architecture / interior
Hello.
LI HENG CHUE . J ONATHAN
+60481387790 chueliheng30@live.com chueliheng30@gmail.com issuu.com/Architectural Portfolio Chue Jonathan
BIOGRAPHY Li Heng Chue (Jonathan) is currently an experienced architecture graduate who has been always passionate about designing residential homes and industrial project. During his 2 years of working in the field has enable him to further explore his interest and set his direction in his future career. Li Heng Chue has accumulates significant experiences working on single residentials, townhouses, commercial and mixed-use projects and also developed a great eye to oversee and guide the workflow of projects. Li Heng Chue is a postgraduate from University of Adelaide, holding a Bachelor of Architectural Design and Master of Architectural Design . Born in Malaysia, on 30th September 1994, Li is raised in a family with drawing background and thus, had always been interested with anything that related to art and drawings until when he was turning 13, he got interested in architecture due to the approach that he was given. After finishing his high school, Li Heng Chue came to Adelaide to start his Foundation of Design Studies in Bradford College for a year which prepared him to University of Adelaide. After he graduated, Li Heng Chue also had the opportunities to gain work experiences working with architect firm and civil engineering firm. Architecture for Li has always been about the experiences and atmosphere that a space can provide to a visitor, that spatial quality that enhances one’s senses through the circulation and materials. In addition, Li had developed strong interest and skills in digital works and graphic design using Photoshop, Illustrator and rendering software.
EDUCATIONS
University of Adelaide - Master of Architectural Design (2015-2017) - Bachelor of Architectural Design (2013-2015) Bradford College - Foundation of Design Studies (2012)
SKILLS
ADOBE Photoshop Illustrator InDesign
EXPERIENCES
AUTODESK AutoCad Revit 3ds Max
OTHER Rhinoceros 3D Vray for Rhinoceros Vray for 3ds Max
HANSO ARCHITECTS (2018 - present) - Project managing - Design - Planning - Building Permit - Tender - Construction - Furniture design JPE (2016) - construction drawings - renders HASSELL (2015) - Adelaide, Australia - Model making and “work studio”
EXTRACURRICULUM
ACHIEVEMENTS
LEYOHAN - Malaysia - Self- learning 3d Max + Vray render - Design and modelling several apartments and housing Workshop Operator - Training students to do 3D print, 3D scan and laser- cutting - Responsible to conduct 3D print, 3D scan and laser-cutting jobs from students Superstudio (2015) - Nation state runner- up, State Runner- up Superstudio (2016) - State First place Lesley Lynn (2017) - Participants Creative Hub (2017) - Shortlisted
LANGUAGES
English Mandarin Malay
REFERENCE
Dr. Urs Bette Senior Lecturer University of Adelaide School of Architecture & Built Environment (08) 8313 4590 urs.bette@adelaide.edu.au
Cantonese Hakka
CONTENT
Completed Projects (selected) Restaurant - Panda Hotpot - 100 Victoria St, Melbourne, VIC Office - VIVO mobile office - 4.01 & 4.03 Lyonpark Road, Macquarie Park, NSW On-going Projects (selected) Residential - Townhouses - 54 Cassinia Avenue, Ashwood, VIC Mixed-Use Developement - 15 - 17 Heffernan Lane, Melbourne, VIC Postgraduate Architecture - Final Year Project - Cruiseship Terminal Genesis + Design Process Drawings + Renders Architecture - Boutique Hotel Design Architecture - Australian Embassy Design in India Undergraduate Architecture - Redevelopment of Union House Precinct - Architectural School Competitions SuperStudio 2015 SuperStudio 2016 Lesley Lynn 2017 Other completed projects: Bubble tea - Yi Fang Fruits Tea - Shop 3, 233A Toorak Rd, South Yarra, VIC - 205 Elizabeth St, Melbourne, VIC Retail - MIDEA appliances shop fitout - Tenancy 1093, LVL 1, Eastland SC, Ringwood Restaurant - Discovery Fusion BBQ Buffet - Tenancy F3, Burwood One SC.
01
PANDA HOTPOT 100 VICTORIA ST, CARLTON
This is the first Panda Hot Pot for Australia. It was established in Chengdu City, China in 2015, and has since expanded to Japan, Malaysia and the US. Stepping through giant wooden door, the interior design instantly channels the customers into ancient Chengdu, that strongly represent the craft of the origin of Hotpot and most importantly, the cultures and historyof China. It was fun and exciting project to personally manage throughout, especially working alongside with the interior design team from Chengdu. Collaborating with international team definitely adds the experiences and understands the differences in the working process as well as documentations. Despite long planning process working with town planner and the Council and localising the documentations, the outcome is no doubt worth the time.
EXISTING
NOW
GROUND FLOOR PLAN
FIRST FLOOR PLAN
MEZZANINE FLOOR PLAN
02
VIVO MOBILE OFFICE
4.01 & 4.03 LYONPARK ROAD, MACQUARIE PARK, NSW
VIVO is a quick uprising smartphone and technology company from China and has open its first ever store in NSW. Designing interstate project definitely adds the experience and understand the differences of the process. By understanding the client’s requirements, we stick to simplicity and keep it minimalistic by integrating timber and aluminium composite panel materials . Timber used to
transform office spaces to connect to nature to discover a sensory feelings that allow the client to relax while waiting. Aluminium Composite Panel paired with recessed LED strip light exhibit a sense of contemporary and innovation.
03 54
CASSINIA HOUSE
54 CASSINIA AVE, ASHWOOD, VIC 54 Cassinia House offers a collection of two distinguished townhouses designed carefully with contemporary aspects and modern day comfort. Integration between timber, brick and concrete render finish allows these homes to sit cohesively on site without compromising the suburban characteristics.
HW H 65.90
PORCH
LOWER STORY HW H 65.95
CARPORT
GARAGE
P.O.S
2440
NHW H 62.85
7600 EX.DWELLING SETBACK
DASH DOT LINE DENOTES EXISTING EASEMENT
S 9 58.1
8 58.2
3 58.5
0 .05 59.0 59
59.5
TITLE BOUNDARY
0
60.0
0
PALINGS PALINGS 1.6M1.6M
3 60.2
60.5
0 6180
62000
0 6140
0 6150
PALINGS 1.6M
FOOTPATH (BITUMEN)
0
0 6160
1 58.7
NOT FENCED
1 61.7
NO. 54 SINGLE STORY BRICK HOUSE RIDGE RL. 66.20 UPPER EAVE RL. 66.20 LOWER EAVE RL. 62.65
1 58.9
3 58.6
W
SHED GRASSED SURFACE
TITLE BOUNDARY TITLE BOUNDARY
GRASSED SURFACE
3 58.6
PORCH
9 58.5 2 59.8
2 58.0
2 58.6
NOT FENCED
PORCH 8 58.7
0 58.5
4 57.7
7 58.9
P.O.S
D A05
W A10
4.7 m² TILES
WT2
P'DR
P'TRY
2.7 m²
2.1 m²
WT2
TILES
TIMBER FLOORING
D T03
WT2
KITCHEN
D A06
KITCHEN 24.3 m²
WT2
UP
2.7 m²
COMMON
TIMBER FLOORING
D A07
WT3
WT2
3.4 m²
W A02
WT2 WT2
WIR
D A06
W A02
3.8 m² CARPET
3500
M.BEDROOM 1 16.1 m² CARPET
W A02
4600
WT5 WT2
WT2
WT2
D T03
LINES DENOTES FIRST FLOOR ABOVE
19 m² CARPET
D A02 FFL 59300
D T04
500
W A11
PROPOSED PERMEABLE CONCRETE DRIVEWAY
DP
WT3
D T04
TH 2 DOUBLE GARAGE 33.1 m²
D A07
FFL 59000
UP
CONCRETE
FFL 59000
PROPOSED PERMEABLE CONCRETE DRIVEWAY SWP
WT5
C
D
TITLE BOUNDARY
8
2.9 m² -
200
635
590
ELEC. SUPPLY METER BOX
PROPOSED RETAINER WALL WITH PALINGS 2.0M ABOVE
MIN. 500MM BOUNDARY SETBACK OF SEYMOUR TOPPINGS/ GRASSED SURFACE WITH STRAPPY LEAFY PLANTS.
61.4
SHED
WT5
WMT GMT DP
PALINGS 0.9M
1
UP
HWU
RAMP UP 1:10 (10%)
3000
61.7
DP WT3
WT5 WT3
W A11
10 m² TIMBER
FFL 59250
1800
WT2
FFL 59000
TIMBER
WT2
TILES
ENTRY
3.9 m²
TILES
1
WD13
TIMBER FLOORING
D 4.2 m² A08TIMBER FLOORING
WT3
WT3
DECKING
LIVING 26.6 m²
P'TRY
3.9 m²
5.2 m²
DP
E
PROPOSED RETAINER WALL WITH PALINGS 2.0M ABOVE
1
260
4590
190
2710
30
2130
195
260
WD14
12800
5615
140
7600
12540
260
1400 5000 REAR SETBACK 5000
4
3
12540
4500 LIVING
6520
TH2 GARAGE 12380
3
2
7600
180
M.BEDROOM 1
5760
2
1
2090 ENTRY
5605
TH1 GARAGE
1
2
D T04
WT3
D A06
D T04
L'DRY
ENS. 1
WT2
61.7
11.7 m²
W A02
B
FFL 59250
DINING TIMBER FLOORING
UP
WT2
S.P.O.S
UP
M.BEDROOM 1
W A02
TIMBER
W A02
TIMBER FLOORING
TILES
WT2
U2
12.2 m²
3970
D T03
A
THE DEMOLITION AND REMOVAL OF THE EXISTING RESIDENCE, GARAGE AND ASSOCIATED RETAINING SWP WALLS, FOOTINGS, CONCRETE PAVING UNDERGROUND SERVICES INCLUDING STOPPING OFF ALL SERVICES.
W A12
10115
D A09
L'DRY
EXISTING TREE INCLUDING STUMPS TO BE REMOVED
SEWER INSPECTION SHAFT WT3 P.O.SDP PUBLIC OPEN SPACE IS
1190 995
SV
2/10/2020 10:21:33 AM
TREE (TRUNK & SPREAD) DENOTES TREE TO BE RETAINED
SEWER VENT
FLOOR ABOVE
P'DR
D T04
5860 0
WT3
9.2 m² TIMBER
WT2
FIRE PLUG
WT2
DINING
FFL 59000
FIRE HYDRANT
FP2
15680
CONCRETE
FH
GAS METER
WT2
FFL 59000
D T04
270
ADJACENT PROPERTY
11.9 m² TIMBER
WT3
5850 0
CONCRETE
D A02
WT2
D A06
33 m²
3975
KITCHEN DEMOLITION LEGEND
TELSTRA PIT
POWER POLE
TILES
4.8 m² CARPET
TH1 DOUBLE GARAGE
1245 110 P'TRY
TH2 GARAGE
5000
ENS. 1 D T03
FFL 58950
REAR SETBACK
250
5960
D T01
1200
EXISTING FOOTPATH 1 57.5
E
3350
9 57.5
VEHICLE CROSSING MIN. WIDTH 3000MM
1820 4145
VEHICLE CROSSOVER CONCRETE 9 57.1
-
WT7
1460 P'DR
PVP.S.M
W A10
WIR
ENTRY
WT4
BRICK AND TIMBER BATTEN FENCING
110
D
CLOTHESLINE UNKNOWN PIT
3645
0.9 m²
5 9 57.7 57.7
1 57.7
JUNCTION PIT
WT5
D T04
1705
1760
NATURE STRIP
10115 11935
FFL 59000
58800
3500
PORCH
WMT
0 40 58
260
UP
FFL 58150
58200
M.BEDROOM 1
WD16
C
JP UNK
4.8 m²
WT3
110
WATER METER
W
DP
TIMBER
LINES DENOTES FIRST FLOOR ABOVE
JP
G
TBM
14.2 m²
GATE
LIGHT POLE
ELECTRICITY PIT
DECK W A06
WT3
1 57.4
W A06
21.7 m²
WATER VALVE
E
WATER TANK
5000
GRATED PIT T WD15 WATER TAP GAS VALVE GV PROPOSED RETAINER WALL WITH PALINGS 2.0M ABOVE SIDE ENTRY PIT
2.7 m²
CLOTHESLINE
6 5000
GP
SEP
SEWER MANHOLE
SHED
WT4
TIMBER
WV
2NON- HABITABLE WINDOW
FFL 58950
LIVING W A08
1600 L'DRY
S
S.P.O.S
U1
3 WD15
5
4
5760
6
5
12380
5000
6
43280 54 CASSINIA HOUSES 8530
NO. DATE DESCRIPTION 2020/08/26 11870BUILDING PERMIT SUBMISSION
TENDER ISSUE
G F D
54 Cassinia Avenue, Ashwood VIC 3147
150
DRAWING NAME
394 - 396 BURKE ROAD CAMBERWELL VIC 3124
PROPOSED GROUND FLOOR PLAN
T 03 9939 3693 l www.hanso.com l ABN 71 624 791 171 l ACN 624 791 171 © copyright
DWG NO: WD06 Scale @ A2 Project No.
CLIENT PJY DEVELOPMENT 1 : 100 1014
Drawn by.
Check. by
4135
C 130
M.BEDROOM 2
B
2020/06/30 2020/05/16 2020/05/05 2700 2020/03/03
© COPYRIGHT TO ALL OR PART PLANS, DRAWINGS & SPECIFICATIONS. THE INFORMATION, IDEAS & CONCEPTS CONTAINED IN THIS DRAWING ARE CONFIDENTIAL. DISCLOSING SUCH INFORMATION, IDEAS & CONCEPTS BY THE RECIPIENT(S) TO ANY PERSON WITHOUT WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED. A PERSON USING HANSO ARCHITECTS DRAWINGS AND OTHER DATA ACCEPTS THE RISK OF: 1. USING THE DRAWINGS AND OTHER DATA IN ELECTRONIC FORM WITHOUT REQUESTING AND CHECKING THEM FOR ACCURACY AGAINST THE ORIGINAL HARD COPY VERSIONS. 2. USING THE DWGS OR OTHER DATA FOR ANY PURPOSE NOT AGREED TO IN WRITING BY HANSO ARCHITECTS.
