Christopher Pulcer Professional Architectural Portfolio April 2021

Page 1

Professional Development Portfolio Christopher Pulcer


Table of Contents

NORR Work: Greektown Casino High Stakes Baccarat

Panda Express-Revit Conversion-Brimfield Twp. Panda Express-Next Gen-Fort Wayne Denver Airport-Airport Concessions Package Panda Express-Various New Development Panda Express-Various Non-Traditional CVS Pharmacy-Various Remodeling

Hobbs and Black Work: Graduate Ann Arbor

AADL West Branch Thomas City Loft Apartments 242 Community Church Bell’s Cottage FYI Fitness Center Ferguson Lofts St. John’s Episcopal Amber Engine University Towers Pool Enclosure Midtown A2 Apartments Ithaka/Jstor Renovation Frankenmuth Cheese Haus

4 8 12 16 18 20 22 24 28 32 34 38 40 44 48 52 54 58 62 64


Facility Solutions Work: Packline KFC Renovation Labra Design Build Work: Mudroom Cabinet/Backyard Deck UDM Collegiate Work: Waterfront Redevelopment Thesis

68 70 78

3


G reektown Casino High Stakes Baccarat Room

Front Space Baccarat Room Design Rendering

Floor Plan Room Layout

4


Main Room Space

Front Facade Entry

Glass Arch Gateway

Site: 555 E Lafayette St. Detroit, MI Status:

Completed 2021

Objective: This project was for the renovation of an existing slot machine area within the Greektown Casino to be turned into a high stakes baccarat room. This consisted of Interior renovation of finishes and fixtures in the baccarat space. Design features included a red light lounge motif with a fabric wall finish and gold trimming. The entrance is a back-lit glass archway between book-end framed paintings with a built-in light box. The ceiling fixtures are the focal point of the design with a geometric collage of rectangular tube lighting. Project Contribution: Responsible for surveys, designing floor plans, research, modeling, and presentation in the schematic and design development phase.

PHASE SD DD CD B CA 5


Front Entry Facade Exemplifying the Back-lit Glass Gateway Arch

6


Inspiration Board For the Motif of the Baccarat Room

Work Performed/ Production: -Research and Put Together Inspiration Boards -Floor Plan Layout Design -Survey Existing Space -Coordinate with Lighting Vendor -Sketchup Modeling -Model Conversion In Lumion -Put Together Submittal Package - Present Submittal To Client Meetings Materials Board and Finishes

7


P

anda Express- Revit Conversion - Brimfield Twp

Equipment Floor Plan Front Entry Facade View Rear Service Counter Elevation

8


Serving Counter Area View

Drive-Thru Exterior View

Public Dining Area View

Site: 233 E Tallmadge Rd Kent, OH Status:

Completed 2019

Objective: This project was for a 2,300 square foot Panda Express restaurant. Until this time all Panda Express projects at the office were produced in autocad sheets. Brimfield Twp was undertaken to produce the sheets in Revit and create the Revit model from scratch to sell to the clients at Panda Inc. The sheets were also going to be submitted for permitting for the county building departments of Brimfield Twp. Design features included a stone veneer base with an EIFS system painted stucco exterior. The facade has a tower boarded with fiberon, a wood composite. Project Contribution: Responsible for surveys, configuring site plan, designing floor plans, modeling, detail drawings, team coordination, and client presentation in the schematic design, design development, construction drawings, bid services, and construction administration phase. ,

PHASE SD DD CD B CA Cook Line Section Views

9


Site Visits During Construction

Revit Model Roof Overview

Section At Drive Thru Window

10


Prep Line Elevation

Drive Thru Elevation

Site Plan

Work Performed/ Production: -Site Investigation Reports -Site Plan Design -Put Together Client Submission -Drawing Conversion from CAD to Revit -Modeling In Revit -Construction Drawings -Team Coordination - Permitting -Bids and Shop Drawing Review -Site Visits During Construction

11


P

anda Express- Next Gen - Fort Wayne Site Vicinity Map

Next Gen Sketchup Model Entry View

Site Plan Layout

12


Interior Model Elevation Drink Station and Dining Room

Interior Model Elevation Online Order Station and Service Counter

Site: 4589 W. Dupont Rd. Fort Wayne, IN Status:

