
1 minute read
Water Projects
. North Suffolk Connector
City Council Goal – Transportation
The project will provide for a new two-lane roadway alignment connecting Nansemond Parkway to Shoulders Hill Road using local funding.
FY 23 FY 24 FY 25 FY 26 FY 27 FY 28-32 Total $0 $0 $0 $750,000 $0 $0 $750,000 Operating Costs: The project will not have an operational impact on the City.

Carolina Road Connector
City Council Goal – Transportation
The project will provide for a Carolina Road connector study using local funding.
FY 23 FY 24 FY 25 FY 26 FY 27 FY 28-32 Total $0 $0 $0 $300,000 $0 $0 $300,000
Operating Costs: The project will not have an operational impact on the City.

. Route 460 Improvements
City Council Goal – Transportation
The project will provide for road widening, median construction, sidewalks, and a closed drainage system from Kings Fork Road to the Bypass using state and local funding.
FY 23 FY 24 FY 25 FY 26 FY 27 FY 28-32 Total $0 $0 $0 $900,000 $15,000,000 $0 $15,900,000
Operating Costs: The project will not have an operational impact on the City.

Kings Highway Bridge
City Council Goal – Transportation
The project will provide for design and preliminary engineering of a bridge over the Nansemond River between Chuckatuck and Driver.
FY 23 FY 24 FY 25 FY 26 FY 27 FY 28-32 Total $0 $0 $0 $0 $0 $16,000,000 $16,000,000
Operating Costs: The project will not have an operational impact on the City.