>> Office © Yum Sunghoon
harim group headquarters The Beck Group | Rick del Monte, Jay Chung
The Harim Group Headquarters building is located in the Gangnam district of Seoul, on one of the most active
Location Seoul, South Korea
pedestrian streets in the city. The project consists of three stories of retail space at the base with 14 stories of office
Site area 1,255m2
space above. The client is the largest agricultural business in Korea and he wanted this building to provide a strong
Total building area 10,000m2 (including
identity on the skyline during the day and particularly at night. It was important that the building be sustainable and
Automated Parking Tower)
provide a strong public presence on the street. Within a tightly constrained floor area a vertical recessed slot allows
Floor B3 - L16
the eastern summer wind to create a low pressure zone along the north face of the building. This low pressure zone
Maximum building height 78 m
allows natural ventilation of the office space from the operable windows around the perimeter of the floor. This slot is
Structure RC, Steel
allowed to curve linking the public area on the ground floor with the roof garden, providing a visual identity for the
Mechanical system Water Cooled Central Plant
building. The slot is highlighted with polished stainless steel panels incorporating a perforated and textured pattern.
Lead designer The Beck Group
These are illuminated at night by a series of recessed white LEDs that through multiple reflections create a soft,
Design team Rick del Monte, Jay Chung, Ik
shimmering lighting effect. The building includes high performance glass, LED light fixtures, underfloor air
Joo Lee, Yoo Sook Lee, Noma Lehman
distribution, a green roof, and perimeter operable windows. To maximize the building height within the zoning code, a
Project team Well Light, Doojowon, Purumin,
large public space is provided on the ground floor. This public space flows from the street to a courtyard in the back
Jeonin, Zahner, Iljin, BDD
which is defined by aluminum panels which graphically recall the curve at the building front. This space will provide
Photographer Yum Sunghoon, Mijie
restaurants, fountains, and public seating in a district with almost no public amenities. The roof has a circular conference room overlooking the roof garden and the city beyond. The interior and public spaces reinforce the architectural concept through the consistent and rhythmic use of materials and geometric patterns, creating a texture and pattern that weaves throughout the building. <하림그룹본사> 하림그룹 본사 사옥은 서울 강남구 즉 서울에서도 가장 역동적인 보행거리에 들어서 있다. 건물은 저층부 상업공간 3개 층과 그 위의 사무공간 14개 층으로 구성되어 있다. 의뢰인은 한국 최대의 농산물 유통기업으로 자신의 건물이 낮과 특히 밤에 하늘을 향해 강한 정체성을 드러내기를 원했다. 또한 건물은 친환경적이며 동시에 가로를 향해 강한 공공적 성격을 표출해낼 수 있어야 했다. 엄격한 연면적 제한에 따른 후퇴형 수직 구조는 여름 동풍이 건물 북쪽 입면을 따라 저압대를 형성하도록 유도해준다. 저압대는 층 경계부를 둘러싼 개폐식 창들을 통해 사무공간에 자연환기가 일어날 수 있도록 해준다. 또한 후퇴형 구조는 1층 공용부와 옥상정원을 곡선으로 연결해주며 건물에 시각적 정체성을 부여해주고, 질감을 입힌 다공질 유광 스테인리스 스틸 패널을 적용해 더욱 돋보인다. 이들 패널은 밤이 되면 수많은 반사광과 어우러져 은은하게 반짝이는 매립형 백색 LED 조명이 빛을 비춰준다. 아울러 건물에는 고성능 유리, LED 조명, 바닥급기 시스템, 녹화 지붕, 개폐식 창 등을 적용했다. 용도지역 규정이 허락하는 최대 건물 높이 확보를 위해 1층에 넓은 공개공지를 구성했다. 1층 공개공지는 가로에서 시작해 건물 뒤편 마당까지 이어지고, 뒷마당을 정의해주는 알루미늄 패널의 그래픽은 건물 전면의 곡선 구조를 떠올려준다. 이러한 공개공지는 레스토랑, 분수대와 더불어 공공 편의시설이 거의 전무한 이 지역에 공공쉼터를 제공해줄 것이다. 건물 옥상에서는 원형 회의실이 옥상정원과 그 너머의 도시 전경을 바라보고 있다. 실내 및 공용공간은 일관성 있고 율동감 넘치는 소재 및 기하학적 무늬를 통해 건축 어휘를 강화해주며 질감과 무늬로 건물 전체를 수놓는다. 디자인 / 더 벡 그룹 | 릭 델 몬테, 제이 청