Currently In County Review

Objective: This project was for a 2,500 square foot Panda Express restaurant next generation layout to expand the dining areas, provide additional space for online pickup stations, and set up double drive thru lanes for heavy traffic volumes. Design features included a stone veneer base with an EIFS system painted stucco exterior. The facade has a tower boarded with fiberon, a wood composite. Project Contribution: Responsible for site investigation reports, configuring site plan, designing floor plans, modeling, detail drawings, team coordination, and client presentation in the schematic design, design development, construction drawings, and permitting submittal services,

Reflected Ceiling Plan

PHASE SD DD CD B CA 13


Enlarged Plan Detail Drive Thru Bump-out Wall Enlarged Plan Restrooms and Hall

Exterior Elevation Front View

Exterior Elevation Drive Thru Side Wall View Exterior Elevation Entry View

14

Exterior Elevation Rear View


Section Detail Parapet and Cornice

Interior Elevation Rear BOH Tankless Hot Water Heater/Irrigation Water Meter

Interior Elevation BOH Area and Roof Hatch

Work Performed/ Production: -Site Investigation Reports -Site Plan Design -Put Together Client Submission -Plan Commission Review -Google Sketchup Exterior -Construction Drawings -Team Coordination - Permitting

Next Gen Sketchup Model Rear View

15


D enver Airport-Airport Concessions Package Qdoba and Roasting Plant with Seating Area

Mixology Drinks Bar with Concessions Seating Area

Chicken Guy Concessions Space

16


Overall Concession Space Layout Across Two Existing Terminal Spaces

Site: 8500 Peña Blvd Denver, CO Status:

In Client Review

Objective: This project was for the submittal package to bid on renovating existing airport terminal space within the Denver Airport. The package includes the concession stqtions (left to right) of Qdoba, Roasting Plant Coffee, Mixology Drinks Bar, Seating Area, and Guy Fieri’s Chicken Guy! PHASE

Project Contribution: Responsible for floor plan configuration , modeling, and submittals in the schematic and design development phase.

SD DD CD B CA

Qdoba and Roasting Plant with Seating Area

17


P

anda Express- Various New Development Projects

Shorewood, IL New Construction Site Plan Alternatives

18

Scio Twp, MI End Cap Constrcution Floor Plan Configuration


Kentwood, MI Brick Exterior Front Elevation

Sites:

Kentwood, MI Portage, MI Scio Twp, MI Shorewood, IL

Status:

Willowbrook, IL Brownsburg, IN Oxon Hills, MD Prince Frederick, MD

Willowbrook, IL Brick Veneer Model Perspective For Plan Review Ashwaubenon, WI Eau Claire, WI Sheboygan, WI Vienna, WV

Various Stages of Permitting, In Construction, and Fully Finished Construction

Objective: These projects were for new construction restaurants of 2,300 square foot Panda Express properties along the midwest and east coast. Some of the projects were considered End Cap Construction within a strip mall or near adjacent tenants sharing party walls. The site plans would consist of multiple iterations to be drawn and presented to the client for a board review. Design features included a range of exterior finish materal based on the zoning ordinaces of each jurisdiction. Examples include requiring brick only buildings, not allowing fiberon, not allowing certain square feet of signage, a Vienna, WV New Construction minimum percentage of glazing, and other codes. Signage Plan

Project Contribution: Responsible for site investigations, site plan design, client site plan review, plan commission submission, construction drawings, and permitting services.

PHASE SD DD CD B CA 19


P

anda Express- Various Non Traditional Projects Salt Lake City Airport Facade Model WVU Student Union Center Vicinity Plan

WVU Floor Plan

WVU Facade Model

20

WVU Serving Counter Elevation


Union Station

Sites:

Purdue University

MSY Airport

WVU, WV Salt Lake City Airport, UT U of M, MI Union Station, DC Purdue University, IN MSY Airport, LA Florida Atlantic University, FL

Status:

Various Stages of Permitting and Construction

Florida Atlantic University

Objective: These projects were for the Panda Express launch of the office’s Non-Traditional Program within the hospitality department. The Non-Traditional Program saught to place Panda Express concession services in more confined building environments like university student unions/cafeterias and airport terminals. The designs would eliminate public access areas like a dining area and showcase a front facade at the service counter with Work Performed/ Production: kitchen and back of house area. In some cases, the back -Floor Plan Layout Design of house area was shared with adjacent concessions ser-Elevation Layout Design vices within the university or airport. -Draft Floor Plans, Elevations on CAD Project Contribution: Responsible for floor plan configura- -Modeling In Sketchup tion , modeling, and submitting for client review during the -Present to Client Meetings schematic and design development phase. Once green -Put Together DD Set or CD set if needed -Correspond with University Departments on Building Approval lighted the projects may go into a DD or CD package.

