Clarence Valley Council
Operational Plan and Budget 2023/2024
Enquiries Published by Clarence Valley Council 2 Prince Street Grafton Phone 02 6643 0200 council@clarence.nsw.gov.au www.clarence.nsw.gov.au © 2023 Clarence Valley Council
Acknowledgment We acknowledge the Bundjalung, Gumbaynggirr and Yaegl people as the Traditional Owners of the land on which we live and work. We honour the First Nations peoples culture and connection to land, sea and community. We pay our respects to their Elders past, present and emerging.
2
Clarence Valley Council
Contents Foreward by the General Manager
4
About The Clarence Valley
6
Who We Are
8
Our Vision and Our Values
12
Our Plan
14
Highlights of 2023/2024
18
How To Read This Plan
28
Operational Plan 2023/2024 by Strategic Theme
30
Capital Works Program
75
Revenue Policy
101
Budget Summary Income Statement
129
2023/2024 Budgeted Service Income Statements
133
Operational Plan
2023/24
3
Foreward The Plan has been publicly exhibited prior to adoption and details the activities and actions that will be delivered or commenced before 30 June 2024. We have allocated responsibilities and budgets for projects, programs and actions, identified what services will be reviewed and included a Capital Works Program valued at $210M and a Statement of Revenue Policy. A Capital Works Program valued at $210M is record breaking for Clarence Valley Council. We’ve previously said our capacity to deliver is much lower. However in the past year, on the back of 2022 flood and storm event, we have
Laura Black Laura Black General Manager
been successful in engaging a reliable team of contractors to increase our capacity and meet the challenge of delivery. While the works are scheduled in the current year program, they will be delivered over two years. In addition, we have identified how the projects, programs and actions link to the Delivery Program and themes of the Community Strategic Plan. On page 28, you will find a guide on how to read the Plan. The bushfire, storm and flood natural disasters
This Operational Plan 2023/2024 (the Plan) is the second in a series of three that aims to meet the strategies developed by the 2021 elected Council, as identified in the 2022/2025 Delivery Program. We are now also in our second year of our journey to meet the standards of the new Integrated Planning and Reporting Framework for Operational Plans, so you’ll see some more changes from last year. To better articulate what actions are achieving, they are now aligned against strategies of the Delivery Program, progress against which is reported every six months.
4
Clarence Valley Council
and health pandemic of the past three years followed by stimulus funding has seen local government in receipt of record grant allocations from the State and Federal Governments, and Clarence Valley Council is one of those recipients. 2023/2024 sees us deliver grant funded projects to a value of $153M on top of the general, water and sewer, holiday park and waste funded activities. The Plan covers both the recurrent activities that occur every year, such as managing corporate governance arrangements, compliance activities
and maintenance programs, as well as special non-recurrent projects, such as delivering particular construction projects. We also aim to engage community in decision-making by facilitating a number of Advisory Committees to the Council, including the Access, Climate Change and Floodplain Risk Management; Coast and Estuary; Sports; Economic Development and Tourism; Biodiversity; Community and Culture; and Aboriginal advisory committees. Over the next 12 months major construction projects will commence, including the Yamba Community Precinct, the Cultural and Community Centre in Maclean and the Regional Aquatic Centre in Grafton. We’ll also continue the highpriority pedestrian footpaths from the Pedestrian and Access Mobility Plan (PAMP), community hall upgrades, and construction of 12 bridges under the Fixing Country Bridgesk program Round 1 having completed 19 of the total of 31 in the prior year. 2023/2024 is the year that residents will start to see significant roads works commencing across the local government area as we deliver the equivalent of 16 years of upgrades and road improvements in two years. At the same time, we will implement an Urban Stormwater Maintenance program funded by the newly implemented Stormwater Management Service Charge. While much of the investigation has commenced, there is still a lot to be completed, but works to unblock and re-establish stormwater channels in urban areas will make a significant difference to ponding in future rain and storm events. Another new initiative that will be welcomed by community is the establishment of our flying squad Town and Beautification team. The team will include new roles at Council and once
established will attend to jack of all trade-type activities to return towns and villages to their shiny best. This year we will continue our senior management community engagement program, making ourselves more accessible for conversations with community, and we will commence a community discussion about water filtration and the cost to community of progressing. We are also this year undertaking the Environmental Impact Assessment required to implement water filtration. Both of these actions will inform the decision to proceed. The celebration of significant dates and achievements is important to us. In 2023/2024, we will celebrate citizenship ceremonies, Youth Week, Seniors Week, NAIDOC and our end-ofyear staff achievement and development day, to name a few. We will host exhibitions and festivals, implement a community engagement program and continue to deliver our new CVC magazine. Underpinning all of this is our continuous improvement program to upgrade our corporate systems to increase our efficiency and make doing business with us easier for customers. Local government is like no other business; it is complex and diverse, and as you can see, we have another huge year ahead of us. A community of opportunity is what we are working towards, and we value the partnerships that we form as we achieve the goals of the Community Strategic Plan. We aim to make a positive difference to those who choose to live, work or visit the Clarence Valley. Have a read of our Plan and see what we have in store to meet the aspirations identified in the Community Strategic Plan for 2023/2024.
Operational Plan
2023/24
5
About the Clarence Located in the Northern Rivers region in NSW, the Clarence Valley covers an area of 10,441 square kilometres and has three major centres, Grafton, Maclean and Yamba.
NSW
Our Population Total population:
54,580
Population by 2041:
64,121
Our People
49 median age 71.4% residents aged over 18 and eligible to vote
6
Our Households
26,069 dwellings
2.3 people per
8.1%
average household
of our population identify as Aboriginal or Torres Strait Islander
8% residents
Clarence Valley Council
born overseas
Our Area
Our Economy
3 towns 60 villages 2,068 kilometres of roads
100 kilometres
$2.62
billion gross regional product in June 2022, growing 7.8% since the previous year
Largest industry (by employment):
Health Care and Social Assistance
of coastline
generating 3,500 jobs in 2021/22
8 rivers 36 beaches
21,721
2,262
22,148
square kilometres of National Parks, State Forest & Reserves
local jobs
employed residents
4,254 local businesses
Source: id profile, 2021 Census, NIEIR
Operational Plan
2023/24
7
Brisbane 300km
Yamba Maclean Grafton
Sydney 600km
8
Clarence Valley Council
Who We Are Clarence Valley Council employs more than 450 staff and is responsible for providing services and facilities to more than 54,000 people
What we provide and manage Roads and bridges
Tourism and economic development
Waste management and recycling
Pet registration and animal control
Lifeguard patrols at our beaches
Street and park trees
Parking strategy and enforcement
Community and cultural facilities and programs
Creeks, beaches and bushland parcels
Strategic and long-term planning
Residential and commercial DAs
Playgrounds and skate facilities
Water and sewer
Events and licensing
Sports facilities and grounds
Community engagement for plans, services and facilities
Biodiversity Management
Aquatic centres and an ocean pool
Cemeteries
Pathways
Operational Plan
2023/24
9
Organisational Structure General Manager Laura Black Executive Support
Internal Audit
Director Works & Civil Jamie Fleeting
Fleet
Director Corporate & Community Alex Moar
Manager Development and Land Use Planning
Manager Strategic Infrastructure
Manager Open Spaces & Facilities
Manager Technical Services
Manager Water/Sewer Operations
Manager Civil Services
Manager Organisational Development
Manager Finance & Systems
Manager Culture, Community & Industry
Manager Environment & Regulatory
Vacant
Peter Birch
Greg Mashiah
Andrew Potter
Devin Simpson
Jess Kennedy
Kate Maginnity
Justin Putze
Scott Lenton
Survey & Design
Facilities
Strategic Water Services
Mechanical/ Electrical
Bridges
People & Culture
Revenue Management
Communications & Industry Engagement
Regulatory Services
Building Services
Project Management Officer
Parks & Reserves
Water & Sewer Operations
Roads Infrastructure Maintenance
Safety & Risk
Strategic Procurement
Library Services
Environmental Services
Development Services
Emergency Management & Resilience
Holiday Parks
Water and Sewer Capital Works
Roads Infrastructure Capital Works
Corporate & Customer Experience
Accounting Services
Regional Gallery/ Cultural Services
Natural Resource Management & Projects
Strategic Planning
Information Technology
Community Engagement
Waste & Sustainability
Road Safety
Property
Coast, Estuary & Floodplain
Corporate Systems
Infrastructure, Assets & Financial Planning
10
Director Environment & Planning Adam Cameron
Clarence Valley Council
Murray Lane
Operational Plan
2023/24
11
Our Vision To make the Clarence Valley a community full of opportunity.
12
Clarence Valley Council
Our Values
We have a safety focused workplace culture to ensure the wellbeing of our staff and the community
We work together as one council towards shared goals and for the greater good of the community
We are inclusive, treat people with courtesy and fairness, and ensure each individual is valued and heard
We behave in a way that is honest, open, and transparent. We will take responsibility for our actions and strive for excellence
We deliver services efficiently, effectively, and in an environmentally and financially sustainable manner
We engage with our staff and community to inform our decision making, and create awareness of our activities
Operational Plan
2023/24
13
Our plan The actions in this Operational Plan are projects and initiatives that Council will undertake in 2023/2024 to achieve the Delivery Program 2022/2025 and the Community Strategic Plan (CSP), The Clarence 2032. The actions are organised within the five themes of the CSP, linked to an objective from the CSP and strategies from the Delivery Program.
Five Strategic Themes Society Creating a place where people are healthy, safe, connected and in harmony with the natural environment to retain and improve the quality of community life.
Infrastructure Maintaining our diverse infrastructure base to serve the needs of the Clarence.
Economy Strengthening and diversifying the region’s economic base in a way that complements the environmental and social values of the Clarence.
Environment Valuing, respecting and actively participating in the care and management of the Clarence’s natural environment for current and future generations.
Leadership Setting the overall direction and long-term goals for the Clarence in accordance with community aspirations.
14
Clarence Valley Council
Integrated Planning and Reporting The Integrated Planning and Reporting (IP&R) framework guides the way local government plans, documents and reports its future strategies. The IP&R Framework begins with the community’s aspirations for a period of least 10 years, considered by each newly elected council and which is underpinned by a suite of integrated plans that set out a vision and objectives and hones down to specific actions to achieve those aspirations. It involves a reporting structure to communicate progress to council and the community as well as a structured timeline for review to ensure the goals and actions are still relevant.
STATE AND REGIONAL PLANS
COMMUNITY STRATEGIC PLAN
COUNCIL OBJECTIVES
Society
Infrastructure
Economy
Environment
Leadership
COUNCIL
DELIVERY PROGRAM
STAFF
STRATEGIES
OPERATIONAL PLAN
4 YEAR
1 YEAR
REPORTING AND ACCOUNTABILITY ANNUAL REPORT/STATE OF OUR CITY REPORT
MINIMUM 6 MONTHLY REPORT ON PERFORMANCE AGAINST DELIVERY PROGRAM
RESOURCING STRATEGY
10 YEAR
COMMUNITY ENGAGEMENT
COMMUNITY ENGAGEMENT
COMMUNITY
COMMUNITY ENGAGEMENT
QUARTERLY BUSINESS REVIEW STATEMENTS
Operational Plan
2023/24
15
Our planning framework Community Engagement Strategy The Community Engagement Strategy is based on social justice principles and details how we engage with our community to prepare the Community Strategic Plan.
Community Strategic Plan ‘The Clarence 2032’ The Community Strategic plan is the overarching document for all plans and policies of the Council. It identifies the community’s aspirations and priorities for the future of the local government area. It creates the vision we are working toward.
Delivery Program The Delivery Program is the key directional document for the term of the elected council. It is developed by a newly elected council and adopted before the end of June in the year following the election. It presents as a statement of commitment to the community by outlining the focus the council intends to contribute toward achieving the long term aspirational goals of the community as identified in the Community Strategic Plan.
16
Clarence Valley Council
Resourcing Strategy Without sufficient resources - money, people and assets, the objectives of the Operational Plan cannot be achieved. The Resourcing Strategy consists of three components:
Long Term Financial Plan A ten year financial plan, often presented as more than one scenario that informs decision making and planning.
Workforce Management Strategy A minimum four year strategy that addresses the human resourcing needs and challenges of the organisation in achieving goals.
Asset Management Strategy A minimum ten year strategy that is supported by Asset Management Plans that details the management and maintenance strategies for assets within the ownership of Council.
Operational Plan Supporting the Delivery Program is an annual Operational Plan prepared by the General Manager and staff. The Operational Plan defines quite specifically how the commitments of the Delivery Program will be achieved by detailing what the organisation will deliver where, how delivery will be resourced, at what cost and who is accountable for action as well as how performance is measured. The Operational Plan is a document of organisational accountability. The Operational Plan is intrinsically linked to staff performance with outcomes reflected in individual workplans. The Clarence Valley Council’s Operational Plan is prepared by the organisation’s leadership team in consultation with coordinators of teams and staff who delivery services and activities. Included in the Operational Plan is the actions planned for 2023/2024 to achieve the strategies in the Delivery Program, the Capital Works Program, Revenue Policy and Budget 2023/2024.
Capital Works Program (CWP) Capital works are projects that upgrade and renew our infrastructure. They include such things as road improvements, resurfacing, intersection upgrades, shared pathways, drainage improvements, new facilities such as community centre, playgrounds, libraries. This year the CWP is more than $210 million. This year the CWP is projected over four years. Capital works can take a number of years to progress from planning to completion.
Revenue Policy As outlined in Section 405 of the Local Government Act 1993, Council presents its Revenue Policy. The revenue Policy ensures fair and equitable levying of rates and charges in order to provide sufficient funding to carry out services for the benefit of all ratepayers of the Clarence Valley Government Area
Budget Council generates income to fund services and assets for the Valley through rates on property, developer contributions, interest on investments, government grants, users charges and business activities. This year Council’s adopted original budget is a deficit of $55,526.
Operational Plan
2023/24
17
You spoke, we listened In August 2022, Council carried out a Customer Satisfaction Survey to better understand key issues, community needs and priorities regarding the services and facilities provided by the Council.
Focus services based on the 2022 Customer Satisfaction Survey results Facilities/Services deemed to be most important to you
Council Resources deemed most important
Maintenance of Roads
Maintenance of Roads
Water Supply
Floodplain & Coastline
Waste & Recycling Sewerage Floodplain & Coastline Management
Maintenance of Bridges
Protection of Natural Environment
Parks, Reserves & Playgrounds
Public Toilets Lifeguards
Management
Protection of Natural Environment
Maintenance of Bridges
Parks, Reserves & Playgrounds
DA Processing Sporting Facilities Economic Development
Public Toilets Footpaths & Cycleways
18
Clarence Valley Council
Facilities/ Services with Lowest Customer Satisfaction Ratings Maintenance of Roads DA Processing Economic Development
Public Toilets Tourism Marketing Floodplain & Coastline Management
Council Pools Footpaths and Cycleways
Online Services i.e. website
Enforcement by Rangers
Highlights for 2023/24
Society n Active Transport Strategy completion n Disability Inclusion Action Plan completion n Reconciliation Action Plan consultation n Deliver a Public Art Program n Review of Alcohol Free Zones and Alcohol Prohibited Area designations
Operational Plan
2023/24
19
Infrastructure Council has been designing and securing grant funds to deliver an additional 400,000 square metres of regional, and local road pavement restoration, at a cost of over $90 million. The 2023/2024 financial year sees the commencement of this program to deliver the equivalent of 16 years of work on our road network in two to three years, with the support of external contractors.
20
Clarence Valley Council
The $210 million capital works program features: $68.2 million
$13.83 million
to emergency restoration and
to demolish Treelands Drive
betterment works for essential public
Community Centre and commence
assets damaged by the February
construction of Yamba Community
2022 floods (and $25 million for
Precinct.
2024/2025). Civil Services Manager Devin Simpson explains the details of program in this video: CLICK ON LINK
$13.6 million to commence construction of the
$38.4 million to other road and bridge
Maclean Cultural and Community Precinct.
infrastructure projects.
Over $5.3 million $38.5 million to water and sewer projects.
in road safety programs with safety works around high pedestrian activity areas in Angourie, Brooms Head, River Street Maclean, Iluka,
$31 million
Minnie Water and Grafton.
to community facility and building projects.
$9 million to open spaces, sports field and
$19.97 million
holiday parks projects. This includes
to the continued replacement of
the creation of a dedicated team
timber bridges.
to undertake Town and Village Beautification Works.
$15 million to Regional Aquatic Centre project.
Operational Plan
2023/24
21
Other infrastructure projects include:
22
Regional Water Supply Agreement approval
Water Filtration financial modelling and consultation
Complete the Environmental Impact Statement for Rushforth Road Water Treatment Plant
Launch of the Fixing Country Bridges mapping project for public access
Concept design for Prince Street Grafton redevelopment
Develop an annual rolling program for Town and Village Beautification Works
Clarence Valley Council
Town and Village Beautification Works A dedicated team will be created to carry out maintenance and renewal works across the Clarence Valley. The annual rolling program will have focus areas each year and include the improvement of amenities and shelters, and the beautification and improvement of town and village entrances. The map below shows the focus areas for 2023/2024. The program will expand to other areas in the Clarence Valley moving forward.
Infrastructure Repairs and Maintenance Weed Spraying
Waste Removal
Plumbing
Repaint
Pressure Cleaning
Operational Plan
2023/24
23
Drainage improvement program This year sees the introduction of a Stormwater Management Charge that will be applied to our urban residential and business category properties. The charge will be applied annually and the income generated from this charge will be used to fund an ongoing dedicated drainage improvement program in our urban villages and towns including:
24
Grafton
Wooli
Maclean
Diggers Camp
Yamba
Sandon River
Illarwill
Tucabia
South Grafton
Harwood
Junction Hill
Ulmarra
Townsend
Glenreagh
Iluka
Coutts Crossing
Woombah
Lawrence
Minnie Water
Copmanhurst
Wooloweyah
Clarence Valley Council
This program will include activities such as:
General drainage maintenance
Clearing blocked pipes
CCTV pipe investigations
Open/Swale drain maintenance
Renewal/upgrade works
Water quality initiatives (eg additional urban street sweeping)
Pump renewal
Environment n Implement the Susan Island Flying Fox Habitat Restoration Program n Prepare Stage 2 and 3 for the Coastal Management and Estuary Management Plans n Deliver a composting tunnel linked to new organics processing contract
Operational Plan
2023/24
25
Economy n Undertake Developer Contributions Reform n Implement a Developer Engagement Program n Finalise Council’s Housing Strategy n Design the Grafton Regional Landfill Gas to Energy Project n Dark Sky Project implementation n Deliver Illuminate project
26
Clarence Valley Council
Leadership n Upgrade Corporate System to cloud technology n Review and launch Council’s Grow Your Own Traineeship Program n Implement an Elected Member Mentor program n Implement an Environment Management System for monitoring incidents n Prepare a Business Case for consideration of an environmental levy n Implement an annual dedicated Urban Stormwater Drainage Management Program n Local Government Candidate Information sessions
Operational Plan
2023/24
27
How to read this plan The planning framework is organised under the five Community Strategic Plan themes and related Delivery Program Strategies
Objectives
Actions
are the community’s long-term priorities and aspirations for the valley.
are the projects and initiatives Council
Strategies are the activities and plans Council has committed to delivering within the 20222026 Council term. Each strategy relates to a CSP long-term objective.
28
Clarence Valley Council
aims to achieve in 2023/2024.
Responsible service is the Council service that will oversee and report on the relevant action. See Table 1, page 29.
Table 1: Our services Office of General Manager The Office of the General Manager provides organisational leadership and support to the elected members to deliver the below services.
Corporate & Community Directorate The Director Corporate and Community oversees organisational governance and compliance activities which are delivered to our community through the following services: Service
Finance Control & Compliance Financial Analysis & Business Support Information Services & Corporate Systems Corporate & Customer Experience People & Culture Safety & Risk Community & Industry Engagement Community Development Library Services Cultural Services
Responsible Manager
Manager Finance & Systems
Manager Organisational Development
Manager Cultural, Community & Industry
Works & Civil Directorate The Director Works and Civil oversees a coordinated approach to Council’s works and civil services and strategic infrastructure operations which are delivered to our community through the following services: Service
Strategic Infrastructure & Planning Coordination Quarries Emergency Services Property Services Roads & Drainage Infrastructure Delivery Parks & Open Spaces Buildings & Facilities Saleyards Regional Airport Holiday Parks Watercycle Sewer Services Floodplain & Estuary Management
Responsible Manager
Manager Strategic Infrastructure Manager Civil Services
Manager Open Spaces & Facilities
Manager Water/Sewer Operations
Environment & Planning Directorate The Director Environment and Planning oversees a coordinated approach to Council’s community, planning, environment, waste and regulatory services. Service
Environmental Services Regulatory Services Natural Resource Management Waste Services Cemeteries Building & Planning Services Land Use Planning
Responsible Manager
Manager Environment & Regulatory
Manager Development & Land Use Planning
Operational Plan
2023/24
29
Society
Society Creating a place where people are healthy, safe, connected and in harmony with the natural environment to retain and improve the quality of community life.
30
Clarence Valley Council
Society
Society Objectives SO1
To be part of a proud and inviting community with opportunities to connect and belong.
SO2
A community that supports, encourages and celebrates the rich cultural heritage of the Gumbaynggir, Bundjalung and Yaegl people and provides space for active community participation and strong relationships with local Traditional Owners.
SO3
A safe and active community where healthy lifestyles and better health outcomes are encouraged and supported with accessible infrastructure for residents of all ages and abilities.
SO4
A community in which cultural assets and public art is valued and plays a role in celebrating local arts as well as bringing innovative opportunities to the Valley.
SO5
An inclusive community where diversity is respected and Clarence Valley residents, regardless of age or ability, have equal access to quality services, events and opportunities.