128 DETAILS
office_harim group headquarters
129
Š Yum Sunghoon
1 lobby 2 sunken 3 restaurant 4 office 5 parking 6 conference room 7 directorâ&#x20AC;&#x2122;s office 8 reception 9 roof top garden 10 roof deck
6 10 1
8
6
4
9
7
typical office plan
15th floor plan
16th floor conference room plan
5 4
2nd floor plan
2
1
3
0 1
site plan 130 DETAILS
6m
1st floor plan office_harim group headquarters
131
© Yum Sunghoon
© Yum Sunghoon
© Yum Sunghoon
© Yum Sunghoon
1 mechanical 2 restaurant 3 café 4 office 5 electrical
6 lobby 7 courtyard 8 parking 9 bridge 10 conference
A
4F GL+17,050
4F GL+17,050
3F GL+12,750
3F GL+12,750
2F GL+8,450
2F GL+8,450
1F GL±0
1F GL±0
10
B
4
4
8
6
3
2
9
elevation
7
section 2
1
2
5
1 0 0 1
section A 132 DETAILS
section B
2
4m
1
3
6m
plan partial drawing C office_harim group headquarters
133
© Mijie 3F GL+12,750
3F GL+12,750
3F GL+12,750
2F GL+8,450
2F GL+8,450
2F GL+8,450
1F GL±0
1F GL±0
1F GL±0
4F GL+17,050
4F GL+17,050
3F GL+12,750
3F GL+12,750
2F GL+8,450
2F GL+8,450
1F GL±0
1F GL±0
elevation
section
B1F GL-7,600
B1F GL-7,600
elevation
section 0 0
1
3
1
3
6m
6m
plan plan partial drawing A 134 DETAILS
stair detail office_harim group headquarters
135
4 thk100 mineral wool 5 161x100x4t built-up steel pipe 6 75x75x2.3t st’l pipe 7 urethane foam
7
426.9 395 31.9
170 31.9 50 42
8 steel angle 25x25x3t 100lg. 9 thk2mm aluminum sheet 10 slide lock plate 11 thk1.5mm s.s. backer per slide lock slot
5
12 slide lock tab 13 pre-seal 14 stiffener
1
225
3
75
8
164 201.5
© Mijie
1 thk1.5mm s.st. panel 2 polished stainless steel cover to hide led wires and conduits 3 thk3mm aluminum sheet
150
0.5 31.5 6
10 24
3 10 13 25 37.5
8 150
4
150
2
5
11
9
12 3
6
2
150
7 4
9
12
150
11 200 164
10
.2°
30 6 0.5
13
82
25
14
50
1
13 10
42 92
75
170
31.9
3
225
395 426.9
250
detail A
detail B
13
1 7
201.5 164
.9
0
17 3
75
92 50
3
42
24
6.9 42 5 39
31.5 6
C
0.5
31
B
5
1310 37.5 25
5 22
3
4
14 4
11
2
12
10 9
5
10
7
detail C
50 42 92 0 17 75
11 12
.9
31
3
A 5
22
5 .9 39 426
13 14 25
1 250
s-curve area curtain wall section detail 136 DETAILS
30 6
164 200
D
10
13
detail d office_harim group headquarters
137
6
164
MODULE DIM.(800)
4
45
10 13
30 28
15 15
30
60
2
Roof 1 GL+75,300
Roof GL+72,800
6
47
13 10
Roof 2 GL+78,000
1 mineral wool al. foil tape 2 extruded aluminum cover 3 front sleeve 4 structural sleeve 5 urethane form 6 extruded aluminum anchor clip 7 fire seal w/mineral wool 8 extruded aluminum bracket 9 ∅ 17x18lg slot holes 10 expansion shield 11 thk1.2mm galv.steel sheet 50mm 12 thk2mm aluminum sheet 13 glass setting block 14 air hole 15 4.5mmx21.8mm notch
200 30
8 16 6 0.5
126
265
3 78 40 450
185
38
175
80
480
11.7
16F GL+68,650
50
50
20
5
50
50
140
6
20
7
13
9
10
26 10
10
15F GL+64,350
125
115
57.5
154
6
14
8
MODULE DIM.(2670)
11
12
14F GL+60,050
elevation
8 16 6 0.5 30
6
164 200
50
section
125
curtain wall vertical section detail A 30 16
6 6
1
3
6m
164 0.5
partial drawing D
75
58
3.5
100.5
10.5
55.5 45
75 34.5 6 34.5
164 30 6 8 16 6 0.5
200 3.5 4.5
164 30 6 8 16 6 0.5
6
MODULE DIM.(800)
curtain wall vertical section detail B
MODULE DIM.
