-920

B

CEILING AS SCHEDULED

BA-04

ELEVATOR LOBBY COFFER CLG 1B BOARD ROOM NORTH ELEVATION 4 1/2" =1 1'-0"1/2" = 1'-0"

1B A-901

5

EQ

LEVEL 14 (M15) BOARD ROOM ENLARGED RCP 3 3/8" = 1'-0"

BA-04

EQ

WD-01

2A A-901 7' - 0"

64

C L

7' - 0"

PROJECT:

EQ B

WD-01

BOARD ROOM SOUTH ELEVATION 1/2" = 1'-0"

2"

3

5

SPK

CONTINOUS BLOCKING

21' - 6 1/2"

A-803

1/8"

A

36" AFF

6

1/8"

F4

EQ EQ SCHEDULED COVE LIGHT FIXTURE

CORNER BEAD KEY PLAN:

5 3/4"

1C

______________________________

A-920

SEE RCP

EQB

A-901

6B

A-920

EQ

MIC

VS

6"

1 ______________________________

SPK

F4

CEILING AS SCHEDULED

2D A-901

36" AFF

1A

______________________________

POWER/ DATA IN TABLETOP HATCH - SEE PC PLANS

A-922

FRAMING AND EQ BRACING AS REQ

EQ

TYP

WF-04

3

15

______________________________

TAPE IN BEAD

TYP

TYP

2

EQ

2"

D ACT AS SCHEDULED, SEE RCP AND FINISH PLANS

5

7D A-902

CEILING AS SCHEDULED C TYP

______________________________

EQ

VECTOR/ CONCEALED BORDER CLIP. GC TO MAKE A CLEAN, STRAIGHT CUT AT ACT TILE

TYP

3

12/15/2017 ISSUED FOR BID BOARD ROOM SOUTH ELEVATION 02/05/2018 ISSUED FOR 1/2" = 1'-0" 3 CONSTRUCTION

PT-01

3' - 5"

3

A-902

2' - 6 1/2"

V

1DBA-04

______________________________

3' - 2"

A

BA-04

3' - 2"

SCHEDULED LIGHT FIXTURE 5 INDEPENDANTLY SUSPENDED FROM CEILING, BOTTOM OF FIXTURE TO BE FLUSH WITH SIM 8A ADJACENT CEILING A-901

7' - 0"

3

DESCRIPTION:

EQA

V

DATE:

5' - 0"

4

C L

EQ A

EXISTING BLDG STRUCTURE

ISSUES

NUMBER:

NOTE: ALL DIMENSIONS ARE TAKEN FROM FACE OF SHEETROCK (NOT FINISH FACE)

F4

LEVEL 14 (M15) BOARD ROOM ENLARGED PLAN = 1'-0"

1 PT-01 WD-01 3/8"

5' - 0"

BA-01

5 7' - 0"

EQ

______________________________

SEE RCP

DS

EQ A 20' - 0"

ALIGN

SCHEDULED COVE 6B A-920 LIGHT FIXTURE FLUSH TO COVE POCKET ARCHITECTURAL RETURN SLOT

EQ A

EQC

CUSHION SEAMS TO ALIGN WITH CENTER OF MULLIONS

2A A-901

7' - 8 1/2"

BOARD ROOM WEST ELEVATION 1B 1/2" = 1'-0" 6 A-901

HOLD

6

2A A-901

EQ

EQ B

6"

PAINT INTERIOR SURFACES BA-01 PT-01 MATTE WHITE E

EQ

3' - 2"

5

EQ

3

EQ

ST

SPK 5' - 0"

A-901

SEAL & SIGNAT

3' - 2"

V

E E

KEY PLAN:

1C

______________________________

A

PROJECT:

M SPK

RS

2' - 6 1/2"

ALIGN

F4

CEILING RECESS LINEAR LIGHT FIXTURE 3" = 1'-0" C L

15

______________________________

TYP

A-902 TYP

T

EQ

1C

F6A

2D A-901

CEILING AS SCHEDULED

. O.C 2 3/4"

7D A-902

______________________________

EQ

WOOD SLAT CLNG DETAIL 1 1/2" = 1'-0"

EQ

F6A

1D

1A

______________________________

ALIGN

SPK

PT

3' - 4 1/2"

3

15' - 6"

ALIGN

BA-01

4' - 3"

EQ

SEE RCP

CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD FLOOR WHITE PLAINS, NY 10606 (914) 997-9660 http://www.cfldesign.com

CEILING AS SCHEDULED

VS

3' - 7 1/2"

EQ

SHEN MILSOM & WILKE LLC 417 5TH AVENUE, NEW YORK, NY 10016 212-710-3008 http://www.smwllc.com/

2

21' - 6 1/2"

3

CUSHION SEAMS TO ALIGN WITH CENTER OF MULLIONS

ST

ALIGN

AV + ACOUSTICAL CONSULTANT:

KITCHEN CONSULTANT:

EQ

EQA

MIC

C L

15

A-922

7' - 8" 3' - 2"

6B

A-920

A-922

EQ

TYP

EQB

6"

4

PT-01

______________________________

3' - 5"

3C WD-01C L

2D A-901

KEY PLAN:

WF-04

EQ

TYP

3

PRO4IA 55 BROAD STREET, 16TH FLOOR

EQ

EQB

2

5

3/8"

2' - 6" 2' - 6"

SPK

12/15/2017 ISSUED FO 01/19/2018 ADDENDUM 02/05/2018 ISSUED FO CONSTRUC

______________________________

EQC

VIF

SPK

3' - 2"

1"

EQA

EQC

EQ

VIF

IT CONSULTANT: BA-01

F4C

CEILING AS F4 SCHED. EQ

VIF

A-803

YORK, NY 10004 BOARD ROOM NEW WEST ELEVATION 212-710-3008 1D 6 1/2" http://www.pro4ia.com A-902= 1'-0"

F4C

3' - 2"

5' - 0"

CF-05

DATE:

SIM

8A

A-901

4 6

WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 (212) 687-9888 http://www.wsp.com

POWER/ DATA IN TABLETOP HATCH - SEE PC PLANS

VIF

SEE SCHEDULED LIGHT FIXTURE

ALIGN

VIF

MIC

VS

2 3

3

STRUCTURAL ENGINEER:

F4C

CEILING SUSPENSION SPK FRAME F4 SEE RCP

21' - 9 1/4"

F4C 2' - 6"

3' - 2"

5' - 0"

F

NUMBER:

EQ

LIGHTING WORKSHOP 20 JAY STREET - SUITE 500, BROOKLYN, NY 11201 (212) 796-6510 www.ltgworkshop.com

KINDORF CEILING GRID SYSTEM, ALL SIDES PAINTE BLACK 5 WD-01 VENEER SLAT 1"X12" DEEP E

2' - 6"

3' - 2"

A-902 APPROVED PENCIL VIF ROD

ED WALL AS DULED TOF NUE INTO COVE

EQ

5' - 0"

6

WD-01

1D

______________________________

EQ

LIGHTING DESIGN:

APPROVED PENCIL ROD

SPK F4C

SEE WALL PARTITION 7 BA-04 F4 SCHEDULE

15

A-922

2' - 6" 2' - 6"

ST

SPK

DS

3

ALIGN

UP ROBERT DERECTOR ASSOCIATES 19 WEST 44TH STREET 12TH FLOOR, NEW YORK, NY 10036 (212) 764-7272 http://www.derector.com C L

______________________________

F4C

3' - 2"

F4

G AS DULED

LINE OF STRUCTURE

3 5/16" . +/- 25' - 0" VIF

EQB

6"

A-920

SEE RCP

MIC F4C

______________________________

TECTURAL RN SLOT

12 02

M.E.P. ENGINEER:

3' - 2"

5' - 0"

VS

V

ALIGN

EQC

SPK

MIC

1C

3

CBRE | NEW YORK TRI-STATE REGION PROJECT MGMT 200 PARK AVENUE, 20TH FLOOR NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/

F4

DULED COVE FIXTURE FLUSH VE POCKET

3

ï›™ COPYRIGHT 2016

VS

1D A-902

VIF

ISSUES

1' - 6 1/2"

A-902

V

A

EQ

F

3' - 4 1/2"

1D

______________________________

VIF

EQ

ALIGN

One New York Plaza, Suite 4200 New York, NY 10004 Ph: 212 620 5583 www.spacesmith.com

F6A

VIF

7' - 0"

INTERIOR DESIGN A

SPK

C L

7' - 0"

ARCHITECTURE

WF-04

VIF

NUMBER:

A-920

EQ

5' - 0"

EQ

36" AFF

EQ

5

36" AFF

4' - 3"

EQ

6

HOLD

BA-04

1

EQ B

BA-04 3' - 7 1/2"

NEWMAT CLNG2DETAIL 1D 1 1/2" = 1'-0"

ALIGN

3

EQ

5

EQ

7

LEVEL 14 (M15) BOARD ROOM ENLARGED RCP 3/8" = 1'-0"

3

7' - 8 1/2"

A-920

HOLD

______________________________

INTERIOR SURFACES WHITE

Q

4

PRO4IA 55 BROAD STREET, 16TH FLOOR NEW YORK, NY 10004 212-710-3008 1 http://www.pro4ia.com

V

3

A

V

3

MARKET AXES


F E AT U R E W A L L D E S I G N M O D E L , E L E V AT I O N , P L A N + D E TA I L S

65


5

4

3

2

4

2 1/2" 14 GAUGE MTL STUD SPACED @24" O.C

SEE SCHEDULED PARTITION

A-940

MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTURE FOR MOUNTING WOOD VENEER PANELS. SPACING AS REQUIRED.

