BOU ND selected works
CHARLES LENT
The City College of New York Bernard & Anne Spitzer School of Architecture
CHARLES LENT New York, NY
charlesanthonylent@gmail.com
727.515.0861
https://www.linkedin.com/in/charles-lent-67299794 https://issuu.com/charleslent https://www.behance.net/charlesant908e
BOU ND contents
Winter Pasture fall 2016
I
pg. 01-14
Heights Pavilion spring 2016
I
pg. 15-28
Plastic Flowers summer 2015
I
pg. 29-42
NYC Labor Council Summer 2018
I
pg. 43-56
MarketAxess fall-winter 2017-2018
I
pg. 57-70
Vitra Showroom summer 2016
I
pg. 71-78
Google - Pier 57 summer 2016
I
pg. 79-86
health lodge rendering
W I N T E R PA S T U R E EMERGENCE OF A FIXED NENET ARCHITECTURE
DURATION: 7 weeks research + 9 weeks design PROFESSOR: Alberto Foyo TEAM: colaborative research + independent design LOCATION: Siberia, Russia CLIENT: The Nenets [indigenous reindeer herders]
yamal peninsula
migration path key A
K
B
C D E F
G H
J
I
I
MAY - AUG.
J
K
crossing the ob beginning of may crossing the ob middle of december early winter pasture crossing the luribei in september crossing the luribei end of may summer pasture moving towards kharasavei moving towards tivtei lakha crossing the luribei in september migration to vicinity winter pastures northen yamal brigade migration
H G
F
hearding threats APRIL - MAY
D
E
melting permafrost
APRIL - MAY mys-kamenny
climate change
- 1,000
novy port x 1,790
C
yar-sale
kharp
oil infrastructure
x 4,880
x 6,410
salekhard
A
x48,500
B
labythnangi x 26,930
aksarka
x 3,130
DEC. - APRIL
01 03
50 mi
W I N T E R PA S T U R E EMERGENCE OF A FIXED NENET ARCHITECTURE
The Yamal Peninsula stretches some seven
hundred kilometers into the Arctic Ocean from the Russian mainland below the Arctic Circle. Known to it’s indigenous inhabitants as ‘the end of the world’, this area of the Russian federation is arousing international attention.
The nomadic Nenets tribes of this peninsula have
retained their traditional culture and simple way of life for over a thousand years. Surviving Stalinist Russia and the interests of the gas drilling company Gazprom they now face a new threat, climate change and their landscape is dramatically changing. In recent years, this rich, rugged and inaccessible peninsula in Northern Siberia has been the focus of media headlines. The world’s largest energy company Gazprom, is trying to fully exploit Russia’s largest gas field containing an estimated half of the world’s reserves. Gazprom has embarked on an extensive venture to cash in on these gas reserves, the venture becoming Russia’s largest energy project in history.
food source
transportation + shelter
At the same time the landscape in Yamal is
changing as the Arctic permafrost thaws due to warmer Arctic temperatures. Scientists are concerned that millions of tonnes of Ch4 (methane) locked in the thawing permafrost could be a ticking time bomb, a tipping point for the world’s climate system.
JUNE 46 F
DEC.
nenets home
-5 F
arctic circle
JUNE
24 HRS
DEC. 0 HRS
JAN.
GREENLAND
0.2 IN
JULY
1.8 IN
YAMAL RUSSIA
04
INSTITUTED SITE PROGRAM
herd + bregade 100-7,000 reindeer per bregade 5-50 chums per bregade
5-500 nenets per bregade
education PHASE I 120 children in primary +secondary schooling PHASE II 90 children in history theory, and culture PHASE III 90 children in craft, survival, and nutrition
health relief from coldbath house phytotherapyherbs grown on site extended stay health treatment
05
pasture rendering
site section
corral as site protection
operable corral gate
06
ARCHITECTURE AS LAND ART
control snow drifts to collect
maximize solar heat gain
07
B AT H H O U S E + C L I N I C
“WATER” BATH HOUSE: HOT STEAM, STORAGE, HEAT PUMPS
“EARTH” DRY ARID SPACE: SPRING GARDEN(WINTER) FIRE PITS (WINTER)
OPEN PROGRAMABLE SPACE (9 MONTHS) EXTRA SPACE FOR PATIENT BEDS (WINTER)
TH A B GA RD EN
LO
UN
GE
BY B LO
“FIRE” lOUNGE SPACE: COOKING, FIRE PLACE, PANTRY
“EARTH” WARM HUMID SPACE: STORAGE, MOSS RESTROOMS, CIRCULATION
PATIENT ROOMS (YEAR ROUND)
PATIENT ROOMS SERVICE SPACE: SMALL FOOD PREP,TOILETS, STORAGE
08
spring garden rendering interior spring garden rendering
As a way to gain back autonomy, the new winter pasture settlement shall include options for both education (primary/secondary, as well as cultural and survival) trade, nutrient supplements staionary dwellings, and reindeer production facilities.
09
1st floor plan
DN
UP
UP
east section
39’-0” ROOF 1
29’-0” LEVEL 2
19’-0” LEVEL 1 14’-0” UNDER STORY
10
moss wall lobby rendering
interior spring garden rendering
building development axons
11
2nd floor plan
south section
39’-0” ROOF 1
29’-0” LEVEL 2
19’-0” LEVEL 1 14’-0” UNDER STORY
12
winter pasture site model
exterior pavilion rendering
H E I G H T S PAV I L I O N F O R M A S U N K N O W N ( X ) : P O O L A N D B AT H H O U S E
DURATION: 6 weeks research +10 weeks design PROFESSORS: Holger Schulze-Ehring, Corey Wowk, Julio Salcedo TEAM: collaboration with Eric Iversen LOCATION: Washington Heights, New York CLIENT: NYC Parks Department
pavilion site citeria
interior pavilion rendering
1
2
3
17
H E I G H T S PAV I L I O N F O R M A S U N K N O W N ( X ) : P O O L A N D B AT H H O U S E
Structure revitalizes space and social
WIND + SUN PATH
LOCAL SCALE SITE
environments. Novel and in depth investments in structure and technology become means to reexamine N
Wind direction rathered from windfinder.com Location of weather tower: LGA
and revitalize the social infrastructure of the city. This
NW
studio looks at pools as example of touch points and what
NE
June
can be achieved by further understanding the integral structural and architectural disciplines. LEGEND Winter wind Summer wind
6
6 March 7
8
1
12 1 2
11 1
Dec. SE S
Sun path
City planner Robert Moses, known as the
series of recreational swimming pool centers throughout the city. The Highbridge Pool and Bathhouse, opened in 1936 and still in use, is located within Highbridge Park at
9 10 10
Water
“master builder” of mid 20th century New York created a
E
W
Overlap
Amsterdam Avenue between West 172nd and West 174th Streets. Perched high above the city, Highbridge offers extraordinary views of the Harlem River valley, the High
S
1:4000
Bridge, and the stone water tower. Like Moses’ numerous other pools the Highbridge Pool and Bathhouse is an open air pool and its use is limited to a few summer months. The goal is the design of a long span roof and enclosure for this pool.
18
ANALOG FORM FINDING MODELS tensile fabric kast studies
compression ring cast studies
19
D I G I TA L F O R M F I N D I N G
Y X
X
X
Y
X
X
X X
Y
Y
X
Y
X X
X
X
X
X
X
X X
X
X
The advancement of structures through computational methods allows a far more explorative approach which translates to larger enriched designs. By engaging in new ways of understanding structural design we were exposed to basic ideas of structural form finding in combination with the analysis of physical and digital structural models. We will study the design of parametric structures involving cuttingedge theories and techniques. These explorations were supported by tools for parametricized structural design and structural optimization. We were prompted to develop innovative form finding techniques and structural design through digital computation. Ultimately, produced speculative models that integrate the use of contemporary tools for design and fabrication in the production of structural driven forms.
20
computational stress analysis
21
planarity deviation studies
22
C U S T O M D E S I G N E D D E TA I L S
lock in place unit detail
four unit intersection
frited etfe panelization
interior pool rendering
24
cap
cap seal
keder rope base seal
lid profile
aluminum extrusion
stanchion base
canister
25
wall section detail
AIR SUPPLY VALVE EXTRUDED ALUMINUM FRAME HIGH PRESSURE AIR TUBE
WELDED STEEL SUPPORT PLATE
BOLT ROTATION GROOVE UNIT ROTATION POINT SLIP CRITICAL BOLT [TYP] TRIPPLE LAYER ETFE CUSHION
3/8” HIGH STRENGTH STANLESS STEEL
18” CHS COMPRESSION RING ANGLED STEEL FLANGE SUPPORT
GRANITE SETT DRAINAGE DITCH
26
exterior pavilion night rendering
west section perspective
27
north park rendering
south park rendering
28
post production photo in situ
PLASTIC FLOWERS C O M P U TAT I O N A L D E S I G N B U I L D P A V I L I O N
DURATION: 6 weeks design +6 weeks production PROFESSORS: Jonathan Scelsea TEAM: Ermir Gjoka, Tony Fung Cheung, Daniel Escobar, Destiny Conely LOCATION: New York, New York CLIENT: NYC Parks Department
31
PLASTIC FLOWERS C O M P U TAT I O N A L D E S I G N B U I L D P A V I L I O N
Plastic Flowers began as a study of curved
folding as a methodology of creating a volumetric structural unit from sheet material, requiring minimal fastening and maximum space. The pavilion is formed from 100 “petal” units each constructed from an individual piece of .0625” thick density polyethylene. Two petals each were cut from a 2’ x 4’ sheet and etched to .032” depth using a CNC 3 axis router. The figural arc groove contour is created with a V-Groove tool-bit that when folded forms the rigid structure of this “Petal brick.”
Geometrically, the petals each are contained
within an octahedral bounding box which is locked to a geodesic grid around a sphere. The chosen geodesic grid is a triangulation of Goldberg’s Icosahedral Polyhedra of the 3rd order, featuring regular pentagons, and two six sided figures, one regular hexagon and one irregular. As a result of the tessellation, each octahedral and its contained petal, span from a hexagon to a hexagon or from the hexagon to the pentagon resulting in 2 unit types. Three petals, 2 hex units and 1 pent unit, join together at a half-lap joint using nylon socket bolt-screws, to form a cluster of three resembling a flower.
32
33
D I G I TA L + A N A L O G U E A P E R T U R E S T U D I E S
34
petal [unit]
material mock-up
35
flower [component, 3 units]
rose [ c l u s t e r, 1 8 u n i t s ]
cnc cut sheets
unit assembly details
36
view from within pavilion
Five flowers themselves come together to form a larger rose-component, using inner and outer brackets. This staged construction methodology of brick, cluster and larger component makes for easy transport to and from a deployment site, requiring only the 7 roses to be carried and snapped together. The Pavilion meets the ground utilizing custom half-units and feet designed to be scoop seating.
37
exploded cluster
front elevation
38
object nested on site
39
view from within pavilion
40
post production photo in situ
LIMINARY TEST FITS
MENITIES 2ND FLOOR TEST FIT 2nd floor plan test fit
NEW YORK CENTRAL LABOR CO 43
NYC LABOR COUNCIL P R O G R A M M I N G A N A LY I S I S A N D T E S T F I T S
DURATION: 6 weeks OFFICE: Spcaesmith TEAM: Julia Libby, Elisabeth Post Marner LOCATION: 110 William Street - New York, New York CLIENT: New York Central Labor Council
BUILDING CORE CIRCULATION SHARED SPACE STAKEHOLDER 1
58 SEATS
TOTAL
58 SEATS
44
110 WILLIAM STREET pre-programming test fits
low density
LOW DENSITY
VS.
111 Seats total
NEW YORK CE
high density 45
VS.
HIGH DENSITY 143 Seats total
NYC LABOR COUNCIL
SURVEY RESULTS
CURRENT WORKPLACE PROGRAMM I N G A N A LY I S I S A N D T E S T F I T S SUPPORT IN PLACE
SUPPORT CURRENTLY IN PLACE
SUPPORT NEEDED
SUPPORT NEEDED
The New York City Central Labor Council
commissioned Spacesmith with the task of designing a space they acquired at 110 William Street. While the
92%
employees surveyed saysome that NYCCLC is comprised of Of many union divisions, only
the design of their workplace is important
participants wanted to become stakeholders in this
“shared space” concept their developer was proposing.
PERSONAL WORK SPACE
DPT. ADJACENCIES
SOCIAL GATHERING
MULTIPURPOSE VENUE
The concept started as a way to give smaller unions the
YOUR CURRENT WORKSPACE
ability to scale don their rentable square footage in terms 69%
It's a place I'm proud to bring visitors to
of workspace and office and gain more space in storage, It creates an enjoyable environment to workspace. in meeting, and amenity LARGE MTG. ROOMS
SMALL PANTRY
HUDDLE / SMALL MEETING ROOMS
PHONE BOOTHS
73% 78%
It enables me to work productively
The exercise started with a series of
73%
pre=programming low density and high density test-fits
It contributes to a sense of community at work
andofamyvisioning session The design workplace is important to mefor
the space at 110 Water Street to
get a sense of which unions would want to participate. The STORAGE
MAIL/ COPY CENTER
SHARED AND CLOUD BASED STORAGE
next exercise was preliminary interviews, surveys, and post programming test-fits for the confirmed stakeholders. High density test-fits were developed to reduced the amount of usable square footage in their workspace and maximize shared/amenity space.
NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018
46
SURVEY RESULTS
PERCENTAGE OF PARTICIPATING STAKEHOL
ONLINE SURVEY SUMMARY
12% 7% 0% 2% 0%
42%
10% 0%
26%
14%
2% 0% 2%
9%
OF ALL STAFF RESPONDED
Did not respond
Responded
STUDY DEMOGRAPHICS
PARTICIPANTS BY UNION
AGE GROUP
Leadership and all staff surveys were sent to 13 unions for a total of +/- 215 people. 56 responses were received for a total of 26%.