SO6
A community supportive of its young people and their safety, growth and development and their participation in decision making that affects them.
SO7
Affordable housing and living standards with health, education and employment opportunities that support a resilient community.
SO8
An appropriate mix of housing that meets the various stages of life.
SO9
Preservation of the heritage and historic buildings and other significant assets across the area.
SO10
A resilient community, prepared for natural disaster.
Operational Plan
2023/24
31
Society
Objective SO1 To be part of a proud and inviting community with opportunities to connect and belong.
Strategy SO1.1 Establish a rolling program to document Community Economic Development Plans for towns and villages throughout the LGA. Action
Jul-Dec
Jan-Jun
Responsible Service
Implement an LGA wide community engagement program
Office of the General Manager
Deliver a program of candidate information sessions
Office of the General Manager
Develop a 5 year rolling program for the preparation of the Community Economic Development Plans for Clarence Valley towns and villages
Communications and Industry Engagement
Strategy SO1.2
Strengthen the Clarence Valley identity.
Action
Jul-Dec
Jan-Jun
Responsible Service
Support ANZAC celebratory events
Office of the General Manager
Create a partnership with community to host Australia Day citizen of the year Awards
Office of the General Manager
Host citizenship ceremonies
Office of the General Manager
Support the running of the Annual Jacaranda Festival through in kind sponsorship
Communications and Industry Engagement
Deliver the annual 'Illuminate Jacaranda' project in See Park
Communications and Industry Engagement
Objective SO2 A community that supports, encourages and celebrates the rich cultural heritage of the Gumbaynggir, Bundjalung and Yaegl people and provides space for active community participation and strong relationships with local Traditional Owners.
Strategy SO2.1
Implement Signage Strategy including recognition of language.
Action
Implement the Signage Strategy
32
Clarence Valley Council
Jul-Dec
Jan-Jun
Responsible Service
Open Spaces and Facilities
Society
Strategy SO2.2
Develop and endorse a Reconciliation Action Plan (RAP).
Action
Jul-Dec
Jan-Jun
Responsible Service
Work with the organisation and the community to deliver the actions from the Reconciliation Action Plan
Strategy SO2.3
Community Engagement
Re-establish the Clarence Valley Aboriginal Advisory Committee.
Action
Jul-Dec
Jan-Jun
Responsible Service
COMPLETED IN PREVIOUS YEAR
Strategy SO2.4
Investigate options for developing a cultural capability framework.
Action
Jul-Dec
Jan-Jun
Deliver the Aboriginal Engagement framework to ensure effective engagement, communication and participation with First Nations communities within the local government area
Strategy SO2.5
Responsible Service
Corporate and Community Directorate
Engage with the Aboriginal Traditional Owners to grow and understanding of culture.
Action
Jul-Dec
Jan-Jun
Responsible Service
Deliver the Aboriginal Engagement framework to ensure effective engagement, communication and participation with First Nations communities within the local government area
Community Engagement
Prepare a business case for the new Yamba Community Centre Precinct after redevelopment
Community Engagement
Continue Indigenous Land Use Agreements discussions related to Holiday Parks
Holiday Parks
Objective SO3 A safe and active community where healthy lifestyles and better health outcomes are encouraged and supported with accessible infrastructure for residents of all ages and abilities.
Strategy SO3.1 Support Chambers to identify and seek funding for crime prevention and safety technology, activities and programs. Action
Jul-Dec
Jan-Jun
Responsible Service
Finalise the Crime Prevention Strategy and submit for Attorney General's endorsement
Community Engagement
Partner with the Police, internal and external stakeholders to respond, support and address current & emerging community safety issues and deliver community safety initiatives from Crime Prevention Strategy
Community Engagement
Operational Plan
2023/24
33
Society
Strategy SO3.2 community.
Advocate for adequate medical and allied health services to meet the needs of
Action
Jul-Dec
Jan-Jun
Advocate as opportunities arise
Strategy SO3.3 mobility aids.
Office of the General Manager
Create a network of shared pathways for use by pedestrians, cyclists and those using
Action
Jul-Dec
Jan-Jun
Deliver the Active Transport Strategy
Strategy SO3.4
Responsible Service
Strategic Infrastructure and Planning Coordination
Establish Advisory Committees to provide input to the planning of community assets.
Action
Jul-Dec
Jan-Jun
Responsible Service
Oversee the engagement and governance of the advisory and s355 committees
Corporate and Customer Experience
Support the administration of the CV Access Committee
Community Engagement
Support the Clarence Regional Library Advisory Committee
Library Services
Support the administration and governance of the CV Community and Cultural Committee
Cultural Services
Administer the Clarence Valley Biodiversity Advisory Committee
Natural Resource Management
Oversee the engagement and governance of the advisory and s355 committees
Corporate and Customer Experience
Strategy SO3.5
Promote use of council sporting, cultural and community facilities.
Action
34
Responsible Service
Jul-Dec
Jan-Jun
Responsible Service
Support the administration and funding to the two Sports Committees
Parks & Open Spaces
Support the operation of aquatic facilities and sports centres
Parks & Open Spaces
Support and keep community informed of delivery of the Regional Aquatic Centre redevelopment
Parks & Open Spaces
Prepare a facilities operational management plan to promote the use of the new Yamba Community Centre Precinct after redevelopment
Community Engagement
Clarence Valley Council
Strategy SO4.1
Society
Objective SO4 A community in which cultural assets and public art is valued and plays a role in celebrating local arts as well as bringing innovative opportunities to the Valley.
Develop a public art program that recognises local artists and culturally heritage.
Action
Jul-Dec
Jan-Jun
Responsible Service
Implement the Philanthropy Plan to increase support for Gallery Programs
Cultural Services
Present the 2023 JADA and secure secured touring venues
Cultural Services
Conduct a collection copyright & online portal project
Cultural Services
Deliver public art and culture in line with the Public Art Policy
Cultural Services
Strategy SO4.2 Partner, participate and support cultural and artistic activities being coordinated by communities across the Valley. Action
Jul-Dec
Jan-Jun
Responsible Service
Deliver Get Connected programs for targeted groups including – digital literacy and skills programs
Library Services
Develop the commercial revenue generating opportunities for the Regional Art Gallery
Cultural Services
Deliver Plunge and cultural activity across the LGA
Cultural Services
Review and develop the Clarence Valley Cultural Plan for 2023-2027
Cultural Services
Create a rolling program of public art projects including maintenance of public art works
Cultural Services
Strategy SO4.3
Create opportunities for local artists to develop their talent.
Action
Jul-Dec
Jan-Jun
Deliver public art and culture in line with the Public Art Policy
Responsible Service
Cultural Services
Objective SO5 An inclusive community where diversity is respected and Clarence Valley residents, regardless of age or ability, have equal access to quality services, events and opportunities.
Strategy SO5.1
Review of accessible parking in towns.
Action
Plan and design road safety and traffic improvement projects identified through customer feedback, the Safe Systems Working Group, Local Traffic Committee and State and Federal funded road safety programs
Jul-Dec
Jan-Jun
Responsible Service
Strategic Infrastructure and Planning Coordination
Operational Plan
2023/24
35
Society
Strategy SO5.2
Consult with representative groups on major infrastructure proposals.
Action
Jul-Dec
Jan-Jun
Plan and design road safety and traffic improvement projects identified through customer feedback, the Safe Systems Working Group, Local Traffic Committee and State and Federal funded road safety programs
Responsible Service
Strategic Infrastructure and Planning Coordination
Strategy SO5.3 Offer community groups and not for profits support to access funding to deliver services that meet the needs of residents and visitors alike. Action
Jul-Dec
Jan-Jun
Responsible Service
Support the community through the annual event and sports tourism sponsorship program
Community Engagement
Build the capacity of community organisations and groups to access external funding opportunities
Community Engagement
Facilitate the delivery of the Community Initiative Program and the Cultural & Sports Trust Fund
Community Engagement
Strategy SO5.4 Identify barriers to use of Council’s sporting, cultural and community facilities to inform decisions about future improvements. Action
Jul-Dec
Jan-Jun
Support the administration and funding to the two Sports Committees
Responsible Service
Open Spaces and Facilities
Objective SO6 A community supportive of its young people and their safety, growth and development and their participation in decision making that affects them.
Strategy SO6.1 people.
Investigate opportunities for decision making to be informed by the views of young
Action
Jul-Dec
Jan-Jun
Develop a plan to ensure effective engagement, communication and participation of young people in communities across the local government area
Strategy SO6.2
Community Engagement
Improve youth engagement and involvement.
Action
36
Responsible Service
Jul-Dec
Jan-Jun
Responsible Service
Develop a youth program to support the delivery of relevant and inclusive youth projects
Community Engagement
Partner with relevant internal and external stakeholders to support events that focus on children and seniors in the Clarence Valley
Community Engagement
Clarence Valley Council
Strategy SO7.1
Society
Objective SO7 Affordable housing and living standards with health, education and employment opportunities that support a resilient community.
Pursue affordable/accessible housing through policy and planning.
Action
Jul-Dec
Jan-Jun
Streamline approval pathways for complying minor residential development
Responsible Service
Planning and Building Services
Strategy SO7.2 Consider options to achieve an increased range of housing options through a review of Council’s Development Control Plans. Action
Jul-Dec
Jan-Jun
Responsible Service
Commence reform of Residential Zones Development Control Plan
Land Use Planning
Streamline approval pathways for complying minor residential development
Planning and Building Services
Finalise the Clarenza DCP
Land Use Planning
Strategy SO7.3
Advocate for a range of options for health and education.
Action
Jul-Dec
Jan-Jun
Responsible Service
Deliver Print Manage Project
Library Services
Develop and deliver the Clarence Regional Libraries Strategic Action Plan
Library Services
Strategy SO7.4
Partner with education providers through a supported traineeship program.
Action
Jul-Dec
Jan-Jun
Develop a group cohort CVC traineeship annual program, including development of targeted engagement plan
Objective SO8 of life.
Strategy SO8.1
Responsible Service
People and Culture
An appropriate mix of housing that meets the various stages
Prepare a Housing Strategy to inform Local Growth Management.
Action
Finalise a Housing Strategy for the Clarence Valley
Jul-Dec
Jan-Jun
Responsible Service
Land Use Planning
Operational Plan
2023/24
37
Society
Strategy SO8.2 Consider options to achieve an increased range of housing options through a review of Council’s Development Control Plans. Action
Jul-Dec
Jan-Jun
Support the implementation of recommended actions from The Clarence – Riverway Masterplan II for 2023/2024
Responsible Service
Communications and Industry Engagement
Strategy SO8.3 Review Affordable Housing Policy to consider options for increased opportunities for low income individuals and families. Action
Jul-Dec
Jan-Jun
Finalise a Housing Strategy for the Clarence Valley
Responsible Service
Land Use Planning
Objective SO9 Preservation of the heritage and historic buildings and other significant assets across the area.
Strategy SO9.1
Document heritage and culturally significant trees, plants and gardens.
Action
Jul-Dec
Jan-Jun
Oversee implementation of Cultural Mapping Program
Environment and Planning Directorate
Implement the annual Heritage Assistance Grant Program and investigate signage and streetscape entry improvements to Heritage Conservation Areas
Land Use Planning
Strategy SO9.2
Formalise commitment to local museums.
Action
Jul-Dec
Jan-Jun
Responsible Service
Implement the findings of the Museums Service Review
Cultural Services
Deliver quarterly Museums skills development workshops
Cultural Services
Strategy SO9.3 community.
Encourage the repurposing of historic buildings to serve current and future needs of
Action
Jul-Dec
Jan-Jun
Support initiatives that actively repurpose historic buildings for current and future community needs as raised by the Economic Development and Tourism Advisory Committee and Community and Cultural Committee
Strategy SO9.4
Responsible Service
Communications and Industry Engagement
Encourage innovation to retain public access to the Historic Grafton Gaol.
Action
Investigate available options to retain public access through the historic Grafton Goal
38
Responsible Service
Clarence Valley Council
Jul-Dec
Jan-Jun
Responsible Service
Cultural Services
Society
Objective SO10
A resilient community, prepared for natural disaster.
Strategy SO10.1 Support establishment of a unified Emergency Management Co-ordination Centre for first responder agencies. Action
Jul-Dec
Jan-Jun
Support the planning and delivery of the RFS Emergency Operations Command Centre
Strategy SO10.2 groups.
Responsible Service
Strategic Infrastructure and Planning Coordination
Improved disaster resilience: People, Flora & Fauna, Environment, Business, Sporting
Action
Jul-Dec
Jan-Jun
Responsible Service
Establish and deliver an annual program of emergency management community planning and preparedness and public education programs
Emergency Services and Resilience
Seek funding to implement the actions of the Disaster Resilience Framework Action Plan
Emergency Services and Resilience
Implement actions in the Clarence Valley Bush Fire Risk Management Plan
Natural Resource Management
Strategy SO10.3 Improve community ability to recover after disaster by building community and infrastructure resilience. Action
Jul-Dec
Jan-Jun
Responsible Service
Plan and deliver emergency response exercises with local emergency services
Emergency Services and Resilience
Develop the first Clarence Valley Recovery Support Plan including individual community profiles that support local recovery in consultation with Council functional areas, emergency services and community groups
Emergency Services and Resilience
Operational Plan
2023/24
39
Infrastructure
Infrastructure Maintaining our diverse infrastructure base to serve the needs of the Clarence.
40
Clarence Valley Council
Infrastructure
Infrastructure Objectives IN1
A safely maintained transport (road and bridge) network.
IN2
Footpaths and cycleways that are interconnected, functional, well maintained and reach destinations.
IN3
Communities that are well serviced with essential infrastructure (including transport services, water and sewage systems and public amenities).
IN4
Floodplain and drainage infrastructure that is maintained in a way that improves amenity and liveability.
IN5
Forward planning for modern, accessible infrastructure upgrades and renewals.
IN6
Well maintained facilities and amenities that serve the needs of a growing residential population and visitors to the area.
IN7
Beautification of towns and villages to improve amenity and pride of place.
IN8
Passive and active recreational infrastructure that is well planned and well maintained.
IN9
Well serviced digital infrastructure.
IN10
Disaster mitigation planning to reduce the impact of natural disaster on infrastructure.
Operational Plan
2023/24
41
Infrastructure
Objective IN1
Strategy IN1.1
A safely maintained transport (road and bridge) network.
Review and establish service levels for road and transport infrastructure maintenance.
Action
Jul-Dec
Jan-Jun
Responsible Service
Facilitate a rolling asset condition rating process across all infrastructure asset classes
Financial Analysis and Business Support
Investigate the use of and renewal/upgrade of road signage, variable message signs and traffic light systems to manage road safety
Strategic Infrastructure
Strategy IN1.2
Develop snap send solve integration with Council’s corporate systems.
Action
Jul-Dec
Jan-Jun
Review Snap-Send-Solve platform to determine costing and process for integration into Council’s Corporate System
Strategy IN1.3
Responsible Service
Information Technology and Corporate Systems
Investigate options for Viaduct Road South Grafton.
Action
Jul-Dec
Jan-Jun
Consult with Transport for NSW with a view to reclassify and transfer Viaduct Road, along with Armidale Road to State Government
Responsible Service
Road and Drainage Infrastructure Delivery
Objective IN2 Footpaths and cycleways that are interconnected, functional, well maintained and reach destinations.
Strategy IN2.1
Implementation of the Pedestrian Access and Mobility Plan (PAMP).
Action
42
Jul-Dec
Jan-Jun
Responsible Service
Deliver the Active Transport Strategy
Strategic Infrastructure and Planning Coordination
Create a concept design for Prince St Grafton - CBD Redevelopment
Strategic Infrastructure and Planning Coordination
Project manage the delivery of strategic projects
Strategic Infrastructure and Planning Coordination
Project manage the construction of the Yamba Community Precinct Centre
Strategic Infrastructure and Planning Coordination
Project manage the construction of the Maclean Community Precinct Centre
Strategic Infrastructure and Planning Coordination
Clarence Valley Council
Action
Jul-Dec
Jan-Jun
Deliver the Active Transport Strategy
Responsible Service
Infrastructure
Strategy IN2.2 Investigate options for a cycle/pedestrian route from Maclean to Yamba and from Woombah to Woody Head.
Strategic Infrastructure
Strategy IN2.3 Advocate for State funding of the Big River Way cycleway/pedestrian route from Grafton to Maclean. Action
Jul-Dec
Jan-Jun
Advocate as opportunities arise
Strategy IN2.4
Strategic Infrastructure
Plan for walking trails from The Glen to Maclean.
Action
Jul-Dec
Jan-Jun
Deliver the Active Transport Strategy
Strategy IN2.5
Responsible Service
Responsible Service
Strategic Infrastructure and Planning Coordination
Create a network of connected cycleways and footpaths for active recreation.
Action
Jul-Dec
Jan-Jun
Plan and design pedestrian and bicycle facilities identified and prioritised in the Active Transport Strategy
Responsible Service
Strategic Infrastructure and Planning Coordination
Objective IN3 Communities that are well serviced with essential infrastructure (including transport services, water and sewage systems and public amenities).
Strategy IN3.1 areas.
Model and cost town sewerage systems to consider expansion to currently un-serviced
Action
Jul-Dec
Jan-Jun
Complete a full revaluation of Sewer Network Assets
Strategy IN3.2
Responsible Service
Financial Analysis and Business Support
Consider and determine options for Yamba Bypass.
Action
Determine options for Yamba Bypass
Jul-Dec
Jan-Jun
Responsible Service
Environment and Planning Directorate
Operational Plan
2023/24
43
Infrastructure
Strategy IN3.3 priorities.
Review Council’s Integrated Water Cycle Management (IWCM) strategy and confirm
Action
Jul-Dec
Jan-Jun
Responsible Service
Prepare a Property Management Plan for Glens Creek Rd property
Watercycle
Partner with Coffs City Council to manage the Regional Water Supply
Watercycle
Manage the Water Network to meet licence / health requirements
Watercycle
Manage the Sewer Network to meet licence requirements
Sewer Services
Inflow/Infiltration prevention program to detect illegal stormwater connections and failed pipes
Sewer Services
Strategy IN3.4
Investigate options for water filtration.
Action
Jul-Dec
Jan-Jun
Responsible Service
Complete the financial modelling for the Rushforth Road Water Filtration Plant
Watercycle
Complete the Environmental Impact Statement for the Rushforth Road Water Filtration Plant
Watercycle
Complete the community consultation for the Rushforth Road Water Filtration Plant
Watercycle
Objective IN4 Floodplain and drainage infrastructure that is maintained in a way that improves amenity and liveability.
Strategy IN4.1
Review the suite of floodplain management plans for the local government area.
Action
Jul-Dec
Jan-Jun
Create a plan for review of suite of floodplain management plan
Strategy IN4.2
Responsible Service
Floodplain and Estuary Management
Advocate for increased government funding to improve floodplain infrastructure.
Action
Jul-Dec
Jan-Jun
Engage with state and federal government for funding to improve floodplain infrastructure opportunities
Responsible Service
Floodplain and Estuary Management
Strategy IN4.3 Advocate for increased funding to the State Government’s Floodplain Management Program - Maintenance Grants. Action
Engage with LGNSW and Floodplain Management Authority to lobby for increase in funding
44
Clarence Valley Council
Jul-Dec
Jan-Jun
Responsible Service
Floodplain and Estuary Management
Infrastructure
Objective IN5 Forward planning for modern, accessible infrastructure upgrades and renewals.
Strategy IN5.1
Adopt a forward capital works program.
Action
Jul-Dec
Jan-Jun
Responsible Service
Coordinate preparation of a long term Capital Works Program
Works and Civil Directorate
Develop an annual project under the Local Government Road Safety Program
Strategic Infrastructure and Planning Coordination
Deliver Fixing Country Bridges Program
Strategic Infrastructure and Planning Coordination
Implement Council’s property rationalisation program
Property Services
Conduct disposals and acquisitions to support the capital works program
Property Services
Progress Land swap negotiations to realise the Maclean Boardwalk
Property Services
Implement a dedicated urban stormwater drainage program
Road & Drainage Infrastructure Delivery
Complete the Civil Services capital works program
Road & Drainage Infrastructure Delivery
Complete the Building & Facilities capital works program
Building and Facilities
Complete the Holiday Parks capital works program
Holiday Parks
Complete the Watercycle capital works program
Watercycle
Complete the Sewer Services capital works program
Sewer Services
Complete the Open Spaces capital works program
Parks & Open Spaces
Complete the Waste Services capital works program
Waste Services
Prepare a Grafton Regional Landfill Expansion concept design
Waste Services
Complete the Cemeteries capital works program
Cemeteries
Investigate and prepare a perpetual maintenance program and associated funding
Cemeteries
Strategy IN5.2
Review and establish service levels for road and transport infrastructure maintenance.
Action
Develop a strategic plan for future operations of Council owned quarries
Jul-Dec
Jan-Jun
Responsible Service
Quarries
Operational Plan
2023/24
45
Infrastructure
Strategy IN5.3 mobility aids.
Create a network of shared pathways for use by pedestrians, cyclists and those using
Action
Jul-Dec
Jan-Jun
Deliver the Active Transport Strategy
Responsible Service
Strategic Infrastructure and Planning Coordination
Strategy IN5.4 Investigate options for future use of Ulmarra Fire Control Centre post construction of the Emergency Control Centre. Action
Jul-Dec
Jan-Jun
Responsible Service
Support the planning and delivery of the RFS ‘Emergency Operations Command Centre'
Regional Airport
Prepare the communication plan to support future use of Ulmarra Fire Control Centre investigations
Building and Facilities
Objective IN6 Well maintained facilities and amenities that serve the needs of a growing residential population and visitors to the area.
Strategy IN6.1
Review and plan for off leash dog friendly areas.
Action
Jul-Dec
Jan-Jun
Promote off-leash, dog-friendly areas to the community
Strategy IN6.2
Regulatory Services
Review of amenities and cleaning contracts.