6" 14 GAUGE MTL STUD SPACED @12" O.C

ARCHITECTURE

6 5/8"

CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01

INTERIOR DESIGN

 COPYRIGHT 2016

1' - 0"

1' - 11 5/8"

1' - 11 1/2"

PLANNING

One New York Plaza, Suite 4200 New York, NY 10004 Ph: 212 620 5583 www.spacesmith.com

5"

CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01

ANGLE SUPPLIED & BY G.C. TO E 1/8" AFF. SATIN ALUMINUM

PROJECT MANAGER:

5"

3 A-940

CBRE | NEW YORK TRI-STATE REGION PROJECT MGMT 200 PARK AVENUE, 20TH FLOOR NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/

WOOD VENEER PANEL BY MILLWORKER

FEATURE WALL DETAIL - PLAN 3/4" = 1'-0"

2

M.E.P. ENGINEER:

S 5/8" MDF, WD-01

ROBERT DERECTOR ASSOCIATES 19 WEST 44TH STREET 12TH FLOOR, NEW YORK, NY 10036 (212) 764-7272 http://www.derector.com

20' - 0" V.I.F

EQ

EQ

LIGHTING DESIGN:

+2"

LIGHTING WORKSHOP 20 JAY STREET - SUITE 500, BROOKLYN, NY 11201 (212) 796-6510 www.ltgworkshop.com

+12"

24.23 °

24.23°

+12"

TITION WALL

STRUCTURAL ENGINEER:

4' - 6"

7

WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 (212) 687-9888 http://www.wsp.com

5

6

4

IT CONSULTANT:

A

6 5/8"

KITCHEN CONSULTANT:

1/1

5"

CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD FLOOR WHITE PLAINS, NY 10606 (914) 997-9660 http://www.cfldesign.com

5 A-940

6"

45.0 0°

4' - 6"

5/8" GWB

1' - 0"

+8"

5"

SHEN MILSOM & WILKE LLC 417 5TH AVENUE, NEW YORK, NY 10016 212-710-3008 http://www.smwllc.com/

VERTICAL ANGLE SUPPLIED & INSTALLED BY G.C. TO TERMINATE 1/8" AFF. SATIN BRUSHED ALUMINUM

F

CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01

AV + ACOUSTICAL CONSULTANT:

CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01

1' - 11 1/2"

11 4.2 3°

24.23 °

+2"

24.23°

+2" CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01

1' - 11 5/8"

° .77 65

PRO4IA 55 BROAD STREET, 16TH FLOOR NEW YORK, NY 10004 212-710-3008 http://www.pro4ia.com

+12"

ALIGN

ALIGN

+12"

11 4.2 3°

9.93°

LED ON

SEE SCHEDULED PARTITIONS +12"

+2"

24.23 °

+2" 6" 14 GAUGE MTL STUD SPACED @12" O.C

+12"

FEATURE WALL DETAIL - CORNER CONDITION AT PARTITION WALL 6" = 1'-0"

6

4' - 6"

+8"

GE MTL STUD O.C

24.23 °

3° 4.2 11

E

ISSUES NUMBER:

4' - 6"

4

3

2 A-940

3

28.63 °

5"

2 3/4"

6 5/8" 1' - 0"

A-940

WOOD VENEER PANEL BY MILLWORKER ALIGN

2 5

+12"

3

FEATURE WALL DETAIL - PLAN 3/4" = 1'-0"

FEATURE WALL DETAIL - CONCEALED LIGHTING 3" = 1'-0"

20' - 0" V.I.F

2 1/2" 14 GAUGE MTL STUD SPACED @24" O.C

3' - 6 3/4"

6 A-940

EQ

SEE SCHEDULED +12" WALL PARTITION

+8"

FEATURE WALL DETAIL - CORNER CONDITION AT PARTITION WALL 6 6" = 1'-0"

6" 14 GAUGE MTL STUD SPACED @12" O.C

+2"

4' - 6"

2 ° .77 65

5

MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTUREFOR MOUNTING WOOD VENEER PANELS. SPACING AS REQUIRED.

24.23 °

+12"

1' - 0"

2' - 0"

24.23 °

4' - 6"

2 1/2"

1 3/4"

3° 4.2 11

PROJECT:

+8"

55 HUDSON YARDS NEW YORK, NY 10001

+2"

WOOD VENEER PANEL BY MILLWORKER, WD-01 FINISH DRAWING TITLE:

2 3/4"

CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01

12/15/2017

PROJECT NO:

16322

5/8"

3' - 6 3/4"

3

4

SEE SCHEDULED WALL PARTITION

FEATURE WALL DETAIL - CONTINOUS WASH LIGHT DETAIL 2 3" = 1'-0"

1 2' - 0"

B

+2" 6"

6" 14 GAUGE MTL STUD SPACED @12" O.C

5"

+2"

MF,DM

As indicated

A-940.00

4' - 6"

2 1/2" 14 GAUGE MTL STUD SPACED @24" O.C

CHECKED BY:

DRAWING NO:

+8"

0"

+2"

PAGE__ OF__

11 4.2 3°

+12"

+12" 1' - 0"

3' - 6 3/4"

4' - 6"

SCALE:

WD-01

9.93°

4

4"

24.23 °

6 A-940

FEATURE WALL - ELEVATION 1 3/4" = 1'-0"

JL,MV,CL

TYPE F3 COVE LIGHT; SEE LIGHTING SCHEDULE +12"

+2"

+12"

FEATURE WALL DETAIL - CONCEALED LIGHTING 3" = 1'-0"

ALIGN

DATE:

SEAL & SIGNATURE:

41.5 4°

2"

5"

3

A-9

° 24.23

+12"

A-940

+2"

MINIMUM CLEARANCE FROM FACE

3"

4"

DRAWN BY:

5

5

4' - 6"

LIGHTING FIXTURE CONCEALED BEHIND MILLWORK WALL SEE DETAIL (TYP)

ALIGN

MILLWORK PANELS OF VARIOUS SIZE AND PITCH, WD-01 FINISH

5

+12"

MARKET AXESS - 55 HY

FEATURE WALL DETAILS

MINIMIZE

4' - 6"

REMOTE POWER SUPPLY OF F9 FIXTURE TO BE LOCATED IN AN ACCESSIBLE AND VENTILATED LOCATION

+2"

11 4.2 3°

MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTURE FOR MOUNTING WOOD VENEER PANELS. SPACING AS REQUIRED.

24.23°

5/8" MDF

24.23°

ALIGN

SCHEDULED F9 TO BE SURFACE-MOUNTED ONTO BLOCKING LOCATED BEHIND LIP OF FEATURE PANEL AS SHOWN

65 .77 °

CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01

C

A-940

+12" +2"

24.23 °

4' - 6"

A-940 +8"

WOOD VENEER PANEL BY MILLWORKER

LIGHTING FIXTURE CONCEALED BEHIND MILLWORK WALL SEE DETAIL (TYP)

5/8" MDF

6 5/8"

METAL STUD BOX BEAM SECURED TO EXISTING SLAB EDGE

MITERED CORNER

+12"

4' - 6"

+12"

11"

SEE SCHEDULED PARTITIONS

13.10°

5/8"

24.23 °

2"

24.23°

3"

MAX

5"

+12"

3"

2"

5/8"

3° 4.2 11

MAX

+12"

11"

SEE SCHEDULED WALL PARTITION METAL STUD BOX BEAM SECURED TO EXISTING SLAB EDGE 5

EXISTING BUILDING SLAB

2

MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTUREFOR MOUNTING WOOD VENEER PANELS.+2" SPACING AS REQUIRED.

+12"

MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTURE FOR MOUNTING WOOD VENEER PANELS. SPACING AS REQUIRED.

MITERED CORNER

WOOD VENEER PANEL BY MILLWORKER, WD-01 FINISH ALIGN

4' - 6"

5/8" MDF 3

3"

TYPE F3 COVE LIGHT; SEE LIGHTING SCHEDULE

+2" 11 4.2 3°

WD-01

FEATURE WALL DETAIL - CONTINOUS WASH LIGHT DETAIL 3" = 1'-0"

7  COPYRIGHT 2017 2' - 0"

+12"

66

3' - 6 3/4"

FEATURE WALL DETAIL -SECTION A 3" = 1'-0" 4' - 6"

5/8"

11"

28.63 °

+12"

2"

5"

° .77 65

ALIGN

° 24.23

SEE SCHEDULED WALL PARTITION

MINIMUM CLEARANCE FROM FACE

4' - 6"

A-940

A

3

4

+2"

WOOD VENEER PANEL BY MILLWORKER

FIRE CAULKING TO MAINTAIN 2HR RATING

4"

° 24.23

2' - 0"

ALIGN

A-940

CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01

A-940

4' - 6"

6 5/8"

LIGHTING FIXTURE CONCEALED BEHIND MILLWORK WALL SEE DETAIL (TYP)

4' - 6"

FIRE CAULKING TO MAINTAIN 2HR RATING

5/8" MDF

1' - 0"

1' - 0"

EQ +2"

+2"

2' - 0" +2"

KEY PLAN:

+2"

3' - 6 1/2"