24 of 51 5 of 13 1 of 55 0 of 8 1 of 18 8 of 12 0 of 17 6 of 7 0 of 15 1 of 3 0 of 4 4 of 5 7 of 7
2% 30% 33% 35%
EMPLOYEE TYPE 86% Part time 14% Full time 0% Intern or volunteer
CWE Local 210 CWA Local 1180 OPEIU International OPEIU Local 153 CLC NYCOSH ALIGN UAW Region 9A UAW Local 1981 UAW Local 2110 UAW Local 2320 UAW Local 7902
23 or younger (Gen Z) 24-38 (Millennial or Gen Y) 39-53 (Gen X) 54 & up (Baby Boomer)
YEARS WITH UNION 41% 14% 35% 10%
0-5 Years 5-10 Years 10-20 Years 20+ Years
NEW YORK CENTR
47
ONLINE SURVEY SUMMARY
PERCENTAGE OF PARTICIPATING STAKEHOLDERS
N
80 tional 53
A 81 10 20 02
PERCENTAGE OF PARTICIPATING STAKEHOLDERS CWE
12%
Local 210
12%
CWA Local 1180
7%
OPEIU International
7%
2%
OPEIU Local 153
0% 2% 0%
42%
42%
CLC
10%
NYCOSH
10%
ALIGN UAW Region 9A
0%
26%
14%
2% 0% 2%
9%
UAW Local 1981
14%
UAW Local 2110
9%
UAW Local 2320
2%
UAW Local 7902
2%
PERCENTAGE STAKEHOLDERS REFLECTED IN SURVEY
OF ALL STAFF RESPONDED
PERCENTAGE OF PARTICIPATING STAFF PER STAKEHOLDER 100%
UAW LOCAL 7902
AGE GROUP 2% 30% 33% 35%
UAW LOCAL 2110
23 or younger (Gen Z) 24-38 (Millennial or Gen Y) 39-53 (Gen X) 54 & up (Baby Boomer)
YEARS WITH UNION
80%
UAW LOCAL 2320
0% 33%
UAW LOCAL 1981 UAW REGION 9A
0% 86%
ALIGN NYCOSH
0% 67%
CLC
6%
OPEIU LOCAL 153
41% 14% 35% 10%
0-5 Years 5-10 Years 10-20 Years 20+ Years
OPEIU INTERNATIONAL
0%
CWA LOCAL 1180
2% 38%
LOCAL 210
47%
CWE 0%
20%
40%
60%
80%
100%
120%
PERCENTAGE OF PARTICIPATING STAFF PER STAKEHOLDER
NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 6
48
stakeholder surveys
SURVEY RESULTS
WORK MODES
WORK MODES
WORK MODES
WORK MODES
During an average work week, 39% of all staff in the office spend the most time doing focused work, followed by 24% doing collaborative work. 20% spend the most time learning, and about 17% spend the most time on Social Interactions work mode. WORK WORK MODES MODES
COLLABORATIVE
COLLABORATIVE
LEARNING
LEARNING
WORK MODES
39%
24%
20%
17%
Focus
Collaborative
Learning
Social
You work with others to achieve common goals.
Structured and independent learning.
Social activities that improve personal well-being and relationships internally and with outside visitors.
FOCUSED
COLLABORATIVE
SOCIAL SOCIAL
FOCUSED FOCUSED
SOCIAL
LEARNING
Individual focused work tasks that require concentration and minimal disruption.
FOCUSED
FOCUSED LEARNING LEARNING
SOCIAL COLLABORATIVE COLLABORATIVE
SOCIAL NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 7
49
COLLABORATIVE
LEARNING
SURVEY RESULTS
WORK f o c u s e dFOCUSED work
47% 47% 62%
71%
SOCIAL
FOCUSED
Of employees surveyed say they spend less than 4 hours per week away from their desk WORK MODES
Of employees surveyed say they spend less than 4 hours per week on confidential discussions
Of employees surveyed say they spend about 4 -10 hours per week on telephone conversations
4%
19%
6%
NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 9
collaborative work SURVEY RESULTS COLLABORATIVE COLLABORATIVE WORK
LEARNING
49%
53% 63% 82% 80% FOCUSED
Of employees surveyed say they spend about 4 hours per week in planned meetings
SOCIAL
Of employees surveyed say they spend about 4 hours per week in informal meetings
Of employees surveyed say they spend less than 4 hours per week in larger group meetings or audiences
Of employees surveyed say they do not spend any time using video conferencing
31%
18%
2%
NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 10
50
stakeholder surveys
SURVEY RESULTS
ROOM TYPES AND USAGE
Chart 5%Title
7% 13% 3% 6%
11%
32%
52%
10-15 p mtg 15-20 p mtg 20-35 p mtg 50-100 p mtg
23%
100+ p mtg
48% 10-15 p mtg
15-20 p mtg
20-35 p mtg
52%
50-100 p mtg
100+ p mtg
Of large reoccurring meetings are 10-15 person meetings
100% Quiet rooms for working alone Informal work / break out zones
During interviews, stakeholders agreed that most large meeting rooms would be part of the shared amenities floor Most expressed the need for smaller meeting rooms and private quiet rooms within their designated space
53%
16%
57%
22%
Meeting rooms (large)
58%
Meeting rooms (small) Room booking system
% Importance of feature
80%
60% 36%
% Satisfaction with current features
82%
65%
NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 15
51
SURVEY RESULTS
LEARNING
47%
learning
LEARNING
18% 51% SOCIAL
Of employees surveyed say they spend about 5-10 hours per week learning from others
Of employees surveyed say they spend about 4 hours per week learning from others
35%
10%
8%
NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 11
LEARNING
SURVEY RESULTS
social
SOCIAL
SOCIAL
35%
59% 90%
Of employees surveyed say they spend about 4 hours per week on informal social interaction
Of employees surveyed say they spend less than 4 hours per week on relaxing or taking a break
29%
20%
16%
NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 12
52
area blocking plans + calculations PRELIMINARY TEST FITS
AMENITIES FLOOR BLOCKING DIAGRAM
KING DIAGRAMS SHARED SPACE
BUILDING CORE CIRCULATION SHARED SPACE
PRELIMINARY TEST FITS
STAKEHOLDER 1
STAKEHOLDER FLOORS BLOCKING DIAGRAMS
TOTAL
15,208 CSF 7,867 CSF 23,075 CSF
TOTAL STAKEHOLDER & SHARED: 23,075 CSF
TOTAL STAKEHOLDER & SHARED: 24,132 CSF
TOTAL S
STAKEHOLDER 1 2ND FLOOR
3RD FLOOR
4TH FL
STAKEHOLDER 2
TOTAL ALL FLOORS: 55,149 CSF
NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 22
STAKEHOLDER 8
BUILDING CORE CIRCULATION SHARED SPACE STAKEHOLDER 3
STAKEHOLDER 7
STAKEHOLDER 5/6
STAKEHOLDER 4
SHARED SPACE
2,262 CSF
STAKEHOLDER 2
7,509 CSF
STAKEHOLDER 3
3,041 CSF
STAKEHOLDER 4
1,463 CSF
STAKEHOLDER 5/6
3,733 CSF
STAKEHOLDER 7
2,290 CSF
STAKEHOLDER 8 TOTAL
TOTAL STAKEHOLDER & SHARED: 24,132 CSF
PRELIMINARY TEST FITS
3RD FLOOR STAKEHOLDER FLOORS BLOCKING DIAGRAMS
NEW YORK CENTRAL LABOR COUNC
3,349 CSF 24,132 CSF
TOTAL STAKEHOLDER & SHARED: 7,942 CSF
NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 18
4TH FLOOR
FUTURE TENANT
NEW YORK CENTRAL LABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 24 BUILDING CORE FUTURE TENANT
CIRCULATION SHARED SPACE
53
TOTAL STAKEHOLDER & SHARED: 7,942 CSF STAKEHOLDER 9
4TH FLOOR
STAKEHOLDER 10
SHARED SPACE
2,262 CSF
STAKEHOLDER 9
3,263 CSF
STAKEHOLDER 10
1,416 CSF
TOTAL
7,942 CSF
8'-0"
16'-6" 16'-6" 16'-6"
8'-6"
6'-0" 6'-0"
15'-0"15'-0"
OFFICE TYPE A 250 SF
11'-0" 11'-0"
6'-0"
8'-0" 8'-0" 8'-0"
6'-0"
6'-0"
6'-0"
7'-6"
7'-6"
8'-0" 8'-0" 8'-0" 8'-0" 19'-6"19'-6"
11'-0"
11'-0" 11'-0"
11'-0"
14'-0" 14'-0"
8'-0" 8'-0"
15'-0"
14'-0"
11'-0"
15'-0" 15'-0"
15'-0"
10'-0"
10'-0"
11'-0"
15'-0"
15'-0" 15'-0"
workplace types
8'-6" 8'-6" 7'-6" 7'-6" 8'-6"
10'-0" 10'-0" 10'-0"
8'-6"
OFFICE TYPE B 150 SF
OFFICE TYPE C 120 SF
W O R K S TAT I O N D 64 SF
W O R K S TAT I O N E 36 SF
11'-0"
10'-0" 10'-0"
10'-0"
11'-0" 8'-6"
10'-0"
OFFICE TYPE B 150 SF
8'-0"
15'-0" 15'-0" 15'-0"
7'-6"
8'-0"
8'-6"
6'-0"
15'-0"
6'-0"
7'-6"
11'-0" 15'-0"
16'-6"
6'-0"
11'-0"
14'-0"
15'-0" 15'-0"
15'-0"
15'-0"
15'-0"
14'-0"
10'-0"
15'-0" 14'-0"
8'-0"
8'-0"
19'-6" 19'-6" 19'-6"
25'-0" 25'-0" 25'-0"
19'-6"
8'-0"
OFFICE TYPE C 120 SF
W O R K S TAT I O N D 64 SF
W O R K S TAT I O N E 36 SF
15'-0"
1 -2 P E R S O N 50 SF
7'-6"
11'-0"
15'-0"
25'-0"
2-4 PERSON 125 SF
11'-0"
14'-0"
15'-0"
19'-6" 8'-6"
6'-0"
6'-0"
7'-6"
15'-0"
8'-0"
8'-0"
7'-6"
14'-0"10'-0"
6'-0"
15'-0"
8'-0"
14'-0"
15'-0"
15'-0"
11'-0"
in suite meeting room types
7'-6"
19'-6"
4-8 PERSON 150 SF
8-10 PERSON 300 SF
19'-6"
25'-0"
8'-0"
8'-0"
8'-6" 16'-6"
10'-0"
shared meeting room types
6'-0"
6'-0" 19'-0"
19'-0" 7'-6" 15'-0"
15'-0"
6'-0"
7'-6"
8'-0"
10'-0"
14'-0"
14'-0" 14'-0"
densified workplace types
26'-6" 19'-6"
25'-0"
10-15 PERSON 350 SF
26'-6"
15'-0"
1 5 -2 0 P E R S O N 450 SF 54
“ T Y P I C A L” F L O O R P L A N T E S T F I T
LIMINARY TEST FITS
PICAL FLOOR PRELIMINARY TEST FIT
NEW YORK CENTRAL LABOR CO 55
BUILDING CORE CIRCULATION SHARED SPACE STAKEHOLDER 2
39 SEATS
STAKEHOLDER 3
18 SEATS
STAKEHOLDER 4
14 SEATS
STAKEHOLDER 5
31 SEATS
STAKEHOLDER 6
21 SEATS
STAKEHOLDER 7
29 SEATS
TOTAL
152 SEATS
ABOR COUNCIL | PROGRAMMING VISIONING SESSION | JULY 25, 2018 | PAGE 21
56
key section perspective
57
M A R K E TA X E S S C O R P O R AT E O F F I C E - D D + C D
DURATION: 5 months OFFICE: Spcaesmith TEAM: Drew Miller, Julia Libby, Elisabeth Post Marner LOCATION: 55 Hudson Yards - New York, New York CLIENT: Market Axess
58
ALIGN
ALIGN
D
BA-01
4
PT-01
PT-01
PT-01
BA-01
BA-01
WD-01
BA-01
PT-01
PT-01
BA-01
BA-01
L16 (M17)_Open Area West 1/4" = 1'-0"
ISSUES NUMBER:
3 1.3
1.8
2.6
3.2
3.3
3.9
4.1
4.8
5.1
5.5
EQ
EQ
EQ
DATE:
12/15/2017 ISSUED FO 02/05/2018 ISSUED FO CONSTRUC
6.1
TYP
6A
______________________________
A-901
C EQ
BA-01
6
PT-01
?
BA-01
EQ
EQ
PT-01
BA-01
PT-01
PT-01 BA-01
EQ
PT-01
BA-01
BA-03
PT-01 BA-01
?
EQ
EQ
EQ
PT-01
BA-01
PT-01 BA-01
?
BA-03
EQ
EQ
PT-01
PT-01
PT-01
BA-01
PT-01
BA-01 BA-03
?
NORTH CORRIDOR
EQ
BA-01
BA-01
PT-01
?
PT-01
L16 (M17)_Core Wall Elevation West 1/4" = 1'-0"
KEY PLAN:
A.6
B.1
B.6
B.8
C.8
6A
D.8
D.9
E.6
E.8
TYP
______________________________
A-901
B
4D
______________________________
A-920
4' - 3 1/2"
?
8
4' - 3 1/2"
PT-01
BA-03
CENTRAL CORRIDOR
EQ
PT-01
EQ
BA-01
PT-01
BA-01
PL-01
?
EQ
EQ
PT-01
BA-01
BA-03
?
L16 (M17)_Core Wall Elevation North 1/4" = 1'-0"
PROJECT:
6.1
5.5 EQ
EQ
5.1
4.8
4.1
3.9
3.3
3.2
2.6
1.8
1.3
MARKET AXES
EQ
55 HUDSON YA NEW YORK, NY DRAWING TITLE:
EQ
ALIGN
ALIGN
EQ
A
LEVEL 16 ( ELEVATIO NORTH CORRIDOR
2' - 0"
42' - 1"
SEAL & SIGNATURE:
2' - 0"
D
P
D
J
S
PT-01
9
WF-05
BA-01
BA-01
PT-01
WF-01
BA-05
BA-05
WF-01
WF-01
BA-05
PT-01
BA-01
BA-03
BA-01
?
L16 (M17)_Core Wall Elevation East 1/4" = 1'-0"
7 ï›™ COPYRIGHT 2017
59
6
5
4
3
2
1
PT-01
D
MARKET AXESS C O R P O R AT E O F F I C E - D D + C D
MarketAxess, a leader in electronic trading of
global credit products, commissioned Spacesmith to design their new NYC office located at 55 Hudson Yards. The concept for this space was derived by the notion of “Warped Speed�, using fragmented geometry to convey changing motion. The 55,000 sqft office is located in the newly developed Hudson Yards and occupies floors 14-16 of 55 Hudson Yards overlooking the Hudson rRver, the Highline and Midtown Manhattan.
The layout of the space is meant to maximize
workspace, daylighting, accessible amenities, and meeting space while promoting a healthy work environment with lots of natural light. The buildings core acts as a central meeting space where the offices support space is located. Huddle rooms, wellness rooms, telephone booths, and storage space can be found within the central core while private offices, workstations, and conference rooms line the perimeter.
60
programmatic floor plans
Reception Meeting/Collaboration Private Office Open Office Support
Reception Meeting/Collaboration Private Office Open Office Support
Reception Meeting/Collaboration Private Office Reception Meeting/Collaboration Private Office Open Office Support
61
Open Office Support
felt panel seaming diagram
6
5
6
4
5
3
4
2
3
1
2
1
UNIKA VAEV PANEL SIZE IS 3'-11.5" X 8'-11" (THICKNESS IS UNIKA VAEV PANEL SIZE ISTHIS 3'-11.5" X 8'-11" (THICKNESS IS 0.53"). SEAM LAYOUT IS BASED ON PRODUCT. IF 0.53"). SEAM LAYOUT IS BASED ON THIS PRODUCT. IF ALTERNATE PRODUCT IS SELECTED, ARCHITECT TO ALTERNATE PRODUCT IS SELECTED, ARCHITECT TO VERIFY NEW LAYOUT. VERIFY NEW LAYOUT.
