CV + portfolio_experienced graduate_Chooi si

Page 1

P O R T F O L I O ARCHITECTURE & INTERIOR by

CHOOI

DESIGN SI

CHOK


architecture graduate - 2 years experience chooisichok@gmail.com

+614 1605 6346

DESIGN

kitamotif

PROFILE

Hello there! I am an architecture graduate with a keen eye for detail, interiors and project coordination. I seek to create meaningful architecture through a holistic design approach - an ongoing conversation between form & function, people & place, past & present, liveability & sustainability.

SKILLS

ArchiCAD

Revit

AutoCAD

Social Media PR

Architecture Marketing

Photoshop

Sketchup

InDesign

Graphic Design

Interior Styling

I llustrator

Life Cycle Assessment

M.Excel Public Speaking

EDUCATION Masters of Architecture The University of Melbourne 2013 - 2014

Bachelors of Environments (Architecture) The University of Melbourne 2012

INDUSTRY 1 YEAR 6 MONTHS . SEPT ‘15 - FEB ‘17

Diploma in Architectural Technology Taylor’s University, Malaysia 2009 - 2011

EXPERIENCE

CONTRACT 1 YEAR 5 MONTHS . AUG ‘14 - DEC ‘15

HINDLEY & CO Architectural Graduate ( Full time)

5 MONTHS . JUL - DEC ‘15

RARA ARCHITECTURE Architecture Graduate ( Project basis, Full time)

Projects (Greater Melbourne) + Boutique residences (Alts & Adds) + Luxury apartments (New build - contract work) + Architecture competitions

Projects (Greater Melbourne) + Townhouse development (New build) + Boutique residences (Alts & Adds)

Experience + Documentation & reports for all stages - SD, DD, TP, BP, TD, CD & CA + Liason with clients, local council, consultants, builders, suppliers + Site visits, meetings & inspections + Interior furnishing & joinery design + Competition drawings + 3D modelling + Designing company website (WIX) + Media kits (Bowerbird) + Social media (Houzz)

Experience + Documentation - BP + Liason with consultants + Contract work - Hindley & Co (2 months) + Establishing company Instagram

INTERESTS

5 MONTHS . FEB - JUN ‘15

RBI ARCHITECTS Architecture Graduate ( Part time) Projects (Greater Melbourne) + Townhouse development (New build) + Commercial building + Display showroom layout & joinery Experience + Documentation - TP & CD + 3D modelling + Walkthrough animation

PAST

Photography

Travel

Sustainability

Socials

Project (Malaysia) + University campus extension - SD stage

Projects (Melbourne) + Life Cycle Impact Assessment research paper published in Architectural Science Association (ASA) conference year 2015 + ASA Conference presentation Experience + Sustainable residential design + Life Cycle Assessment - minimizing carbon footprint + Infographics

INTERNSHIPS

SN LOW & ASSOCIATES Year 2011 (1 month)

THE UNIVERSITY OF ME L B O U R N E Graduate Student Researcher

S AY H A N L I M A R C H I T E C T Year 2010 (2 months) Projects (Malaysia) + Boutique residence + Market (Kasturi Walk)

REFERENCES Anne Hindley Director | Hindley & Co anne@hindleyandco.com.au +614 2330 3959

Dr. Robert Crawford Architectural Science Association Senior Lecturer | Melbourne Uni rhcr@unimelb.edu.au +613 8344 8745

Andrew Simpson Principal | Andrew Simpson Architects Senior Tutor | Melbourne Uni andrew@asimpson.com.au +613 9416 4814


CONTENTS

01

WORK

EXPERIENCE

Featured single residential projects (alterations & additions) with experience gained throughout sketch design to contract administration stages.

02

COMPETITION

03

ACADEMIA

International architecture competition for

Graduate research paper proposing the redesign

the Melbourne Tattoo Academy building. The

of a case study residential building. The aim is to

competition site is based in North Melbourne.

minimize carbon footprint.

04

DESIGN

STUDIO

05

T R AV E L

Featured university design project of an

Curated images from my travelling experience.

atmospheric public bath cum private holiday

In the pursuit of creativity and design inspiration.

residence in Seljavallalaug, Iceland.