Action
Jul-Dec
Jan-Jun
Undertake review of amenities and cleaning contracts
Strategy IN6.3
Responsible Service
Building and Facilities
Improve usage of Council facilities.
Action
46
Responsible Service
Jul-Dec
Jan-Jun
Responsible Service
Manage annual lease and licence program
Property Services
Develop Facilities Management Plans for active and high use community halls
Building and Facilities
Support community organisation in the Clarence Valley through the operations, maintenance and administration of community halls.
Building and Facilities
Support the business functions of Council through the operations, maintenance and administration of works depots and administration centres
Building and Facilities
Review Alcohol Free Zones and Alcohol Prohibited Area designations
Regulatory Services
Clarence Valley Council
Review CBD amenity and establish Service Level Agreements.
Action
Jul-Dec
Jan-Jun
Develop an annual rolling program for town and village beautification
Responsible Service
Parks & Open Spaces
Infrastructure
Strategy IN6.4
Strategy IN6.5 Establish a town entrance beautification program for Grafton and Maclean to improve amenity on entry. Action
Jul-Dec
Jan-Jun
Develop an annual rolling program for town and village beautification
Responsible Service
Parks & Open Spaces
Objective IN7 Beautification of towns and villages to improve amenity and pride of place.
Strategy IN7.1
Develop an annual program for town and village beautification.
Action
Jul-Dec
Jan-Jun
Responsible Service
Develop an annual rolling program for town and village beautification
Parks & Open Spaces
Recruit team to undertake increased town and village maintenance
Parks & Open Spaces
Strategy IN7.2
Develop small village amenity plans.
Action
Jul-Dec
Jan-Jun
Develop an annual rolling program for town and village beautification
Strategy IN7.3
Responsible Service
Parks & Open Spaces
Upgrade Village entry /arrival signage and general look and feel.
Action
Undertake upgrade of entry/arrival signage
Jul-Dec
Jan-Jun
Responsible Service
Building and Facilities
Operational Plan
2023/24
47
Infrastructure
Objective IN8 Passive and active recreational infrastructure that is well planned and well maintained.
Strategy IN8.1 Review and adopt the Open Space and Recreational Management Strategy to inform asset maintenance and renewal plans. Action
Jul-Dec
Jan-Jun
Implement the Public Halls Strategy
Building and Facilities
Investigate options for reduction of antisocial behaviour at Yamba Skatepark
Parks & Open Spaces
Seek grant funding opportunities for Crown Reserve improvements
Parks & Open Spaces
Complete review of the Open Spaces Strategic Plan and Aquatic and Sports Facilities sub-plans
Parks & Open Spaces
Strategy IN8.2
Better access to get on the river for leisure and social activities.
Action
Jul-Dec
Jan-Jun
Deliver the Active Transport Strategy
Objective IN9
Strategy IN9.1
Strategic Infrastructure and Planning Coordination
Advocate for improved telecommunications. Jul-Dec
Jan-Jun
Review telecommunications standards for new development
Strategy IN9.2
Responsible Service
Well serviced digital infrastructure.
Action
Responsible Service
Planning and Building Services
Upgrade Council’s mobile and fixed infrastructure to support a connected community.
Action
48
Responsible Service
Jul-Dec
Jan-Jun
Responsible Service
Review and implement best-practice telecommunication servicing for new development
Planning and Building Services
Complete the IT/Corporate system Capital Works Prigram
Information Services and Corporate Sytems
Complete Wifi Projects for Holiday Parks and Libraries
Information Services and Corporate Sytems
Clarence Valley Council
Strategy IN10.1
Advocate for funding to deliver the actions of the Disaster Resilience Framework.
Action
Jul-Dec
Jan-Jun
Seek funding to implement the actions of the Disaster Resilience Framework Action Plan
Strategy IN10.2
Infrastructure
Objective IN10 Disaster mitigation planning to reduce the impact of natural disaster on infrastructure.
Responsible Service
Emergency Services and Resilience
Consider flood immunity in future planning for assets.
Action
Jul-Dec
Jan-Jun
Responsible Service
Inform projects to be included in a long term Capital Works Program
Strategic Infrastructure and Planning Coordination
Flood recovery works program delivery 2023/2024
Road and Drainage Infrastructure Delivery
Strategy IN10.3 Seek funding to implement design options for Yamba Road and Iluka Road to improve access during floods. Action
Jul-Dec
Jan-Jun
Responsible Service
Complete current year Roads Infrastructure Capital Works Program
Road and Drainage Infrastructure Delivery
Investigate funding and designs for additional sections of Yamba Road and Iluka Road currently not scheduled as part of this years road betterment program.
Road and Drainage Infrastructure Delivery
Strategy IN10.4
Review and consolidation of Flood Risk Management Plans.
Action
Jul-Dec
Jan-Jun
Prepare Floodplain Risk Management Study and Floodplain Risk Management Plan
Strategy IN10.5
Floodplain and Estuary Management
Consider options for improved flood mitigation for Ulmarra.
Action
Jul-Dec
Jan-Jun
Prepare Floodplain Risk Management Study and Floodplain Risk Management Plan
Strategy IN10.6
Responsible Service
Responsible Service
Floodplain and Estuary Management
Seek funding to upgrade floodplain assets.
Action
Jul-Dec
Jan-Jun
Responsible Service
Complete the Floodplain capital works program
Floodplain and Estuary Management
Esk River Flood Monitoring
Floodplain and Estuary Management
Operational Plan
2023/24
49
Economy
Economy Strengthening and diversifying the region’s economic base in a way that complements the environmental and social values of the Clarence.
50
Clarence Valley Council
Economy
Economy Objectives EC1
An affordable and attractive environment for local business to flourish.
EC2
Sustainable tourism that benefits the whole of the local government area, without burdening the coast further.
EC3
RV friendly towns.
EC4
Support for the sustainable growth of local industries that are respectful of the lifestyle that exists.
EC5
Dispersed and sustainable development ensuring connections to services.
EC6
Diversification of employment and education that provides opportunity for young people and families to stay in the area.
EC7
Major events that drive economic activity in the region and make it a more attractive place for people to live, work and visit.
EC8
Support for community and business led innovation that creates a diverse and vibrant community.
EC9
Adequate telecommunications to service economic growth.
EC10
Recognition of Grafton as a Regional City for State Planning purposes.
Operational Plan
2023/24
51
Economy
Objective EC1 flourish.
Strategy EC1.1
An affordable and attractive environment for local business to
Establish a Tourism and Economic Advisory Committee.
Action
Jul-Dec
Jan-Jun
Support the administration and governance of the Tourism and Economic Development Advisory Committee
Strategy EC1.2
Responsible Service
Industry Engagement
Support and coordinate activities for small business and industry engagement.
Action
Jul-Dec
Jan-Jun
Responsible Service
Implement a local contractor engagement program
Financial Control and Compliance
Support and coordinate activities for small business and industry engagement
Industry Engagement
Support agriculture in the Clarence Valley through the operations, maintenance and administration of the Grafton Regional Saleyard.
Saleyards
Complete the Saleyards capital works program
Strategic Infrastructure
Support tourism and business in the Clarence Valley through the operations, maintenance and administration of the Grafton Regional Airport.
Regional Airport
Support contractors in the operations of the Clarence Coast Holiday Parks
Holiday Parks
Strategy EC1.3 Partner with the Chambers of Commerce in the delivery of programs and activities that support economic sustainability. Action
Support and coordinate activities for small business and industry engagement
52
Clarence Valley Council
Jul-Dec
Jan-Jun
Responsible Service
Industry Engagement
Economy
Objective EC2 Sustainable tourism that benefits the whole of the local government area, without burdening the coast further.
Strategy EC2.1 Review the Tourism Strategy to identify appropriate service levels including Visitor Information outlets and collateral. Action
Jul-Dec
Jan-Jun
Responsible Service
Deliver an accredited Visitor Information Centre and support visitor information hubs
Industry Engagement
Develop and deliver CV Tourism Strategy
Industry Engagement
Complete the Business Development Strategy for Wooli Holiday Park
Holiday Parks
Complete the Business Development Strategy for Minnie Water Holiday Park
Holiday Parks
Engage consultant and undertake detailed design for Brooms Head Holiday Park
Holiday Parks
Undertake the Business Development Strategy for Iluka Riverside Holiday Park
Holiday Parks
Strategy EC2.2
Promote infrastructure and environmental heritage assets.
Action
Jul-Dec
Jan-Jun
Responsible Service
Prepare and finalise the Holiday Parks Plan of Management
Land Use Planning
Finalise the Brooms Head Plan of Management
Land Use Planning
Strategy EC2.3 tourism.
Implement Hinterland Cluster Development Tourism program to disperse coastal
Action
Jul-Dec
Jan-Jun
Responsible Service
Implement Hinterland cluster development program to disperse coastal tourism & increase economic benefits to broader area
Communications and Industry Engagement
Develop and promote the Dark Skies project
Communications and Industry Engagement
Strategy EC2.4 Recognise the important role of Jacaranda avenues through retention, maintenance and replacement. Action
Plan and deliver the urban tree planting program
Jul-Dec
Jan-Jun
Responsible Service
Parks & Open Spaces
Operational Plan
2023/24
53
Economy
Objective EC3
Strategy EC3.1
RV friendly towns.
Incorporate opportunities for RV access in parking strategies.
Action
Jul-Dec
Jan-Jun
Plan and design road safety and traffic improvement projects identified through customer feedback, the Safe Systems Working Group, Local Traffic Committee and State and Federal funded road safety programs
Responsible Service
Strategic Infrastructure and Planning Coordination
Objective EC4 Support for the sustainable growth of local industries that are respectful of the lifestyle that exists.
Strategy EC4.1
Partner with other levels of government and local industry groups.
Action
Jul-Dec
Jan-Jun
Implement actions from the CV Regional Economic Development Strategy (REDS)
Responsible Service
Communications and Industry Engagement
Strategy EC4.2 Support buy local campaigns and support and promote local market opportunities that benefit the small business and the agricultural sector. Action
Jul-Dec
Jan-Jun
Deliver the Load, Local Love program to support buying local.
Objective EC5 to services.
Strategy EC5.1
Communications and Industry Engagement
Dispersed and sustainable development ensuring connections
Review Local Growth Management Strategy.
Action
54
Responsible Service
Jul-Dec
Jan-Jun
Responsible Service
Developer Contribution Reform
Land Use Planning
Finalise a Housing Strategy for the Clarence Valley
Land Use Planning
Clarence Valley Council
Strategy EC6.1
Economy
Objective EC6 Diversification of employment and education that provides opportunity for young people and families to stay in the area.
Attract new investment and employment growth within the Valley.
Action
Jul-Dec
Jan-Jun
Responsible Service
Deliver engagement activities with the development and building industry to inform planning reform
Development and Building Services
Advance actions to rezone Council owned land on Big River Way for Employment Land
Land Use Planning
Prepare a Marine Based Industry Policy
Land Use Planning
Implement key short term actions from Employment, Rural and Green Infrastructure Strategies
Land Use Planning
Finalise the Clarenza DCP
Land Use Planning
Objective EC7 Major events that drive economic activity in the region and make it a more attractive place for people to live, work and visit.
Strategy EC7.1 Market LGA events beyond the LGA. Action
Jul-Dec
Jan-Jun
Responsible Service
Liaise and engage with the tourism sector and key stakeholder agencies
Communications and Industry Engagement
Prepare a draft business plan for operation of the Maclean Cultural & Community Precinct
Communications and Industry Engagement
Objective EC8 Support for community and business led innovation that creates a diverse and vibrant community.
Strategy EC8.1 Work with stakeholder to establish roundtable activities that bring representatives of town, village and community progress associations and business chambers together. Action
Deliver the My Clarence Valley website and social media platforms
Jul-Dec
Jan-Jun
Responsible Service
Communications and Industry Engagement
Operational Plan
2023/24
55
Economy
Objective EC9
Strategy EC9.1 condition.
Adequate telecommunications to service economic growth.
Review and promote telecommunications required for new developments as standard
Action
Jul-Dec
Jan-Jun
Review and implement best-practice telecommunication servicing for new development
Objective EC10 purposes.
Strategy EC10.1
Planning and Building Services
Recognition of Grafton as a Regional City for State Planning
Advocate the reinstatement of Grafton as a Regional City.
Action
Advocacy supporting growth and investment in new infrastructure, such as the upgrade to Grafton Base Hospital and the proposed private hospital, will continue through 2023/2024, which are key infrastructure investments that place Grafton on a positive growth trajectory towards a Regional City.
56
Responsible Service
Clarence Valley Council
Jul-Dec
Jan-Jun
Responsible Service
Land Use Planning
Economy
Operational Plan
2023/24
57
Environment
Environment Valuing, respecting and actively participating in the care and management of the Clarence’s natural environment for current and future generations.
58
Clarence Valley Council
Environment
Environment Objectives EN1
To protect and enhance our natural environments, ecosystems and native flora and fauna.
EN2
Encourage sustainable and innovative agricultural processes that preserve what we have.
EN3
Promotion of sustainable development that integrates with the environment.
EN4
Action that maintains the health of our coastline, waterways and natural environment.
EN5
Promotion of sustainable business practices to reduce our region’s ecological footprint.
EN6
A community that follows the three Rs of waste: Reuse, Recycle and Reduce.
EN7
Celebration and promotion of the diverse natural beauty of the area.
EN8
Enhanced maintenance of green space in a way that encourages responsible use.
EN9
Opportunities for equal access to enjoy the outdoors.
EN10
A community that doesn’t support detrimental mining activities.
Operational Plan
2023/24
59
Environment
Objective EN1 To protect and enhance our natural environments, ecosystems and native flora and fauna.
Strategy EN1.1
Review management of Lake Wooloweyah to prevent further loss of seagrass.
Action
Jul-Dec
Jan-Jun
Responsible Service
Lobby NSW Government to take action to prevent further loss of seagrass from Lake Wooloweyah
Natural Resource Management
Include seagrass loss risk assessment in Estuary Coastal Management Program Hazard Study
Floodplain and Estuary Management
Strategy EN1.2 Consider policy position to avoid rezoning and use of flood prone wetlands and vulnerable ecosystems. Action
Jul-Dec
Responsible Service
Make known existing policy position that prohibits rezonings of flood prone wetlands and vulnerable ecosystems as and when required
Land Use Planning
Continue to strengthen with implementation of actions from the Climate Adaptation Strategy
Natural Resource Management
Strategy EN1.3
Improved ecological management of Council reserves and corridors.
Action
60
Jan-Jun
Jul-Dec
Jan-Jun
Responsible Service
Finalise Coastal Management Program for whole LGA coastline
Floodplain and Estuary Management
Investigate land use application options for the Brooms Head Holiday Park Wastewater Treatment Plant
Holiday Parks
Commence implementation of priority administrative actions in Bush Regeneration Strategy
Natural Resource Management
Prepare a koala habitat and population survey for LawrenceBanyabba-Mororo Area
Natural Resource Management
Prepare bush regeneration strategy for CVC-owned/managed land
Natural Resource Management
Conduct weed control on Crown reserves
Natural Resource Management
Implement the Susan Island Flying Fox Habitat Restoration Program
Natural Resource Management
Implement actions of the Biodiversity Strategy 2020-2025
Natural Resource Management
Purchase an agricultural drone and develop a user guide and plan for weed control
Natural Resource Management
Prepare and finalise Site Management Plans for Crown Land
Land Use Planning
Clarence Valley Council
Strategy EN2.1 practice.
Collaborate with government departments to promote sustainable agricultural
Action
Jul-Dec
Jan-Jun
Coordinate education programs to encourage best practice native vegetation, soil and water management
Objective EN3 environment.
Strategy EN3.1 assessments.
Environment
Objective EN2 Encourage sustainable and innovative agricultural processes that preserve what we have.
Responsible Service
Environmental Services
Promotion of sustainable development that integrates with the
Increased transparency and improved methodology for DA related ecological
Action
Jul-Dec
Jan-Jun
Implement actions of the Green Infrastructure Strategy
Responsible Service
Land Use Planning & Environmental Services
Objective EN4 Action that maintains the health of our coastline and waterways and natural environment.
Strategy EN4.1
Investigate funding options to undertake riverbank restoration and rejuvenation.
Action
Jul-Dec
Jan-Jun
Prepare Stage 2 & 3 of the Coastal Management Program for the Clarence River Estuary
Strategy EN4.2
Responsible Service
Floodplain and Estuary Management
Continue water quality improvements and communications.
Action
Jul-Dec
Jan-Jun
Responsible Service
Lobby NSW Government to recommence Beach Watch/water quality monitoring in Clarence Valley local government area
Environmental Services
Conduct National Water Week activities and deliver Waterwise Schools Program and water efficiencies activities
Waste Services
Implement actions identified in the Water Efficiency Implementation Plan
Waste Services
Operational Plan
2023/24
61
Environment
Strategy EN4.3
Demonstrate leadership on climate change through education and action.
Action
Jul-Dec
Jan-Jun
Responsible Service
Commence implementation of priority administrative actions in Climate Adaptation Strategy
Environmental Services
Continue to progress the development of the proposed Grafton Regional Landfill solar farm.
Waste Services
Continue to progress the development of the proposed Grafton Regional Landfill gas to energy project.
Waste Services
Implement Community Energy and Emissions Reduction Action Plan.
Waste Services
Objective EN5 Promotion of sustainable business practices to reduce our region’s ecological footprint. Strategy EN5.1
Investigate options for optical fibre connections to premises for new developments.
Action
Jul-Dec
Jan-Jun
Review telecommunications standards for new development
Responsible Service
Planning and Building Services
Objective EN6 A community that follows the three Rs of waste: Reuse, Recycle and Reduce. Strategy EN6.1 programs.
Aim for an increase in community participation in waste recycling through education
Action
Jul-Dec
Jan-Jun
Implement Solid Waste Management Strategy And Environmental Education Plan
Objective EN7 area. Strategy EN7.1
Waste Services
Celebration and promotion of the diverse natural beauty of the
Promote the Clarence Valley as a destination.
Action
62
Responsible Service
Jul-Dec
Jan-Jun
Responsible Service
Implement Hinterland Cluster Development Program to disperse coastal tourism & increase economic benefits to broader area
Communications and Industry Engagement
Develop and deliver CV Tourism Strategy
Communications and Industry Engagement
Clarence Valley Council
Environment
Objective EN8 Enhanced maintenance of green space in a way that encourages responsible use.
Strategy EN8.1
Review tree varieties and increase tree canopy.
Action
Jul-Dec
Jan-Jun
Complete review of Tree Management Policy and Urban Tree Strategy
Strategy EN8.2
Responsible Service
Parks & Open Spaces
Review tree replacement programs and maintenance of existing street trees.
Action
Jul-Dec
Jan-Jun
Responsible Service
Complete review of Tree Management Policy and Urban Tree Strategy
Parks & Open Spaces
Implement the agreed actions from the Open Spaces Service Review
Parks & Open Spaces
Objective EN9
Strategy EN9.1
Opportunities for equal access to enjoy the outdoors.
Incorporate accessible infrastructure in design of open spaces managed by Council.
Action
Jul-Dec
Jan-Jun
Work with the organisation and the community to incorporate Disability Inclusion Action Plan recommendations in Parks and Reserves infrastructure projects
Strategy EN9.2
Responsible Service
Parks & Open Spaces
Promote current opportunities available that facilitate equal access.
Action
Jul-Dec
Jan-Jun
Work with the organisation and the community, and consult with the Access Committee, to deliver the Disability Inclusion Action Plan recommendations for equal access
Objective EN10 activities.
Strategy EN10.1 required. Action
Advocate as required
Responsible Service
Community Engagement
A community that doesn’t support detrimental mining
Advocate the position of Council in submissions to State and Federal governments as
Jul-Dec
Jan-Jun
Responsible Service
Office of the General Manager
Operational Plan
2023/24
63
Leadership
Leadership Setting the overall direction and long-term goals for the Clarence in accordance with community aspirations.
64
Clarence Valley Council
Leadership
Leadership Objectives LE1
A strong, accountable, and representative government that engages broadly with the community in a genuine, respectful and meaningful way.
LE2
To provide representation and advocacy where it counts.
LE3
To provide high standard of customer service to the community.
LE4
To be an effective and efficient local government that operates in a financially responsible and sustainable manner.
LE5
An accessible local government with improved responsiveness and transparency in its actions.
LE6
Decision making that is informed by diverse views and broad representation.
LE7
A strong relationship between all levels of government and partnerships with community to deliver outcomes that benefit residents.
Operational Plan
2023/24
65
Leadership
Objective LE1 A strong, accountable, and representative government that engages broadly with the community in a genuine, respectful and meaningful way.
Strategy LE1.1
Deliver a program of water quality education forums.
Action
Jul-Dec
Jan-Jun
Plan and implement delivery of water quality education forums
Strategy LE1.2
Water Cycle
Develop and deliver a community engagement program.
Action
Jul-Dec
Jan-Jun
Implement a plan for monthly community engagement sessions across the local government area
Strategy LE1.3
Responsible Service
Community Engagement
Improve communication, engagement and response to and with the Community.
Action
Jul-Dec
Jan-Jun
Responsible Service
Deliver the Council's magazine quarterly
Communications and Industry Engagement
Deliver timely and informative communications by media releases and social media platforms
Communications and Industry Engagement
Implement Communication Strategy Policy and procedure to ensure effective, timely and meaningful information to our community
Communications and Industry Engagement
In line with the IAP2 Framework, facilitate Council's online engagement portal ‘Clarence Conversations’
Community Engagement
Review and scope new Regional Gallery Website design for implementation
Cultural Services
Strategy LE1.4
Develop a Councillor Youth Mentor program.
Action
Develop a plan to create and implement a Councillor Youth Mentoring Program
66
Responsible Service
Clarence Valley Council
Jul-Dec
Jan-Jun
Responsible Service
People and Culture
Strategy LE2.1
Leadership
Objective LE2
To provide representation and advocacy where it counts.