ARCH
PROJECT MANAGE PROJE
CBRE | NE C 200 PARK 2 NEW YOR N (212) 984(2 https://www h
M.E.P. ENGINEER: M.E.P.
ROBERT D 19 WESTR4 1 NEW YOR N (212) 764(2 http://www h
EQ
EQ
C.8
B.8
D.8 D.9
C.8
EQ
EQ
1' - 6" 9"
EQ
3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2"
LIGHTING DESIGN LIGHT
LIGHTING L 20 JAY ST 2 BROOKLY B (212) 796(2 www.ltgwo w
D.8 D.9
3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"
EQ
STRUCTURAL ENG STRU
1' - 6" 9"
EQ 1' - 6" 9"
B.8
B.6
EQ
WSP USA W ONE PENN O NEW YOR N (212) 687(2 http://www h
1' - 6" 9"
B.6
EQ
3' - 11 1/2" EQ EQ 3' - 11 1/2"
EQ
EQ
8' - 6"
3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2"
EQ
8' - 6"
CLOSET HALLWAY NO FELTHALLWAY NO FELTCLOSET NO FELT NO FELT
EQ 3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"
EQ
EQ
FILE ROOM FILE ROOM NO FELT NO FELT
CLOSET HALLWAY NO FELTCLOSET NO FELTHALLWAY NO FELT NO FELT
3' - 11 1/2" EQ EQ 3' - 11 1/2"
EQ
EQ
3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"
3' - 11 1/2" EQ EQ 3' - 11 1/2"
KITCHEN CONSUL KITCH
CLEVENG C 39 WESTM 3 WHITE PL W (914) 997(9 http://www h
EQ
WELLNESS WELLNESS NO FELT NO FELT
LEVEL 15 (M 16) LEVEL 15 (M 16) DIMENSION PLAN DIMENSION 253' - 1" PLAN 253' - 1" EQ
8' - 6"
EQ
SHEN MIL 417 5TH S A 4 NEW YOR N 212-710-30 2 http://www h
1' - 6" 9"
EQ
AV + ACOUSTICAL AV + A
8' - 6"
3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2" 3' - 11 1/2"
EQ
1' - 6" 9"
EQ
LEVEL 16 (M 17) LEVEL 16 (M 17) DIMENSION PLAN DIMENSION 266' - 7" PLAN 266' - 7"
3' - 11 1/2" EQ EQ 3' - 11 1/2"
1' - 6" 9"
EQ
PRO4IA P 55 BROAD 5 NEW YOR N 212-710-30 2 http://www h
8' - 6"
RESTROOM RESTROOM NO FELT NO FELT
8' - 6"
HALLWAY NO FELTHALLWAY NO FELT
1' - 6" 9"
8' - 6"
8' - 6"
IT CONSULTANT: IT CO
INFRASTRUCTURE BUILDINFRASTRUCTURE AREA BUILD AREA NO FELT NO FELT
LEVEL 14 (M 15) LEVEL 14 (M 15) DIMENSION PLAN DIMENSION 239' - 7" PLAN 239' - 7"
NUMBER:
3
1.8
2.6
1.8
3' - 11 1/2" EQ EQ 3' - 11 1/2"
3.3
3.2
3.9
3.3
4.1
3.9
4.8
4.1
5.1
4.8
5.5
5.1
5.5
EQ EQ
1' - 6" 9"
1' - 6" 9"
EQ
3.2
2.6
D
NUMB 02/0 3 18
EQ
3' - 11 1/2" EQ 3' - 11 1/2"
EQ
EQ
EQ
EQ
EQ
EQ
EQ
3' - 11 1/2" EQ 3' - 11 1/2"
EQ
EQ
EQ EQ
EQ
EQ
EQ
EQ
EQ
EQ
3' - 11 1/2" EQ EQ 3' - 11 1/2"
EQ
EQ
EQ EQ
EQ
EQ
EQ
3' - 11 1/2" EQ 3' - 11 1/2"
EQ
EQ
EQ EQ
EQ
EQ
3' - 11 1/2" EQ EQ 3' - 11 1/2"
EQ
OUTLET AND PLATE OUTLET AND PLATE COVER TO MATCH COVER ADJACENT WALLTO MATCH ADJACENT 3' - 11 1/2" EQ EQ WALL 3' - 11 1/2" EQ EQ 3' - 11 1/2" EQ EQ 3' - 11 1/2"
EQ
EQ
OUTLET AND PLATE OUTLET AND PLATE COVER TO MATCH COVER ADJACENT WALLTO MATCH WALL EQ 3' - 11 1/2" 3' - 11 1/2" ADJACENT EQ EQ 3' - 11 1/2" 3' - 11 1/2" EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
+/EQ
3' - 11 1/2" DOOR 3' - 11 1/2" +/+/3' - 11 1/2" DOOR 3' - 11 1/2" WIDTH WIDTH
3' - 11 1/2" EQ EQ 3' - 11 1/2"
+/-
EQ EQ
EQ
EQ
8' - 6"
3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"
OUTLET AND PLATE AND PLATE COVEROUTLET TO MATCH COVER TO MATCH ADJACENT WALL ADJACENT WALL EQ 3' - 11 1/2" EQ EQ EQ 3' - 11 1/2"
FLUSH DOOR TO HAVE FLUSH APPLIED FELTDOOR PANELTO HAVE APPLIED FELT PANEL EQ
EQ
3' - 11 1/2" EQ EQ 3' - 11 1/2"
EQ
EQ
STORAGE ROOM STORAGE ROOM NO FELT NO FELT
3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"
LEVEL 15 (M 16) LEVEL 15 (M 16) DIMENSION PLAN DIMENSION 253' - 1" PLAN 253' - 1"
EQ 0"1' - 6" 9"
EQ
OUTLET AND PLATE OUTLET AND PLATE COVER TO MATCH COVER ADJACENT WALLTO MATCH ADJACENT WALL 3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"
8' - 6"
EQ
LEVEL 16 (M 17) LEVEL 16 (M 17) DIMENSION PLAN DIMENSION 266' - 7" PLAN 266' - 7"
EQ
1' - 6" 9"
EQ
EQ
1' - 6" 9"
EQ
EQ
8' - 6"
EQ
EQ
8' - 6"
EQ EQ
PROJECT:
0"1' - 6" 9"
EQ
EQ
PROJ
MA
8' - 6"
3' - 11 1/2" EQ EQ 3' - 11 1/2"
8' - 6"
1' - 6" 9" 8' - 6"
EQ
8' - 6"
3' - 11 1/2" 3' - 11 1/2" EQ EQ 3' - 11 1/2" 3' - 11 1/2"
1' - 6" 9"
1' - 6" 9"
EQ
8' - 6"
8' - 6"
3' - 11 1/2" EQ EQ 3' - 11 1/2"
1' - 6" 9"
EQ
EQ
KEY
8' - 6"
8' - 6"
KEY PLAN:
PREACTION ROOMPREACTION NO FELT ROOM NO FELT
DRAWING TITLE: DRAW
FE
LEVEL 14 (M 15) LEVEL 14 (M 15) DIMENSION PLAN DIMENSION 239' - 7" PLAN 239' - 7"
SEAL & SIGNATUR SEAL
6
6
5
5
4
4
3
3
2
2
1
1
62
7
5
6
VIF
VIF
VIF
VIF
3 3' - 7 1/2"
1D A-902
VIF
4' - 3"
ALIGN
VIF
4
EQC
F
SP
F4
C L
15
EQ
EQ
______________________________
VS EQ
5' - 0"
MIC C L
EQ
A-922
F4
PT-01
CUSHION SEAMS TO ALIGN WITH CENTER OF MULLIONS
BA-01
F4
PT-01
1D
BOARD ROOM WEST ELEVATION 1/2" = 1'-0"
___________________
A-90 F
6B
EQ
______________________________
A-920
EQ
5' - 0"
6
6"
BA-01
E
5' - 0"
SP
DS
SP F4
7D A-902
1A
MIC
TYP
VS
5' - 0"
15' - 6"
______________________________
A-901
EQ
WF-04
EQC
F4
WF-04
EQ
SP
1A
______________________________
A-901
D
1C
______________________________
7
ALIGN
A-920
5
6
4
3
LEVEL 14 (M15) BOARD ROOM ENLARGE 3/8" = 1'-0"
3 WD-01 VIF
5
VIF
VIF
VIF
BA-04
BA-04
PT-01
VIF
VIF
BOARD ROOM SOUTH ELEVATION 1/2" = 1'-0"
3' - 7 1/2"
1D A-902
______________________________
EQ
EQ
EQ
A-920
EQ
ALIGN
EQ
4' - 3"
2A A-901
1B A-901
6B
7D A-902
TYP EQ
F
ALIGN
EQC
EQ
C
SP
F4
WF-04
UP
MIC
EQ
______________________________
VS
5' - 0"
C L
15
EQ
DS
5' - 0"
EQ C L
EQ
EQ
A-922
15
______________________________
A-922
1C
______________________________
A-920
F4
SP
4
BOARD ROOM NORTH ELEVATION 1/2" = 1'-0"6B
CUSHION SEAMS TO ALIGN WITH CENTER OF MULLIONS
BA-01 BA-04
PT-01
WD-01
F4
1D
___________________
A-90 F
EQ
______________________________
A-920
EQ
5' - 0"
PT-01 BOARD ROOM WEST BA-04 ELEVATION 1/2" = 1'-0"
+/- 25' - 0" VIF
B
PT-01
6
6"
BA-01
E
6
SP F4
MIC
TYP
VS
______________________________
ALIGN
7D A-902
1A
5' - 0"
15' - 6"
A-901
EQ
EQ
UP
SP
ALIGN
WF-04
EQC
F4
EQ
CF-05
WF-04
EQ
1A
______________________________
A-901
D
EQ
1C A-920 WD-01
ALIGN
______________________________
A 5C
______________________________
A-901 2A
LEVEL 14 (M15) BOARDA-901 ROOM ENLARGE 3/8" = 1'-0"
3 WD-01 WD-01
63
EQ B
EQ
EQ
EQ
BA-04 EQ
EQ
BA-04
BOARD ROOM SOUTH EAST ELEVATION ELEVATION 2 5 1/2" = 1'-0"
7 ï›™ COPYRIGHT 2017
TYP
PT-01 EQ
EQ
EQ B 1B A-901
6B
______________________________
EQ
EQ
EQ
6
EQ
EQ
A-920
5
4
1
2A LEVEL 14 (M15) BOARD ROOM ENLARG A-901 3/8" = 1'-0"
3
CANTILEVERED OVER OPENING. SEE ELEVATIONS, PLANS, RCP 5
6
VIF
VIF
VIF
VIF
3' - 7 1/2"
1D A-902
VIF
WOOD END CAP, PT-01
3
2
4' - 3"
1' - 9 1/2"
FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.
2' - 0 1/2"
B O A R D R O O1EMDETAIL R E NATDHUDDLE E R I N ROOM G , P OPEN L A NCEILING S , E L E V AT I O N S + D E TA I L
AV + ACOUSTICAL CONSULTANT:
SHEN MILSOM & WILKE LLC 417 5TH AVENUE, NEW YORK, NY 10016 212-710-3008 http://www.smwllc.com/
ALIGN
1 1/2" = 1'-0"
F6A
3' - 4 1/2"
1D
______________________________
A-902
ARC
One
PROJECT MANA
CBRE | N 200 PAR NEW YO (212) 984 https://ww
VS
EQC
KITCHEN CONSULTANT: SPK
M.E.P. ENGINEER
EQB
F4
5' - 0"
VS
EQ
EQ
SURFACE MOUNTEDF4C LED FILM ST 2' - 6"
SPK
F4
3' - 2"
NEWMAT ALUMINUM FIN EXTRUSION
F4
IT CONSULTANT
PRO4IA 55 BROA NEW YO 212-710http://ww
F4C
AV + ACOUSTIC
SPK
MIC
VS
SHEN MI 417 5TH NEW YO 212-710http://www
3' - 2"
NEWMAT DOUBLE GHOST ALUMINUM F4C RAIL
KITCHEN CONS
CLEVEN 39 WEST WHITE P (914) 997 http://ww
EQA
8"
EQ
SPK
SPK
SEE RCP
3' - 5"
3 1/2"
EQ
EQC
F4
1" 1/2"
10"
ARCHITECTURAL RETURN SLOT
WF-04
VS
3"
A-901
5' - 0"
7D A-902
1A
______________________________
WSP US ONE PEN NEW YO (212) 687 http://www
2"X3" ALUMINUM STRUCTURAL TUBEF4C
MIC
TYP
1' - 6"
15' - 6"
THREADED ROD
SPK 3' - 2"
POCKET FRAMING AS REQ, MUST NOT EQ INTERFERE WITH MOTOR UNIT AND MUST ALLOW FOR EASY ACCESS VIA ACT PANELS
2' - 6"
F
2' - 6"
5' - 0"
A-902
STRUCTURAL E
2' - 6"
1D
______________________________
EQB
PT-01
SPK
2' - 6"
3' - 2"
BA-01
LIGHTIN 20 JAY S BROOKL (212) 796 www.ltgw
F4C BLOCKING AND FRAMING AS REQUIRED TO SUPPORT NEWMAT CLG COMPONENTS PER F4C MANUFACTURER INSTALLATION DETAILS.
