Christina M. Rubino Post Graduate Architectural Portoflio

Page 1

THE POST GRADUATE ARCHITECTURAL PORTFOLIO OF

CHRISTINA M. RUBINO Syracuse University School of Architecture Bachelor of Architecture Class of 2019

christinamarierubino@gmail.com 201 704 1432



CONTENTS

New Construction

Renovation Work

Comprehensive Design

Urban Planning

4

8

14

18


NORTHWELL HEALTH INNOVATION CENTER AT THE HUBUNIONDALE, NY

The Northwell Health Innovation Center at the HUB was submitted as a competition for the Uniondale HUB, located on Long Island. The Innovation Center serves as a gateway to the HUB site which contains retail and commercial buildings and public gathering spaces. The Innovation Center is the physical entry to the HUB and is conceptually a space of higher learning in science and technology. The ground floor is a welcome and exhibition center that displays the medical research in telehealth that occurs on the upper levels. The building trickles down research and learning from researchers to the public.

Site Diagrams Designed by Anthony Caputo, Produced individually September 2019

4


Site Diagrams Designed by Anthony Caputo, Produced in collaboration with Karen Zellner

5


HOFTSRA UNIVERSITY SCIENCE AND INNOVATION CENTER BUILDINGHEMPSTEAD, NY The Hofstra University Science and Innovation Center Building was completed as a design competition for the engineering and nursing school. Each of the massing strategies sought to engage the pedestrian zones on campus and the public on the façade facing the parking area and street. The design intent of the two faces of the building communicate with the public and the campus’ interior.

Massing Strategy Designed by Anthony Caputo, Produced individually October 2019

6


Massing Strategies Designed by Anthony Caputo, Produced individually

7


OFFICE OF GENERAL SERVICES 41st FLOOR CORNING TOWER RENOVATIONALBANY, NY

MATCHLINE SEE PLAN: 1/A902

25 19 13 7 BK36

OFFICE 4123

BK36

1-1

OFFICE

BK36

A

4131

42/5

OPEN OFFICE

42/5

4129

T

P

OPEN OFFICE

B

4125

4141

OFFICE

T

P

OPEN MEETING

OPEN MEETING

PY PR/CO

4147

4133

42/5

42/5

PR/COPY

The 41st Floor OGS renovation was a full floor renovation which included abatement removals, schematic design, design development, and construction documentation. The reconfiguration oriented the user to the elevated views of upstate New York. The multi-faceted core of the building created an angled and continuous circulation path which houses more private areas.

BK36

1

42/5

42/5

SHAFT

T

P

BK36

BK36 42/5 42/5

P

TEL. CLOS.

42/5

42/5

42/5

42/5

42/5

42/5

4151

4146

S P

BREAK AREA

T

ELEC CLOS.

P S

4138

S P

ELV 13

4100B

4134B

T

ELEV LOBBY 4100

D

T

PR/ COPY

+/- 3'-6"

S

PR/COPY

PR/ COPY

OPEN OFFICE

H

COPY ROOM

T

P

2B

D

4134

+/- 3'-6"

14

SHAFT

4134A

MEETING

GA P

5

4126

42/5

42/5

42/5

MENS TOILET

42/5

42/5

P

42/5

42/5

42/5

42/5

42/5

42/5

42/5

42/5

42/5

42/5

P

D

HA 5'-0" MIN . TYP.

COORDIN ATE LOC +/-20'-10", VIF ATION WIT H FURNITU RE MANU F, TYP.

BK36

4'-0", MIN . TYP.

BK36

P

OFFICE

P

P

Q

1-1

4153

MEETING

42/5

42/5

42/5

42/5

42/5

42/5

SHAFT

4168

42/5

TELE

42/5

2B

STAIR 1 1

12

4168A

42/5

+/-16'-6", VIF 42/5

4'-0", MIN . TYP.

42/5

42/5

42/5

+/-16'-6", VIF

4176

42/5

4'-0", MIN . TYP.

OPEN OFFICE

WOMEN'S TOILET

42/5

42/5 42/5

4'-0", MIN . TYP.

32'-6", VIF

42/5

OPEN MEETING 4171

4159

+/- 6'-4 COORDIN " ATE

P

42/5

+/-16'-6", VIF

42/5

+/- 6'-4 WITH FU " RNITURE +/- 6'-4" MANUF., TYP

+/- 9'-6"

P

42/5

SHAFT 6

AED

42/5

42/5

+/-16'-6", VIF 42/5 42/5

42/5

+/-16'-6", VIF 42/5

PR/COPY

42/5

COORDIN ATE

1

+/-6 LOCATIO '-9" N WIT

OPEN OFFICE

OFFICE 4173

H FURNITU

RE, TYP.