CLH VC
C.O.S / REFER TO LAND SURVEYOR FEEDBACK GENERAL LEGENDS: IB CLH AFFL ABOVE FINISH FLOOR LEVEL JP7045 JUNCTION PIT
TP AMENDMENTS TP REVISED ACCORDING TO NOD REVISED PALINGS, SHADOW DIAGRAM, 4505 OVERLLOKING & DRIVEWAY SETBACK REVISED PLANNING DRAWING ROOM 1
CLH CLH CLH
BI-CAB C.O.S 250 EMT FCH FFL GMT HR HWU
CLH
1
RL TBC U1 U2 P.O.S PV S.P.O.S SWP WMT
BUILT IN-CABINET CHECK ON SITE ELECTRICAL METER FINISH CEILING HEIGHT FINISH FLOOR LEVEL GAS METER HANDRAIL HOT WATER UNIT
WALL TYPES LEGEND: (REFER TO WALL SCHEDULES FOR DETAILS) WT1
RELATIVE LEVEL TO BE CONFIRMED 1545 UNIT 1 UNIT 2 PUBLIC OPEN SPACE STEPPING STONE PAVERS SECLUDED PRIVATE OPEN SPACE STORMWATER PIT WATER METER
155
FRL 60/60/60 FIBRE CEMENT SHEET WALL: 9MM6000 THICK JAMES HARDIE FIBRE CEMENT SHEET FIXED TO 90MM TIMBER STUD FRAME ON 20MM BATTENS. RENDER FINISH.
BRICK VENEER WALL: 110MMENS.2 BRICK, 40MM CAVITY, 90MM STUD, 10MM WIR ROOM 1 PLASTERBOARD. (EXPANSION JOINT REFER TO ENGINEER'S 6105 110 3320 DRAWING.)
SIDE,OR CERAMIC TILES.
4030
150
TIMBER BATTEN WALL: 28MM SCREENWOOD PANELS - STANDARD SCREENWOOD PROFILES RED CEDAR 2 STAIR 3040-6 SERIES (WESTERN CLEAR) ON 35MM TOP HATS FIXED TO 90MM TIMBER STUDS.10MM PLASTERBOARD TO INTERNAL SURFACES WD15 DOUBLE BRICK WALL: 110MM BRICK, 40MM CAVITY AND 110MM BRICK.
WT5
PROPOSED PALINGS 0.9M
WT6
STUD WALL: 70MM 10MM PLASTERBOARD TO EACH 2465 110 STUD WITH2930
WT3 WT4
WD15
FIBRE CEMENT SHEET WALL: 9MM THICK JAMES HARDIE FIBRE 9835 CEMENT SHEET FIXED TO 90MM TIMBER STUD FRAME ON 20MM BATTENS. RENDER FINISH.
WT2
10/11/2020 3:06:12 PM
PROJECT TITLE
PROPOSED RETAINER WALL WITH PALINGS 2.0M ABOVE
TITLE BOUNDARY
W A10
WT1
2O FALL
WT1
PROPOSED PALING 1.8M
100 ROOM 1
DP WT1
C.O.S / REFER TO LAND SURVEYOR FEEDBACK
D
2O FALL
E
E TITLE BOUNDARY
1870 150 720
4035
155
STAIR
8530
0 7045
12540
54 CASSINIA HOUSES 54 Cassinia Avenue, Ashwood VIC 3147
DRAWING NAME
PROPOSED FIRST FLOOR PLAN
TENDER ISSUE
NO. DATE
2020_09_10 2020/08/26 2020/06/30 2020/05/16
DESCRIPTION
BP REVISED ACCORING TO CHECKLIST BUILDING PERMIT SUBMISSION TP AMENDMENTS TP REVISED ACCORDING TO NOD
IB
CLH CLH CLH CLH
3570
150 4220
4
GENERAL LEGENDS: AFFL BI-CAB C.O.S EMT FCH FFL
7490
ABOVE FINISH FLOOR LEVEL BUILT IN-CABINET CHECK ON SITE ELECTRICAL METER FINISH CEILING HEIGHT FINISH FLOOR LEVEL
JP RL TBC U1 U2 P.O.S
6000
12380
3
I G F D
PROPOSED RETAINER WALL WITH PALINGS 2.0M ABOVE
150
9835
5760
2
PROJECT TITLE
1895 2045
11870
7600
1
PROPOSED RETAINER WALL WITH PALINGS 2.0M ABOVE
4020
JUNCTION PIT RELATIVE LEVEL TO BE CONFIRMED UNIT 1 UNIT 2 PUBLIC OPEN SPACE
5000
5
WALL TYPES LEGEND: (REFER TO WALL SCHEDULES FOR DETAILS) WT1 FIBRE CEMENT SHEET WALL: 9MM THICK JAMES HARDIE FIBRE WT6 CEMENT SHEET FIXED TO 90MM TIMBER STUD FRAME ON 20MM BATTENS. RENDER FINISH. WT2 STUD WALL: 70MM STUD WITH 10MM PLASTERBOARD TO EACH SIDE,OR CERAMIC TILES. WT3 BRICK VENEER WALL: 110MM BRICK, 40MM CAVITY, 90MM STUD, 10MM
FRL 60/60/60 FIBRE CEMENT SHEET WALL: 9MM THICK JAMES HARDIE FIBRE CEMENT SHEET FIXED TO 90MM TIMBER STUD FRAME ON 20MM BATTENS. RENDER FINISH.
6
06:19 PM
PALINGS 0.9M
394 - 396 BURKE ROAD CAMBERWELL
C
4220
VEHICLE CROSSOVER CONCRETE
TITLE BOUNDARY
WT1
W A09
DP
17070
10115 WT1
13.7 m² CARPET
WT1
5960
W A01
ROOM 2
LINEN DP
BATHROOM 10420
2O FALL
BIR WT2
W A01
2O FALL
D
18.1 m² CARPET
WT2
PROPOSED PALING 1.8M
WT1
TILES
5960
WT1
TILES
FFL 62200
DP
5.3 m²
D T04
FFL 62400
WT1
DP
W A11
BATHROOM
ROOM 2
W A09
4.8 m²
WT1
2125
LINEN
WT1 BIR
BATHROOM
RUMPUS
WT2
1865
2390
D T03
WT2
CARPET
D T03
D T04 W A07
12990
2O FALL
21.6 m²
1855
WT2
RUMPUS W A03
WT2
130
CARPET
W A01
1810
12.3 m²
4420
100 1870
WT6
WT2
3745
ROOM 2
14.9 m²
DP
W A01
WT1
WT2 D T04
215
WT2
15.8 m² CARPET
UP
WT2
M.BEDROOM 2
CARPET
WT1
BATHROOM
D T04
UP
1150
2460 1900
WT2
D T04
D T04 W A04
ROOM 1
D A06 W A01
2O FALL
4.4 m² CARPET
WT4
WT2
TILES
2O FALL
WT2
WT2
WIR
2O FALL
5.3 m²
BIR
D A06
WT1
4200
CARPET
CARPET
150
D T03
ENS.2
D T03
B
DP
W A01
WT2
4.6 m²
6430
13.3 m²
TILES
2O FALL
W A04
WIR CARPET
W A01
ROOM 1
4.6 m²
14.5 m²
110 1975
BIR
ENS. 2
WT2
M.BEDROOM 2
WT1
W A10
110
DP
3170
W A05
WT1
2390
WD16
C
EXISTING FOOTPATH
1
4080
150 3500
3 WD15
WT1
W A07
M.BEDROOM 2 1600 130 1780
UP
WT2 W A10
DP
170
WT1
10115
WD16
2O FALL
1310
2
WT1
STAIR
NATURE STRIP
B
2430
BRICK AND TIMBER BATTEN FENCING
995
A 995
A
BRICK AND TIMBER BATTEN FENCING
500
VC
Check. by
SWP
HWU
110
ENS. 1
HABITABLE WD14 WINDOW
NHW H 108.30 S 106.30
TITLE BOUNDARY
5
12130 3000
HW H 108.30 S 106.30
CLH CLH
1
1014
260
SITE PLAN LEGEND
IB
BUILDING PERMIT SUBMISSION TP PRE-APP SUBMISSION
WT4
1
WD13
5765 TH1 GARAGE
GATE
BRICK AND TIMBER BATTEN FENCING
995
995
170 7895
LIVING
3 58.0
Project No.
30680
WD15
AND CHECKING THEM FOR ACCURACY AGAINST THE ORIGINAL HARD COPY VERSIONS. 2. USING THE DWGS OR OTHER DATA FOR ANY PURPOSE NOT AGREED TO IN WRITING BY HANSO ARCHITECTS.
NO. 2/56 DOUBLE STORY RENDERED BRICK HOUSE 12380 UPPER EAVE RL. 66.35 LOWER EAVE RL. 63.30
4 5760
DESCRIPTION
2020/08/26 2020/02/24
EXISTING SITE PLAN & DEMOLITION PLAN PROPOSED PALINGS 0.9M DWG NO: CLIENT © COPYRIGHT TO ALL OR PART PLANS, DRAWINGS & SPECIFICATIONS. THE INFORMATION, IDEAS & CONCEPTS CONTAINED IN THIS DRAWING ARE CONFIDENTIAL. DISCLOSING SUCH INFORMATION, IDEAS & CONCEPTS BY THE RECIPIENT(S) TO ANY PERSON WITHOUT WD03 PJY DEVELOPMENT WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED. IS PV DRAWINGS AND OTHER DATA ACCEPTS THE RISK OF: A PERSON USING HANSO ARCHITECTS WT4 FORM WITHOUT REQUESTING GMT 1. USING THE DRAWINGS AND OTHER DATA IN ELECTRONIC DP Scale @ A2 As indicated Drawn by. CLH 58800
WD16
586 00
B
2
3000
G A
P'DR
DRAWING NAME
A
DRIVEWAY
STAIR NO. DATE
2220
TENDER ISSUE
54 Cassinia Avenue, Ashwood VIC 3147
P.O.S
270
54 CASSINIA HOUSES
3
DINING & KITCHEN 4835
4750
0
HW H 61.65
HW1 H 64.60
7035
LIVING
2290
HW H 62.95
61.5
PROPOSED PALING 1.8M
4405
165
PALINGS 1.9M
TITLE BOUNDARY
1095
0
PROPOSED PALING 1.8M
FRONT SETBACK
61.0
WATER TANK
HW1 H 64.70
0
HW H 61.15
-
110
2
PORCH
7600
HW H 61.65
NO. 1/56 DOUBLE STORY RENDERED BRICK HOUSE 12540 RIDGE RL. 66.35 UPPER EAVE RL. 65.00 LOWER EAVE RL. 61.95
2
60.5
110
FOOTPATH (BITUMEN)
59.3 FL
PROJECT TITLE
T 03 9939 3693 l www.hanso.com l ABN 71 624 2 791 171 l ACN 624.8791 171 © copyright
0
LOWER STORY
HW1 H 64.60
7600
9 58.1
60.0
PALINGS 1.9M
HW H 61.70
HW1 H 64.70
6000
TITLE BOUNDARY
HW H 61.65
HW H 61.75
P.O.S
0 60.2
0
4440
HW H 61.40
7450
1
1
59.5
1205
0
HW1 H 64.60
HW H 61.75
NATURE STRIP
7 59.4
59.0
1675
0
7575
58.5
PALINGS 1.0M
1600
3 58.2
1 57.5
57
8 61.4
SHED
3 58.5
D
6 58.5
6 58.1
394 - 396 BURKE ROAD CAMBERWELL VIC 3124
GARAGE
0 59.6
GRAVEL DRIVEWAY
5 58.2
0 58.2
5 59.0
Group#1
9 57.5
9 57.1
8 58.9
1050
VEHICLE CROSSOVER CONCRETE
8 58.8
5 58.7
6 58.2
9 57.7
Group#1
5 57.7
0 61.1
-
PALINGS 1.6M
2 57.9
1 57.7
9 60.8
2 60.2
GP
5 57.8
D
645
1 61.7
1 58.7
1 57.4
1810
3 58.0
P'TRY
NATURE STRIP
61.5
0 6100
CASSINIA AVENUE
0
0 6120
9 60.5
0 6060
0 6050
0 6040
0 6020
60000
59800
59600
59400
59500
59200
0 5900
58800
0 5860
58500 58400
G
61.0
0
0 6080
IS
2 57.8
CASSINIA AVENUE
HW H 65.90
HW H 65.90
PALINGS 0.9M
110 1130
VEHICLE CROSSOVER CONCRETE
4350
NATURE STRIP
FOOTPATH (BITUMEN)
NO. 52 DOUBLE STORY BRICK HOUSE & WEATHERBOARD RIDGE RL. 68.00 UPPER STORY EAVE RL. 66.00
E
D
C
B
A A
B
C
D
E
ROOF TRUSSES TO MANUFACTURER'S DETAILS.
RFC2
ROOF PITCHED @15o
RFC2
FIRST FLOOR CEILING LEVEL
50
150
800
MIN.
2
2
1 : 100
2
1100
CPG/PP
C/PB
WT3
ENTRY
D A02
280
BLOCKWORK RETAINER WALL MAX. 1800MM TALL REFER TO STRUCTURAL ENGINEER'S SPEC.
DRIVEWAY 57750.00
1
COMMON WT2
DECKING ON GROUND: DECKING ON JOISTS SUPPORTED BY STUMP FOTTINGS IN GROUND TO STRUCTURAL ENGINEER'S SPECIFICATION. GROUND TO BE SLOPED AWAY FROM BUILDING TOWARDS AG PIPES. BUILDER TO INSTALL WATERPROOF MEMBRANE TO COMPACTED SAND BELOW DECKING. FRAMING TIMBERS TO BE TERMITE RESISTANT AND PRESERVATIVE TREATED TO H4 OR HIGHER. DECKING BOARDS TO BE TERMITE RESISTANT ABOVE GROUND NATURAL DURABILITY CLASS 1 OR 2 AND PRESERVATIVE TREATED TO H3 OR BETTER. DECKING BOARDS TO HAVE MIN 6MM SPACING BETWEEN BOARDS
Section 1
1
P'TRY
TH2 GROUND FLOOR LEVEL
59300.00
WD17 REINFORCED CONCRETE FOOTINGS AND SLABS REFER TO ENGINEER'S DESIGN & DETAILS.
C/PB
C/PB
WT3
GROUND FLOOR LEVEL
59000.00
GU/B
RFC1
3
WT2
C/PB DP
WT3
ROOF TRUSSES REFER TO MANUFACTURER'S SPECIFICATIONS.
WT1
RWH
62000.00
WL1
W A06
SOF/CS
D T04
RUMPUS
WD17
GARAGE 2 D T04
D T04
3000
W A06
D T03
3000
D A02
ENS.2
RFC1 CPG/PP
WT5
150
D T01
WT2
D T04
2400
DINING
D A06
61700.00
DP
SOF/T
TH2 GROUND CEILING LEVEL
C/PB
WT2
ROOF TRUSSES ACCOMODATING BOX GUTTER REFER TO MANUFACTURER'S DETAILS.