Gain an understanding of stakeholders’ position to inform advocacy role.
Action
Jul-Dec
Jan-Jun
Responsible Service
Support the Councillors Listening Tours
Office of the General Manager
Quarterly meetings planned with local State and Federal Members
Office of the General Manager
Strategy LE2.2 Engage as a stakeholder in State Government plans for development of the Old Grafton Gaol to create public access to the historic site. Action
Jul-Dec
Jan-Jun
Quarterly meetings planned with local State and Federal Members
Objective LE3 community.
Strategy LE3.1
Responsible Service
Office of the General Manager
To provide high standard of customer service to the
Increased payment options for those doing business with Council.
Action
Jul-Dec
Jan-Jun
Upgrade corporate system platform to cloud-based technology to enhance accessibility and automation of corporate systems
Responsible Service
Information Technology and Corporate Systems
Strategy LE3.2 Develop clear, measurable service levels and standards to guide response to correspondence and complaints. Action
Commence implementation of priority administrative actions identified in the Environmental Auditing and Compliance Strategy
Jul-Dec
Jan-Jun
Responsible Service
Environmental Services
Operational Plan
2023/24
67
Leadership
Strategy LE3.3
Deliver Corporate systems upgrade.
Action
Jul-Dec
Responsible Service
Complete a strategic corporate system review
Financial Control and Compliance
Implement Strategic Asset Management corporate system module to informing asset management services
Financial Analysis and Business Support
Commence upgrade of Property & Rating Software - Phase 1 (CRM, ECR, Customer Interactions (NAR)
Information Technology and Corporate Systems
Upgrade corporate system platform to cloud-based technology to enhance accessibility and automation of corporate systems
Information Technology and Corporate Systems
Implement NSW Government DA planning portal Stage 3 and integration with corporate systems
Information Technology and Corporate Systems
Deliver corporate system dashboards for improved information management and reporting
Information Technology and Corporate Systems
Create & implement robust end of quarter financial system reporting for budget managers
Information Technology and Corporate Systems
Implement Corporate Knowledge Base software
Information Technology and Corporate Systems
Implement corporate system interactive forms and associated workflow for identified business processes
Information Technology and Corporate Systems
Implement corporate system recruitment module
People and Culture
Complete data migration to singular document management system
Information Technology and Corporate Systems
Implement software to ensure efficient and effective management of delegations and legislative compliance register
Corporate and Customer Experience
Continued migration of the WHS management system on VAULT (online safety module)
Safety and Risk
Implement the risk management corporate system module to manage and review risks and report as per the Risk Management Framework
Safety and Risk
Implement and promote the Learning and Development Plan 2023/2024 including eLearning module
People and Culture
Continue roll-out of Automated Water Meter reading
Watercycle
Strategy LE3.4
Promote Customer Service Charter.
Action
68
Jan-Jun
Jul-Dec
Jan-Jun
Responsible Service
Update and promote Customer Service Charter and report on data from call centre
Corporate and Customer Experience
Develop the 2023/2024 annual Learning and Development training plan
People and Culture
Clarence Valley Council
Leadership
Objective LE4 To be an effective and efficient local government that operates in a financially responsible and sustainable manner.
Strategy LE4.1
Report achievement of Delivery Program every six months.
Action
Jul-Dec
Jan-Jun
Responsible Service
Review the Community Strategic Plan 2032 pending Council Election Sept 2024
Office of the General Manager
Prepare the 2024/2025 Operational Plan
Office of the General Manager
Deliver all required 2024/2025 IP&R documentation
Office of the General Manager
Deliver six monthly Delivery Program report to Council
Corporate and Community
Ensure compliance with Integrated Planning and Reporting Framework 2021 and requirements delivered
Corporate and Community
Develop the annual budget & Long Term Financial Plan for 2024/25
Financial Analysis and Business Support
Update the 10 year Long Term Financial Plan and 4 year rolling Capital Works Program
Financial Analysis and Business Support
Facilitate annual review of Asset Management Strategy and associated Asset Management Plans
Financial Analysis and Business Support
Implementation of 2023/2024 actions from the Workforce Management Strategy and update for next financial year
People and Culture
Strategy LE4.2
Table the Annual Report within three months of the end of the financial year.
Action
Jul-Dec
Jan-Jun
Responsible Service
Deliver the 2022/2023 Annual Report
Office of the General Manager
Coordinate and report complaint management
Corporate and Community
Strategy LE4.3
Prepare the Annual Financial Statements within legislated timeframes.
Action
Jul-Dec
Jan-Jun
Responsible Service
Complete the Annual Financial Statements
Financial Control and Compliance
Complete Annual Rating Returns
Financial Control and Compliance
Create and implement robust end of quarter financial control processes
Financial Control and Compliance
Operational Plan
2023/24
69
Leadership
Strategy LE4.4
Demonstrated commitment to reviewing services and service levels.
Action
Jul-Dec
Jan-Jun
Responsible Service
Deliver the improvements of the 2022/2023 service review program
Office of the General Manager
Complete the Service Review program:
Office of the General Manager
Internal Audit Information Technology Governance Safety & Risk Community Engagement Parks & Reserves Sporting & Aquatic Facilities Holiday Parks x 6 Design & Survey Quarries Regional Roads Floodplain, Coast & Estuary Natural Resource Management Cemeteries EDSP Administration & Support
70
Finalise the Information Technology Service Review
Information Technology and Corporate Systems
Implement the Capability Framework across organisation
Corporate and Community Directorate
Implement the agreed recommendations of the FY 2022/2023 Customer Service & Records Service Review as required
Corporate and Customer Experience
Refine and streamline the People & Culture content on Intranet for greater access
People and Culture
Create a streamlined recruitment process, including front end planning for the variety of roles as outlined in the recruitment strategy
People and Culture
Continue the review of all human resource related policy, including 2023 Local Government Award updates and convert all forms to online versions
People and Culture
Promote and deliver the annual STRIVE Awards for staff excellence
Office of the General Manager
Review onboard and offboarding engagement in line with the My Employee Journey Framework
People and Culture
Develop an Employee Value Proposition as per recruitment strategy
People and Culture
Continue to implement the Employee Performance Framework including the capability framework
People and Culture
Deliver the recommendations of the Public Libraries Service Review
Library Services
Review the operating model of the Yamba and Maclean Libraries to support future growth
Library Services
Clarence Valley Council
Library Services
Conduct the review of the Fleet Replacement program
Works and Civil Directorate
Coordinate meetings of the Fleet Management Working Committee
Works and Civil Directorate
Finalise the Natural Resource Management Service Review
Natural Resource Management
Finalise the Cemeteries Service Review
Cemeteries
Strategy LE4.5
Leadership
Implement the Regional Library Strategic Plan (Action Plan)
Demonstrated commitment to the functions of the Audit Risk Improvement Committee.
Action
Jul-Dec
Jan-Jun
Responsible Service
Deliver the Internal Audit Plan
Office of the General Manager
Create robust budget management processes and report to the ARIC
Financial Control and Compliance
Implement the Annual Management Letter recommendations
Financial Analysis and Business Support
Complete the GIS Audit Action Plan
Information Technology and Corporate Systems
Undertake quarterly corporate system database security & integrity audits and report to the Audit Risk and Improvement Committee
Information Technology and Corporate Systems
Complete a WHS StateCover audit and deliver on the three priority areas from the audit
Safety and Risk
Implement and deliver WHS legislative required Health Monitoring programs (immunisation & lung bus program)
Safety and Risk
Implement the WHS planning, report and monitor program and undertake site audits
Safety and Risk
Deliver the outcomes for the WHS Internal Audit Action Plan
Safety and Risk
Implement recommendations from CVC Internal Environmental Audit relevant to 23/24 year
Environmental Services
Strategy LE4.6
Determine future uses for Grafton Regional Airport.
Action
Finalise Options Paper and determine future uses of Grafton Regional Airport following completion of the environmental and cultural assessment of available land identified in Masterplan
Jul-Dec
Jan-Jun
Responsible Service
Regional Airport
Operational Plan
2023/24
71
Leadership
Objective LE5 An accessible local government with improved responsiveness and transparency in its actions.
Strategy LE5.1 Investigate options for developing a Cultural Capability Framework and establishing a robust Aboriginal community engagement framework. Action
Jul-Dec
Jan-Jun
Finalise a First Nations Employment Strategy
Responsible Service
People and Culture
Strategy LE5.2 Develop transparent and robust policy framework to ensure current and best practice policies and procedures. Action
72
Jul-Dec
Jan-Jun
Responsible Service
Deliver an end of year staff development & achievement event
Office of the General Manager
Lead the staff engagement survey action plan
Office of the General Manager
Deliver the staff engagement survey
Office of the General Manager
Review policies as required as per Policy Framework
Corporate and Community
Complete a strategic procurement review and create a Strategic Procurement Action Plan
Financial Control and Compliance
Complete Revenue Debt Management processes as per policy
Financial Control and Compliance
Review and update the Revenue Policy
Financial Control and Compliance
Create and implement an overarching Financial Management Strategy
Financial Control and Compliance
Complete bi-annual depot WHS compliance review
Financial Control and Compliance
Conduct a sale of land for unpaid rates review
Financial Control and Compliance
Engage with State Records to ensure compliance and complete audit requirements as per legislative compliance
Corporate and Customer Experience
Deliver governance compliance as outlined in the OLG compliance calendar
Corporate and Customer Experience
Develop and implement clear policies and processes for all insurance related matters, including audit opportunities
Corporate and Customer Experience
Ensure all polices and related documents are reviewed in line with Policy Framework
Corporate and Customer Experience
Ensure the new PID legislation is embedded within the organisation and related policy and practices are updated by 1 Oct 2023
Corporate and Customer Experience
Delivery of the Return To Work program
Safety and Risk
Develop documentation to address psychosocial hazards and support a mental fitness program
Safety and Risk
Clarence Valley Council
Environmental Services
Complete the Climate Adaptation Strategy
Environmental Services
Prepare Environmental Levy business case
Environmental Services
Review On-Site Waste Water Management Strategy
Environmental Services
Finalise Animal Control and Animal Shelter Strategy
Regulatory Services
Commence implementation of priority actions in Animal Control and Animal Shelter Strategy
Regulatory Services
Complete an independent financial review of Council’s current and planned future borrowing capacity including debt service cover ratio and debt ceiling.
Office of the General Manager
Strategy LE5.3
Leadership
Prepare environmental auditing and compliance strategy
Promote transparency of access to information.
Action
Jul-Dec
Jan-Jun
Responsible Service
Promote access and transparency to information in accordance with information legislation and policy
Corporate and Community
Manage the Unreasonable Complainant Register
Corporate and Community
Coordinate Public Interest Disclosure activity and implementation of new legislation
Corporate and Community
Implement organisational training in governance process as outlined in governance framework
Corporate and Customer Experience
Deliver the communication plan for closure of Treelands Drive Community Centre and relocation of services pending demolition of the building
Community Engagement
Deliver and promote the bridge upgrade mapping layer for community access
Strategic Infrastructure and Planning Coordination
Review and implementation of improved Planning Certificate service
Planning and Building Services
Strategy LE5.4 Develop a Councillor update to keep Councillors informed about successes and ongoing activities. Action
Jul-Dec
Jan-Jun
Responsible Service
Facilitate an elected member review of the Delivery Program
Office of the General Manager
Deliver a councillor newsletter
Office of the General Manager
Strategy LE5.5
Support and equip Councillors as ‘brand’ ambassadors.
Action
Coordinate the elected member professional development program
Jul-Dec
Jan-Jun
Responsible Service
Office of the General Manager
Operational Plan
2023/24
73
Leadership
Objective LE6 Decision making that is informed by diverse views and broad representation.
Strategy LE6.1 deputations.
Deliver opportunity for community input to decision making through submissions and
Action
Jul-Dec
Jan-Jun
Prepare the monthly business paper
Responsible Service
Office of the General Manager
Objective LE7 A strong relationship between all levels of government and partnerships with community to deliver outcomes that benefit residents.
Strategy LE7.1
Coordinate a schedule of meetings with local State and Federal Members.
Action
Quarterly meetings planned with local State and Federal Members
74
Clarence Valley Council
Jul-Dec
Jan-Jun
Responsible Service
Office of the General Manager
Clarence Valley Council
Capital Works Program 2023/24
Capital Works Program 2023/24
75
Information Services & Corporate Systems Location (Asset)
Description of Works
Communications
2023-24
2024-25
2025-26
2026-27
541,600
490,500
489,000
610,000
CVC - Wide
Hardware & Infrastructure
474,000
450,500
449,000
606,000
CVC - Wide
Hardware & Infrastructure - Library Assets
22,600
40,000
40,000
4,000
Yamba - Yamba Water Tower
Upgrade Comms Infrastructure
45,000
0
0
0
2023-24
2024-25
2025-26
2026-27
5,650,000
5,785,000
5,920,000
6,055,000
Works & Civil Mgt Location (Asset)
Description of Works
Fleet CVC Wide
Light Fleet Replacement Program
800,000
825,000
850,000
875,000
CVC Wide
Small Plant Replacement Program
350,000
360,000
370,000
380,000
CVC Wide
Heavy Plant Replacement Program
4,500,000
4,600,000
4,700,000
4,800,000
2023-24
2024-25
2025-26
2026-27
10,000
35,000
35,000
35,000
20,000
20,000
20,000
10,000
15,000
15,000
15,000
Swimming Pool Improvements
15,000,000
11,925,278
0
0
Grafton - Regional Aquatic Centre
15,000,000
11,925,278
0
0
Sports Council Contributions
80,000
80,000
80,000
80,000
CVC Wide
Lower Clarence Sports Council
40,000
40,000
40,000
40,000
CVC Wide
Upper Clarence Sports Council
40,000
40,000
40,000
40,000
Parks & Open Spaces Location (Asset)
Description of Works
Swimming Pool Reactive Works
76
CVC Wide
Pool Structures
CVC - Wide
Pool Plant & Equipment
"Renew, upgrade & Add Facilities - Stage 1 Site Prep & Demo, Splash Pad, indoor heated 25m pool, Indoor Program pool, Ancillary Substation/Plant Room, shade, Refurbish Existing Entry. Stage 2 - 50m Outdoor Pool, New Grandstand (Pending Approved Grant Funds) Stage 3 - Water Slides (Pending Approved Grant Funds)"
Clarence Valley Council
Location (Asset)
Description of Works
Sports Council Contributions
2023-24
2024-25
2025-26
2026-27
80,000
80,000
80,000
80,000
90,000
90,000
90,000
Maclean - Indoor Sports Centre, Wherret Park, Grafton - McKittrick Park, Wooli Tennis Club house
Floor Coverings & External Cladding
Maclean - Maclean Sport Centre
Floor Coverings & External Cladding
10,000
0
0
0
Yamba - Yamba Sports Centre
Floor Coverings & External Cladding
50,000
0
0
0
Maclean - Maclean Showground
Amenities Upper Area - Design & Construct upgrade - including all accessible
0
15,000
250,000
0
Maclean - Maclean Showground
Kiosk - Refresh & Modernise
30,000
0
0
0
0
30,000
40,000
50,000
0
30,000
40,000
50,000
10,000
290,000
290,000
40,000
0
40,000
40,000
40,000
10,000
250,000
250,000
0
0
35,000
0
80,000
Cricket Assets CVC Wide
Cricket Assets Nets, Rubber, Fencing
Sport Surfaces CVC Wide
Sporting Surfaces
Maclean - Maclean Netball
Netball Courts
Tennis Courts CVC Wide
Tennis Court Asset - Renewals
0
0
0
80,000
Yamba - Flinders Park - Tennis Courts
Multi Court, Pickle Ball Conversions
0
35,000
0
0
580,000
610,000
250,000
50,000
Reserves South Grafton Hawthorne Park
Design & Construct - Per Masterplan
100,000
500,000
0
0
Iluka - Ken Lesson Oval
Skate Shelter
30,000
0
0
0
Iluka - Ken Lesson Oval
Skate Park Extension
0
25,000
200,000
0
Maclean Showground - Main Arena
Lighting Upgrade
380,000
0
0
0
Brooms Head Reserve - Bluff, End of Holiday Park
Fish Cleaning Table
5,000
20,000
0
0
Yamba - Rock Pool
Beach Safety Rescue - Tube program
5,000
0
0
0
Wooli - Breakwall
Beach Safety Rescue - Tube program
5,000
0
0
0
Capital Works Program 2023/24
77
Location (Asset)
Description of Works
Iluka - Breakwall
Beach Safety Rescue - Tube program
Reserves
2024-25