COORDIN ATE

+/-6'-9" LOCATIO , VIF N WITH FU RNITU

7

BK36

42/5

4183

BK36

P

RE, TYP.

COORDIN ATE

+/- 20'-4", VIF LOCATIO N WITH FU RNITU

RE, TYP.

13 19 25

1

MATCHLINE SEE PLAN: 1/A902

41ST FLOOR FURNITURE PLAN - PART A 1/8" = 1'-0"

Floor Plan Designed by Scott Kimble, Produced in collaboration with Scott Kimble, Mia Kang October 2019

8


1. 2. 3.

4. 5.

REVIEW GENERAL NOTES PRIOR TO COMMENCEMENT OF THE WORK. REVIEW PROPOSED FLOOR PLANS PRIOR TO COMMENCEMENT OF THE WORK. CONFLICTS AND COORDINATION DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE A/E PRIOR TO COMMENCEMENT OF THE WORK. REFER TO LIFE SAFETY PLANS FOR LOCATIONS AND INTENDED RATINGS OF EXISTING FIRE-RATED WALL CONSTRUCTION TO REMAIN. REMOVALS ENSURE THE RATING INTEGRITY OF EXISTING WALLS TO REMAIN IS NOT COMPROMISED DURING REMOVALS AND NEW CONSTRUCTION. EXISTING CONDITIONS WHICH COMPROMISE THE INTEGRITY OF THE WALL SHALL BE REPAIRED TO ENSURE THE INTENDED FIRE RATING IS MAINTAINED. ALL DIMENSIONS ARE TO FINISH FACE OF WALL, UNLESS OTHERWISE NOTED. CONTRACTOR TO VERIFY IN FIELD ALL MEASUREMENTS AND COORDINATE ALL CONNECTION TO WALKER DUCT WITH FURNITURE MANUFACTURER.

CONSULTANT

37

MATCHLINE SEE PLAN: 1/A901

31

37-1

HENNINGSON, DURHAM, & RICHARDS ARCHITECTURE AND ENGINEERING, P

A B T

P

T

P

OFFICE 4111

T

P

41

BK36

BK36

OPEN OFFICE

T

P

PR/ COPY

4117

47 P

COPY AREA 42/5

42/5

T

4109

42/5

42/5

S

S

42/5

42/5

52

P

S

GB

42/5

42/5

42/5

T

P

S

42/5

42/5

42/5

SHAFT

42/5

7

TELE

J.C.

4110A

4110B

FIRE TOWER COURT

42/5

T

S T

11

42/5

42/5

42/5

GB

42/5

4104

PANTRY

42/5

4110C

4100A

4100

42/5

42/5

FILES

STAIR 2

SERVICE LOBBY

42/5

D

4104A

ELV

4101

SHAFT ELEC

ELV

MEETING

4103

42/5

14

ELEV LOBBY

WAITING

42/5

T

P

22

D

13

4102

T

2

CONTRACT:

T

P

4110

42/5

42/5

42/5

42/5

42/5

42/5

42/5

42/5

42/5

P S

S

42/5

S

H

S

P

TITLE:

T

FILES

10

T

42/5

SHAFT

4196

HB

SHAFT

D

ELEC. CLOS.

9

4110D

42/5

42/5

S

42/5

42/5

42/5

LOCATION:

42/5 S

MEETING

4196A

D

4110E

8

42/5

TEL. CLOS.

TEL.CLOS.

SHAFT

42/5

42/5

S

42/5

HB 42/5

42/5

42/5

CLIENT:

4199

WAITING 4197

OFFICE OF GENERAL SE

S

T

OPEN OFFICE

42/5

42/5

42/5

T

42/5

P

T

42/5

EMPIRE STATE PLAZA ALBANY, NEW YORK

42/5

T

RENOVATE 41ST FLOOR CORNING TOWER

S

T

12

CONSTRUCTION

P

T

S

4195

S

P

T

42/5

42/5

42/5

52

S

P

T

OPEN FFICE

S

COPY AREA

P

4191

4183

MATCHLINE SEE PLAN: 1/A901

WARNING: THE ALTERATION OF THIS MATERIAL IN ANY WA DONE UNDER THE DIRECTION OF A COMPARAB PROFESSIONAL, I.E. ARCHITECT FOR AN ARCHI ENGINEER FOR AN ENGINEER, OR LANDSCAPE FOR A LANDSCAPE ARCHITECT , IS A VIOLATION YORK STATE EDUCATION LAW AND / OR REGUL A CLASS 'A' MISDEMEANOR.