62500.00
2700
WIR
WL1
2400
ENS.1
WT3
290
800
WL1
2400
WT2
C/PB
C/PB
C/PB
62200.00 GROUND CEILING LEVEL
500
RWH
WD17
TH2 FIRST FLOOR LEVEL
C/PB
DP
SOF/CS
FIRST FLOOR LEVEL
WT1
2700
ENS.2
D A06
2700
C/PB
WT2
WIR
W A04
65200.00
SOF/CS
500
2400
1
D T03
TH2 CEILING LEVEL
64900.00
C/PB WT2
RUMPUS
BATHROOM
WT1 GU/B CPG/PP
C/PB
WT2
C/PB
2700
W A10
2700
SOF/CS
3
Section 2 1 : 100
4
5
1 WD18
R2.5 BATT INSULATION TO ALL GARAGES, BATHROOMS AND LAUNDRY INTERNAL WALLS.
RFC2
RFC2
PROPOSED ROOF PLAN FIRST FLOOR 65400.00 CEILING LEVEL
TH2 CEILING LEVEL
C/PB
SOF/CS
C/PB
2700
M.BEDROOM 2
WIR
WT1
W A07
SOF/CS WT1
ROOM 1
FL/C
RUMPUS
WT2
D/T01
DINING
D A02
KITCHEN
2485
WT5 LIVING
D T01
2300
325 2150
2700
RFC1 GU/B
CPG/PP
FIRST FLOOR LEVEL GROUND 62200.00 CEILING LEVEL
WT3
C/PB
61700.00
C/PB
SOF/CS WT4
2500
BATHROOM WT1
C/PB
TH2 GROUND FLOOR LEVEL
64900.00
SOF/CS
500
RFC1
WT2
M.BEDROOM 2
D A06
RFC1 GU/B CPG/PP FL/C
C/PB
1000
500
CAP/PP
62000.00
WT6 GARAGE ROOF RAFTER/TRUSSES REFER TO MANUFACTURER'S SPECIFICATION.
C/PB
WT7
C/PB GARAGE 1
KITCHEN & DINING
M.BEDROOM 1
D A06
D A02
PROPOSED BLOCKWORK RETAINER WALL REFER TO ENGINEER'S DETAILS
GROUND FLOOR LEVEL
150
59300.00
2700
TH2 FIRST FLOOR LEVEL TH2 GROUND CEILING62500.00 LEVEL
WT2
D T03
C/PB
SOF/CS
C/PB DP
WT4
2700
WT2
2700
65200.00
59000.00
2
DRIVEWAY
WD18
57750.00
Section 3
3
1 : 100
NO. DATE
TENDER ISSUE
I G
54 Cassinia Avenue, Ashwood VIC 3147
DRAWING NAME
WT1
SECTIONS
T 03 9939 3693 l www.hanso.com l ABN 71 624 791 171 l ACN 624 791 171 © copyright
DWG NO: WD15 Scale @ A2 Project No.
DESCRIPTION
BP REVISED ACCORING TO CHECKLIST BUILDING PERMIT SUBMISSION
CLIENT PJY DEVELOPMENT 1 : 100 1014
Drawn by. Check. by
CLH RP
© COPYRIGHT TO ALL OR PART PLANS, DRAWINGS & SPECIFICATIONS. THE INFORMATION, IDEAS & CONCEPTS CONTAINED IN THIS DRAWING ARE CONFIDENTIAL. DISCLOSING SUCH INFORMATION, IDEAS & CONCEPTS BY THE RECIPIENT(S) TO ANY PERSON WITHOUT WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED. A PERSON USING HANSO ARCHITECTS DRAWINGS AND OTHER DATA ACCEPTS THE RISK OF: 1. USING THE DRAWINGS AND OTHER DATA IN ELECTRONIC FORM WITHOUT REQUESTING AND CHECKING THEM FOR ACCURACY AGAINST THE ORIGINAL HARD COPY VERSIONS. 2. USING THE DWGS OR OTHER DATA FOR ANY PURPOSE NOT AGREED TO IN WRITING BY
FIRST FLOOR LEVEL
HANSO ARCHITECTS. TIMBER PACKER
62200.00
IB
CLH CLH
NOTES: 1. DIMENSIONS TO WALL STUDS/STRUCTURAL ELEMENTS/LIGHT WEIGHT CLADDING ONLY. 2. DRAWINGS TO BE READ IN CONJUNCTION WITH STRUCTURAL ENGINEERS & ALL OTHER RELEVANT CONSULTANTS DRAWINGS 3. DO NOT SCALE DRAWINGS. BUILDING CONTRACTORS SHALL VERIFY DIMENSIONS ON SITE BEFORE COMMENCEMENT OF ANY CONSTRUCTION. REPORT ANY DISCREPANCIES TO BUILDING DESIGNER BEFORE COMMENCEMENT OF WORK 4. CONTRACTOR MUST VERIFY AND CONFIRM FLOOR LEVELS PRIOR TO COMMENCING WORK 5. STRUCTURAL/CIVIL ELEMENTS AND LOCATIONS INDICATIVE ONLY. REFER TO STRUCTURAL/CIVIL ENGINEER'S DOCUMENTATION FOR LOCATION/DETAILS 6. REFER TO FLOOR PLANS FOR WINDOW AND DOOR SCHEDULES 7. ALL EXTERNAL HARD SURFACES ARE TO GRADE AWAY FROM BUILDING OVER MIN 50MM OVER THE FIRST METER 8. ROOF PLUMBER IS RESPONSIBLE FOR DESIGN, CONSTRUCTION AND CERTIFIACTION OF ROOF DRAINAGE.
GENERAL LEGENDS: AFFL ABOVE FINISH FLOOR LEVEL BULKHEAD BH CPG/PP CAPPING, PARAPET. FOLDED METAL SHEET, COLOURBOND FINISH CEILING, PLASTERBOARD C/PB DOWNPIPE DP FINISH CEILING HEIGHT FCH FINISH FLOOR LEVEL FFL FLASHING, COLOURBOND FL/C GU/B BOX GUTTER, ZINCALUME STEEL MIN.150 DEEP. SET TO FALL TO GUTTERS AND RAINWATER HEADS.
WALL TYPES LEGEND: (REFER TO WALL SCHEDULES FOR DETAILS) WT1 FIBRE CEMENT SHEET WALL: 9MM THICK JAMES HARDIE FIBRE WT6 ROOF CLADDING AT 2oMIN. PITCH. LYASAGHT CEMENT SHEET FIXED TO 90MM TIMBER STUD FRAME ON 20MM CUSTOM ORB CONFORMING TO AS 1397-G550BATTENS. RENDER FINISH. AZ150. WT2 STUD WALL: 70MM STUD WITH 10MM PLASTERBOARD TO EACH ROOF CLADDING AT 15o PITCH. LYASAGHT SIDE,OR CERAMIC TILES. CUSTOM ORB CONFORMING TO AS 1397-G550WT3 BRICK VENEER WALL: 110MM BRICK, 40MM CAVITY, 90MM STUD, 10MM AZ150. PLASTERBOARD. (EXPANSION JOINT REFER TO ENGINEER'S RWH RAINWATER HEAD DRAWING.) SOF/CS SOFFIT, HARDIEFLEX FIRE RATED FIBRECOLOURBOND RFC2, WT4 ROOFING TIMBER BATTEN WALL: 28MM SCREENWOOD PANELS - STANDARD CEMENT SHEET. SCREENWOOD PROFILES 3040-6 SERIES (WESTERN RED CEDAR SOF/T SOFFIT, TIMBER CLADDING. PREFINISHED CLEAR) ON 35MM TOP HATS FIXED TO 90MM TIMBER STUDS.10MM HARDWOOD FIXED DIRECTLY TO BATTENS. RAFTER/ ROOF WT5 TRUSSPLASTERBOARD REFER TO TO INTERNAL SURFACES AUSTRALIAN TIMBER CEILINGS "CEDAR" SATIN DOUBLE BRICK WALL: 110MM BRICK, 40MM CAVITY AND 110MM BRICK. FINISH MANUFACTURER'S DETAILS. RFC1
ROOF BATTEN
90X45 MGP10 TIMBER STUD
FRAMING MEMBER (FLOOR BEAR) REFER TO STRUCTURAL ENGINEER'S SPECIFICATION
1075
59000.00
61700.00 FIRST FLOOR LEVEL
CEILING, PLASTERBOARD ON CEILING BATTEN FIXED TO POSI STRUT
62200.00
SECTION DETAIL
COMPACTED SOIL BACKFILL REFER TO STRUCTURAL ENGINEER'S DETAILS
300
300
ZINCALUME BOX GUTTER, MIN DEPTH 150MM X 300MM WIDTH ON SPANDEK GUTTER SUPPORT OR SIMILAR. MIN FALL 1:100 TOWARDS DOWNPIPE PRESSED METAL COLOURBOND PARAPET CAPPING
FIBRE CEMENT SHEET SOFFIT
GROUND FLOOR LEVEL W A08
59000.00 METAL FLASHING WITH DRIP PROTECTIVE COVERING
SECTION DETAIL
700
2
WT4
150
150
GROUND CEILING LEVEL
61700.00
CEILING, PLASTERBOARD ON CEILING BATTEN FIXED TO POSI STRUT PARALLEL FLANGE CHANNEL ALUBASE SHADOWLINE SKIRTING. LINTEL REFER TO STRUCTURAL ENGINEER'S SPECIFICATIONS. SILL SEALER OR TERMITE PROTECTION UNDERNEATH BOTTOM PLATE REFER TO BUILDER.
1 : 20
MIN. 550
1 : 20
FIBRE CEMENT SHEET SOFFIT
W A08
10 40
STUMP FOOTING DETAILS REFER TO STRUCTURAL ENGINEER'S DRAWING
WT4
500
300
300
2700
400
MOISTURE BARRIER
POSI STRUT
PARALLEL FLANGE CHANNEL LINTEL REFER TO STRUCTURAL ENGINEER'S SPECIFICATIONS.
2
GROUND CEILING LEVEL
FIBRE CEMENT SHEET ON CAVITY TRIM AND FIX ON 90MM STUD WALL. RENDER FINISH
4
50MM THICK SAND BED
SLAB EDGE DETAILS REFER TO STRUCTURAL ENGINEER'S DRAWINGS.
FIRST FLOOR LEVEL
62200.00
ZINCALUME BOX GUTTER, MIN DEPTH 150MM X 300MM WIDTH ON SPANDEK GUTTER SUPPORT OR SIMILAR. MIN FALL 1:100 TOWARDS DOWNPIPE
WD18
MIN.
150
2700
R2.5 BATT INSULATION (EXCL. GARAGE) + FOIL IN ALL EXTERNAL WALLS OF UNIT 1 AS PER ESD REPORT.
COMPACTED SOIL BACKFILL REFER TO STRUCTURAL ENGINEER'S DETAILS
150
ROOFING.
WD18
GROUND FLOOR LEVEL
800
550MIN.
700
SLAB EDGE DETAILS REFER TO STRUCTURAL ENGINEER'S DRAWINGS.
FIBRE CEMENT SHEET ON CAVITY TRIM AND FIX ON 90MM STUD WALL. RENDER FINISH
4
59000.00
50
SLAB
150
STUMP FOOTING DETAILS REFER TO STRUCTURAL ENGINEER'S DRAWING
W A05
GROUND FLOOR LEVEL
MIN.
MOISTURE BARRIER
ZINCALUME BOX GUTTER, MIN DEPTH 150MM X 300MM WIDTH ON SPANDEK GUTTER SUPPORT OR SIMILAR. MIN FALL 1:100 TOWARDS DOWNPIPE
500
50 50MM THICK SAND BED
800
700
550MIN.
150
FRAMING MEMBER ( FLOOR BEAR) REFER TO STRUCTURAL ENGINEER'S SPECIFICATION
CEILING , PLASTERBOARD
DECKING ON GROUND: DECKING ON JOISTS SUPPORTED BY STUMP FOOTING IN GROUND TO STRUCTURAL ENGINEER'S SPECIFICATION. GROUND TO BE SLOPED AWAY FROM BUILDING TOWARDS AG PIPES. BUILDER TO INSTALL WATERPROOF MEMBRANE TO COMPACTED SAND BELOW DECKING. FRAMING TIMBERS TO BE TERMITE RESISTANT AND PRESERVATIVE TREATED TO H4 OR HIGHER. DECKING BOARDS TO BE TERMITE RESISTANT ABOVE GROUND NATURAL DURABILITY CLASS 1 OR 2 AND PRESERVATIVE TREATED TO H3 OR BETTER. DECKING BOARDS TO HAVE MIN 6MM SPACING BETWEEN BOARDS
MIN.
SLAB
150
D A02
THICK METAL PLATE
400
BOARD
FIRE RATED HARDIEFLEX
R2.5 BATT INSULATION (EXCL. FIBRE CEMENT SHEET SOFFIT GARAGE) + FOILINSTALLED IN ALL AS PER SPECS. EXTERNAL WALLS OF UNIT 1 AS PER ESD REPORT.
POSI STRUT
WT3
FASCIA BOARD, COLOURBOND
WT1
2410
1075
( FLOOR BEAR) URAL FICATION
00MM POSI STRUT REFER TO STRUCTURAL ENGINEER'S SPECIFICATION
A05
LINTEL STRUCTURE REFER TO STRUCTURAL ENGINEER'S SPECIFICATION.
DECKING ON GROUND: DECKING ON JOISTS SUPPORTED BY STUMP FOOTING IN GROUND TO STRUCTURAL ENGINEER'S SPECIFICATION. GROUND TO BE SLOPED AWAY FROM BUILDING TOWARDS AG PIPES. BUILDER TO INSTALL WATERPROOF MEMBRANE FLASHING AT TO FACADE/SOFFIT COMPACTED SAND BELOW DECKING. FRAMING TIMBERS TO BE TERMITE JUNCTION. RESISTANT AND PRESERVATIVE TREATED TO H4 OR HIGHER. DECKING BOARDS TO BE TERMITE RESISTANT ABOVE GROUND TIMBER BATTEN SOFFIT:28MM NATURAL DURABILITY CLASS 1 OR 2 AND SCREENWOOD PANELS - STANDARD PRESERVATIVE TREATED TO H3 OR SCREENWOOD PROFILES 3040-6 BETTER. DECKING BOARDS TO HAVE MIN SERIES INSTALLED AS PER SPECS 6MM SPACING BETWEEN BOARDS
A02
FIRST FLOOR CEILING LEVEL
64900.00
COLOURBOND EAVES GUTTER TO CONFIRM BY BUILDER. FINISH TO MATCH THE BACKGROUND/ CHARCOAL BLACK.
CEILING, PLASTERBOARD FIXED TO CEILINGWBATTEN
10 40
10MM THICK PLATE
ENGINEER'S SPECIFICATION.
SARKING THICK METAL PLATE
790
FRAMING MEMBER (FLOOR BEAR) REFER TO STRUCTURAL ENGINEER'S SPECIFICATION TIMBER BATTEN SOFFIT:28MM SCREENWOOD PANELS - STANDARD SCREENWOOD PROFILES400MM 3040-6POSI STRUT REFER SERIES INSTALLED AS PER TOSPECS MANUFACTURER'S DETAILS.
