Howley Park East - concept design options

Page 1

>

>

>

> >

>

>

>

0 0.0

>

>

>

>

>

>

>

> >

>

>

>

>

>

>

>

>

>

>

>

4.16 .21 .444 1 11.4 4.05 5 4.05 1.3 3.95 3.85 3.953.85 3.835.85 3.73 5 3.8 3.82

>

RO

>

W

CK

>

3.75 1.29 3.57 3.45 3.57 3.35 3.45 3.24.21 1 1 3.35 0.48 1.2 0.46 3.26 0.38 3.24 3.14 0.92 3.08 3.08 2 5 2.93 1.621.54 0.3 3.14 3 1 .02 0.40 1.812.73 0.56 0.4 4 2 .1 .2 1 3 3 2 2 .9 .3 .4 .5 2 0.503 2 2 0.83 2 2.93 2.11 2.63 1.091.09 0 7 .6 7 3 1 .3 1 .3 .3 2 .2 2 .8 0 0 20 1 3 3 2.72.88 1.72 .63 2.53 2.53 2.03 2 22.4.31 0 22 4 3 2.11 2 .8 .3 4 .4 .5 .2 1 2 1 .9 2 4 0 2 4 7 .82 .73 2.7 2.3 3 .03 1 2.0821.9 2.63 2.63 .53 1 1 1.69 1.721.6 1.5 1.62 2.132.2 2.1 2 2 .9 1.8 2.452.31 2.30 2.71 2.71 .841 1.91 2.00 1 2.36 2.16 2.72 2.72 2.372.53 2.74

3.75

C

P

W

C

W

0.02 1.521.43 1.42

VC

00 3.

-0.10

1.41 1.41

1.43

Access to Marina Step slope

50 2.

3.06 6.09

2.48

F

7.85 9.14 4.70 7.74 7.83 4 7.8 7.85 7.80 7.95

4.74 4.74 7.856 7.9

F

7.87 7.89 7.90 7.85 7.90

7.75

DR

4.71 2.62

2.32 3.55

7.95 3 2.7 7.93 8.06 8.06 7.95 2.19 7.90

IV

AY W E

1.86

8

HOWLEY POINT 8.0

23

1

2.26 2.18

Image credit: TownWBeach Mural,2.1By Rob Freijs, 4 R PROJECT:7.9 ED SPCC BY-SA 3.0 8.014 .04 AY

-0.29

1.58

P R

1.43 1.52 1.40

0.12

D

3

PREPARED BY:

-0.42

-0.00

>

3 .5

0 4 .0

0.38

7.28

7.66

-0.65

>

>

0 4 .5

4.25 1.21

W

5 7.7.8 5 7 .1 6 5 7.75 7.85 7.77

S

-0.00

0.31

0

0

AY

SPR

5 .0

RED

>

Concrete ramp access to beach

3.46

0

3.80

-0.57

>

2.0

>

>

TOK

0.02

0.29

Mini mesh or concrete landing with interpretive signage

>

>

>

> >

>

>

AY PR KS P IN

>

RA Y SP NK PI

BOK

0.05

>

>

> >

>

>>

>0.08

>

SP

-0.69

>

>

>

>

>

> >

TO K

>

>

0

D

-0.64 -0.19

0

0.03

0

>

1 .0

>

>

DATE

>

>

DRAWN

0.00

AMENDMENT

0.5

1.06

4.46

7.81

Level 3 suite 3.01 22-36 Mountain street Ultimo 2007 Ph: (02) 9555 1033 Fax: (02) 98185292 Email: admin@epnsw.com.au ABN 53 088 175 437

/

ISSUE

>

APPROVED:

7.93 7.92

0 .0

-0.33

>

4.58

Y RA

TH PA

DATE:

7.72 7.87 9 7.88 7.7 7.82 8.00 7.87 7.86 8.00 7.84 5 7.9 .95 7 7.90 7.98 7.99 7.96 7.98 7 7.89 7.98 7.9 7.92 8.00

>

>

30 0 75 Ø P A V

8 3.927 3.87.35 3.8 3.753 4 6 7.3 .83 37.8.437.3 7.38 3 4 .3 7 1 3.50 7.41 .4 0 7 7.4 .42 7.32 7 7.37 7.24 7.51 7.325 7.5 7.584 7.64 7.6 7.75 7.75 7.59 7.45 7.30

W

> >

>

0.97

P

RE

0

-0.55 -0.13

4.16

P

7.5

>

0.97

4.25

4.34 4.35 4.31 4.35

AY EW

CHECKED:

GENERAL NOTES 1. Do not scale off drawings. Follow written dimensions. If in doubt obtain written advice from the Superintendent. 2. Verify all dimensions on site. 3. Refer to legend for all symbol and code keys. 4. Read in conjunction with the specifications 5. Read in conjunction with all Civil, and Electrical Engineer drawings and specifications. 6. Read in conjunction with all associated drawings

4.36 4.33

-0.02 > >

>

1.29 1.29

4.39

>

0.75

4.55

IV

APPROVED:

7.44 2 7.4 9 7.57 7.5 9 7.5.7 2 7 2 .7 3 7 .0 1 8 .17 .78 8.2 7 9 0 7.61 8.1 7.80 .76 7.62 8 9.422 77.8.93 7 7.65 7.9 7.81

P

0.64

0.72

>

0.22

Handrail

0.56

0.65

4.62 4.62

DR

DATE:

Sandstone log wall

PREPARED FOR:

4.67

/

DRAWN:

8.07

K

Y RA

/

>

5.59

D

7.91 7.86

>

K

SP

7.88 7.93

APPROVED:

TO

UE

0

8.06 6.62

DATE:

8.0

8.13

P

0

/

BL

NE

DESIGNED:

W

7.94

LI

5.81

5.97

8.02

RE

>

5.65

W

9.62

/

Corten blade screen

5.61

8.10 EOT

8.15

5.80

5.69

8.09

NT

EOT 5.92 5.89

CE

DP

Y RA

5.79

SP

>

5.70

8.14

5.96

/

5.69

W

7.12

8.06

NK

>

5.73

8.13

TH PA /

C

>

8.15

B

8.16

57083 0 7 94

7.0

7.861 8.0

/

5.86

D

7.952 7.8

PI

> 5.73

6.95

8.09

/

5.80

6.73

7.83

/

>

5.89

6.05 5.86

8.14

/

.01 > 6

P

6.01 6.00

6.04

7.84

>

4.88 2.100 2.1

4.12

/

>

5.79

8.08 7.84

M

4.33

7.02

TO

6.08

8.11

8.10

W

-0.53 -0.01

CK

>

6 4.6.6 .76 1 0 4.70 4 .66 1.60 4.52 4 4.63 4.58 4.46 4.58

D

TH PA

W

H

8.08

8.11

/

C

/

5.96

D

>

3.72

6.85 6.85

6.75

/

> 5.84

/

5.82

8.15

8.06 3 .21 8.0 9.12 8 8.19 8.01 8.188.19 8.03 8 8.18 8.10 1 8.2 8.18 88.0.18 8.19 8.18 8.03

