selecte d w or k s born on 18.06.1987 +44.77.69.34.08.43
www.sujatac.com london, uk
S U J A T A
C H I T L A N G I A
(exterior facades)
MAISON 1896
2018-2021. architect at darchitectura. paris/dijon description built area client project type
: : : :
5 star hotel, beaune, france 1000 sqm david fink, mirabel group/relais & chateaux restorating a dilapidated 1896 building into a hotel corformed to strict safety and comfort standards, including major structural changes and reinforcements. my main role : client communication, client co-ordination, drawings and presentations, project planning, budgeting, building permits, product sourcing, tender drawings, tender process, conformance to french public building standards, incorporation of hvac, electrical & fire networks.
In the heart of the french Burgundy landscape, producer of the best french wines, lies the tiny city of Beaune, a host to ardent wine lovers from all over the world. The former public electric works administrative building with its ideal historic city-center setting, just across the famed Hotel Dieu (home to the yearly wine auctions) now unfolds as a luxurious 5 star hotel, conference facilities, a gastronomic restaurant, a bar and a bistro. The inner courtyard binds the u-shaped form with its heated bistro simmering with activity all day long. Guests can choose from 16 unique rooms and suites over 3 floors, in a rustic charm of the original Burgundy limestone, wrought iron details, oak parquet and exposed timber roof structure. Certain rooms retain their original charm of gilded mouldings, painted ceilings, timber panellings or stained glass windows. Being the only English speaker in the office, the project fell in my hands by chance, giving me the opportunity to handle the client and his team of advocates, interior designers, lighting designers and managers on my own. Combining French and American methodologies, a challenging task, I spent 2.5 years on the project from procuring the project to preparing it for construction: - client communication - city patrimony drawings, presentations and approval - building permit drawings, presentations and approval - co-ordination with the structural engineer - co-ordination with hvac and electrical engineers - asbestos removal - 3d and 2d modelling, animated walkthroughs - negotiation between the client, interior and lighting designers - co-ordination with the kitchen designer - tender drawings and procedure - corformance to french public building standards - corformance to fire safety and personnel security standards The project is under construction since nov 2021.
RUBRIQUES
RENOVATION ET RESTRUCTURATION de Bureaux en Hôtel 5 étoiles 2 Place Fleury – 21 200 Beaune Dossier de permis de construire – Mars 2019 à savoir de référence RVB est 130 132 111. Pour finir, les vitraux existants seront au maximum conservés et rénovés si besoin afin de respecter l'esthétisme de la façade existante. Façades : La façade existante, constituée de pierre et d'enduit avec modénatures et corniches, devra être entièrement ravalée. Pour se faire et afin de respecter la nature des matériaux et de ne pas en altérer les surfaces, des techniques de nettoyage à l'eau sous pression comme admises seront favorisées. Une corniche continue en partie haute des bâtiments sera créée afin de cacher des installations techniques existantes de type électrique.
Toiture : La toiture existante est en bonne état et ne nécessite pas de lourde rénovation. Seule une intervention de démoussage sera à prévoir afin de rendre à la tuile sa teinte d'origine.
PLONGE
A'
1m
3.0
+0.40m 11.70m²
B
2m
5.7
0m
5.6
2m
e
CUISINE
pf 1/
+0.40m 31.00m²
2h cf 2h
1/
vv
(6%)
(+0.51)
1.81m
A' B
E'
Peinture sur enduit Carrelage (M0) – Parquet (M4) Gros mobilier (M3) toit de sis age châs nfum se dé
Page 4/8
NOTICE/ERP/SDIS/97
velux neuf 98x118
ESC.01
1h
2.28m
S.S.
+8.38m
1h
1.15m
S.S.
m
1.28m
CH.22
+8.33m 29.95m²
)
CH.24
4.72m
34 1. 1h cf
0.90m
cf
1.71m
1U . S.Sm
châssis de désenfumage
CH.6
3.51m
cf 1h
cf 1/2h
S.S.
cf
90
B'
m
Une procédure et des consignes seront établies afin de former et d’informer le personnel pour l’évacuation des personnes handicapées.
1U
ESC.02
.36
12
Sans objet
S.S.
(+0.29)
(10%
1.44m
4.35m
1.30m
0.80m
(+0.29)
(+0.40)
5.61m
4.28m
4.19m
S.S.
fenetre en porte
1.30m
1.30m
1.86m
cf 1h
S.S.
2.45m
Vasques PMR ALLIA
pf 1/2h
S.S.
)
(+0.29)
2h
2.
1m
5.3
Téléphone
l Moyen d’extinction……………………………
pf 1/2h
n
13.70m² +0.29m
cf 1h
+8.33m 25.90m²
1/
. S.S m 5 1.2
EAS sur passerelle : 2 fauteuils
l Moyen de Liaison………………………………
la zone technique
llo rti
A
Chambre adaptée aux PMR au R+1
l Mesures d’isolement prévues.............................
revêtement des parois verticales
po
(+0.15)
m
(+0.15)
65 1.
9m
2.0
+8.33m 28.10m²
2.02m
(+0.026)
pf
5
l Emplacement des locaux....................................
S.S
7m
6m
3.6
FP
pf 1/2h
m
1.6
67
1m
1.
2.3
2h
1/
cf 1h
1/2h
S.S.
pf
pf
rte
po
P0 rte Po 1U
Parois CF 1h + Porte CF 1/2h avec ferme-porte
4.78m
m
38
cf 1h
6.
cf 1h
2h
FP
e en
etr
fen
m
2.02
m
54
3.
1.4
T
D'
D' m
2.82
m
E
m
4.01
2.22
m
54
+8.33m 26.40m²
m
2.
S.S. 8m
m
8.77
CH.23
ut)
a ss
R re é ntr PM L'e cès 2cm Ac uil < (se
m
8.24
10.2
m
5.02
:
le
3.52
m
0.5
m
+0.01m 2U 04
P ipa rte nc Po e pri
9m
3.56
cf 1h vitrage m 3.59
8m
2.6
1.13
5m
EX
+0.15m 44.20m²
pf 1/2h
T
EX
Cuisine, réserves, poubelles, bagagerie, local technique, TGBT, lingeries
Mesures d’isolement prévues
.
(2%)
RESTAURANT
+0.15m
m
57
3.