T

P

47

PR/ COPY P

BK36

BK36

41

P

MEETING 4189

MARK

P

P Q

100% SU

01/17/20

60% SUB

DATE

PROJECT NUMBER:

P

04/03/20

DESCRIP

45957- C

DESIGNED BY: DRAWN BY: FIELD CHECK:

37-1 31

37

OOR FURNITURE PLAN - PART B

Floor Plan

APPROVED: SHEET TITLE:

41ST FLOOR FURNITURE PLAN PART B DRAWING NUMBER

A902

Interior Renderings Designed by Scott Kimble, Produced individually

SHEET

9

OF


CL

C1

SKYFOLD FLOOR SEAL DETAIL

SKYFOLD DETAIL END SEAL DETAIL

C2

1 1/2" = 1'-0"

SKYFOLD PARTITION SECTION

C3

1 1/2" = 1'-0"

3/8" = 1'-0"

WARNING: THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E. ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER, OR LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT , IS A VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND / OR REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.

(2) 1/2" DIA. HILTI KWIK BOLT TZ (2" EMBEDMENT)

UNISTRUT P9012 UNISTRUT P9000 @ 4'-0" O.C. MAX UNISTRUT P1843 (EACH END)

1

1

C8X11.5 CONTINUOUS

2'-0" MAX

UNISTRUT P1000 STRUT AT HANGER LOCATION

(2) UNISTRUT P1026

MATCHLINE SEE PLAN: 1/A702

NEW CEILING AS SCHEDULED

2'-0"

CONTRACT:

CONSTRUCTION

OFFICE TITLE:

COORDINATE ALL SWITCHES WITH ELECTRICAL

C3 A513

LINE OF SOFFIT ABOVE

4123

SKYFOLD PARTITION HEADER

B1

OFFICE

1/2" = 1'-0"

4131

A2 A791

NEW CEILING

B1 A513 P

OPEN OFFICE

CLIENT:

OFFICE OF GENERAL SERVICES

D

O

4117

4147

OPEN OFFICE

ACT-1 9'-0" AFF

O

4129

OPEN MEETING

ACT-1 9'-0" AFF

O

4125

OPEN MEETING

3'-4" CL

D

4151

O

SIM

C1

A513 BREAK AREA

4134

4168

ACT-1 9'-0" AFF

SP D

SP

2B

DRAWN BY:

STAIR 1

SHAFT

1

WOMEN'S TOILET

SHEET TITLE:

EQ

1/2"

CONSTRUCTION

O

4159

ACT-1

A1 A790

T.O. STACKED PANELS

FLEXIBLE ACOUSTIC END SEAL, RETRACTED

EQ EQ

EQ

EQ

SHAFT

2'-0"

6

OPEN MEETING 4171

ACT CEILING

ACT-1 9'-0" AFF

EQ

EQ

CONSULTANT

GYP. SOFFIT9'-0" AFF

METAL T-BAR

OF

O

8'-4"

B1 A791

3'-4"

D

B.O. SUPPORT STEEL

CL

ACT-1 9'-0" AFF

O

ACT CEILING

GYP. SOFFIT

CL

ALIGN

ALIGN

4153

TYPICAL SKYFOLD PANEL WITH SEMI RIGID FIBERGLASS BOARD BACKER

OBSTRUCTION SENSOR

PROVIDE TWO ACCESS PANELS TO MOTOR UNIT, 24” X 24” MINIMUM, 2 LOCATIONS

OFFICE

HORIZONTAL PANEL IN DOWN POSITION MAY REST FLUSH, OR SLIGHTLY ABOVE THE BOTTOM OF POCKET.

FLEXIBLE ACOUSTIC END SEAL, DEPLOYED

ACT-1 9'-0" AFF

B1 A513

O

P

OPEN OFFICE

D

TYPICAL SKYFOLD PANEL WITH SEMI-RIGID FIBERGLASS BOARD BACKER

OPEN COORDINATE. ELECTRICAL CONTROL OFFICE BOX WITH ABOVE CEILING

SHEET

O

HENNINGSON, DURHAM, & RICHARDSON ARCHITECTURE AND ENGINEERING, P.C.