RA Y

0.06 > >

0.39

6.83

6.91 6.87

6.50

/

8.16

K

6.26

RED SPRAY

/

6.03

S

6.31

SP

4.66 4.67 4.62

Existing retaining wall shortened and returned under entrance slab

TH PA

8.17 8.16

8.05

OW

0.11

>

4.58 4.47 4.27 4.46

5.145.27 4.992 5.2 5.40 5.2 2 0 5.39 7.9 95.14 25.04 5.56 5.40 5.0 5.1 5.51 4.88 1 4.88 5.064.9 5.80 5.98 6.07 4.74 6.11 9 4.6 4.67 6.27 7 .2 6.41 6.10 6 4.61 6.37 2 .5 6 3 .3 6

/

8.22 8.08

8.09

0

8.19

/

A

6.24 2 6.20 6.9 .27 6 6.93 6.10 6.87 0 .7 5 .14 6 6.24 4 6.17 6.8

6.32

LL

>

Corten blade balustrade RO

4.98 4.99

6.52

8.0

/

4.56

Y RA

TO K

W

/

SP

8.18

RAY PINK SP

8.19

6.03

>

A RI O CT VI

/

3.46

L

UE

/

8.22

4.75 4.74

3.60

8.22 9 8.0

6.37 9 6.3 .272 8.14 8 66.3 6.3 0 8.14 6.4 8.15 .40 6 5 .1 8 6.28 8.14 6.46 8.14 6.46 6.32 5 8.15 .1 8 6.45 .32 6 .30 6 8 6.44 8.14 8 .1 6.36 6.51 8.10 6.54 8.13 8.13 6.55 8.07 6.39 8.11

P

9.33 4 10.5 3 10.2

BL

8.07

0

8.11 8.2.009 8.22 8 8.20

P

YE

>

>

0.27

4.76

.253 66.3

K

8.01

SP

On grade access

/

>

8.05

8.11

>

D

2.71 8 3.1.1 3 85.21 2.15 5.26 5.137.09 2.15 5.21 3.09 5 5.26 .17 5.0 5 5.19 .01 8 6 5 5.1 3 5.05.05 4.9 5 4.9 4.94 5.03 0 4.8 4.88

4 5.49 3.5 5.37

5.92

/

Ramp entry point

1.00

8.14 8.145 8.26 8.2

0.50

8.17

6.00

8.08

8.07 8.07 9.34 6 7.90 8.0.0 6 7.90 8 / 5 8.0708.0.06 7.91 .9 8 7 2 7 7.9 8.0 8.060 7.9 7.90 7.92

0.43

0.56

4.57 OW

-0.49 > 0.09

-0.20

0.10

0.12 >

Garden bed

2 7.9.9 7 2 8.12 2 .1 8

/ 8.16

-0.35

1:14 Mini mesh ramp with handrails

4.5.500 4 RA 5.61 Y 5.49 5.37 8 5.61 5.44 5.3 5.49 5.45 4 .4 5 9 5.52 .6 8 5.62 5 5.4 5.20 5.31 .69 5 0 .6 5 2 5 .7 .5 5 2 5 .38 5.41 .7 5 5 8 5.6 6 5.6.5 5 1 5.48 1 5.75.555.69

6.15

/

K

>

8.04

8.24

3.91

3.70

7.93

7.93

/

Garden bed

DP

50

2.42

LL

-0.49

0.0

/

TO

0.

6.00

8.27

>

W

/

S 8.21 .62 / 99.54

3.62

O

/

ND

Sandstone log retaining wall

Concrete path on grade 0.91

5.44

Existing ground level

• Walls are stepped to accommodate for the slope

Insitu concrete retaining wall Artwork opportunity SA

4.05

58083 0 7 94

8.01 5.78

8.27 9.36

0.36

2.33

YE

Concrete path on grade

-0.34

-0.49

5.50

8.28 8.28 8 8.2 8.28 8.27

/

3.50

CK

8.01

8.04 9.24 1 8.1

Y RA

W

3.37

C UT

/

8.04

7.95

-0.03

0.97

5.66

5.65

6.407.95 5.75

SP

/

RO

8.11

7.94

7.80

8.10 0 8.02 0 8.1 8.10 8.0 8.00

8.31

3.19

>

8.17 8.18

7.14

7.94

UE

8.42 8.32 4 8.3

.33

3.15 8.20 3.18 3.05 3.22 3.11 3.28 3.70 3.54 3.65 3.48 3.38 3.24

>

8.19

8.22

PA TH

/

4.39

8.14

8.09

8.32

>

H

>

8.25

8.19

6.03

5.46

ORIGINAL CHARACTER Raised lawn • Residential lookout street frontage

0.28 >

0.24>

0.22

Insitu concrete wall Artwork opportunity

-0.03

>

5.50

BL

8.26 8

3.24

K

9.68 8.23 .23 8 8.23

8.20 8.20

8.32 8.31 8.33

8.43

8.21

4.74 4.684.11 4.74 4.14 6 3.5 3.97

RA Y

BO

/

8.32

8.22

8.20

SP

>

9 8.51 88.4.53 8.50 8.65

UE

4.69 4.76

PA T S H

1:14 Mini ramp with handrails BL

6.57 8.16 8.62

>

7.49

8.1/7 8.16

>

2 8.40 8.5 8.422 .4 8.40 8

8.54

30 5.91

EOT9 8.2

K TO mesh

AY

8.44

8.34

8.17 7 8.1 7 8.1

4.73

5.00

6.14

6.96

Raised lookout lawn with interpretive signage

R

8.34

ER

SP

8.22

3.88

>

• Site bordered by low solid & permeable walls sitting Balustrade in front of low planting not reaching above 2m Sandstone log retaining wall 0.07