01

WORK

EXPERIENCE

HINDLEY & CO The client’s brief was to create an upper

My role extended throughout all stages

Private residential

storey extension for two teenage children and to freshen up the ground floor’s look. In contrast to other projects, no planning permit was required. Council approval was required to ensure the architectural works did not interfere into the site’s existing Public Acquisiton Overlay. Dispensations were required for a 19th stair riser (due to the existing ceiling height) and for a pocket door.

in the project :

Sketch design to Contract Administration ArchiCAD, AutoCAD,

TB

A

C

K

SK01

ES

.C

CENTER OPENING WITHIN PLY PANEL

R

FCL 35.44

G CEILIN

D WOO

PLY

3000

TREAD = 240MM RISERS = 19 X 186.05 MM

TIMBER HANDRAIL TO DETAIL 870

3 2 1

FFL 28.76

6

5

4

7

8

9

D

TE

AIN

P

VELUX 550 X 1180MM ALLOW POWER TO SKYLIGHT & BLIND

VELUX 550 X 1180MM ALLOW POWER TO SKYLIGHT & BLIND

HEIGHT OF PENDANT TBC BY ARCHITECT ON SITE

PLYW

OOD

10

G TIN IR SK 15 R BE 14

16

17

CENTER SKYLIGHT OPENING TO PLYWOOD CEILING PANEL . PLYWOOD LINING INTO SHAFT, CONCEAL FRAME. NO LENS IN CEILING. TERRACOTA TILES. REUSE TILES FROM DEMOLISHED ROOF AND FROM OWNER SUPPLY. BUILDER TO INSTALL WITH REFLECTIVE FOIL ROOF BLANKET. REF SPEC.

RUMPUS

OPEN

R3.5 CEILING INSULATION. REFER SPEC. CEILIN

18

COLORBOND ROOF GUTTER. COLOUR - SURFMIST. REFER SPEC. PAINTED WEATHERBOARD PROFILE TO MATCH EXISTING

G

HEIGHT OF PENDANT TBC BY ARCHITECT P3 ON SITE

STAIR

900

535

PLASTERBOARD BULKHEAD & CEILING

FCL 31.76 INSULATED BULKHEAD, BUILDER TO CONFIRM IF BULKHEAD SPACE IS SUFFICIENT TO CONCEAL DUCTING BEFORE PROCEEDING.

P2

NOM 2650

9000

CHECK EXISTING ROOF PITCH & HEIGHT ON SITE BEFORE CONSTRUCTION

FFL 32.30

PAINTED FLUSH TIMBER SKIRTS TO DETAIL

19

R2.0 WALL INSULATION PLUS FOIL (INCLUDING REFLECTIVE AIRSPACE) REFER SPEC. POSISTRUTS TO ENGINEER'S SPECIFICATION

existing ceiling joist

R2.0 ACOUSTIC FLOOR INSULATION. REFER SPEC.

EXISTING DECORATIVE CEILING TO BE RETAINED AND PROTECTED DURING CONSTRUCTION

TIM H 13 US 12

FL

INSPECT EXISTING GUTTERS & DOWNPIPES DURING TENDER. ALLOW PC SUM TO REPAIR AND REPLACE IF REQUIRED.

11

ENTRY

COAT CUPBOARD

HALL

LIVING

HOLD, WALL OPENING TBC WITH CLIENT. PAINTED TIMBER REVEALS (TYP). REFER DETAIL.

J

void

J

EGL 28.16

EXISTING STRUCTURE NOT SHOWN

EGL 27.94 *

900

W13

MIN 1900. COS

3141

FIXED FRAMELESS WINDOW LINE INDICATES EXISTING ROOF (TO BE DEMOLISHED)

MATCH PITCH OF ROOF TO EXISTING. CHECK ON SITE.

CENTER OPENING WITHIN PLY PANEL

E

SE

SK03

O

RL 36.24

CENTER SKYLIGHT OPENING TO PLYWOOD CEILING PANEL . PLYWOOD LINING INTO SHAFT. CONCEAL SKYLIGHT FRAME WITH PLYWOOD LINING. NO LENS IN CEILING.

D

SITE BOUNDARY

Sketchup, Photoshop

8725

Software

HEIGHT FROM EGL

1 year 6 months

COS

Duration

+ Correspondance with council and all consultants + Correspondance with suppliers + Coordination of drawings, tenders, dispensations, building permit + Managing Builder’s invoices + Issuing revisions + Site visits and meeting minutes.

2400

Involvement

SITE BOUNDARY

(alterations & additions)

2100

Project 1

Architecture Graduate

2100

Position

NO WORKS AND NO DEMOLITION WORKS TO BE DONE WITHIN PUBLIC ACQUISITION OVERLAY (PAO)

REFER TO STRUCTURAL DRAWINGS FOR RESTUMPING

SECTION A - A SCALE 1:100 @ A3

EXISTING TERRACE FFL 28.76 2970

4285

P

EV

2400 EV P

O

GLASS DOOR

robe

STUDY

ED

W17

690

2490

GROUND FLOOR PLAN SCALE 1:200 @ A3

820

3500 N

NO WORKS AND NO DEMOLITION WORKS TO BE DONE WITHIN PUBLIC ACQUISITION OVERLAY (PAO)

3985

skylight over

FALL skylight over

7 8 9 10 11121314151617 18 19

skylight over CARPET RUNNER

RUMPUS

D06

skylight over

S 90

900

CARPET FFL 32.30

TILES

D02

90

FW

POWDER

REMOVE AND CAP EXISTING BRICK CHIMNEY.