2025-26
2026-27
5,000
0
0
0
580,000
610,000
250,000
50,000
Brooms Head Beach
Beach Safety Rescue - Tube program
0
5,000
0
0
Other Lower Risk Beach's TBD
Beach Safety Rescue - Tube program
0
10,000
0
0
Coutts Crossing Golf Course
Greens, irrigation, Fairways, Tees etc
50,000
50,000
50,000
50,000
30,000
105,000
65,000
65,000
Parks & Reserve - Fencing & Bollards CVC Wide
Parks Fencing and Bollard - RENEWALS
0
65,000
65,000
65,000
South Grafton - JJ Lawrence
Parks Fencing and Bollard - RENEWALS
30,000
40,000
0
0
0
20,000
410,000
200,000
Boating Facilities Seeland - Punt Lane
Boat Launching Ramps Design Construct
0
10,000
200,000
0
Junction Hill - Carrs Peninsula
Boat Launching Ramps Design Construct
0
10,000
200,000
0
Yamba - Carrs Drive
Boat Launching Ramps Design Construct
0
0
10,000
200,000
283,798
985,327
0
0
Drainage Works Junction Hill Barnier Park
Drainage
0
384,935
0
0
South Grafton Hawthorne Park
Drainage
283,798
0
0
0
South Grafton Rushforth Park
Drainage
0
499,796
0
0
Yamba - Yamba Sports Complex
Drainage
0
100,596
0
0
25,000
25,000
25,000
25,000
Parks & Reserve - Buildings CVC Wide
Parks & Reserves Buildings (inc Crown)
0
25,000
25,000
25,000
Wooli - Sports Buildings
Parks & Reserves Buildings (inc Crown)
25,000
0
0
0
Glenreagh Shannon Park
Upgrade Amenities
0
0
0
0
2,275,000
285,000
55,000
55,000
0
55,000
55,000
55,000
Parks & Reserves - Other Structures
78
2023-24
CVC Wide
Parks & Reserves Other Structures (Tables, Bench's, Garden Beds, Art etc)
Grafton - See Park
Shelters Stage 1 per Masterplan
25,000
0
0
0
CVC Wide - Open Space Reserves
LED Lighting Conversions
50,000
0
0
0
Clarence Valley Council
Location (Asset)
Description of Works
Grafton - Corcoran Park
Stage 2 - Shelters, Roadways, Amenities, Access Pathways, Boat ramps
Parks & Reserves - Other Structures Yamba - William Ager Park
Shelters
Beach - Accessibility
2023-24
2024-25
2025-26
2026-27
2,200,000
200,000
0
0
2,275,000
285,000
55,000
55,000
0
30,000
0
0
440,000
0
0
0
Yamba - Turners Beach
All Ability Access - Design & Construct
20,000
0
0
0
Yamba - Pippie Beach
Construct - All Ability Access pathways & viewing platform - Design & Construct
420,000
0
0
0
30,000
90,000
30,000
30,000
BBQ Facilities CVC Wide
BBQ Replacements - RENEWALS (inc Crown Reserves)
0
0
30,000
30,000
Brushgrove -
BBQ Replacements - RENEWALS
0
30,000
0
0
Lawrence -
BBQ Replacements - RENEWALS
0
30,000
0
0
Wooli -
BBQ Replacements - RENEWALS
30,000
0
0
0
Minnie Water -
BBQ Replacements - RENEWALS
0
30,000
0
0
0
300,000
300,000
300,000
250,000
0
0
0
0
300,000
300,000
300,000
80,000
50,000
0
50,000
Playground Equipment Woombah
Playground Upgrade
CVC Wide
Playground Equipment
Septic Systems Wooli - South Terrace Amenities/ Marine Rescue
Onsite Sewer Management
50,000
0
0
0
Harwood - Hall
Onsite Sewer Management
0
50,000
0
0
Chatsworth Island - Hall
Onsite Sewer Management
30,000
0
0
0
Harwood Bridge Maclean Side
Onsite Sewer Management
0
0
0
50,000
Park Improvement Program
896,881
420,000
150,000
0
CVC Wide
Security Camera (CCTV) Integration Review Across All Facilities
20,000
0
0
0
Grafton - See Park
Design & Construct - Per Masterplan
0
100,000
150,000
0
Grafton - Corcoran Park
Regeneration & Dog Park
200,000
0
0
0
Iluka - Wingfield Park
Shelter
0
30,000
0
0
Wooli - Wooli Park (Adjacent to Skate Bowl)
Shelter
0
30,000
0
0
Capital Works Program 2023/24
79
Location (Asset)
Description of Works
2023-24
2024-25
2025-26
2026-27
Townsend Community Hub
23-24 Design & Construct Stage 1
200,000
200,000
0
0
Maclean - Cameron Park
Masterplan 22-23, 23-24 Design & Construct Stage 1
0
60,000
0
0
369,332
280,000
270,000
80,000
0
80,000
80,000
80,000
Parks & Reserves - Access Pavement & Carparks CVC Wide
Access Pavement & Carparks
Yamba - Turners Beach
Parking Improvements
50,000
0
0
0
Rushforth Park
Access Pavement & Carparks
309,332
0
0
0
Angourie - Blue Pools
Access Pavement & Carparks
10,000
200,000
0
0
South Grafton - JJ Lawrence Vere St
Access Pavement & Carparks
0
0
150,000
0
Grafton - Fisher Park
Access Pavement & Carparks
0
0
40,000
0
2023-24
2024-25
2025-26
2026-27
60,000
0
0
0
60,000
0
0
0
Community Precinct Program
27,465,077
50,000
50,000
0
Maclean - Civic Centre Hall
Construct Stage 1 - Clarence Valley Cultural & Community Precinct
13,586,000
0
0
0
Yamba - Community Centre
Treelands Drive Community Hub - Upgrade & New Library
13,829,077
0
0
0
Maclean - Visitors Centre
Cane Barge & Ashby Ferry Removal
50,000
50,000
50,000
0
2,248,113
0
0
0
Buildings & Facilities Location (Asset)
Description of Works
Corporate Signage CVC Wide
Corporate Signage
Community Halls Brooms Head Community Hall
Refresh & Modernise
30,000
0
0
0
Ewingar - Ewingar Hall
New RFS Station & Helipad
829,286
0
0
0
CVC Wide
Community Halls
527,667
0
0
0
CVC Wide
Resilience Facilities for the Community
692,911
0
0
0
CVC Wide
Public Facilities for the Community
138,249
0
0
0
475,000
0
0
0
475,000
0
0
0
Library Buildings Treelands Drive Yamba Library
80
Fit out
Clarence Valley Council
Location (Asset)
Description of Works
Works Depots
2023-24
2024-25
2025-26
2026-27
700,000
500,000
40,000
0
Koolkhan - Depot
Remove Fuel Tanks - EPA Breach
150,000
0
0
0
South Grafton Rushforth Road Depot
Depot - Hardstand Truck Parking
500,000
500,000
0
0
Grafton - Kirchner St Depot
Depots - Kirchner St Works & Civil Layoff Area
40,000
0
40,000
0
South Grafton Rushforth Road Depot
Install Yard Emergency Evacuation Alarm
10,000
0
0
0
20,000
350,000
0
0
0
350,000
0
0
20,000
0
0
0
200,000
0
0
0
200,000
0
0
0
10,000
210,000
480,000
0
Administration Buildings Maclean Administration Building
Roof Renewal
Maclean Administration Building
Floor Covering Renewals
Airports Glenugie - Grafton Airport
Compliance Matters - Line marking, Refuelling, Papi System
Public Amenities Iluka - Spencer St Amenities
Design & Construct upgrade - including all accessible
0
10,000
180,000
0
Angouire - Blue Pool Amenities
Design & Construct upgrade - including all accessible
10,000
180,000
0
0
Iluka - Main Street Amenities
Design & Construct upgrade - including all accessible
0
20,000
300,000
0
2,200
0
0
0
2,200
0
0
0
50,000
0
0
0
50,000
0
0
0
30,000
50,000
0
0
Animal Control South Grafton Pound
AC - Renewal
Saleyards South Grafton Saleyards
Design Roof
Cemetery Buildings Townsend Cemetery Shed
Roof
20,000
0
0
0
South Grafton Clarence Lawn Cemetery Shed
Design & Construct - upgrade
10,000
50,000
0
0
0
200,000
0
0
0
200,000
0
0
Emergency Facilities Maclean - SES
Clay tile roof upgrade
Capital Works Program 2023/24
81
Location (Asset)
Description of Works
2023-24
2024-25
2025-26
2026-27
Hazardous Material (Asbestos) Management
50,000
100,000
50,000
50,000
CVC Wide
50,000
100,000
50,000
50,000
2023-24
2024-25
2025-26
2026-27
Levee's, Gates & Pumps
2,074,078
210,000
210,000
210,000
Grafton - Alice Street
Levee Rehabilitation
1,069,333
0
0
0
CVC Wide
Floodplain Asset Renewals
194,745
200,000
200,000
200,000
North Street - Flood Pump Station
Flood Pump Station Renewal
200,000
0
0
0
Boormans Creek Culvert Floodgate
Floodgate Renewal
350,000
0
0
0
Palmers Drain/ March's - Culvert Floodgate
Floodgate Renewal
250,000
0
0
0
CVC Wide
Floodplain Minor Plant and Tools
10,000
10,000
10,000
10,000
90,000
0
0
0
90,000
0
0
0
2023-24
2024-25
2025-26
2026-27
24,000
24,000
24,000
24,000
Artwork Collection Acquisitions
24,000
24,000
24,000
24,000
Description of Works
2023-24
2024-25
2025-26
2026-27
30,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
Hazardous Material (Asbestos)management and/or removal (inc Specialised) - Buildings in Other Services
Floodplain Infrastructure & Estuary Management Location (Asset)
Description of Works
Flood Monitoring Iluka - Esk River Bridge
Flood Monitoring
Cultural Services Location (Asset)
Description of Works
Art Gallery Purchases Grafton - Regional Art Gallery
Quarries Location (Asset) Rehabilitation Program CVC Wide
82
Clarence Valley Council
Quarry Rehabilitation
Roads & Drainage Infrastructure Delivery Location (Asset)
Description of Works
Bus Stops
2023-24
2024-25
2025-26
2026-27
101,000
0
0
0
South Grafton
Bus Stop Accessibility Upgrades
24,500
0
0
0
Grafton -
Bus Stop Accessibility Upgrades
37,500
0
0
0
Yamba -
Bus Stop Accessibility Upgrades
39,000
0
0
0
5,395,380
5,610,000
2,610,000
2,610,000
Safety Program Angourie - Village Treatment
Safety Works - High Pedestrian Activity Area (HPAA)
140,000
0
0
0
Minnie Water Village Treatment
Safety Works - High Pedestrian Activity Area (HPAA)
100,000
0
0
0
Malabugillmah bus bay and intersection
Bus bay and intersection improvements
20,000
0
0
0
CVC Wide
Annual LG Road Safety Project
42,000
10,000
10,000
10,000
CVC Wide
Traffic & Minor Road Safety Works
100,000
100,000
100,000
100,000
Grafton - CBD
Wombat Crossing
250,000
0
0
0
Palmers Island Yamba Road/Yamba St & school Road
Construct - Realignment & Intersection Upgrade (previously planned roundabout)
0
3,000,000
0
0
Brooms Head - Village entry to Holiday Park
Traffic Calming & Pedestrian Safety
197,880
0
0
0
Yamba - Pacific Parade & Prince St
Design - William Agar Park Intersection Realignment
50,000
0
0
0
Kremnos - Orara Way - Boundary Road South (1.2km)
Safety improvements and upgrade on a regional road for freight movements
180,000
0
0
0
Grafton - Villiers Street & Pound Street Intersection
Adjustment to lane allocation (Pound Street) and pedestrian safety improvements
50,000
0
0
0
0
1,900,000
2,500,000
2,500,000
CVC Wide Iluka - Iluka Road
Design - Safety Works
290,000
0
0
0
Iluka - Iluka Road
Construct - Safety Works
1,215,500
0
0
0
South Grafton Bent St & Little Ryan Street Intersection
Intersection Treatment
0
600,000
0
0
Lawrence - Pringles Way
Realignment Works
750,000
0
0
0
Iluka - Spencer Street
Construct - Safety Improvements
705,000
0
0
0
Maclean - River St Yamba Road
Safety Improvements
1,055,000
0
0
0
Iluka Road Esk River Approaches
Design & Construct - Road betterment Raise road
250,000
0
0
0
Capital Works Program 2023/24
83
Location (Asset)
Description of Works
Intersections
2024-25
2025-26
2026-27
350,000
0
0
0
CVC Wide
Intersection upgrade, footpath connections
50,000
0
0
0
Maclean, Intersection of Alexander Street and Stanley Street
Intersection upgrade, footpath connections
20,000
0
0
0
Townsend Industrial Estate
Construct - Upgrade
280,000
0
0
0
150,000
100,000
100,000
100,000
Town Entry Works CVC Wide
Town entry statements
0
100,000
100,000
100,000
Glenreagh
Town entry statements
150,000
0
0
0
Town Precinct Improvements
100,000
0
0
0
Harwood Precinct
100,000
0
0
0
865,599
1,516,700
600,000
600,000
500,000
500,000
500,000
Design - to include waterfront park, carparking, footpaths and BMX pump track
Footpaths & Cycleways CVC Wide
PAMP
South Grafton - Bent Street between Tyson Street and Hyde Street
Footpath construction and Design only for separated on road cycleway
460,000
0
0
0
Grafton - Bacon Street - Turf St to Garden St
Construct- PAMP Footpaths with crossing point - Defer from 22-23
65,000
0
0
0
Maclean - Cameron Drive - Jubilee to CBD ( Woombah St. to Showground)
Construct - PAMP Footpath - Defer from 22-23
165,000
0
0
0
Yamba - Claude St
Design - Missing Link Coldstream St to Wooli St
5,000
0
0
0
Yamba - Claude St
Construct - Missing Link Coldstream St to Wooli St
85,000
0
0
0
Yamba - Gumnut Drive
Design - PAMP Footpath - Connecting The Halyard & Mainbrace to Shores Drive
37,000
0
0
0
Yamba - Gumnut Drive
Construct - PAMP Footpath - Connecting The Halyard & Mainbrace to Shores Drive
0
916,700
0
0
Yamba - Angourie Road and Golding Street
Design & Construct - Pedestrian & Cycleway Upgrades
40,000
100,000
100,000
100,000
Junction Hill Laneway
Pedestrian Laneway Behind Pub to Casino Road
8,599
0
0
0
668,450
350,000
0
0
10,000
100,000
0
0
School Zones Grafton - Grafton Public School Bacon St
84
2023-24
Stage 2 Design & Construct Crossing Upgrade
Clarence Valley Council
Location (Asset)
Description of Works
School Zones
2023-24
2024-25
2025-26
2026-27
668,450
350,000
0
0
0
250,000
0
0
Maclean - Maclean Public School
Wombat Crossing , Stage 2 Design & Construct
South Grafton & Grafton Schools
Pedestrian Crossing Lighting - Mary Street between south Grafton Infants and Public school; Mary Street in front of Grafton High School and Oliver Street between High School and Grafton Public School
80,000
0
0
0
Bent Street South Grafton
Get Active Footpath / Cycleway
578,450
0
0
0
17,973,282
8,967,733
3,807,761
4,125,568
Timber Bridge Replacement Program Jackadgery-Lilydale Road - Winters Bridge
Construct
815,000
0
0
0
Coaldale - Barretts Ck Bridge, Coaldale Road
Construct
1,000,000
0
0
0
Nymboida - Billys Ck bridge, Armidale Road
Construct
2,184,252
0
0
0
Glenreigh Brennans Road Bridge No2
Construct
392,000
0
0
0
Ulmarra Coldstream River Bridge, Franklins Road
Construct
350,000
0
0
0
Halfway Creek Dundoo Floodway Bridge, Kungala Road
Construct
2,002,030
0
0
0
Fortis Ck, Greberts Road - Fortis Creek Bridge
Construct
200,000
0
0
0
Koukandowie Armidale Road - No 2 Bridge
Construct
480,000
0
0
0
Coutts Crossing McIntosh Ck Bridge, Black Swan Drive
Construct
435,000
0
0
0
Blaxlands Creek Skinners Swamp Bridge , Armidale Rd
Construct
1,000,000
0
0
0
Stockyard Creek - White Swamp Bridge, Stockyard Creek Road
Construct
55,000
0
0
0
Wintervale Ck Bridge, Old Glen Innes Road
Construct
1,560,000
0
0
0
Capital Works Program 2023/24
85
Location (Asset)
Description of Works
2023-24
2024-25
2025-26
2026-27
Timber Bridge Replacement Program
17,973,282
8,967,733
3,807,761
4,125,568
Lanitza, Orara Way Bluff Bridge
Design & Construct
7,200,000
3,847,971
0
0
Coombadjha - No 3 Bridge, Coombadjha Road
Design & Construct
40,000
742,285
0
0
Coombadjha - No 4 Bridge, Coombadjha Road
Design & Construct
40,000
742,285
0
0
Coombadjha - No 5 Bridge, Coombadjha Road
Design & Construct
40,000
639,245
0
0
Coombadjha - No 6 Bridge, Coombadjha Road
Design & Construct
40,000
742,285
0
0
Coombadjha - Scrubby Creek Bridge, Coombadjha Road
Design & Construct
40,000
742,285
0
0
Tyringham - Harness Cask Road Bridge
Design & Construct
100,000
1,511,377
0
0
Lavadia - No 3 Bridge, Cassons Creek Road
Design & Construct
0
0
581,122
0
Tyndale - Shark Creek Bridge, Byrons Lane
Design & Construct
0
0
2,105,198
0
Deep Creek McCalls Creek Bridge, Deep Creek Road
Design & Construct
0
0
1,121,441
0
Nymboida Cloughers Creek Bridge, Coalmine Road
Design & Construct
0
0
0
2,354,414
Lionsville - Deep Creek Bridge, Collum Collum Road
Design & Construct
0
0
0
1,022,881
Hernani - Allans Water Bridge, Montrose Loop Road (West end)
Design & Construct
0
0
0
748,273
200,000
210,000
220,000
230,000
Gap Seal Program
86
Grays Rd
Gap Seal
200,000
0
0
0
Tucabia - Streets
Gap Seal
0
210,000
0
0
Sullivans Rd
Gap Seal
0
0
220,000
0
Lawrence - High Street,
Gap Seal
0
0
0
230,000
Clarence Valley Council
Location (Asset)
Description of Works
2023-24
2024-25
2025-26
2026-27
Shoulder Widening & Grading Program
650,000
675,000
700,000
725,000
Coaldale - Coaldale Road
Shoulder Widening & Grading
650,000
0
0
0
Old Glen Innes
Shoulder Widening & Grading
0
675,000
0
0
Kangaroo Creek Road
Shoulder Widening & Grading
0
0
700,000
0
Kangaroo Creek Road
Shoulder Widening & Grading
0
0
0
725,000
1,817,151
865,280
886,912
909,085
Gravel Resheeting Program CVC Wide
Gravel Sheeting
0
865,280
886,912
909,085
Pillay Valley - Eight Mile lane
Gravel Sheeting
132,980
0
0
0
Mororo - Mororo Road - Pacific Mwy
Gravel Sheeting
213,824
0
0
0
Broomshead Sandon River Road
Gravel Sheeting
593,072
0
0
0
Broomshead Grass Tree Road
Gravel Sheeting
194,144
0
0
0
Micalo Island Micalo Road
Gravel Sheeting
60,610
0
0
0
Lawrence - Mantons Road
Gravel Sheeting
229,177
0
0
0
Harwood Serpentine Channel South Bank Road
Gravel Sheeting
255,871
0
0
0
Lanitza - East Lanitza Road
Gravel Sheeting
137,473
0
0
0
200,000
4,050,000
4,150,000
2,800,000
200,000
0
0
0
0
2,750,000
2,800,000
1,400,000
0
1,300,000
1,350,000
1,400,000
Stormwater Drainage Program
725,180
750,000
750,000
750,000
Old Glen Innes Road
Pipe Replacement
362,590
0
0
0
Coombadja
Pipe Replacement
362,590
0
0
0
CVC Wide
0
750,000
750,000
750,000
Roads to Recovery Program
0
2,052,000
2,052,000
2,052,000
CVC Wide
0
2,052,000
2,052,000
2,052,000
0
0
0
0
Reseal Prep & Reseal Coongbar Road
Asbestos seal contaminated Roads
CVC Wide
Prep & Reseal
CVC Wide - Urban Reseal & Prep
Keybargin Clarence Way Seal
Prepare & Seal Remaining Section
Capital Works Program 2023/24
87
Location (Asset)
Description of Works
Regional Roads Program CVC Wide Regional Rds
2024-25
2025-26
2026-27
7,340,000
13,395,000
4,630,000
4,770,000
0
4,495,000
4,630,000
4,770,000
Harwood - Yamba Road/James Creek Intersection
Under Harwood Bridge (AC mill and fill) and intersection upgrade
0
1,000,000
0
0
Glenugie - Eight Mile Lane (2.8km Section)
Widening and pavement rehabilitation using foam bitumen. Local contractors to be engaged to deliver the works. Approx 2800 metres length.
3,840,000
0
0
0
Pillar Valley - Wooli Road - Wreckers to Skinner Road (1.1km)
Safety improvements and upgrade on a regional road for freight movements
1,500,000
0
0
0
Yamba Road
Design & Construct - Road betterment
2,000,000
7,900,000
0
0
68,239,481
24,986,234
10,000,000
10,000,000
0
0
10,000,000
10,000,000
Natural Disaster Repair Works Program
88
2023-24
CVC Wide
Possible Events
Admiralty Ct AGRN1012 EPAR
Reseal Prep & Reseals
408,864
19,588
0
0
Alexander St AGRN1012 EPAR
Reseal Prep & Reseals
150,636
15,420
0
0
Amos rd.
Reseal Prep & Reseals
102,742
52,452
0
0
Angourie RdAGRN1012 EPAR
Reseal Prep & Reseals
593,340
249,721
0
0
Argyle St AGRN1012 EPAR
Reseal Prep & Reseals
229,983
15,663
0
0
Avenue Road AGRN1012 EPAR works
Reseal Prep & Reseals
787,259
188,713
0
0
Bakers Lane AGRN1012 EPAR
Reseal Prep & Reseals
78,911
7,348
0
0
Banksia Place AGRN1012 EPAR
Reseal Prep & Reseals
119,782
3,568
0
0
Campbell Street
Reseal Prep & Reseals
28,452
5,182
0
0
Carrs Peninsula Road AGRN1012 EPAR
Reseal Prep & Reseals
304,019
76,078
0
0
Chatsworth rd.