PHASE SD DD CD B CA 21


C VS Pharmacy- Various Remodeling Projects Franklin, TN Matterport Store Scan Model Franklin, TN Store Exterior From Remodel

Franklin, TN Floor Plan

22

Franklin, TN Matterport Roof Plan


Bridgewater, MA Floor Plan

Sites:

Mt. Lebanon, PA Matterport Store Scan Model

Franklin, TN Indianapolis, IN Mt Lebanon, PA Bridgewater, MA

Status:

Various Stages of Permitting and Remodeling

Objective: These projects were for the retail special projects for the remodel rollout of CVS Pharmacy stores throughout the midwest regions. The remodels consisted of added clinic spaces, larger pharmacy space areas, new merchandise plans, and in some cases alterations to the exterior facade. CVS had the office implement a Matterport software store scan that was digitally modeled based on those photos and then annotated within the Matterport program.

Indianapolis, IN Pharmacy Counter Elevation

Indianapolis, IN Service Counter Elevation

Work Performed/ Production: Project Contribution: Responsible for running in-store sur veys, floor plan configuration, and Matterport deliverables -Store Surveys, during the design development phase. A few stores re-Pre-design site visits quired construction drawing sets as well. -Draft Floor Plans and Elevations on CAD -Matterport Software-Annotating Point Cloud Model

PHASE SD DD CD B CA 23


G raduate Hotel Ann Arbor Renovation

24


Existing Exterior

Coffee Bar Under Construction

Lobby Under Construction

Site: Ann Arbor, MI On the corner of State St. and Huron Ave. Status:

Completed 2016

Objective: This project was for the renovation of an existing 14 story hotel 98,000 square feet in downtown Ann Arbor. This consisted of Interior renovation of finishes and fixtures throughout the hotel guest rooms and public spaces. Design features included a new lobby interior. with the existing first floor public restrooms to be reconfigured as new accessible restrooms. Also added was for a coffee bar in the lobby and reception offices. Project Contribution: Responsible for procuring drawings throughout schematic design to construction documents and coordinating with clients and consultants in construction administration.

PHASE SD DD CD B CA Window Modification on Exterior

25


Hotel Guest Room Types

Coffee Bar Millwork

Reception Desk Millwork

26


Completed Streetfront

Completed Exterior

Completed Guest Room

Work Performed/ Production: -Site Analysis and Documentation -Draft Up as Builts on CAD -Draft Floor Plans, Reflected Ceiling Plans on CAD -Finishes on CAD, -Demolition Plans on CAD -Construction Drawings on CAD -Millwork Production and Detailing on CAD, -Coffee Bar and Reception Desks/Millwork Design -Attend Client Meetings -Coordinate with Interior Design Consultants -Construct. Admin. Assistance -Perform Punchlist Checks on All Floors with PlanGrid -Submittals and RFI Responses

Completed Lobby

3

Graphic Courtesy of Hobbs Black Marketing Dept.

27


A nn Arbor District Library West Branch

Existing Space in Westgate Shopping Center Library Space Reflected Ceiling Plan

28

Library Space Floor Plan

Curvilinear Recpetion Area


Existing Reading Stacks

Childrens Area Under Construciton

Study Spaces Under Construciton

Site: 2503 Jackson Ave. Ann Arbor, MI Status: Completed 2016 Objective: This project was for the renovation and additional expansion of the existing library space by expanding and taking up the adjacent tenant spaces in the West Gate Shopping Center. The library would add on from its existing 5,300 S.F. of assembly space to be 22,000 S.F. of assembly. This required the demolition of multiple demising walls, interior construction, renovation of finishes and fixtures, and plumbing realignment. Design features included a new central lobby with circular millwork design, construction of glass study rooms, interactive children’s play area, reading room, reconfigured book stacks, restrooms and offices, and chimney construction for the social room. Project Contribution: Responsible for procuring drawings throughout schematic design, construction documents,and coordinating with clients and consultants in construction administration.

