CRL Presentation

Page 1

1 1.Stationconstructionupdate 2.Theregenerationofmidtown 3.Streetscapeconstruction 4.Q&A TeWaihorotiuStation/ MidtownCommunityLiaisonGroup 29November2022 MexicanCafé,VictoriaSt
End2021start2022 WeeklyPCRtesting
Hundredsofcases
3 North(belowWyndhamSt) Endof2021
4
North2022
5 VictoriaSt Endof2021
6 VictoriaSt 2022
VictoriaSt2022
8 CentralZone(betweenVictoria&Wellesley) –Endof2021
9 Central2022
10 Central2022 B1&B4levels
11 South(MayoralDrivearea)2021 B4levels
12 South2022 B4&Platform level
13 South2022 Bothtunnels from Karangahape &MtEden complete
14 South2021 WellesleyBuilding
15
South2022 WellesleyBuilding
17 •CovidrestrictionsandworkingthroughmultipleOmicronwaves
WatermaindiversioncompleteVictoria
ExcavationcompleteinDecember
3100m2blockworkcomplete-45%
EntrancestructurescompleteatVictoria
Back-of-houseandfront-of-housefitoutworkscommenced
CrownePlazaairbridgeaccessreinstated
RunningTunnelcompleteinDecember •TBMbreakthrough
WellesleyStbuildingcomplete,façadepanelsandblockworkcompletebyChristmas 2022constructionmilestoneachievements
•24,000m3ofconcretepouredfor2022(520m3/week) •6000tofreinforcing(130t/week) •94,000m3ofexcavation(2000m3/week) •

REGENERATING AUCKLAND’S MIDTOWN

ShaunSutton,LinkAlliance OliverSmith,AucklandCouncil

PROJECTSIN MIDTOWN

Te Waihorotiu Station Te Ha Noa Victoria Street
UNDERWAYINMIDTOWN •Majorstreetscapeupgradesare comingtomidtown •IncludeslandaboveTeWaihorotiu Station,andsurroundingstreets •Additionalscopeforutilityprovider upgrades(e.g.Watercare,Vector) •EnablingworksbeginDecember2022 •InitialfocusonVictoriaStreet •Overallprogrammeofseveralyears

VICTORIASTREET

TEHĀNOAVICTORIASTREET

Streetscapedesign–engagementprocess

•LinkAlliance’sUrbanDesignDeliveryWorkPlan (DWP)hasbeendevelopedfollowingconsultation, including: Manawhenua(CRLprojectpartners) CommunityLiaisonGroup Engagementwithlandownersandbusinesses AucklandCouncilandAucklandTransport CapitalProjectAccessibilityGroup HeartoftheCityandtheCityCentreResidents Group •TheUrbanDesignDWPisalsosubjecttoreview andcommentbythe: AucklandUrbanDesignPanel(UDP)and AnIndependentPeerReviewer

Indicativeonly Indicativefor construction

Indicativefor construction

Indicativefor construction

TEHĀNOA–VICTORIASTREET QueentoKitchener Fromearly2024 NearElliotttoQueen Early2023–early2024 FederaltonearElliott Underway

Tawāpou

Indicativeonly
QUESTIONS Wecommittoregularupdatesand sharingasmuchinformationas possible.Ifyouwouldliketoreceive regularconstructionupdatesfor midtownpleaseemailusat midtown@aucklandcouncil.govt.nz aotea@linkalliance.co.nz
PatrickGibbs–ProjectEngineer CarlHewitson-Townley–EngineeringManager NicoleBorland–DevelopmentResponseManager Streetscapeconstruction overview Contactus:aotea@linkalliance.co.nz 0800CRLTALK(selectoption3)
WellesleyStreetentrancebuilding VictoriaStreetwesternentrance VictoriaStreeteasternentrance

•VectorenablingworksDec2022/Jan2023

•earlyworksQ12023

•firstpaverlaidQ22023

•aimtore-openVictoriaSttotrafficbyend2023

Indicativeprogrammeofworks2023-2024
2023 VictoriaStreet
KingstonStreetabove-groundventilationstructureandstreetscapeearlyworks Bluestonewallreconstruction 2023-2024(detailtbc) AlbertSt,fromVictoriatoWyndhamSt AlbertSt,fromVictoriatoWellesleySt WellesleyStreetinconjunctionwithWellesleyStBusImprovementsProject Currentconstraints -Contractorappointment -Resourceavailability -Utilitiesprovidercoordination -‘Digonce’approachedispreferred -Completingundergroundandabove-groundworks UsualConstructionWorkingHours Monday–Saturday–7am-7pm Nightworksandearlymorningworkswillberequiredatcertaintimes–workwithlocal businessesaroundshopopeninghoursandresidentaccess.
•phaseoneofconstructionworksinconjunctionwithTeHāNoaVictoriaStProject

Expectedmethodologyofworks

Constructionmitigations Someconstructionimpactsareunavoidable,butweworkto minimisetheseby: •Supportingsafety/security/amenityinthearea •Noise,vibration,anddustmitigations •Loadingzoneenforcement–workingwithAT •Walkways,hoardings,andcommunityplacemaking •Parkingandpropertyaccess •Trafficmanagement •Pedestrianaccess •Interfacewithotherconstruction&developmentprojects •Keepingyouupdatedonprogress

Supportforbusinesses,residents,andvisitors

Nextsteps andfeedback •CLG-29November2022–from4pm-5pm •Drop-inatTePukakion: •1December12pm-2pm •6December11am–1pm •1:1meetingsavailable(pleasecontactus) •Wewillvisitbusinessowners/buildingmanagerswithbrochure packsandfreecoffeevoucherscareofSierraCafeAlbertSt •Contactus:aotea@linkalliance.co.nz •0800CRLTALK(selectoption3)
Tellusyour ideas! •SpecialdealsforLinkAllianceworkers •Webuygiftvoucherswherepossible •Cateringopportunities •Supportingeventswithinyourbusiness •Giftideas •Otheractivations •Internalnewsletter–opportunityforbusiness profileeachmonththatgoesouttoourdatabase •Wegototheworkerstoolboxestosharewhatison offeraroundtheconstructionsite