3200
PARALLEL FLANGE CHANNEL LINTEL REFER TO STRUCTURAL ENGINEER'S D DETAILS.
ROOF BATTEN
FIRE RATED HARDIEFLEX FIBRE CEMENT SHEET SOFFIT 2 OFF FRAMING ANCHORS. TRUSS TIE INSTALLED AS PERDOWN SPECS. DETAIL REFER TO STRUCTURAL
3200
FLASHING AT FACADE/SOFFIT JUNCTION.
CEILING, PLASTERBOARD
0 x 45MM MGP10 TIMBER STUD FICATION
WT1
90X45 MGP10 TIMBER STUD
R2.5 BATT INSULATION INSTALLED BETWEEN ALL POSI STRUTS/ FLOOR JOIST IN UNIT 1 AS PER ESD REPORT.WT3
TIMBER PACKER REFER
LINTEL STRUCTURE REFER TO STRUCTURAL ENGINEER'S SPECIFICATION.
62200.00
2410
10MM THICK PLATE
90 x 45MM MGP10 TIMBER STUD
FIRST FLOOR LEVEL
TIMBER PACKER
MIN.
MBER STUD
64900.00
COLOURBOND EAVES GUTTER TO CONFIRM BY BUILDER. FINISH TO MATCH THE RFC2, COLOURBOND ROOFING BACKGROUND/ CHARCOAL BLACK. RAFTER/ ROOF TRUSS REFER TO MANUFACTURER'S DETAILS. FASCIA BOARD, COLOURBOND
CEILING, PLASTERBOARD FIXED TO CEILING BATTEN
400MM POSI STRUT REFER TO MANUFACTURER'S DETAILS.
PARALLEL FLANGE CHANNEL LINTEL REFER TO STRUCTURAL ENGINEER'S DETAILS.
FIRST FLOOR CEILING LEVEL
SARKING
WT1
CEILING, PLASTERBOARD
TIMBER STUD
2 OFF FRAMING ANCHORS. TRUSS TIE DOWN DETAIL REFER TO STRUCTURAL ENGINEER'S SPECIFICATION.
790
R2.5 BATT INSULATION INSTALLED BETWEEN ALL POSI STRUTS/ FLOOR JOIST IN UNIT 1 AS PER ESD REPORT.
FRL 60/60/60 FIBRE CEMENT SHEET WALL: 9 FIBRE CEMENT SHEET FIXED TO 90MM TIMB BATTENS. RENDER FINISH.
RFC2
2700
394 - 396 BURKE ROAD CAMBERWELL VIC 3124
2020_09_10 2020/08/26
2700
54 CASSINIA HOUSES
THICK RIGID INSULATION 50MM THICK SAND ALUBASE SHADOWLINE SKIRTING.
SILL SEALER OR TERMITE PROTECTION UNDERNEATH BOTTOM PLATE REFER TO BUILDER.
PRESSED METAL COLOURBOND PARAPET CAPPING
ROOF TRUSSES ACCOMODATING BOX GUTTER REFER TO MANUFACTURER'S SPECIFICATION.
WT5
59000.00 METAL FLASHING WITH DRIP SLAB EDGE DETAILS REFER TO STRUCTURAL ENGINEER'S DRAWING PROTECTIVE COVERING
MIN. 550
CEILING, PLSATERBOARD TO CEILING BATTEN FIX ON ROOF TRUSSES.
700
CTURAL BEAM REFER TO RUCTURAL ENGINEER'S SPECFICATION.
GROUND FLOOR LEVEL
MOISTURE MEMBRANE
150
ZINCALUME BOX GUTTER, MIN DEPTH 150MM X 300MM WIDTH ON SPANDEK GUTTER SUPPORT OR SIMILAR. MIN FALL 1:100 TOWARDS DOWNPIPE
RF1, COOURBOND ROOFING.
THICK RIGID INSULATION 50MM THICK SAND
150
DRIVEWAY
300
57750.00
MOISTURE MEMBRANE
STRUCTURAL BEAM REFER TO STRUCTURAL ENGINEER'S SPECFICATION.
CEILING, PLSATERBOARD TO CEILING BATTEN FIX ON ROOF TRUSSES.
ROOF TRUSSES ACCOMODATING BOX GUTTER REFER TO MANUFACTURER'S SPECIFICATION.
4
SECTION DETAIL
SLAB EDGE DETAILS REFER TO STRUCTURAL ENGINEER'S DRAWING
1 : 20
WT5
DRIVEWAY
150
300
57750.00
10/11/2020 3:06:35 PM
PROJECT TITLE
VERTICAL SUNSHADE PERFORATION FINS PROPOSED SUNSHADE FINS DESIGN DERIVES FROM THE INTERPRETATION AND INTEGRATION OF THE HISTORICAL CONTEXT OF BRICK CHARACTER BUILDING AND THE SURROUNDING SITE CHARACTERISTICS,WHICH IS THE CHINATOWN.
450
THESE IDEAS ARE INTERPRETED INTO A BRICK-LIKE PATTERN WHICH BECOME THE PERFORATION OF THE FINS. FROM OUTSIDE VISUALLY, THEY RESEMBLES THE CHINESE PARTITION/ SCREENS THAT FITS PERFECTLY IN CHINATOWN. FROM THE INSIDE, BRICKLIKE PERFORATION SHADOWS ARE CAST ONTO WALL AND FLOOR TO REMINDS US THE HISTORY OF THIS BUILDING.
VERTICAL SUNSHADE PERFORATION FINS PROPOSED SUNSHADE FINS DESIGN DERIVES FROM THE INTERPRETATION AND INTEGRATION OF THE HISTORICAL CONTEXT OF BRICK CHARACTER BUILDING AND THE SURROUNDING SITE CHARACTERISTICS,WHICH IS THE CHINATOWN.
450
7400
7400
THESE IDEAS ARE INTERPRETED INTO A BRICK-LIKE PATTERN WHICH BECOME THE PERFORATION OF THE FINS. FROM OUTSIDE VISUALLY, THEY RESEMBLES THE CHINESE PARTITION/ SCREENS THAT FITS PERFECTLY IN CHINATOWN. FROM THE INSIDE, BRICKLIKE PERFORATION SHADOWS ARE CAST ONTO WALL AND FLOOR TO REMINDS US THE HISTORY OF THIS BUILDING.
04
394 - 396 BURKE ROAD CAMBERWELL VIC 3124
2
15
3D - SHADOW STUDY
HEFFERNAN LANE PROJECT TITLE
NO. DATE
DESCRIPTION
IB
15 - 17 HEFFERNAN LANE, MELBOURNE MIXED-USE BUILDING
BUILDING PERMIT
2
15-21 HEFFERNAN LANE, MELBOURNE
3D - SHADOW STUDY
DRAWING NAME
SUNSHADE FINS DESIGN
T 03 9939 3693 l www.hanso.com l ABN 71 624 791 171 l ACN 624 791 171 © copyright
DWG NO: A405
Scale @ A2 Project No.
CLIENT HE SHENG GROUP
1 : 50 1050
Drawn by.
CLH VC
© COPYRIGHT TO ALL OR PART PLANS, DRAWINGS & SPECIFICATIONS. THE INFORMATION, IDEAS & CONCEPTS CONTAINED IN THIS DRAWING ARE CONFIDENTIAL. DISCLOSING SUCH INFORMATION, IDEAS & CONCEPTS BY THE RECIPIENT(S) TO ANY PERSON WITHOUT WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED. A PERSON USING HANSO ARCHITECTS DRAWINGS AND OTHER DATA ACCEPTS THE RISK OF: 1. USING THE DRAWINGS AND OTHER DATA IN ELECTRONIC FORM WITHOUT REQUESTING AND CHECKING THEM FOR ACCURACY AGAINST THE ORIGINAL HARD COPY VERSIONS. 2. USING THE DWGS OR OTHER DATA FOR ANY PURPOSE NOT AGREED TO IN WRITING BY HANSO ARCHITECTS.
15 Heffernan Lane is a redevelopment Proposed sunshade fins design derives project by refurbishing an existing 2 storey from the interpretation and integrationof building and proposed additional 2 storey on the historical context of brick character BUILDING PERMIT building & the surrounding site top, becoming a mix-used building. characteristic, Chinatown. Due to the site’s planning sheme, overlayed zones and other complications, a planning These ideas are interpreted into a brick permit is finally approved after one year of like pattern which becomes the perforation fo the fins. From outside, the fins visually efforts and is now onto the next stage. resembles the chinese partition/ screens. From the inside, brick-like perforation shadowsare cast onto wall and floor to reminds us the history of the building. Check. by
PROJECT TITLE
NO. DATE
MIXED-USE BUILDING
15-21 HEFFERNAN LANE, MELBOURNE
394 - 396 BURKE ROAD CAMBERWELL VIC 3124
T 03 9939 3693 l www.hanso.com l ABN 71 624 791 171 l ACN 624 791 171 © copyright
DRAWING NAME
SUNSHADE FINS DESIGN
DWG NO: A405
Scale @ A2 Project No.
CLIENT HE SHENG GROUP
1 : 50 1050
Drawn by. Check. by
CLH VC
© COPYRIGHT TO ALL OR PART PLANS, DRAWINGS & SPECIFICATIONS. THE INFORMATION, IDEAS & CONCEPTS CONTAINED IN THIS DRAWING ARE CONFIDENTIAL. DISCLOSING SUCH INFORMATION, IDEAS & CONCEPTS BY THE RECIPIENT(S) TO ANY PERSON WITHOUT WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED. A PERSON USING HANSO ARCHITECTS DRAWINGS AND OTHER DATA ACCEPTS THE RISK OF: 1. USING THE DRAWINGS AND OTHER DATA IN ELECTRONIC FORM WITHOUT REQUESTING AND CHECKING THEM FOR ACCURACY AGAINST THE ORIGINAL HARD COPY VERSIONS. 2. USING THE DWGS OR OTHER DATA FOR ANY PURPOSE NOT AGREED TO IN WRITING BY HANSO ARCHITECTS.
DESCRIPTION
IB
MIXED-USE DEVELOPMENT
A
B
C
1950
D
5000
TOTAL GROUND FLOOR AREA: APPROX 275.8SQM
11570
18515 400 160
2495
110
MALE TOILET 2795
FEMALE 1630
300
COS 5865
3585
CHANGE ROOM 1550 110 1985
DISABLED 2565
255
BIN
160
110 255
LIFT SHAFT
5180
160400
11010 985 110
SERVICES
A301 2
160 400
6310
EX .C OL
500
EX .C OL
3355
5205
1140
130.7 m² 7825
FFL 16.51
UP
FIRE SHAFT
WT2
3
255
SERVICES 3.4 m²
FFL 16.51
7x VERTICAL BICYCLE PARKING SPACES
UP UP
13.9 m² RL 16.75
1100L WASTE BIN
955
UP
4
UP
BIN 3640
FFL 16.51
1100L RECYCLE BIN
4225
1100L WASTE BIN
255
WT4
1100L WASTE BIN
4.5 m²
3180
WT3
LIFT SHAFT
3225
2060
5350
18402
TENANCY 1 - CLASS 6 RESTAURANT
5185
3.3 m²
A302
COS
SERVICES
STORE
LIFT SHAFT
2285
1
EX .C OL
5180
FIRE SHAFT 8300
SERVICES
2590 7470
110
255
29.2 m²
2 A306
1200
2
WT3
1 A306
500
2495
5
.64
985 110
6.7
6.3
255
9905
SERVICES
LIFT SHAFT
110
400
5
RL 1
RL
1975 2215 1740
2 A307
A301
RL 1
16
5
.18
0 6.1
16 RL
RL 1
.07
1
1 A307
16
5
RL
3640
6.9 m²
CORRIDOR 2
BIN
3715 6560
3180
4
DISABLE TOILET
3.3 m²
16.4 m²
110
3
WT1
6.3 m²
1650
110
110
FEMALE
WT2
EX .C OL
160 400 1800
900
WT2
A302
18315
5185
4.8 m²
4.5 m²
FEMALE & DIS. TOILET
6310
2
1
MALE
CHANGE ROOM
110 1140
110
CHANGE ROOM & MALE
1
160
6300
1350
7215
2850
385
18186 COS
A
C
B
PROJECT TITLE
MIXED-USE BUILDING
NO. DATE
BUILDING PERMIT
7 4 2 1
15-21 HEFFERNAN LANE, MELBOURNE
BICYCLE PARKING, SHOWER & CHANGE ROOM TOWN PLANNING - EXTERNAL FACADE REVISED LAYOUT REVISED ACCORDING TO TP & STRUCTURAL ENGINEER
WT1 WT2 WT3 WT4 WT5
PROPOSED GROUND FLOOR PLAN DWG NO: A201
CLIENT HE SHENG GROUP
Scale @ A2 Project No.
As indicated 1050
Drawn by. Check. by
A
B
1950
CLH VC
5000
2495
110
110
110
FEMALE 1630
255
2685
110
DISABLED 2565
255
160
A301
STAIR SHAFT
2
1
400
CHANGE ROOM & MALE
MALE
CHANGE ROOM
4.8 m²
900
4.5 m²
WT2 WT1
900
FEMALE & DIS. TOILET
160 1810
2080 1130
110 1130 110 2590
2
5340
3560
1985
BIN
1
11570
COS 5890
6165
300
TOTAL FIRST FLOOR AREA: APPROX 279.1SQM
D
18515
160
1550
150MM STUD WALL W. SINGLE SIDE PLASTERBOARD FINISH. 110MM STUD WALL W. BOTH SIDE PLASTERBOARD FINISH. AFS REDIWALL 256MM. RENDER FINISH IS OPTIONAL. CURTAIN WALL AFS LOGICWALL 162MM W. ACRYLIC RENDER FINISH ON EXTERNAL. EXISTING STRUCTURES TO BE RETAINED.
C
© COPYRIGHT TO ALL OR PART PLANS, DRAWINGS & SPECIFICATIONS. THE INFORMATION, IDEAS & CONCEPTS CONTAINED IN THIS DRAWING ARE CONFIDENTIAL. DISCLOSING SUCH INFORMATION, IDEAS & CONCEPTS BY THE RECIPIENT(S) TO ANY PERSON WITHOUT WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED. A PERSON USING HANSO ARCHITECTS DRAWINGS AND OTHER DATA ACCEPTS THE RISK OF: 1. USING THE DRAWINGS AND OTHER DATA IN ELECTRONIC FORM WITHOUT REQUESTING AND CHECKING THEM FOR ACCURACY AGAINST THE ORIGINAL HARD COPY VERSIONS. 2. USING THE DWGS OR OTHER DATA FOR ANY PURPOSE NOT AGREED TO IN WRITING BY HANSO ARCHITECTS.