6 .02
(+0
3.56m
0.80m
0m
1.30m
m
HALL/RECEPTION
ESC.03
DECHETS
1.50m (7%)
m 1.61
m
1.66m
pf 1/2h
5m
ecs
2.97m
3.24
m
+0.29m 8.30m²
m 1.70
pf 1/2h
5.41
4.21
LINGERIE
cf 1/2h FP
6.41m
S.S.
pf 1/2h
m
1.88
S.S.
L'accueil avec tablette PMR m 30x75cm 5.04
E
0.80m
1.37m
+0.15m
0.8
2
m
01
2.
P0
1U
rte
Po
T m EX 0.90
0m m 1.50
1.3
CAVE
3.47m
m
80 1.
+0.53m 31.40m²
S.S.
RECEPTION
1.60m
cf 1h
m
26
+
1.62m
1h
cf
.
7.50m²
Dénomination des locaux
VERRIERE revêtement de sol gros mobilier (agencement principal)
ASCENSEUR PMR 630kg
1.3
STOCKAGE 5m
1.0
1.50m
+0.15m 20.50m²
1.30m
2.
7m .5 18
m
22
3.
Baie info/ Backoffice
S.S
S.S
2.28m
1h
7m
0.1
vitrage
1
cf
1U1.40m m 5 50m 1.2 1.
1.96m
m 95 m 0. 86 0.
+0.53m
ESC.02
+0.53m
.
S.S
FP
3m 2.9
2h
1/
3.29m 1.99m
S.S.
2h
1/
.
S.S
(7%)
.
gaines elec
cf 1h
P0 rte Po U 1
B'
3.61m
pf
ESC.01
1h
.
cf
m
50
1.
S.S
90
1.
+0.53m
A
S.S.
Tm EX1.66 0m 0.9
. S.Sm
1.59m
1/
m
96
1.
Porte à maintenir ouverte
.
8m
2.3
pf
pf 1/2h vv
S.S
(20%) 5m
4.5
+0.53m 27.20m²
1U
pf 1/2h vv 1.01m
CH.21
+8.33m 31.15m²
+0.40m 9.90m²
pf
5.
6.50m
+0.53m
m
71
CH.20
.
0.80m
1.30m
vitré sur allège 1m m
1.50
pf 1/2h
3.
6m
+0.29m 54.80m²
.
S.S
+8.33m DARCHITECTURA, 4 boulevard des clomiers, 21240 DIJON - www.darchitectura.com S.A.R.L unipersonnelle au capital de 7000 euros - SIRET 519 905 335 00013, 27.80m² RCS B 519 905 335, TVA Intracomm. FR 55 19905335, code APE: 7111 Z Société Inscrite au tableau des architectes de Bourgogne (Affiliation Nationale S13715 / Affiliation Régionale 04 S01130)
m
65
1.4
+0.51m
pf 1/2h
vv
0.80m
m
1.50
BISTRO
2h
1/
S.S
0.80m
E'
.
+0.53m 19.10m² 0.80m Tablette PMR 30x75cm
pf
Cloisons toute hauteur jusque sous couverture
Nature et réaction au feu des matériaux utilisés pour les : ZONE TECHNIQUE Sans objet éléments de décoration 32,8m² Plafond suspendu sur ossature métallique avec dalles à base revêtement de plafond de fibres minérales ou plaques de plâtre (M0) ou plafond bois skydome accès à
4.02m
(20%)
S.S
ASCENSEUR PMR 630kg
1.50m
BAR
cf 1h
1.30m
Recoupement des combles inaccessibles, des intervalles entre les planchers et les plafonds suspendus VII. LOCAUX REPRESENTANT DES RISQUES PARTICULIERS D’INCENDIE
IX. AMENAGEMENTS INTERIEURS, DECORATION, GROS MOBILIER
Les descentes d'eau pluviales seront remplacés au besoin par des descentes en zinc avec ajouts d'une boite à eau au niveau des façades intérieures.
0.80m 7.91m
1m
SALON PRIVE +0.53m 16.50m²
1.70m
+0.53m 11.90m² 1.50m 2.00m S.S.
4.45m
PLACARD TGBT
6.1
SANITAIRES
1.60m
3.53m
er
à utilis
WC MIXTE PMR
1.40m
1.35m
inée
1.50
Escaliers existants non modifiés par les travaux sauf escalier accessoire créé Parois CF 1h pour l’escalier créé Porte PF 1/2h avec ferme-porte pour l’escalier créé
lProcédures et Consignes………………………..
e
4m
3.0
1.40m
2.20m m
chem
èg all
s/
1.36m
Cloisons CF 1h + Portes PF 1/2h avec ferme-porte
Protection des cages d’escaliers : résistance au feu des : - parois d’encloisonnement - bloc-portes
l Moyen de Signalisation…………………………. Sans objet +7.00m
Pour finir, des châssis de désenfumage seront installés en toiture au droit de deux escaliers et un en façade sur l'avenue de la République et devront respecter 1m² d'ouverture.
1.40m
fen
C'
De plus, trois velux, seront nouvellement installés et ceux existants seront remplacés afin de garantir l’étanchéité à l'air et à l’eau, deux seront de dimension 78 x 118 cm et un de 78 x 98 cm. Une ouverture toiture existante sera remplacée par un velux neuf de dimension 98 x 118 cm.
6.1
. rte S.S po en (20%)
etr
- et entre locaux et dégagements
D
Afin de pouvoir créer des chambres dans les combles, des chiens assis au nombre de 4 seront créer. Ils reproduiront à l'identique ceux déjà existants.
1.40m
WC PMR MIXTE - Référence Vasque PMR ALLIA - WC Cuvette PMR
Cloisons CF 1h entre les chambres Cloisons PF 1/2h entre les autres locaux
l Cheminement Praticable………………………… Cheminement praticable par les PMR pour le RDC
Au niveau des façades sur rue, des enseignes avec mise en œuvre d'un système d'éclairage seront installées. Elles respecteront la réglementation du PLU et feront l'objet d'un dépôt ultérieur d'une demande d'autorisation préalable.
C'
- des locaux entre eux
VIII – ESPACE D’ATTENTE SECURISE (GN8 hors cas d’exonération)
Les gardes corps en ferronnerie seront rénovés et peints de couleur RAL 7021 gris noir. La lisse en bois existante, ne pouvant être conservée car en trop mauvaise état, sera remplacée à l'identique. Rue du paradis, un garde corps sera ajouté afin de se prémunir du risque de chute. Au niveau du pan coupé au 2 place Fleury, la balustrade du balcon supérieur, sera rénovée et reconstituée à l'identique et surmontée d'une lisse métallique afin de respecter les normes et de se prémunir du risque de chute.