11 4.2 3°

ALIGN 4"

° 24.23

4' - 6"

1 3/4"

+12"

D

6" 14 GAUGE MTL STUD SPACED @12" O.C

+12"

° .77 65

TAIL

24.23°

+2"

CONTINOUS 5/8" MDF, FINISH IN WD-01 BY GC

WD-01

SEE SCHEDULED PARTITION

A-940

24.23 °

6"

MILLWORK PANELS OF VARIOUS SIZE AND PITCH, WD-01 FINISH

ALIGN

4

ALIGN

5"

A-940

MINIMUM CLEARANCE FROM FACE

TYPE F3 COVE LIGHT; SEE LIGHTING SCHEDULE

1' - 11 5/8"

REMOTE POWER SUPPLY OF F9 FIXTURE TO BE LOCATED IN AN ACCESSIBLE AND VENTILATED LOCATION

3

5/8" GWB

1/1

45.0 0°

4' - 6"

VERTICAL ANGLE SUPPLIED & INSTALLED BY G.C. TO TERMINATE 1/8" AFF. SATIN BRUSHED ALUMINUM

1' - 11 1/2"

WOOD VENEER PANEL BY MILLWORKER, WD-01 FINISH

MINIMIZE

2 1/2"

SCHEDULED F9 TO BE SURFACE-MOUNTED ONTO BLOCKING LOCATED BEHIND LIP CONTINOUS WOOD LIGHT OF FEATURE PANEL AS SHOWN COVE, FINISH IN WD-01

+2"

2 1/2" 14 GAUGE MTL STUD SPACED @24" O.C

4' - 6"

24.23°

+2" +12"

DESCRIPTION:

2

2

MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTURE FOR MOUNTING WOOD VENEER PANELS. SPACING AS REQUIRED.

DATE:

12/15/20 ISSUED FOR BID 17 01/19/20 ADDENDUM 2 18 CONTINOUS WOOD LIGHT 02/05/20 ISSUED FOR CONSTRUCTION COVE, FINISH IN WD-01 18

3' - 6 3/4"

5

6

24.23 °

11"

LIGHTING FIXTURE CONCEALED BEHIND MILLWORK WALL SEE DETAIL (TYP)

7

5/8" MDF

4' - 6"

4' - 6"

3' - 6 1/2"

CONTINOUS 5/8" MDF, FINISH IN WD-01 BY GC

3' - 6 3/4"

41.5 4°

24.23°

+12"

FEAT 3/4" =

2

+2"

"

0"

1

6

5

4

+8"

1

FEAT 3/4" =


PLAN

FRONT

BACK

67


PL-01 PANEL CONTINUOUS EQ TO UNDERSIDE OF COUNTER

EQ

EQ

2"

WORK DETAIL - 36IN RECEPTION DESK - 3 DRAWER -0"

EQ

R E C E P T I O N D E S K D E S I G N M O D E L , E L E V AT I O N S , P L A N + D E TA I L S LINE OF FINISHED FLOOR

3 3/4"

MILLWORK DETAIL - LOW 24IN RECEPTION DESK - 1 DOOR 1" = 1'-0"

1 1/2" DIA GROMMIT HOLE. LOCATION TO BE COORDINATED IN FIELD

MILLWORK DETAIL - 24IN RECEPTION DESK - OPEN 1" = 1'-0"

16

8' - 3 1/2"

PL-01

WD-02 COUNTERTOP ON PLYWOOD SUBSTRATE

2"

6"

A-925

2"

10

A-925 BAL.

ALL EXPOSED/ SEMI EXPONSED SURFACES AS SCHEDULED. SEE ELEVATIONS.

2"

A-925

2"

MILLWORK (M19)_RECEPTION DESK - ENLG PLAN 9 1" = 1'-0" 2"

PL-01

WD-02

PL-01 BASE

PL-01 9"

9"

LINE OF FINISHED FLOOR

2"

LINE OF FINISHED FLOOR 2"

MILLWORK DETAIL - 36IN RECEPTION DESK - OPEN PL-01 1" = 1'-0"

13

PL-01

B

MILLWORK DETAIL - 36IN RECEPTION DESK - 3 DRAWER 1" = 1'-0"

2"

14

6

13.02°

3' - 6"

WF-02

ALL SEMI EXPOSED INTERIOR CABINET SURFACES TO BE MELAMINE U.O.N

12

WD-02 2"

3"

INTERIOR SURFACE OF DRAWER TO BE WHITE MELAMINE A-925

2" RECESSED ANGLED PANEL MOUNTED WITH CLEATS TO PERPENDICULAR PANELS - WD-01.

1' - 9"

BAL

2"

TYP

1' - 3"

EQ PL-01 PANEL CONTINUOUS TO UNDERSIDE OF COUNTER

2' - 10"

EQ

3F A-920

15' - 0"

A-925

2"

EQ

13.02°

______________________________

MILLWORK CABINET BEYOND

A-925

______________________________

A-925

1" REVEAL

RECESSED ANGLED PANEL 1' - 9" MOUNTED WITH CLEATS TO PERPENDICULAR PANELS ; WD-01 WD-02

OUTLETS AND COVERPLATES TO MATCH ADJACENT FINISH

15

16

______________________________

18

______________________________

SURFACE MOUNTED F5 LIGHTING

6"

CONTINOUS MTL ANGLE 17

WD-02 COUNTERTOP ON PLYWOOD SUBSTRATE

3' - 6"

ESSED PANEL; WD-01

WD-02 COUNTERTOP ON PLYWOOD 36" AFF SUBSTRATE

2' - 0"

LEVEL 14 (M15) WEST RECEPTION DESK - EAST 10 1/2" THICK GREY FELT PANEL; WF-02 1" = 1'-0"

2"

1 1/2"

WD-02 COUNTERTOP ON PLYWOOD SUBSTRATE

SURFACE MOUNTED F5 LIGHTING

2"

2"

LEVEL 14 (M15) WEST RECEPTION DESK - SOUTH 1/2" THICK GREY FELT PANEL; WF-02 11 1" = 1'-0"

1' - 2"

TYP

4F A-920

2"

1' - 2" 2' - 0"

2" 2' - 0"

C

CKING AS REQ.

2"

PL-01

WD-02

02 COUNTERTOP ONPL-01 WOOD SUBSTRATE

EQ

LINE OF FINISHED FLOOR

2"

17

EQ

6"

6"

4"

4"

RECEPTACLE TO BE HIDDENPL-01 INSIDE OF MILLWORK CABINET

WD-02

EQ

2"

2"

WD-02

2"

2"

ALL EXPOSED/ SEMI EXPONSED SURFACES AS SCHEDULED. SEE ELEVATIONS

PANEL

1 1/2" DIA GROMMIT HOLE. LOCATION TO BE COORDINATED IN FIELD

MILLWORK CABINET BEYOND

2' - 10"

2' - 10"

2' - 10"

ADJUSTABLE WHITE MELAMINE SHELF

3' - 6"

WD-01 RECESSED PANEL

9"

WD-01 RECESSED LINE OF FINISHED FLOOR PANEL

1' - 6"

2' - 2 3/4"

LEVEL 15 (M16) RECEPTION DESK - EAST 1" = 1'-0"

LEVEL 15 (M16) RECEPTION DESK - SOUTH 1" = 1'-0"

7

2"

8

1 1/2" DIA GROMMIT HOLE. LEVEL15 LOCATION TO 6 BE COORDINATED IN FIELD 1" = 1'-0"

(M16) RECEPTION

WD-01 2"

1 1/2" DIA GROMMIT HOLE. LOCATION TO BE COORDINATED IN FIELD

2"

WD-02

14

______________________________

13

WD-02

______________________________

A-925

A-925 2' - 5 3/4"

2"

WD-01

WF-02

WD-02 ?

PL-01 WD-02 EQ

EQ

A

EQ PL-01

17

______________________________

A-925

A-925

EQ

EQ

EQ

2"

1' - 6"

MILLWORK (M15)_WEST RECEPTION DESK - ENLG PLAN 1" = 1'-0"

2"

5

PL-01

PL-01

LEVEL 14 (M15) RECEPTION DESK - EAST 1" = 1'-0"

7

2"

WD-02

6

5

2' - 2 3/4"

2"

 COPYRIGHT 2017

LEVEL 14 (M15) WEST RECEPTION DESK - EAST 1" = 1'-0" 15

16

______________________________

A-925

VEL 15 (M16) RECEPTION DESK - SOUTH = 1'-0"

2"

2"

WD-02

1 1/2" DIA GROMMIT HOLE. LOCATION TO BE COORDINATED IN FIELD

WD-01

2"

WF-02

WD-01 2"

WD-02 PL-01

3' PL-01 2' - 2 3/4"

LEVEL 14 (M15) RECEPTION DESK - WEST 1" = 1'-0"

2

2"

EPTION DESK - SOUTH

2"

1' - 9"

2"

A-925

______________________________

1' - 9" WD-02

LEVEL 14 (M15) RECEPTION D 1" = 1'-0"

3

2"

4

OUTLETS AND COVERPLATES TO MATCH ADJACENT FINISH

A-92

2"

ECEPTION DESK - NORTH

10

EQ

18

______________________________

2"

WD-02

EQ

W

4

A-925 2' - 0"

2"

EQ

2"

2"

PL-01

1

MILLWORKWD-02 (M14)_EAST RECEPTION DESK 1" = 1'-0" PL-01

1' - 6"

4

3

6

LEVEL15 (M16) RECEPTION DESK - NORTH 1" = 1'-0"

1' - 6"

2 5

68

MILLWORK (M 1" = 1'-0"


A-902 EQ

EQ

EQ

EQ

EQ

EQ

A-902

EQ

A-902

EQ

1 1/2" TRACK RECESSED IN ACT CEILING

ALIGN

ALIGN

3

5B

EQ

EQ B

1' - 6"

A-901

EQ

ALIGN

ALIGN

______________________________

EQ

3

5B

______________________________

EQ B

1' - 6" HOLD

2' - 6"

1' - 6" HOLD

8' - 6"

4' - 6"

A-901 WF-05

A-01

1" TRACK ON F.F

PT-01

WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN

FURNITURE BY CASEGOOD MFG

PT-01

1" TRACK ON F.F

BA-01

SIM

8A A-901

C-A - ELEVATION B

5

OFFICE TYPE C-A - ELEVATION A 10 1/2" = 1'-0"

4

EQ

EQ

6B A-902

EQ

TYP

7D A-902

EQ

OFFICE TYPE C-A - AXON

12

3

2

OFFICE TYPE C-A 1/2" = 1'-0"

9

FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.