0.10> 0.17

0.67

4.79

5.94 >

R

/

4.50

0.34

Balustrade

-0.25

0.11

0.96

>

0.11

W

6.07

7.71

1.73 3.31

3.94

>

>

SECTION A

-0.19

-0.08 0.2>9

0.53

3.78

4.00

> >

0.37

1.08

O

/

0.37 >

1.12

3.45

3.50

2.33

2.65

NT

0.97

LL

8.22

8.54

VE

3.00

3.46

8.20

CH

2.50

2.07

0.55

3.46

2.39

>

0.19

0.23 0.23 > 1.21 0.66 >

P

1.12 1.20

1.77 >

1.13

YE

6.83 7.93 8.26

Bush / D Regeneration/ with stabilised embankment B

1.91

2.00

O

0.96

-0.03

0.07

0.51

>

1.12

>

/ 8.19 8.19 8.19 8.19 8.200 8.20 .2 8.19 8 1 8.2 .19 8 8.21

1.05

2.75

3.96

8.19

AM

1.50

CR >

>

1.19

> 1.10

0.26

-0.15

.07 0.95> 00.09

1.97 5 1.58 1.8 1.33

2.85

1.21

1.59 1.19

1.49

0.17

0.09>

CK

U

>

1.00

Bush Regeneration/ with stabilised embankment

-0.28

0.86

A

3.70

2.56

1.00

0.84

RO

>

8.32

8.19

Balustrade

2.28

3.54

2.52

>

/

8.27

1.88

1.56 1.16

7.39

8.16

2.18

>

0

0.53

1.42

1.47

7.60 8 .0

>

>

0

0.60 >

/

0

3.97

>

7 .0 7 .5

1.02

>

>

50

0

0 2.0 .50 0 2 3.0 0 3.5 4.00

8.

7.99

1.72

0.74

0.71 1.05

1.48 1.37

0

>

6 .5

/

23

C

UT

2.36

> 1.91

0.50

0.68

0.03

>

8.62

0

6 .0

9.15 8.72

1.42

-0.12 -0.01

O

TC

-0.

0.03

P

>

5 .5

5.30

1.33 1.32 > 0 > 1.4

0.47

0.18

0.51

3.95

0

O

0.42

RO

>

00

5 .0

CK

>

>

1.13 1.03 0.71 4.80 >

0.02 0.15

>

>

>

>

9.

>

>

-0.27

> 0.16

0.93

>

.21 0.18 0

>

> 8.66 5 8.4 .64 8

8.63

0.85

1.10.50 1 .0 1 .5 0 0 .99 > .37 > 1 0 1 .8 > 1 > > > 3.91 > 4 .5 > 0

>

1.50

-0.12

>

1.15.06> 1.06 1

> 0.79

RO

1.29

>

>

>

1.78

0.22

>

>

> .29 -0 > 5 0.9 0.10 > 4>.44

.67 >1

1.43

>

-0.34

>

>

SA

-0.32 0.10

-0.31

1.51

1.66

0.03

>

Sleeper stair access to water

-0.38 0.00

>

-0.08

-0.25

ND

0.21 >

1.49

0.06

-0.37

>

>

0.24 >

> 0.26

-0.02

0.00 -0.32

> 0.23

1.1

0.99

0.54

> -0.29 -0.0>7 9 -0.29 0.1 -0.11 >

-0.52

-0.35

0.14

-0.19

0.15

>

-0.45 0.39 -0.28 1 -0.5 -0.20

-0.28

-0.18 5 .2 > 0

>

-0.45

-0.30

0.30

>

0.08

-0.30

-0.28

>

CK

C

-0.33

>

RO

O

UT

>

>>

P

OPTION A

NE

.18

RO

-0.23

>

-0.26 >

-0.26

DRAWING TITLE 2.02

DP

1 20

4

DATE

DEC 2021

DRAWING TITLE

HOWLEY POINT

SCALE

ISSUE

1:100 @ A1 1:200 @ A3

N

DRAWING NO.

EP-LD-G02

/ /


>

>

>

>

>

>

>

> >

>

>

>

>

0

0.0

>

>

>

> >

>

>

>

>

>

>

>

>

>

>

>

>

>

RO

>

>

W

CK

-0.42

-0.00

>

3.75 1.29 3.57 3.45 3.57 3.35 3.45 3.24.21 1 1 3.35 0.48 1.2 0.46 3.26 0.38 3.24 3.14 0.92 3.08 3.08 2 5 2.93 1.621.54 0.3 3.14 3 1 .02 0.40 1.812.73 0.56 0.4 4 2 .1 .2 1 3 3 2 2 .9 .3 .4 .5 2 0.503 2 2 0.83 2 2.93 2.11 2.63 1.091.09 0 7 .6 7 3 1 .3 1 .3 .3 2 .2 2 .8 0 0 20 1 3 3 2.72.88 1.72 .63 2.53 2.53 2.03 2 22.4.31 0 22 4 3 2.11 2 .8 .3 4 .4 .5 .2 1 2 1 .9 2 4 0 2 4 7 .82 .73 2.7 2.3 3 .03 1 2.0821.9 2.63 2.63 .53 1 1 1.69 1.721.6 1.5 1.62 2.132.2 2.1 2 2 .9 1.8 2.452.31 2.30 2.71 2.71 .841 1.91 2.00 1 2.36 2.16 2.72 2.72 2.372.53 2.74

3.75

C

P

W

C

W

0.02 1.521.43

>

0 3 .5

W

1.42

1.43 1.52 1.40

0.12

-0.29 -0.10

1.41 1.41

1.43

00

D

3.

Access to Marina Step slope 1.58

50 2.

0 4 .0

0.38

>

0

>

3.06 6.09

2.48

F

7.85 9.14 4.70 7.74 7.83 4 7.8 7.85 7.80 7.95

DR

4.71 2.62 4.74 4.74 7.856 7.9

7.87 7.89 7.90 7.85 7.90

F

2.32 3.55

7.95 3 2.7 7.93 8.06 8.06 7.95 2.19 7.90

7.75

IV

AY W E 0

RED

4 .5

4.16 .21 .444 1 11.4 4.05 5 4.05 1.3 3.95 3.85 3.953.85 3.835.85 3.73 5 3.8 3.82

2.0

0

AY

SPR

5 .0

TOK

> >

>

> AY PR KS P IN

>

RA Y SP NK PI

BOK >

-0.65

>

>

>

4.25 1.21

7.28

7.66

-0.00

0.31

3.46

5 7.7.8 5 7 .1 6 5 7.75 7.85 7.77

S

-0.57

>

>

>>

0.02

0.29

Mini mesh or concrete landing with interpretive signage

>

>

0.05

>

>

> >

>

AY

>0.08

>

1.86

2.13

DRAWING TITLE 8.014 8.0

8.04

HOWLEY POINT

23

1

2.26 2.18

7.94

R

>

3.80

-0.69

Concrete ramp access to beach

W PROJECT: SP

>

0

SP

-0.64 -0.19

0

0.03

0

>

1 .0

DATE

0 .0

-0.33

>

TO K

>

>

>

> >

>

ED

Level 3 suite 3.01 22-36 Mountain street Ultimo 2007 Ph: (02) 9555 1033 Fax: (02) 98185292 Email: admin@epnsw.com.au ABN 53 088 175 437