Reseal Prep & Reseals
57,492
146,314
0
0
Clarence St Maclean AGRN1012 EPAR
Reseal Prep & Reseals
69,381
39,373
0
0
Coldstream Road AGRN1012 EPAR
Reseal Prep & Reseals
581,140
193,843
0
0
Colletts Island Road AGRN1012 EPAR
Reseal Prep & Reseals
795,057
32,662
0
0
Clarence Valley Council
Location (Asset)
Description of Works
2023-24
2024-25
2025-26
2026-27
Natural Disaster Repair Works Program
68,239,481
24,986,234
10,000,000
10,000,000
Deep Creek Road AGRN1012 EPAR
Reseal Prep & Reseals
1,702,982
139,541
0
0
Ensbey Lane
Reseal Prep & Reseals
142,055
36,357
0
0
Ewingar
Reseal Prep & Reseals
2,485,776
276,258
0
0
Figtree rd Ulmarra
Reseal Prep & Reseals
266,258
37,455
0
0
Finlaysons rd Ulmarra
Reseal Prep & Reseals
963,899
127,695
0
0
Fischers Lane Chatsworth
Reseal Prep & Reseals
211,374
26,967
0
0
Fullers rd
Reseal Prep & Reseals
919,899
82,782
0
0
Geregarrow RoadAGRN1012 EPAR
Reseal Prep & Reseals
497,367
132,747
0
0
Gilletts Ridge Road AGRN1012 EPAR
Reseal Prep & Reseals
1,738,194
142,287
0
0
Great Marlow Road AGRN1012 EPAR
Reseal Prep & Reseals
1,622,208
141,577
0
0
Greens lane
Reseal Prep & Reseals
203,736
19,658
0
0
Gumnut Rd AGRN1012 EPAR
Reseal Prep & Reseals
299,862
41,974
0
0
Lakes Boulevarde AGRN1012 EPAR
Reseal Prep & Reseals
750,189
104,821
0
0
Lionsville Road AGRN1012 EPAR
Reseal Prep & Reseals
1,398,969
1,232,295
0
0
Lower Coldstream Road AGRN1012 EPAR
Reseal Prep & Reseals
1,661,133
797,297
0
0
Melaleuca Dr AGRN1012 EPAR
Reseal Prep & Reseals
334,411
69,252
0
0
Middle Rd EPAR AGRN1012
Reseal Prep & Reseals
344,367
85,835
0
0
Morpeth St. Harwood
Reseal Prep & Reseals
81,514
27,890
0
0
North Bank Rd AGRN1012 EPAR
Reseal Prep & Reseals
323,763
98,909
0
0
O'Keefe's Lane
Reseal Prep & Reseals
104,322
88,612
0
0
Old Coldstream Road AGRN1012 EPAR
Reseal Prep & Reseals
291,244
436,298
0
0
Old Glenn Innes Road AGRN1012 EPAR
Reseal Prep & Reseals
2,999,666
0
0
0
Old post office lane
Reseal Prep & Reseals
584,853
66,454
0
0
Capital Works Program 2023/24
89
Location (Asset)
Description of Works
Natural Disaster Repair Works Program
90
2023-24
2024-25
2025-26
2026-27
68,239,481
24,986,234
10,000,000
10,000,000
Pacific Street
Reseal Prep & Reseals
136,806
27,988
0
0
Pegus Drive
Reseal Prep & Reseals
248
12,364
0
0
Possom Hole Ulmarra
Reseal Prep & Reseals
192,993
53,043
0
0
Rannoch Ave AGRN1012 EPAR
Reseal Prep & Reseals
77,792
17,603
0
0
River rd East Harwood
Reseal Prep & Reseals
257,037
34,740
0
0
Rogans bridge road
Reseal Prep & Reseals
715,619
317,491
0
0
School Lane AGRN1012 EPAR
Reseal Prep & Reseals
274,988
88,001
0
0
School rd Palmers Channel
Reseal Prep & Reseals
384,088
94,001
0
0
Seelands Hall Road AGRN1012 EPAR
Reseal Prep & Reseals
638,581
157,849
0
0
Sherrys Lane
Reseal Prep & Reseals
965,864
71,957
0
0
Short St AGRN1012 EPAR
Reseal Prep & Reseals
241,438
8,732
0
0
South Arm Road AGRN1012 EPAR
Reseal Prep & Reseals
850,800
419,742
0
0
South Arm School Rd AGRN1012 EPAR
Reseal Prep & Reseals
517,044
272,024
0
0
Telopea Ave AGRN1012 EPAR
Reseal Prep & Reseals
305,415
16,064
0
0
The Halyard AGRN1012 EPAR
Reseal Prep & Reseals
205,175
37,243
0
0
Union St AGRN1012 EPAR
Reseal Prep & Reseals
106,185
38,621
0
0
Watts Lane AGRN1012 EPAR
Reseal Prep & Reseals
1,080,555
141,728
0
0
Westringia Place AGRN1012 EPAR
Reseal Prep & Reseals
156,774
18,270
0
0
Wharf St AGRN1012 EPAR
Reseal Prep & Reseals
405,474
53,473
0
0
Willow Way AGRN1012 EPAR
Reseal Prep & Reseals
399,816
32,273
0
0
Woodford Dale Road AGRN1012 EPAR
Reseal Prep & Reseals
1,137,535
204,249
0
0
Young street
Reseal Prep & Reseals
78,875
12,951
0
0
Amos Road
Reseal only IRW Works Claim
26,117
0
0
0
Clarence Valley Council
Location (Asset)
Description of Works
Natural Disaster Repair Works Program
2023-24
2024-25
2025-26
2026-27
68,239,481
24,986,234
10,000,000
10,000,000
Angourie Street
Reseal only IRW Works Claim
6,498
0
0
0
Broomshead Road
Reseal only IRW Works Claim
672,458
0
0
0
Duke Street
Reseal only IRW Works Claim
41,637
0
0
0
East Bank Road
Reseal only IRW Works Claim
14,551
0
0
0
Elizabeth Street
Reseal only IRW Works Claim
17,956
0
0
0
Gillies Lane
Reseal only IRW Works Claim
27,133
0
0
0
Hickey Street
Reseal only IRW Works Claim
13,416
0
0
0
Jackybulbin Tullymorgan Road
Reseal only IRW Works Claim
85,845
0
0
0
Johnson's Lane
Reseal only IRW Works Claim
49,581
0
0
0
Loxton Street
Reseal only IRW Works Claim
16,712
0
0
0
Spenser Street
Reseal only IRW Works Claim Reconstruction works to be undertaken
41,202
0
0
0
Winegrove Road
Reseal only IRW Works Claim
96,753
0
0
0
Lawrence Road
Reseal only IRW Works Claim
1,146,709
0
0
0
Clarence way
Regional Roads Pavement Repair Works
6,780,725
0
0
0
Eight Mile Lane
Regional Roads Pavement Repair Works
1,393,590
0
0
0
Iluka Road
Regional Roads Pavement Repair Works
1,139,226
0
0
0
Lawrence Road
Regional Roads Pavement Repair Works
1,264,006
0
0
0
Wooli Road
Regional Roads Pavement Repair Works
2,828,225
0
0
0
Yamba Road
Regional Roads Pavement Repair Works
2,069,940
0
0
0
McLachlan Park
Road Repairs
600,000
0
0
0
Great Marlow Road
Flood EPARW - Pavement Improvement
500,000
0
0
0
Armidale Road 898
Flood EPARW - Drainage & Embankment Work
3,600,000
0
0
0
Armidale Road 871
Flood EPARW - Headwall Extension
1,000,000
0
0
0
Sandy Crossing Wooli
Flood EPARW - Road Culvert Augmentation
750,000
0
0
0
CVC Wide
Flood EPARW - Causeway Package
0
2,000,000
0
0
Tallawudja Creek Box Culvert
Flood EPARW - Culvert Package
528,000
0
0
0
CVC Wide
Flood EPARW - Culvert Package
0
1,000,000
0
0
Marine Parade
Flood EPARW - Landslip Repairs
1,000,000
0
0
0
George Road
Flood EPARW - Causeway Repairs
750,000
0
0
Capital Works Program 2023/24
91
Location (Asset)
Description of Works
Natural Disaster Repair Works Program
2023-24
2024-25
2025-26
2026-27
68,239,481
24,986,234
10,000,000
10,000,000
Six Mile Lane
Flood EPARW - Bridge Approaches
600,000
0
0
0
Patemans Road
Flood EPARW - Unsealed Road Repairs
600,000
0
0
0
Old Glen Innes Rd Approx 3 Locations
Flood EPARW - Landslip Package Structural Retaining
0
5,000,000
0
0
Old Glen Innes Rd - Approx 65 Locations
Flood EPARW - Landslip Package - Rock/ Earth fill
0
5,000,000
0
0
Clarence Way 2 Locations
Flood EPARW - Landslip Package - Basic Treatment
1,000,000
0
0
0
Kangaroo Creek Road 1 Location
Flood EPARW - Landslip Package - Basic Treatment
500,000
0
0
0
Tallawajah River Works
Flood EPARW - Landslip Package - River Training Works
4,000,000
0
0
0
Sandy Swamp Road
Flood EPARW - Causeway Augmentation
0
1,500,000
0
0
Frames Bridge
Flood EPARW - Replacement
1,115,000
0
0
0
Four Mile Lane Wilcox Bridge
Flood EPARW - Replacement
1,350,000
2,346,938
0
0
Description of Works
2023-24
2024-25
2025-26
2026-27
4,421,197
7,500,000
0
0
Waste Location (Asset)
Landfill & Transfer Stations
92
Grafton Regional Landfill
Solar Farm
200,000
5,000,000
0
0
Grafton Waste Transfer Station
Redevelopment Waste Transfer Station
48,000
900,000
0
0
Maclean Waste Transfer Station
Redevelopment Waste Transfer Station
72,000
1,500,000
0
0
Grafton Regional Landfill
Landfill Heavy Plant
1,301,197
0
0
0
Grafton Regional Landfill
Cell 5a - Design & Construct
0
100,000
100,000
0
Grafton Regional Landfill
Composting Tunnel linked to new organics Processing Contract'
2,800,000
0
0
0
Clarence Valley Council
Cemeteries Location (Asset)
Description of Works
2023-24
2024-25
2025-26
2026-27
Cemetery Renewals & Improvements
40,000
20,000
115,000
35,000
South Grafton Clarence Lawn Cemetery
Replacement of defective footpaths
20,000
20,000
0
20,000
Maclean Lawn Cemetery -
TBD
0
0
15,000
15,000
Maclean Lawn Cemetery -
Replace defective memorial Wall
20,000
0
0
0
South Grafton Clarence Lawn Cemetery
New Road to New Interment Section
0
0
100,000
0
Description of Works
2023-24
2024-25
2025-26
2026-27
PROGRAM HEADER
250,000
250,000
135,000
80,000
CVC Wide
Coastal Management Program - Stage 2
250,000
250,000
25,000
0
CVC Wide
Coastal Management Program - Stage 3
0
0
110,000
0
CVC Wide
Coastal Management Program - Stage 4
0
0
0
80,000
2023-24
2024-25
2025-26
2026-27
232,607
162,374
84,613
849,210
Environmental Services Location (Asset)
Watercycle Location (Asset)
Description of Works
Fleet CVC Wide
Small Plant Replacement Program
2,619
15,566
4,568
8,565
CVC Wide
Light Fleet Replacement Program
103,740
110,437
80,045
182,922
CVC Wide
Heavy Plant Replacement Program
126,248
36,371
0
657,723
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
4,710,873
2,108,782
2,295,648
2,190,000
0
0
0
1,100,000
108,711
0
0
0
Pump Stations CVC Wide
Water Pump Station - Renewals
Mains CVC Wide
Water Mains - Renewals
Waterview Heights - 25221 - Gwydir Hwy (Btwn Friars and MCln)
1345m 100mm PVC
Capital Works Program 2023/24
93
Location (Asset)
Description of Works
Mains
94
2023-24
2024-25
2025-26
2026-27
4,710,873
2,108,782
2,295,648
2,190,000
Junction Hill 24014 - Taurus Avenue
86.6m 100mm AC
31,038
0
0
0
Junction Hill -24051- Trenayr Close
116m 100mm AC
25,868
0
0
0
Townsend - 23923 Jubilee St
1079m 100mm AC
534,017
0
0
0
Upper Copmanhurst - 24565 - Clarence Way
932m 100m uPVC
120,849
0
0
0
Junction Hill 24044 - Trenayr Close
220.8 100m AC
170,389
0
0
0
Waterview Heights - 25221 - Gwydir Hwy (Btwn MCln and Ryan)
1462m 100mm PVC
0
149,842
0
0
Eatonsville - 25141 - Orara Street
148m 100mm uPVC
0
42,780
0
0
Eatonsville - 25819 - South Street
48m 100mm uPVC
0
10,978
0
0
Ashby - 23786 - Old Ferry Road
2107m 100mm uPVC
0
597,072
0
0
South Grafton 22589 - Mcfarlane St 1 (Btwn Moorhead and Johnson)
114.1m 100mm AC
0
77,867
0
0
South Grafton 25641 - Mcfarlane St (Btwn Moorhead and Roberts)
255.2m 100mm AC
0
140,242
0
0
Woombah - 23743 Adam Street
541.7m 100mm AC
0
0
135,650
0
Palmers Island 23661 - South Bank Road (Amos to Camerons)
1363.7m 100mm AC
0
0
151,277
0
South Grafton 22847 - Tyson St
440.8m 250mm uPVC
0
0
507,182
0
Palmers Island Multi - South Bank Road (End)
2393.7m 100mm AC
0
0
311,539
0
Brooms Head
Main Renewal
540,000
540,000
540,000
540,000
Rushforth Road
Main Renewal
0
0
100,000
0
Lower River Swallow Road
Trunk Main Renewal
2,630,000
0
0
0
Clarence Valley Council
Location (Asset)
Description of Works
Mains
2023-24
2024-25
2025-26
2026-27
4,710,873
2,108,782
2,295,648
2,190,000
CVC Wide
Water Mains - Resilience Sinking fund
500,000
500,000
500,000
500,000
CVC Wide
Valve and Hydrant Renewal & upgrades
50,000
50,000
50,000
50,000
16,055,000
2,000,000
0
0
Reservoirs Maclean - 4.5ML
Roof Replacement
300,000
0
0
0
Wooli - Water Intake
Water Intake Upgrade
325,000
0
0
0
Lawrence Reservoir
Booster Pumps & Re-chlorination
330,000
0
0
0
Junction Hill Reservoir
Renewal & Recommissioning
0
2,000,000
0
0
Rushforth Road 32ML
"Reservoirs deferred from 21-22"
15,100,000
0
0
0
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
1,080,000
2,500,000
33,500,000
60,950,000
Monitoring CVC Wide
Scada Upgrade
Treatment CVC Wide
Water Sampling Taps
0
0
0
0
CVC Wide
Carbon Dioxide Dosing Renewal of Mass Flow Meter
0
0
0
0
Glenreagh
Filtration plant
980,000
0
0
0
Coutts Crossing
Filtration plant
100,000
0
0
0
Nymboida Infrastructure
2,634,000
1,000,000
2,500,000
2,500,000
Nymboida Armidale Road
Nymboida Headworks Infrastructure
2,384,000
1,000,000
2,500,000
2,500,000
Nymboida Armidale Road
Nymboida Infrastructure - Reseal Access Roads & Electrical Mechanical Renewals
200,000
0
0
0
Nymboida Armidale Road
Nymboida Infrastructure -Electrical Mechanical Renewals
50,000
0
0
0
0
0
6,500,000
5,200,000
0
0
6,500,000
5,200,000
1,510,000
4,660,000
160,000
160,000
160,000
160,000
160,000
160,000
1,350,000
4,500,000
0
0
160,000
160,000
160,000
160,000
160,000
160,000
160,000
160,000
52,000
52,000
52,000
52,000
Resilience Woodford Island
Slip replacement - all assets
Water Meters CVC Wide
Water Meter Replacements
CVC Wide
Automated Water Meter Reading System
Water Connections CVC Wide
New Installations
Plant & Equipment CVC Wide
Minor Plant & tools
20,000
20,000
20,000
20,000
CVC Wide
Instrument purchases
32,000
32,000
32,000
32,000
Capital Works Program 2023/24
95
Sewer Services Location (Asset)
Description of Works
Fleet
2024-25
2025-26
2026-27
177,172
81,570
1,164,757
618,506
1,298
8,895
225,558
1,794
CVC Wide
Small Plant Replacement Program
CVC Wide
Light Plant Replacements
107,757
72,675
60,640
79,942
CVC Wide
Heavy Plant Replacements
68,117
-
878,559
536,770
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
8,765,000
75,000
19,050,000
19,050,000
Mains CVC Wide
Sewer Rehabilitation & Relining
Treatment CVC Wide
STP Lightening Protection Program
175,000
0
0
0
Coutts Crossing STP
Coutts Crossing STP - EPA Licence requirements
2,360,000
0
0
0
Grafton - North Grafton STP
North Grafton STP - EPA Licence requirements
0
75,000
19,050,000
19,050,000
Grafton - North Grafton STP
Settlement Pond - Rehabilitation
3,600,000
0
0
0
Clarenza - STP
Clarenza STP Sludge Lagoon Renewal Deferred from 21-22
2,630,000
0
0
0
1,450,000
325,000
325,000
325,000
Pump Stations Yamba - Pump Station
Upgrade Pump Station Y1
250,000
0
0
0
South Grafton Crossroads 1S
WHS Pump Station Upgrades 1S
100,000
0
0
0
Grafton - 7AN
Pump station & Rising Main Replacement
775,000
0
0
0
CVC Wide
WHS Pump Station LID Upgrades
25,000
25,000
25,000
25,000
CVC Wide
Sewer Pump Station Renewals
300,000
300,000
300,000
300,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
0
0
0
0
70,000
70,000
70,000
70,000
Monitoring CVC Wide
Scada Upgrade
CVC Wide
Telemetry Upgrade Clear Scada
Pressure Systems CVC Wide
Sewer Pressure Pump Station Renewals
50,000
50,000
50,000
50,000
Yamba - Y2 Pilot Hill Sewer Pressure
Sewer Pressure Pump Station Renewals
0
0
0
0
CVC Wide
Pressure Sewer Installation - Council Funded
20,000
20,000
20,000
20,000
22,500
22,500
22,500
22,500
22,500
22,500
22,500
22,500
Plant & Equipment CVC Wide
96
2023-24
Minor Plant and tools
Clarence Valley Council
Location (Asset)
Description of Works
2023-24
2024-25
2025-26
2026-27
10,000
10,000
10,000
10,000
Sewer Easement Acquisition
10,000
10,000
10,000
10,000
Description of Works
2023-24
2024-25
2025-26
2026-27
1,180,000
1,431,500
33,000
0
Easements CVC Wide
Holiday Parks Location (Asset) Renewals Brooms Head - Brooms Head Holiday Park
Amenities - A Block & Permanents Design & Construct
40,000
600,000
0
0
Brooms Head - Brooms Head Holiday Park
Amenities - B Block Roof Replacements
100,000
0
0
0
Brooms Head - Brooms Head Holiday Park
Amenities - C,D& E Block Fixtures Replacements, Partitions & repainting
80,000
0
0
0
Wooli - Wooli River Holiday Park
Amenities - Fixtures Replacements, Partitions & repainting
50,000
0
0
0
Iluka - Iluka Holiday Park
Amenities - Fixtures Replacements, Partitions & repainting
50,000
0
0
0
Minnie Water - Minnie Water Holiday Park
Amenities - Fixtures Replacements, Partitions & repainting
80,000
0
0
0
Yamba - Calypso Holiday Park
Amenities - Fixtures Replacements, Partitions & repainting
80,000
0
0
0
Iluka - Iluka Holiday Park
Cabin Substructure Renewals
200,000
0
0
0
Brooms Head - Brooms Head Holiday Park
Cabin - Furniture & Fixtures Replacements, Appliances, blinds, Internal Linings
100,000
0
0
0
Minnie Water - Minnie Water Holiday Park
Cabin - Furniture & Fixtures Replacements, Appliances, blinds, Internal Linings
40,000
0
0
0
Yamba - Calypso Holiday Park
Unsealed Roads
40,000
0
0
0
Minnie Water - Minnie Water Holiday Park
Unsealed Roads
40,000
0
0
0
Brooms Head - Brooms Head Holiday Park
Unsealed Roads
40,000
0
0
0
Yamba - Calypso Holiday Park
Sealed Roads
50,000
0
0
0
Minnie Water - Minnie Water Holiday Park
Sealed Roads
50,000
0
0
0
Capital Works Program 2023/24
97
Location (Asset)
Description of Works
Renewals
2024-25
2025-26
2026-27
1,180,000
1,431,500
33,000
0
Brooms Head - Brooms Head Holiday Park
Sealed Roads
50,000
0
0
0
Brooms Head - Brooms Head Holiday Park
Sullage Upgrade - Detailed Design & Construct
40,000
0
0
0
Yamba - Calypso Holiday Park
Park Offices - Furniture & Fittings
5,000
5,200
5,400
0
Brooms Head - Brooms Head Holiday Park
Park Offices - Furniture & Fittings
5,000
5,200
5,400
0
Minnie Water - Minnie Water Holiday Park
Park Offices - Furniture & Fittings
5,000
5,200
5,400
0
Iluka - Iluka Holiday Park
Park Offices - Furniture & Fittings
5,000
5,200
5,400
0
Wooli - Wooli River Holiday Park
Park Offices - Furniture & Fittings
5,000
5,200
5,400
0
Yamba - Calypso Holiday Park
Park Offices - Office Equipment
5,000
1,100
1,200
0
Brooms Head - Brooms Head Holiday Park
Park Offices - Office Equipment
5,000
1,100
1,200
0
Minnie Water - Minnie Water Holiday Park
Park Offices - Office Equipment
5,000
1,100
1,200
0
Iluka - Iluka Holiday Park
Park Offices - Office Equipment
5,000
1,100
1,200
0
Wooli - Wooli River Holiday Park
Park Offices - Office Equipment
5,000
1,100
1,200
0
Minnie Water - Minnie Water Holiday Park
OSM Design & Construct
0
800,000
0
0
400,000
11,340,000
14,150,000
0
Improvements
98
2023-24
Yamba - Calypso Holiday Park
Site Improvements (Syn Grass/Drainage)
50,000
0
0
0
Brooms Head - Brooms Head Holiday Park
Site Improvements (Syn Grass/Drainage)
50,000
0
0
0
Iluka - Iluka Holiday Park
Site Improvements (Syn Grass/Drainage)
50,000
0
0
0
Minnie Water - Minnie Water Holiday Park
Site Improvements (Syn Grass/Drainage)
50,000
0
0
0
Wooli - Wooli River Holiday Park
Site Improvements (Syn Grass/Drainage)
0
40,000
0
0
Yamba - Calypso Holiday Park
EV Electric Charging Centres
40,000
0
0
0
Clarence Valley Council
Location (Asset)
Description of Works
Improvements
2023-24
2024-25
2025-26
2026-27
400,000
11,340,000
14,150,000
0
Brooms Head - Brooms Head Holiday Park
EV Electric Charging Centres
40,000
0
0
0
Iluka - Iluka Holiday Park
EV Electric Charging Centres
40,000
0
0
0
Minnie Water - Minnie Water Holiday Park
EV Electric Charging Centres
40,000
0
0
0
Wooli - Wooli River Holiday Park
EV Electric Charging Centres
40,000
0
0
0
Brooms Head - Brooms Head Holiday Park
New Cabins x 6
0
1,500,000
0
0
Iluka - Iluka Holiday Park
New Cabins x 2 each year
0
500,000
500,000
0
Iluka - Iluka Holiday Park
Road Upgrades Camping Area
0
200,000
0
Minnie Water - Minnie Water Holiday Park
Redevelopment engagement & Staged Construct
0
200,000
500,000
0
Brooms Head - Brooms Head Holiday Park
Redevelopment engagement & Staged Construct
0
500,000
4,000,000
0
Wooli - Wooli River Holiday Park
Redevelopment engagement & Staged Construct
0
200,000
450,000
0
Iluka - Iluka Holiday Park
Redevelopment engagement & Staged Construct
0
400,000
500,000
0
Yamba - Calypso Holiday Park
Redevelopment engagement & Staged Construct
0
8,000,000
8,000,000
0
2023-24
2024-25
2025-26
2026-27
11,382
20,506
35,736
20,101
11,382
20,506
35,736
20,101
341,507
345,831
350,708
340,057
4,417
2,000
0
0
337,090
343,831
350,708
340,057
2023-24
2024-25
2025-26
2026-27
Libraries Services Location (Asset)
Description of Works
Public Library Grafton, Maclean, Yamba, Iluka
Furniture & Equipment
Regional Library Grafton - Regional Library
Furniture & Equipment
Grafton - Regional Library
Library Book Stock Replacement Program
TOTALS
210,203,839 123,044,114 122,664,635 132,224,027
Capital Works Program 2023/24
99
100
Clarence Valley Council
Clarence Valley Council
Revenue Policy 2023/2024
Revenue Policy 2023/2024
101
1. Proposed Borrowings General Fund
Water Fund
The general fund proposes to borrow up to $10
There are no proposed loan borrowings between
million during 2023/2024 over a term of 15 years
2023/2024 and 2032/2033. All loans will have been repaid in full by 30 June 2033.
as part of the funding strategy for investing in the upgrade of the Regional Aquatic Centre and the Yamba Community Centre. Works on these projects
102
Sewer Fund There are no proposed loan borrowings between
have commenced and will move to the construction
2023/2024 and 2032/2033. All loans will have been
stage during 2023/2024 and 2024/2025.
repaid in full by 30 June 2033.