TYP

TYP

7B A-901

1

ARCHITECTURE

EQ

EQ

EQ

ALIGN

EQ

SIM

8A

1 1/2" TRACK RECESSED IN ACT CEILING

EQ B

EQ B

1' - 6"

ALIGN

2' - 0" 11' - 5"

LIGHTING DESIGN:

2E

STRUCTURAL ENGINEER:

HOLD

EQ

WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 (212) 687-9888 http://www.wsp.com

2' - 6"

EQ

IT CONSULTANT:

7' - 7"

PRO4IA 55 BROAD STREET, 16TH FLOOR NEW YORK, NY 10004 212-710-3008 http://www.pro4ia.com

1' - 6"

1' - 6"

A-901

3

6

2

7 TYP

SHEN MILSOM & WILKE LLC 417 5TH AVENUE, NEW YORK, NY 10016 212-710-3008 EQ http://www.smwllc.com/

7A A-901

3

OFFICE TYPE C-B 5 CLEVENGER FRABLE LAVALLE, INC 1/2" = 1'-0"

KITCHEN CONSULTANT:

39 WESTMORELAND AVENUE, 3RD F WHITE PLAINS, NY 10606 (914) 997-9660 http://www.cfldesign.com

2

1

TYP EQ

6B A-902 E.8

TYP

6B A-902

TYP EQ EQ

7D A-902

E.6

7D A-902

TYP

EQ

D.9

EQ

TYP

6B A-902

TYP

SIM ARCHITECTURE 8A EQ

EQ

INTERIOR DESIGN

ALIGN

SIM

8A

1'COPYRIGHT 2016 - 6"

4' - 0"

EQ

3

3

EQA

A-901 1 1/2" TRACK RECESSED IN ACT CEILING

ARC

A-901

B.1

SIM

8A

A.6

A-901

C

6' - 9 1/2"

HOLD

PROJECT MANA

CBRE | N 200 PAR NEW YO (212) 98 https://w

10

EQ

A-805

EQ

EQ

EQ

EQ

D.8

J

EQ

C.8

EQA

2

A

EQ

EQ

EQ

EQ B

EQ

B.8

2E

B.6

1' - 6"

2' - 6"

EQ B

HOLD

EQ

PLAN AND IS EQ ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.

EQ

NUMBER:

B.1

A.6

2 3

EQ EQ

STRUCTURAL E

SUE S WSP US

ONE PE D NEW YO (212) 68

DATE:

12/15/2017 ISSUEDhttp://ww FOR ARC AR 01/19/2018 ADDENDUM 02/05/2018 ISSUEDPRO4IA FOR 55 BROA CONSTRUCT NEW YO

IT CONSULTAN

212-710http://ww

SC

2' - 6"

WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 (212) 687-9888 http://www.wsp.com EQ

PT-01

1' - 6" EQ

LIGHTIN 20 JAY S BROOKL (212) 79 www.ltgw

1 E.8 FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN

STRUCTURAL ENGINEER:

A-901

HOLD

LIGHTING DESI

PT-01

3

EQ

______________________________

F

V

FP

7

A-805

E.6

LIGHTING WORKSHOP 2E 20 JAY STREET - SUITE 500, A-901 BROOKLYN, NY 11201 (212) 796-6510 www.ltgworkshop.com

ALIGN

D.9

3

LIGHTING DESIGN: EQ EQ

EQ

______________________________

BA-01

8

9"

D.9

______________________________

ALIGN

E.6

2' - 1"

EQ

11

BACKPAINTED GLASS BY CASEGOOD MFG

ROBERT 19 WEST NEW YO (212) 76 http://ww

2E

3

EQ

EQ

EQ

V

3

EQ

D.8

ALIGN

EQ

BA-01

C.8

11' - 5"

EQ

4' - 6"

A-901

8' - 6"

EQ

5B

______________________________

4

B.8

ROBERT DERECTOR ASSOCIATES PT-01 19 WEST 44TH STREET 12TH FLOOR, NEW YORK, NY 10036 (212) 764-7272 3 http://www.derector.com

8' - 0"

B.6

WF-05

WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES E.8PLAN IN CONSTRUCTION

BA-01

5

B.1

M.E.P. ENGINEE A

A-901

ALIGN

PT-01

PT-01

BA-01

2' - 0" ALIGN

1' - 6"

EQ

6

A.6

8' - 6"

ALIGN ALIGN

ALIGN

EQ

PT-01

L16 (M17)_Core Wall Elevation South 7 1/4" = 1'-0"

EQ B

1' - 6"

ALIGN

4' - 6"

BA-01

A-901

M.E.P. ENGINEER:

3

E

______________________________

CBRE | NEW YORK TRI-STATE REGION PROJECT MGMT 200 PARK AVENUE, 20TH FLOOR NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/

3

6

5B

EQ

EQ B

PROJECT MANAGER:

CENTRAL CORRIDOR

AV + ACOUSTIC

SHEN M 417 5TH NEW CBREYO |N 212-710200 1' PAR -6 http://ww NEW YO (212) 98 HOLD https://w

PROJECT MANA

EQ

EQ EQ

BA-01

ALIGN

8A

EQ

SIM

EQ

EQ

BA-01

A-901

OFFICE TYPE C-A - AXON OFFICE TYPE C-B 12- ELEVATION A 7 = 1'-0" B C-SCOTT -1/2" ELEVATION

B.6

B.8

EQ

EQ

3

D

EQ

EQ

7A A-901

417 5TH AVENUE, EQ NEW YORK, NY 10016 212-710-3008 http://www.smwllc.com/ D.8 D.9

EQ

5 1/2" = 1'-0"

EQ

EQ

EQ

EQ

2

TYP BA-01 PT-01 6B A-902 L15 (M16)_Core Wall Elevation South 1/4" = 1'-0" EQ EQ

BA-03

PT-01

BA-01

EQ

L16 (M17)_Open Area North 1/4" = 1'-0" A.6

BA-01

PL-01

SIM

8A

A-901

EQ BUTT JOINT

PT-01

B.1

B.6

B.8

9

BUTT JOINT

BA-01

PT-01

BA-01

EQ BA-01

PT-01

ALIGN PT-01 BA-01

A-901

SIM

TYP

A-901

BUTT JOINT

T

8A

TYP BA-01

EQ

7A A-901

3

LIGHTIN 20 JAY S BROOKL (212) 79 www.ltgw

E.8

EQ

TYP

8A

CLEVEN 39 WEST WHITE P ROBERT (914) 99 19 WES http://ww NEW YO (212) 76 http://ww

M.E.P. ENGINEE

LIGHTING DESI

PT-01 A.6

E.6 EQ

SIM

A-901

7B A-901

B.1

EQ

STRUCTURAL E

WSP US

EQ

1

SIM

A-901

EQ

2

KEY PLAN:

BA-01

EQ EQ

BUTT JOINT

BUTT JOINT

PT-01

ONE PE OFFICE TYPENEW C-S YO (212) 68 1/2" = 1'-0" http://ww

IT CONSULTAN

PRO4IA 55 BROA NEW YO 212-710 http://ww

SHEN M 417 5TH NEW YO 212-710 http://ww

PT-01

D.8

KITCHEN CONS NUMBER:

BUTT JOINT

BA-01

C4

C.8

SIM

8A

PT-01

SIM

8A

BUTT JOINT

A-901

B.6 LLC EQ

EQ EQ

8A BA-01

5

WF-13

BA-01

AV + ACOUSTIC

EQ

4

3

TYP

PT-01

CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD FLOOR WHITE PLAINS, NY 10606 WEST (914) 997-9660 CORRIDOR TYP EQ EQ http://www.cfldesign.com 7B A-901 RS

PT-01

7D A-902

BUTT JOINT

OFFICE TYPE C-B - ENLG PLAN EQ EQ EQ 5EQ EQ 1/2" = 1'-0" OFFICE TYPE C-SCOTT - AXON KITCHEN CONSULTANT:

4

CENTRAL CORRIDOR

PL-01

EQ

TYP

OFFICE TYPE C-A - ENLG PLAN

9

AV + ACOUSTICAL CONSULTANT: BA-01 PT-01 B.8MILSOM & WILKE SHEN

C.8

OFFICE TYPE C-B TYP - AXONEQ EQ EQ EQ 7B 6 A-901 OFFICE TYPE C-SCOTT - ELEVATION A 1/2" = 1'-0"

6

E

SIM

1' - 6"

B.1

8A A-901

C.8

EQ

1' - 6"

T

EQA PT-01

D.8

1' - 6"

PT-01 D.9

BA-01

E.6

BA-01

HOLD

PT-01

L16 (M17)_Core Wall Elevation South 1/4" = 1'-0" A.6

7

PRO4IABUTT JOINT 55 BROAD STREET, 16TH FLOOR NEW YORK, NY 10004 212-710-3008 http://www.pro4ia.com

BUTT JOINT

1' - 6" HOLD

1" TRACK ON F.F BA-01 E.8

6

PT-01 CENTRAL BA-01 BA-01CORRIDOR

7' - 7"

PT-01

FURNITURE BY CASEGOOD MFG

HOLD

BUTT JOINT

BA-01

HOLD

BUTT JOINT

PT-01

PT-01

KITCHEN CONS

T

BA-01

BA-01

EQA

IT CONSULTANT:

L16 (M17)_Open Area North 5 1/4" = 1'-0" FURNITURE BY CASEGOOD PT-01 BA-01 PT-01MFG BA-01

E

SIM

8A

B.8 One New York B.6Plaza, Suite 4200 New York, NY 10004 Ph: 212 620 5583 www.spacesmith.com

EQ

C.8

ALIGN

F

PLANNING

A-901

EQ

D.8

EQ

7D A-902

EQ RS

EQ

A-901

TYP

7B A-901

FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.

3

2E

______________________________

E

EQ

TYP

02

EQ

AV + ACOUSTICAL CONSULTANT:

OFFICE TYPE C-A - ENLG PLAN 1/2" = 1'-0"

9

FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.

4

EQ

A-901 OFFICE TYPE C-B - AXON

1

5

6

TYP

7B

SIM

1' - 6"

OFFICE TYPE C-A - AXON 12 OFFICE TYPE C-B - ELEVATION A 7 1/2" = 1'-0"

8A A-901

SIM

8A

1' - 6"

PT-01 BA-01

1" TRACK ON F.F

T

EQA

BA-01

ALIGN

HOLD

OFFICE TYPE C-A - ELEVATION A 10 1/2" = 1'-0" C-B - ELEVATION B

J

EQ B

ALIGN

ALIGN

1' - 6"

BA-01

PT-01

9"

LIGHTING WORKSHOP 20 JAY STREET - SUITE 500, BROOKLYN, 2E NY 11201 (212) 796-6510 A-901 www.ltgworkshop.com

A-901

FURNITURE BY CASEGOOD MFG 1" TRACK ON F.F

11

A-805

______________________________

HOLD PT-01

ROBERT DERECTOR ASSOCIATES 19 WEST 44TH STREET 12TH FLOOR NEW YORK, NY 10036 (212) 764-7272 http://www.derector.com

______________________________

4' - 6"

WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN

A-901

1' - 6"

WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN

1' - 6"

ALIGN

ALIGN ______________________________

WF-05

M.E.P. ENGINEER:

EQ B

1' - 6" HOLD

5B

8' - 6"

1' - 6"

10

2' - 6"

WF-05

A-901

EQ

8' - 6"

4' - 6"

A-901

HOLD

5B

______________________________

EQ

3

ALIGN

3

5B

______________________________

HOLD

ALIGN

EQ

1' - 6

HOL CBRE | NEW YORK TRI-STATE REGIO 200 PARK AVENUE, 20TH FLOOR NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/

EQ

5B

A-901

EQ

3

PROJECT MANAGER:

______________________________

EQ

I

 COPYRIGHT 2016

EQ

3

3

EQA

A-901

4' - 0"

EQ

PLANNING

SIM

8A

One New A-901 York Plaza, New York, NY 1 Ph: 212 620 5 www.spacesmit

TYP

3

EQ

6B A-902

2' - 1"

EQ

TYP

7D A-902

HOLD

A-901

TYP

7D A-902

HOLD

TYP

6B A-902

T

2E

______________________

1' - 6"

D.9

3

HOLD

E.6

E.8

CLEVEN 12 39 WEST 17P WHITE (914) 99 02 http://ww

18

______________________________

A-010

EQ

EQ

1' - 6"

EQ

EQ

EQ

EQ

EQ

6' - 9 1/2"

HOLD

C.8

B.8

EQ

EQA

C

EQ

EQ

EQ

EQ

A-901 3

ALIGN

V

J

A-901

L15 (M16)_Core Wall Elevation South 1/4" = 1'-0" E.8 EQ

A.6

EQ

EQ

E.6 EQ

D.9 EQ

B.1

EQ

D.8

PL-01

B.6

B.8

9

______________________________

A-010

FP

DATE:

BA-01

PT-01

2 3

C.8

C.8

4

PROJECT:

ISSUES NUMBER:

BA-01

EQ

TYP

A-805

KEY PLAN:

BA-01

DESCRIPTION:

12/15/2017 ISSUED FOR BID 01/19/2018 ADDENDUM 2 B.8 B.6 02/05/2018 ISSUED FOR CONSTRUCTION

D.8

PT-01

MARKET AXESS

PT-01

D.9

B.1

55 HUDSON YAR NEW YORK, NY 1

A.6

NUMBER:

EQ

EQ

EQ

EQ

E.6

EQ

EQ

2E

______________________________

3

IGN

PT-01

BA-01

3

EQ

WF-13

V

3

BA-03

ALIGN

J

BACKPAINTED GLASS BY CASEGOOD MFG

8' - 0"

BA-01

ALIGN

PT-01

7

A-805

SC

8' - 6"

4

L15 (M16)_Open Area North 1/4" = 1'-0"

EQ B

3

EQ

A.6

WEST CORRIDOR

69

EQ

2E

A

8

9"

EQ

CENTRAL CORRIDOR

PL-01

4' - 6"

EQ

B.1

3

2' - 1"

ALIGN

1' - 6"

ALIGN

EQ

3

ALIGN

EQ

B.6

______________________________

A

D

EQ

5' - 6"

EQ

EQ

EQ

D.8

EQ

2' - 8"

D.9

4' - 0"

5' - 4"

E.6

EQ B

2' - 7"

E.8

EQ

E.8

DRAWING TITLE:

3

12 17 02 18


F ALIGN

______________________________

A-901 EQ

EQ

EQ

EQ

EQ

EQ

6B A-902

EQ

TYP

TYP

7D A-902

EQ

5B

A-901

EQ

1' - 6"

EQ

ALIGN

ALIGN

______________________________

EQ

1 1/2" TRACK RECESSED IN ACT CEILING

P RFI V AT E O F F I C7 E R E N D E R I N G , P L A N6 S , E L E V AT I O N S + A5X O N S

5B

______________________________

ALIGN

3

8' - 6"

ALIGN

4 5B

A-901 EQ

EQ

EQ

EQ

HOLD

EQ

EQ

TYP

6B A-902

EQ

1' - 6"

EQ 1' - 6"

EQ

TYP

7D A-902

1' - 6" EQ HOLD

2' - 6"

______________________________

EQ

A-901

ALIGN

2E

TYP

6B A-902

ALIGN

______________________________

TYP

7D A-902

4' - 6"

A-901

WF-05

5B

______________________________

1" TRACK ON F.F

WF-05

ALIGN

EQ

1" TRACK ON F.F

2' - 0"

EQ

EQ

8' - 6" 1' - 6"

OFFICE TYPE C-A - AXON

12

EQ

PT-01

WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN

BA-01

2E

TYP

6B A-902

LIGHTING DESIGN:

LIGHTING WORKSHOP 20 JAY STREET - SUITE 500, TYPE OFFICE 1011201 BROOKLYN, NY 1/2" = 1'-0" (212) 796-6510 1 1/2" TRACK RECESSED www.ltgworkshop.com IN ACT CEILING

ALIGN

ALIGN

D

11

EQ A-805

ROBERT DERECTOR ASSOCIATES 19 WEST 44TH STREET 12TH FLOOR, NEW YORK, NY 10036 (212) 764-7272 http://www.derector.com TYP 7D A-902

TYP

7D A-902

ALIGN

10

EQ

TYP

11' - 5"

ALIGN

EQ

OFFICE TYPE C-A - ELEVATION B 11 1/2" = 1'-0"

EQ

M.E.P. ENGINEER:

3

6B A-902

A-902

CBRE | NEW YORK TRI-STATE REGION PROJECT MGMT 200 PARK AVENUE, 20TH FLOOR NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/ 1 1/2" TRACK RECESSED IN ACT CEILING

3

2E

A-901

A-902

PROJECT MANAGER:

1" TRACK ON F.F

______________________________

1' - 6" HOLD

OFFICE TYPE COPYRIGHTC-A 2016 - ELEVATION A TYP TYP 1/2"7D = 1'-0" 6B

10

EQ

FURNITURE BY CASEGOOD MFG

PT-01 EQ B

BA-01

7D A-902

A-901

INTERIOR DESIGN

EQ

EQ

ALIGN

EQ

TYP

EQ

EQ

6B A-902

EQ

EQA

A-901

3

3

______________________________

TYP

OFFICE TYPE C-A - AXON

______________________________

One New York Plaza, Suite 4200 New York, NY 10004 Ph: 212 620 5583 1' - 6" www.spacesmith.com HOLD

SIM

8A A-901

OFFICE TYPE C-A - ELEVATION B 11 2E 1/2" = 1'-0"

PLANNING

12

BA-01 5B

2' - 6"

ARCHITECTURE

PT-01

WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN

4' - 6"

OFFICE TYPE C-A - ELEVATION A 1/2" = 1'-0"

10

EQ

EQ 5B

ALIGN

1" TRACK ON F.F

A-901

EQ

ALIGN

1

EQ

FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.