Private Glass Study Spaces

PHASE SD DD CD B CA 29


Completed Spaces

Graphic Courtesy of Hobbs Black Marketing Dept.

30


Children’s Tubular Reading Pods Design Model

Model/Rendering Courtesy of Hobbs Black Design Dept.

Work Performed/ Production: -Site Analysis and Documentation -Draft Up As Builts on CAD -Draft Floor Plans, Finishes, Elevations, Details on CAD -Demolition Plans on CAD -Construction Drawings on CAD -Millwork Production and Detailing on CAD -Reflected Ceiling Layout Design -Circular Reception Desks/Millwork Design -Tubular Children Reading Pods/Detailing Design -Submittals and RFI Responses

Children’s Tubular Reading Pods Details

31


T

homas City Loft Apartments

Model/Rendering courtesy of Hobbs Black Design Dept.

Site Layout

32

Floor Plans 123


Site: Detroit, MI Off Grand River Ave. and Magnolia St. Status:

Site Approval

Objective: This project was for the schematic design and site approval of a new independent senior living apartment building versatile to being placed on a 6 and half acre site in Detroit. The project consists of a 4 story apartment building totaling approx. 88,000 square feet with landsaping and proposed 233 space parking lot. Design features included orienting the building in a “L” form design with the building’s center located on the axis of true north facing Grand River Avenue. There contains 76 total living units made up of 31 one bedroom and 45 two bedroom. Also included are community rooms, dining area, kitchen, support spaces, and offices. Project Contribution: Responsible for procuring diagrams, drawings, and design delegation throughout the schematic design phase.

Work Performed/ Production: -Site Diagramming -Floor Plan Layout Design -Elevation Layout Design -Draft Floor Plans, Elevations on CAD -Schematic Drawings on CAD -Attend Client Meetings -Delegate Design Changes - Redmarking

1 Bedroom and 2 Bedroom Plan Types

PHASE SD DD CD B CA 33


2 42 Community Church Exterior Vestibule Design Rendering

Model/Rendering Courtesy of Hobbs Black Design Dept.

Building Footprint

34

Vestibule and Lobby Floor Plan


Existing Community Center Stire

Site: 2600 Bennet Road Okemos, MI Status:

Completed 2016

Objective: This project was for the design and renovation of a 22,000 square feet existing community center to be the campus of a new non denominational religious franchise known as 242 Community Church. The project consists of the existing square foot space to better suit the needs of the worship building and take the already exsting spaces such as the basketball courts to be versatile in becoming the area of the sanctinasium. Design features included a contemporary entry way and vestibule design, barn wood cladding, wood millwork design for a new lobby, office, reception space, childrens area, and sanctinasium. Project Contribution: Responsible for procuring drawings and detailing throughout the construction documents phase for bids and permitting.

PHASE

Model/Rendering Courtesy of Hobbs Black Design Dept.

SD DD CD B CA 35


Exterior Glass Vestibule with Metal Canopy Elevations and Sections

36


Completed Lobby

Completed Sanctinasium

Graphics Courtesy of Hobbs Black Marketing Dept.

Work Performed/ Production: -Draft Floor Plans -Reflected Ceiling Plans on CAD -Elevations on CAD -Demolition Plans on CAD -Construction Drawings on CAD -Millwork Production on CAD -Entryway/Vestibule Drafting and Design

37


B ell’s Cottage Residence Corner Lot Site Plan Down the Street from Lake Michigan

“H” Form Plan Layout

38


South

North

West

Site: 2600 Bennet Road Leland, MI Status:

Under Phased Construction

Objective: This project was for the design and construction for a client’s summer cottage just down the street from Lake Michigan. The client requested a 1,500 Square Foot cedar shake exterior that is to be placed on the corner lot property of square feet. Design features included a “H” form layout of the cottage with a great living room in the center accessible to both the front deck and the back deck. The left wing housed the kitchen, dining, and laundry spaces while the right wing contained the bedroom quarters and bathroom. Also added on the lot was a two car garage with guest room attached. Exposed Wood Studs was the client’s request for the interior.