5' - 0"
DS
NEWMAT WALL GHOST ALUMINUM RAIL
ACT CEILING AS SCHEDULED
LIGHTING DESIG
21' - 9 1/4"
F4
GWB; PT-01
CUSHION SEAMS TO ALIGN WITH CENTER OF MULLIONS
CROSS BRACING AS F4C REQUIRED TYP. 2' - 6"
______________________________
3' - 2"
C L
15 SURFACE MOUNTED A-922 LED FILM
MIC
3' - 2"
MIC
ACT INFILL CEILING
CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD ROBERT 19 WEST WHITE PLAINS, NY 10606 NEW YO (212) 764 http://ww (914) 997-9660 http://www.cfldesign.com
SPK
EQA
EXISTING BUILDING STRUCTURE
3"
F6A
1C
ALIGN
2' - 6 1/2"
DOUBLE LAYER ACT0B6 MICROPERFORATED ACOUSTIC, SEMITRANSPARENT WHITE MEMBRANE
SKYFOLD PANELS WITH COM FABRIC FINISH TBD
PT-01
1' - 9 1/2"
FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT. 1B A-901
2' - 0 1/2"
6B
______________________________
VIF
2A A-901
VIF
PLANNING
PROJECT MANAGER:
EQA
3
UP
. 1 5/16"
A-901
1' - 6"
EQ
EQ
D
1A
EQ
WF-04
DRAWING TITLE
ALIGN
MIC
VS
______________________________
A-901
EQ
A
3
CAM
V
A-920 3
A
V
6
F4
5C
______________________________
LEVEL EQ 14 (M15) BOARD ROOM ENLARGED RCP EQ EQ 3/8" = 1'-0"
EQ
15' - 6" ALIGN
1A
WF-04
EQ
6"
ALIGN
1' - 6 1/2"
A-901
UP
7D A-902
F
EQ
SEE RCP WF-04
4 2
CORNER BEAD WITH SPACKLE
+/- 25' - 0" VIF
FINISHED WALL AS SCHEDULED TO CONTINUE INTO COVE
2B
ST
3' - 2"
CORNER BEAD
3
PT-01
BA-04
BA-04
PT-01
6B
______________________________
EQ
EQ
EQ
EQ
ALIGN
3 ALIGN
A-920
CORNER BEAD WITH SPACKLE
F7 LIGHT DETAIL 3" = 1'-0" EQ
F6A 1C
______________________________
SEE RCP 2 1/4"
A-920
B
CEILING AS SCHEDULED
BA-04
ELEVATOR LOBBY COFFER CLG 1B BOARD ROOM NORTH ELEVATION 4 1/2" =1 1'-0"1/2" = 1'-0"
1B A-901
5
EQ
LEVEL 14 (M15) BOARD ROOM ENLARGED RCP 3 3/8" = 1'-0"
BA-04
EQ
WD-01
2A A-901 7' - 0"
64
C L
7' - 0"
PROJECT:
EQ B
WD-01
BOARD ROOM SOUTH ELEVATION 1/2" = 1'-0"
2"
3
5
SPK
CONTINOUS BLOCKING
21' - 6 1/2"
A-803
1/8"
A
36" AFF
6
1/8"
F4
EQ EQ SCHEDULED COVE LIGHT FIXTURE
CORNER BEAD KEY PLAN:
5 3/4"
1C
______________________________
A-920
SEE RCP
EQB
A-901
6B
A-920
EQ
MIC
VS
6"
1 ______________________________
SPK
F4
CEILING AS SCHEDULED
2D A-901
36" AFF
1A
______________________________
POWER/ DATA IN TABLETOP HATCH - SEE PC PLANS
A-922
FRAMING AND EQ BRACING AS REQ
EQ
TYP
WF-04
3
15
______________________________
TAPE IN BEAD
TYP
TYP
2
EQ
2"
D ACT AS SCHEDULED, SEE RCP AND FINISH PLANS
5
7D A-902
CEILING AS SCHEDULED C TYP
______________________________
EQ
VECTOR/ CONCEALED BORDER CLIP. GC TO MAKE A CLEAN, STRAIGHT CUT AT ACT TILE
TYP
3
12/15/2017 ISSUED FOR BID BOARD ROOM SOUTH ELEVATION 02/05/2018 ISSUED FOR 1/2" = 1'-0" 3 CONSTRUCTION
PT-01
3' - 5"
3
A-902
2' - 6 1/2"
V
1DBA-04
______________________________
3' - 2"
A
BA-04
3' - 2"
SCHEDULED LIGHT FIXTURE 5 INDEPENDANTLY SUSPENDED FROM CEILING, BOTTOM OF FIXTURE TO BE FLUSH WITH SIM 8A ADJACENT CEILING A-901
7' - 0"
3
DESCRIPTION:
EQA
V
DATE:
5' - 0"
4
C L
EQ A
EXISTING BLDG STRUCTURE
ISSUES
NUMBER:
NOTE: ALL DIMENSIONS ARE TAKEN FROM FACE OF SHEETROCK (NOT FINISH FACE)
F4
LEVEL 14 (M15) BOARD ROOM ENLARGED PLAN = 1'-0"
1 PT-01 WD-01 3/8"
5' - 0"
BA-01
5 7' - 0"
EQ
______________________________
SEE RCP
DS
EQ A 20' - 0"
ALIGN
SCHEDULED COVE 6B A-920 LIGHT FIXTURE FLUSH TO COVE POCKET ARCHITECTURAL RETURN SLOT
EQ A
EQC
CUSHION SEAMS TO ALIGN WITH CENTER OF MULLIONS
2A A-901
7' - 8 1/2"
BOARD ROOM WEST ELEVATION 1B 1/2" = 1'-0" 6 A-901
HOLD
6
2A A-901
EQ
EQ B
6"
PAINT INTERIOR SURFACES BA-01 PT-01 MATTE WHITE E
EQ
3' - 2"
5
EQ
3
EQ
ST
SPK 5' - 0"
A-901
SEAL & SIGNAT
3' - 2"
V
E E
KEY PLAN:
1C
______________________________
A
PROJECT:
M SPK
RS
2' - 6 1/2"
ALIGN
F4
CEILING RECESS LINEAR LIGHT FIXTURE 3" = 1'-0" C L
15
______________________________
TYP
A-902 TYP
T
EQ
1C
F6A
2D A-901
CEILING AS SCHEDULED
. O.C 2 3/4"
7D A-902
______________________________
EQ
WOOD SLAT CLNG DETAIL 1 1/2" = 1'-0"
EQ
F6A
1D
1A
______________________________
ALIGN
SPK
PT
3' - 4 1/2"
3
15' - 6"
ALIGN
BA-01
4' - 3"
EQ
SEE RCP
CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD FLOOR WHITE PLAINS, NY 10606 (914) 997-9660 http://www.cfldesign.com
CEILING AS SCHEDULED
VS
3' - 7 1/2"
EQ
SHEN MILSOM & WILKE LLC 417 5TH AVENUE, NEW YORK, NY 10016 212-710-3008 http://www.smwllc.com/
2
21' - 6 1/2"
3
CUSHION SEAMS TO ALIGN WITH CENTER OF MULLIONS
ST
ALIGN
AV + ACOUSTICAL CONSULTANT:
KITCHEN CONSULTANT:
EQ
EQA
MIC
C L
15
A-922
7' - 8" 3' - 2"
6B
A-920
A-922
EQ
TYP
EQB
6"
4
PT-01
______________________________
3' - 5"
3C WD-01C L
2D A-901
KEY PLAN:
WF-04
EQ
TYP
3
PRO4IA 55 BROAD STREET, 16TH FLOOR
EQ
EQB
2
5
3/8"
2' - 6" 2' - 6"
SPK
12/15/2017 ISSUED FO 01/19/2018 ADDENDUM 02/05/2018 ISSUED FO CONSTRUC
______________________________
EQC
VIF
SPK
3' - 2"
1"
EQA
EQC
EQ
VIF
IT CONSULTANT: BA-01
F4C
CEILING AS F4 SCHED. EQ
VIF
A-803
YORK, NY 10004 BOARD ROOM NEW WEST ELEVATION 212-710-3008 1D 6 1/2" http://www.pro4ia.com A-902= 1'-0"
F4C
3' - 2"
5' - 0"
CF-05
DATE:
SIM
8A
A-901
4 6
WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 (212) 687-9888 http://www.wsp.com
POWER/ DATA IN TABLETOP HATCH - SEE PC PLANS
VIF
SEE SCHEDULED LIGHT FIXTURE
ALIGN
VIF
MIC
VS
2 3
3
STRUCTURAL ENGINEER:
F4C
CEILING SUSPENSION SPK FRAME F4 SEE RCP
21' - 9 1/4"
F4C 2' - 6"
3' - 2"
5' - 0"
F
NUMBER:
EQ
LIGHTING WORKSHOP 20 JAY STREET - SUITE 500, BROOKLYN, NY 11201 (212) 796-6510 www.ltgworkshop.com
KINDORF CEILING GRID SYSTEM, ALL SIDES PAINTE BLACK 5 WD-01 VENEER SLAT 1"X12" DEEP E
2' - 6"
3' - 2"
A-902 APPROVED PENCIL VIF ROD
ED WALL AS DULED TOF NUE INTO COVE
EQ
5' - 0"
6
WD-01
1D
______________________________
EQ
LIGHTING DESIGN:
APPROVED PENCIL ROD
SPK F4C
SEE WALL PARTITION 7 BA-04 F4 SCHEDULE
15
A-922
2' - 6" 2' - 6"
ST
SPK
DS
3
ALIGN
UP ROBERT DERECTOR ASSOCIATES 19 WEST 44TH STREET 12TH FLOOR, NEW YORK, NY 10036 (212) 764-7272 http://www.derector.com C L
______________________________
F4C
3' - 2"
F4
G AS DULED
LINE OF STRUCTURE
3 5/16" . +/- 25' - 0" VIF
EQB
6"
A-920
SEE RCP
MIC F4C
______________________________
TECTURAL RN SLOT
12 02
M.E.P. ENGINEER:
3' - 2"
5' - 0"
VS
V
ALIGN
EQC
SPK
MIC
1C
3
CBRE | NEW YORK TRI-STATE REGION PROJECT MGMT 200 PARK AVENUE, 20TH FLOOR NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/
F4
DULED COVE FIXTURE FLUSH VE POCKET
3
ï›™ COPYRIGHT 2016
VS
1D A-902
VIF
ISSUES
1' - 6 1/2"
A-902
V
A
EQ
F
3' - 4 1/2"
1D
______________________________
VIF
EQ
ALIGN
One New York Plaza, Suite 4200 New York, NY 10004 Ph: 212 620 5583 www.spacesmith.com
F6A
VIF
7' - 0"
INTERIOR DESIGN A
SPK
C L
7' - 0"
ARCHITECTURE
WF-04
VIF
NUMBER:
A-920
EQ
5' - 0"
EQ
36" AFF
EQ
5
36" AFF
4' - 3"
EQ
6
HOLD
BA-04
1
EQ B
BA-04 3' - 7 1/2"
NEWMAT CLNG2DETAIL 1D 1 1/2" = 1'-0"
ALIGN
3
EQ
5
EQ
7
LEVEL 14 (M15) BOARD ROOM ENLARGED RCP 3/8" = 1'-0"
3
7' - 8 1/2"
A-920
HOLD
______________________________
INTERIOR SURFACES WHITE
Q
4
PRO4IA 55 BROAD STREET, 16TH FLOOR NEW YORK, NY 10004 212-710-3008 1 http://www.pro4ia.com
V
3
A
V
3
MARKET AXES
F E AT U R E W A L L D E S I G N M O D E L , E L E V AT I O N , P L A N + D E TA I L S
65
5
4
3
2
4
2 1/2" 14 GAUGE MTL STUD SPACED @24" O.C
SEE SCHEDULED PARTITION
A-940
MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTURE FOR MOUNTING WOOD VENEER PANELS. SPACING AS REQUIRED.
6" 14 GAUGE MTL STUD SPACED @12" O.C
ARCHITECTURE
6 5/8"
CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01
INTERIOR DESIGN
COPYRIGHT 2016
1' - 0"
1' - 11 5/8"
1' - 11 1/2"
PLANNING
One New York Plaza, Suite 4200 New York, NY 10004 Ph: 212 620 5583 www.spacesmith.com
5"
CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01
ANGLE SUPPLIED & BY G.C. TO E 1/8" AFF. SATIN ALUMINUM
PROJECT MANAGER:
5"
3 A-940
CBRE | NEW YORK TRI-STATE REGION PROJECT MGMT 200 PARK AVENUE, 20TH FLOOR NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/
WOOD VENEER PANEL BY MILLWORKER
FEATURE WALL DETAIL - PLAN 3/4" = 1'-0"
2
M.E.P. ENGINEER:
S 5/8" MDF, WD-01
ROBERT DERECTOR ASSOCIATES 19 WEST 44TH STREET 12TH FLOOR, NEW YORK, NY 10036 (212) 764-7272 http://www.derector.com
20' - 0" V.I.F
EQ
EQ
LIGHTING DESIGN:
+2"
LIGHTING WORKSHOP 20 JAY STREET - SUITE 500, BROOKLYN, NY 11201 (212) 796-6510 www.ltgworkshop.com
+12"
24.23 °
24.23°
+12"
TITION WALL
STRUCTURAL ENGINEER:
4' - 6"
7
WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 (212) 687-9888 http://www.wsp.com
5
6
4
IT CONSULTANT:
A
6 5/8"
KITCHEN CONSULTANT:
1/1
5"
CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD FLOOR WHITE PLAINS, NY 10606 (914) 997-9660 http://www.cfldesign.com
5 A-940
6"
45.0 0°
4' - 6"
5/8" GWB
1' - 0"
+8"
5"
SHEN MILSOM & WILKE LLC 417 5TH AVENUE, NEW YORK, NY 10016 212-710-3008 http://www.smwllc.com/
VERTICAL ANGLE SUPPLIED & INSTALLED BY G.C. TO TERMINATE 1/8" AFF. SATIN BRUSHED ALUMINUM
F
CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01
AV + ACOUSTICAL CONSULTANT:
CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01
1' - 11 1/2"
11 4.2 3°
24.23 °
+2"
24.23°
+2" CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01
1' - 11 5/8"
° .77 65
PRO4IA 55 BROAD STREET, 16TH FLOOR NEW YORK, NY 10004 212-710-3008 http://www.pro4ia.com
+12"
ALIGN
ALIGN
+12"
11 4.2 3°
9.93°
LED ON
SEE SCHEDULED PARTITIONS +12"
+2"
24.23 °
+2" 6" 14 GAUGE MTL STUD SPACED @12" O.C
+12"
FEATURE WALL DETAIL - CORNER CONDITION AT PARTITION WALL 6" = 1'-0"
6
4' - 6"
+8"
GE MTL STUD O.C
24.23 °
3° 4.2 11
E
ISSUES NUMBER:
4' - 6"
4
3
2 A-940
3
28.63 °
5"
2 3/4"
6 5/8" 1' - 0"
A-940
WOOD VENEER PANEL BY MILLWORKER ALIGN
2 5
+12"
3
FEATURE WALL DETAIL - PLAN 3/4" = 1'-0"
FEATURE WALL DETAIL - CONCEALED LIGHTING 3" = 1'-0"
20' - 0" V.I.F
2 1/2" 14 GAUGE MTL STUD SPACED @24" O.C
3' - 6 3/4"
6 A-940
EQ
SEE SCHEDULED +12" WALL PARTITION
+8"
FEATURE WALL DETAIL - CORNER CONDITION AT PARTITION WALL 6 6" = 1'-0"
6" 14 GAUGE MTL STUD SPACED @12" O.C
+2"
4' - 6"
2 ° .77 65
5
MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTUREFOR MOUNTING WOOD VENEER PANELS. SPACING AS REQUIRED.