FURNITURE BY CASEGOOD MFG

1" TRACK ON F.F

D E

HOLD

5B

ALIGN

2

E

1' - 6"

HOLD

______________________________

OFFICE TYPE C-A - ELEVATION B 1/2" = 1'-0" BA-01 PT-01

11

BA-01

8' - 6"

ALIGN

3

1' - 6"

ALIGN

1" TRACK ON F.F

______________________________

C-A - ELEVATION A

EQ

A-901

EQ

1' - 6"

PT-01

PT-01

WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN

FURNITURE BY CASEGOOD MFG

2' - 6"

BA-01

E F

4' - 6"

A-901 WF-05

1 1/2" TRACK RECESSED IN ACT CEILING

12

OFFICE TYPE C-A - AXON

STRUCTURAL ENGINEER:

______________________________

7D A-902

C

8' - 6"

4' - 6"

A-901

EQ

8' - 6"

6

7D A-902

EQ B

______________________________

3

7D A-902

7D A-902

TYP

4' - 6"

2' - 0"

EQ

NUMBER:

1 1/2" TRACK RECESSED IN ACT CEILING

ISSUES DATE:

10

DESCRIPTION:

OFFICE TYPE 12/15/2017 ISSUED FORC-B BID- ELEVATION A 7 1/2" = 1'-0" 01/19/2018 ADDENDUM 2 02/05/2018 ISSUED FOR CONSTRUCTION

2 3

SC

A-805

11

LIGHTING DESIGN:

EQ

EQ

LIGHTING WORKSHOP 20 JAY STREET - SUITE 500, BROOKLYN, NY 11201 (212) 796-6510 www.ltgworkshop.com

EQ

ALIGN

V

8' - 6"

EQA

EQ

ROBERT DERECTOR ASSOCIATES 19 WEST 44TH STREET 12TH FLOOR, NEW YORK, NY 10036 (212) 764-7272 http://www.derector.com

PT-01 BA-01

2E

6

STRUCTURAL ENGINEER:

______________________________

A-901

OFFICE TYPE C-B - AXON

WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 (212) 687-9888 http://www.wsp.com

BACKPAINTED GLASS BY CASEGOOD MFG

EQ B

ALIGN

ALIGN

OFFICE TYPE C-B - ELEVATION B A-901 1/2" = 1'-0" 2' - 6"

M.E.P. ENGINEER:

ALIGN

A

BA-01 TYP 6B A-902 11' - 5"

TYP

7

PT-01

TYP

ALIGN

6B 1" TRACK A-902 ON F.F

EQ A-805

8

BA-01

IT CONSULTANT:

BA-01

7A A-901

1' - 6"

TYP

EQ

7

PT-01 BA-01

HOLD

A

TYP

7B

OFFICE TYPE C-SCOTT A-901 - ELEVATION B RS 1/2" = 1'-0"

4

SIM

A-901

ALIGN T

BA-01

KITCHEN CONSULTANT:

CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD FLOOR WHITE PLAINS, NY 10606 (914) 997-9660 http://www.cfldesign.com

OFFICE TYPE C-SCOTT - ELEVATION A 1/2" = 1'-0" 8A

BA-01

EQ

TYP

7A A-901

SHEN MILSOM & WILKE LLC 417 5TH AVENUE, NEW YORK, NY 10016 212-710-3008 http://www.smwllc.com/

KEY PLAN:

3

FURNITURE BY CASEGOOD MFG

PT-01

6

SIM

ALIGN FURNITURE BY CASEGOOD MFG

5

A-901

BA-01

8A A-901

1" TRACK ON F.F

BACKPAINTED GLASS BY CASEGOOD MFG

SIM

2

OFFICE TYPE C-SCOTT - AXON

4

3

BA-01

3

T

SIM

8A

EQ

FURNITURE BY CASEGOOD MFG

AV + ACOUSTICAL CONSULTANT:

OFFICE TYPE C-A - ENLG PLAN 9 1/2" = 1'-0"

EQ

EQ COPYRIGHT 2017 

8A

TYP

BACKPAINTED GLASS BY CASEGOOD MFG

7B A-901 BA-01

PT-01

SIM

8A

EQ

A-901

TYP

1" TRACK ON F.F

EQ

PRO4IA 55 BROAD STREET, 16TH FLOOR NEW YORK, NY 10004 212-710-3008 http://www.pro4ia.com

ALIGN

FURNITURE BY CASEGOOD MFG

OFFICE TYPE C-B - ENLG PLAN 1/2" = 1'-0"

5

EQ

SIM

8A A-901

TYP 7B 1 1/2" TRACK RECESSED A-901 IN ACT CEILING

OFFICE TYPE C-A - AXON EQ EQ

12

PT-01 BA-01

AXON

EQ

SIM

ALIGN

A B

HOLD

1' - 6"

8A A-901

1' - 6" HOLD

TYP

6B A-902

1' - 6"

ALIGN

7D A-902

TYP

HOLD

EQ

7' - 7" 7D A-902

TYP

ALIGN

EQ

TYP

EQ

EQ

6B A-902

EQA

A-901

T

2E

______________________________

EQA

PT-01

HOLD

3

FP

EQ

8' - 0"

1" TRACK ON F.F

2E

8

1' - 6"

3

2' - 1" 8' - 6"

4' - 6"

A-901 EQ

J 1' - 6"

V

FURNITURE BY CASEGOOD MFG

2E

______________________________

9"

B HOLD

EQ B

EQA

1 1/2" TRACK RECESSED IN ACT CEILING

OFFICEREGION TYPE PROJECT C-B - AXON CBRE | NEW YORK TRI-STATE MGMT 6 20TH FLOOR 200 PARK AVENUE, NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/

EQ EQ

3

WF-05

EQ EQ

3

A-901

EQ 1' - 6"

A

5B

______________________________

 COPYRIGHT 2016

PROJECT MANAGER:

HOLD

BC

SIM

A-901 A-901

A-902

OFFICE TYPE C-B - ELEVATION A EQ 1/2" = 1'-0"

7

EQ

HOLD

7D A-902

TYP

INTERIOR DESIGN

2' - 6"

6' - EQ 9 1/2"

TYP

8A5B

______________________________

WF-05

EQ

1' - 6" EQ

6B A-902

EQ B

1' - 6"

ALIGN

EQ

ALIGN

OFFICE TYPE C-B - AXON PLANNING

One New York Plaza, Suite 4200 New York, NY 10004 Ph: 212 620 5583 www.spacesmith.com

PT-01 BA-01

WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES TYP TYP IN CONSTRUCTION 6BPLAN

EQ 3

OFFICE TYPE C-B - ELEVATION B EQ 1/2" = 1'-0" 4' - 0"

8 5B

EQ

1' - 6" 2' - 6"

______________________________

EQ

SIM

8A A-901

______________________________

EQ

EQ

3

A-901

BA-01

3

2E

______________________________

TION A

ALIGN

PT-01

ALIGN 1" TRACK ON F.F

1" TRACK

WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN

1 FINISH PLANS SHALL OVERIDE ANY 1' - 6" PLAN AND DISCREPANCIES FOUND BETWEEN ELEVATIONS WHEN DETERMINING HOLDTHE TYPE OF FINISH NOTED EQ THROUGHOUT THIS PROJECT. 5B

1' - 6" HOLD

OFFICE TYPE C-B - ELEVATION A 1/2" = 1'-0"

7

FURNITURE BY CASEGOOD MFG

SIM

8A

A-901

A-901

ARCHITECTURE

A-901 ON F.F

EQ

5B

______________________________

WF-05

CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD FLOOR WHITE PLAINS, NY 10606 (914) 997-9660 http://www.cfldesign.com

ALIGN

EQ

HOLD

EQ

PT-01 BA-01

KITCHEN CONSULTANT:

OFFICE TYPE C-A - ENLG PLAN 9 1/2" = 1'-0" TYP OFFICE TYPE C-B - ELEVATION B 8 1/2" = 1'-0"

ALIGN

TYP

EQ

EQ

2

EQ

TYP

7A A-901

EQ EQ

AV + ACOUSTICAL CONSULTANT:

3

6B A-902

EQ

EQ

ON F.F

1' - 6"

HOLD

SHEN MILSOM & WILKE LLC 417 5TH AVENUE, 1 1/2" TRACK RECESSED WRITABLE SURFACE: NEW YORK, NY 10016 IN ACT CEILING FOR APPLICABLE 212-710-3008 PT-01 BA-01 KEY NOTES http://www.smwllc.com/ LOCATIONS SEE IN CONSTRUCTION PLAN

ALIGN

EQ

31" TRACK

TYP 7B 1" TRACK A-901ON F.F

A-901

EQ

1' - 6"

1' - 6"

FURNITURE BY CASEGOOD MFG

4

SIM

8A A-901

A-901

5B

______________________________

EQ TYP 1' - 6"