D03

4580

TILES FFL 32.30

1400 500 570 90 3470

DP TV

FW

BATH FALL

W04

D05

BRACE 90X45 STUD WALLS TO STRUCTURAL ENGINEER'S SPEC.

P

8320 90 1050 90 1020 90 2335 90 1000 920 900 510 900 DP S 100 2220

J

CARPET FFL 32.30

W01 W02 W03 90 1235 1100 495 600 1100 1185 1100 1235 2155 90 SETBACK TO 90 2830 90 1000 4220

A POCKET DOOR TBC, PENDING APPROVAL FROM AUTHORITY.

CLADDING

PA

30° C.O.S.

O

NO WORKS AND NO DEMOLITION WORKS TO BE DONE WITHIN PUBLIC ACQUISITION OVERLAY (PAO)

P

1930 C.O.S

SEAL AROUND & REGLAZE EXISTING STUDY WINDOWS WITH CLEAR ACOUSTIC GLASS. TBC ON APPROVAL OF QUOTE.

PLUMBER TO PROPOSE WASTE WATER ROUTE FOR ARCHITECT'S APPROVAL BEFORE WORK COMMENCES

D04

ED

UP

PAINTED EX42MM KDHW REVEALS ON ALL OPENINGS (TYP). REFER SPEC AND DETAIL.

A

W13

robe robe

P ED P ED

P

1565 EXISTING SETBACK 2195 EXISTING SETBACK

PAINTED SKIRTING TO MATCH EXISTING

CARPET FFL 32.30

W05

BED 2

ED

3150 4220 2500

900 500

1250

DS

BEDROOM

PORCH

5 4 3 2 1

1255

P ED DS

990 C.O.S

DS

LIVING

500 900

TIMBER FFL 28.76

D01

PA

DS

ENTRY

W15

W16

DS

+F

UP

DS

CL

31 .16

ENTRY HALL

1595

4055 800 2635

300 1580 90 1810 1005 1020 800 365 800 800 800 800 800

UP

A

DS

COATS

W12

J

BED 1

W11

PLUMBER TO PROPOSE WASTE WATER ROUTE FOR ARCHITECT'S APPROVAL BEFORE WORK COMMENCES

W06

300MM DEEP X 10MM PAINTED STEEL REVEAL. W06 - W09

P

1595 2205

W14

U/STAIR SEAT

J

PAINTED EX42MM KDHW REVEALS ON ALL OPENINGS (TYP). REFER SPEC.

LOCATE DOOR TO MAKE WAY FOR POCKET DOOR.

W07

J

ED

CARPET RUNNER 1 2

J J

4 5 6

P

MAINTAIN CONCRETE STEPS. NO WORKS TO BE DONE IN PAO.

DS

ED

RETAIN SECURITY SCREEN

900 500

P

SAND AND REFINISH EXISTING FLOORBOARDS. REFER SPEC.

HALL

500 900

DECOMMISSION FIREPLACE. SEAL CHIMNEY FLUE

ED

RETAIN TIMBER STEP. MAKE GOOD, SAND AND FINISH. REF SPEC.

P ED DP E

P ED

DINING MASTER BEDROOM

W08

W10

DS

DS

3

W09

DS

REF

DP S

line of new first storey over

BATHROOM

A

DS

DS

DS

8320 2155 4025 4025 90 90 90 SETBACK TO 580 850 570 850 1170 90 1170 850 570 850 580 CLADDING

RETAIN EXISTING KITCHEN.

KITCHEN

LAUNDRY

SAND AND REFINISH EXISTING FLOORBOARDS IN KITCHEN, LAUNDRY, LIVING, DINING, ENTRY, BEDROOMS, HALL AND STUDY ON GROUND FLOOR. REFER SPEC.

30° C.O.S

DW

3465 90 1400 500D 570 PS

WM

RETAIN EXISTING LAUNDRY

FIRST FLOOR PLAN SCALE 1:200 @ A3

N

Drawings used with permission granted by Hindley & Co Pty Ltd. Contents for one time use only and not to be redistributed.