24.23 °
+12"
1' - 0"
2' - 0"
24.23 °
4' - 6"
2 1/2"
1 3/4"
3° 4.2 11
PROJECT:
+8"
55 HUDSON YARDS NEW YORK, NY 10001
+2"
WOOD VENEER PANEL BY MILLWORKER, WD-01 FINISH DRAWING TITLE:
2 3/4"
CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01
12/15/2017
PROJECT NO:
16322
5/8"
3' - 6 3/4"
3
4
SEE SCHEDULED WALL PARTITION
FEATURE WALL DETAIL - CONTINOUS WASH LIGHT DETAIL 2 3" = 1'-0"
1 2' - 0"
B
+2" 6"
6" 14 GAUGE MTL STUD SPACED @12" O.C
5"
+2"
MF,DM
As indicated
A-940.00
4' - 6"
2 1/2" 14 GAUGE MTL STUD SPACED @24" O.C
CHECKED BY:
DRAWING NO:
+8"
0"
+2"
PAGE__ OF__
11 4.2 3°
+12"
+12" 1' - 0"
3' - 6 3/4"
4' - 6"
SCALE:
WD-01
9.93°
4
4"
24.23 °
6 A-940
FEATURE WALL - ELEVATION 1 3/4" = 1'-0"
JL,MV,CL
TYPE F3 COVE LIGHT; SEE LIGHTING SCHEDULE +12"
+2"
+12"
FEATURE WALL DETAIL - CONCEALED LIGHTING 3" = 1'-0"
ALIGN
DATE:
SEAL & SIGNATURE:
41.5 4°
2"
5"
3
A-9
° 24.23
+12"
A-940
+2"
MINIMUM CLEARANCE FROM FACE
3"
4"
DRAWN BY:
5
5
4' - 6"
LIGHTING FIXTURE CONCEALED BEHIND MILLWORK WALL SEE DETAIL (TYP)
ALIGN
MILLWORK PANELS OF VARIOUS SIZE AND PITCH, WD-01 FINISH
5
+12"
MARKET AXESS - 55 HY
FEATURE WALL DETAILS
MINIMIZE
4' - 6"
REMOTE POWER SUPPLY OF F9 FIXTURE TO BE LOCATED IN AN ACCESSIBLE AND VENTILATED LOCATION
+2"
11 4.2 3°
MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTURE FOR MOUNTING WOOD VENEER PANELS. SPACING AS REQUIRED.
24.23°
5/8" MDF
24.23°
ALIGN
SCHEDULED F9 TO BE SURFACE-MOUNTED ONTO BLOCKING LOCATED BEHIND LIP OF FEATURE PANEL AS SHOWN
65 .77 °
CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01
C
A-940
+12" +2"
24.23 °
4' - 6"
A-940 +8"
WOOD VENEER PANEL BY MILLWORKER
LIGHTING FIXTURE CONCEALED BEHIND MILLWORK WALL SEE DETAIL (TYP)
5/8" MDF
6 5/8"
METAL STUD BOX BEAM SECURED TO EXISTING SLAB EDGE
MITERED CORNER
+12"
4' - 6"
+12"
11"
SEE SCHEDULED PARTITIONS
13.10°
5/8"
24.23 °
2"
24.23°
3"
MAX
5"
+12"
3"
2"
5/8"
3° 4.2 11
MAX
+12"
11"
SEE SCHEDULED WALL PARTITION METAL STUD BOX BEAM SECURED TO EXISTING SLAB EDGE 5
EXISTING BUILDING SLAB
2
MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTUREFOR MOUNTING WOOD VENEER PANELS.+2" SPACING AS REQUIRED.
+12"
MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTURE FOR MOUNTING WOOD VENEER PANELS. SPACING AS REQUIRED.
MITERED CORNER
WOOD VENEER PANEL BY MILLWORKER, WD-01 FINISH ALIGN
4' - 6"
5/8" MDF 3
3"
TYPE F3 COVE LIGHT; SEE LIGHTING SCHEDULE
+2" 11 4.2 3°
WD-01
FEATURE WALL DETAIL - CONTINOUS WASH LIGHT DETAIL 3" = 1'-0"
7 COPYRIGHT 2017 2' - 0"
+12"
66
3' - 6 3/4"
FEATURE WALL DETAIL -SECTION A 3" = 1'-0" 4' - 6"
5/8"
11"
28.63 °
+12"
2"
5"
° .77 65
ALIGN
° 24.23
SEE SCHEDULED WALL PARTITION
MINIMUM CLEARANCE FROM FACE
4' - 6"
A-940
A
3
4
+2"
WOOD VENEER PANEL BY MILLWORKER
FIRE CAULKING TO MAINTAIN 2HR RATING
4"
° 24.23
2' - 0"
ALIGN
A-940
CONTINOUS WOOD LIGHT COVE, FINISH IN WD-01
A-940
4' - 6"
6 5/8"
LIGHTING FIXTURE CONCEALED BEHIND MILLWORK WALL SEE DETAIL (TYP)
4' - 6"
FIRE CAULKING TO MAINTAIN 2HR RATING
5/8" MDF
1' - 0"
1' - 0"
EQ +2"
+2"
2' - 0" +2"
KEY PLAN:
+2"
3' - 6 1/2"
11 4.2 3°
ALIGN 4"
° 24.23
4' - 6"
1 3/4"
+12"
D
6" 14 GAUGE MTL STUD SPACED @12" O.C
+12"
° .77 65
TAIL
24.23°
+2"
CONTINOUS 5/8" MDF, FINISH IN WD-01 BY GC
WD-01
SEE SCHEDULED PARTITION
A-940
24.23 °
6"
MILLWORK PANELS OF VARIOUS SIZE AND PITCH, WD-01 FINISH
ALIGN
4
ALIGN
5"
A-940
MINIMUM CLEARANCE FROM FACE
TYPE F3 COVE LIGHT; SEE LIGHTING SCHEDULE
1' - 11 5/8"
REMOTE POWER SUPPLY OF F9 FIXTURE TO BE LOCATED IN AN ACCESSIBLE AND VENTILATED LOCATION
3
5/8" GWB
1/1
45.0 0°
4' - 6"
VERTICAL ANGLE SUPPLIED & INSTALLED BY G.C. TO TERMINATE 1/8" AFF. SATIN BRUSHED ALUMINUM
1' - 11 1/2"
WOOD VENEER PANEL BY MILLWORKER, WD-01 FINISH
MINIMIZE
2 1/2"
SCHEDULED F9 TO BE SURFACE-MOUNTED ONTO BLOCKING LOCATED BEHIND LIP CONTINOUS WOOD LIGHT OF FEATURE PANEL AS SHOWN COVE, FINISH IN WD-01
+2"
2 1/2" 14 GAUGE MTL STUD SPACED @24" O.C
4' - 6"
24.23°
+2" +12"
DESCRIPTION:
2
2
MDF RIB STRUCTURE OR ALTERNATE APPROVED SUB STRUCTURE FOR MOUNTING WOOD VENEER PANELS. SPACING AS REQUIRED.
DATE:
12/15/20 ISSUED FOR BID 17 01/19/20 ADDENDUM 2 18 CONTINOUS WOOD LIGHT 02/05/20 ISSUED FOR CONSTRUCTION COVE, FINISH IN WD-01 18
3' - 6 3/4"
5
6
24.23 °
11"
LIGHTING FIXTURE CONCEALED BEHIND MILLWORK WALL SEE DETAIL (TYP)
7
5/8" MDF
4' - 6"
4' - 6"
3' - 6 1/2"
CONTINOUS 5/8" MDF, FINISH IN WD-01 BY GC
3' - 6 3/4"
41.5 4°
24.23°
+12"
FEAT 3/4" =
2
+2"
"
0"
1
6
5
4
+8"
1
FEAT 3/4" =
PLAN
FRONT
BACK
67
PL-01 PANEL CONTINUOUS EQ TO UNDERSIDE OF COUNTER
EQ
EQ
2"
WORK DETAIL - 36IN RECEPTION DESK - 3 DRAWER -0"
EQ
R E C E P T I O N D E S K D E S I G N M O D E L , E L E V AT I O N S , P L A N + D E TA I L S LINE OF FINISHED FLOOR
3 3/4"
MILLWORK DETAIL - LOW 24IN RECEPTION DESK - 1 DOOR 1" = 1'-0"
1 1/2" DIA GROMMIT HOLE. LOCATION TO BE COORDINATED IN FIELD
MILLWORK DETAIL - 24IN RECEPTION DESK - OPEN 1" = 1'-0"
16
8' - 3 1/2"
PL-01
WD-02 COUNTERTOP ON PLYWOOD SUBSTRATE
2"
6"
A-925
2"
10
A-925 BAL.
ALL EXPOSED/ SEMI EXPONSED SURFACES AS SCHEDULED. SEE ELEVATIONS.
2"
A-925
2"
MILLWORK (M19)_RECEPTION DESK - ENLG PLAN 9 1" = 1'-0" 2"
PL-01
WD-02
PL-01 BASE
PL-01 9"
9"
LINE OF FINISHED FLOOR
2"
LINE OF FINISHED FLOOR 2"
MILLWORK DETAIL - 36IN RECEPTION DESK - OPEN PL-01 1" = 1'-0"
13
PL-01
B
MILLWORK DETAIL - 36IN RECEPTION DESK - 3 DRAWER 1" = 1'-0"
2"
14
6
13.02°
3' - 6"
WF-02
ALL SEMI EXPOSED INTERIOR CABINET SURFACES TO BE MELAMINE U.O.N
12
WD-02 2"
3"
INTERIOR SURFACE OF DRAWER TO BE WHITE MELAMINE A-925
2" RECESSED ANGLED PANEL MOUNTED WITH CLEATS TO PERPENDICULAR PANELS - WD-01.
1' - 9"
BAL
2"
TYP
1' - 3"
EQ PL-01 PANEL CONTINUOUS TO UNDERSIDE OF COUNTER
2' - 10"
EQ
3F A-920
15' - 0"
A-925
2"
EQ
13.02°
______________________________
MILLWORK CABINET BEYOND
A-925
______________________________
A-925
1" REVEAL
RECESSED ANGLED PANEL 1' - 9" MOUNTED WITH CLEATS TO PERPENDICULAR PANELS ; WD-01 WD-02
OUTLETS AND COVERPLATES TO MATCH ADJACENT FINISH
15
16
______________________________
18
______________________________
SURFACE MOUNTED F5 LIGHTING
6"
CONTINOUS MTL ANGLE 17
WD-02 COUNTERTOP ON PLYWOOD SUBSTRATE
3' - 6"
ESSED PANEL; WD-01
WD-02 COUNTERTOP ON PLYWOOD 36" AFF SUBSTRATE
2' - 0"
LEVEL 14 (M15) WEST RECEPTION DESK - EAST 10 1/2" THICK GREY FELT PANEL; WF-02 1" = 1'-0"
2"
1 1/2"
WD-02 COUNTERTOP ON PLYWOOD SUBSTRATE
SURFACE MOUNTED F5 LIGHTING
2"
2"
LEVEL 14 (M15) WEST RECEPTION DESK - SOUTH 1/2" THICK GREY FELT PANEL; WF-02 11 1" = 1'-0"
1' - 2"
TYP
4F A-920
2"
1' - 2" 2' - 0"
2" 2' - 0"
C
CKING AS REQ.
2"
PL-01
WD-02
02 COUNTERTOP ONPL-01 WOOD SUBSTRATE
EQ
LINE OF FINISHED FLOOR
2"
17
EQ
6"
6"
4"
4"
RECEPTACLE TO BE HIDDENPL-01 INSIDE OF MILLWORK CABINET
WD-02
EQ
2"
2"
WD-02
2"
2"
ALL EXPOSED/ SEMI EXPONSED SURFACES AS SCHEDULED. SEE ELEVATIONS
PANEL
1 1/2" DIA GROMMIT HOLE. LOCATION TO BE COORDINATED IN FIELD
MILLWORK CABINET BEYOND
2' - 10"
2' - 10"
2' - 10"
ADJUSTABLE WHITE MELAMINE SHELF
3' - 6"
WD-01 RECESSED PANEL
9"
WD-01 RECESSED LINE OF FINISHED FLOOR PANEL
1' - 6"
2' - 2 3/4"
LEVEL 15 (M16) RECEPTION DESK - EAST 1" = 1'-0"
LEVEL 15 (M16) RECEPTION DESK - SOUTH 1" = 1'-0"
7
2"
8
1 1/2" DIA GROMMIT HOLE. LEVEL15 LOCATION TO 6 BE COORDINATED IN FIELD 1" = 1'-0"
(M16) RECEPTION
WD-01 2"
1 1/2" DIA GROMMIT HOLE. LOCATION TO BE COORDINATED IN FIELD
2"
WD-02
14
______________________________
13
WD-02
______________________________
A-925
A-925 2' - 5 3/4"
2"
WD-01
WF-02
WD-02 ?
PL-01 WD-02 EQ
EQ
A
EQ PL-01
17
______________________________
A-925
A-925
EQ
EQ
EQ
2"
1' - 6"
MILLWORK (M15)_WEST RECEPTION DESK - ENLG PLAN 1" = 1'-0"
2"
5
PL-01
PL-01
LEVEL 14 (M15) RECEPTION DESK - EAST 1" = 1'-0"
7
2"
WD-02
6
5
2' - 2 3/4"
2"
COPYRIGHT 2017
LEVEL 14 (M15) WEST RECEPTION DESK - EAST 1" = 1'-0" 15
16
______________________________
A-925
VEL 15 (M16) RECEPTION DESK - SOUTH = 1'-0"
2"
2"
WD-02
1 1/2" DIA GROMMIT HOLE. LOCATION TO BE COORDINATED IN FIELD
WD-01
2"
WF-02
WD-01 2"
WD-02 PL-01
3' PL-01 2' - 2 3/4"
LEVEL 14 (M15) RECEPTION DESK - WEST 1" = 1'-0"
2
2"
EPTION DESK - SOUTH
2"
1' - 9"
2"
A-925
______________________________
1' - 9" WD-02
LEVEL 14 (M15) RECEPTION D 1" = 1'-0"
3
2"
4
OUTLETS AND COVERPLATES TO MATCH ADJACENT FINISH
A-92
2"
ECEPTION DESK - NORTH
10
EQ
18
______________________________
2"
WD-02
EQ
W
4
A-925 2' - 0"
2"
EQ
2"
2"
PL-01
1
MILLWORKWD-02 (M14)_EAST RECEPTION DESK 1" = 1'-0" PL-01
1' - 6"
4
3
6
LEVEL15 (M16) RECEPTION DESK - NORTH 1" = 1'-0"
1' - 6"
2 5
68
MILLWORK (M 1" = 1'-0"
A-902 EQ
EQ
EQ
EQ
EQ
EQ
A-902
EQ
A-902
EQ
1 1/2" TRACK RECESSED IN ACT CEILING
ALIGN
ALIGN
3
5B
EQ
EQ B
1' - 6"
A-901
EQ
ALIGN
ALIGN
______________________________
EQ
3
5B
______________________________
EQ B
1' - 6" HOLD
2' - 6"
1' - 6" HOLD
8' - 6"
4' - 6"
A-901 WF-05
A-01
1" TRACK ON F.F
PT-01
WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN
FURNITURE BY CASEGOOD MFG
PT-01
1" TRACK ON F.F
BA-01
SIM
8A A-901
C-A - ELEVATION B
5
OFFICE TYPE C-A - ELEVATION A 10 1/2" = 1'-0"
4
EQ
EQ
6B A-902
EQ
TYP
7D A-902
EQ
OFFICE TYPE C-A - AXON
12
3
2
OFFICE TYPE C-A 1/2" = 1'-0"
9
FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.