10 10 6 10 10
MODULE DIM.
75
30 8 8 16 6
21.8
68
20.2
10 11 13 9.7
4.5
10
22.7
55.5 45 10.5
16 6
6
138 DETAILS
75 6 34.5
96
350
8
34.5
34.5
78
200 30 8
75 34.5 6
40
10
20.2
21.8
15 © Yum Sunghoon
9.7 13
4.5
11
22.7
10
MODULE DIM .(2670)
8
0
plan
200
49
1010 6 10 11 MODULE DIM.
10
MODULE DIM.
10
11 10 61010
MODULE DIM.
curtain wall horizontal section detail C office_harim group headquarters
139
MODULE DIM.(800)
201.5 164
25 25
60
4.4
37.5 316.5
2
1
9
8
540 480.2
7 125
© Yum Sunghoon
© Yum Sunghoon
1 mullion 2 sill 3 head 4 rear sleeve 5 front sleeve 6 index clip 7 str. sleeve 8 urethane form 9 e x tr u d e d al u min u m brack e t t h k 1 5 60x237x250lg 10 thk2mm aluminum sheet 11 st.l bracket thk10 70x120x120lg painted same as mullion 12 m 12x110lg. stl’ set anchor 13 brushed ss metal panel 14 perforated ss metal panel w/lighting
5 3
1412.5
10
6 4
872.5
2
11
110
12
26
s-curve detail axonometric 13 14
tvk|slGkptUOY]^WP
2
16
Z^U\
tvk|slGkptUO[_WP
tvk|slGkptUOYY]WP
s-curve detail section
3
16
1
MODULE DIM. 1/2 MODULE
1/2 MODULE
200 6
50
11
X][
section
ZW ]
YWW
elevation
200
plan curtain wall detail A 140 DETAILS
s-curve detail office_harim group headquarters
141
© Yum Sunghoon
© Yum Sunghoon
© Yum Sunghoon
1 male mllion 2 head 3 corner mullion 4 transom 5 female mullion 6 sill 7 st.l reinforcement(mullion, zinc primer minish) 8 aluminum shear block 9 shadow box 10 extruded aluminum cover 11 corner mullion cap 12 st’l sleeve(transom) 13 thk3mm aluminum sheet 14 str. steel pipe 15 thk12mm steel bracket 16 rear sleeve 17 front sleeve 18 structural sleeve 19 urethane form 20 expansion shield 21 thk1.2mm gal’v sheet
2
1
1080
1080 1080
4
1080
3
3
5
4
6 1066.7
A
\W
YWW X][
ZYU\
18
17
10
40
11
10
15 10 6 10 15 MODULE DIM
MODULE DIM
detail B
_YU\ _^U\
\W tvk|slGkptUOY[XWP
X\W
20
yvvmGXm nsR^\SZWW
Y XXW Y\ ZW ZW Y\
XZXZ
Y_ [\ Y\ ]W
21
14
Y_UY
15
X^_U_ YW^
X\W Y\W
53
53
3
13
16
19
XXW
7
40 10 17
200 164 40 MODULE DIM
detail A 142 DETAILS
8 7
306 16 0.5 8 6
10 17
200 164 30 6 16 0.5 8 6
8 15 10 10 15 MODULE DIM
ZY[
\
17
XXYU\ MODULE DIM
MODULE DIM
12
8
10
[\WU` XY]U`
[
[^
MODULE DIM
XmGmUs nsRXYU\
7
7
YWZUX X^WU]
corner mullion plan 2
7
9
YWW
XXYU\
corner mullion plan 1
B
1066.7
MODULE DIM
corner mullion axonometric
1066.7
ZW ] _X]] WU\
Y\ tvk|slGkptUOYYYYU\P XW ZW XWXZ XWX\X\
1066.7
11
ZW ]
X][ YWW
XZW
ZYW [\W
1710 40
coping vertical section detail office_harim group headquarters
143
>> RETAIL
Crescent Pavilion The Beck Group
Design Narrative
Location Texas, USA
Built on a leftover corner of the Crescent Development in Dallas, the 2,900 SF pavilion was designed to activate the
Site area 11,917m2
existing grove of trees creating a public space that serves as a mini park. Facing the park, the glass pavilion is
Building area 2,925m2
transparent and dissolves the barrier between the inside and out. Under the trees a floating canopy adds shade by
Total floor area 2,925m2
day and illuminated at night serves to draw the eye in. Designed to reflect the values of Shake Shack, the materials
Landscape area 8,992m2
and detailing attempt to blur the line between the park and dining room bringing the outside in.