D
DISPOSITIONS PREVUES AU PROJET
Caractéristiques (nature et comportement au feu) des parois verticales et des portes.
DOSSIER PC / MARS 2019/ MAISON 1896 / 2 Place FLEURY – 21 200 BEAUNE
EXT 2.80
m
Porte
PC40 PC COMPLEMENTAIRE Document 6 PLAN RDCAA' 1/100 COUPE EXISTANTE 1/100
1U
PC40 PC COMPLEMENTAIRE Document 7 PLAN R+2 BB' 1/100 COUPE EXISTANTE 1/100
P03
C
2m
0m
2.7
monte charge
5m 2.9
C'
C'
1m
2.6
A'
monte charge
VEST/F
8m 3.0
SDB - Référence 2x Vasque PMR ALLIA - Douche avec siège et main courante - WC Cuvette PMR
D
0.8
D
C
dalle béton nouvelle non accessible +7.00m 14m²
A' B
B
3m
0.9
4m
1.4
0m 1.3
6.00m²
4.9 0m
S.S
2.09m
4.23m
toit de e sis ag châs nfum se dé velux neuf 78x118
sis
as ne uf 01
cf 1h FP
1h
cf 1h
pf 1/2h 1.45m
m
S.S.
12
8.
1.45m
cf
pf 1/2h
+11.70m 12.40m²
2m
ien
ch
châssis de désenfumage
m
02
as
3.
sis uf
ne 02
2.90m
1.55m
2.22m
de age sis m âs fu ch sen dé
5m
3m
1.3
2.2
5m
0.9
0.90m
5m
2.3
B'
cf 1h
2.57m
3.56m
CH.32
CH.34
m
50
3. m
4.71m
m
29
3.65m 3.45
+4.55m 36.90m²
m
m
16
2.
CH.33
1.00m
+11.70m 18.25m²
m
3.95
3.94m
2.93m
D'
4.
6m
4.2
CH.4 suite
+11.70m 17.40m²
1.62
+11.65m 26.15m²
3.98m
m
5.03
3.49m
m
Projet : : Projet Maison 1896 Maison 1896
2, Place Fleury, 21200 Beaune 2, Place Fleury, 21200 Beaune
DARCHITECTURA DARCHITECTURA 4, boulevard des Clomiers - 21 240 4, boulevard des Clomiers - 21TALANT 240 TALANT Tel: 09 5409 2654 0926 15/09Fax: 5809 2658 0926 1509 15 Tel: 15/ 09 Fax: Email:Email: contact@darchitectura.com contact@darchitectura.com
Permis PermisdedeConstruire Construire PC40 PC COMPLEMENTAIRES
f 04
is neu
n ass
chie
f 04
is neu
n ass
C
D'
m
4.01
2.84
E
chie
PC40 PC COMPLEMENTAIRE Document 6 PLAN R+1AA' 1/100 COUPE PROJET 1/100
velux neuf 78x118
cf 1/2h
7m
S.S.
6m
4.3
4.7
ESC.02 0.90m
9m
5.28
E
1.21m
cf 1h
A 3m
4.3
3.2
m
3.29m
ESC.01
4.11m
1.51m
velux neuf 98x118
1U
3.1
4m
4.5
1h
4.07m
garde-corps vitré pf 1/2h
velux neuf 78x98
ASCENSEUR PMR 630kg
E'
lames acoustiques
cf
1.20m
toiture nouvelle PF 1/2h
4.16m
CH.31
+11.70m 27.40m²
ien
cf 1h
S.S.
1h
ch
.
1.04m 1.16m
5m
1U
0m
1.5
1.5
1.70m
4.08m
. S.S
1.52m
2.13m
S.S.
2h
1.52m
1/
1.40m
pf
3m
cf
. S1.2.S8m
+3.98m 32.30m²
3.76m
CH.3
+4.55m 30.90m²
CH.30
+11.70m 30.90m²
9m 0.9 5m 1.2
+4.38m
S.S.
m
66
2.
0.90m
.
S.S
CH.5
+4.55m 33.00m²
1.22m
1.78m
B'
cf 1/2h
m
+4.55m 4.68m
1h
5m
1.5
CH.5 suite
31
2.
ESC.02 cf
3.6
.
m
1h
ESC.03
CH.6
S.S.
cf 1h
83
cf
0m
1.3
m
0.
A
gaines elec
2h
1/
7m
EAS SF 1/2h
+4.55m 23,8m² 0m 1.3
2.20
ESC.01
m
2.79
1.6
PASSERELLE 0m 0.8
.
m 1.40 1.61m
vitrage pf 1/2h
1h
pf
E'
1h
0m
S.S
1U
1.70m
1.40m
m
S.S.
57
h
4.07m
cf
0.8
pf 1/2
1.41m
7.
+4.55m 21.70m²
WC PRIVE
3m
cf 1h
2.20m
8m
2.7
8m
1.7
.
S.S
cf 7m
2.3
+3.98m
4.30m
cf 1h FP
cf 1h
4.70m²
(skydome accès à la zone technique)
. S2.0.S1m
1.50m
2.20m
pf 1/2h
1.50m
0.90m
1.5
+4.55m 34.10m²
0.90m 1.40m
S.S
ASCENSEUR PMR 630kg
5m
2.7
1m
1.50m
SDB et WC PMR
m
20
2.
VEST/H 9m
1.0
.