MIXED-USE DEVELOPMENT
WALL LEGENDS:
IB
CLH CLH CLH CLH
6310
T 03 9939 3693 l www.hanso.com l ABN 71 624 791 171 l ACN 624 791 171 © copyright
DRAWING NAME
DESCRIPTION
2020_07_30 2020_01_31 2019_12_21 2019/12/16
1920
394 - 396 BURKE ROAD CAMBERWELL VIC 3124
D
FEMALE
DISABLE TOILET
5.1 m²
6.9 m²
2
3.3 m²
TENANCY 2 - CLASS 6 RESTAURANTS 197 m²
8300
FIRE SHAFT
5165
A302
SERVICES
6.3 m²
BIN
FFL 20.50
FIRE SHAFT
3
255
16.4 m² SERVICES
2285
3.4 m² LIFT SHAFT
3180
110
STORE/ BIN
1 A306
1650 1200 110
3
2
1
5185
A302
3715
18315
9655
WT3
WT1
255
4.5 m²
4
4 3640
4705
5050
1100
400
2 A306
5
1
1 A307
1550
300
2215
2495
SHOWER
LIFT SHAFT
2 A307
A301
1090
9905
160
18186 COS
A
B
PROJECT TITLE
MIXED-USE BUILDING
BUILDING PERMIT
15-21 HEFFERNAN LANE, MELBOURNE
394 - 396 BURKE ROAD CAMBERWELL VIC 3124 T 03 9939 3693 l www.hanso.com l ABN 71 624 791 171 l ACN 624 791 171 © copyright
DRAWING NAME
PROPOSED 1F FLOOR PLAN DWG NO: A203 Scale @ A2 Project No.
CLIENT HE SHENG GROUP As indicated 1050
Drawn by. Check. by
CLH VC
© COPYRIGHT TO ALL OR PART PLANS, DRAWINGS & SPECIFICATIONS. THE INFORMATION, IDEAS & CONCEPTS CONTAINED IN THIS DRAWING ARE CONFIDENTIAL. DISCLOSING SUCH INFORMATION, IDEAS & CONCEPTS BY THE RECIPIENT(S) TO ANY PERSON WITHOUT WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED. A PERSON USING HANSO ARCHITECTS DRAWINGS AND OTHER DATA ACCEPTS THE RISK OF: 1. USING THE DRAWINGS AND OTHER DATA IN ELECTRONIC FORM WITHOUT REQUESTING AND CHECKING THEM FOR ACCURACY AGAINST THE ORIGINAL HARD COPY VERSIONS. 2. USING THE DWGS OR OTHER DATA FOR ANY PURPOSE NOT AGREED TO IN WRITING BY HANSO ARCHITECTS.
C
NO. DATE
7 2 1
2020_07_30 2019_12_21 2019/12/16
DESCRIPTION
BICYCLE PARKING, SHOWER & CHANGE ROOM REVISED LAYOUT REVISED ACCORDING TO TP & STRUCTURAL ENGINEER
D
IB
CLH CLH CLH
WALL LEGENDS: WT1 WT2 WT3 WT4 WT5
150MM STUD WALL W. SINGLE SIDE PLASTERBOARD FINISH. 110MM STUD WALL W. BOTH SIDE PLASTERBOARD FINISH. AFS REDIWALL 256MM. RENDER FINISH IS OPTIONAL. CURTAIN WALL AFS LOGICWALL 162MM W. ACRYLIC RENDER FINISH ON EXTERNAL. EXISTING STRUCTURES TO BE RETAINED.
5
MIXED-USE DEVELOP
TOTAL 2ND FLOO APPROX 247.7SQM
A
B
D
C
1950
5000
11570 18060
230
6830
330 170
2495
5335
110
3560
CHANGE ROOM 1550 110 1985
MALE
110
FEMALE 1820
255
IN
5895
330 2685
110
DISABLED 2565
255
FIRE SHAFT
330
210
5230
330
11010 985 110
A301
SERVICES
2
MALE
CHANGE ROOM
1805
230
1
335
1
WT5
4.7 m²
3870
FEMALE
DISABLE TOILET
5.1 m²
7 m²
255
110
2
WT1
FEMALE & DISABLED
2590
6310
110 1130
110
4.5 m²
WT1
1
BIN
2
5180
6.8 m² SERVICES
TENANCY 3 - CO-WORKING SPACE
110
7.9 m²
1650
1 A306
195.7 m²
FIRE SHAFT
FFL 24.50
16.7 m²
3
255
110
3
A302
STORE/ BIN FIRE SHAFT
3715
16255 13735
5185
A302
2
WT5
WT5
2285
LIFT SHAFT
LIFT SHAFT 4.5 m²
255
2540
3180
WT2
1660
WT4
2 A306
345
3640 1830
4
WT3
450
150
1660
4
5
5
1
1 A307 2075 1550
110
2565
2405
STAIR 1975
255
4065 SHOWER
255
985 110
2495
1090
9905
LIFT SHAFT
170 275 1000
1000
2 A307
A301
1000
1000
1000
17555
1000
1000
1000
1000
230
160 170 1500
1500
1500
1500
1500
18060
A
B
1110
385 210
D
C
MIXED-USE DEVEL PROJECT TITLE
MIXED-USE BUILDING
NO. DATE
BUILDING PERMIT
7 2 1
15-21 HEFFERNAN LANE, MELBOURNE
A
DRAWING NAME
394 - 396 BURKE ROAD CAMBERWELL VIC 3124
PROPOSED 2F FLOOR PLAN DWG NO: A205
T 03 9939 3693 l www.hanso.com l ABN 71 624 791 171 l ACN 624 791 171 © copyright
Scale @ A2 Project No.
CLIENT HE SHENG GROUP As indicated 1050
Drawn by. Check. by
CLH VC
B
DESCRIPTION
2020_07_30 2019_12_21 2019/12/16
WALL LEGENDS:
IB
BICYCLE PARKING, SHOWER & CHANGE ROOM REVISED LAYOUT REVISED ACCORDING TO TP & STRUCTURAL ENGINEER
CLH CLH CLH
C
WT1 WT2 WT3 WT4 WT5
150MM STUD WALL W. SINGLE SIDE PLASTERBOARD FINISH. 110MM STUD WALL W. BOTH SIDE PLASTERBOARD FINISH. AFS REDIWALL 256MM. RENDER FINISH IS OPTIONAL. CURTAIN WALL AFS LOGICWALL 162MM W. ACRYLIC RENDER FINISH ON EXTERNAL.
D
EXISTING STRUCTURES TO BE RETAINED.
© COPYRIGHT TO ALL OR PART PLANS, DRAWINGS & SPECIFICATIONS. THE INFORMATION, IDEAS & CONCEPTS CONTAINED IN THIS DRAWING ARE CONFIDENTIAL. DISCLOSING SUCH INFORMATION, IDEAS & CONCEPTS BY THE RECIPIENT(S) TO ANY PERSON WITHOUT WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED. A PERSON USING HANSO ARCHITECTS DRAWINGS AND OTHER DATA ACCEPTS THE RISK OF: 1. USING THE DRAWINGS AND OTHER DATA IN ELECTRONIC FORM WITHOUT REQUESTING AND CHECKING THEM FOR ACCURACY AGAINST THE ORIGINAL HARD COPY VERSIONS. 2. USING THE DWGS OR OTHER DATA FOR ANY PURPOSE NOT AGREED TO IN WRITING BY HANSO ARCHITECTS.
1950
5000
11570
A301 1 A307
2
1
1 MALE
CHANGE ROOM
4.7 m²
WT5
900
1140
4.5 m²
WT1
FEMALE
DISABLE TOILET
5.1 m²
7 m²
2
2 WT1
A302
2
WT5
TENANCY 4 - CLASS 6 RETAIL/ BAR
STORE/ BIN
166.2 m²
6.8 m²
SERVICES 7.9 m²
1 A306
FIRE SHAFT
3
WT2
16.7 m²
LIFT SHAFT
3
WT4
2000
4.5 m²
OUTDOOR SEATING AREA
4
4
53.3 m² WT3
2 A306
5
5
1
A301 2 A307
A
B
PROJECT TITLE
MIXED-USE BUILDING
BUILDING PERMIT
15-21 HEFFERNAN LANE, MELBOURNE
394 - 396 BURKE ROAD CAMBERWELL VIC 3124
DRAWING NAME
PROPOSED 3F FLOOR PLAN DWG NO:
CLIENT
© COPYRIGHT TO ALL OR PART PLANS, DRAWINGS & SPECIFICATIONS. THE INFORMATION, IDEAS & CONCEPTS CONTAINED IN THIS DRAWING ARE CONFIDENTIAL. DISCLOSING SUCH
C
NO. DATE
7 2 1
2020_07_30 2019_12_21 2019/12/16
DESCRIPTION
BICYCLE PARKING, SHOWER & CHANGE ROOM REVISED LAYOUT REVISED ACCORDING TO TP & STRUCTURAL ENGINEER
D
IB
CLH CLH CLH
WALL LEGENDS: WT1 WT2 WT3 WT4 WT5
150MM STUD WALL W. SINGLE SIDE PLASTERBOARD FINISH. 110MM STUD WALL W. BOTH SIDE PLASTERBOARD FINISH. AFS REDIWALL 256MM. RENDER FINISH IS OPTIONAL. CURTAIN WALL AFS LOGICWALL 162MM W. ACRYLIC RENDER FINISH ON EXTERNAL. EXISTING STRUCTURES TO BE RETAINED.
A
B
C
D
D
NO.29
ALL HEIGHT LEVEL AND EXISTING MEASUREMENTS REFER TO LAND SURVEYOR'S DRAWING. EXISTING ELEVATIONS AND PLANS TO READ IN CONJUNCTION WITH LAND SURVEYOR'S DRAWING.
PROPOSED 2F CEILING LVL
+7200.00
PROPOSED FF CEILING LVL
PARAPET
2800
2040
NO.13
4000
2985
2410
ADJACENT BUILDING
8550
TOP OF WALL RL 20.56
STEP
.64 16 RL
.18 16 RL
16
6.0
7
.10
BITUMEN FOOTPATH
RL
RL RL 16.7 16 5 .77
FFL 0.010
RL 1
1
EXISTING PARAPET W
+11000.00
COS / REFER TO LAND SURVEYOR
TOP OF FRONT WALL RL 25.06
1750
PARAPET
ADJACENT BUILDING
ADJACENT BUILDING
TOP OF WALL RL 36.61
EXISTING EXTERNAL BRICK WALL TO BE DEMOLISH.
EXISTING LANE A EAST B ELEVATION - HEFFERNAN C
D
EXISTING WEST E D
2
1 : 100
1 : 100
NO.29 TOP OF WALL RL 20.10
PROJECT TITLE
MIXED-USE BUILDING
NO. DATE
BUILDING PERMIT
8 2 1
15-21 HEFFERNAN LANE, MELBOURNE
DESCRIPTION
2020_09_09 2019_12_21 2019/12/16
REVISED ACCORDING TO NOD REVISED LAYOUT REVISED ACCORDING TO TP & STRUCTURAL ENGINEER
DRAWING NAME
394 - 396 BURKE ROAD CAMBERWELL VIC 3124 510
IB
CLH CLH CLH
EXISTING EXTERNAL ELEVATION
T 03 9939 3693 l www.hanso.com l ABN 71 624 791 171 l ACN 624 791 171 © copyright
DWG NO: A107 Scale @ A2 Project No.
18005
1 : 100 1050
CLIENT HE SHENG GROUP CLH Check. by VC [AR1]
Drawn by.
© COPYRIGHT TO ALL OR PART PLANS, DRAWINGS & SPECIFICATIONS. THE INFORMATION, IDEAS & CONCEPTS CONTAINED IN THIS DRAWING ARE CONFIDENTIAL. DISCLOSING SUCH INFORMATION, IDEAS & CONCEPTS BY THE RECIPIENT(S) TO ANY PERSON WITHOUT WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITED. A PERSON USING HANSO ARCHITECTS DRAWINGS AND OTHER DATA ACCEPTS THE RISK OF: 1. USING THE DRAWINGS AND OTHER DATA IN ELECTRONIC FORM WITHOUT REQUESTING AND CHECKING THEM FOR ACCURACY AGAINST THE ORIGINAL HARD COPY VERSIONS. 2. USING THE DWGS OR OTHER DATA FOR ANY PURPOSE NOT AGREED TO IN WRITING BY HANSO ARCHITECTS.
3200
[AR1]
3800
14800
3800
BALUSTRADE
[AR1]
1100
ADJACENT BUILDING
[ALU]
NO.13
1
PROPOSED EAST ELEVATION - HEFFERNAN LANE 1 : 100
RL RL 0.24 0.2 0 60
RL
30 -0 .3 RL
10 -0 .4
RL
RL
-0 .4
40
BITUMEN FOOTPATH
0.1 30
4000
ADJACENT BUILDING
TOP OF WALL RL 4.050
2
PROPOSED 1 : 100
05
TERMINUS / CRUISESHIP TERMINAL Outer Harbour is predominantly an industrial estate. Shipping and maritime transport infrastructure dominant the urban landscape, detached from the Adelaide CBD. This detached context results in Outer Harbour being underutilised.
Bridging Land and Sea - Creation of a spatial “in-between�, creating a dialogue between two states of building. Through a series of physical media, drawings and through exercises, a personal interpretation of the crane arose. The project tasked the designer with the Intricate details of the design with regards aim of celebrating and reconstituting the to programme and interior were refined in existing industrial bodies into a speculative the proceeding weeks. architectural design of a cruise ship terminal. Land - Cruise Ship Terminal The conceptual boarding point of the project is derived from both the practical and Sea - Maritime Museum thematic natures of the harbour crane. The crane was then used as a generator for three What resulted was the re-imagining of the main anchors of the design philosophy :harbour crane as a generative machine for spatial qualities, turning a device for work Machinery - Movement as a spatial informer into one for play, learning and movement. Scale - Monumentalisation of the crane silhouette
CONCEPT This project provides the opportunity to explore the structure of cranes, specifically port cranes, and translate these interesting structures into architectural spaces and possibly, a building that portray the industrial characteristics. The main task of this project is to design a cruise ship terminal at Outer Harbour, Adelaide. The port cranes are interpreted as demonstrating the characteristics of verticality, megastructures (scale), machinery and most importantly, they are the only element on harbour that bridge the land and sea (carrying containers from ship onto the land).
machinery scale bridging land and sea
Process + Explorations The three natures of crane from personal interpretations translating into architectural context, a cruise shp terminal. Starting by creating montages with overlaying images of harbour crane and also in upside down manner, a metaphorical representation of water reflection, also representing the element of bridging land and sea. These montages were then used to trace out information whilst considering the three design anchors, in search of my own re-interpretation and re-imagining of the harbour crane as an architecture.