Structure Steel
This project involved building an intricate structure and finish out in a very confined space, packing a lot of features
Exterior finish Glass, mirror, steel, wood
and design into a small footprint, surrounded by many other aspects of the property, including main entrances to the
Interior finish Locally sourced reclaimed
building and garage, a grove of old-growth oaks, and pedestrian friendly uptown.
wood makes up 75% of the wall finishes
Performance Narrative
with the gym floor sourced from the Old First
The project meets the City of Dallas’ green building code; it’s designed and constructed to deliberately respect the
Baptist Church Gym in downtown Dallas
impact on the environment and to optimize efficiency and resource management. Locally sourced reclaimed wood
Design team Rick Del Monte, John Jacobson,
makes up the 75% of the wall finishes with the gym floor sourced from the Old First Baptist Church Gym in
Toby Newham
downtown Dallas. Through the use of high efficiency plumbing fixtures, the project reduced water use by 27%.
Construction BECK
The site is within walking distance of numerous basic services and multiple alternative transportation bus lines
Client The Crescent
including a free city trolley. This level of community connectivity reduces urban sprawl and increases physical activity,
Photograph Steve Hinds
reducing greenhouse gas emissions associated with single occupancy vehicles The owner purchased renewable energy certificates to offset air pollution associated with traditional fossil fuel energy sources and encourage the use of renewable energy generation. Energy reduction was achieved with high efficiency LED lighting and hvac systems. Light Power Density (LPD) was reduced by 69%. Passive design strategies included deep overhangs and high performance glass. <크레센트 파빌리온> 디자인 구성 댈러스 크레센트 개발지구의 자투리 대지에 건설된 2,900SF의 이 파빌리온은 작은 공원 같은 공공공간 역할을 하는 기존 나무숲의 활성화를 목적으로 설계되었다. 공원을 마주보고 있는 유리 파빌리온의 투명성은 내부와 외부의 경계를 허문다. 나무 아래의 공중 캐노피는 낮 동안 그늘을 드리워주고, 밤에는 밝게 빛나며 시선을 사로잡는다. 쉐이크 쉑의 가치를 반영해 디자인한 소재와 디테일은 공원과 식당의 경계를 무너뜨리며 외부를 안으로 끌어들여준다. 이 프로젝트는 복잡한 구조 설계, 한정된 면적 안에 수많은 기능과 디자인이 집중되어 있는 협소한 공간, 건물과 차고의 주 출입구, 수령이 오래된 오크 나무숲, 보행친화적 교외 환경 등 다양한 주변 환경 요소 등을 고려해야 했다. 기능 구성 이 프로젝트는 댈러스시 친환경 건축 규정에 따라 주변 환경 영향과 효율성 및 자원 운용 최적화를 염두에 두고 설계 및 시공했다. 지역에서 수집한 재활용 목재와 댈러스 시내의 올드 퍼스트 뱁티스트 처치 체육관에서 가져온 체육관 바닥재로 벽 마감재의 75%를 충당했고, 고효율 배관 설비를 사용해 물 소비량을 27% 절감했다. 프로젝트 대지는 수많은 기초 서비스 시설과 무료 도심 전차를 비롯해 다양한 대중 교통 버스 노선을 걸어서 갈 수 있는 거리에 두고 있다. 이런 연계체계는 도시 확산을 막고, 육체활동 증진을 통해 자가용 온실 가스 배출량 절감에 도움이 된다. 의뢰인은 전통적인 화석 연료 에너지 자원 관련 공기오염 방지와 재생에너지 사용 장려를 위해 재생에너지 공급인증서를 득했다. 에너지 절감은 고효율 LED 조명 및 공조설비 시스템을 통해 실현했고, 조명출력밀도(LPD)를 69% 줄였다. 아울러 깊은 처마와 고성능 유리 등 패시브 디자인 전략을 적용했다. 디자인 / 벡그룹