Clarence Valley Council
Loan Information included in the Long Term Financial Plan Loan Repayments (Principal & Interest) by Fund from 2023/2024 to 2032/2033: Fund/Year
2023/2024
2024/2025
2025/2026
2026/2027
2027/2028
General
$2,562,864
$3,440,141
$3,440,141
$3,440,142
$3,440,142
Water
$2,655,018
$2,655,018
$2,655,018
$2,655,018
$2,655,018
Sewer
$8,225,058
$8,184,600
$8,144,850
$8,105,100
$8,065,622
Total
$13,442,940
$14,279,759
$14,240,009
$14,200,260
$14,160,782
Fund/Year
2028/2029
2029/2030
2030/2031
2031/2032
2032/2033
General
$1,012,628
$1,012,628
$1,012,628
$1,012,628
$1,012,629
Water
$2,430,065
$2,430,065
$2,430,065
$2,430,065
$2,319,567
Sewer
$5,912,226
$5,872,476
$4,347,619
$4,347,619
$4,883,794
Total
$9,354,919
$9,315,169
$7,790,312
$7,790,312
$8,215,990
Principal Outstanding (Loan Liability) by Fund from 2023/2024 to 2032/2033: Fund/Year
2023/2024
2024/2025
2025/2026
2026/2027
2027/2028
General
$8,511,639
$16,156,036
$13,649,520
$10,980,871
$8,139,809
Water
$16,569,890
$15,113,657
$13,546,937
$11,860,875
$10,047,025
Sewer
$45,377,477
$39,910,831
$34,158,617
$28,098,735
$21,708,954
Total
$70,458,675
$71,180,223
$61,354,772
$50,940,481
$39,895,788
Fund/Year
2028/2029
2029/2030
2030/2031
2031/2032
2032/2033
General
$7,600,910
$7,028,773
$6,421,347
$5,776,457
$5,091,791
Water
$8,325,673
$6,470,997
$4,472,670
$2,319,567
$0
Sewer
$17,129,291
$12,311,098
$8,735,901
$4,883,794
$0
Total
$33,055,874
$25,810,868
$19,629,918
$12,979,818
$5,091,791
Revenue Policy 2023/2024
103
2. Rates Income General Fund
Categorisation
Council levies property rates in accordance
The Local Government Act requires that all rateable
with the provisions of the Local Government
properties be categorised as one of four categories
Act. Each property that is rateable has a rate
of ordinary rates based on the dominant use of the
levied which is either a minimum rate or a base
property.
charge plus ad valorem rate. The Act allows a number of variations on how rates can be levied and to understand the difference it is handy to understand the following terms:
Unimproved Capital Value (UCV)
Business Farmland Mining Properties that are subject to a Mixed Development
This is the value of a parcel of land, as
Apportionment Factor (MDAF) as supplied by the
determined by the NSW Valuer General, not
Valuer General are rated part Residential and part
taking into account any improvements such as
Business on the percentage basis of that MDAF and
houses, landscaping, pools, etc.
are not categorised according to the dominant use
Ad Valorem (On the Value) Rate This is the rate in the $ based on a property’s UCV. For instance, a rate in the $ rate of 0.5184 means a property is rated 51.84 cents for every $100 UCV.
Minimum Rate Council can also charge a minimum rate, which means that if the rate applicable under the ad valorem rate is less than the minimum, then the minimum will be charged.
Base Rate In addition to an ad valorem rate, Council can also charge a base rate which when added to the ad valorem rate gives the applicable rate. The levying of a base rate tends to nullify the effects of wide variations in the movement of the property values. It assumes that all properties benefit from the availability of services and facilities provided by the Council.
104
Residential
Clarence Valley Council
of the property.
Valuations Rates are calculated on the land value of a property, multiplied by a ‘rate in the dollar’. The land value is determined by the NSW Valuer General who issues a Notice of Valuation at least every three years. The Valuation of Land Act 1916 requires that Council assess rates using the most recent values provided. For the 2023/2024 rating year, the valuation base date will be 1 July 2022.
2023/2024 Rate Peg
2023/2024 Rate Levy
The rate peg is the maximum percentage Councils
Business B – Maclean/Townsend
can increase their income from ordinary rates. Revenue from rates represents one of the main sources of income for Councils in NSW. The rate peg protects ratepayers from excessive rate increases, while ensuring Councils receive a fair amount of income from rates which enables them to provide quality services for their communities.
Maclean CBD has been defined as the business properties located within the following area – from the river up Taloumbi Street to River Street east along River Street to Short Street, down Short Street to Stanley Street, south along Stanley Street to Alexander Street then into McLachlan Street to Howard Street, Howard Street to the
The Independent Pricing and Regulatory Tribunal
river. A map showing this CBD boundary is
(IPART) have determined that Council’s general
attached, refer Appendix A.
ordinary rate income may be increased by 5.4% in accordance with Section 506 of the
Business C – Iluka
Local Government Act 1993 for the rating year
Iluka industrial area has been defined as all
commencing 1 July 2023.
businesses located within the industrial estate off Henry Searle Drive. A map showing this Iluka industrial area boundary is attached, refer Appendix A.
Business D – Yamba Yamba Town CBD has been defined to include the business properties within the following area – from Ford Park up Claude Street across to the Yamba Golf Club to Queen Street, Queen Street up to Clarence Street, Clarence Street to Ritz Street and then down Ritz Street to the coast line. A map showing this CBD boundary is attached, refer Appendix A. The Treelands Drive business area has also been identified as a CBD area for Yamba and has been defined as follows. The business properties on the western side of Treelands Drive and the business properties on the eastern side of Treelands Drive between Yamba Road and Roberts Close. A map showing this CBD boundary is attached, refer Appendix A.
Revenue Policy 2023/2024
105
2023/2024 Rate Levy
Pensioners
Business E – Grafton and South Grafton
Ratepayers that hold a current Pensioner Concession Card may be eligible to receive a rebate on rates for a property that is their sole
Grafton CBD (north side of the river) defined
or principal place of residence. The rebate
as business properties within the following
varies from one property to another and will be
area – from the river up Mary Street to
calculated at the time the application is made.
Bacon Street, down Bacon Street to Queen
The rebate for a full year from 1 July to 30 June
Street, Queen Street to Oliver Street, down
will be based on 50% of the residential rate levy
Oliver Street to Villiers Street, Villiers Street
to a maximum of $250, 50% of the water levy
to Clarence Street and then down Clarence
to a maximum of $87.50, 50% of the sewerage
Street to the river. A map showing this CBD
levy to a maximum of $87.50. Where 50% of the
boundary is attached, refer Appendix A.
water levy is less than $87.50 in one year, the
South Grafton CBD defined as business properties within the following area – from the river down Cowan Street to Ryan Street, then east along Ryan Street to Bligh Street, along Bligh Street to Vere Street, Vere Street to Kelly Street, Kelly Street to the Pacific Highway, along Schwinghammer Street to Heber Street and then back to the river. A map showing this CBD boundary is attached, refer Appendix A.
Business F – Grafton and South Grafton Other Business will include all business properties located outside the boundaries of the Grafton and South Grafton CBD areas including the business properties located at Junction Hill and Trenayr. A map showing the Junction Hill and Trenayr business boundaries is attached, refer Appendix A.
106
Clarence Valley Council
remaining pension entitlement will be applied to the water consumption account until the maximum of $87.50 has been granted. Pro rata rebates are available and will be calculated for each full quarter following the quarter in which the pensioner becomes eligible.
Rate Structure The Rate Levy tabled below is a summary of the recommended Rate Structure for 2023/2024 which includes an increase of 5.4% to the general income as originally suggested by The Independent Pricing and Regulatory Tribunal (IPART) under section 506 of the Local Government Act. The number of properties, total yield and rates in $ have been updated to reflect the most recent land valuation/ property adjustments as supplied by the Valuer Generals Department. The rate structure for 2023/2024 also contains the following:
Yamba, Maclean and Townsend Residential Categories Base Amount increases from $512 to $540.
All Business Rating Categories (except Grafton and South Grafton) Base Amount increases from $512 to $540.
Residential “Outside Town Areas” and Residential A – “Coastal Villages” minimum increases from $677 to $712.
Farmland Category as a Base Amount increase from $330 to $350.
Jetties Category will be charged a minimum rate of $65
Revenue Policy 2023/2024
107
Rate Structure Category
Number of Properties
Farmland
2279
Residential – Ashby, Chatsworth, Copmanhurst, Brushgrove, Gulmarrad, Harwood, Ilarwill, Lawrence, Palmers Island, Coutts Crossing, Woombah, Cowper, Glenreagh, Swan Creek, Tucabia, Ulmarra, Waterview, Seelands, Eatonsville, Illarwill, Tyndale plus rural residential areas. This includes residential flood prone land (15 properties)
8129
Residential A – Angourie, Brooms Head, Diggers Camp, Iluka, Sandon River, Minnie Water, Wooloweyah, Wooli
2286
Residential B – Maclean, Townsend
Number on Minimum
Total Land Value
Cents in the $
Minimum
Base Amount
Total Yield
1,809,724,170
0.0018796
$350.00
$4,199,208
2375
2,634,311,840
0.0032661
$712.00
$9,095,085
367
1,466,006,626
0.0019966
$712.00
$3,002,872
1659
519,402,490
0.0021824
$540.00
$2,029,404
Residential C – Yamba
3509.56
2,424,071,864
0.0016281
$540.00
$5,841,794
Residential E – Grafton, Junction Hill
7887.02
1,276,143,342
0.00588060
$540.00
$11,763,500
Business
226
82,446,454
0.003773
$540.00
$433,110
Business B – Maclean
168
94,673,910
0.0041829
$540.00
$486,731
57
54,449,200
0.0028437
$540.00
$185,617
284.44
272,567,988
0.002809
$540.00
$919,241
Business E – Grafton & South Grafton CBD
378.29
128,402,022
0.0173226
$540.00
$ 2,428,533
Business F – Grafton & South Grafton Other Business
302.69
107,021,586
0.0067746
$540.00
$888,481
76
264,800
27242
10,869,486,292
Business B – Maclean, Townsend Other Business Business C – Iluka Industrial Business C – Iluka Other Business Business D – Yamba CBD (Includes Treelands Drive) Business D – Yamba Other Business
Jetties Total Ordinary Rates
108
Clarence Valley Council
$65.00
$4,940 $41,278,517
3. Water Charges The requirements of best practice pricing for water include having one price for both residential and non-residential consumers and acquiring 25% of income from fixed charges and 75% of income from consumption charges. The charges for 2023/2024 are shown in Tables 1 and 2 where an increase of 4.75% has been applied. Best Practice Pricing requires a single charge for both residential and non-residential consumers, charges for 2023/2024 will be in accordance with Table 3.
Table 1: 2023/2024 Water Consumption Charges 2022/2023 Charge
2023/2024 Charge
Consumption
$2.65
$2.78
Residential inclining block for average daily water consumption above 1.233kl/day per unit or residence per billing period
$3.98
$4.17
Fire Service consumption - water usage registered on fire service meter that was not for the purpose of the fire service charged per kl
$10.60
$10.82
Consumption Untreated (Raw) Water
$1.33
$1.39
Non-residential High Consumption Charge (for developments that were approved after 1 July 2021) for average daily water consumption above 1.233kl/day per billing period.
$7.49
$7.83
Estimated 2023/2024 Yield
$13.21m
Revenue Policy 2023/2024
109
Table 2: Fixed (Access) Water Charges for 2023/2024 Charge Description/Meter Size
2022/2023 Charge
2023/2024 Charge
Water Vacant
$177.00
$185.00
Residential Water 20mm
$130.00
$136.00
Residential Water 25mm
$203.00
$213.00
Residential Water 32mm
$333.00
$348.00
Residential Water 40mm
$521.00
$544.00
Residential Water 50mm
$814.00
$850.00
Residential Water 80mm
$2,083.00
$2,176
Residential Water 100mm
$3,254.00
$3,400
Untreated Water 20mm
$105.00
$111.00
Untreated Water 25mm
$178.00
$153.00
Water Non-Residential 20mm
$130.00
$136.00
Water Non-Residential 25mm
$203.00
$213.00
Water Non-Residential 32mm
$333.00
$348.00
Water Non-Residential 40mm
$521.00
$544.00
Water Non-Residential 50mm
$814.00
$850.00
Water Non-Residential 80mm
$2,083.00
$2,176
Water Non-Residential 100mm
$3,254.00
$3,400
Water Non-Residential 150mm
$7,323.00
$7,650
2023/2024 Yield
$3.33m
*The access charge for meter sizes greater than 20mm is calculated on the square of the meter size compared with a 20mm meter Untreated water consumers supplied direct from trunk mains prior to treatment are charged at half of the above access charges. Council does not approve any additional untreated water connections.
Table 3: Proposed consumption charge for 2023/2024 Best Practice Pricing requires a single charge for both residential and non-residential consumers, charges for 2023/2024will be in accordance with Table 3. Consumption Charge
Consumption $/kl
110
Clarence Valley Council
2022/2023
2023/2024
$2.65
$2.78
4. Sewerage Charges In May 2004, the then Department of Energy,
fees and charges. In April 2005, Council resolved
Utilities and Sustainability (DEUS) released
to adopt best practice pricing for sewerage with
guidelines for the Best Practice Management of
common sewerage charges across the Council
Water Supply and Sewerage. The guidelines require
area, and best practice pricing was implemented in
Council to charge a uniform sewerage bill for
the 2005/06 financial year.
residential properties, a two part tariff comprising an annual access charge and a uniform sewer
Table 1 below shows the sewerage charges for
usage charge per kilolitre (kL) for non-residential
2023/2024 and Table 2 shows the access charge for
properties and appropriate liquid trade waste
non-residential properties.
Table 1: Charges for 2023/2024 Charge Description
Sewer Residential Connected Charge
Adopted 2022/2023 Charge
$1,218
Proposed 2023/2024 Charge
$1,276
Estimated Yield 2023/2024
$16.84M
As per Table 13
Sewer Residential Connected Pressure System
$1,193
$1,251
As Per Table 11
As Per Table 11
$704
$737
As per Table 12
As per Table 12
Non-Rateable Sewerage Connection Charge
$3.69
$3.87
Properties exempt from Rating under Sec 556 Sewerage Generation Charge
$3.69
$3.87
Sewer Availability Charge Non-Rateable Sewer Generation Charge
Properties exempt from Rating under Sec 556 Sewer Connection Charge (per connection or separate occupation)
$1,218
$1,276
As per Table 13
As per Table 14
Non-residential High Consumption Sewerage Generation Charge (for development approved after 1 July 2021) for sewerage generation above 0.74kL/day per billing period – Grafton, Junction Hill & Coutts Crossing
$5.72/Kl
$6.00/Kl
Non-residential High Consumption Sewerage Generation (for development approved after 1 July 2021) for sewerage generation above 0.74kL/day per billing period – Maclean, Townsend, Ilarwill, Lawrence, Iluka, Yamba
$7.32/Kl
$7.67/Kl
$1.78M $387,162
1. Properties within a pressure sewer zone are charged $25 less than properties in a gravity sewer zone to reflect the average cost of pressure pump electricity consumption which is paid for by the property 2. The non-residential sewer charge is the sum of the access charge and the generation charge, with a minimum charge of the residential charge ($1,276 for 2023/2024). As meters are read three times per year, the minimum non-residential charge will be calculated on an equivalent charge of $3.49 per day. 3. Residential properties are charged the Sewer Residential Connected Charge per connection or separate occupation, within the Sewerage Access area and connected to the sewer. In respect of Residential Flat Buildings or properties under separate occupation, the sewer residential connected charge will be equal to the number of residential flats or separate occupation multiplied by the Sewer Residential Connected Charge for a single connection. 4. Properties exempt from Ordinary Rates in accordance with the Local Government Act are charged the Non-Rateable Sewer Connection Charge per connection or separate occupation, within the Sewerage Access area and connected to the sewer. In respect of Residential Flat Buildings or properties under separate occupation, the Non-Rateable Sewer Connection Charge will be equal to the number of residential flats or separate occupation multiplied by the Non-Rateable Sewer Connection Charge for a single connection.
Revenue Policy 2023/2024
111
Table 2: Fixed (Access) Sewer Charges for 2023/2024 Charge Description/Meter Size
Sewer Non-Residential Availability Charge
2022/2023 Charge
2023/2024 Charge
$704
$737
Sewer Non-Residential 20mm
$1,217
$1,276
Sewer Non-Residential 25mm
$1,217
$1,276
Sewer Non-Residential 32mm
$1,261
$1,887
Sewer Non-Residential 40mm
$2,817
$2,948
Sewer Non-Residential 50mm
$4,401
$4,606
Sewer Non-Residential 80mm
$11,267
$11,792
Sewer Non-Residential 100mm
$17,604
$18,425
Sewer Non-Residential 150mm
$39,610
$41,456
Sewer Non-Res 20mm Pressure System
$1,192
$1,251
Sewer Non-Res 25mm Pressure System
$1,192
$1,251
Sewer Non-Res 32mm Pressure System
$1,236
$1,862
Sewer Non-Res 40mm Pressure System
$2,792
$2,923
Sewer Non-Res 50mm Pressure System
$4,376
$4,581
Sewer Non-Res 80mm Pressure System
$11,242
$11,767
Sewer Non-Res 100mm Pressure System
$17,579
$18,400
*The access charge for meter sizes greater than 20mm is calculated on the square of the meter size compared with a 20mm meter Liquid trade waste fees and charges are shown in the fees and charges section.
112
Clarence Valley Council
Estimated Yield 2023/2024
$1.43m
5. Waste Management Charges The Domestic Waste Management (DWM) charge
Council meeting held on the 28 March 2023, it was
must be determined each year pursuant to Section
resolved to commence a new bulky waste collection
496 of the Local Government Act, 1993. This charge
model from 1 July 2023 that aligned with the new
is audited by Council’s external auditors to ensure
10 year Domestic Waste Management Contract.
that the rate is reasonable and that the cost of collecting and processing domestic waste throughout the Council area is relative to the charge for providing the service.
Council levies a waste management charge pursuant to Section 501 of the Local Government Act 1993 on all rateable properties. The levy contributes to the cost of developing waste
Council resolved at its meeting held on the 23 August
management infrastructure such as waste transfer
2022 to accept a tender from JR Richards and Sons
stations, landfills, composting facilities, recycling
to provide domestic waste collection and waste
centres and other services such as litter collection.
processing services for the next 10 years. At the
The 2022/2023 levy has increased from $67 to $70.
Domestic Waste Charge (s.496)
2022/2023 Charge
2022/2023 Yield
2023/2024 Charge
2023/2024 Yield
3 Bin Service
$375
$6,826,125
$390
$7,148,310
2 Bin Service
$308
$1,207,052
$337
$1,347,663
Vacant Land
$35
$59,395
$37
$61,531
Additional Red Bin
$200
$55,400
$208
$67,392
Additional Yellow Bin
$110
$6,380
$115
$7,360
Additional Green Bin
$135
$6,615
$115
$6,900
2022/2023 Charge
2022/2023 Yield
2023/2024 Charge
2023/2024 Yield
$67
$1,807,392
$70
$1,911,070
Waste Management Charge (s.501)
Waste Management Charge
6. On-Site Effluent Disposal Systems The annual charge to fund the required level of auditing of the 9,311 on-site sewerage management systems has been indexed by 5% to $46 for 2023/2024 ($44 2022/2023). The charge is levied on all properties with on-site effluent disposal systems and the charge is known as “Residential – Onsite Wastewater Management” Charge
Revenue Policy 2023/2024
113
7. Backflow Prevention Device Annual Charge The annual charge to fund the administration of the
be annually tested and certified in accordance with
backflow prevention device program including the
Council’s Backflow prevention and cross connection
auditing of the backflow devices has been indexed
control policy. The charge known as “Non-Residential
by 5.0% to $65 for 2023/2024 ($62 2022/2023). The
Backflow Prevention Device” Charge, is per annum
charge is levied on properties that have containment
and per containment device. There are currently 99
backflow prevention devices that are required to
Backflow Prevention Devices to administer.
8. Stormwater Annual Charge In accordance with Section 496A of the Local Government Act 1993 Council proposes to make and levy an annual charge for the provision of stormwater management services for each eligible urban property. Council’s Stormwater charging structure for 2023/2024 is as follows: Consumption Charge
2023/2024
Stormwater Management Charge – Residential
$25.00
Stormwater Management Charge – Strata
$12.50
Stormwater Management Charge – Business
$25.00
9. National Competition Policy – Business Activites In accordance with Pricing and Costing for Council Businesses – A Guide to Competitive Neutrality Council has declared the following activities as business activities
Category 1
Category 2
(where gross operating turnover is over $2 million)
(where gross operating turnover is less than $2
Clarence Valley Council Water Supply Fund
million)
Provision of Water Supply Services
Council has no category 2 businesses
Clarence Valley Council Sewerage Services Provision of Sewerage Augmentation Reticulation & Treatment
Holiday Parks Camping and Holiday Park Accommodation
114
Clarence Valley Council
10. Fees and Charges for 2023/2024 Clause 201 of the Local Government (General)
Details of those fees and charges subject to
Regulation 2005 provides that Council’s Revenue
GST and exempt from GST are identified in the
Policy must include a statement of the types of fees
schedule of Fees and Charges. The GST status
proposed to be charged by Council, the amount of
of each charge/fee depends on whether there is
each fee, estimated yield and the proposed pricing
consideration for a supply. Some fees and charges
methodology for each fee.
are exempt from GST in accordance with the
A schedule of Fees and Charges for 2023/2024 has been prepared and is available on Council’s website at www.clarence.nsw.gov.au. Council’s schedule of Fees and Charges has 1,758 fees including 120 new fees.
Federal Treasurer’s Determination under Section 81-5 of the A New Tax System (GST) Act 1999 as amended, and as assessed under the Tax Laws Amendment (2011 Measures 2 No. 2) Bill 2011: exempting taxes, fees and charges from the GST. Generally, where permissible, the majority of
Each fee or charge has been categorised as
Council’s fees and charges have been increased
follows:
by an estimated CPI amount of 4% and rounded. Some prices vary outside CPI based on specific
U - User Pays Council pricing reflects the nature
issues impacting the operations, costs, or pricing
of service and costs.
parameters of the particular service. Regulatory or
R - Regulatory The price is set by Council for a goods/service which Council has a regulatory right or obligation to provide.