LAND SEA
cruise ship terminal
maritime museum
circulations
boarding
programmes
in-transit
event space activation
plan 1
plan 2
section 1
KANGAROO ISLAND
section 2
entry
event space
boat restoration workshop
.terminus
SITE
VARDON AVENUE
OUTSIDE
RUNDLE ST
SPACE IN BETWEEN INSIDE
Interpret outside and inside as Vardon AvenueVARDON and AVENUE Rundle Street VARDON VARDON
RUNDLE ST
SITE
AVENUE AVENUE
OUTSIDE
INSIDE
SITE SPACE ININSIDE BETWEEN SPACE IN INSIDE BETWEEN OUTSIDE OUTSIDE OUTSIDE SITE
RUNDLE ST
INSIDE INSIDE
SPACE IN BETWEEN INSIDE
INSIDE
‘KOMOREBI’ ‘KOMOREBI’ FACADE FACADE
06
SPACE IN BETWEEN
IN BETWEEN IN BETWEEN OUTSIDE OUTSIDESPACESPACE
SITE SITE VARDON AVENUE
VARDON VARDON ‘KOMOREBI’ FACADE RUNDLE RUNDLE ST ST AVENUE AVENUE
RUNDLE RUNDLE ST ST SPACE IN BETWEEN
OUTSIDE
SITE SITE
‘KOMOREBI’ FACADE FACADE ‘KOMOREBI’ FACADE IN BETWEEN‘KOMOREBI’ SPACESPACE IN BETWEEN SPACE SPACE IN BETWEEN IN BETWEEN OUTSIDE OUTSIDE SPACE IN BETWEEN INSIDEINSIDE OUTSIDE OUTSIDE
OUTSIDE
INSIDE INSIDE
‘KOMOREBI’ FACADE
SPACE IN BETWEEN OUTSIDE
INSIDE
INSIDE
VERTICAL FLUX / BOUTIQUE HOTEL As the building situated in between Vardon Avenue and Rundle Street, they are culturally connected through a sweeping gestures that run from Rundle Street over to the building and down to Vardon Avenue. This sweeping gestures, or curve contains the dialogue that speak of both Vardon Avenue and Rundle Street characteristics, particularly the idea of ‘Komorebi’ – filtering of light through trees. This idea eventually form the façade and openings and also a dominant factor to the interior spaces. With the ‘Komorebi’ openings that runs on the front façade (north facing), all the rooms will be designed to face north. Consists of 3 different units with different floor area; standard room, Studio room and 2 Bedroom Suite, they eventually create the basic form of the hotel. The idea of in-between spaces eventually shifts to transitional space. This transitional space form the basis for my interior layout as well as connecting human to the interior space, creating the “Attunement”. Transitional space enables to emphasize the consciousness as one walks from one space to another (outside and inside). Thus, the interior space of each units will have 3 floor levels; “outside” represent the living room, kitchen and bathroom, continue to “transitional space” which are working space or quiet space, leading to “inside” which is the bedroom. Integration of both the ideas of ‘komorebi’ façade and transitional spaces ultimately form the Vertical Flux.
SITE SITE SITE SITE
SITE
SITE
RUNDLE STREET A
B
D
C
E
TBM-PSM 6628/22740
EXISTING U/G GAS PIPE
SET OUT
SET OUT
EXISTING TO REMAIN
ADJACENT BUILDING
EAST TERRACE
1
BOUNDARY LINE 2
RYMILL PARK / MURLAWIRRAPURKA (PARK 14)
3
4
EXISTING SPOON DRAIN
EXISTING SUMP POINT
SEWAGE PIPE
VARDON AVENUE
A A07
A
B
D
C
8376
7040 6035
E
8160
10116 1894
4935
110
6797
9784
5653
6665
EXISTING TO REMAIN
1
8273
B B08
11040
B B08
STAG LANE
1934
GL-0.150
EMERGENCY EXIT
2257
2257
KITCHEN G.05 FT3 GL0.00
3
WD 130
D.03
G.01 FT1 GL0.00
FW
D.03
2913
G.06 FT3 GL0.00
LIFT LOBBY
WB 250
D.03
WE 225
CAFE
5642
2729
ENTRY
D.02
2
UNISEX/ HANDICAPPED TOILET
WA 300
LIFT 1
SEATING AREA
W.02
UP
HR2
SERVICES ROOM
LIFT 2
UP
D.02 WC 400
WA 300
STAIR 3 CF1
DN
HR1 HR1
DN
UP
WA 300
CF1
STAIR 2 D.02
WB 200
STAIR 1
RECEPTION G.02 FT1 GL0.00
WA 300
BOUNDARY LINES
WA WB
A07
RAIN WATER OUTLET
FT#
FLOOR TILES TYPE
CPT#
CARPET TYPE
CF#
CONCRETE FINISH TYPE
RF#
RESILIENT FLOOR FINISH HANDRAIL TYPE
IN-SITU CONCRETE WALL PRECAST CONCRETE WALL
WC
PRECAST CONCRETE WALL WITH CONCRETE VENEER FINISH
WD
STEEL STUD WALL, INSULATED, WITH CONCRETE VENEER FINISH
WE
CONCRETE VENEER - PRECAST CONCRETE WALL - LATEX PORTLAND CEMENT MORTAR BOND COAT WITH CERAMIC TILES STEEL STUD - WATERPROOF MEMBRANE AS REDQ’D - CEMENTITOUS BACKER UNIT (CBU) ORGANIC ADHESIVE - CERAMIC TILE
WF
A
RWO
HR#
W.02
D.04
110
W.01
WA 300
G.07 FT1 GL0.00
D.01
D.02
G.04 FT2 GL-0.50
WH 450
4
G.03 FT1 GL0.00
WG
STEEL STUD - (WATERPROOF MEMBRANE AS REDQ’D + CEMENTITIOUS BACKER UNIT (CBU) + ORGANIC ADHESIVE + CERAMIC TILE) ON BOTH SIDE
WH
EXISTING STONEWORK FROM NOLA
A A07
A
B
D
C
8376
7041
200
5790 2245
E
8154
200
1800 656
1795
10121
5600
200
1780 633
2217
1620
5790
1795
200
1815 670
2180
W.03
1
WC 225
3010
UP
STAIR
W.02
LIVING
SD1
1302.03 CPT2 FFL 72.540
840
W.03
B 4090 6595
1301.01 CPT2 FFL 72.540
FW
BATHROOM
1302.02 RF1 FFL 72.540
WE 225
WG 180
WE 225
1265
PLANTER BOX FFL 73.740
FW
3
WF 140 WE 225
FW
BATHROOM
D.06
1303.03 FT2 72.490 FFL
WE 225
LIFT LOBBY 13.01 CPT1 FFL 72.540
WC 225 WA 300
D.02
BALCONY 13.00 FT1 FFL 72.540
2913
1303.01 CPT2 FFL 72.540
D.02
WE 225
1302.04 FT2 FFL 72.490
B08 WC 225
WE 225
WE 225
B
W.02
HR2
UNIT 1303
WF 140
WF 140
D.06
RWO
WD 130
WD 130
D.02
BATHROOM
WE 225
1303.02 CPT2 FFL 72.540
STAIR
ENTRY
1302.01 CPT2 FFL 72.540 WF 140
WE 225
W.03 UP
LIVING
WC 225
ENTRY
FW
WF 140
FW
UNIT 1302
KITCHEN
WD 130
D.02
D.06
1301.03 FT2 72.490 FFL
2257
2
1301.02 CPT2 FFL 72.540
ENTRY
WF 140
SD2 WE 225
WC 225
LIVING
HR2
UNIT 1301 WC 225
2510
11041
B08
UP
STAIR
W.02
W.02
HR2
SERVICES ROOM
LIFT 1
D.05
WC 225
LIFT 2
5642
WA 300 WC 225
2729
4
UP
D.02 STAIR 3
WA 300
WC 225
CF1
DN
HR1 HR1
DN
CF1
STAIR 2 D.02
WB 200
UP
WC 225 WA 300
A A07
A
B
1
415 3000
W.02
UP
STAIR
WC 225
WC 225
W.05
VESTIBULE 1302.04 CPT2 FFL 75.750 WD 130
WD 130
D.07
BEDROOM
VESTIBULE 1301.04 CPT2 FFL 75.750
SD3
1301.05 CPT2 FFL 76.070
W.05
BEDROOM 1302.05 CPT2 FFL 76.070
D.08 D.08
WD 130
WD 130
UP
WD 130
BEDROOM 1302.06 CPT2 FFL 76.070
STAIR
HR2
BEDROOM
D.07
1303.05 CPT2 FFL 76.070
WC 225
WD 130
VESTIBULE WD 130
WC 225
1303.04 CPT2 FFL 75.750
WC 225
2257
VOID WC 225
WA 300
WC 225
LIFT 2
LIFT 1
WA 300
VOID WC 225
UP
WC 225
WA 300
STAIR 3 CF1
DN
HR1 HR1
W.02
UNIT 1303
W.05
WC 225
BALCONY BELOW
5642
WC 225
W.05
WC 225
4
2550
W.02
UNIT 1302
2 3
3245
W.03
UP
STAIR
HR2
UNIT 1301 1340
2745 2625
11041
B08
E
W.03
810
B
HR2
RESILIENT FLOOR FINISH HANDRAIL TYPE
WC WD
130mm STEEL STUD WALL, INSULATED, WITH CONCRETE VENEER FINISH
WE
225mm CONCRETE VENEER - PRECAST CONCRETE WALL - LATEX PORTLAND CEMENT MORTAR BOND COAT WITH CERAMIC TILES 140mm STEEL STUD - WATERPROOF MEMBRANE AS REDQ’D - CEMENTITOUS BACKER UNIT (CBU) ORGANIC ADHESIVE - CERAMIC TILE
WG
W.03 WC 225
W.02
CONCRETE FINISH TYPE
RF#
CONCRETE VENEER FINISH - PRECAST CONCRETE WALL - FIBER CEMENT PANELS
A07
10121
200 1360
2390
160
1850
CARPET TYPE
CF#
300mm IN-SITU CONCRETE WALL
WF
8154
130 3095
2550
FLOOR TILES TYPE
CPT#
WA WB
A
D
7041
RAIN WATER OUTLET
FT#
HR#
C
8376
RWO
DN
UP
VOID
CF1
STAIR 2 WB 200 WC 225
A A07
B B08
200mm PRECAST CONCRETE WALL
180mm STEEL STUD - (WATERPROOF MEMBRANE AS REDQ’D + CEMENTITIOUS BACKER UNIT (CBU) + ORGANIC ADHESIVE + CERAMIC TILE) ON BOTH SIDE
A
B
C
D
1
E
2
3
4
BEDROOM BEDROOM 1602.07
1602.06
LIVING/ KITCHEN
1602.02/03
BEDROOM BEDROOM 1502.07
LIFT OVER RUN
PLANT ROOM
1502.02/03
BEDROOM
BEDROOM BEDROOM
1403.05
LIFT LOBBY ENTRY 1403.01
14.00
1402.01
LIVING BEDROOM BEDROOM 1302.07
1302.02
1303.02
BEDROOM
1203.05
1203.01
12.00
1103.05
LIVING
LIVING
1103.02
1203.02
BEDROOM
BEDROOM 1103.05
1103.05
LIFT LOBBY ENTRY 1103.01
11.00
LIVING
LIVING
1103.02
1103.02
BEDROOM
BEDROOM 1003.05
LIFT LOBBY ENTRY 1003.01
10.00
1002.05
LIVING
LIVING
1002.02
1003.02
BEDROOM
BEDROOM 903.05
LIFT LOBBY ENTRY 903.01
9.00
902.05
SD01 A09
LIVING
LIVING 902.02
903.02
BEDROOM
BEDROOM
802.05
803.05
LIFT LOBBY ENTRY 803.01
8.00
LIFT LOBBY
LIVING
LIVING
802.02
803.02
SERVICE ROOM
7.00
703.02
BEDROOM 603.05
LIFT LOBBY ENTRY 6.00
603.01
LIVING 603.02
BEDROOM
BEDROOM
503.05
503.05
LIFT LOBBY ENTRY 5.00
503.01
LIVING
LIVING
503.02
503.02
BEDROOM
BEDROOM
403.05
403.05
LIFT LOBBY ENTRY 4.00
403.01
LIVING
LIVING
403.02
403.02
LIFT CORE LOUNGE 1.01
STAG BAR
KITCHEN
FINE DINING STAIR
EXISTING TO REMAIN LOBBY G.01
LIFT PIT
1302.06
LIVING
LIVING
BEDROOM LIFT LOBBY ENTRY
1501.05
LIVING
1501.01
BEDROOM 1401.01
1401.01
1403.02
1303.05
1303.01
13.00
1402.02
BEDROOM
LIVING
BEDROOM LIFT LOBBY ENTRY
1502.06
LIVING/ KITCHEN
KITCHEN
STAG BAR
EXISTING TO REMAIN
A
C
B
D
E
A
WC
C
B
D
1
E
2
3
4
1
2
3
4
WC
WC
WC
W.03
WC
WC
W.03
WC
W.03
W.03
WC
W.03 WC
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
WC
WC
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
WC
WC
W.03
W.03
W.03
W.03
W.03 WC
WC
W.03
W.03
W.03
W.03
W.03
WC
WC
W.03
W.03
WC
WC
WC
W.03
W.03
WC
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
WC
WC
WC
W.03
W.03
WC
WC
WC
WC
W.03
W.03
W.03
WC
WC
WC
WC
W.03
DE
A09 W.03
W.03
WC
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
WC
WC
W.03
W.03
WC
WC
WC
WC
WC
WC
WC
CURTAIN WALL FACADE SYSTEM
WC
W.03
W.03
WC
CUR
NOTE: REFER TO SECTIONS AND DETAILS DRAWING FOR MORE SPECIFIC
WC
W.03
W.03
W.03
W.03
N A M
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
W.03
WC
W.03
WC
W.03
WC
WC
FIBER CEMENT PANEL
WC
W.03
W.03
WC
WC
W.03
W.03
WC
FIBER CEMENT PANEL
W.03
W.03
W.03
WC
WC
WC
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
W.01
W.01
W.01
D.01
W.01
W.01
W.01
D.01
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
E
LEVEL 10
FL 54240
AFL 5600 STEEL STUD FRAME WITH PLASTERBOARDS FINISH SINGLE GLAZED ALUMINIUM FRAMED WINDOW SYSTEM AS SPECIFIED
BEDROOM
SUSPENDED PLASTERBOARD CEILING
903.05 INSULATED FIBER CEMENT PANELS WALL SYSTEM TO ENGINEERS DETAILS
CARPET AS SPECIFIED
INTERIOR CONCRETE SLAB TO ENGINEERS DETAILS
DOUBLE GLAZED ALUMINIUM FRAMED WINDOW SYSTEM AS SPECIFIED AFL 3037
CONCRETE VENEER FACE
LIVING 903.02
CARPET AS SPECIFIED
CONCRETE SLAB TO ENGINEERS DETAILS LEVEL 9
FL 48140
EXTERIOR
ALUMINIUM SKIRTING MAXI JAMB STUD 92mm x 1.20BMT CURTAIN WALL SIDE CLIP WELDED TO CONCRETE SLAB MOTORIZED DRAPERY TRACK: SOMFY GLYDEA AS-68 FIBER CEMENT PANEL SIDING NAILS 6mm GAP, ALUMINIUM SKIRTING NO CAULK MAXI JAMB STUD 92mm x 1.20BMT Z FLASHING, FLUSH W/ EDGES OF FIBER CEMENT SIDING CURTAIN WALL SIDE CLIP WELDED TO CONCRETE SLAB DUROCK CEMENT PANEL MOTORIZED DRAPERY 30 x 30 x 3mmGLYDEA ALUMINIUM TRACK: SOMFY L-PROFILE AS-68 FIBER CEMENT PANEL 10 x 10 x 2mm ALUMINIUM SIDING NAILS L- PROFILE DUROCK 6mm GAP, EXTERIOR BASECOAT DUROCK EXTERIOR FINISH NO&CAULK Z FLASHING, FLUSH W/ EDGES OF FIBER CEMENT SIDING DUROCK CEMENT PANEL 30 x 30 x 3mm ALUMINIUM L-PROFILE 10 x 10 x 2mm ALUMINIUM CARPET L- PROFILE SCREED DUROCK EXTERIOR BASECOAT & DUROCK EXTERIOR FINISH 250mm REINFORCED CONCRETE SLAB ANGLE BRACKET BOLTED TO REINFORCED CONCRETE SLAB