/

DRAWN

>

VC

D

P R

PREPARED BY:

>

0.5

1.06

4.46

7.81

7.93 7.92

> >

>

4.58

Y RA

TH PA

APPROVED:

AY EW

DATE:

IV

CHECKED:

GENERAL NOTES 1. Do not scale off drawings. Follow written dimensions. If in doubt obtain written advice from the Superintendent. 2. Verify all dimensions on site. 3. Refer to legend for all symbol and code keys. 4. Read in conjunction with the specifications 5. Read in conjunction with all Civil, and Electrical Engineer drawings and specifications. 6. Read in conjunction with all associated drawings

DR

APPROVED:

K

DATE:

Sleeper stairs

PREPARED FOR:

P

-0.55 -0.13

>

30 0 75 Ø P A V

8 3.927 3.87.35 3.8 3.753 4 6 7.3 .83 37.8.437.3 7.38 3 4 .3 7 1 3.50 7.41 .4 0 7 7.4 .42 7.32 7 7.37 7.24 7.51 7.325 7.5 7.584 7.64 7.6 7.75 7.75 7.59 7.45 7.30

7.72 7.87 9 7.88 7.7 7.82 8.00 7.87 7.86 8.00 7.84 5 7.9 .95 7 7.90 7.98 7.99 7.96 7.98 7 7.89 7.98 7.9 7.92 8.00

-0.02 > >

>

0.97

P

W

>

4.16

RE

0

>

0.97

4.25

P

7.5

CK

>

1.29 1.29

4.34 4.35 4.31 4.35

/

DRAWN:

D

7.91 7.86

7.44 2 7.4 9 7.57 7.5 9 7.5.7 2 7 2 .7 3 7 .0 1 8 .17 .78 8.2 7 9 0 7.61 8.1 7.80 .76 7.62 8 9.422 77.8.93 7 7.65 7.9 7.81

/

Y RA

APPROVED:

8.07

TO

SP

Mini mesh ramp /

AMENDMENT

0.00

K

/

UE

0

7.88 7.93

7.12

TH PA

/

NE

BL

LI

8.0

8.13

8.06 6.62

DATE:

W

RE

DESIGNED:

8.02

4.36 4.33

>

0.75

4.55

4.12

P

0

0.64

0.72

-0.53

-0.01

0.22

Handrail

0.56

0.65

4.39

4.33

7.02

TO

/

W

7.94

NT

5.81

5.97

5.59

>

ISSUE

>

/

7.0

7.861 8.0

CE

>

5.65

W

9.62

/

Insitu concrete wall

5.61

8.10 EOT

8.15

5.80

5.69

Y RA

DP

SP

5.79

EOT 5.92 5.89

8.09

>

4.88 2.100 2.1

4.62 4.62

D

8.06

NK

>

5.70

8.14

5.96

/

5.69

D

7.952 7.8

PI

>

5.73

6.95

7.83

8.13

TH PA /

C

>

8.15

B

8.16

57083 0 7 94

7.84

/

5.86

6.73

8.09

/

> 5.73

7.84

/

5.80

6.05 5.86

8.08

/

>

5.89

6.01 6.00

6.04

8.08

8.10

W

6 4.6.6 .76 1 0 4.70 4 .66 1.60 4.52 4 4.63 4.58 4.46 4.58

4.67

RO

>

3.72

6.85 6.85

6.75

8.11

M

>

>

6.83

6.91 6.87

6.50

8.11

8.14

6.08

>

.01 > 6

D

/

W

8.06 3 .21 8.0 9.12 8 8.19 8.01 8.188.19 8.03 8 8.18 8.10 1 8.2 8.18 88.0.18 8.19 8.18 8.03

H

8.05

/

C

6.26

RED SPRAY

TH PA

/

8.15

K

8.09

RA Y

4.66 4.67 4.62

Existing retaining wall shortened and returned under entrance slab 6.31

SP

0.06 >

>

4.58 4.47 4.27 4.46

5.145.27 4.992 5.2 5.40 5.2 2 0 5.39 7.9 95.14 25.04 5.56 5.40 5.0 5.1 5.51 4.88 1 4.88 5.064.9 5.80 5.98 6.07 4.74 6.11 9 4.6 4.67 6.27 7 .2 6.41 6.10 6 4.61 6.37 2 .5 6 3 .3 6

/

8.16

S

/

6.03

5.96

/

8.16

6.32

OW

0.11

0.39

4.98 4.99

6.52

0

8.17

/

> 5.84

L

W

8.0

8.22 8.08

P

9.33

Y RA

8.19

6.37 9 6.3 .272 8.14 8 66.3 6.3 0 8.14 6.4 8.15 .40 6 5 .1 8 6.28 8.14 6.46 8.14 6.46 6.32 5 8.15 .1 8 6.45 .32 6 .30 6 8 6.44 8.14 8 .1 6.36 6.51 8.10 6.54 8.13 8.13 6.55 8.07 6.39 8.11

LL

>

0.27

4.76 YE

>

>

Corten blade balustrade

P

On grade access

4 10.5 3 10.2

SP

6.24 2 6.20 6.9 .27 6 6.93 6.10 6.87 0 .7 5 .14 6 6.24 4 6.17 6.8

SP

.253 66.3

UE

TO K

/

4.56

8.01

2.71 8 3.1.1 3 85.21 2.15 5.26 5.137.09 2.15 5.21 3.09 5 5.26 .17 5.0 5 5.19 .01 8 6 5 5.1 3 5.05.05 4.9 5 4.9 4.94 5.03 0 4.8 4.88

4 5.49 3.5 5.37

5.92

/

K

0.43

0.56

4.57 OW

-0.49 > 0.09

-0.20

0.10

0.12 >

Garden bed

6.00

8.08

8.07 8.07 9.34 6 7.90 8.0.0 6 7.90 8 / 5 8.0708.0.06 7.91 .9 8 7 2 7 7.9 8.0 8.060 7.9 7.90 7.92