182 DETAILS
REtail_Crescent Pavilion
183
concept sketch
site location
north elevation 184 DETAILS
site plan REtail_Crescent Pavilion
185
1 PREFINISH METAL COPING 2 TPO ROOFING ON 1/2’’ COVER BOARD ON TAPERED INSULATION 3 AL1 4 MT1 5 CORRUGATED METAL PANEL 6 TPO ROOFING SYSTEM ON 1/2’ COVER BOARD ON METAL DECK 7 PAINTED ARCHITECTURALLY EXPOSED STRUCTURAL STEEL FRAMING-REF: STRUCTURAL 8 PRE-FINISHED TONGUE AND GROOVE METAL PANEL SYSTEM 9 SSG 2-SIDED ALUMINUM CURTAIN WALL
SYSTEM 10 CONCRETE FOUNDATION-REF: STURUCTURAL 11 PAVERS-REF: LANDSCAPE 12 LOW CONCRETE WALL- REF: STRUCTURAL 13 TPO ROOFING MEMVRANE TO TURN AND OVER PARAPET UNDER CAP 14 EXT. GRADE PLYWOOD SHEATHING-1/2’ 15 TPO ROOFING SYSTEM 16 CORRUGATED METAL PANEL 17 1/2” GLASS FACED SHEATHING W/FLUID APPLIED VAPOR BARRIER ON 6” METAL STUD FRAMING W/ BATT INSULATION 18 CONCRETE SLAB- REF: STRUCTURAL
19 STRUCTURAL STYROFOAM- REF: STRUCTURAL 20 UNDER SLAB VAPOR BARRIER 21 CONCRETE FOOTING- REF: STRUCTURAL 22 COLD FLUID APPLIED WATERPROOFING SYSTEM 23 LOW CONCRETE WALL- REF: STRUCTURAL 24 WATERSTOP 25 METAL STUD FRAMING-6” 26 PRESSURE TREATED PLYWOOD-1/2” 27 FLUID APPLIED VAPOR BARRIER 28 GLASS MAT FACED GYPSUM BOARD-1/2” 29 BATT INSULATION 30 METAL FINISHING 31 METAL COUNTER FLASHING
32 1.5” COMPOSITE METAL DECK- REF: STRUCTURAL 33 STEEL FRAMING- REF: STRUCTURAL 34 STEEL COLUMN BEYOND REF: STRUCTURAL 35 SEALANT AND BACKER ROD 36 SEALANT 37 PRE-FINISHED EDGE TRIM FOR METAL PANEL SYSTEM
detail A-parapet section
detail B-cw head
axonometric-wall section 186 DETAILS
wall section
detail C-edge of canopy REtail_Crescent Pavilion
187
1 ALUMINUM CUTRAIN WALL CAP PER CUTAIN WALL MANUFACTURER 2 AL1 3 SSG 4-SIDED ALUMINUM CURTAIN WALL SYSTEM
4 GL2 5 LOW CONCRETE WALLREF: STRUCTURAL 6 GALVANIZED 1-1/4” DIAMTER METAL PIPE RAING GUARDRAIL WITH HANDRAIL 7 TPO ROOFING ON 1/2”
COVER BOARD ON TAPERED INSULATION 8 PAINTED ARCHITECTUREALLY EXPOSED STRUCTURAL STEEL COLUMN BEYONDREF: STRUCTURAL 9 CURTAIN WALL ENTRANCE DOOR 10 WALL BEYOND
axonometric-wall section 188 DETAILS