MASONRY ANCHOR ALUMINIUM TRACK (92mm x 0.70BMT)
SUSPENSION ROD
AIR/MOISTURE MEMBRANE EXTEND OVER FLANGE OF METAL HEAD TRIM
SUSPENSION CLIP CARPET SCREED TOP CROSS RAIL LOCKING KEY 250mm REINFORCED CONCRETE SLAB DUROCK ANGLE BRACKET CEMENT PANELBOLTED TO REINFORCED CONCRETE SLAB DUROCK EXTERIOR BASECOAT & DUROCK EXTERIOR FINISH BindEX SEALANT SUSPENSION ROD STEEL STUD FRAME SUSPENSION CLIP PLASTERBOARD TOPINSULATION CROSS RAIL LOCKING KEY
EXTERIOR GRADE PLYWOOD SHEATING
FASTENER SUITED TO THE CONSTRUCTION ASW20-F FOUNDATION EXTRUSION MASONRY ANCHOR ALUMINIUM TRACK (92mm x 0.70BMT)
SEALANT FLEXIBLE GASKET OR BACKER ROAD & CAULK SET ON SEALANT SHEET METAL TRIM SET ON SEALANT ASW20/30-S1 CLIP WITH BUTTONHEAD SCREW WINDOW UNIT
DUROCK CEMENT PANEL DUROCK EXTERIOR BASECOAT & DUROCK EXTERIOR FINISH BindEX SEALANT STEEL STUD FRAME PLASTERBOARD INSULATION
RONDO P50 RONDO WALL TRACK (92mm x 32mm x 1.15BMT)
6mm GAP, NO CAULK Z FLASHING, FLUSH W/ EDGES OF FIBER CEMENT SIDING SIDING NAILS FIBER CEMENT PANEL
07
MEZZO / AUSTRALIAN EMBASSY IN INDIA The term, MEZZO, which is a word similar to ‘middle’ best describe the concept behind this Australian Embassy located in New Delhi. Instead of looking at an embassy as a normal building containing 2 countries attributes in one volume or space, it was separated and fragmentated throughout the site in considering with the existing entries, types of people that entering the site and also types of programmes. Site analysis and condition were eventually lead to the concept of MEZZO, the concept of creating the middle or in between spaces, searching the harmony and connection between Australia and India in architecture. Based on the physical model, the sunken plaza represent the MEZZO space with two distinct buildings that surround the plaza. The two different characteristics of the buildings were tied together through the continuity of roof form (skillion roof Australia, chajja - India). In microscale, another MEZZO space was also created by separating the exterior and interior walls that created the interval spaces. Both exterior and interior walls are clad with corrugated zinc and concrete respectively as these two materials represent Australia and India.
Quarters Public
Think of normal embassy as a volume, a simple cube that contains 2 of the countries attributes.
Volume was split into half to represent Australia and India with main circulation going through middle.
More pathways are opened up to engage with the surroundings landscapes and better circulation flows.
Chancery and staff quarters are separated for privacy reasons and better circulation flow.
Plaza / Hub
Both volumes were connected by The area in between the volumes was assigned as plaza / circulation hub, sharing programs. the most important space in relation to my concept and also the circulation.
Quarters are further divided between By utilising roof structure to tied ambassador and staffs. Flow and everything as one. continuity were considered.
section 1
section 2
Steel-structure framing is the main construction system with trusses running on top and connected to steel columns due to the extreme length of 70m.The steel structure framing also clad with zinc panel for both roof and wall. The interior walls were constructed by two types of wall: - steel frame wall - concrete wall Majority of the interior walls are concrete wall to reduce the heat from the sun in India. In addition, Timber is not used in this construction due to the reason that timber is one of the material that are not allow to used massively in India and strict rules and regulations were applied on timber construction based on research. Furthermore, zinc is used instead of aluminium or steel because part of it is due to my design concept, another p art is because aluminium facade create a very commercialized result while steel is not that abundant in India in comparison with other countries. Top hats were used repeatedly in connecting the panels as top hats are fairly lightweight structure compare to other complicated joint connections. Trusses are exposed in most of the rooms and corridors to create the tall ceiling space spatial quality and a direct view to the skillion-like roof form. Suspended ceiling were hung in certain spaces to create the transition of space.
1
2
4
3
Concrete footings to engineers details
2 BOX GUTTER 2 BOX : GUTTER : 1:10 1:10
1 ZINC PANEL 1 ROOF ZINC PANEL DETAILS ROOF : DETAILS : 1:10 1:10
ZINC PANEL with ZINC PANEL with 25mm JOINT WIDTH 25mm JOINT WIDTH
ZINC PANEL with ZINC PANEL with 25mm JOINT WIDTH 25mm JOINT WIDTH
50mm 50mm TOP HAT at 600 ctrs TOP HAT at 600 ctrs
50mm TOP HAT at 600 50mm ctrs TOP HAT at 600 ctrs WEATHERBOARD
FLASHING
WEATHERBOARD
1 ZINC PANEL 1 ZINC ROOF PANEL DETAILS ROOF : DETAILS : 1:10 1:10
2 BOX GUTTER 2 BOX : GUTTER : 1:10 1:10
BATT INSULATION BATT INSULATION
350mm BOX GUTTER 350mm BOX GUTTER BONDEK 200 SHS
CLEAT WELDED TO CLEAT WELDED TO 200 SHS 200 SHS
200 SHS 50mm TOP HAT at 50mm 600 ctrs TOP HAT at 600 ctrs
100 SHS
WEATHERBOARD WEATHERBOARD 100 SHS
FLASHING
350mm BOX GUTTER 350mm BO
CLEAT WELDED TO CLEAT WELDED TO 200 SHS 200 SHS
3
100 SHS
100 SHS
ANDSLAB CONCRETE DETAIL : BALUSTRADE AND CONCRETE DETAIL SLAB : 3 BALUSTRADE 1:10 1:10 CHEVRON 10mm THICK CHEVRON 10mm THICK DOUBLE GLAZED DOUBLE GLAZED TOUGHEN GLASS TOUGHEN GLASS 60mm DIA STAINLESS 60mm DIA STAINLESS STEEL RAIL @1000mm STEEL RAIL @1000mm SATIN POLISHED STAINLESS SATIN POLISHED STAINLESS STEEL RAILING ATTACHED STEEL RAILING TO ATTACHED TO
3
PANEL GLASS PANEL BALUSTRADE AND CONCRETE SLAB DETAIL : ANDGLASS CONCRETE SLAB DETAIL : 3 BALUSTRADE 1:10 1:10 38x10mm CLEAR GLASS 38x10mm CLEAR GLASS
4 EXTERIOR4WALL EXTERIOR WALLDETAIL AND GLASS DETAIL : AND GLASS : 1:10 1:10
WEEP SLOT WEEP SLOT ZINC HEAD FLASHING ZINC HEAD FLASHING PREFINISHED PREFINISHED
DOUBLE GLAZED GLASS DOUBLE GLAZED GLASS
4 EXTERIOR 4 WALL EXTERIOR AND GLASS WALL AND DETAIL GLASS : DETAIL : 1:10 1:10
STANDOFF FITTING STANDOFF FITTING
CHEVRON 10mm THICK CHEVRONSKIRTING 10mm THICK 2mm THICK ALUMINIUM 2mmSKIRTING THICK ALUMINIUM DOUBLE GLAZED DOUBLE GLAZED CONCRETE SCREED CONCRETE AS FLOOR SCREED FINISH AS FLOOR TOUGHEN GLASS TOUGHEN GLASSFINISH 200mm CONCRETE SLAB 200mm WITH CONCRETE CON- SLAB WITH CONDIA STAINLESS DIA STAINLESS CRETE SCREED60mm AS CRETE FLOOR SCREED FINISH60mm AS FLOOR FINISH STEEL RAIL @1000mm STEEL RAIL @1000mm 38x10mm CLEARGLASS 38x10mm STANDOFF CLEARGLASS STANDOFF FITTING WELDED ONTO FITTING ENDPLATE WELDED ONTO ENDPLATE SATIN POLISHED STAINLESS SATIN POLISHED STAINLESS STEEL RAILING ATTACHED STEEL RAILING TO SHEETING ATTACHED TO LYSAGHT BONDEK STEEL LYSAGHT SHEETING BONDEK STEEL GLASS PANEL GLASS PANEL ENDPLATE WELDEDENDPLATE ONTO ENDWELDED OF ONTO END OF STEEL JOIST STEEL JOIST 38x10mm CLEAR GLASS 38x10mm CLEAR GLASS STANDOFF FITTING STANDOFF FITTING 310 UNIVERSAL BEAM 310 UNIVERSAL BEAM 2mmSUSPENSION THICK ALUMINIUM 2mm SKIRTING ALUMINIUM SKIRTING SUSPENSION CLIP CLIP THICK CONCRETE SCREED CONCRETE AS FLOOR SCREED FINISHAS FLOOR FINISH 200mm CONCRETE 200mm SLAB CONCRETE WITH CON- SLAB WITH CONCRETE SCREED AS CRETE FLOOR SCREED FINISHAS FLOOR FINISH 38x10mm CLEARGLASS 38x10mm STANDOFF CLEARGLASS STANDOFF FITTING WELDED FITTING ONTO ENDPLATE WELDED ONTO ENDPLATE SUSPENSION JOINER SUSPENSION 442 JOINER 442 LYSAGHT BONDEKLYSAGHT STEEL SHEETING BONDEK STEEL SHEETING ENDPLATE WELDED ENDPLATE ONTO END WELDED OF ONTO END OF SUSPENDED CEILING SUSPENDED CEILING STEEL JOIST STEEL JOIST 310 UNIVERSAL BEAM 310 UNIVERSAL BEAM
FOIL FACED WRB. AROUND FOIL FACED WRB. AROUND FRAME OPENING FRAME OPENING WEEP SLOT WEEP SLOT PRIMARY SEAL PRIMARY SEAL ZINC HEAD FLASHING ZINC HEAD FLASHING PREFINISHED PREFINISHED SECONDARY SEAL SECONDARY SEAL DOUBLE GLAZED DOUBLE GLASS GLAZED GLASS PREFINISH ZINC FLASHING PREFINISH ZINC FLASHING CORRUGATED ZINCCORRUGATED PANEL ZINC PANEL CLEAT WELDED TO CLEAT COLUMN WELDED TO COLUMN FOIL FACED WRB.FOIL AROUND FACED WRB. AROUND OPENING GIRT BOLTED TOFRAME CLEAT AND GIRTOPENING BOLTED FRAME TO CLEAT AND BOLTED WITH TOP HATS BOLTED WITHPRIMARY TOP HATSSEAL PRIMARY SEAL 50mm TOP HATS BOLTED 50mm TO TOP HATS BOLTED TO SECONDARY SECONDARY SEAL GIRT AND ZINC PANELS GIRT AND SEAL ZINC PANELS PREFINISH ZINC FLASHING PREFINISH ZINC FLASHING CORRUGATED ZINC PANEL CORRUGATED ZINC PANEL CLEAT WELDED TO COLUMN CLEAT WELDED TO COLUMN
SUSPENSION CLIPSUSPENSION CLIP GIRT BOLTED TO CLEAT AND TO CLEAT AND GIRT BOLTED BOLTED WITH TOPBOLTED HATS WITH TOP HATS
SUSPENSION JOINER SUSPENSION 442 JOINER 442
FLASHING
C200 PURLIN BOLTED C200TO PURL CLEAT CLEAT
BATT INSULATIONBATT INSULATION
200 SHS
200 SHS
50mm TOP HAT at 50mm 600 ctrs TOP
Z200 PURLIN BOLTED Z200TO PURLIN CLEATBOLTED AT TO CLEAT AT 900CTRS FIXED TO 900CTRS ENGINEERS FIXED TO ENGINEERS DETAILS DETAILS
200 SHS
BONDEK
ZINC PANEL with ZINC PANE 25mm JOINT WIDTH 25mm JOIN
ZINC PANEL with ZINC PANEL with 25mm JOINT WIDTH 25mm JOINT WIDTH 200 SHS
FLASHING
C200 C200 PURLIN BOLTED TO PURLIN BOLTED TO CLEAT CLEAT
Z200 PURLIN BOLTED Z200 TO PURLIN CLEAT AT BOLTED TO CLEAT AT 900CTRS FIXED TO ENGINEERS 900CTRS FIXED TO ENGINEERS DETAILS DETAILS
FLANGE CHANNEL 380mm FLANGE CHANNEL 380mm WIDTH WIDTH 50mm TOP HATS BOLTED TO HATS BOLTED TO 50mm TOP GIRT AND ZINC PANELS GIRT AND ZINC PANELS
SUSPENDED CEILING SUSPENDED CEILING
FLANGE CHANNELFLANGE 380mm CHANNEL 380mm WIDTH WIDTH
BONDEK
BONDEK
200 SHS
200 SHS
07
ARCHI-FUNGI / ARCHITECTURE SCHOOL Union House Precinct, with nearly 120 years of history starting from the World War I, still able to stand firm on ground with classic architecture form. The building portrayed a sense of isolation and abandoned due to its wall materials and conditions are not well maintained. The idea is to embrace these characters and further exaggerate it and develop into a storyline. A tree is used as a metaphor to represent the Union House Precinct where fungus are slowly growing and spreading in and out of the building. These fungus developed into a series of interconnected interior spaces that become creative spaces for design students to think and find ideas. These spaces are also functioned as part of the circulation spaces and studio rooms. Part of the existing exterior brick walls were maintained and part of them were changed to perforated aluminium exterior wall panels to bring in modernistic character.