870

C W1

870

W1

90

6 C

5 PAINTED PLASTERBOARD 4 90

W1

ALIGN NOOK TO STAIR PROFILE

90

1

DRW

DRW

PLYWOOD PANEL DRW

DRW

DRW

DRW UPHOLSTERED PANEL

COAT CUPBOARD

90

870

DRW

DRW

DRW

DRW

DRW

DRW

2260 C.O.S W1

CARPET RUNNER STEPS

C

C

5

6

640

8

9

10

11

12

13

14

15

16

17

18

19

C CARPET RUNNER

CARPET RUNNER STEPS

C

C

5

6

7

8

9

240

240

240

240

10

11

12

13

14

15

16

17

18

CARPET RUNNER 240 240 240

240

240

240

240

240

240

240

19

50

4

2 900

240

40MM DIAMETER KDHW RODS WITH OIL FINISH. CONCEALED FIXING INTO TREADS AND TIMBER PLATE (CEILING) . REFER SPEC.

110

1000 110 585 525

900

240

C

15

16

17

18

240

240

240

240

STAIR PLAN SCALE 1:50 @ A3

1 STAIR PLAN SCALE 1:50 @ A3 50

525 110

3

1

CARPET RUNNER STEPS 40MM DIAMETER KDHW RODS WITH OIL FINISH. CONCEALED FIXING INTO TREADS AND TIMBER PLATE (CEILING) . REFER SPEC.

DRW

50

525

C

DRW

640 +270 proposal of materials and fittings C C C C + interior documentation based on 3 4 5 6 7 8 9 10 11 12 13 14 the director’s markups 2 + presentation drawings (photoshop) CARPET RUNNER + interior schedules +1 coordinating quotes and sample requests from suppliers. 240 240 240 240 240 240 240 240 240 240 900 240 + checking the costplan and PC Sum

TIMBER BALUSTRADE. REF SPEC AND DETAIL

50

C

7

DRW

designPAINTED contribution PLASTERBOARD DRW DRW wasDRW the

design responsibilties include :

1000

4

UPHOLSTERED PANEL UPHOLSTERED BENCH SEAT

50

C

COAT CUPBOARD

PLYWOOD PANEL

During construction stage, my interior

585

C

W3

understair nook with a seating space, TREAD = 240MM , RISERS = 19 X 186.05MM ( DISPENSATION OBTAINED ) display shelves STAIR ELEVATION and shoe storage. In SCALE 1:50 A3 client’s brief, the aim was response to@the to create a welcoming entrance and a space for wearing shoes.

RECESSED LED STEP LIGHTS

50 585

2 270

TIMBER BALUSTRADE. REF SPEC AND DETAIL

40MM DIAMETER KDHW RODS WITH OIL FINISH. CONCEALED FIXING INTO TREADS AND TIMBER PLATE (CEILING) . REFER SPEC.

C

4

2

My1

PLASTERBOARD WALL, PAINT FINISH. REF FINISHES SCHEDULE. ALLOW 8MM SHADOWLINE BETWEEN STAIRS AND WALL.

640

3

1000

RECESSED LED STEP LIGHTS

270

5

I N T E R3 I OFLUSH R DESIGN

HOOP PINE PLYWOOD RISER AND TREAD. CLEAR, MATTE POLYURETHANE FINISH. REFER SPECS.

HOOP PINE PLYWOOD RISER AND TREAD. CLEAR, MATTE POLYURETHANE FINISH. PLASTERBOARD WALL, PAINT REFER SPECS. FINISH. REF FINISHES SCHEDULE. RECESSED LED SHADOWLINE STEP LIGHTS ALLOW 8MM BETWEEN STAIRS AND WALL. TIMBER BALUSTRADE. AND DETAIL HOOP REF PINESPEC PLYWOOD RISER AND TREAD. CLEAR, MATTE CARPET RUNNER STEPS POLYURETHANE FINISH. REFER SPECS.

PLYWOOD PANEL

240

240

240

240

240

240

240

240

240

240

240

240

240

240

STAIR PLAN SCALE 1:50 @ A3

LIGHT FITTING, CENTER TO MIRROR PANELS AND FEATURE TILING (TYP). REF PC SUM.

LIGHT FITTING, CENTER TO MIRROR PANELS AND FEATURE TILING (TYP). REF PC SUM.

FCL 35.14

PAINT OUT PLASTER STOPPING ANGLE

PAINT OUT PLASTER STOPPING ANGLE LIGHT FITTING, CENTER TO FLUSH MIRROR PANELS AND FEATURE W2 TILING (TYP). REF PC SUM.