East

Wood Truss Wall Section

Work Performed/ Production: -Site Analysis and Documentation -Floor Plan Layout Design -Elevation Layout Design -Draft Floor Plans, Elevations on CAD -Schematic Drawings on CAD -Construction Drawings on CAD Project Contribution: Responsible for site documentation, procuring drawings, floor layout designs, and exposed stud-detailing throughout the schematic, design development, and construction documents phase for bids and permitting.

PHASE SD DD CD B CA 39


F YI Food and Fitness Center

Rendering Courtesy of Hobbs Black Design Dept.

Exterior Front Entry Night Rendering

First Floor

40

Second Floor


East

South North

Site: 8754 Riverside Dr. Brighton, MI Status:

Under Developer Review

Objective: This project was for the design and construction for a two story fitness center totaling 63,000 square feet renovated from an existing big box retail space of a strip mall. The client requested a fully incorporated health and fitness institution for a variety of regimens complete with offices, hair salon, day care center, saunas, and merchandise space. Design features included an open fitness gymnasium, climbing wall, bicycle room, indoor track, hockey rink. Also included in on the design was a juice bar and fruit grocery area. Project Contribution: Responsible for site documentation, procuring drawings, floor layout designs, programming, design development, detailing, and construction documents phase for owner review

Rendering Courtesy of Hobbs Black Design Dept.

PHASE Front Exterior View from Park Lot Using Screen Designs and Wood Canopies

SD DD CD B CA 41


Fitness Entry Wall Sections

Fitness Center Glass Curtain Wall Partitions

42


Hockey Rink Render

Weight Room Render

Indoor Track Render

Renderings Courtesy of Hobbs Black Design Dept.

Work Performed/ Production: -Site Analysis and Documentation -Floor Plan Layout Design -Draft Floor Plans, Reflected Ceiling plans on CAD -Elevations on CAD -Demolition Plans on CAD -Construction Drawings on CAD -Detailing on CAD

Grocery Area Render

43


F erguson Lofts/Woodward Lofts Site Along Woodward Ave. along M-1 Rail Line and adjacent to future developments.

Site Graphic Provided by DPop Design Team

First Floor: Houses White Box Retail Space and Tenant Common Area

44

Basement Floor: Houses Support Spaces, Mech. Rooms, and Open Bays


Existing Exterior

Existing Corridor Spaces

Existing Rooftop

Site: 1448 Woodward Ave. Detroit, MI Status:

Under Construction Phase

Objective: This project was for the interior renovation of an existing 66,000 square foot six story apartment building across the street from the Hudson’s Site in Detroit. The renovated space takes a white box retail space on the first floor separated by a tenant common area and mail room. Floor finishes are throughout tenant corridors on the upper floors, and the elevator penthouse on the roof is reconstructed. Project Contribution: Responsible for site documentation, procuring drawings, floor layout designs, programming, design development, detailing, construction documents, and coordination with construction.

Second and Third Corridor Plans- New Fixtures, Fire Doors, Finishes

PHASE SD DD CD B CA 45


Storefront System Details and Storefront Elevations

46


Corridor Egress Doors Recessed in Wall

Sealing Off the Basement Vault

Work Performed/ Production: -Site Analysis and Documentation -Floor Plan Layout Design -Draft Floor Plans, Reflected Ceiling Plans on CAD -Elevations on CAD, -Demolition plans on CAD -Finishing Plans on CAD -Construction Drawings on CAD -Detailing on CAD -Sketches for RFIs -Additional Services Plans -Laser Scanning Verification

Roof Plan: New Elevator Penthouse

47


S t. John’s Episcopal Church

Rendering Courtesy of Hobbs Black Design Dept.

Site Plan: Reconfigured Parking Accessible Friendly Walks Drop of Zones

48


Existing Back of House Exterior

Site: 2326 Woodward Ave. Detroit, MI Status:

Existing Cathedral Exterior

Existing Chapel Exterior

Accesible Entry Vestibule Exterior at Public Walk

Construction Documents Phase

Objective: This project was for the constructed addition and interior renovation of an existing church’s chapel and parsonage. The 17,000 square foot project consisted of demolishing the existing back of house sturcture that housed the offices and support spaces to design a contemporary worship design complimenting the forms and angles of the existing cathedral. Design features included new accessible vestibule entry with parking lot, new wing of support spaces, and renovation of the basement to house banquets and large gatherings. Project Contribution: Responsible for site documentation, procuring drawings, floor layout designs, programming, design development, accessibility changes, and multiple design iterations for community meetings.