S.S 3.4
+4.55m 25.70m²
CH.1
+3.98m 35.00m²
CH.2 PMR
2.24m
4m 1.4
BISTRO 1.00m vitrage de la verrière pf 1/2hjusqu'à 1m
4.70m
PC40 PC COMPLEMENTAIRE Document 7 PLAN R+3 BB' 1/100 COUPE PROJET 1/100 Place Fleury
C
Feuille no:no: Feuille
Date: 13.03.2019 Date: 3.12.2018
PC11 PC08
Echelle: Indiqué Echelle: Indiqué
Maître d'ouvrage: Maître d'ouvrage: MM David FINK David FINK
Maison 1896, Maison 1896, Mirabel Hotel andand Mirabel Hotel Restaurant Group Restaurant Group POB 7228 Carmel, POB 7228 Carmel, California 93921 Etats-Unis California 93921 Etats-Unis
Building permit application and negotiation
Maître d'oeuvre: Maître d'oeuvre:
DARCHITECTURA DARCHITECTURA
PC5 Document 1 FACADE OUEST EXISTANTE 1/100
PC5 Document 1 FACADE OUEST EXISTANTE 1/100
PC5 Document 1 FACADE OUEST PROJET 1/100 DARCHITECTURA
Projet :
4, boulevard des Clomiers - 21 240 TALANT Tel: 09 54 26 09 15/ Fax: 09 58 26 09 15 Email: contact@darchitectura.com
Maison 1896
Permis de Construire PC5
Feuille no:
PC03
2, Place Fleury, 21200 Beaune
Date: 3.12.2018
Echelle: Indiqué
Maître d'ouvrage: M David FINK
Maison 1896, Mirabel Hotel and Restaurant Group POB 7228 Carmel, California 93921 Etats-Unis
Maître d'oeuvre:
DARCHITECTURA
PC5 Document 1 FACADE OUEST PROJET 1/100 Projet : Maison 1896
2, Place Fleury, 21200 Beaune
DARCHITECTURA 4, boulevard des Clomiers - 21 240 TALANT Tel: 09 54 26 09 15/ Fax: 09 58 26 09 15 Email: contact@darchitectura.com
Permis de Construire PC5
Feuille no:
Facade restoration
PC03
Date: 3.12.2018
Echelle: Indiqué
Maître d'ouvrage: M David FINK
Maison 1896, Mirabel Hotel and Restaurant Group POB 7228 Carmel, California 93921 Etats-Unis
Maître d'oeuvre:
DARCHITECTURA
N
m 85
0.
B'
ACOUSTIQUE CLOISONS
m
11
1.
0.20
ISO TYP NR°
m
45
1.
72 m
CT
P 08 -Pie
1h
2 4.2
6.1
OI
ee
+0
04
2.
45mm laine minérale typ Multimax 30 alu (ISOVER) BA13 hydrofuge
Embrasures fenêtres
ext
20mm POLYPLAC (KNAUF) plaque de platre incl.
1.
Embrasures fenêtres (cas spécifiques)
int int
2. 3 2 1
3.
200mm support béton cage d'ascenseur 80+10mm doublage intérieur en laine de verre type Calibel (ISOVER) collé (80mm ldv + 10mm plâtre) 2x BA13 CF 1h
Mur B.A. d'ascenseur (Calibel = bruits aeriennes+bruits de chocs+corrrection acoustique)
l.
NE
.3m ²
A' B
HSFP 3.00
HS
FP
A1
rre
3
+0
100
.15
m
x2
10c
12%
01
0.11
MA
15 2%
1
6
E
A0
9
HS 2.9 FP 0
0.54 01
13
E
2.06
DT02
l.
ET
.7m ²
S
1.31
P 21 CF 1/2h
1.93
ec
s
0.07
portes automatiques
F08 257/300
Porte PE04 +0.01m
ha=180 54/93
F09
F08
ha=130 128/144
Ca
A1 ST rrel. 0 OC
rre
CH
6.13
CT
Ca
DE
ses
ha=168 54/93
5.6 m²
HS 2.9 FP 0
A1
CF1h
K.
CT01E CF1h
HS 1 2.9 FP 0 +0 .29 m +0
PF 1/2h P20
GT.P.
1.5
Soffite de 65cm de hauteur pour coffre de climatisation
0.1
m
Bac à grais
CF 1/2h P 21
90 x 2--
26
0.40
F01
m
340c
105x
ha=1 105/ 00 233
+0.0
2
CT01E
CT01E
CT
.29
0
1.3
0.44
P17
1.15
0.99
IE
CF 1/2h P 18
m
+0
0.1
1.27
.3m ²
HS 2.9 FP 0
DT02
2.42
+0.1 8 +0.0 26
l.
100 x 204cm
C
Tender drawings
D'
E'
m
C
.0 A1 3 9
ec
s
1.42
NB. IL APPARTIENDRA A L'ENTREPRISE, SOUS SA RESPONSABILITE DE VERIFIER LES COTES EXACTES SUR LE SITE. Maître d'oeuvre
11-18 MAISON 1896 2 Place Fleury 21200 Beaune
4 boulevard des Clomiers 21240 Talant 0954260915 contact@darchitectura.com
PLAN PROJET : RDC, SOUS SOL
1.20
09/12/2020
0.10 -PF +0
1:50
Maître d'ouvrage (MOA)
.00
m
Porte PE05
Emprise de nouvelle marquise
CF1h
ES
2.04
DT01
CA11
.40
CT01E
5
Ca 3.3
CF 1/2 P1 h 9
CT01
m
Tableau elec
CT04
A LIN 08 G 8 ER
CT01E
PF 1/ 2h --
rre
ISI
32
1.38
10c
MA 15
ha=1 105/ 00 233
F
x2
P 17 CF 1/2h
99
7%
F01
3
Ca
CU
HS 2.6 FP 5
CF 1/2h P 16
7%
NT
0.94
CF1h
MA14 2.00
RA
F14 140/36
m
+0.2 9 +0.1 8
PF 1/2 P0 h 2
F01
2
100 x 204cm
CT01
1
m
qt.
.25 1.812
A1
5.33
.29
.
1.34
1
1 2
2.68
MVA14
F01
02
3.45
1.09
Contre-cloisons sur bricks existants
int
2.94
3.61
100 x 2-- FP
P13 cf 1/ 2h
CT0
3
CT
AU
mo ch nte a à d rge éfi nir
0.44
100mm doublage intérieur en laine minérale type GR32 (ISOVER) avec 2x BA13 ou plaque phonique? CF 1h
int
DOUBLAGE TYP 03b
DT01
DT
Mo
.4m ²
VITR E
9
5 0.
00 P --
43
2. 2 1
1.
DOUBLAGE TYP 03a
GE
6.17
/23
GT.P
RE
HS 3.5 FP 8
DT0
ha=1 105/ 00 233
0
105
4
2
int
P24
2 14
F01
04
ST
1.03
2.45
3.0
MA
pla mé ca. na .
N
0.56
m²
6%
3
CT
m
0.51
/23
5
13
.15
105
CT0
A0
1.
Murs extérieurs, Murs mitoyens, plafond à l'entrée bistro
9
1.7
1.