DRW DRW EQ

450

755 COS EQ

803 CENTER EQ

300 575 25

25MM UNDER HANG

DRW

EQ

EQ

TILES

EQ 2810 COS 1204 2830 COS EQ 2810 COS

BATHROOM ELEVATION 10 SCALE 1:50803@ A3 CENTER

1204 2830 COS

BATHROOM ELEVATION SCALE 1:50 @ A3

Volcano 77838 - 300 x 600mm Matte Finish Academy Tiles Floor Tiles

EQ

EQ DRW 803

CENTER EQ

EQ

W2

MIRROR ADJ

MIRROR ADJ

ADJ

ADJ

TR2 578 COS

450

755 COS

25MM UNDER HANG

TR2 578 COS

450

FFL 32.30

DRW

DRW

DRW

DRW EQ

EQ

EQ

TILES

10

803 CENTER

RECON STONE BENCH DRW 2PAC BOARD VANITY EQ DRAWERS WITH ABS EDGING. 803

CENTER

10

W2

PENNY ROUND TILES

25MM UNDER HANG

TR2 578 COS DRW

450 EQ

MIRROR DECORSAFE CLEAR

375

450 MIRROR ADJ ADJ

ADJ

TILES

10

W2 TR2 578 COS

2100

755 COS

W2

NOM 525 NOM 300 EQ EQ 75

450 MIRROR ADJ

DRW TR2 578 COS DRW EQ PENNY ROUND TILES

PAINTED WR BOARD

W2

825 TOP OF BENCH

25 300

TR2 578 COS MIRROR DECORSAFE PENNY ROUND TILES CLEAR

375

2100

2100 NOM 525 NOM 525 75 75 300 NOM 300 EQ EQ NOM 375EQ 25 EQ 575

ADJ

FLUSH

W2

FFL 32.30

FFL 32.30

PAINT OUT PLASTER MIRROR ADJSTOPPING ANGLE

MIRROR ADJ ADJ

W2

825 TOP OF BENCH

575

MIRROR DECORSAFE CLEAR

PAINTED WR BOARD

FLUSH

PAINTED WR BOARD W2

300

FCL 35.14

EQ 2810 COS 1204 2830 COS

BATHROOM ELEVATION SCALE 1:50 @ A3

10

RECON STONE BENCH

825 TOP OF BENCH

FCL 35.14

EQ

EQ

EQ

803 CENTER

10

RECON STONE BENCH 2PAC BOARD VANITY DRAWERS WITH ABS EDGING.

2PAC BOARD VANITY DRAWERS WITH ABS EDGING.

Raw Concrete Matte Finish Caesarstone Benchtop

Oyster Grey 30% Gloss Laminex Joinery

2100 C.O.S

RECESSED LED STEP LIGHT. REFER STAIRS DETAIL.

TREAD = 240MM , RISERS = 19 X 186.05MM ( DISPENSATION OBTAINED )

PLASTERBOARD WALL, PAINT FINISH. REF FINISHES SCHEDULE. ALLOW 8MM SHADOWLINE BETWEEN STAIRS AND WALL.

8

6 C

FFL 28.76

STAIR ELEVATION SCALE 1:50 @ A3

W1

EXPOSED PROFILE OF HOOP PINE PLYWOOD RISER AND TREAD. PAINT OUT PLASTER STOPPING BEAD.

90

FFL 28.76

2

STAIR ELEVATION 1 SCALE 1:50 @ PAINTED A3 PLASTERBOARD

PLYWOOD PANEL

9

7

FLUSH UPHOLSTERED BENCH SEAT TREAD =3240MM , RISERS = 19 X 186.05MM ( DISPENSATION OBTAINED )

CARPET RUNNER STEPS

186

535

HALL

W3

OILED KDHW HANDRAIL. REFER DETAIL AND SPEC.

10 C

90

COAT CUPBOARD

7UPHOLSTERED BENCH SEAT

2

RECESSED LED STEP LIGHT. FFLREFER 28.76 STAIRS DETAIL.

UPHOLSTERED PANEL PLYWOOD PANEL

8

HALL

W3

PLYWOOD PANEL

9

ALIGN NOOK TO STAIR PROFILE

870

C

4

FLUSH

3

EXPOSED CARPET PROFILERUNNER OF HOOPSTEPS PINE PLYWOOD RISER AND TREAD. PAINT OUT PLASTER STOPPING BEAD.

11 10

6 5

12 PLYWOOD PANEL

12

11

90

2260 C.O.S W1

W1

8

7

90

C

C

9 W1

3000

PLASTERBOARD EXPOSED PROFILE OF WALL, HOOP PAINT PINE FINISH.RISER REF FINISHES SCHEDULE. PLYWOOD AND TREAD. PAINT ALLOW SHADOWLINE BETWEEN OUT8MM PLASTER STOPPING BEAD. STAIRS AND WALL. RECESSED LED STEP LIGHT. OILED KDHW HANDRAIL. REFER STAIRS DETAIL. REFER DETAIL AND SPEC.