GEORGE MURRAY BUILDING
RECEPTION
STAFF TOILET
TOILET
UNION HOUSE (E5-NT46) LEVEL 2
S1
S2
LEVEL 2 (SOUTH)
Y BUILDING
GEORGE MURRAY BUILDING
RECEPTION
STAFF TOILET
TOILET
LEVEL 2 (SOUTH)
UNION HOUSE (E5-NT46) LEVEL 3
ground floor plan
2nd floor plan
GEORGE MURRAY BUILDING
section 1
toilet
toilet
TOILET toilet
toilet
HOUSE 6)
third floor plan
fourth floor plan
UNION HOUSE (E5-NT46) LEVEL 5
male toilet
female toilet
male toilet
female toilet
toilet
toilet
fifth floor plan UNION HOUSE (E5-NT46) LEVEL 6
section 2 male toilet
female toilet
COMPETITIONS SuperStudio 2015 (State & national runner-up) SuperStudio 2016 (State 1st Place) Lesley Lynn 2017
reIGNITE framework
SuperStudio 2015 -Mind the Gap reIGNITE By acknowledging the fundamental flaw of the senses, reIGNITE attempts to go back to the basics and trust our senses once more in the digital age. by attributing each object to unique sites, we maximise their individual stories onto reIGNITE targetted audiences to stimulate their symbolic meaning as an act of broadening the gap. But on framework common space; the virtual reality of the internet, and thus engaging people to mind the gaps of reality and displacing the norm.
Conventional way of perceiving knowledge/ information
reIGNITE from a exhibition gallery. framework
Conventional way ofthe perceiving knowledge/ information Breaking the norm, exhibitions were brought to the Changing the juxtaposition where stories are interpreted from a exhibition gallery. peopleinwith different backgrounds to extend the stories/ from the beginning rather than the ending. legacy.
reIGNITE Conventional way of perceiving knowledge/ information framework
from a exhibition gallery.
Breaking in the the exhibitions were brought to the Changing thenorm, juxtaposition where stories are interpreted people withthe different backgrounds to extend the stories/ than the is ending. The gapfrom betweenbeginning the viewerrather and the object then
Conventional way of perceiving knowledge/ information Breaking the norm, the exhibitions were brought to the from a exhibition gallery. people with different backgrounds to extend the stories/
legacy. reignited through the exploration of senses
legacy.
#sonamindthegap
premise
What is perceived may not necessarily be what it is . reIGNITE context
Breaking the norm, the exhibitions were brought to the people with different backgrounds to extend the stories/ legacy.
The implied reception of our senses are flawed, what is implied may not be what is meant to be implied.
The gap between the viewer and the object is then reignited through the exploration of senses
#sonamindthegap
- - - - - -
HOPE
Creating the
PURPOSE
LOVE
EQUALITY
MEMORY
JUSTICE
in peoples lives, to make them mind the gaps .
Distance, Geographical dimensions ... disruptions of space, mind-ing the gaps of Life.
#sonamind
reIGNITE
reIGNITE Phar Lap’s Heart
Sytagma Square, Athens, Greece
HOPE
A windmill in the West,by Peter Carey National Mall, Washington DC, U. S.A.
Embedded in the Australian cultural identity as a symbolism of Hope, Phar Lap’s humble beginnings to a champion racing horse empowers ones motivation to thrive for the better which was especially significant during the 1911 Great Depression. This is what we aim to evoke amongst the Greek society, to rise up from the economical crisis of today and to make a better tomorrow. Embedded in the Australian cultural identity as a symbolism of Hope, Phar Lap’s humble beginnings to a champion racing horse empowers ones motivation to thrive for the better which was especially significant during the 1911 Great Depression. This is what we aim to evoke amongst the Greek society, to rise up from the economical crisis of today and to make a better tomorrow.
War has always taken a toll on the Australian heritage, and questions of our role in the wars of the U.S. have always been ambiguous. Running parallel to this ambiguity lies the story of “A windmill in the West” where confusion and change are deeply embedded in Carey’s Story. Reflecting on this imperfection of our past, We ask the United States of America, what is our purpose?
War has always taken a toll on the Australian heritage, and questions of our role in the wars of the U.S. have always been ambiguous. Running parallel to this ambiguity lies the story of “A windmill in the West” where confusion and change are deeply embedded in Carey’s Story. Reflecting on this imperfection of our past. We ask the United States of America, what is our purpose?
SA/7/Chua,Chue,Koh/SS15
reIGNITE
reIGNITE Convicts Love Token
Central Criminal Courts (Old Bailey) , London, U. K.
PURPOSE
Faith Bandler’s Gloves
LOVE
Statue of Omar Makram, Tahir Square, Cairo, Egypt
SA/7/Chua,Chue,Koh/SS
EQUALITY
What is our fundamental right as humans? To have a voice. As the advocate for the rights of the Aboriginal people, the gloves of Faith Bandler symbolises the notion of change. As harmless as it seems, the simple donning of the “glove” within the noise of Tahir Square attempts to ignite the revolution of change within the Egyptian society and allow for voices to be heard once more.
Acknowledging our heritage, the Old Bailey site (where Newgate Prison sat) holds a strong relation to our beginnings where messages of goodbyes, engraved into these Convicts Love Tokens, are exchanged. As such the notion of reflecting on our past is engaged within our reach as we approach the still surfaces of its “boundary”. Acknowledging our heritage, the Old Bailey site (where Newgate Prison sat) holds a strong relation to our beginnings where messages of goodbyes, engraved into these Convicts Love tokens, are exchanged. This relation is often overlooked and sometimes forgotten, As such the notion of reflecting on our past is engaged within our reach as we approach the still surface of its “boundary”.
What is our fundamental right as humans? To have a voice. As the advocate for the rights of the Aboriginal people, the gloves of Faith Bandler symbolises the notion of change. As harmless as it seems, the simple donning of the “gloves” within the noise of Tahir Square atempts to ignite the revolution of change within the Egyptian society and allow for voices to be heard once more. SA/7/Chua,Chue,Koh/SS15
SA/7/Chua,Chue,Koh/SS15
reIGNITE Pie Floater
Victoria Square, Adelaide, Australia
MEMORY
Pie Floater? Seriously, a pie floater? What is its significance? A simple local food becomes the embodiment of the states identity, and yet, its prominence has diminished so severely overtime. As this “forgotten past” monumentalises in the heart of the state, curiosity peaks and perhaps, the floating pie, as delicious as it sounds may one day back in our tummies.
PIE FLOATER? Seriously, a pie floater? What is its significance? A simple local food becomes the embodiment of the states identity, and yet, its prominence has diminished so severely overtime. As this “forgotten past” monumentalises in the heart of the state, curiosity peaks and perhaps, the floating pie, as delicious as it sounds may one day be back in our tummies.
SA/7/Chua,Chue,Koh/SS15
reIGNITE Azaria Chamberlain’s Dress
Kuala Lumpur International Airport (KLIA) , Kuala Lumpur , Malaysia
JUSTICE
Controversies are abundant in our societies today. Technology on one hand simplifies how we gather information. The dress of Azaria Chamberlain perfectly embodies this controversial age, and in manipulating what we perceive with technology, we lose the basic trust of senses. only when we fell back to basics, can the truth (or so they said0 be revealed. Controversies are abundant in our societies today. Technology on one hand simplifies how we gather information and yet on the other complicates that very information. The dress of Azaria Chamberlain perfectly embodies this controversial age, and in manipulating what we perceive with technology, we lose the basic trust of senses. Only when we fall back to basics, can the truth (or so they say) be revealed. .
SA/7/Chua,Chue,Koh/SS15
SuperStudio 2016 -Converse around the Pool the dunny On conversation themes 1. Music & Territory: The Psychogeography of Aural Space 2. Landscapes of the Anthropocene 3. Liquid Texture ... (on garden)
Two Thirds & One Third access, without access.
one per 600 Two Thirds & One Thirds, a slum(p) in progress. access, without access. one per 600 Overwhelming complex a slum(p) in progress.Forgotten simplicity.
This is our return brief. The dunny, the toilet, a closet in space a room within a room
the complex-city of our
Overwhelming complexities Forgotten simplicity. the complex-city of our moral need.
the dun
The primary human - water relationship, the interaction of water and culture, how we engage in this fundamental element that brings us life we are 70% water afterall, defining our morals as a humanity.
SA Team 2 | Bernic
SA Team 2 | Bernice, Jonathan, Ben
segregated cultures,
partitions
immersive in landscape
SA Team 2 | Bernice, Jonathan, Benedict
segregate
part
immersive i
SA Team 2 | Berni
茅厕 tandas ห้อง a towel story in hot springs one small towel where to cover? the face. “see no evil, hear no evil” an enclosed space.
a toilet. water and culture. Humanity’s basic need the right to proper san
a towe in hot s one sm where the face
“see no an enc
SA Team 2 | Bernice, Jonathan, Benedict
SA
An installation in the garden, that forgets about; the partition wall, the edge, the complex pipe system, Introducing a composting toilet with a “dunny cap” just enough to protect our privacy.
An installa that forget the partitio the edge, the compl
Introducin “dunny ca privacy.
SA Team 2 | Bernice, Jonathan, Benedict
SA Te
#19thnovember World Toilet Day
SA Team 2 | Bernice, Jonathan, Benedict
nedict
#19thnovember World Toilet Day
#19thnovember World Toilet Day
SA Team 2 | Bernice, Jonathan, Benedict
SA Team 2 | Bernice, Jonathan, Benedict
Lesley Lynn 2017 Attaching Memories Attaching Memories envisions this importance of space enabling memories that are personal and unique to students experience during Skywell Openings the university life. Embracing the rural oasis character of the campus whilst promoting a well knitted college commuters between students Roof across faculties. Roof Framing System
Timber Clad Wall System R - Value In: R3.0 Out: 3.2
1. Weathertex Weathergroove (Natural) 300mm Timber Cladding Panel 2. Horizontal Timber Battens @ 300mm Spacing
Bedroom Module
3. External Gypsum Board Sheting with Waterproof membrane
Integrating advanced construction techniques and new materials. The modular nature of the design minimises the potential impacts of onsite Transitory construction with prefabricated elements. By Module Lounge rooms carefully engaging in environmental strategies, & Shared Bath Room the posed development of the student housing ensures Upper Floora balance of sustainability issues across Standard Ceiling Plan Unit social, economic and environmental aspects. Common
4. 90mm Timber Stud Frame with Kingspan K12 Framing Board , fixed internally. 1.
2.
3.
4.
5.
5. Kingspan K18 Plasterboard with interior finish
Stone Clad Wall System
1. Veneer Stone Drystack Natural Grey Web Panel Stone Cladding
R - Value In: R3.1 Out: 3.3
2. Mortar / Cement Joint 3. External Gypsum Board Sheting with Waterproof membrane 4. 90mm Timber Stud Frame with Kingspan K12 Framing Board , fixed internally.
Kitchen Area & Laundry
Upper Floor Plan 1.
2.
3.
4.
5. Kingspan K18 Plasterboard with interior finish
5.
Upper Floor Walls
Lower Floor Ceiling Plan
Pegboard Internal Walls 1. Deatachable Pegs (for customisation of shelving sturcture & other elements 2. 1.
Lower Floor Walls
3.
2. Pegboard with springloaded* peg slots (Dust Preventive measure) 3. Shelving Units attachable to pegs
Washbay Area & Bike Racks Allocated adjacent to residential modules to provide hygienic and sanitided condition for students who are exposed to potential bio security risks.
Lower Floor Plan
Typical Edge Detail
Structural Framework
With Rainwater harvesting System & Bio Retention Swale
Typical Block
LYSAGHT OGEE GUTTER
90mm DIAMETER DOWN PIPE
Roof Catchment Stormwater
SOIL MIX & BIO-RETENTION FILTER COARSE SAND FINE GRAVEL RAIN WATER TANK (BLOCK)
Excess Stormwater Run Off
Prevailing Summer Morning Winds
Main Access Proposed Linkage
Secondary Access
Equine Health & Performance Centre
Prevailing Summer Afternoon Winds
SARDI Custance Centre
Veterinary Science Building
Skywell Openings
Timber Clad Wall System R - Value In: R3.0 Out: 3.2
Roof Roof Framing System
1. Weathertex Weathergroove (Natural) 300mm Timber Cladding Panel 2. Horizontal Timber Battens @ 300mm Spacing
Bedroom Module
3. External Gypsum Board Sheting with Waterproof membrane 4. 90mm Timber Stud Frame with Kingspan K12 Framing Board , fixed internally. 1.
Transitory Module Lounge rooms & Shared Bath Room
Upper Floor Ceiling Plan
2.
3.
4.
5.
5. Kingspan K18 Plasterboard with interior finish
Stone Clad Wall System
1. Veneer Stone Drystack Natural Grey Web Panel Stone Cladding
R - Value In: R3.1 Out: 3.3
2. Mortar / Cement Joint
Standard Unit
3. External Gypsum Board Sheting with Waterproof membrane
Common Kitchen Area & Laundry
4. 90mm Timber Stud Frame with Kingspan K12 Framing Board , fixed internally.
Upper Floor Plan 1.
Lower Floor Ceiling Plan
2.
3.
4.
5. Kingspan K18 Plasterboard with interior finish
5.
Upper Floor Walls
Pegboard Internal Walls 1. Deatachable Pegs (for customisation of shelving sturcture & other elements 2. 1.
Lower Floor Walls
3.
2. Pegboard with springloaded* peg slots (Dust Preventive measure) 3. Shelving Units attachable to pegs
Washbay Area & Bike Racks Allocated adjacent to residential modules to provide hygienic and sanitided condition for students who are exposed to potential bio security risks.
Lower Floor Plan
Typical Edge Detail
Structural Framework Typical Block
With Rainwater harvesting System & Bio Retention Swale LYSAGHT OGEE GUTTER
90mm DIAMETER DOWN PIPE
Roof Catchment Stormwater
SOIL MIX & BIO-RETENTION FILTER COARSE SAND FINE GRAVEL RAIN WATER TANK (BLOCK)
Excess Stormwater Run Off
Prevailing Summer Morning Winds