6B A-902

212-710-3008 A-902 http://www.pro4ia.com

EQ

SIM

8A

PRO4IA 55 BROAD STREET, 16TH FLOOR TYP NEW YORK, NY 10004 7D

4' - 6"

ALIGN

EQ

IT CONSULTANT:

TYP

7D A-902

HOLD

HOLD

C D

EQ

EQA

EQ

1' - 6"

TYP

A-901

ALIGN 2' - 6"

6B A-902

A-901

5B

______________________________

WF-05

ALIGN

7' - 7"

2E

______________________________

T

ALIGN

ALIGN

EQ B

WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 WRITABLE SURFACE: (212) 687-9888 FOR APPLICABLE http://www.wsp.com LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN

ALIGN

A-901

AXON

A-901 6' - 9 1/2"

HOLD

EQ B

OFFICE TYPE C-SCOTT - ELEVATION A 1/2" = 1'-0"

FURNITURE BY CASEGOOD MFG ALIGN

PT-01

A-901

8A

SIM

A-901

6

EQ

8A

OFFICE TYPE C-B - AXON

12/15/2017

5

7B A-901

3

2

OFFICE TYPE C-SCOTT - ENLG PLAN 1/2" = 1'-0"

CHECKED BY:

JL,MV,CL MF,DM OFFICE SCALE: TYPE C-B - ENLG PLAN 1/2" = 1'-0" As indicated

A-805.00

NOTE: ALL DIMENSIONS ARE TAKEN FROM FACE OF SHEETROCK (NOT FINISH FACE)

1

TYP

EQ

70

DRAWING NO:

1

SIM

A-901 DATE:

EQ 16322

OTT - AXON

3

T

8A

SEAL & SIGNATURE:

DRAWN BY:

6

4

SIM

A-901

PROJECT NO:

TION A

DESCRIPTION:

SC

5

ENLARGED PLANS & ELEVATIONS - OFFICES

6' - 9 3/4"

ALIGN

DATE:

12/15/2017 ISSUED FOR BID 01/19/2018 ADDENDUM 2 02/05/2018 ISSUED FOR OFFICE TYPE C-SCOTT - AXON CONSTRUCTION 2

DRAWING TITLE:

EQA

1' - 6" HOLD PT-01 BA-01

FP

OFFICE TYPE C-SCOTT - ELEVATION A 1/2" = 1'-0" 55 HUDSON YARDS NEW YORK, NY 10001

1' - 6"

ALIGN

EQ

7

HOLD

 COPYRIGHT 2017

ISSUES NUMBER:

2 3

3

3

-01

EQ

BA-01

3

MARKET AXESS - 55 HY

OFFICE TYPE C-SCOTT - ELEVATION B 1/2" = 1'-0"

1' - 6" EQ

V

3

______________________________

PROJECT:

7 ALIGN

2E

4

A-805

8' - 0"

J

ALIGN

A-805

8

9"

EQ B

3

2' - 6"

1' - 6" HOLD

A

BA-01 J

EQ

4

BA-01 1" TRACK ON F.F

8' - 6"

4' - 6"

A-901

3

FURNITURE BY CASEGOOD MFG 3

5B

______________________________

WF-05

4

3

A-901

PT-01 BA-01

ACE: ABLE OTES PLAN

5

2' - 1"

6 2E

V

______________________________

HOLD

A-901

1' - 6"

A

EQ

A

3

7  COPYRIGHT 2017 5B

______________________________

EQ

OFFICE TYPE C-SCOTT - AXON

EQA

2

EQ

5' - 6"

3

EQ

1' - 6" HOLD

OFFICE TYPE C-SCOTT - ELEVATION B 1/2" = 1'-0"

1' - 6"

4' - 0"

C4

4

ALIGN

B 02

2E

TYP

6B A-902

ALIGN

TYP

7D A-902

7B A-901

TYP

EQ RS

EQ PAGE__ OF__

7A A-901

TYP

8A A-901

SIM KEY PLAN:


project birds eye perspective

New York Showroom | Concept Design | June 9, 2016


VITRA NY SHOWROOM SHOWROOM + OFFICE - SD + DD

DURATION: 2 months OFFICE: Gensler TEAM: Laurent Lisimachio, Douglas Burton, Ady Chu LOCATION: 95 Madison Ave - New York, New York CLIENT: Vitra


Initial concept sketches

Zig-Zag. Floor Plan Back of House

DN

Elev. Focal Wall

CafĂŠ

Exhibit

DN

UP

13

New York Showroom | Concept Design | June 1, 2016

Zig-Zag. Section Perspective

(Other Tenant)

New York Showroom | Concept Design | June 1, 2016

73

(Other Tenant)

16


VITRA NY SHOWROOM SHOWROOM + OFFICE - SD + DD

Swiss furniture company Vitra reached out to

Gensler to design a new showroom for their new space at 95 Madison Ave in New York. The small 10,000 sqft space was to be used as both a storefront showroom and workspace for local staff. The entire space could act as a showroom. The ground floor being more of their home collections showroom and the top floor doubling as both workspace for employees and showroom for Vitra’s office collection.

To allow ADA accessibility of an existing back-

of-house space in the rear of the building, our idea was to create a slight slope in the floor at the ground entrance. The slope at 1:38 became a point of departure for the New York Showroom | Concept Design | June 9, 2016

idea to treat this as a gallery space not unlike that of the Guggenheim where the occupants are forced through a gallery by means of a ramp. The gallery was designed to have custom floating millwork cases displaying old and new Vitra furniture as a way to educate and promote business.

74


programmatic floor plans

r Plan

Back of House

rney



Elev.

Focal Wall

Café

Sculpture

Feature Wall B



Canopy



Exhibit Wall B



Exhibit Wall A

Window Display

Showroom | Concept Design | June 27, 2016

13

or Plan

ney Conference Room

Elev. Storage Restrooms

Open Office/Contract Showroom

Café

Display Shelves

Elevator Lobby

Project Room

Display Shelves Showroom | Concept Design | June 27, 2016

75

14


workspace rendering - north

York sign si June ne 2 w Yo rk SSho wroo wr m | Co Desi gn | Ju 27, 7, 2 016 01 6 New Ne howr ho oom oo Conc ncep nc eptt De ep 201

workspace rendering - south

York sign si June ne 2 w Yo rk SSho wroo wr m | Co Desi gn | Ju 27, 7, 2 016 01 6 New Ne howr ho oom oo Conc ncep nc eptt De ep 201

76


design development floor plans 2

3

4

5

2

6

3

4

F

DN

E

D

C SHEET NOTES

Vitra

95 Madison Avenue Floors 1& 2 New York, NY 10016

B

UP

UP

DN Rockefeller Center 1230 Avenue of the Americas Suite 1500 New York, NY 10020 United States

A

1

1

2

3

4

5

Tel 212.492.1400 Fax 212.492.1472

Robert Derector Associates MEP Engineer 19 West 44th Street New York, NY 10036 USA Tel 212.764.7272 Fax 212.764.7827

6 Lighting Workshop 20 Jay Street, Suite 500 New York, NY 11201 USA Tel 212.796.6510 Fax 212.796.2072

F

F

E

6/29/2016 4:49:14 PM

DN

E

16

GENERAL NOTES

08

FINISH PLAN - LEVEL 02 SCALE: 1/8" = 1'-0"

DN

D

FINISH PLAN - LEVEL 01 SCALE: 1/8" = 1'-0"

D

C

B

UP

DN

Date

Description

A Seal / Signature

77

1

PROGRESS SET NOT FOR CONSTRUCTION


CHANNEL BRIDGING 09 29 00.B05 09 SAG-RESIS 22 16.B03 GYP BD COLD-ROLLED CHANNEL

Robert Derector Associates MEP Engineer 19 West 44th Street New York, NY 10036 USA Tel 212.764.7272 Fax 212.764.7827

09 22 16.C08 FURRING CHANNEL CLIP

design development details

1

SEE RCP

09 29 00.B05 TYP SOFFIT GYP TO OPEN CLG SAG-RESIS GYP BD 09 22 16.A00 METAL STUD

SEE RCP

09 22 16.A01 METAL RUNNER TRACK

09 29 00.J09 JOINT REINFORCEMENT

09 22 16.A09 CHANNEL BRIDGING

SCHEDULED OR EXISTING PARTITION

0'

20 Jay Street, Suite 500 New York, NY 11201 USA Tel 212.796.6510 Fax 212.796.2072

01

08 80 00.A00 GLASS 08 41 26.B02 BOTTOM RAIL 08 41 26.G01 CONCEALED FLOOR CLOSER

09 22 16 01 METAL STUD

02

03

2"

0'

125 STEPPED SOFFIT

08 11 13 STEEL FRAME

2"

2

5/8"

SEE RCP

STEPPED SOFFIT 09 29 00.B05 SCALE: 3" = 1'-0"

03 04 05 06

METAL S ABOVE A SCHEDU CONSTR THICKNE SCHEDU SCHEDU LINE OF SCHEDU OCCURS

1/2"

1/2"

VIF

09 22 16.C08 FURRING CHANNEL CLIP

02

09 22 16 METAL STUD TRACK

4"

09 22 16.B03 COLD-ROLLED CHANNEL

C3030.125_GYP BD STEPPED SOFFIT

SHEET

VARIES

GENERAL NOTES Lighting Workshop

09 22 16.C04 FURRING CHANNEL

1/4"