14 PLYWOOD PANEL 13

13 W1

90

2260 C.O.S

C

14

PLASTERBOARD WALL, PAINT FINISH. REF FINISHES SCHEDULE. ALLOW 8MM SHADOWLINE BETWEEN STAIRS AND WALL.

15

11 10

3000

STAIRS AND WALL. 40MM DIAMETER KDHW RODS WITH OILED OIL FINISH. KDHWCONCEALED HANDRAIL. FIXING INTO TREADS. REFER SPEC. REFER DETAIL AND SPEC.

12

16

15

C

40MM DIAMETER KDHW RODS WITH OIL FINISH. CONCEALED FIXING INTO TREADS. REFER SPEC.

17 16

2100 C.O.S

PAINTED PLASTERBOARD

CEILING THROUGHOUT PLASTERBOARD WALL,ENTRY PAINT HALL REPLACE WITH FINISH. REFONLY. FINISHES SCHEDULE. PAINTED PLASTERBOARD CEILING. ALLOW 8MM SHADOWLINE BETWEEN

W1

17 W1

3000

W1

C

ALIGN NOOK TO STAIR PROFILE

40MM DIAMETER KDHW RODS FCL 31.76CONCEALED WITH OIL FINISH. FIXING INTOEXISTING TREADS. ORNAMENTAL REFER SPEC. REMOVE

14 13

ALIGN NOOK TO STAIR PROFILE

535

40 40 80 80

18

18 C

PAINTED PLASTERBOARD

REMOVE EXISTING ORNAMENTAL CEILING THROUGHOUT ENTRY HALL ONLY. REPLACE WITH PAINTED PLASTERBOARD CEILING.

240 19

15

40MM DIAMETER KDHW RODS WITH OIL FINISH. CONCEALED FIXING INTO CEILING. REFER SPEC. C

FCL 31.76

W1

16

40MM DIAMETER KDHW RODS WITH OIL FINISH. CONCEALED FIXING INTO CEILING. REFER SPEC.

40 40 80 80

870

PAINTED PLASTERBOARD

REMOVE EXISTING ORNAMENTAL FCL 32.30 CEILING THROUGHOUT ENTRY HALL ONLY. REPLACE WITH PAINTED PLASTERBOARD CEILING.

C

17 W1

870

C

2100 C.O.S

FCL 31.76

18 186

40 40 80 80

FCL 32.30

240 19

40MM DIAMETER KDHW RODS WITH OIL FINISH. CONCEALED FIXING INTO CEILING. REFER SPEC.

186

535

FCL 32.30

240 19

ALIGN NOOK TO STAIR PROFILE

W1

ALIGN NOOK TO STAIR PROFILE

C

Penny Rounds 76172 Academy Tiles Feature Wall Tiles

Matte White - 150 x 600mm Rectified Edges Signorino Wall Tiles

Drawings used with permission granted by Hindley & Co Pty Ltd. Contents for one time use only and not to be redistributed.

19


HINDLEY & CO Position Project 1

Architecture Graduate

The client’s brief required a renovation to

Private residential

update the look of an existing mid-century house. A new carport is also required. The budget allowed interior furnishing with a contemporary Australian flair.

(alterations & additions) Involvement

Construction documentation

Duration

3 months

Software

ArchiCAD, AutoCAD

My role during construction stage: + Resolve construction details for the new carport + Update structural drawings into the architectural documentation. + Furniture and lighting schedule.

Photographer : Tatjana Plitt The picture of the carport (left) is the built result of construction drawings I worked on. A glimpse into the interior reveals interior furnishing selected by the director. I was responsible for the schedules.

ZINCALUME CAPPING TO MATCH HOUSE

SITE BOUNDARY

LED DOWNLIGHT

TIMBER BATTENS GT

DP

PAINTED FC SHEET CEILING ABOVE RAFTERS

+ 2700MM FC SHEET CEILING

SARKING

BINS

CHECK ON SITE

EAVES GUTTER & DOWNPIPE TO LEGAL POINT OF DISCHARGE.

STORE

SENSOR LIGHT

CARPORT

D3 A36

DRILL THROUGH POST FOR ELECTRICAL WIRING

SENSOR LIGHT

1600

1600

2100 2340

2700

FIBER CEMENT SHEET LINING WITH PAINT FINISH TO INSIDE STORE

CORRUGATED ZINCALUME SHEET ROOFING WITH SARKING. DETAIL AND PITCH TO MATCH HOUSE

D2 A35

SHIPLAP TIMBER CLADDING WITH GREY STAIN FINISH (REFER TO SPEC.)