1
05 Po seuil /34 rte +0 0 PE .00 03
-
m
2.
2 1
int
LOCALISATION
100mm doublage intérieur en laine minérale type GR32 roulé revêtu kraft (ISOVER) R=3,15 BA13 avec finition
2.3 3
60
0. 4 x3 05 +0
x 2-
F12
TIO
m 0c
Cloisons entre sdb-wc
3.8
.15
PF 1/2 P0 h 3
.8m ²
HS 3.9 FP 5
EP
+0
OT
.90
r.B
04
.56
100
GT.P.
m
CF1h
1.23
EC
+0
m²
CT01
GT.P .
1.07
11
r.B
V 5.6 E
ON
.9m ²
HS 2.6 FP 5
DOUBLAGE TYP 04
TR
71
GT.P .
0.19
ha=109 105/233
F01
/R
Pie
CA
1.90
CT01
r.B
72mm Cloison PLACOSTIL 72/48 PHONIQUE El30 42db (45mm isolant typ laine de verre)
1.
vv 100 x 2--
BIS
Pie
1.59
CT
P-CF 1/2h
3.41
E
4
HS 3.6 FP 0
Pie
04
4
C.
m
A0
m
.15
Cloisons entre chambre-sdb
ext
l.
P23
A1
GT.
.15
N
CT
04
+0
IO
.
.
.2m ²
lec
EC
GT.P
PT
.EL
CT
m
.53
+0
1
0x 10
.53
r.B
VITR
2.15 1.04
ha=73 105/233
F01
+0
GT
l.e
m
0
12
rre
P 23 PF 1/2h
1.7
+0
Pie
5.06
0.19
LL
.29
2.3 01
tab
2
350/136
3
HS 3.1 FP 5
HA
+0
6.0
PL
Ca
F13
0.96
A0
19
m
1.23
CF1h
CE
04
.53
m
9
DT
2--
E
RE
+0
6c
1.4
FIC
P04
DT02
vv
PF 1 P 0 /2h 5 CT01
30
CT
P 22 PF 1/2h
l.
OF
0
2
01
CT
1.45
1.38
HS 3.2 FP 5
4x
P1 9 x -1 -cm
P 11 1/2 h
CF
rre
CK
0.3
4.3
PF
CF1h
Ca
BA
CT04
3
4
01
11
etr
qt.
C.
MA
17
np
ort
e
R
A1
8
0.25
Mo
DT
UL
01
9
CO
HS 0m² 3.1 FP 5
01
1.6
int
DOUBLAGE TYP 02
DT
100 x 2--
1h
1h
0.27 m
ES
1
fen
7
0.6
2.97
A1
m
0.70
02
140/343
Porte PE
.17
CF
.2
.53
+0
R
.6m ²
P PF 14 1/2 h
2.34 1.00
+0
Cloisons entre chambres - chambres/couloirs
98mm Cloison PLACOSTIL 98/48 DUO'TECH 25 El60 54db (45mm isolant typ laine de verre) variante EB+ au besoin
DESCRIPTION ext
M1 4
0.64
02
wc
DOUBLAGE TYP 01
HS 3.2 FP 0
5
0.12 F01
105/233
C.
sdb
160mm Cloison PLACOSTIL SAA DUO'TECH 25 El60 66db h 3.75m / 2.70m (90mm isolant laine de verre) variante EB+ au besoin
DOUBLAGE MURS
5
--
qt.
BA
04
27
CA18
x2
Mo
CT
6
ES
sdb chambre/sdb
ISO TYP NR°
4.4
0.1
2--
D
01
100 x 204cm
CT 01
1h
7
P25
8
77
DT
vv 100 x 2--
CF
A0
A1
A1
CF
2-10 0x
PF 1 P /2h 10
0x
7
90x 204cm
1h CF 01
C'
0.0
23 10
DT01
E
CT
-P 00
1.44
01
B'
1.4
0 PL TG ACA BT RD
1
129x341cm
m
chambre
Gaines techniques
0
CF 1 P /2h 15
03 CT
0.45 0.31
129/341
Porte PE
.53
2.
couloir/chambre
LOCALISATION
70mm laine minérale Gaine Technique Verticale Placostil 2x BA18S El120 (PLACO) 2x plâtre CF parois 1h
0.1
AS.55 PM C. 63 R 0k g
CT04
+0
0
01
0 2.2 06 1/2 h
2--
CLOISON TYP 04
1.7
0
1
1 P 0 /2h 7
P
0x
0.1
0.4
PF
PF
1.08
10
2--
F0 3 10 8/2 33
0x
P 12 PF 1/2 h
10
0
01
2.0
CLOISON TYP 03
PLAN SOUS SOL 1:100
.P.
0.701 2
CT
CT
I.
GT
CT
r.B
AN
.5
CT
12
m² HS 2.7 FP 0
P 09 --
6S
0
0.98
FV01
ha=70 105/233
A
6
A0 0.1
F'
1.5
04
IVE
0.1 DT01 0
DT
rq.
PR
--
CF 1h
5.88
FV01
ha=70 105/233
1.10
N
.2m ²
x2
CLOISON TYP 02
8
Pa
LO
16
HS 3.5 FP 6
int
3.55
E
3.4
SA
2.1 1
5
03
0.96
--
A0
1.
2 1
m
0.1 1.3 0 3
3
03cm
1.10
FV01
ha=70 105/233
.P.
0.5 chem inée en in à tube ox r
gaines
01
GT
01
120x3
0.16
DT
DESCRIPTION
3.58m
5.
CLOISON TYP 01
Maison 1896
Representé par Mr FINK 7 rue d'Enfer 21200 Beaune dfink@mirabelgroup.com
Bureau de Contrôle
Alpes Contrôles
Bat F, 8 rue Jeanne Barret 21000 Dijon phenon@alpescontroles.com
* site
émetteur
état
phase
indice
plan
21200
DA
projet
PRO
00
100
001
Zones non visibles
0.59
dimensions non vérifiés
Vélux 78 x 118cm Volet motorisé
Doublage BA13
2.24
0.17
Porte PF 1/2h
Laine minérale ép.12+6cm Cloison CF 1h Laine de verre ép.9cm
Porte PF 1/2h
Laine miné. ép.10cm
COULOIR
+11.78m
Solives + lambourdes + entre solives laine minérale ép ..