11 TPO ROOFING MEMBERANE TO TURN UP AND OVER PARAPET UNDER CAP 12 FLULD APPLIED VAPOR BARRIER 13 EXT. GRADE PLYWOOD SHEATING-1/2” 14 METAL STUD FRAMING-6” 15 UNDER SLAB VAPOR BARRIER
16 EDGE OF SLAB LEAVEOUT BELOW 17 STRUCTURAL STYROFOAM- REF: STRUCTURAL 18 CONCRETE FOOTING- REF: STRUCTURAL 19 COLD FLULD APPLIED WATERPROOFING SYSTEM 20 WATERSTOP
21 SSG 2-SIDED ALUMINUM CURTAIN WALL SYSTEM 22 CURTAIN WALL MULLION BEYOND
wall section-cw at serv door
section detail D-head cw door REtail_Crescent Pavilion
189
1 TPO ROOFING ON 1/2” COVER BOARD ON TAPERED INSULATION 2 AL1 3 ALUMINUM CURTAIN WALL CAP PER CURTAIN WALL MANUFACTURER 4 SSG 4-SIDED ALUMINUM CURTAIN WALL SYSTEM 5 MT2
6 TPO ROOFING MEMBRAINE TO TURN UP AND OVER PARAPET UNER CAP 7 EXT. GRADE PLYWOOD SHEATING- 1/2” 8 METAL STUD FRAMING- 6” 9 STEEL COLUMN BEYOND- REF: STRUCTURAL 10 EDGE OF SLAB LEAVEOUT BELOW 11 CONCRETE FOOTING- REF: STRUCTURAL
12 STRUCTUAL STYROFOAM- REF: STRUCTURAL 13 UNDER SLAB VAPOR BARRIER 14 WATERSTOP 15 COLD FLUID APPLIED WATERPROOFING SYSTEM 16 BATT INSULATION 17 STUCTURAL SILICONE SEALANT 18 STEEL FRAMING- REF: STRUCTURAL
19 TPO ROOFING SYSTEM 20 EDGE OF CURTAIN WALL MULLION BELOW 21 SLAB LEAVE OUT 22 COCRETE SLAB-REF: STRUCTURAL
detail E
detail F
axonometric-wall section 190 DETAILS
wall section-at frit curtain wall
detail G REtail_Crescent Pavilion
191
4’-6”
4’-6”
3d perspective-wood light trellis
9
1
9
3 4
10 11
5”
1
12
2
5 6 7 8 3d perspective
3d perspective 3 1/8”
detail H
5”
1
9
3 4
10 11
5”
1
12
2
5 6 7 8
3 1/8” 5”
1 2 3 4 5
SINKER PINE WITH HIDDEN FASTENERS LIGHT FIXTURE- REF: ELECTRICAL FIBERGLASS REINFORCED PLASTIC GYPSUM BOAD-5/8” RECLAIMED WOOD
6 PLYWOOD SHEATHING- 3/4” 7 GYPSUM BOARD- 5/8” 8 METAL STUD FRAMING- 3 5/8” 9 FIBERGALSS REINFORCED PLASTIC 10 GYPSUM BOARD ON METAL STUD FRAMIG
11 STAINLESS STEEL CLOSURE STRIPS ATTACHED TO COOLER WALL ONLY, K.E.C. 12 PREFABICATD WALK-IN COLLER/FREEZER BY K.E.C 13 1/8” THICK BLACKENED STEEL PLATE 14 RECLAIMED WOOD
15 STEEL COLUMN- REF: STRUCTURAL 16 18 GAUGE STAINLESS STEEL PANEL 17 1-1/2” X 1-1/2” 20 GAUGE SONTNUOUS ANGLE 18 SOUND INSULATION 19 PREFABRICTED WALK-
plan detail-view win. ABV
plan detail-view win. BLW
plan detail-wood corner 1
5”
1
2
3 1/8” 5”
east elevation 192 DETAILS
section detail-wood light trellis
plan detail-HM JAMB
plan detail-infill wall REtail_Crescent Pavilion
193