SCALE: 3" = 1'-0"

GENERAL NOTES

SAG-RESIS GYP BD

03 30 00 CAST-IN-PLACE CONCRETE

09 22 16.C04 FURRING CHANNEL

04

SEE RCP 09 29 00.J09 JOINT REINFORCEMENT

SCHEDULED OR EXISTING PARTITION

1 15/16"

C3030.125_GYP BD STEPPED SOFFIT

05

125 STEPPED SOFFIT

Date

09 22 16.C08 FURRING CHANNEL CLIP

06

09 29 00.B05 SAG-RESIS GYP BD

09 29 00.J03 EDGE TRIM, L-BEAD

Date

09 22 16.A01 METAL RUNNER TRACK

SCALE: 3" = 1'-0"

09 29 00.J01 CORNER BEAD REFER TO RCP

01 RETURN AIR SLOT; REFER TO ENGINEERING DRAWINGS

09 22 16.A01 METAL RUNNER TRACK

1 15/16" 08 11 13 STEEL FRAME

Showroom

06

GENERA

07 92 00 JOINT SEALANT 02

06.0524.000 Description

Seal / Signature

09 29 00.B05 SAG-RESIS GYP BD

09 29 00.J03 EDGE TRIM, L-BEAD

05

2"

Project Number

09 22 16.A00 METAL STUD

26 51 00.A01 GYP BD LIGHT COVE LIGHT FIXTURE AS SCHEDULED - SEE ELECTRICAL DRAWINGS

01

Description

05 12 00 Project Name STEEL ENCASEMENT

VitraSLAB. NY EXISTING FLOOR

REFER TO RCP

06 10 00.C01 WOOD BLOCKING

04

DETAILS - CEILING TRANSITIONS

GLASS DOOR BASE DETAILPROGRESS SET 02 STEEL FRAME JAMB

KEY SCALE: PLAN 3" = 1'-0"

SCALE: 3" = 1'-0"

NOT FOR 09 22 16.C01 WIRE TIE 3" = 1'-0" CONSTRUCTION 09 22 16.C05

09 22 16.C05 GRID SUSPENSION SYSTEM

Scale

09 22 16.C01 WIRE TIE

Project Name

09 29 00.C02 WATER-RESIS GYP BD 5/8" 09 29 00.J03 EDGE TRIM, L-BEAD

GRID SUSPENSION SYSTEM

A-901.00 A-901

STANDING & RUNNING TRIM

Vitra NY Showroom 09 22 16.A00

09 22 16.A00 METAL STUD

LINE OF DOOR HEADER ABOVE

METAL STUD

09 22 16.A00 METAL STUD

Project Number

DRAWING NO. ______ OF ______

06.0524.000

© 2016 Gensler

VARIES

08

???

PROGRESS SET NOT FOR RAISED ACCESS FLOOR TILES. CONSTRUCTION SCHEDULED FLOOR FINISH; REFER TO FINISH FLOOR PLAN.

09 29 00.J01 09 22 16.C08 FURRING CHANNEL CLIP CORNER BEAD

REFER TO RCP

5/8"

1 15/16"

KEY PLAN

06 10 00.C01 WOOD BLOCKING

09 29 00.B05 SAG-RESIS GYP BD

2" 1/2"

26 51 00.A01 LIGHT FIXTURE AS SCHEDULED - SEE ELECTRICAL DRAWINGS

01 RETURN AIR SLOT; REFER TO ENGINEERING DRAWINGS

08 11 13 METAL ANCHOR

1'

Seal / Signature

08 41 26.B02 BOTTOM RAIL 08 41 26.G01 CONCEALED FLOOR CLOSER

09 29 00.B05 SAG-RESIS GYP BD

09 22 16.C04 FURRING CHANNEL

07 92 00 JOINT SEALANT

6" UON

FILL RAISED ACCESS FLOOR TILE IN FIELD WITH CONCRETE AT EMBEDDED HARDWARE LOCATIONS.

REFER TO RCP

01

Description

08 41 26.A01 GLASS DOOR

09 22 16.C04 FURRING CHANNEL

???

SCALE: 3" = 1'-0"

1/2"

SCALE: 3" = 1'-0"

STEEL FRAME HEAD

0'

STEPPED SOFFIT

SCALE: 3" = 1'-0"

VARIES

2

01

ENTRANCE GLASS DOOR SILL

1 15/16"

Description

GYP BD LIGHT COVE SCALE: 3" = 1'-0"

SCHED. WOOD DOOR

Scale

08 81 13.A00 DECORATIVE GLASS

3" = 1'-0"

OFFSET PIVOT

08 71 00.J00 DOOR BOLT 08 41 26.B01 TOP RAIL

A-901.00 A-901 DRAWING NO. ______ OF ______ © 2016 Gensler

08 41 26.A01 GLASS DOOR

ELEVATOR LOBBY SIDE

REFER TO HARDWARE SET

08 41 26.G04 PUSH-PULL SET

ELEVATOR LOBBY SIDE

RECEPTION SIDE

03

FLUSH WOOD DOOR JAMB SCALE: 3" = 1'-0"

VARIES 0'

RECEPTION SIDE

SCHEDULED PARTITION; REFER TO CONSTRUCTION PLAN

1 1/4" 1/2"

1/8"THK CONTINUOUS ST STL SHOE CHANNEL

2"

08 41 26.G01 CONCEALED FLOOR CLOSER

SCHEDULED FLOORING

SCHEDULED FLOORING

SEE REFLECTED CEILING PLAN FOR CEILING TYPE AND HEIGHT

1/2"

08 41 26.B02 BOTTOM RAIL

CLOSET SIDE

CENTER PIVOT SEE HARDWARE SCHEDULE

1/4"

. 1/8"

08

DETAILS - CEILING TRANSITIONS

08 14 16 FLUSH WOOD DOOR

12

HEAD & SILL - GLASS SIDELIGHT SCALE: 3" = 1'-0"

08

HEAD & SILL - ENTRANCE GLASS DOOR SCALE: 3" = 1'-0"

04

FLUSH WOOD DOOR HEAD W/ REVEAL SCALE: 3" = 1'-0"

78

KEY PL


“ t h e ra m p� i nte r i o r re n d e r i n g


G O O G L E - P I E R 57 P U B L I C S PA C E + O F F I C E - C O M P E T I T I O N

DURATION: 3 weeks OFFICE: Gensler TEAM: Carlos Martinez, Amanda Carroll, Senior + Intermediate Designer LOCATION: Pier 57 at Hudson River Park - New York, New York CLIENT: Google


“ w e l c o m e” c o n c e pt re n d e r i n g

81


n areG no O Olonger G L E H Esufficient ADQUARTER P U B L I C S P A C E + O F F I C E - C Ois M P Enecessary. TITION ms. Regeneration er sufficient ation is necessary.

e

Tech leaders Google invited Genselr to

participate in a private competition to develop and

Identify overlaps between design a space at the old Pier 57 along the Hudson River company expertise in core businesses and develop strategies in Downtown Manhattan, The tech company was looking to lease 70,000 sqft of office space and 50,00 sqft of Identify overlaps between that foster problem-solving. community based functions from the nearly 500,000 sqft company expertise in core pier. During the design exercise we worked along side in businesses and develop strategies Identify issues and develop house sustainability experts to ensure our addition best that foster problem-solving.strategies that best leverage

nequality Safety Diversity

nomy

resources and expertise.

served the community as well as the local habitat of the

Hudson River. The intense design competition lasted just

Identify issues and develop over 3 weeks. Remediation and mitigation are no longer sufficien strategies that best leverageGoogle can leverage abundant resources and expertise. resources to build a regenerative responses to global problems. Regeneration is nec ecosystem that addresses problems Identify overla company exper locally, city-wide and globally. Google can leverage abundant businesses and Climate that foster prob Inequality Water resources to build a regenerative Safety Identify issues ecosystem that addresses problems Environment - Polluted Waterways, strategies that Food Food Security and Climate Change resources and e Diversity locally, city-wide and globally.

Jobs

Networks

Environment

Economy - Jobs (Networks/Skills)

Infrastructure - Access and Investment Environment - Polluted Waterways, Food Security and Climate Change

Organization - Motivation, Training and Culture

Economy - Jobs (Networks/Skills)

Community - Inequality, Safety and Diversity

Infrastructure - Access and Investment

Investment Access

Community

Infrastructure

Economy

Motivation Training Culture Organization

Google can leve resources to bu ecosystem that locally, city-wid

Jobs Networks

Environment - Polluted W Food Security and Climat

Economy - Jobs (Network

Infrastructure - Access an

Organization - Motivation

Community - Inequality, S

Organization - Motivation, Training and Culture Community - Inequality, Safety and Diversity

circulation media wall media totems

82


83


P R O G R A M M AT I C P L A N , S E C T I O N + A X O N S

FOOD HALL

welcome

workplace

the beacon

training

the ramp

cafe + food hubs

outdoor greenspace

support + collboration

winter garden

circulation

WORKPLACE

WINTER GARDEN

GREENSPACE

THE RAMP

CAFE

THE BEACON

ACTIVATE 84


greenspace/wintergarden rendering



CHARLES LENT New York, NY

charlesanthonylent@gmail.com

727.515.0861

The City College of New York Bernard & Anne Spitzer School of Architecture


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.