TYP
TYP
7B A-901
1
ARCHITECTURE
EQ
EQ
EQ
ALIGN
EQ
SIM
8A
1 1/2" TRACK RECESSED IN ACT CEILING
EQ B
EQ B
1' - 6"
ALIGN
2' - 0" 11' - 5"
LIGHTING DESIGN:
2E
STRUCTURAL ENGINEER:
HOLD
EQ
WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 (212) 687-9888 http://www.wsp.com
2' - 6"
EQ
IT CONSULTANT:
7' - 7"
PRO4IA 55 BROAD STREET, 16TH FLOOR NEW YORK, NY 10004 212-710-3008 http://www.pro4ia.com
1' - 6"
1' - 6"
A-901
3
6
2
7 TYP
SHEN MILSOM & WILKE LLC 417 5TH AVENUE, NEW YORK, NY 10016 212-710-3008 EQ http://www.smwllc.com/
7A A-901
3
OFFICE TYPE C-B 5 CLEVENGER FRABLE LAVALLE, INC 1/2" = 1'-0"
KITCHEN CONSULTANT:
39 WESTMORELAND AVENUE, 3RD F WHITE PLAINS, NY 10606 (914) 997-9660 http://www.cfldesign.com
2
1
TYP EQ
6B A-902 E.8
TYP
6B A-902
TYP EQ EQ
7D A-902
E.6
7D A-902
TYP
EQ
D.9
EQ
TYP
6B A-902
TYP
SIM ARCHITECTURE 8A EQ
EQ
INTERIOR DESIGN
ALIGN
SIM
8A
1'COPYRIGHT 2016 - 6"
4' - 0"
EQ
3
3
EQA
A-901 1 1/2" TRACK RECESSED IN ACT CEILING
ARC
A-901
B.1
SIM
8A
A.6
A-901
C
6' - 9 1/2"
HOLD
PROJECT MANA
CBRE | N 200 PAR NEW YO (212) 98 https://w
10
EQ
A-805
EQ
EQ
EQ
EQ
D.8
J
EQ
C.8
EQA
2
A
EQ
EQ
EQ
EQ B
EQ
B.8
2E
B.6
1' - 6"
2' - 6"
EQ B
HOLD
EQ
PLAN AND IS EQ ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.
EQ
NUMBER:
B.1
A.6
2 3
EQ EQ
STRUCTURAL E
SUE S WSP US
ONE PE D NEW YO (212) 68
DATE:
12/15/2017 ISSUEDhttp://ww FOR ARC AR 01/19/2018 ADDENDUM 02/05/2018 ISSUEDPRO4IA FOR 55 BROA CONSTRUCT NEW YO
IT CONSULTAN
212-710http://ww
SC
2' - 6"
WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 (212) 687-9888 http://www.wsp.com EQ
PT-01
1' - 6" EQ
LIGHTIN 20 JAY S BROOKL (212) 79 www.ltgw
1 E.8 FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN
STRUCTURAL ENGINEER:
A-901
HOLD
LIGHTING DESI
PT-01
3
EQ
______________________________
F
V
FP
7
A-805
E.6
LIGHTING WORKSHOP 2E 20 JAY STREET - SUITE 500, A-901 BROOKLYN, NY 11201 (212) 796-6510 www.ltgworkshop.com
ALIGN
D.9
3
LIGHTING DESIGN: EQ EQ
EQ
______________________________
BA-01
8
9"
D.9
______________________________
ALIGN
E.6
2' - 1"
EQ
11
BACKPAINTED GLASS BY CASEGOOD MFG
ROBERT 19 WEST NEW YO (212) 76 http://ww
2E
3
EQ
EQ
EQ
V
3
EQ
D.8
ALIGN
EQ
BA-01
C.8
11' - 5"
EQ
4' - 6"
A-901
8' - 6"
EQ
5B
______________________________
4
B.8
ROBERT DERECTOR ASSOCIATES PT-01 19 WEST 44TH STREET 12TH FLOOR, NEW YORK, NY 10036 (212) 764-7272 3 http://www.derector.com
8' - 0"
B.6
WF-05
WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES E.8PLAN IN CONSTRUCTION
BA-01
5
B.1
M.E.P. ENGINEE A
A-901
ALIGN
PT-01
PT-01
BA-01
2' - 0" ALIGN
1' - 6"
EQ
6
A.6
8' - 6"
ALIGN ALIGN
ALIGN
EQ
PT-01
L16 (M17)_Core Wall Elevation South 7 1/4" = 1'-0"
EQ B
1' - 6"
ALIGN
4' - 6"
BA-01
A-901
M.E.P. ENGINEER:
3
E
______________________________
CBRE | NEW YORK TRI-STATE REGION PROJECT MGMT 200 PARK AVENUE, 20TH FLOOR NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/
3
6
5B
EQ
EQ B
PROJECT MANAGER:
CENTRAL CORRIDOR
AV + ACOUSTIC
SHEN M 417 5TH NEW CBREYO |N 212-710200 1' PAR -6 http://ww NEW YO (212) 98 HOLD https://w
PROJECT MANA
EQ
EQ EQ
BA-01
ALIGN
8A
EQ
SIM
EQ
EQ
BA-01
A-901
OFFICE TYPE C-A - AXON OFFICE TYPE C-B 12- ELEVATION A 7 = 1'-0" B C-SCOTT -1/2" ELEVATION
B.6
B.8
EQ
EQ
3
D
EQ
EQ
7A A-901
417 5TH AVENUE, EQ NEW YORK, NY 10016 212-710-3008 http://www.smwllc.com/ D.8 D.9
EQ
5 1/2" = 1'-0"
EQ
EQ
EQ
EQ
2
TYP BA-01 PT-01 6B A-902 L15 (M16)_Core Wall Elevation South 1/4" = 1'-0" EQ EQ
BA-03
PT-01
BA-01
EQ
L16 (M17)_Open Area North 1/4" = 1'-0" A.6
BA-01
PL-01
SIM
8A
A-901
EQ BUTT JOINT
PT-01
B.1
B.6
B.8
9
BUTT JOINT
BA-01
PT-01
BA-01
EQ BA-01
PT-01
ALIGN PT-01 BA-01
A-901
SIM
TYP
A-901
BUTT JOINT
T
8A
TYP BA-01
EQ
7A A-901
3
LIGHTIN 20 JAY S BROOKL (212) 79 www.ltgw
E.8
EQ
TYP
8A
CLEVEN 39 WEST WHITE P ROBERT (914) 99 19 WES http://ww NEW YO (212) 76 http://ww
M.E.P. ENGINEE
LIGHTING DESI
PT-01 A.6
E.6 EQ
SIM
A-901
7B A-901
B.1
EQ
STRUCTURAL E
WSP US
EQ
1
SIM
A-901
EQ
2
KEY PLAN:
BA-01
EQ EQ
BUTT JOINT
BUTT JOINT
PT-01
ONE PE OFFICE TYPENEW C-S YO (212) 68 1/2" = 1'-0" http://ww
IT CONSULTAN
PRO4IA 55 BROA NEW YO 212-710 http://ww
SHEN M 417 5TH NEW YO 212-710 http://ww
PT-01
D.8
KITCHEN CONS NUMBER:
BUTT JOINT
BA-01
C4
C.8
SIM
8A
PT-01
SIM
8A
BUTT JOINT
A-901
B.6 LLC EQ
EQ EQ
8A BA-01
5
WF-13
BA-01
AV + ACOUSTIC
EQ
4
3
TYP
PT-01
CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD FLOOR WHITE PLAINS, NY 10606 WEST (914) 997-9660 CORRIDOR TYP EQ EQ http://www.cfldesign.com 7B A-901 RS
PT-01
7D A-902
BUTT JOINT
OFFICE TYPE C-B - ENLG PLAN EQ EQ EQ 5EQ EQ 1/2" = 1'-0" OFFICE TYPE C-SCOTT - AXON KITCHEN CONSULTANT:
4
CENTRAL CORRIDOR
PL-01
EQ
TYP
OFFICE TYPE C-A - ENLG PLAN
9
AV + ACOUSTICAL CONSULTANT: BA-01 PT-01 B.8MILSOM & WILKE SHEN
C.8
OFFICE TYPE C-B TYP - AXONEQ EQ EQ EQ 7B 6 A-901 OFFICE TYPE C-SCOTT - ELEVATION A 1/2" = 1'-0"
6
E
SIM
1' - 6"
B.1
8A A-901
C.8
EQ
1' - 6"
T
EQA PT-01
D.8
1' - 6"
PT-01 D.9
BA-01
E.6
BA-01
HOLD
PT-01
L16 (M17)_Core Wall Elevation South 1/4" = 1'-0" A.6
7
PRO4IABUTT JOINT 55 BROAD STREET, 16TH FLOOR NEW YORK, NY 10004 212-710-3008 http://www.pro4ia.com
BUTT JOINT
1' - 6" HOLD
1" TRACK ON F.F BA-01 E.8
6
PT-01 CENTRAL BA-01 BA-01CORRIDOR
7' - 7"
PT-01
FURNITURE BY CASEGOOD MFG
HOLD
BUTT JOINT
BA-01
HOLD
BUTT JOINT
PT-01
PT-01
KITCHEN CONS
T
BA-01
BA-01
EQA
IT CONSULTANT:
L16 (M17)_Open Area North 5 1/4" = 1'-0" FURNITURE BY CASEGOOD PT-01 BA-01 PT-01MFG BA-01
E
SIM
8A
B.8 One New York B.6Plaza, Suite 4200 New York, NY 10004 Ph: 212 620 5583 www.spacesmith.com
EQ
C.8
ALIGN
F
PLANNING
A-901
EQ
D.8
EQ
7D A-902
EQ RS
EQ
A-901
TYP
7B A-901
FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.
3
2E
______________________________
E
EQ
TYP
02
EQ
AV + ACOUSTICAL CONSULTANT:
OFFICE TYPE C-A - ENLG PLAN 1/2" = 1'-0"
9
FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.
4
EQ
A-901 OFFICE TYPE C-B - AXON
1
5
6
TYP
7B
SIM
1' - 6"
OFFICE TYPE C-A - AXON 12 OFFICE TYPE C-B - ELEVATION A 7 1/2" = 1'-0"
8A A-901
SIM
8A
1' - 6"
PT-01 BA-01
1" TRACK ON F.F
T
EQA
BA-01
ALIGN
HOLD
OFFICE TYPE C-A - ELEVATION A 10 1/2" = 1'-0" C-B - ELEVATION B
J
EQ B
ALIGN
ALIGN
1' - 6"
BA-01
PT-01
9"
LIGHTING WORKSHOP 20 JAY STREET - SUITE 500, BROOKLYN, 2E NY 11201 (212) 796-6510 A-901 www.ltgworkshop.com
A-901
FURNITURE BY CASEGOOD MFG 1" TRACK ON F.F
11
A-805
______________________________
HOLD PT-01
ROBERT DERECTOR ASSOCIATES 19 WEST 44TH STREET 12TH FLOOR NEW YORK, NY 10036 (212) 764-7272 http://www.derector.com
______________________________
4' - 6"
WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN
A-901
1' - 6"
WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN
1' - 6"
ALIGN
ALIGN ______________________________
WF-05
M.E.P. ENGINEER:
EQ B
1' - 6" HOLD
5B
8' - 6"
1' - 6"
10
2' - 6"
WF-05
A-901
EQ
8' - 6"
4' - 6"
A-901
HOLD
5B
______________________________
EQ
3
ALIGN
3
5B
______________________________
HOLD
ALIGN
EQ
1' - 6
HOL CBRE | NEW YORK TRI-STATE REGIO 200 PARK AVENUE, 20TH FLOOR NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/
EQ
5B
A-901
EQ
3
PROJECT MANAGER:
______________________________
EQ
I
COPYRIGHT 2016
EQ
3
3
EQA
A-901
4' - 0"
EQ
PLANNING
SIM
8A
One New A-901 York Plaza, New York, NY 1 Ph: 212 620 5 www.spacesmit
TYP
3
EQ
6B A-902
2' - 1"
EQ
TYP
7D A-902
HOLD
A-901
TYP
7D A-902
HOLD
TYP
6B A-902
T
2E
______________________
1' - 6"
D.9
3
HOLD
E.6
E.8
CLEVEN 12 39 WEST 17P WHITE (914) 99 02 http://ww
18
______________________________
A-010
EQ
EQ
1' - 6"
EQ
EQ
EQ
EQ
EQ
6' - 9 1/2"
HOLD
C.8
B.8
EQ
EQA
C
EQ
EQ
EQ
EQ
A-901 3
ALIGN
V
J
A-901
L15 (M16)_Core Wall Elevation South 1/4" = 1'-0" E.8 EQ
A.6
EQ
EQ
E.6 EQ
D.9 EQ
B.1
EQ
D.8
PL-01
B.6
B.8
9
______________________________
A-010
FP
DATE:
BA-01
PT-01
2 3
C.8
C.8
4
PROJECT:
ISSUES NUMBER:
BA-01
EQ
TYP
A-805
KEY PLAN:
BA-01
DESCRIPTION:
12/15/2017 ISSUED FOR BID 01/19/2018 ADDENDUM 2 B.8 B.6 02/05/2018 ISSUED FOR CONSTRUCTION
D.8
PT-01
MARKET AXESS
PT-01
D.9
B.1
55 HUDSON YAR NEW YORK, NY 1
A.6
NUMBER:
EQ
EQ
EQ
EQ
E.6
EQ
EQ
2E
______________________________
3
IGN
PT-01
BA-01
3
EQ
WF-13
V
3
BA-03
ALIGN
J
BACKPAINTED GLASS BY CASEGOOD MFG
8' - 0"
BA-01
ALIGN
PT-01
7
A-805
SC
8' - 6"
4
L15 (M16)_Open Area North 1/4" = 1'-0"
EQ B
3
EQ
A.6
WEST CORRIDOR
69
EQ
2E
A
8
9"
EQ
CENTRAL CORRIDOR
PL-01
4' - 6"
EQ
B.1
3
2' - 1"
ALIGN
1' - 6"
ALIGN
EQ
3
ALIGN
EQ
B.6
______________________________
A
D
EQ
5' - 6"
EQ
EQ
EQ
D.8
EQ
2' - 8"
D.9
4' - 0"
5' - 4"
E.6
EQ B
2' - 7"
E.8
EQ
E.8
DRAWING TITLE:
3
12 17 02 18
F ALIGN
______________________________
A-901 EQ
EQ
EQ
EQ
EQ
EQ
6B A-902
EQ
TYP
TYP
7D A-902
EQ
5B
A-901
EQ
1' - 6"
EQ
ALIGN
ALIGN
______________________________
EQ
1 1/2" TRACK RECESSED IN ACT CEILING
P RFI V AT E O F F I C7 E R E N D E R I N G , P L A N6 S , E L E V AT I O N S + A5X O N S
5B
______________________________
ALIGN
3
8' - 6"
ALIGN
4 5B
A-901 EQ
EQ
EQ
EQ
HOLD
EQ
EQ
TYP
6B A-902
EQ
1' - 6"
EQ 1' - 6"
EQ
TYP
7D A-902
1' - 6" EQ HOLD
2' - 6"
______________________________
EQ
A-901
ALIGN
2E
TYP
6B A-902
ALIGN
______________________________
TYP
7D A-902
4' - 6"
A-901
WF-05
5B
______________________________
1" TRACK ON F.F
WF-05
ALIGN
EQ
1" TRACK ON F.F
2' - 0"
EQ
EQ
8' - 6" 1' - 6"
OFFICE TYPE C-A - AXON
12
EQ
PT-01
WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN
BA-01
2E
TYP
6B A-902
LIGHTING DESIGN:
LIGHTING WORKSHOP 20 JAY STREET - SUITE 500, TYPE OFFICE 1011201 BROOKLYN, NY 1/2" = 1'-0" (212) 796-6510 1 1/2" TRACK RECESSED www.ltgworkshop.com IN ACT CEILING
ALIGN
ALIGN
D
11
EQ A-805
ROBERT DERECTOR ASSOCIATES 19 WEST 44TH STREET 12TH FLOOR, NEW YORK, NY 10036 (212) 764-7272 http://www.derector.com TYP 7D A-902
TYP
7D A-902
ALIGN
10
EQ
TYP
11' - 5"
ALIGN
EQ
OFFICE TYPE C-A - ELEVATION B 11 1/2" = 1'-0"
EQ
M.E.P. ENGINEER:
3
6B A-902
A-902
CBRE | NEW YORK TRI-STATE REGION PROJECT MGMT 200 PARK AVENUE, 20TH FLOOR NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/ 1 1/2" TRACK RECESSED IN ACT CEILING
3
2E
A-901
A-902
PROJECT MANAGER:
1" TRACK ON F.F
______________________________
1' - 6" HOLD
OFFICE TYPE COPYRIGHTC-A 2016 - ELEVATION A TYP TYP 1/2"7D = 1'-0" 6B
10
EQ
FURNITURE BY CASEGOOD MFG
PT-01 EQ B
BA-01
7D A-902
A-901
INTERIOR DESIGN
EQ
EQ
ALIGN
EQ
TYP
EQ
EQ
6B A-902
EQ
EQA
A-901
3
3
______________________________
TYP
OFFICE TYPE C-A - AXON
______________________________
One New York Plaza, Suite 4200 New York, NY 10004 Ph: 212 620 5583 1' - 6" www.spacesmith.com HOLD
SIM
8A A-901
OFFICE TYPE C-A - ELEVATION B 11 2E 1/2" = 1'-0"
PLANNING
12
BA-01 5B
2' - 6"
ARCHITECTURE
PT-01
WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN
4' - 6"
OFFICE TYPE C-A - ELEVATION A 1/2" = 1'-0"
10
EQ
EQ 5B
ALIGN
1" TRACK ON F.F
A-901
EQ
ALIGN
1
EQ
FINISH PLANS SHALL OVERIDE ANY DISCREPANCIES FOUND BETWEEN PLAN AND ELEVATIONS WHEN DETERMINING THE TYPE OF FINISH NOTED THROUGHOUT THIS PROJECT.