4183

9'-0"

LINE OF NEW WALL AT BACK

ACTIVATING MECHANISM

A513

1'-6"

1"

4168A

ELEV LOBBY

EQ

O

TELE

MUST NOT INTERFERE WITH MOTOR UNIT, LIFTING MECHANISMS OR CABLES & OMUST ALLOW FOR EASY ACCESS VIA ACCESS PANELS.

3/4" = 1'-0"

O

11 3/4"

1/2" = 1'-0"

POCKET ACOUSTIC BARRIER FRAMING SKYFOLD PARTITION ELEVATION

A2

GWB-1 10'-6" AFF

4100

GWB-1 9'-0" AFF

S

D

LINE OF NEW GYP. SOFFIT ABOVE

S

4176 SKYFOLD DETAILS

DRAWING NUMBER

SKYFOLD PLAN

ELV

4100B

APPROVED:

2B

O

EQ

GWB-1 9'-0"BY: AFF DESIGNED

FIELD CHECK:

S

MEETING

FINISHED FLOOR

SHAFT B2 A512

GWB-2 9'-0" AFF

ELEC CLOS. 4134B

ACT-1 9'-0" AFF

ACT-1 9'-0" AFF

ACT-1 9'-0" AFF

MEETING

4138

DESCRIPTION

45957- C

EQ

A3 A791 O

O

60% SUBMISSION

EQ DATE EQ

O

EQ

ACT-1 9'-0" AFF

TOILET

PROJECT 4126 NUMBER:

EQ

OPEN OFFICE

MARKMENS

5

100% SUBMISSION

EQ

4146

A2 A513

D

C2 A513

SP D

COORDINATE ALL SWITCHES WITH ELECTRICAL

SHAFT CL

01/17/20

PROVIDE 1HR RATED CEILING ASSEMBLY AT ELEC. ROOMS

S

O

SP

D

D

COPY ROOM

EQ

EQ

LINE OF SOFFIT ABOVE

04/03/20

EQ

O

EQ

4134A

EQ

ACT-1 9'-0" AFF

4141

EQ

ACT-1 9'-0" AFF

O

EQ

9'-0"

ACT-1 9'-0" AFF

16'-0"

TEL. CLOS. EQ

1'-2".

EQ

OPEN OFFICE

D

O

EQ

ACT-1 9'-0" AFF

4133

O

1'-6"

D

EQ

P

ALIGN

ACT-1 9'-0" AFF

EQ

7'-10"

1'-2".

7'-10"

O

EQ

CABLES. LIFT CABLE PATHS MUST BE CLEAR OF ALL MECHANICAL OBSTRUCTIONS.

EQ

CL

A1

P

EMPIRE STATE PLAZA ALBANY, NEW YORK

OFFICE GYPSUM BOARD CEILING FIXED WALL TO BE CONSTRUCTED TO PROVIDE AN EQUAL/COMPARABLE ACOUSTIC PERFORMANCE AS THE SKYFOLD PARTITION, TYPICAL BOTH ENDS.

RENOVATE 41ST FLOOR CORNING TOWER

LOCATION:

ACT-1 9'-0" AFF

LINE OF NEW WALL AT BACK

A2 A790

FLEXIBLE ACOUSTIC FLOOR SEAL

OFFICE

P

4173

FINISHED FLOOR

CL

SEAL DETAIL

C2

SKYFOLD DETAIL END SEAL DETAIL

C3

1 1/2" = 1'-0"

SKYFOLD PARTITION SECTION 3/8" = 1'-0" (2) 1/2" DIA. HILTI KWIK BOLT TZ (2" EMBEDMENT)

UNISTRUT P9012

41ST FLOOR REFLECTED CEILING PLANUNISTRUT - PART P9000 @A 4'-0" O.C. MAX

1

1/8" = 1'-0"

UNISTRUT P1843 (EACH END)

1

2'-0" MAX

UNISTRUT P1000 STRUT AT HANGER LOCATION

Operable Partition Details Designed by Mia Kang, Produced individually Reflected Ceiling Plan Designed by Scott Kimble, Produced individually C3 A513

WARNING: THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E. ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER, OR LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT , IS A VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND / OR REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.

(2) UNISTRUT P1026 1

C8X11.5 CONTINUOUS

NEW CEILING AS SCHEDULED

2'-0"

CONTRACT:

CONSTRUCTION TITLE:

B1 NEW CEILING

SKYFOLD PARTITION HEADER 1/2" = 1'-0"

RENOVATE 41ST FLOOR CORNING TOWER

LOCATION: B1 A513

EMPIRE STATE PLAZA ALBANY, NEW YORK CLIENT:

OFFICE OF GENERAL SERVICES CABLES. LIFT CABLE PATHS MUST BE CLEAR OF ALL MECHANICAL OBSTRUCTIONS.