0.49
CH.30
Niv. exist.+11.70m R+3
1.36
COULOIR
Gaine d'extraction galva inox Isolé Ø 25cm - 40cm. Toit non étanche à créer
Barreaux métalliques existants repeints
Tuiles traditionnelles
Marquise à créer Couleur...
COULOIR
±0.00m
0.51 0.36
BISTROT
Niv. exist.+4.55m
R+1
2.42
1.75
3.27
Parquet cont. ép. 2cm
3.39
Barreaux métalliques existants repeints
Porte PF 1/2h
Pierre de bourgogne ép.2
Parquet cont. ép. 2cm
Dalle béton à créer
Porte PF 1/2h
ESCALIER 01
COULOIR
Niv. exist.+3.98m
3.50
Ajout de forme "S" entre les barreaux
Rampe PMR à créer 6% Garde de corps métallique
1.45
0.65
0.51
+4.63m
0.36
0.75
Poteau métallique Ø 15cm
Chasse roue Finition pierre de bourg.
2.82
1.35
2.64
CH.1
COULOIR
+0.53m
COULOIR
Escalier à créer
0.20 0.21
Carrelage. époxy
1.00
2.37 0.41 0.12 0.57
CUISINE
Vitrage CF 1/2h Verre feuilleté
COULOIR
Système de sol chauffant
0.91
+0.40m
Faux plafond métallique Ensamble stable au feu 1h
Doublage BA 13 ens. CF1h Laine minérale ép.10cm Finition carrelage
Double vitrage feuilleté PF 1/2h
Porte CF 1/2h
1.04
2.20
Parcelle AB n°489 RDC
BISTROT
R+2
Menuiserie ext. Feuilleté double vitrage
Cloison CF 1h Laine de verre ép.9cm
Porte PF 1/2h
0.16
Doublage BA 13 Laine minérale ép.10cm
VEST.
Porte PF 1/2h
Verrière str. métallique Double vitrage feuilleté
3.20
0.20
0.20
Barrière en verre feuilleté
Cloison Laine de verre ép.4.5cm
Niv. exist.+8.33m
+8.41m
0.60
Double vitrage feuilleté PF 1/2h
Sens de pente
0.13 0.13
+6.96m
R+1
Garde de corps métallique repeint
COULOIR
hauteur à vérifier insitu
R+2
Lisse en bois
Av. de la Republique
Dallette en béton ép.3
Doublage BA 13 Placophonique
2.52
Vélux 98 x 118cm Volet motorisé
Isolant rigide polysterène ép.18cm
Laine minérale ép.10cm
1.43
Porte CF 1/2h
Porte PF 1/2h
2.15
Ajout de forme "S" entre les barreaux
Ventelles acoustiques Couleur RAL 7016
0.36
Charpente en partie métallique
+10.22m
Niv. exist. +0.15m RDC ±0.00m (NGF=215.00m)
(Z=215.00m)
NB. IL APPARTIENDRA A L'ENTREPRISE, SOUS SA RESPONSABILITE DE VERIFIER LES COTES EXACTES SUR LE SITE. Maître d'oeuvre
DESCRIPTION
B 02
LOCALISATION
30mm pierre de bourgogne scéllée 40mm mortier colle + T2 quicknet (3,4mm) primeur revêtement d'étanchéité Siplast 18mm OSB4 (humidité + contrainte élevée) (patine/elastomère) L'ambourdage 45x220mm 24mm solives existantes laine minérale faible densité entre solives Lattes existant 100mm laine minérale 1x BA13 placo-phonique CF 1/2h 80mm plenum(selon besoin) BA 13+ finition
B 01
enduit
pente min 1.5%
20mm pierre de bourgogne scellée 15mm mortier colle 55mm chape en 1.5% min pente 61mm typ RAUPUR en mousse polyuréthan (REHAU) film polyéthylène membrane d'étanchéité dalle concassée
Tender drawings
P 01
P 02
11-18 MAISON 1896 2 Place Fleury 21200 Beaune
lot parquet
lot carrelage
4 boulevard des Clomiers 21240 Talant 0954260915 contact@darchitectura.com
DESCRIPTION 20mm parquet contrecollé Sous-couche résilient ISOMIL 6mm réduc.de bruits 19dB. 18mm OSB4 (humidité + contrainte élévée) (patine/elastomère)? Lambourdage 45x220mm 24mm solives existantes laine minérale faible densité entre solives? Lattes existants 100mm laine minérale thermos-acoustique 1x BA13 placophonique CF 1/2h 80mm plenum selon besoin BA13 + finition 20mm parquet contrecollé résiliente sous-couche 18mm OSB4 (humidité + contrainte élevée) patine/elastomère 40x80 band de bois 100mm laine minérale chape béton
COUPES PROJET : BB'
LOCALISATION
09/12/2020
1:50
Maître d'ouvrage (MOA)
Maison 1896
Representé par Mr FINK 7 rue d'Enfer 21200 Beaune dfink@mirabelgroup.com
Bureau de Contrôle
Alpes Contrôles
Bat F, 8 rue Jeanne Barret 21000 Dijon phenon@alpescontroles.com
* site
émetteur
état
phase
indice
plan
21200
sc
projet
PRO
00
100
007
Jonction verrière x mur chambre 02
Passerelle
1.00m
0.05m
Passerelle
21 20 19
24 23 22
int Bistro 0.26m
ext R+1 Passerelle
14 11 10
0.25m
14
14 12 13
Niveau soffite +3.95m Largeur de la passerelle 1.40 - 2.70m
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25.