CARPORT GRAVEL

DRESSED TIMBER POST WITH GREY STAIN FINISH (REFER SPEC) TO COMPLY WITH BAL19. REFER TO STRUCTURAL ENGINEER'S SPEC.

STORE 2 FFL 56.90 COS

1

1 STORE 1

GRAVEL FINISH BY LANDSCAPER

FFL 56.90

EXISTING GROUND LINE

90

1000

90

1200

3780

FFL 56.90 COS

KEY FLOORPLAN

115

3875

SECTION 1 SCALE 1:50 @ A3

CORRUGATED ZINCALUME ROOFING WITH SARKING TIMBER BATTEN

SELECTED CEILING LINING

PAINTED FC SHEET

PROPRIETARY BRACKET (PAINTED TO MATCH GREY STAIN FINISH)

DETAIL 3A BEAM TO RAFTER CONNECTION DETAIL SCALE 1:20 @ A3

2 X M12 COACHBOLTS ACCORDING TO ENGINEER'S SPECIFICATION

75

TIMBER BATTEN

TIMBER RAFTER TO STRUCTURAL ENGINEER'S SPEC.

TIMBER BEAM CHECKED INTO TIMBER POSTS

DETAIL 3B BEAM TO POST CONNECTION DETAIL SCALE 1:20 @ A3

ZINCALUME CAPPING TO MATCH HOUSE

DETAIL 1 ROOF CAPPING DETAIL SCALE 1:20 @ A3

75

CONCRETE SLAB 100MM ABOVE GROUND LEVEL TO STRUCTURAL ENGINEERS SPEC.

FFL 56.80

SHIPLAP TIMBER CLADDING WITH GREY STAIN FINISH (REFER TO SPEC.)

DETAIL 2 ROOF CAPPING DETAIL SCALE 1:20 @ A3

Drawings used with permission granted by Hindley & Co Pty Ltd. Contents for one time use only and not to be redistributed.


02

COMPETITION

HINDLEY & CO Competition Organiser Entry title Software

Melbourne Tattoo Academy The competition brief called for designing the Melbourne Tattoo Academy (2016) headquarters. Interior Spaces are to Arch Out Loud be flexible and to cater for a reception White Light area, workshops, an art gallery space, a cafe, temporary accommodation, staff Sketchup, AutoCAD, facilities and parking lots. The selected Photoshop, Indesign site is in North Melbourne, consisting of an existing shop building and an opposite triangular green space.

The design team consisted of the director and I. The architecture seeks to reframe prejudices about the art of tattoo by presenting spaces as transparent, futuristic and hygienic but with a quirky personality. On the exterior facade, luminous LED panels with projected shadows ignite curiousity. The interior spaces are laboratory like, featuring tattoo workshop spaces as part of the art gallery exhibition.

Drawings used with permission granted by Hindley & Co Pty Ltd. Contents for one time use only and not to be redistributed.


03

ACADEMIA

LIFE CYCLE ANALYSIS Position

Graduate Student Researcher

The research paper investigates the

Redesign of the case study (typical of

Duration

1 year 5 months

Project

Case study of a

global warming impact of an initial design scheme.

a single story dwelling in Victoria) was conducted using :

Residential building

Life cycle analysis reveals areas of

in Victoria

focus in minimizing carbon footprint, concluding with design proposals.

+ Substitution with other materials that are readily available + Improved construction methodology + Energy efficient electrical fittings.

Aim

Sustainable residential design Minimize carbon footprint

Carbon footprint is estimated (60kg

Supervisor

Dr Robert Crawford

Software

AutoCAD, Sketchup

CO2-e/GJ) from lifetime Embodied energy (EE) and operational energy throughout a 50 year lifespan. EE was derived using a comprehensive hybrid method developed by Dr. Crawford.

Microsoft Excel, Word, Powerpoint, Photoshop

Natural building materials and fully recycled materials were tested for a second alternative proposal. Findings are benchmarked against two case studies (with and without PV panels).

PASSIVE HOUSE

EFFICIENCY M I N I M I Z I N G C A R B O N EQUIPMENT FOO TPRINT

PASSIVE HOUSE

EQUIPMENT EFFICIENCY

Equipment Efficiency

NATURAL MATERIALS

Passive House

Natural Materials

REDESIGNED

INITIAL CASE STUDY RECYCLED MATERIALS

NATURAL MATERIALS

COLORBOND ROOF

BRICK VENEER

COLORBOND ROOF

WOOL CARPET

BRICK

WOOL

REINFORCED CONCRETE

TIMBER DECK

REINFORCED

ALUMINIUM FRAME

TIMBER

GALVANIZED ROOF

ALUMINIUM FRAME

Materials with significant carbon footprint VENEER CARPET CONCRETE DECK

29 %

29 %

33 %

33 %

29 %

29 %

5.2

redesigned 5.2 5.2 3.67 3.47 3.67 3.8 3.47 3.67 3.47

29 %

redesigned

3.8 1.57 1.57

1.57

AVERAGE LIFETIME OPERATIONAL AVERAGEENERGY LIFETIME AVERAGE LIFETIME OPERATIONAL ENERGY OPERATIONAL initial ENERGY redesigned