7'-10"

7'-10"

ALIGN

MATCHLINE SEE PLAN: 1/A702

10


ACT CEILING

GENERAL CONSTRUCTION NOTES: ALIGN

ALIGN

GYP. SOFFIT

CL

1. 2.

HORIZONTAL PANEL IN DOWN POSITION MAY REST FLUSH, OR SLIGHTLY ABOVE THE BOTTOM OF POCKET.

FLEXIBLE ACOUSTIC END SEAL, DEPLOYED

3.

4. 5.

TYPICAL SKYFOLD PANEL WITH SEMI RIGID FIBERGLASS BOARD BACKER

OBSTRUCTION SENSOR

6. 7.

FLEXIBLE ACOUSTIC FLOOR SEAL FINISHED FLOOR

8. 9. 10. P

OFFICE

SKYFOLD FLOOR SEAL DETAIL

C1

C2

4111

O D

1 1/2" = 1'-0"

11.

SKYFOLD DETAIL END SEAL DETAIL

C3

1 1/2" = 1'-0"

4117

COPY AREA

ACT-1 9'-0" AFF

O

13.

A2 A791

4109

ACT-1 9'-0" AFF

14.

UNISTRUT P1843 (EACH END)

P

DOOR OPENING AND CEILING TILE

4110

STAIR 2

CL

ACT-2 9'-0" AFF

ELV

4100A

EQ

EQ

D

S

EQ 3'-4"

EQ

D

SHAFT 8

WAITING 4197

LINE OF NEW WALL AT BACK

4110E

7'-10"

OPEN OFFICE

1'-6"

O

1'-2".

A3 A791

1/2"

ACT-1 9'-0" AFF

A1 A791

O

SP SP

O

FLEXIBLE ACOUSTIC ACT-1 END 9'-0" AFF SEAL, RETRACTED 7'-10"

ACT-1 9'-0" AFF

1'-2".

CL

4195

TYPICAL SKYFOLD PANEL WITH SEMI-RIGID FIBERGLASS BOARD BACKER

B1

LINE OF NEW GYP. SOFFIT ABOVE

SP

SP

1"

9

TEL.CLOS.

S

4196

SHAFT

4110D

DOWN LIGHT CEILING DIFFUSER 2' X 2'

O

FILES ACT-1 9'-0" AFF

4196A

RECESSED DOWN LIGHT

SP

SP

SIM

SP

CABLES. LIFT CABLE PATHS METAL MUST BE CLEAR OF T-BAR ALL MECHANICAL OBSTRUCTIONS.

MEETING

EQ

ACT-1 9'-0" AFF

CLIENT:

OFFICE OF GEN

ALIGN

S

SMOKE DETECTOR

D

LIGHT DIMMER OCCUPANCY SENSOR

SP

TYPICAL SKYFOLD PANEL WITH SEMI RIGID FIBERGLASS BOARD BACKER

P

SPEAKER

PROVIDE TWO ACCESS PANELS TO MOTOR UNIT, 24” X 24” MINIMUM, 2 LOCATIONS B1 A513

PROJECTOR LT DEVICE SENSOR

P

LINE OF NEW WALL AT BACK

D

4191

EMPIRE STATE ALBANY, NEW

EXIT SIGNS

HORIZONTAL PANEL IN DOWN POSITION MAY REST FLUSH, OR SLIGHTLY ABOVE THE BOTTOM OF POCKET.

16'-0" AREA

LOCATION:

SPRINKLER HEAD. REFER TO FIRE PROTECTION DRAWINGS FOR MORE INFORMATION.