20x100mm plinthe en pierre sur mur existant posé avec mortier colle 20mm pierre de bourgogne scellée 15mm mortier colle 40mm chape 100mm isolant polystyrène extrudé Roofmate SL-X R=3,5 (ISOVER) visé sur le bac acier Etanchéité 50mm dalle béton armé Bac acier cofraplus 60 Lierne UPE 120 contre mur existant HEA 180 cintré Ceinture périphérique 750x8mm cintré peint RVB 196,206,181 Rails Aquapanel extérieur 12.5mm Aquapanel outdoor avec finition Joints de silicones Profil de fixation de vitrage verticale Double vitrage 15mm Ø poteau métallique Caniveau en pierre HEA 140 cintré Capotage métallique 40mm Ø main courante inox fixée sur poteaux métalliques Double vitrage de la verrière IPE 140 Bracon de compression Mur existant en maçonnerie
0.70m - 2.10m
0.30m 0.62m
Niveau soffite +3.95m (idem niveau soffite passerelle)
Passerelle - cas verrière à l'hauteur sous la main courante Passerelle - cas verrière à l'hauteur de main courante Passerelle - cas verrière à l'hauteur sous la main courante
21 20 19
ext R+1 Passerelle
Passerelle - cas verrière à l'hauteur de main courante
21 20 19
ext R+1 Passerelle 24 23 22
24 23 22
pente
pente
1.00m
1.00m
int Bistro
Niveau soffite +3.95m
int RDC Bistro
0.60m
0.15m 0.25m
0.60m
0.25m
0.15m
int Bistro
Largeur de la passerelle 1.40 - 2.70m
Niveau soffite +3.95m 19. HEA 140 cintré 20. Capotage métallique 21. 40mm Ø main courante inox fixée sur poteaux métalliques 22. Double vitrage de la verrière 23. IPE 140 24. Bracon de compression
Largeur de la passerelle 1.40 - 2.70m
int RDC Bistro
Renforcement Joint de silicone
Mur existant en pierre apparente Verrière Solives métalliques IPE 140 Chenaux métallique avec grille de protection
(l'ensemble des éléments métallique galvanisés et laqué trois couches de finitions peinture polyuréthane RVB 196,206,181)
int RDC Bistro
0.38m
Jonction verrière x mur mitoyen
0.65m min
09
0.15m
pente min 1.5%
18 17 16 15
0.60m
1.00m
8 7 6 5 4 3 2
25 1 14
pente
Fixation en alu de garde corps sur des murs, profil cachant les trous de fixation L'ensemble de vitrage PF 1/2h Bavette métallique avec joint de silicone Solin métallique avec joint de silicone Chenaux métallique avec grille de protection Verrière en pente 5.7° 140mm isolant thermique et acoustique Etanchéité Structure porteuse EP de la passerelle avec isolant rollé Caisson de finition Aquapanel outdoor montrer sur rails + finition Niveau soffit +3.95m
19. HEA 140 cintré 20. Capotage métallique 21. 40mm Ø main courante inox fixée sur poteaux métalliques 22. Double vitrage de la verrière 23. IPE 140 24. Bracon de compression
Details
Angles de support Renforcement Caisson d'aération (AQUAPANEL) Finition Poteaux métalliques (couvert) peint Finition 100mm laine minérale GR32 roulé revêtu kraft (ISOVER)
(view of the main house from the garden)
HOUSE ON A STREAM
2013. architect at architecture brio. mumbai
www.architecturebrio.com/projects/house-on-a-stream-29 www.frameweb.com/magazines/mark/mark-50 www.themeritlist.com/projects/houseonastream www.archdaily.com/448480/house-on-a-stream-architecture-brio www.designboom.com/architecture/architecture-brio-weaves-retreat-house-over-stream-in-india-11-24-2013
description house area plot area architect site climate main materials
: : : : : :
weekend home, alibag, india 300 sqm 3000 sqm robert verrijt, architecture brio heavy monsoon, hot humid summers exposed concrete, burma teak wood
my main role : site execution (single handed), detail design, detail tests on site, supply coordination, drawings (8 months)
A stream runs through this weekend getaway, enlivening it. One walks along it while entering the house. The house weaves around the streambed landscape, making full use of the views within the site and emphasizing particular instances : a beautiful tree or the cascading water of the monsoon. The day areas of the house such as the dining/ kitchen, the living room and entrance verandah are separated from the master bedroom by a bridge that spans the stream. The kitchen is the heart of the house : a large, high ceiling inviting volume. The remaining areas, the living, dining, pantry, guest room span out from here in different directions, maximising views and utilizing the full potential that the site has to offer. I joined this project in April 2012 after the basic concrete structure was built. I was appointed singularly for site execution, supervision and coordination with the contractors, suppliers and client. I also designed and executed the following details : - terrazzo insitu flooring and details - openings : sliding shutter details in btc wood, toughened glass, concealed sliding and sliding-folding systems with btc wood and glass shutters - wooden screen details : fixed and hinged wings in btc wood and galvanised steel framework to soften light and air - fenestrations : box windows in mild steel, btc and glass - skylight with btc wood, mild steel and toughened glass - all external weathering details and insulated roof - railings in btc wood - master bathroom, master wardrobe - kitchen island, pantry cabinets, plumbing and details - ceiling details at all junctions and edges - lighting scheme - garage slatted screen, plexiglas roof and gutter The interior is kept minimal to emplasize the views and connection with nature. With a 50% facade opening, a high level of joinery details protect the house from the heavy rains. The house was completed in September 2012.
Plan and Sections
Detailed Cross Section
NOTES
LEGEND :
REVISION :
HOUSE BY A STREAM
WORKING DRAWINGS SHEET TITLE :
DRAWING NO.
SH.WD.D14
PROJECT NO.
20081202
SCALE
1:10/5/2
DATE
JUNE 15, 2012
DRAWN BY
SUJATA CHITLANGIA
CHECKED BY
ROBERT VERRIJT
PROJECT ARCHITECT :
Details : Openings, Flooring, Waterproofing, Fenestration
SK-001e
SK-001c
SK-001a
PLAN
SK-001d
SK-001b
SECTION
SK-001f
SK-001g
PROJECT NAME
HOUSE A STREAM HOUSE BY ON STREAM
PROJECT NO.
20081202
SCALE
1:3 1:3
DATE
11.10.2010 JULY 15, 2012
DRAWN BY
SUJATA CHITLANGIA BRIO (PROJECT ARCHITECTS)
CHECKED BY
AARYAN (PROJECT ENGINEERS/CONTRACTOR) AARYAN (PROJECT ENGINEERS/CONTRACTOR)
SH_ SLIDING DOOR D1E DRAWING NO.
SK- D-001
Details : Sliding Doors, Weatherproofing
BLOW UP 01
01 SK-D-002
BLOW UP 02
BLOW UP 1
SECTION 01 @ HEADER
BLOW UP 2
BLOW UP 3
SECTION 01 @ SILL
PROJECT NAME
HOUSE ON A STREAM HOUSE BY STREAM
PROJECT NO.
20081202
SCALE
1:5 1:3
DATE
01.03.2011 JULY 15, 2012
DRAWN BY
BRIO (PROJECT ARCHITECTS) SUJATA CHITLANGIA
CHECKED BY
AARYAN (PROJECT ENGINEERS/CONTRACTOR) AARYAN (PROJECT ENGINEERS/CONTRACTOR)
SH_ SLIDING DOOR D1A DRAWING NO.