100% Recycled Metal Lime Wash Paint

C Rammed

Alternative

initialredesigned redesigned Alternative Crawford (2011) Alternative Crawford (2011) - PV Crawford (2011) Crawford (2011)

25 %

0.34 %

0.34 %

Crawford (2011) - PV Crawford (2011) - PV 14.91 14.57 12.98 12.24 14.57 11.16 14.91 14.57 14.91 12.98 12.24 12.98 12.24 11.16 11.16

25 %

Lifespan operational energy (kWh/m²) Lifespan Lifespan operational energyoperational (kWh/m²) energy (kWh/m²)

initial

25 %

38 %

38 %

Crawford (2011) - PV Crawford (2011) 51.37- PV 51.37 51.37 31.91 31.91 31.91 31.91 16.88 31.91 31.91 14.4 16.88 14.4 16.88 14.4

Rammed earth

Lime WashRammed Paint earth flooring

AVERAGE LIFETIME EMBODIED ENERGY AVERAGE LIFETIME AVERAGE LIFETIME EMBODIED ENERGY EMBODIED initial ENERGY redesigned

0.34 %

initial redesigned Alternative Crawford (2011) redesigned Alternative Crawford (2011) Crawford (2011) -(2011) PV Crawford

38 %

RECYCLED ALUMINIUM

3.8

Lifespan : GWP (t CO₂-e/m²)

38 %

RECYCLED TIMBER DECK

ALTERNATIVE MATERIALS

Lifespan : GWP (t CO₂-e/m²) Lifespan : GWP (t CO₂-e/m²)

38 %

RECYCLED CONCRETE

Crawford (2011) - PV panels Crawford (2011) - PV panels (2011) Crawford (2011)Crawford - PV panels Crawford (2011) alternative redesigned Crawford (2011)

33 % 29 %

alternative

38 %

NYLON CARPET

initial initial alternative

initial

Alternative

REVERSE BRICK VENEER

Proposed materials with lower carbon footprint

OVERALL IMPROVEMENT

initial

RECYCLED MATERIALS

Recycled Materials

embodied energy (GJ/m²) embodied energy (GJ/m²) embodied energy (GJ/m²) Lime Wash Paint

Limewash paint Rammed Lime Wash earth Paint flooring

Compressed earth RammedCompressed earth flooring Earth Blocks (CEB) blocks (CEB)

Compre


04

DESIGN

STUDIO

MASTERS DESIGN STUDIO Atsushi Crossing

The project brief explores the meaning

Atsushi Crossing sensitively addresses

Semester

Sem 3, year 2014

Brief

Public bath cum

of dwelling and phenomenology. Fictional client Hirata Atsushi, from the movie “Cold Fever” seeks a private holiday residence which is to extend from an existing historical pool and changing room. New public bath spaces are to be merged into the scheme.

the landscape, heritage and connection between public and private spaces. Two rectangular pavilions sit unobtrusively along the expansive landscape. Interior spaces are naturally lit by translucent, insulated ceilings and walls. Public and private coexist in this unusual brief.

Project

Private holiday residence Location

Seljavallalaug, Iceland

Software

AutoCAD, Sketchup, Photoshop

BLUE PATH (PRIVATE RESIDENCE)

RED PATH (PUBLIC BATH)

1 2 3 4 5 6

1 2 3 4 5

SLIDING DOOR ENTRANCE HORSE STABLE / STORAGE BEDROOM PRIVATE BATH KITCHEN / DINING SPACE SLIDING DOOR EXIT

STAIRWAY ENCLOSED COURTYARD NARROW PASSAGEWAY INDOOR BATH MEMORIAL POOL

0

GROUND FLOOR PLAN

BASEMENT FLOOR PLAN

1m

3m


05

T R AV E L

Travelling has opened my mind to a deeper understanding and appreciation towards culture, architecture and design. Experiencing spaces with a fresh perspective reveals design concepts unique to place.

Through

photography

I document a diverse range of composition, colour, scale, construction details and how people occupy space. Architecture becomes alive when it creates socially engaging and enviromentally responsible spaces.

Experience gained from travelling has developed my ability to grasp unique design concepts and construction details that create architectural finesse. My passion in architecture and design continues to grow and I am excited to contribute my skills towards shaping the built environment.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.