ALIGN

GYP. SOFFIT

CL

GYP. SOFFIT

RENOVATE 41S CORNING TOW

ACT CEILING

ACT CEILING

GWB-1 9'-0" AFF

COORDINATE. ELECTRICAL CONTROL BOX WITH ABOVE CEILING CONSTRUCTION

GYPSUM BOARD CEILING

T.O. STACKED PANELS

4199

ALIGN

COPY

OBSTRUCTION SENSOR

1' X 4' AND 2' X 4' ACOUSTICAL CEILING TILES

B.O. SUPPORT STEEL

A3 A790

P

O

EQ

4183

POCKET ACOUSTIC BARRIER FRAMINGCONTRACT: MUST NOT INTERFERE WITH MOTOR CONSTRUCTION B1MECHANISMS OR CABLES UNIT, LIFTING & MUST ALLOW A513 FOR EASY ACCESS VIA ACCESS PANELS. TITLE:

NEW CEILING

ACTIVATING ACT-1 MECHANISM 9'-0" AFF

ACT-1 9'-0" AFF

OPEN OFFICE

LINEAR DIFFUSER 48"

1/2" = 1'-0"

2' X 4' ACOUSTICAL CEILING TILES

FLEXIBLE ACOUSTIC END SEAL, DEPLOYED

SIM

SKYFOLD PARTITION HEADER

P

O

TEL. A513 CLOS.

ELEC. CLOS.

EMERGENCY LIGHT FIXTURE

4101

P

D

EQ

4102

ACT-1 9'-0" AFF

NEW CEILING AS SCHEDULED

COVE LIGHT FIXTURE

O

SP

WARNING: THE ALTERATION OF THIS MATE DONE UNDER THE DIRECTION O PROFESSIONAL, I.E. ARCHITECT ENGINEER FOR AN ENGINEER, O FOR A LANDSCAPE ARCHITECT YORK STATE EDUCATION LAW A A CLASS 'A' MISDEMEANOR.

C8X11.5 CONTINUOUS

2' X 4' LIGHT FIXTURE

MEETING

SP

GWB-1 9'-0" AFF

C3

B1 A791

PANTRY

10

4100

O

SIM

SHAFT

O

LINE OF SOFFIT ABOVE

FIXED WALL2'-0" TO BE 8'-4" CONSTRUCTED TO PROVIDE AN EQUAL/COMPARABLE ACOUSTIC PERFORMANCE AS THE SKYFOLD PARTITION, TYPICAL BOTH ENDS.

A3 A791

ACT-1 9'-0" AFF

2

CL

GYPSUM BOARD CEILING

4104

O

SP

ACT-1 9'-0" AFF

FILES

D

S

4104A

SERVICE LOBBY

ELV

4110C

GWB-2 9'-0" AFF

ELEC

SP

B2 A512

11

D

EQ

EQ

ACT-1 9'-0" AFF

SHAFT

22

(2) UNISTRUT P1026 1

1' X 4' LIGHT FIXTURE

2'-0" SP

D

GWB-1 10'-6" AFF

D

WAITING

11 3/4"

EQ

J.C.

O

4103

FIRE TOWER COURT

EQ

EQ

4110A

4110B

GWB-1 9'-0" AFF

4105

TELE

S

2'-0" MAX

OPEN OFFICE

O

1

LEGEND

UNISTRUT P1000 STRUT AT HANGER LOCATION

ACT-1 9'-0" AFF

O

SHAFT 7

EQ

SIM

D

3'-4"

1'-6"

A3 A791

ELEV LOBBY

3/8" = 1'-0"

ACT-1 9'-0" AFF

OPEN OFFICE

COORDINATE ALL S SWITCHES WITH ELECTRICAL

SKYFOLD PARTITION SECTION 12.

9'-0"