SK- D-002
Details : Sliding Doors, Weatherproofing
FFL -25.00
FFL +0.00 BLOW UP 03
Site Execution : Entire Built Form
Site Execution : Details, Concrete, Steel, Wood
Site Execution : Finishes
(the Himalayan valley)
(butterflies of Sikkim)
BUTTERFLY RESERVE
2013. architect at architecture brio. mumbai
description area architect site climate main materials
: : : : :
natural reserve with research and tourism, sikkim, india 29 hectares robert verrijt, architecture brio + www.fusestudio.nl heavy monsoon, temperate forests steel structure, wood shingle cladding,recycled wood interior, mica stone and natural fibre nets
my main role : design development, detail design, material research, structure+plumbing+electrical coordination, tender drawings, detail drawings, presentations (6 months)
A vast 75 acre butterfly reserve in the Himalayas of Sikkim, to retain their environment which is now under threat. Architectural intervention involves landscape designing, interpretation pavilions, an entrance reception/observation tower and scientific research and quarters. Only 4 acres is accessible to the public to minimise the impact of the visitors on the butterfly habitat. The most appropriate habitat for Butterflies is a lush landscape filled with nectar and feeding plants that attract them to feed and lay eggs. By increasing the richness and variety of these plants, the population and diversity of butterflies increases. The pavilions are prefabricated to minimise construction disturbance at site. The entrance structure is the culmination of the Butterfly Reserve as a constructed ecology : the watchtower is a vertical butterfly garden interweaving through three cantilevered interpretation pavilions wrapped in a netted enclosure. Its structure is based on tensegrity and balance; it is biomimicry in the form of camouflage and display. Here people are taught about how the environment could be improved for the livelihood of the endemic butterflies.The butterfly is a reminder to make changes when the opportunity arises. Change and transformation are inevitable for us all. The journey through the park encourages this in the hope for a better environment. The vertical garden shows the possibilities of creating microenvironments beneficial for butterflies in urban areas. I worked with Ar. Robert Verrijt and Armand Pardekooper of OIII Architects, Amsterdam, for : - design development of entrance tower, interpretation and exhibition pavilions, research pavilions and staff quarters - design development and detailing of landscape paths and plantations and soil volume calculation - detailing of all built structures, internal and external - material research for external wood shingles, recycled wood, mica stone and netting enclosures - structure, plumbing and electrical coordination with consultants - budget and area calculations - tender drawings for construction - presentations. The project is under construction, and due completion in 2017.
Landscape Intervention
Material Research
Budget and Area Calculation
BIODIVERSITY TRAINING INSTITUTE 2013. architect at architecture brio. mumbai
description area architect site climate main materials
: : : : :
residential training institute, sikkim, india 5000 sqm robert verrijt, architecture brio + www.fusestudio.nl heavy monsoon, temperate forests steel structure, natural breathing stone cladding, concrete interiors
my main role : structure+plumbing+electrical coordination, tender drawings, presentations (4 months)
In the Himalayas, the educational and residential building is characterised by green features that derive from re-using and re-interpreting local techniques and knowledge. Spaces like training halls, workshops, conference auditoriums, library, research labs and residential facilities converge in a place for education in the Himalayan flora and fauna and set an example for an environmental friendly building. Compact with a small footprint, it makes use of solar energy, local vegetation and wind. Thermal mass of the walls create moderate fluctuations in temperature. Local materials like rammed earth and natural earth are chosen to create accumulating qualities of walls and floors. The diverse vegetation of Sikkim will become an integral part of the building such as the vegetated roof with local plants. A place for education, exchange of knowledge, to meet each other and an inspirational example of the Sikkimese ‘green mission.’ I worked with Ar. Robert Verrijt and Armand Pardekooper of OIII Architects, Amsterdam, for : - detailing of all built structures, internal and external - structure, plumbing and electrical coordination with consultants - budget and area calculations - tender drawings for construction - presentations. The project is under construction, and due completion in 2017.
Building camouflaged in the Landscape with Natural Stone and Moss
Site Studies
Building Topography and Sections
Plans and Sections
MARTIN-LUTHER-PLATZ PAVILION 2016. architect at molestina architekten. cologne
description area architect main materials
: : : :
pavilion and cafe, düsseldorf, germany 1000 sqm pablo molestina, molestina architekten wood, corten steel clad curtain wall facade, wooden interiors
my main role : assistance in working drawings and details (4 months)
A freestanding pavilion in the center of Düsseldorf acts as a cafe and resting space for its people. Situated in a busy plaza facing a prominent church, the pavilion opens humbly to the public and invites them inside. Solid built-up wooden frameworks are enclosed by glass and punctured corten facades that borrow colours from the neighbouring church. As evening seeps in, the pavilion becomes a lantern attracting its visitors.
NNü m 03.84 + = 00.11 +
NNü m 03.64 +
retsnefebeihcS 1
retsnefebeihcS 1
retsnefebeihcS 2
Tender drawings
DÜS THCISNA
Presentations
OTTO INFINITO
2012. architect at architecture brio. mumbai
description area architect main materials
: : : :
italian restaurant, mumbai, india 500 sqm robert verrijt, architecture brio natural stones (marble, granite, sandstones), teak wood
my main role : construction drawings, details, material supplies, HVAC coordination, lighting scheme, site execution (2 months)
WAGLE RESIDENCE
2012. architect at architecture brio. mumbai
description area architect main materials
: : : :
duplex apartment interior, mumbai, india 700 sqm robert verrijt, architecture brio natural stones (marble, granite, sandstones), teak wood, various fabrics, specially fabricated windows
my main role : construction drawings, details, material supplies, HVAC coordination, lighting scheme, furniture details (2 months)
thought. space. design. S U J A T A
It’s a passage between framing and deframing of space It’s about time, place and space It’s about simultaneity It’s about multiplicity, multiple singularities It’s about the softening of singular objects It’s about the softening of events It involves spatial specificity and programmatic freedom It involves vantage points It involves choreographed gestures It’s about collectivity It’s about contemplation It’s about co-existence It’s about the Dérive It’s about creating places, spaces and atmospheres for people.
C H I T L A N G I A
+44.77.69.34.08.43 mail@sujatac.com www.sujatac.com london,uk