FURNITURE BY CASEGOOD MFG
1" TRACK ON F.F
D E
HOLD
5B
ALIGN
2
E
1' - 6"
HOLD
______________________________
OFFICE TYPE C-A - ELEVATION B 1/2" = 1'-0" BA-01 PT-01
11
BA-01
8' - 6"
ALIGN
3
1' - 6"
ALIGN
1" TRACK ON F.F
______________________________
C-A - ELEVATION A
EQ
A-901
EQ
1' - 6"
PT-01
PT-01
WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN
FURNITURE BY CASEGOOD MFG
2' - 6"
BA-01
E F
4' - 6"
A-901 WF-05
1 1/2" TRACK RECESSED IN ACT CEILING
12
OFFICE TYPE C-A - AXON
STRUCTURAL ENGINEER:
______________________________
7D A-902
C
8' - 6"
4' - 6"
A-901
EQ
8' - 6"
6
7D A-902
EQ B
______________________________
3
7D A-902
7D A-902
TYP
4' - 6"
2' - 0"
EQ
NUMBER:
1 1/2" TRACK RECESSED IN ACT CEILING
ISSUES DATE:
10
DESCRIPTION:
OFFICE TYPE 12/15/2017 ISSUED FORC-B BID- ELEVATION A 7 1/2" = 1'-0" 01/19/2018 ADDENDUM 2 02/05/2018 ISSUED FOR CONSTRUCTION
2 3
SC
A-805
11
LIGHTING DESIGN:
EQ
EQ
LIGHTING WORKSHOP 20 JAY STREET - SUITE 500, BROOKLYN, NY 11201 (212) 796-6510 www.ltgworkshop.com
EQ
ALIGN
V
8' - 6"
EQA
EQ
ROBERT DERECTOR ASSOCIATES 19 WEST 44TH STREET 12TH FLOOR, NEW YORK, NY 10036 (212) 764-7272 http://www.derector.com
PT-01 BA-01
2E
6
STRUCTURAL ENGINEER:
______________________________
A-901
OFFICE TYPE C-B - AXON
WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 (212) 687-9888 http://www.wsp.com
BACKPAINTED GLASS BY CASEGOOD MFG
EQ B
ALIGN
ALIGN
OFFICE TYPE C-B - ELEVATION B A-901 1/2" = 1'-0" 2' - 6"
M.E.P. ENGINEER:
ALIGN
A
BA-01 TYP 6B A-902 11' - 5"
TYP
7
PT-01
TYP
ALIGN
6B 1" TRACK A-902 ON F.F
EQ A-805
8
BA-01
IT CONSULTANT:
BA-01
7A A-901
1' - 6"
TYP
EQ
7
PT-01 BA-01
HOLD
A
TYP
7B
OFFICE TYPE C-SCOTT A-901 - ELEVATION B RS 1/2" = 1'-0"
4
SIM
A-901
ALIGN T
BA-01
KITCHEN CONSULTANT:
CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD FLOOR WHITE PLAINS, NY 10606 (914) 997-9660 http://www.cfldesign.com
OFFICE TYPE C-SCOTT - ELEVATION A 1/2" = 1'-0" 8A
BA-01
EQ
TYP
7A A-901
SHEN MILSOM & WILKE LLC 417 5TH AVENUE, NEW YORK, NY 10016 212-710-3008 http://www.smwllc.com/
KEY PLAN:
3
FURNITURE BY CASEGOOD MFG
PT-01
6
SIM
ALIGN FURNITURE BY CASEGOOD MFG
5
A-901
BA-01
8A A-901
1" TRACK ON F.F
BACKPAINTED GLASS BY CASEGOOD MFG
SIM
2
OFFICE TYPE C-SCOTT - AXON
4
3
BA-01
3
T
SIM
8A
EQ
FURNITURE BY CASEGOOD MFG
AV + ACOUSTICAL CONSULTANT:
OFFICE TYPE C-A - ENLG PLAN 9 1/2" = 1'-0"
EQ
EQ COPYRIGHT 2017
8A
TYP
BACKPAINTED GLASS BY CASEGOOD MFG
7B A-901 BA-01
PT-01
SIM
8A
EQ
A-901
TYP
1" TRACK ON F.F
EQ
PRO4IA 55 BROAD STREET, 16TH FLOOR NEW YORK, NY 10004 212-710-3008 http://www.pro4ia.com
ALIGN
FURNITURE BY CASEGOOD MFG
OFFICE TYPE C-B - ENLG PLAN 1/2" = 1'-0"
5
EQ
SIM
8A A-901
TYP 7B 1 1/2" TRACK RECESSED A-901 IN ACT CEILING
OFFICE TYPE C-A - AXON EQ EQ
12
PT-01 BA-01
AXON
EQ
SIM
ALIGN
A B
HOLD
1' - 6"
8A A-901
1' - 6" HOLD
TYP
6B A-902
1' - 6"
ALIGN
7D A-902
TYP
HOLD
EQ
7' - 7" 7D A-902
TYP
ALIGN
EQ
TYP
EQ
EQ
6B A-902
EQA
A-901
T
2E
______________________________
EQA
PT-01
HOLD
3
FP
EQ
8' - 0"
1" TRACK ON F.F
2E
8
1' - 6"
3
2' - 1" 8' - 6"
4' - 6"
A-901 EQ
J 1' - 6"
V
FURNITURE BY CASEGOOD MFG
2E
______________________________
9"
B HOLD
EQ B
EQA
1 1/2" TRACK RECESSED IN ACT CEILING
OFFICEREGION TYPE PROJECT C-B - AXON CBRE | NEW YORK TRI-STATE MGMT 6 20TH FLOOR 200 PARK AVENUE, NEW YORK, NY 10166 (212) 984-8000 https://www.cbre.us/
EQ EQ
3
WF-05
EQ EQ
3
A-901
EQ 1' - 6"
A
5B
______________________________
COPYRIGHT 2016
PROJECT MANAGER:
HOLD
BC
SIM
A-901 A-901
A-902
OFFICE TYPE C-B - ELEVATION A EQ 1/2" = 1'-0"
7
EQ
HOLD
7D A-902
TYP
INTERIOR DESIGN
2' - 6"
6' - EQ 9 1/2"
TYP
8A5B
______________________________
WF-05
EQ
1' - 6" EQ
6B A-902
EQ B
1' - 6"
ALIGN
EQ
ALIGN
OFFICE TYPE C-B - AXON PLANNING
One New York Plaza, Suite 4200 New York, NY 10004 Ph: 212 620 5583 www.spacesmith.com
PT-01 BA-01
WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES TYP TYP IN CONSTRUCTION 6BPLAN
EQ 3
OFFICE TYPE C-B - ELEVATION B EQ 1/2" = 1'-0" 4' - 0"
8 5B
EQ
1' - 6" 2' - 6"
______________________________
EQ
SIM
8A A-901
______________________________
EQ
EQ
3
A-901
BA-01
3
2E
______________________________
TION A
ALIGN
PT-01
ALIGN 1" TRACK ON F.F
1" TRACK
WRITABLE SURFACE: FOR APPLICABLE LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN
1 FINISH PLANS SHALL OVERIDE ANY 1' - 6" PLAN AND DISCREPANCIES FOUND BETWEEN ELEVATIONS WHEN DETERMINING HOLDTHE TYPE OF FINISH NOTED EQ THROUGHOUT THIS PROJECT. 5B
1' - 6" HOLD
OFFICE TYPE C-B - ELEVATION A 1/2" = 1'-0"
7
FURNITURE BY CASEGOOD MFG
SIM
8A
A-901
A-901
ARCHITECTURE
A-901 ON F.F
EQ
5B
______________________________
WF-05
CLEVENGER FRABLE LAVALLE, INC 39 WESTMORELAND AVENUE, 3RD FLOOR WHITE PLAINS, NY 10606 (914) 997-9660 http://www.cfldesign.com
ALIGN
EQ
HOLD
EQ
PT-01 BA-01
KITCHEN CONSULTANT:
OFFICE TYPE C-A - ENLG PLAN 9 1/2" = 1'-0" TYP OFFICE TYPE C-B - ELEVATION B 8 1/2" = 1'-0"
ALIGN
TYP
EQ
EQ
2
EQ
TYP
7A A-901
EQ EQ
AV + ACOUSTICAL CONSULTANT:
3
6B A-902
EQ
EQ
ON F.F
1' - 6"
HOLD
SHEN MILSOM & WILKE LLC 417 5TH AVENUE, 1 1/2" TRACK RECESSED WRITABLE SURFACE: NEW YORK, NY 10016 IN ACT CEILING FOR APPLICABLE 212-710-3008 PT-01 BA-01 KEY NOTES http://www.smwllc.com/ LOCATIONS SEE IN CONSTRUCTION PLAN
ALIGN
EQ
31" TRACK
TYP 7B 1" TRACK A-901ON F.F
A-901
EQ
1' - 6"
1' - 6"
FURNITURE BY CASEGOOD MFG
4
SIM
8A A-901
A-901
5B
______________________________
EQ TYP 1' - 6"
6B A-902
212-710-3008 A-902 http://www.pro4ia.com
EQ
SIM
8A
PRO4IA 55 BROAD STREET, 16TH FLOOR TYP NEW YORK, NY 10004 7D
4' - 6"
ALIGN
EQ
IT CONSULTANT:
TYP
7D A-902
HOLD
HOLD
C D
EQ
EQA
EQ
1' - 6"
TYP
A-901
ALIGN 2' - 6"
6B A-902
A-901
5B
______________________________
WF-05
ALIGN
7' - 7"
2E
______________________________
T
ALIGN
ALIGN
EQ B
WSP USA ONE PENN PLAZA, 2ND FLOOR, NEW YORK, NY 10119 WRITABLE SURFACE: (212) 687-9888 FOR APPLICABLE http://www.wsp.com LOCATIONS SEE KEY NOTES IN CONSTRUCTION PLAN
ALIGN
A-901
AXON
A-901 6' - 9 1/2"
HOLD
EQ B
OFFICE TYPE C-SCOTT - ELEVATION A 1/2" = 1'-0"
FURNITURE BY CASEGOOD MFG ALIGN
PT-01
A-901
8A
SIM
A-901
6
EQ
8A
OFFICE TYPE C-B - AXON
12/15/2017
5
7B A-901
3
2
OFFICE TYPE C-SCOTT - ENLG PLAN 1/2" = 1'-0"
CHECKED BY:
JL,MV,CL MF,DM OFFICE SCALE: TYPE C-B - ENLG PLAN 1/2" = 1'-0" As indicated
A-805.00
NOTE: ALL DIMENSIONS ARE TAKEN FROM FACE OF SHEETROCK (NOT FINISH FACE)
1
TYP
EQ
70
DRAWING NO:
1
SIM
A-901 DATE:
EQ 16322
OTT - AXON
3
T
8A
SEAL & SIGNATURE:
DRAWN BY:
6
4
SIM
A-901
PROJECT NO:
TION A
DESCRIPTION:
SC
5
ENLARGED PLANS & ELEVATIONS - OFFICES
6' - 9 3/4"
ALIGN
DATE:
12/15/2017 ISSUED FOR BID 01/19/2018 ADDENDUM 2 02/05/2018 ISSUED FOR OFFICE TYPE C-SCOTT - AXON CONSTRUCTION 2
DRAWING TITLE:
EQA
1' - 6" HOLD PT-01 BA-01
FP
OFFICE TYPE C-SCOTT - ELEVATION A 1/2" = 1'-0" 55 HUDSON YARDS NEW YORK, NY 10001
1' - 6"
ALIGN
EQ
7
HOLD
COPYRIGHT 2017
ISSUES NUMBER:
2 3
3
3
-01
EQ
BA-01
3
MARKET AXESS - 55 HY
OFFICE TYPE C-SCOTT - ELEVATION B 1/2" = 1'-0"
1' - 6" EQ
V
3
______________________________
PROJECT:
7 ALIGN
2E
4
A-805
8' - 0"
J
ALIGN
A-805
8
9"
EQ B
3
2' - 6"
1' - 6" HOLD
A
BA-01 J
EQ
4
BA-01 1" TRACK ON F.F
8' - 6"
4' - 6"
A-901
3
FURNITURE BY CASEGOOD MFG 3
5B
______________________________
WF-05
4
3
A-901
PT-01 BA-01
ACE: ABLE OTES PLAN
5
2' - 1"
6 2E
V
______________________________
HOLD
A-901
1' - 6"
A
EQ
A
3
7 COPYRIGHT 2017 5B
______________________________
EQ
OFFICE TYPE C-SCOTT - AXON
EQA
2
EQ
5' - 6"
3
EQ
1' - 6" HOLD
OFFICE TYPE C-SCOTT - ELEVATION B 1/2" = 1'-0"
1' - 6"
4' - 0"
C4
4
ALIGN
B 02
2E
TYP
6B A-902
ALIGN
TYP
7D A-902
7B A-901
TYP
EQ RS
EQ PAGE__ OF__
7A A-901
TYP
8A A-901
SIM KEY PLAN:
project birds eye perspective
New York Showroom | Concept Design | June 9, 2016
VITRA NY SHOWROOM SHOWROOM + OFFICE - SD + DD
DURATION: 2 months OFFICE: Gensler TEAM: Laurent Lisimachio, Douglas Burton, Ady Chu LOCATION: 95 Madison Ave - New York, New York CLIENT: Vitra
Initial concept sketches
Zig-Zag. Floor Plan Back of House
DN
Elev. Focal Wall
CafĂŠ
Exhibit
DN
UP
13
New York Showroom | Concept Design | June 1, 2016
Zig-Zag. Section Perspective
(Other Tenant)
New York Showroom | Concept Design | June 1, 2016
73
(Other Tenant)
16
VITRA NY SHOWROOM SHOWROOM + OFFICE - SD + DD
Swiss furniture company Vitra reached out to
Gensler to design a new showroom for their new space at 95 Madison Ave in New York. The small 10,000 sqft space was to be used as both a storefront showroom and workspace for local staff. The entire space could act as a showroom. The ground floor being more of their home collections showroom and the top floor doubling as both workspace for employees and showroom for Vitra’s office collection.