D

LL

4.5.500 4 RA 5.61 Y 5.49 5.37 8 5.61 5.44 5.3 5.49 5.45 4 .4 5 9 5.52 .6 8 5.62 5 5.4 5.20 5.31 .69 5 0 .6 5 2 5 .7 .5 5 2 5 .38 5.41 .7 5 5 8 5.6 6 5.6.5 5 1 5.48 1 5.75.555.69

2 7.9.9 7 2 8.12 2 .1 8

/

RAY PINK SP

8.18

8.22 9 8.0

YE

6.15

/

K

A RI O CT VI

/ 8.19

5.79

P

/

BL

/

8.22

4.75 4.74

A 5.82

7.93

8.07

8.2.009 8.22 8 8.20

DP

7.93

8.11

3.60

3.70

>

O

/

TO

5.44

58083 0 7 94

W

Ramp entry point

8.11

3.91

>

CK

/

8.17

8.14 8.145 8.26 8.2

6.03

C UT

8.01

8.04 9.24 1 8.1

8.01 5.78

8.05

3.46

3.62

RO

7.95

Garden bed

8.24

8.21 .62 / 99.54

5.65

6.407.95 5.75

5.50

/

3.50

>

/

8.04

8.10 0 8.02 0 8.1 8.10 8.0 8.00

8.11

7.94

7.80

8.04

8.16

-0.35

6.00

S

8.27

50

0.97

5.66

/

W

9.36

3.19

>

8.17 8.18

8.09

8.27

3.15 8.20 3.18 3.05 3.22 3.11 3.28 3.70 3.54 3.65 3.48 3.38 3.24

4.39

8.19

7.14

7.94

Y RA

/

>

H

8.14

8.31

8.28 8.28 8 8.2 8.28 8.27

-0.49

Mini mesh ramp access

5.50

6.03

5.46

SP

8.42 8.32 4 8.3

.33

3.37

3.24

8.25

8.19

9.68 8.23 .23 8 8.23

8.20 8.20

8.22

PA TH

/

4.74 4.684.11 4.74 4.14 6 3.5 3.97

/

UE

8.26 8

0.

2.42

BL

8.21

30 5.91

8.62

8.32

8.43

Existing ground level

Concrete path on grade

4.69

8.32

8.22

ND

4.76

8.32 8.31 8.33

8.54

8.20

6.57 8.16

PA T S H

K

Insitu concrete hob wall

0.91

Concrete support column

• Walls are stepped to accommodate for the slope Insitu concrete retaining wall

-0.49

0

8.1/7 8.16

RA Y

BO

>

9 8.51 88.4.53 8.50 8.65

1.00

8.54

-0.03

>

7.49

Mini mesh ramp access SP

0.50

UE

>

BL

-0.34

SA

4.05

Balustrade

• Site bordered by low solid & permeable walls sitting in front of low planting not reaching above 2m

-0.03

0.0

2 8.40 8.5 8.422 .4 8.40 8

EOT9 8.2

>

K TO

AY

8.44

8.34

8.17 7 8.1 7 8.1

0.07

0.10> 0.17

2.33

4.73

5.00

6.14

6.96

Lawn area

R

CH

8.34

4.79

3.88

>

R

/

4.50

5.94

/

8.20

ER

>

6.07

7.71

SP

8.26

8.22

B

3.46

7.93

/

4.00

>

0.24>

0.22

Insitu concrete retaining wall

0.67

W

D

6.83

ORIGINAL CHARACTER Flush access between lawn and lookout • Residential street frontage

0.28

0.96

>

0.11

0.36

3.31

3.94

3.50

2.33

2.65

1.73

3.45

O

23

8.19 8.19 8.19 8.19 8.200 8.20 .2 8.19 8 1 8.2 .19 8 8.21

2.75

3.96

2.07

>

Mini mesh lookout blister

-0.25

0.11 >

0.34

1.08

SECTION A

-0.19

-0.08 0.2>9

0.37

1.12

3.78

LL

8.22

1.05

3.00

T

0.97

YE

8.19

N VE

>

> >

>

1.16

/

8.19

2.39

2.50

1.13

>

8.32

1.91

2.00

1.12

0.26

-0.15

0.37 >

0.53

1.12 1.20

1.77 > 3.46

1.56

7.39

8.16

1.50

0.55

0.96

-0.03

0.07

0.51

>

>

8.27

1.49

0.09>

> 1.10

>

0

1.59 1.19

P

1.97 5 1.58 1.8 1.33

2.85

1.21

>

8 .0

1.42

1.47

7.60

0.84

>

1.19

0.19

0.23 0.23 > 1.21 0.66 > 0.86

3.70

2.56

1.00

0.17

>

0

>

3.54

2.52

-0.12 -0.01

>

7 .5

3.97

0

1.88

O

2.28

>

7 .0

>

A

2.18

>

7.99

>

Bush Regeneration/ / with /stabilised embankment

0.53

>

50

0

>

>

8.

1.02

0.60

0 2.0 .50 0 2 3.0 0 3.5 4.00

/

0

>

6 .5

>

6 .0

9.15 8.72

AM

0.71

-0.28

.07 0.95> 00.09

1.42

2.36

1.72

0.74

1.05

1.48 1.37

>

0

0

C

0.03

0.50

0.68

K

U

>

1.00

>

1.33 1.32 > 0 > 1.4

0.47

0.18

0.51

3.95

>

>

> > 1.91

O

TC

-0.

0.03

P

>

5 .0

>

>

5 .5

5.30

8.62

0.02

0.15

0.93

0.42

>

00

Sleeper stair access to water

-0.27

> 0.16

1.50

>

>

1.78

1.29

>

>

>

1.13 1.03 0.71 4.80 >

.67 >1

1.43

0.22

-0.12

>

>

S

.21 0.18 0

>

9.