MATCHLINE SEE PLAN: 1/A701

REVIEW GENERAL NOTES PRIOR TO START OF WORK. PROVIDE TWO ACCESS PANELS TO REFER TO HVAC, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL CEILING DEVICE INFORMATION. BRING CONFLICTS TO THE A/E’S ATTENTION FOR FINAL COORDINATION AND RESOLUTION. MOTOR UNIT, 24” X 24” MINIMUM, 2 CENTER ALL CEILING FIXTURES, ACESSORIES AND SPRINKLER WITHIN ACOUSTICAL CEILING TILES, UNLESS LOCATIONS OTHERWISE NOTED. SPRINKLERS OR SMALL CEILING ACCESSORIES LOCATED IN 24” X 48” CEILING TILE SHOULD BE LOCATED 12” FROM A SIDE AS INDICATEDB1 ON THE RCP, RATHER THAN CENTERED IN THE TILE, CONSULTANT UNLESS OTHERWISE NOTED. A513 NO CUT TILES LESS THAN 2” IN EITHER DIRECTION, UNLESS OTHERWISE NOTED. TO AVOID FRAGMENTS LESS THAN 2”, IT MAY BE NECESSARY TO CUT FROM 24” X 48” TILES. IN GYPSUM BOARD CEILING CONSTRUCTION, ALIGN ALL CEILING FIXTURES, ACCESSORIES AND SPRINKLER HEADS WITH ADJACENT FIXTURES, UNLESS OTHERWISE NOTED. BRING CONFLICTS TO THE A/E’S ATTENTION FOR FINAL COORDINATION AND RESOLUTION. WHERE PLANS OR RCP CALLS FOR EXPOSED CEILINGS, CONTRACTOR SHALL CLEAN AND PREPARE THE UNDERSIDE OF THE EXISTING STRUCTURE FOR NEW FINISHES PER DRAWINGS AND SPECIFICATIONS. LINE OF NEW WALL AT BACK SURVEY FIELD CONDITIONS AND VERIFY THAT WORK IS BUILDABLE AS SHOWN. REFER TO MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION DRAWINGS AND SPECIFICATIONS FOR DESIGN OF THESE SYSTEMS (DUCT SIZE, CIRCUITING, ETC.). LOCATIONS OF THESE DEVICES SHALL BE AS SHOWN ON THE ARCHITECTURAL RCPs. IN CASES WHERE CONFLICTS ARISE BETWEEN THE LIGHTING AND OTHER CEILING DEVICES, CONTRACTOR SHALL OBTAIN WRITTEN CLARIFICATION FROM THE A/E PRIOR TO START OF WORK IN QUESTION AND RELATED WORK. LOCATE ALL LIGHT SWITCHES TO BE LOCATED AT 42 IN. ABOVE FINISHED FLOOR, UNLESS OTHERWISE HENNINGSON, DURHA NOTED. ARCHITECTURE AND E CEILING TILE/GRID/HANGERS ARE NOT DESIGNED TO SUPPORT THE WEIGHT OF ADDITIONAL EQUIPMENT OR MATERIALS. SUPPORT CABLE, CONDUIT, FIXTURES, ETC., INDEPENDENTLY FROM THE STRUCTURE. COORDINATE PLACEMENT OF REQUIRED WALL OR CEILING ACCESS PANELS WITH MEP EQUIPMENT REQUIRING ACCESS; A/E TOCLREVIEW PRIOR TO FRAMING. IMMEDIATELY ALERT A/E TO ACCESS PANELS REQUIRED BUT NOT INDICATED ON THE RCP. LOCATE NEW SPRINKLER HEADS IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13, INTERNATIONAL PLUMBING CODE (IPC), AND OTHER APPLICABLE CODES AND STANDARDS. SPRINKLER HEADS SHOWN ON THE ARCHTECTURAL RCP INDICATE HEAD LOCATIONS IN AREAS WHERE COORDINATION WITH ARCHITECTURAL DETAILS IS CRITICAL. CODE COMPLIANCE AND SPECIFIED COVERAGE MUST BE MAINTAINED. REFER TO FIRE PROTECTION DRAWINGS FOR REQUIRED SPRINKLER HEAD COVERAGE AND ADDITIONAL INFORMATION. IN LOCATIONS WHERE THE FIRE PROTECTION AND ARCHITECTURAL DRAWINGS ARE IN CONFLICT, CONTRACTOR SHALL OBTAIN WRITTEN CLARIFICATION FROM A/E TO HILTI KWIK BOLT TZ (2) PRIOR 1/2" DIA. START OF WORK. (2" EMBEDMENT) SPRINKLER CONTRACTOR SHALL VERIFY ALL COVERAGE OF NEW AND EXISTING (IF ANY) SPRINKLER HEADS. IF CODE CALLS FOR ADDITIONAL HEADS OR RELOCATION OF HEADS, CONTRACTOR TO INCLUDE THE COST FOR THIS WORK IN HIS BASE PROPOSAL. CONTRACTOR SHALL FURNISH A/E WITH STAMPED SPRINKLER DRAWINGS. UNISTRUT P9012 SUBMIT FIRE SPRINKLER LAYOUT FOR COORDINATION/APPROVAL BY A/E. PATTERN OF SPRINKLER LAYOUT SHALL COORDINATE WITH PATTERN OF LIGHTING LAYOUT AND WITH OTHER CEILING COMPONENTS. UNISTRUT P9000 @ 4'-0" O.C. MAX

9'-0"

TYPICAL SKYFOLD PANEL WITH SEMI-RIGID FIBERGLASS BOARD BACKER

9'-0"