To allow ADA accessibility of an existing back-
of-house space in the rear of the building, our idea was to create a slight slope in the floor at the ground entrance. The slope at 1:38 became a point of departure for the New York Showroom | Concept Design | June 9, 2016
idea to treat this as a gallery space not unlike that of the Guggenheim where the occupants are forced through a gallery by means of a ramp. The gallery was designed to have custom floating millwork cases displaying old and new Vitra furniture as a way to educate and promote business.
74
programmatic floor plans
r Plan
Back of House
rney
Elev.
Focal Wall
Café
Sculpture
Feature Wall B
Canopy
Exhibit Wall B
Exhibit Wall A
Window Display
Showroom | Concept Design | June 27, 2016
13
or Plan
ney Conference Room
Elev. Storage Restrooms
Open Office/Contract Showroom
Café
Display Shelves
Elevator Lobby
Project Room
Display Shelves Showroom | Concept Design | June 27, 2016
75
14
workspace rendering - north
York sign si June ne 2 w Yo rk SSho wroo wr m | Co Desi gn | Ju 27, 7, 2 016 01 6 New Ne howr ho oom oo Conc ncep nc eptt De ep 201
workspace rendering - south
York sign si June ne 2 w Yo rk SSho wroo wr m | Co Desi gn | Ju 27, 7, 2 016 01 6 New Ne howr ho oom oo Conc ncep nc eptt De ep 201
76
design development floor plans 2
3
4
5
2
6
3
4
F
DN
E
D
C SHEET NOTES
Vitra
95 Madison Avenue Floors 1& 2 New York, NY 10016
B
UP
UP
DN Rockefeller Center 1230 Avenue of the Americas Suite 1500 New York, NY 10020 United States
A
1
1
2
3
4
5
Tel 212.492.1400 Fax 212.492.1472
Robert Derector Associates MEP Engineer 19 West 44th Street New York, NY 10036 USA Tel 212.764.7272 Fax 212.764.7827
6 Lighting Workshop 20 Jay Street, Suite 500 New York, NY 11201 USA Tel 212.796.6510 Fax 212.796.2072
F
F
E
6/29/2016 4:49:14 PM
DN
E
16
GENERAL NOTES
08
FINISH PLAN - LEVEL 02 SCALE: 1/8" = 1'-0"
DN
D
FINISH PLAN - LEVEL 01 SCALE: 1/8" = 1'-0"
D
C
B
UP
DN
Date
Description
A Seal / Signature
77
1
PROGRESS SET NOT FOR CONSTRUCTION
CHANNEL BRIDGING 09 29 00.B05 09 SAG-RESIS 22 16.B03 GYP BD COLD-ROLLED CHANNEL
Robert Derector Associates MEP Engineer 19 West 44th Street New York, NY 10036 USA Tel 212.764.7272 Fax 212.764.7827
09 22 16.C08 FURRING CHANNEL CLIP
design development details
1
SEE RCP
09 29 00.B05 TYP SOFFIT GYP TO OPEN CLG SAG-RESIS GYP BD 09 22 16.A00 METAL STUD
SEE RCP
09 22 16.A01 METAL RUNNER TRACK
09 29 00.J09 JOINT REINFORCEMENT
09 22 16.A09 CHANNEL BRIDGING
SCHEDULED OR EXISTING PARTITION
0'
20 Jay Street, Suite 500 New York, NY 11201 USA Tel 212.796.6510 Fax 212.796.2072
01
08 80 00.A00 GLASS 08 41 26.B02 BOTTOM RAIL 08 41 26.G01 CONCEALED FLOOR CLOSER
09 22 16 01 METAL STUD
02
03
2"
0'
125 STEPPED SOFFIT
08 11 13 STEEL FRAME
2"
2
5/8"
SEE RCP
STEPPED SOFFIT 09 29 00.B05 SCALE: 3" = 1'-0"
03 04 05 06
METAL S ABOVE A SCHEDU CONSTR THICKNE SCHEDU SCHEDU LINE OF SCHEDU OCCURS
1/2"
1/2"
VIF
09 22 16.C08 FURRING CHANNEL CLIP
02
09 22 16 METAL STUD TRACK
4"
09 22 16.B03 COLD-ROLLED CHANNEL
C3030.125_GYP BD STEPPED SOFFIT
SHEET
VARIES
GENERAL NOTES Lighting Workshop
09 22 16.C04 FURRING CHANNEL
1/4"
SCALE: 3" = 1'-0"
GENERAL NOTES
SAG-RESIS GYP BD
03 30 00 CAST-IN-PLACE CONCRETE
09 22 16.C04 FURRING CHANNEL
04
SEE RCP 09 29 00.J09 JOINT REINFORCEMENT
SCHEDULED OR EXISTING PARTITION
1 15/16"
C3030.125_GYP BD STEPPED SOFFIT
05
125 STEPPED SOFFIT
Date
09 22 16.C08 FURRING CHANNEL CLIP
06
09 29 00.B05 SAG-RESIS GYP BD
09 29 00.J03 EDGE TRIM, L-BEAD
Date
09 22 16.A01 METAL RUNNER TRACK
SCALE: 3" = 1'-0"
09 29 00.J01 CORNER BEAD REFER TO RCP
01 RETURN AIR SLOT; REFER TO ENGINEERING DRAWINGS
09 22 16.A01 METAL RUNNER TRACK
1 15/16" 08 11 13 STEEL FRAME
Showroom
06
GENERA
07 92 00 JOINT SEALANT 02
06.0524.000 Description
Seal / Signature
09 29 00.B05 SAG-RESIS GYP BD
09 29 00.J03 EDGE TRIM, L-BEAD
05
2"
Project Number
09 22 16.A00 METAL STUD
26 51 00.A01 GYP BD LIGHT COVE LIGHT FIXTURE AS SCHEDULED - SEE ELECTRICAL DRAWINGS
01
Description
05 12 00 Project Name STEEL ENCASEMENT
VitraSLAB. NY EXISTING FLOOR
REFER TO RCP
06 10 00.C01 WOOD BLOCKING
04
DETAILS - CEILING TRANSITIONS
GLASS DOOR BASE DETAILPROGRESS SET 02 STEEL FRAME JAMB
KEY SCALE: PLAN 3" = 1'-0"
SCALE: 3" = 1'-0"
NOT FOR 09 22 16.C01 WIRE TIE 3" = 1'-0" CONSTRUCTION 09 22 16.C05
09 22 16.C05 GRID SUSPENSION SYSTEM
Scale
09 22 16.C01 WIRE TIE
Project Name
09 29 00.C02 WATER-RESIS GYP BD 5/8" 09 29 00.J03 EDGE TRIM, L-BEAD
GRID SUSPENSION SYSTEM
A-901.00 A-901
STANDING & RUNNING TRIM
Vitra NY Showroom 09 22 16.A00
09 22 16.A00 METAL STUD
LINE OF DOOR HEADER ABOVE
METAL STUD
09 22 16.A00 METAL STUD
Project Number
DRAWING NO. ______ OF ______
06.0524.000
© 2016 Gensler
VARIES
08
???
PROGRESS SET NOT FOR RAISED ACCESS FLOOR TILES. CONSTRUCTION SCHEDULED FLOOR FINISH; REFER TO FINISH FLOOR PLAN.
09 29 00.J01 09 22 16.C08 FURRING CHANNEL CLIP CORNER BEAD
REFER TO RCP
5/8"
1 15/16"
KEY PLAN
06 10 00.C01 WOOD BLOCKING
09 29 00.B05 SAG-RESIS GYP BD
2" 1/2"
26 51 00.A01 LIGHT FIXTURE AS SCHEDULED - SEE ELECTRICAL DRAWINGS
01 RETURN AIR SLOT; REFER TO ENGINEERING DRAWINGS
08 11 13 METAL ANCHOR
1'
Seal / Signature
08 41 26.B02 BOTTOM RAIL 08 41 26.G01 CONCEALED FLOOR CLOSER
09 29 00.B05 SAG-RESIS GYP BD
09 22 16.C04 FURRING CHANNEL
07 92 00 JOINT SEALANT
6" UON
FILL RAISED ACCESS FLOOR TILE IN FIELD WITH CONCRETE AT EMBEDDED HARDWARE LOCATIONS.
REFER TO RCP
01
Description
08 41 26.A01 GLASS DOOR
09 22 16.C04 FURRING CHANNEL
???
SCALE: 3" = 1'-0"
1/2"
SCALE: 3" = 1'-0"
STEEL FRAME HEAD
0'
STEPPED SOFFIT
SCALE: 3" = 1'-0"
VARIES
2
01
ENTRANCE GLASS DOOR SILL
1 15/16"
Description
GYP BD LIGHT COVE SCALE: 3" = 1'-0"
SCHED. WOOD DOOR
Scale
08 81 13.A00 DECORATIVE GLASS
3" = 1'-0"
OFFSET PIVOT
08 71 00.J00 DOOR BOLT 08 41 26.B01 TOP RAIL
A-901.00 A-901 DRAWING NO. ______ OF ______ © 2016 Gensler
08 41 26.A01 GLASS DOOR
ELEVATOR LOBBY SIDE
REFER TO HARDWARE SET
08 41 26.G04 PUSH-PULL SET
ELEVATOR LOBBY SIDE
RECEPTION SIDE
03
FLUSH WOOD DOOR JAMB SCALE: 3" = 1'-0"
VARIES 0'
RECEPTION SIDE
SCHEDULED PARTITION; REFER TO CONSTRUCTION PLAN
1 1/4" 1/2"
1/8"THK CONTINUOUS ST STL SHOE CHANNEL
2"
08 41 26.G01 CONCEALED FLOOR CLOSER
SCHEDULED FLOORING
SCHEDULED FLOORING
SEE REFLECTED CEILING PLAN FOR CEILING TYPE AND HEIGHT
1/2"
08 41 26.B02 BOTTOM RAIL
CLOSET SIDE
CENTER PIVOT SEE HARDWARE SCHEDULE
1/4"
. 1/8"
08
DETAILS - CEILING TRANSITIONS
08 14 16 FLUSH WOOD DOOR
12
HEAD & SILL - GLASS SIDELIGHT SCALE: 3" = 1'-0"
08
HEAD & SILL - ENTRANCE GLASS DOOR SCALE: 3" = 1'-0"
04
FLUSH WOOD DOOR HEAD W/ REVEAL SCALE: 3" = 1'-0"
78
KEY PL
“ t h e ra m p� i nte r i o r re n d e r i n g
G O O G L E - P I E R 57 P U B L I C S PA C E + O F F I C E - C O M P E T I T I O N
DURATION: 3 weeks OFFICE: Gensler TEAM: Carlos Martinez, Amanda Carroll, Senior + Intermediate Designer LOCATION: Pier 57 at Hudson River Park - New York, New York CLIENT: Google
“ w e l c o m e” c o n c e pt re n d e r i n g
81
n areG no O Olonger G L E H Esufficient ADQUARTER P U B L I C S P A C E + O F F I C E - C Ois M P Enecessary. TITION ms. Regeneration er sufficient ation is necessary.
e
Tech leaders Google invited Genselr to
participate in a private competition to develop and
Identify overlaps between design a space at the old Pier 57 along the Hudson River company expertise in core businesses and develop strategies in Downtown Manhattan, The tech company was looking to lease 70,000 sqft of office space and 50,00 sqft of Identify overlaps between that foster problem-solving. community based functions from the nearly 500,000 sqft company expertise in core pier. During the design exercise we worked along side in businesses and develop strategies Identify issues and develop house sustainability experts to ensure our addition best that foster problem-solving.strategies that best leverage
nequality Safety Diversity
nomy
resources and expertise.
served the community as well as the local habitat of the
Hudson River. The intense design competition lasted just
Identify issues and develop over 3 weeks. Remediation and mitigation are no longer sufficien strategies that best leverageGoogle can leverage abundant resources and expertise. resources to build a regenerative responses to global problems. Regeneration is nec ecosystem that addresses problems Identify overla company exper locally, city-wide and globally. Google can leverage abundant businesses and Climate that foster prob Inequality Water resources to build a regenerative Safety Identify issues ecosystem that addresses problems Environment - Polluted Waterways, strategies that Food Food Security and Climate Change resources and e Diversity locally, city-wide and globally.
Jobs
Networks
Environment
Economy - Jobs (Networks/Skills)
Infrastructure - Access and Investment Environment - Polluted Waterways, Food Security and Climate Change
Organization - Motivation, Training and Culture
Economy - Jobs (Networks/Skills)
Community - Inequality, Safety and Diversity
Infrastructure - Access and Investment
Investment Access
Community
Infrastructure
Economy
Motivation Training Culture Organization
Google can leve resources to bu ecosystem that locally, city-wid
Jobs Networks
Environment - Polluted W Food Security and Climat
Economy - Jobs (Network
Infrastructure - Access an
Organization - Motivation
Community - Inequality, S
Organization - Motivation, Training and Culture Community - Inequality, Safety and Diversity
circulation media wall media totems
82
83
P R O G R A M M AT I C P L A N , S E C T I O N + A X O N S
FOOD HALL
welcome
workplace
the beacon
training
the ramp
cafe + food hubs
outdoor greenspace
support + collboration
winter garden
circulation
WORKPLACE
WINTER GARDEN
GREENSPACE
THE RAMP
CAFE
THE BEACON
ACTIVATE 84
greenspace/wintergarden rendering
CHARLES LENT New York, NY
charlesanthonylent@gmail.com
727.515.0861
The City College of New York Bernard & Anne Spitzer School of Architecture