>

1.10.50 1 .0 1 .5 0 0 .99 > .37 > 1 0 1 .8 > 1 > > > 3.91 > 4 .5 > 0

>

>

> 8.66 5 8.4 .64 8

8.63

0.85

-0.31

1.51

1.66

>

-0.34

>

1.15.06> 1.06 1

> 0.79

4>.44

>

-0.38 0.00

0.06

D AN

0.21 >

1.49

RO

C Bush RO Regeneration/ with stabilised RO embankment CK O UT Mini mesh lookout blister CR with intrepretive signage 0.03

>

-0.32 0.10

>

-0.08

-0.25

> .29 -0 > 5 0.9 0.10

0.00

-0.37

>

>

0.24 >

1.1

0.99

0.54

> -0.29 -0.0>7 9 -0.29 0.1 -0.11

>

1:14 Concrete path with handrails -0.32

> 0.23

> 0.26

-0.02

-0.18 5 .2 > 0

>

-0.35

0.14

>

Balustrade

-0.52

-0.19

0.15

>

-0.45 0.39 -0.28 1 -0.5 -0.20

-0.30

0.30

>

-0.45

-0.28

-0.23

>

CK

C

0.08

-0.30

-0.28

>

O

UT

P

-0.33

>

RO

.18

>>

OPTION B

NE

RO

-0.26 >

-0.26

2.02

DP

1 20

4

DATE

DEC 2021

DRAWING TITLE

HOWLEY POINT

SCALE

ISSUE

1:100 @ A1 1:200 @ A3

N

DRAWING NO.

EP-LD-G02

/ /


>

>

>

>

>

>

> > >

>

>

>

0

0.0

>

>

>

>

> >

>

>

>

>

>

>

>

>

>

4.16 .21 .444 1 11.4 4.05 5 4.05 1.3 3.95 3.85 3.953.85 3.835.85 3.73 5 3.8 3.82

>

W

CK

-0.42

-0.00

>

3.75 1.29 3.57 3.45 3.57 3.35 3.45 3.24.21 1 1 3.35 0.48 1.2 0.46 3.26 0.38 3.24 3.14 0.92 3.08 3.08 2 5 2.93 1.621.54 0.3 3.14 3 1 .02 0.40 1.812.73 0.56 0.4 4 2 .1 .2 1 3 3 2 2 .9 .3 .4 .5 2 0.503 2 2 0.83 2 2.93 2.11 2.63 1.091.09 0 7 .6 7 3 1 .3 1 .3 .3 2 .2 2 .8 0 0 20 1 3 3 2.72.88 1.72 .63 2.53 2.53 2.03 2 22.4.31 0 22 4 3 2.11 2 .8 .3 4 .4 .5 .2 1 2 1 .9 2 4 0 2 4 7 .82 .73 2.7 2.3 3 .03 1 2.0821.9 2.63 2.63 .53 1 1 1.69 1.721.6 1.5 1.62 2.132.2 2.1 2 2 .9 1.8 2.452.31 2.30 2.71 2.71 .841 1.91 2.00 1 2.36 2.16 2.72 2.72 2.372.53 2.74

C

P

W

C

W

W

0.02 1.521.43 1.42

1.43 1.52 1.40

0.12

-0.29 -0.10

1.41 1.41

1.43

00

D

Access to Marina Step slope 1.58

2.

50

7.28 3.06 6.09

2.48

F

7.85 9.14 4.70 7.74 7.83 4 7.8

7.66

RO

>

>

0 3 .5

0 4 .0

0.38

3.75

3.46

5 7.7.8 5 7 .1 6 5 7.75 7.85 7.77

S

-0.65

>

>

4.25 1.21

>

0

>

Y RA

3.80

-0.00

0.31

7.85 7.80 7.95

DR

4.71 2.62 4.74 4.74 7.856 7.9

7.87 7.89 7.90 7.85 7.90

F

2.32 3.55

7.95 3 2.7 7.93 8.06 8.06 7.95 2.19 7.90

7.75

IV

AY W E 0

0

AY

SPR

5 .0

RED

4 .5

1.06

4.46

Concrete landing with interpretive signage

2.0

>

>

TOK

>

3.

>

>

> >

>

> AY PR KS P IN

>

RA Y SP NK PI

>

TO K

>

>

BOK

>

>

>

0.02

0.29

-0.57

0.05

>

>>

> >

>

>

>0.08

>

SP

-0.69

>

>

>

AY

>

0

D

-0.64 -0.19

Concrete ramp access to beach

1.86

2.13

DRAWING TITLE 8.014 8.0

8.04

HOWLEY POINT

23

1

2.26 2.18

7.94

R

>

0

0.03

0

>

0.5

W PROJECT: SP

-0.33

1 .0

>

>

DATE

>

>

DRAWN

0.00

VC

ED

0 .0

>

30 0 75 Ø P A V

TH PA

AMENDMENT

>

0

R

PREPARED BY:

>

>

4.58

P

7.93 7.92

> >

>

0.97

7.81

Level 3 suite 3.01 22-36 Mountain street Ultimo 2007 Ph: (02) 9555 1033 Fax: (02) 98185292 Email: admin@epnsw.com.au ABN 53 088 175 437

/

ISSUE

>

>

APPROVED:

7.72 7.87 9 7.88 7.7 7.82 8.00 7.87 7.86 8.00 7.84 5 7.9 .95 7 7.90 7.98 7.99 7.96 7.98 7 7.89 7.98 7.9 7.92 8.00

W

-0.55 -0.13

>

1.29 1.29

8 3.927 3.87.35 3.8 3.753 4 6 7.3 .83 37.8.437.3 7.38 3 4 .3 7 1 3.50 7.41 .4 0 7 7.4 .42 7.32 7 7.37 7.24 7.51 7.325 7.5 7.584 7.64 7.6 7.75 7.75 7.59 7.45 7.30 0

-0.02 > >

4.16

RE

AY EW

DATE:

>

0.97

4.25

P

7.5

>

0.75

P

IV

CHECKED:

GENERAL NOTES 1. Do not scale off drawings. Follow written dimensions. If in doubt obtain written advice from the Superintendent. 2. Verify all dimensions on site. 3. Refer to legend for all symbol and code keys. 4. Read in conjunction with the specifications 5. Read in conjunction with all Civil, and Electrical Engineer drawings and specifications. 6. Read in conjunction with all associated drawings

7.12

>

CK

0.64

0.72

4.34 4.35 4.31 4.35

4.12

-0.53

-0.01

0.22

0.56

0.65

4.55

DR

APPROVED:

K

Y RA

DATE:

7.02

RO

>

3.72

7.44 2 7.4 9 7.57 7.5 9 7.5.7 2 7 2 .7 3 7 .0 1 8 .17 .78 8.2 7 9 0 7.61 8.1 7.80 .76 7.62 8 9.422 77.8.93 7 7.65 7.9 7.81

P

>

>

>

4.88 2.100 2.1

/

DRAWN:

8.07

PREPARED FOR:

W

4.39

4.33

0.06 >

>

4.62 4.62

4.36 4.33

0.11

0.39

6.83

P

0

/

W

TO

SP

/

>

5.59

D

7.91 7.86

4.67

>

0.27

6 4.6.6 .76 1 0 4.70 4 .66 1.60 4.52 4 4.63 4.58 4.46 4.58

D

/

8.02

UE

7.88 7.93

APPROVED:

1.00

/

NE

6.62

DATE:

0

8.06

M

>

>

Corten blade balustrade

4.58 4.47 4.27 4.46

8.06

BL

LI

DESIGNED:

5.97

8.0

8.13

RA Y

4.66 4.67 4.62

TH PA

W

RE

W Existing ground level

5.80

SP

K

7.0

7.94

NT

9.62

5.81

8.09

8.10 EOT

8.15

OW

TO

/

6.95

7.861 8.0

CE

EOT 5.92 5.89

5.69

Y RA

5.65

DP

8.14

5.96

/

>

5.61

5.79

SP

>

5.70

6.73

7.83

8.13

/

5.69

D

7.952 7.8

NK

>

5.73

8.15

TH PA /

C

>

57083 0 7 94

7.84

/

5.86

8.08 7.84

PI

> 5.73

Insitu concrete retaining wall

Mini mesh ramp 8.16

LL

6.85 6.85

8.09

B

YE

6.91 6.87

6.75

8.11

8.10

/

5.80

6.05

5.86

Handrail Corten blade screen

8.14

0.43

-0.49 > 0.09

-0.20

0.10

0.12 >

P

6.50

8.08

/

>

5.89

6.01 6.00

6.04

6.26

8.11

/

.01 > 6

P

6.08

8.05

/

>

5.79

/

W

H

Existing ground level

-0.35

5.145.27 4.992 5.2 5.40 5.2 2 0 5.39 7.9 95.14 25.04 5.56 5.40 5.0 5.1 5.51 4.88 1 4.88 5.064.9 5.80 5.98 6.07 4.74 6.11 9 4.6 4.67 6.27 7 .2 6.41 6.10 6 4.61 6.37 2 .5 6 3 .3 6

RED SPRAY

/

C

Garden bed 5.96

D

6.31

TH PA

> 5.84

8.15

6.32

Insitu concrete retaining wall

• Walls are stepped to accommodate for the slope

-0.49

4.98 4.99

/

8.16

K

8.06 3 .21 8.0 9.12 8 8.19 8.01 8.188.19 8.03 8 8.18 8.10 1 8.2 8.18 88.0.18 8.19 8.18 8.03

• Site bordered by low solid & permeable walls sitting in front of low planting not reaching above 2m

-0.34

4.76

/

6.03

S

/

5.82

/

8.17 8.16

SP

Balustrade

Mini mesh ramp access

6.52

0

8.22 8.08

8.09

>

0.24>

0.22

50

Existing retaining wall shortened and returned

W

8.0

8.19

/

A

6.24 2 6.20 6.9 .27 6 6.93 6.10 6.87 0 .7 5 .14 6 6.24 4 6.17 6.8

Y RA

TO K

6.37 9 6.3 .272 8.14 8 66.3 6.3 0 8.14 6.4 8.15 .40 6 5 .1 8 6.28 8.14 6.46 8.14 6.46 6.32 5 8.15 .1 8 6.45 .32 6 .30 6 8 6.44 8.14 8 .1 6.36 6.51 8.10 6.54 8.13 8.13 6.55 8.07 6.39 8.11

P

9.33

L

SP

4.56

0.

2.71 8 3.1.1 3 85.21 2.15 5.26 5.137.09 2.15 5.21 3.09 5 5.26 .17 5.0 5 5.19 .01 8 6 5 5.1 3 5.05.05 4.9 5 4.9 4.94 5.03 0 4.8 4.88

4 5.49 3.5 5.37

On grade access

4 10.5 3 10.2

UE

8.18

RAY PINK SP

8.19

/

>

A RI O CT VI

/ 8.22

4.75 4.74

0.34

0.56

4.57 OW

.253 66.3

BL

/

8.11

0.28

0.96

5.92

/

K

8.01

8.07

8.2.009 8.22 8 8.20

3.46

>

8.05

6.00

8.08

8.07 8.07 9.34 6 7.90 8.0.0 6 7.90 8 / 5 8.0708.0.06 7.91 .9 8 7 2 7 7.9 8.0 8.060 7.9 7.90 7.92

D

>

-0.03

Garden bed

2 7.9.9 7 2 8.12 2 .1 8

/

LL

4.5.500 4 RA 5.61 Y 5.49 5.37 8 5.61 5.44 5.3 5.49 5.45 4 .4 5 9 5.52 .6 8 5.62 5 5.4 5.20 5.31 .69 5 0 .6 5 2 5 .7 .5 5 2 5 .38 5.41 .7 5 5 8 5.6 6 5.6.5 5 1 5.48 1 5.75.555.69

6.15

/

K

8.11

3.60

3.70

7.93

SECTION B

8.22 9 8.0

0.50

8.14 8.145 8.26 8.2

8.04

TO

DP

7.93

/

Ramp entry point

8.24

3.91

>

8.17

8.16

6.03

O

/

ORIGINAL CHARACTER Flush access between lawn and lookout • Residential street frontage

