SOOHYUN PARK WORKSAMPLE
•
•
•
•
• PROJECT
- Component 1B: Construction of a consolidated baggage claim area. The new area provides protection from the elements and includes tow new sloped plate carousels. Adjoining BSO offices and restrooms to be phased as part of component 4.
- Component 2: Includes the construction of a new ticketing building. Airline ticket offices, pre-security restrooms and additional check in kiosks.
CONSTRUCTION PROGRESS
02lLAXHOKKAIDO RAMEN SANTOUKA
• PROJECT - The food & beverage concessions scope of work in new midfield satellite concourse
• CLIENT - Los Angeles World Airport
• PROGRAM
A. Tenant improvement on the concourse level (level 4)
- Including walls, ceilings, lighting, finishes, signage, food service equipment and structural.
B. Storage tenant improvement on basement level (level 1)
- Including finishes an equipment.
• LOCATION
- 384 World Way. Los Angeles, CA
• ARCHITECTURAL FIRM
- Corgan
•
•
•
D.
E.
F.
•
•
REDEVELOPMENT
• PROJECT - Singapore Flyer Redevelopment
• CLIENT - Singapore Government
• PROGRAM - Offices
- Retails - Mini Park
• LOCATION
- 30 Raffles Ave, Singapore
• ARCHITECTURAL FIRM
- SHIGERU BAN ARCHITECTS / TOKYO
• PROJECT
YAMAGATA SCIENCE PARK
• PROJECT - Yamagata Science Park
• CLIENT - Yamagata City, Japan
• PROGRAM - Office - School - Hotel
• LOCATION - Yamagata City, Japan
• ARCHITECTURAL FIRM
- SHIGERU BAN ARCHITECTS / TOKYO