PHASE

Rendering Courtesy of Hobbs Black Design Dept.

SD DD CD B CA 49


First Floor: Entry Way and Lobby Accessible Vestibule Rector’s Offices Support Spaces Parking and Drop Off

Second Floor: Banquet Assembly Space Accessible Restrooms Nursery Commercial Kitchen

50


North Exterior

Work Performed/ Production:

East Exterior

West Exterior

Building Section of Support Spaces and FIrst Floor Offices

-Site Analysis and Documentation -Sketching on Site -Procuring As Builts -Floor Plan Layout Design -Draft Floor Plans, Reflected -Ceiling Plans on CAD -Elevations on CAD -Procuring Accessibility Plan Options -Demolition plans on CAD -Elevations on CAD

51


A mber Engine Tenant Improvements Floor Plan of 24th Floor Showing Open Daylight Workspace with Central Node Private Offices

Vicinity Map of of the Site in Detroit

Sliding Barn Door Details of the Private Offices

52

MEP and Reflected Ceiling Layout


Existing Office Space

Site: One Detroit Center, Detroit, MI Status:

Private Office Door Details

Completed 2017

Objective: This 9,000 square foot project was for the interior renovation of the 24th floor of the Ally Detroit Building in downtown Detroit. The tech. firm, Amber Engine, design layout included an open office concept by demolishing the existing private offices that lined the exterior window edges bringing natural daylighting into the work space . Design features included sliding glass barn door offices, butt glazing interior, conference rooms ,and new MEP layout and configuration. Project Contribution: Responsible for site documentation, procuring drawings, floor layout designs, detailing, coordination with glass manufacturers, and coordination with construction administration

Work Performed/ Production: -Site Analysis and Documentation -Sketching on Site -Floor Plan Layout Design -Reflected ceiling plans, -Glass Barn Door Detailing -RFis and RFPs

PHASE SD DD CD B CA 53


University Towers Pool Enclosure

Rendering Courtesy of Hobbs Black Design Dept.

54

Prefabricated Structure by Cabrio Companies

Site Plan


Existing Pool Equipkent Room

Site: 536 South Forest Ann Arbor, MI Status:

Existing Pool Desk Area

Shading Diagrams for Daily Pool Use

Zoning Board of Appeals

Objective: This 3,300 square foot project was for the construction and installation of a prefabricated steel and glass enclosure over the swimming pool area of University Towers, a 18 story high rise primarily for student housing of University of Michigan. Design features included constructing a vestibule entry tunnel to connect to the structure and renovations of the pool equipment room to house restrooms and shower area. Project Contribution: Responsible for site documentation, procuring drawings, floor layout designs, detailing, and coordination with zoning board.

PHASE SD DD CD B CA 55


Pool Plan Showing New Entry Vestibule into Enclosure with Renovated Equipment Room complete with Showers and New Metal Stair Entry/Exit.

Section Cuts of Pool Enclosure Showing Retractable Skylight System

56


Renderings Courtesy of Hobbs Black Design Dept.

Work Performed/ Production:

Wall Section Connection Between Pool Enclosure and Pool Equipment Room

-Site Analysis and Documentation -Shading Diagrams on Revit -Procuring As Builts -Floor Plan Layout Design -Draft floor plans -Elevations on CAD, -Demolition plans on CAD, -Elevations on CAD -Detailing on CAD -Client Meetings

57


M idtown A2 Apartments

Site Phasing Plan to Incorporate the 20 unit and 10 Apartment Buildings with the Walk Up Townhome Buildings along the Edge of the Developed Site Renderings Courtesy of Hobbs Black Design Dept.

Community Building Floor Plan Showing Fitness Area, Sales Offices, Multipurpose, and Pool Functions with Outdoor Swimming Pool

58

Shared Roof Space On Top of End Units of 20 Unit Building Type C/E


First and Second Floor Plans of 20 Unit Apartment Building Type C/E Showing Iterations of One Bedroom, Two Bedroom, and Three Bedroom Units.