FLEXIBLE ACOUSTIC END SEAL, RETRACTED

AT BACK

LINE OF SOFFIT ABOVE

FLEXIBLE ACOUSTIC FLOOR SEAL

ACT-1 9'-0" AFF

FINISHED FLOOR

O

MEETING 4189

04/03/20

COORDINATE ALL SWITCHES WITH ELECTRICAL

C1

SKYFOLD FLOOR SEAL DETAIL 1 1/2" = 1'-0"

C2 A513

CL

A2 A513

C2

SKYFOLD DETAIL END SEAL DETAIL

C3

1 1/2" = 1'-0"

SKYFOLD PARTITION SECTION

1/8" = 1'-0"

A1

Reflected Ceiling Plan

Operable Partition Details SKYFOLD PLAN Designed by Mia Kang, Produced individually 1/2" = 1'-0"

45957- C

DESIGNED BY:

(2) 1/2" DIA. HILTI KWIK BOLT TZ (2" EMBEDMENT)

DRAWN BY: FIELD CHECK: APPROVED: SHEET TITLE:

FINISHED FLOOR

UNISTRUT P9012 UNISTRUT P9000 @ 4'-0" O.C. MAX UNISTRUT P1843 (EACH END)

A2

1

UNISTRUT P1000 STRUT AT HANGER LOCATION

(2) UNISTRUT P1026 1

C8X11.5 CONTINUOUS

SKYFOLD PARTITION ELEVATION

2'-0" MAX

41ST FLOOR REFLECTED CEILING PLAN - PART B

DATE

PROJECT NUMBER:

3/8" = 1'-0"

MATCHLINE SEE PLAN: 1/A701

1

01/17/20 MARK

C1 A513

3/4" = 1'-0"

2'-0"

41ST FLOOR REFLECTED PLAN- PART DRAWING NUMBER

11

NEW CEILING AS SCHEDULED

A702 SHEET


FORDHAM UNIVERSITY VARIOUS PROJECTSNEW YORK, NY Fordham University’s campus’ continuous renovation work required a fast work pace in order to meet each of the projects’ deliverables. The project structures mainly included detailed surveys of existing campus buildings along with construction documents and several interior renderings to make decisions for finishes.

Interior Renderings Designed by Scott Kimble, Produced individually Construction Plan Designed by Scott Kimble, Produced in collaboratin with Scott Kimble January 2020

12


Lincoln Center Ramp, Street View (with Turnstile) Exterior Fordham Renderings Designed by Scott Kimble, Produced individually

Fordham Lincoln Center Ramp, Street View (without Turnstile)

02/13/20

13


RECYCLE REVOLUTION Currently, China is facing huge demands and reforms regarding the improvement of air quality due to pollution. Xiong’an has become an area where citizens are fleeting to have access to breathable air. A self-sustaining building contributes to a healthy environment, while physical activity and exercise contribute to a healthy population. By combining these two reciprocals, a sneaker/active footwear production, manufacturing, sales, and testing center is the program pertaining to Recycle Revolution.

Exterior Rendering Designed in collaboration with Evan Webb, Produced in collaboration with Evan Webb Spring 2017

14


Descriptive Axonometrics Designed in collaboration with Evan Webb, Produced individually Floor Plans Designed in collaboration with Evan Webb, Produced in collaboration with Evan Webb

15


Exploded Axonometric Designed in collaboration with Evan Webb, Produced individually Connection Detail Designed in collaboration with Evan Webb, Produced in collaboration with Evan Webb

16


Sectional Perspective Designed in collaboration with Evan Webb, Produced individually

17


URBAN SCENES The city of Medellin has undergone a series of changes and improvements to infrastructures and areas of urban intensity to promote the use of public space throughout the city. Tapping into this trend, Urban Scenes aims to play a part in this larger narrative. After determining a site, the development strategy came from taking cues from the existing and lacking programs, topography, and formation of natural green space and its interaction with the urban blocks and paths. The goal of Urban Scenes is to weave the green space and existing blocks into a ribbon of programs resulting in a single entity meant for the community, reiforce an axis via lines of surface treatment throughout the neighborhood, and to bring elements of public space and facilities found in the city center into a less formal environment.

Exterior Rendering Designed in collaboration with Rex Hughes, Produced individually Fall 2017

18


Urban Node Map, Character Map Designed in collaboration with Rex Hughes, Produced in collaboration with Rex Hughes Macro Axonometric Designed in collaboration with Rex Hughes, Produced individually

19


Micro Axonometric Designed in collaboration with Rex Hughes, Produced individually

20


Exploded Axonometric Designed in collaboration with Rex Hughes, Produced individually

21


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.