-0.25

0.11

0.0

S

8.27

B

6.00

9.36

8.21 .62 / 99.54

3.62

CK

W

YE

Mini mesh lookout blister

Insitu concrete retaining wall

5.50

8.27

/

3.50

C UT

/

5.44

58083 0 7 94

8.01 5.78

/

W

RO

8.01

8.04 9.24 1 8.1

Y RA

8.28 8.28 8 8.2 8.28 8.27

3.19

>

7.95

SP

8.31

3.15 8.20 3.18 3.05 3.22 3.11 3.28 3.70 3.54 3.65 3.48 3.38 3.24

>

/

8.04

8.10 0 8.02 0 8.1 8.10 8.0 8.00

8.11

7.94

7.80

SECTION A

-0.19

-0.08 0.2>9

0.37

0.97

5.66

5.65

6.407.95 5.75

UE

/

3.37

4.39

8.17 8.18

8.09

7.14

> >

-0.03

>

5.50

BL

8.42 8.32 4 8.3

.33

>

H

8.22

PA TH

/

3.24

8.19

8.32

8.43

8.26 8

4.74 4.684.11 4.74 4.14 6 3.5 3.97

8.14

7.94

0.37 >

-0.49

0.91

4.05

6.03

8.32

8.22

8.21

30 5.91

8.25

8.19

9.68 8.23 .23 8 8.23

8.32 8.31 8.33

8.54

8.20

K

0.07

0.10> 0.17

2.42

5.46

-0.03

0.07

>

BO

>

9 8.51 88.4.53 8.50 8.65

>

8.54

>

SA Handrail

4.73

/

8.20 8.20

>

1.08

>

2.33

4.69

PA T S H

RA Y

0.97

4.76

8.62

Mini mesh ramp access SP

>

UE

8.16

>

BL

6.57

>

ND

Lawn area

5.00

8.16

0.96

1.13

0.11

7.49 8.1/7

1.12

>

EOT9 8.2

3.88

6.14

6.96

>

2 8.40 8.5 8.422 .4 8.40 8

8.17 7 8.1 7 8.1

4.79

5.94

R

/

4.50

1.19

> 1.10

0.26

0.67

4.00

>

0.09>

0.36

3.31

AY

6.07

1.73

R

K TO

2.65

3.78

3.94

3.50

2.33

>

0.51

1.12

3.45

>

/

8.34

3.00

2.07

3.46

7.71

8.22

8.44

8.34

2.75

3.96

8.20

Garden bed

1.05

T

SP

CH

B

D

N VE

W

23

/

2.39

2.50

CK

>

1.00

0.53

1.12 1.20

1.77 > 3.46

O

8.22

1.16

6.83

7.93 8.26

1.91

2.00

0.55

1.97 5 1.58 1.8 1.33

3.70

LL

8.19

8.19 8.19 8.19 8.19 8.200 8.20 .2 8.19 8 1 8.2 .19 8 8.21

1.50

0.17

YE

8.19

1.49

RO

U

0.19

0.23 0.23 > 1.21 0.66 > 0.86

2.85

1.56

7.39

8.16

1.59 1.19

>

8.32

1.42

1.47

>

2.28

3.54

2.52

-0.12 -0.01

-0.15

.07 0.95> 00.09

1.42

2.56 1.21

>

0

8.27

>

>

8 .0

>

7.60

0.53

>

3.97

0

0.84

-0.28

>

2.18

1.88

1.00

O

TC

-0.

0.03

P

>

>

0

1.02

0.60

0 2.0 .50 0 2 3.0 0 3.5 4.00

7 .0 7 .5

0

Bush Regeneration/ / with stabilised / embankment

7.99

50

0

>

8.

/

AM

1.05

1.48 1.37

1.72

0.74

0.71

0.42

RO

>

0

>

2.36

> 1.91

0.50

0.68

C

0.03

>

6 .5

/

ER

0.15

>

>

0.47

0.18

0.51

1.33 1.32 > 0 > 1.4

0

6 .0

9.15 8.72

8.62

0.02

3.95

0.93

1.50

>

>

1.78

1.29

>

-0.27

> 0.16

>

5 .5

5.30

5 .0

.67 >1

1.43

-0.12

>

00

Sleeper stair access to water

1.51

1.66

0.22

>

>

9.

1.13 1.03 0.71 4.80 >

S

.21 0.18 0

>

8.63

>

>

>

> 8.66 5 8.4 .64 8

>

1.10.50 1 .0 1 .5 0 0 .99 > .37 > 1 0 1 .8 > 1 > > > 3.91 > 4 .5 > 0

4>.44

>

0.85

-0.31

1.49

>

-0.34

>

1.15.06> 1.06 1

> 0.79

>

Concrete path on grade

-0.38 0.00

>

-0.08

-0.25

> .29 -0 > 5 0.9 0.10

D AN

0.21 >

0.03

>

-0.32 0.10

0.06

0.24 >

> 0.26

-0.02

0.00

-0.37

>

>

>

-0.32

> -0.29 -0.0>7 9 -0.29 0.1 -0.11 >

-0.35

0.14

>

Insitu concrete retaining wall

> 0.23

1.1

0.99

0.54

Bush Regeneration/ R Mini mesh lookout blister with stabilised OC K O embankment UT with interpretive signage C AROP Balustrade

0.15

>

-0.45 0.39 -0.28 1 -0.5 -0.20

-0.19

-0.18 5 .2 > 0

>

-0.52

-0.30

0.30

>

-0.45

-0.28

-0.23

>

CK

C

0.08

-0.30

-0.28

>

O

UT

P

-0.33

>

RO

.18

>>

OPTION C

NE

RO

-0.26 >

-0.26

2.02

DP

1 20

4

DATE

DEC 2021

DRAWING TITLE

HOWLEY POINT

SCALE

ISSUE

1:100 @ A1 1:200 @ A3

N

DRAWING NO.

EP-LD-G02

/ /


OPTION D

Bush Regeneration/ with stabilised embankment Informal stair access to water

Lawn area 1:14 Concrete path with handrails

Bush Regeneration/ with stabilised embankment

Corten blade screen

Sandstone retaining wall below path to support and retain eroded embankment Garden bed Habitat tree retained Entry point

Balustrade Mini mesh ramp access

Sandstone log wall

Mini mesh lookout blister with interpretive signage

Concrete ramp access

HOWLEY POINT

Access to Marina


OPTION E Corten blade balustrade

Bush Regeneration/ with stabilised embankment Informal stair access to water Lawn area

1:14 Concrete path with handrails Corten blade screen

Bush Regeneration/ with stabilised embankment

Step slope Sandstone retaining wall below path to support and retain eroded embankment Habitat tree retained

Garden bed Balustrade Corten blade balustrade

Mini mesh ramp access

Entry point

Sandstone log wall

Mini mesh lookout blister with interpretive signage

Concrete ramp access

HOWLEY POINT

Access to Marina


OPTION F Bush Regeneration/ with stabilised embankment Corten blade balustrade

Informal stair access to water

Bush Regeneration/ with stabilised embankment

1:20 Concrete path with balustrade

Step slope Lawn area Entry point

Corten blade screen

Sandstone retaining wall below path to support and retain eroded embankment Garden bed

Habitat tree retained

Retaining wall Corten blade balustrade Corten blade balustrade

1:14 Concrete path with handrails Garden bed

1:14 Mini mesh ramp accesswith handrails

Sandstone log wall Mini mesh lookout blister with interpretive signage

Concrete ramp access

HOWLEY POINT

Access to Marina


HOWLEY PARK EAST SKETCH UPDATE HOWLEY POINT


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.