Site: Grace Bible Church Property off Maple Road Ann Arbor, MI Status: Under Owner Review Objective: This project was for the planning and construction of various apartment buildings and walkup town homes within the property of Grace Bible Church. The majority of the structures are four story 20 unit apartments totaling 40,000 square feet and the town home units lining the edges of the site range from 4 unit buildings of 8,000 square feet to 7 unit structures at 14,000 square feet. Design features included a clubhouse community building at the entrance of the site with amenities of sales office, pool and fitness area. Project Contribution: Responsible for programming spaces, procuring drawings, and floor layout designs.

PHASE

Plans of Walk Up Town Home Buildings Type B Showing Iterations of Two Bedrooms and Three Bedroom Town Home Units With Their Respective One or Two Car Garages.

SD DD CD B CA 59


Elevations of Walk Up Town Homes Type A Elevations of 20 Unit Apartment Buildings Type C

60


Elevations and Renderings of the Community Building and Clubhouse

Renderings Courtesy of Hobbs Black Design Dept.

Work Performed/ Production: -Site Plan Layout -Multiple Floor Plan Iterations -Draft Floor Plans -Elevations with Sketchup and CAD -Attend Client Meetings

61


I thaka/Jstor Office Renovation

Cabinet Details in Office Breakroom 4th Floor Plan with New Locker Configuration, Glass Curtain Offices, Enlarged Break Room and Video Conferencing Rooms

62

Break Room and Office Glass Curtain Wall Elevations


Incoming Furniture Layouts into Office Plan

Site: One Detroit Center, Ann Arbor, MI Status: Completed Objective: This project was for the construction and renovation of the fourth and fifth floor of an office space. The Project laid out a central locker system within the open office areas and butt glazing private offices along the north and south faces. Interior partitions were added to create video conferencing spaces. Design features also included a enlarged employee break room Project Contribution: Responsible for project documentation, procuring drawings, floor layout designs, locker layouts, design development and construction drawings.

PHASE Work Performed/ Production: Furniture Plan of Break Room and Break Out Spaces

-Project Documentation -Floor Plan Layouts -Draft floor plans -Plans in CAD -Attend Client Meetings -RFIs and Submittals

SD DD CD B CA 63


F rankenmuth Cheese Haus Rendered South Elevation Showing Entrance Into Cheese Haus From Parking Area

Renderings Courtesy of Hobbs Black Design Dept.

64

First Floor Showing Retail and Show Room Spaces

Site Plan Footprint Off Main Street


Second Floor Plan Showing Tabled Assembly Areas, Commercial Kitchen Back of House, Open Balcony Out Cropping, and Central Stair

Site: 561 South Main Street Frankenmuth, MI

Project Stairway Details and Sections

Status: Under Construction Phase Objective: This 14,000 square foot project is for the construction of the mercantile and assembly use of the new Cheese Haus for the themed Bavarian Village of Frankenmuth, to replace the existing Cheese Haus building that is three buildings down from the the newly proposed site. The first floor is the retail area with the cheese procuring rooms and tasting areas. Upstairs on the second floor houses open assembly for banquets and large gatherings complete with commercial kitchen space. Design features included imitation of German Bavarian themed construction including decorative balcony railings and wooden truss framed construction.

PHASE SD DD CD B CA 65


West Elevation off Main Street

66

Wall Section Termination at Second Floor Balcony South Elevation


Renderings Courtesy of Hobbs Black Design Dept.

Work Performed/ Production: -Reflected Ceiling Plans -Draft floor plans -Elevations in CAD -Details and mill work -Submittals and RFIs in Building Block

Wood Timber Framing Details and Balcony Railing Details

67


P ackline KFC Renovaiton

Implementation Parameters Indicate Various Scenarios for Laying Out Food Equipment. A Standard Packline, an Integrated Line, a Mid Line, and a Bridge Solution are the Programming Solutions for the Test Fits. Stores with Tight Store Constraints Need Equipment to be Placed Off Line to Maximize Efficiency. 68


Site: Various KFC Food Service Franchises Across the United States Status: Renovations Completed by end of 2015 Objective: This project is for the test layout renovations for the stores of the food chain Kentucky Fried Chicken. More than 4,000 stores in the country underwent an interior renovation with the kitchen area in installing pack lines for better efficiency and quality of service. The pack line renovations are in regards to health contamination, fire department enforced egress, replacing outdated equipment, and complete store restructuring. Design features included a 217” packline with the orientation perpendicular to the front counter. A KT store (KFC and Taco Bell) receives a 279” Integrated Line with a Taco Bell EVO Cabinet attached with it.

Work Performed/ Production: -Franchise Site Documentation/Analysis -Programming -As Builts -Hand Draft Floor Plans -220 Redlined Store Layouts -Coordination with Corporate Franchisee Requests

69


L

70

abra Design Build


Labra Design Build WIndow Graphic Site: Labra Design Build Office, Wixom MI Objective: The goal is to design a word collage window graphic for the main window of the office using Adobe Illustrator and InDesign. Features:

The bold style of design is to present and advertise to clients all the services that the design build company provides.

71


Labra Design Build: Three Car Garage Base Model Site:

72

Residential Home, Novi MI

Objective:

The goal is to design a baseline plan for the construction of expanding an existing two car garage into a three car garage and build a master bedroom above.

Features:

The design space is suitable for three cars with space columns and I-joists for master bedroom above done in Googe Sketchup and Revit.


Labra Design Build: Mudroom Cabinet Design Site:

Residential Home, Wixom, MI

Objective: The goal is to design a digital model for the construction of mudroom cabinets. Features: The wooden cabinet is suitable for the residential home’s landing space so that the clients can place their coats as they get in the door as well as sit down and put their shoes on/off. The model is done in Google Sketchup.

73


Labra Design Build: Backyard Deck Removal Site: Residential Home, Southfield, MI Objective: The goal is to remove an existing dilapidated wooden deck for the construction of a deck renovation to add new framing.

74


75


Labra Design Build: Backyard Cumuru Deck Renovation Site: Residential Home, Southfield, MI Objective: The goal is to place and construct a new wooden cumuru deck in the client’s backyard. Features: 76

The deck is set and placed in with the ipe clips system (plastic fastener clips) and screwed down to the framing joists.


77


W aterfront Development Thesis

78


Site: Vantage Point,Port Huron

Design Concept:

Objective: This is a yearlong study researching, analyzing, and designing the concept of how the riverfront can become an anchor for a city’s economic development from an otherwise unused and abandoned area. The study observes underutilized waterfront properties along the Eastern Michigan lakes system of the Detroit River, Lake St. Clair, and St. Clair River; locations that are in the transition out of their past roles of industrial infrastructure. The thesis will focus in on the specific property of Desmond Landing in Port Huron and take into consideration community issues identified by the Port Huron City Council and those specific to the surrounding site area. This will determine a comprehensive solution and plan that provides the Desmond Landing riverfront a role as the catalyst to impact and benefit the community of Port Huron spurring growth and future development for the betterment of the city.

The project for Desmond Landing will celebrate the St. Clair River with a catalyst to generate the area by addressing the education, residential, athletic, and tourism issues taking place in Port Huron. The project will look toward garnering from the local impact of the surrounding downtown, and secondarily from the Blue Water Bridge’s impact with the commuters and out of towners nearby Port Huron. Multiple studies of analyzing the city data of Port Huron were taken in order to see possible solutions to appropriate uses on the site as a whole. The main anchors will consist of a market and maritime museum expansion with recreational auditorium, athletic facility, and a retail spine of shopping and offices. This is supported by a second tier of usages being an affordable residential plan, manufacturing trade school, and port terminal with marina access. 79


80


T TER S

WALL ST

WA

Proposal render

PINE ST

MILITARY STREET COURT ST

CHESTNUT ST

GRISWOLD ST

OAK ST

Residential High Rise Market Retail Office Museum/Municipal Trade Athletic Garage Port Terminal

TEXT---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

BLUE WATER RIVER WALK

NORTH

Project Plan: Court Street is expanded into a boulevard with a retail spine dotted with street parking. The boulevard leads down to the focal point of the maritime museum with an auditorium at the point. The cruise terminal is then adjacent to the museum complete with its dry dock and connecting to the Blue Water River Walk. Further along the river walk is the all seasons farmers market structure with a transitory marina and boat launch. Moving inward from the point are structures of high rise and urban density apartments. The trade school is located in a complete self contained area and administers to the college catered dormitories. Moving inward from the farmers market buildings is a region of single family and multi family condo units. On the far left is the hockey facility with its own attached parking structure and the complex overlooks the Blue 81 Water recreational wetland.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.