S - Statutory The price charged for this goods/ service is a statutory charge set by government regulation.
statutory fees will increase in line with government pronouncements. The following pricing categories have been used in determining the fees, which are summarised below:
Full Cost Pricing - Fees are set to enable the recovery of all direct and indirect costs involved in the provision of a service.
Subsidised Pricing - Fees and charges are set at a level that recovers less than the full cost incurred in service delivery. In effect some level of subsidisation is factored into the price.
Market Pricing - Fees and charges are based on current market fee structures. The market price is usually determined by examining competitors’ prices and may have little relationship to the cost of providing the service.
Statutory Pricing - Fees and charges are set to comply with statutory legislation.
Revenue Policy 2023/2024
115
Sewer and Water Connection Fees Sewer and water connection fees are calculated
to the capital contribution for 1 water ET. The
as outlined in Council’s Policy “Sewer and Water
capital component for larger size water meters is
Capital Contribution Credits for Properties not
based on an ET assessment of the meter capacity.
paying availability charges as at 28 June 2005”. This policy specifies that the connection fee for properties not paying sewer and/or water
The sewer and water contributions for 1 ET were initially set in the Development Servicing Plans for Sewer and Water adopted by Council on 28
availability charges as at 28 June 2005 will include
June 2005, and is adjusted annually using the
a capital component. The capital component for
methodology specified in the Department of
sewer is equivalent to the capital contribution for
Primary Industries - Water Guidelines. The sewer
1 sewer Equivalent Tenement (ET) and the capital
and water contributions for 1 ET are listed in the
component for a 20mm water meter is equivalent
Fees and Charges as “Section 64 contributions”.
11. Hardship Ordinary Rates and Annual Charges Policies The purpose of these policies is to establish
way of doing so. Where there is no willingness to
guidelines for the General Manager and staff on
make payments against outstanding Ordinary Rates
providing appropriate assistance to ratepayers
and Annual Charges, the right of Council to take
suffering financial difficulties with the payment
legal action is well-defined.
of Ordinary Rates and Annual Charges in both normal times and in times of natural disaster and health pandemics.
116
These policies recognise that ratepayers may at times encounter difficulty in the payment of rates and charges. The Local Government Act 1993
The intent of these policies is to ensure that
allows Council to provide assistance to those
ratepayers facing financial hardship, but with
ratepayers. Application for hardship must be made
the will to make payments against their Ordinary
on the appropriate form which is available from
Rates and Charges, have a clear and simplified
Council’s website www.clarence.nsw.gov.au.
Clarence Valley Council
Our Financial Summary
1. 2023/2024 Budget and Long Term Financial Plan Assumptions and factors affecting the budget result have been incorporated into the 2023/2024 budget and 2023/2024 to 2032/2033 Long Term Financial Plan (LTFP) are as follows:
1 General rate revenue will be increased by the
2 Revenue streams and future service
Rate Peg which is set at 5.4% p.a. for 2023/2024
requirements will be adjusted for population
and is then forecast to be 2.5% from 2025/25
growth forecasts where a direct relationship can be
24 onwards. 2020-21 saw the completion of the
determined. Population forecasts will be based upon
SRV Rate peg increase meaning that the standard
the Forecast Id consultant’s population projections
Rate Peg now applies from 2021/22 onwards.
for the Clarence Valley (currently + 0.65% p.a.).
For the next 5 years (2023/2024 to 2027/2028), the estimated yield from the now built in SRV component of our rate base will be restricted and then subsequently used to improve infrastructure as per the SRV requirements. The estimated yield in 22/23 is $5.701mil per the original SRV application.
Revenue Policy 2023/2024
117
3 Recurrent operating expenditure for 2023/2024
8 Domestic Waste Management Charges will
will be based on the Revised Budget as of
be calculated based upon the reasonable cost
December 2022 plus 4%, with consideration of
requirements (The specific Domestic Waste Charge
actuals and any additional maintenance required
income funds the operating and maintenance costs
for new assets. This position will then be further
associated with providing the service).
adjusted for contractual obligations or for expected spend as informed through discussion with
9 Operating Grants - Council has assumed it
Management. From 2024/2025 onwards recurrent
will continue to receive operating grants in relation
operating expenditure generally will be indexed by
to ongoing operations (where evidenced by
3.5% p.a.
management) and that these will generally increase annually in line with estimated indexation of 4%.
4 Recurrent operating revenue for 2022/2023
Operating grants received for specific project
will initially be increased in line with service
related purposes have been included in the year
deliverables and as evidenced through discussion
Council anticipates they will be received.
with Management. A general indexation rate of 4% p.a. will be applied on all general revenue streams
10 Capital Grants - the capital grants applied in
where no other evidence is available to support a
the model will be based on the capital grants for
specific revenue increase and reduce to 3.5% from
2023/2024, as indicated in the updated rolling 4
2024/2025 onwards
year capital works program. These assumptions have been carried out into latter years.
5 Interest and investment income forecast at a conservative rate of 3% per year, based on the
11 The Financial Assistance Grant value is
running yield of Council's investment portfolio (value
estimated at $12,549,492, which is an increase
average $134 million per month) for the quarter
of approximately 4%. This assumes the current
ended 30 September 2022. This will be increased
prepayment arrangements stand however it is
by 1% p.a. up to 5% after which it will change
noted that the actual value and payment will be
based on the now-expected RBA wholesale interest
determined by the Federal Government determined
rate increases.
in late May 2022. Council has assumed over the 10 years of the Long Term Financial Plan that the "in
6 Water Charges will be indexed by 4.75% pa for
advance" tap has not been turned off, and therefore
2023/2024 and 3% pa from 2024/2025 onwards.
Council does not have to report a drop in Financial
7 Sewer Charges will be indexed by 4.75% pa for 2023/2024 and 3% pa from 2024/2025 onwards.
Assistance Grant income.
12 Tax equivalent dividends will be based upon the maximum allowable rate of $3 per assessment (which equates to approximately $75K from the Water Fund and $80K from the Sewer Fund). These figures will be adjusted by each estimated charge increases, and population increases.
118
Clarence Valley Council
13 All positions on the adopted organisation
18 Superannuation - Employees are generally in
structure to be funded unless otherwise indicated.
either of two schemes:
14 Employee wage increases are estimated at
per employee contribution
4.5% p.a. for 2023/2024 and 4.5% for 2024/2025, as per the estimated Local Government (State) Award 2023 and are estimated at 3.5% pa for 2025/2026 onwards.
The Defined Benefits scheme, are calculated as
The Super Guarantee Scheme (SG), Council is legislatively required to contribute 11% of the employee's gross wages for 2023/2024. The
15 Leave Entitlement accruals will be based upon
SG rate will then be increasing to 11.5% from
the assumption that all positions in the organisation
July 2024, and eventually increasing to 12%
structure will be filled.
from July 2025.
16 Workers Compensation premiums will be
19 Electricity and Street lighting charges will be
based upon 3% of the estimated wages from
indexed by 5% from 2023/2024 onwards
2023/2024 onwards. The historical Basic Tariff Premiums as a % on wages is as follows: 2020/2021 - 2.594%, 2021/2022 - 2.594%, and 2022/2023 - 2.8%.
20 Due to the current hard insurance market, property insurance will increase by approximately 15%, and all other insurances will be increased by an estimated indexation of 5%. These increases
17 The average of the past three years indicates
are in line with advice received from our current
an indicative Basic Tariff Premium of approx. 2.66%
insurance provider and are the result of the recent
of estimated wages. During 2022/2023 there has
pandemic and natural disaster events over the past
been an increase in claims and to reflect this the
few years.
budget has been increased to 3%. Any savings realised will be transferred to the smoothing reserve. Any additional costs will firstly be funded from the Workers Compensation Smoothing Reserve (RA10700).
Whilst these assumptions provide a general guideline there are items in the budget that are predetermined, for example services that are subject to tender.
Revenue Policy 2023/2024
119
2. Best practice dividends from Water and Sewer Funds Best-practice management of water supply and sewerage allows that, provided guidelines are met (NSW Government Department of Water & Energy Best-Practice Management of Water Supply and Sewerage Guidelines 2007), a dividend can be paid from water and sewer surpluses to General Fund.
dividend to be met are:
To be eligible to make a dividend payment from a surplus, a local water utility must:
1 Strategic Business Planning
The criteria that must be satisfied for a
compliance through an independent
2 Pricing (including Developer Charges, Liquid
compliance audit report; and
Trade Waste Policy and Approvals)
3 Water Conservation
6 Integrated Water Cycle Management
Obtain an unqualified financial audit report for its water supply and/or sewerage business(es).
4 Drought Management 5 Performance Reporting
Demonstrate best-practice management
Resolve in a council meeting open to the public that it has achieved “substantial compliance” with each criterion in the guidelines.
As per the Water Fund and Sewer Fund 2023/2024 to 2032/2033 Long Term Financial Plans, council is intending to pay the following amounts as best practice dividends (provided the criteria to do so has been met) from Water & Sewer Funds to General Funds Fund/Year
2023/2024
Water
$995,000
Sewer
$1,572,000
TOTAL FORECASTED AMOUNT TO BE PAID TO GENERAL FUND
$2,567,000
Payment of dividend is based on the lesser of 50% of surplus operating result of $27 per assessment.
120
Clarence Valley Council
Appendix A. Business Boundary Maps
Revenue Policy 2023/2024
121
Business B - Maclean/Townsend (Maclean CBD)
122
Clarence Valley Council
Business C – Iluka (Iluka Industrial Area)
Summary Income Statement Revenue Budget Policy 2023/2024
123
Business D – Yamba (Treelands Drive, Yamba)
124
Clarence Valley Council
Business D – Yamba (Yamba Town CBD)
Revenue Policy 2023/2024
125
Business E - Grafton and South Grafton (Grafton CBD)
126
Clarence Valley Council
Business E - Grafton and South Grafton (South Grafton CBD)
Revenue Policy 2023/2024
127
Business F - Grafton and South Grafton Other (Junction Hill)
128
Clarence Valley Council
Clarence Valley Council
Budget 2023/2024 Summary Income Statement
Summary Income Statement
Budget 2023/2024
129
Income Statement 2023/2024 Description
2023-24 General Fund
2023-24 Water Fund
2023-24 Sewer Fund
2023-24 HP Fund
2023-24 CRL Fund
2023-24 DWM Fund
2023-24 Consolidated
Rates Income
(34,452,997)
0
0
0
0
0
(34,452,997)
Rates Income - SRV Component
(5,700,504)
0
0
0
0
0
(5,700,504)
Annual Charges
(3,030,637)
(3,082,036)
(21,066,852)
0
0
(8,245,892)
(35,425,417)
0
(12,372,749)
(1,299,052)
0
0
0
(13,671,801)
Statutory & Regulatory User Charges
(3,336,541)
(42,328)
(42,016)
0
0
0
(3,420,885)
General User Fees
(8,079,950)
(2,314,677)
(697,672)
(8,702,151)
0
0
(19,794,450)
Interest Income
(2,049,733)
(651,043)
(259,326)
(59,462)
(10,320)
(62,686)
(3,092,570)
Operating Grants & Contributions
(15,696,068)
(364,684)
(352,377)
(26,233)
(293,925)
(193,544)
( 16,926,831)
Other Revenue
(2,351,467)
(146,220)
(6,254)
0
(2,239)
(96,662)
(2,602,842)
Net Gains from Disposal of Assets
(1,688,604)
(76,701)
(53,564)
0
0
0
(1,818,869)
Internal Income
(11,904,433)
(829,489)
(533,613)
0
0
(5,164)
(13,272,699)
ABC Recovery
(13,649,227)
0
0
0
0
0
(13,649,227)
Internal Plant Hire Income
(9,027,077)
(765,253)
(750,009)
0
0
0
(10,542,339)
(110,967,238)
(20,645,180)
(25,060,735)
(8,787,846)
(306,484)
(8,603,948)
(174,371,431)
Income
User Charges
Total Income (Excluding Capital Grants & Contributions)
130
Clarence Valley Council
Description
2023-24 General Fund
2023-24 Water Fund
2023-24 Sewer Fund
2023-24 HP Fund
2023-24 CRL Fund
2023-24 2023-24 DWM Fund Consolidated
37,450,083
2,313,176
2,185,986
194,819
726,341
333,363
43,203,768
Other Employee Costs
619,357
550
0
0
624
0
620,531
Borrowing Costs
401,135
1,302,043
3,030,208
0
0
223,239
4,956,625
Materials
7,381,772
1,346,909
1,679,428
367,256
12,300
31,384
10,819,049
Contracts & Consultancies
11,003,956
1,439,932
1,151,562
2,896,099
102,817
4,877,227
21,471,593
Legal Expenses
292,667
5,000
0
26,781
0
0
324,448
Depreciation
31,436,895
7,170,668
8,648,103
706,486
248,469
54,918
48,265,539
Insurance Expenses
2,429,039
67,423
74,957
45,885
2,811
700
2,620,815
Donations, Contributions & Taxes
5,618,902
0
0
474,777
0
0
6,093,679
Administration Expenses
2,368,424
904
0
128,256
27,329
9,255
2,534,168
Other Operating Expenses
4,130,565
271,171
716,935
401,503
138,172
74,814
5,733,160
298,385
13,964
8,828
0
127,430
47,316
495,923
Internal Expenses
3,535,844
1,125,777
309,938
1,302,970
7,500
1,876,647
8,158,676
ABC Distribution
10,308,324
1,559,622
1,142,992
129,214
125,435
383,640
13,649,227
Internal Plant Hire Expenditure
4,279,664
567,986
424,219
0
0
0
5,271,869
Total Expenditure
121,555,012
17,185,125
19,373,156
6,674,046
1,519,228
7,912,503
174,219,070
Net Operating Result for the year before Grants & Contributions provided for capital purposes
10,587,774
(3,460,055)
(5,687,579)
(2,113,800)
1,212,744
(691,445)
(152,361)
Capital Grants & Contributions
(134,743,536)
(1,993,807)
(743,004)
0
0
0
(137,480,347)
Operating Result for the Year
(124,155,762)
(5,453,862)
(6,430,583)
(2,113,800)
1,212,744
(691,445)
(137,632,708)
Expenditure Salaries, Wages & Oncosts
Subscriptions & Memberships
Summary Income Statement
Budget 2023/2024
131
Description
2023-24 General Fund
2023-24 Water Fund
2023-24 Sewer Fund
2023-24 HP Fund
2023-24 CRL Fund
2023-24 2023-24 DWM Fund Consolidated
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
41,093,454
12,590,000
2,045,000
400,000
0
0
56,128,454
Capital Works - Upgrade
77,001,253
325,000
0
0
0
0
77,326,253
0
0
0
0
0
0
0
Capital Works - Renewal
51,568,474
13,609,479
10,049,672
1,180,000
341,507
0
76,749,132
Depreciation
(31,436,895)
(7,170,668)
(8,648,103)
(706,486)
(248,469)
(54,918)
(48,265,539)
Employee Leave Accruals
0
0
0
0
0
0
0
Employee Leave Paid
0
0
0
0
0
0
0
Loan Funds Received
(9,615,301)
0
0
0
0
0
(9,615,301)
Loan Repayments (Principal Only)
1,287,046
1,352,974
5,194,850
0
0
651,445
8,486,315
0
0
0
0
0
0
0
129,898,031
20,706,785
8,641,419
873,514
93,038
596,527
160,809,314
Capital Works - Expansion
Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
Adjust for Transfers to/from Reserves Internal Reserves
(5,339,330)
0
0
0
0
0
(6,887,929)
External Reserves
(1,408,599)
(16,197,870)
(2,953,840)
1,240,286
(1,305,782)
94,918
(19,122,288)
0
0
0
0
0
0
0
Unexpended Grant Reserves
(140,000)
0
0
0
0
0
0
S64 / S94 Contribution Reserves
1,201,186
944,947
743,004
0
0
0
2,889,137
Net Service Result after Transfers to/from Reserves
(5,686,743)
(15,252,923)
(2,210,836)
1,240,286
(1,305,782)
94,918
(23,121,080)
NET RESULT Deficit
55,526
0
0
0
0
0
55,526
Unspent Loans
132
Clarence Valley Council
Clarence Valley Council
2023/2024 Budgeted Service Income Statements
Summary Income Statement
Budget 2023/2024
133
Office of General Manager Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
Operating Grants & Contributions
0
0
0
Other Revenue
0
0
0
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
(567,750)
(567,750)
(590,461)
0
0
0
(567,750)
(567,750)
(590,461)
578,094
578,094
777,118
4,000
4,000
4,000
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs Materials Contracts & Consultancies Legal Expenses Depreciation
0
0
8,668
6,000
170,455
170,455
40,036
0
0
0
682
682
1,401
Insurance Expenses
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses
0
0
0
Other Operating Expenses
0
0
0
Subscriptions & Memberships
0
0
0
Internal Expenses
8,000
8,000
8,000
ABC Distribution
11,909
11,909
12,386
Internal Plant Hire
0
0
0
Total Expenditure
781,808
781,808
848,941
Net Operating Result for the year before Grants & Contributions provided for capital purposes
214,058
214,058
258,480
0
0
0
214,058
214,058
258,480
Capital Grants & Contributions
Operating Result for the Year
134
0 8,668
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0 (1,401)
Depreciation
(682)
(682)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
(682)
(682)
(1,401)
0
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
0
0
0
Net Service Result after Transfers to/from Reserves
0
0
0
213,376
213,376
257,079
NET RESULT
Summary Income Statement
Budget 2023/2024
135
Elected Members Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
Operating Grants & Contributions
0
0
0
Other Revenue
0
0
0
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
(297,626)
(297,626)
(309,531)
0
0
0
(297,626)
(297,626)
(309,531)
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
898
0
40,000
0
Borrowing Costs
0
0
0
Materials
0
0
0
1,958
1,958
5,036
0
0
0
Contracts & Consultancies Legal Expenses Depreciation
0
0
0
Insurance Expenses
0
0
0
Donations, Contributions & Taxes
0
0
0
336,200
336,200
337,415
0
0
0
Administration Expenses Other Operating Expenses Subscriptions & Memberships
57,098
57,098
59,382
Internal Expenses
8,000
8,000
8,000
ABC Distribution
536,147
536,147
557,966
Internal Plant Hire
0
0
0
Total Expenditure
980,301
980,301
967,799
Net Operating Result for the year before Grants & Contributions provided for capital purposes
682,675
682,675
658,268
0
0
0
682,675
682,675
658,268
Capital Grants & Contributions
Operating Result for the Year
136
898 40,000
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0
Depreciation
0
0
0
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments
0
0
0
Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
133,333
133,333
133,333
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
133,333
133,333
133,333
816,008
816,008
791,601
Summary Income Statement
Budget 2023/2024
137
Corporate & Governance Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
Operating Grants & Contributions
0
0
0
Other Revenue
0
0
0
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
(792,855)
(792,855)
(824,567)
0
0
0
(792,855)
(792,855)
(824,567)
748,244
748,244
861,665
600
600
0
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
0
0
0
Materials
0
0
0
14,023
14,023
50,000
0
0
0
Contracts & Consultancies Legal Expenses
148
148
63
Insurance Expenses
Depreciation
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses
0
0
0
Other Operating Expenses
0
0
0
Subscriptions & Memberships
2,983
2,983
3,500
Internal Expenses
24,000
24,000
24,000
ABC Distribution
205,764
205,764
214,126
Internal Plant Hire
0
0
0
Total Expenditure
995,762
995,762
1,153,354
Net Operating Result for the year before Grants & Contributions provided for capital purposes
202,907
202,907
328,787
0
0
0
202,907
202,907
328,787
Capital Grants & Contributions
Operating Result for the Year
138
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0 (63)
Depreciation
(148)
(148)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
(148)
(148)
(63)
0
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
0
0
0
Net Service Result after Transfers to/from Reserves
0
0
0
202,759
202,759
328,724
NET RESULT
Summary Income Statement
Budget 2023/2024
139
Finance Control & Compliance Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
(37,383,061)
(37,383,061)
(40,153,501)
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
(154,000)
(154,000)
(160,160)
Statutory & Regulatory User Charges General User Fees
(42,692)
(42,692)
(44,399)
Interest Income
(675,296)
(1,175,296)
(1,695,555)
(8,821,370)
(9,220,116)
(9,427,301)
(240,075)
(240,075)
(121,240)
Operating Grants & Contributions Other Revenue
0
0
0
Internal Income
Net Gains from Disposal of Assets
(1,328,954)
(1,328,954)
(1,809,360)
ABC Recovery
(2,769,910)
(2,769,910)
(2,880,650)
0
0
0
(51,415,358)
(52,314,104)
(56,292,166)
1,764,914
1,764,914
1,777,507
11,500
11,500
6,240
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs Materials
0
0
11,321
16,264
Contracts & Consultancies
383,015
383,015
133,115
Legal Expenses
200,000
200,000
165,000
Depreciation
344
344
582
Insurance Expenses
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses
593,525
593,525
1,550,643
Other Operating Expenses
2,340
2,340
2,434
Subscriptions & Memberships
0
0
0
Internal Expenses
59,300
59,300
59,300
ABC Distribution
1,057,174
1,057,174
1,100,413
Internal Plant Hire
0
0
0
Total Expenditure
4,083,433
4,083,433
4,811,498
(47,331,925)
(48,230,671)
(51,480,668)
0
0
0
(47,331,925)
(48,230,671)
(51,480,668)
Net Operating Result for the year before Grants & Contributions provided for capital purposes Capital Grants & Contributions
Operating Result for the Year
140
0 11,321
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0 (582)
Depreciation
(344)
(344)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
(344)
(344)
(582)
5,392,162
5,642,162
5,670,173
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
5,392,162
5,642,162
5,670,173
(41,940,107)
(42,588,853)
(45,811,077)
Summary Income Statement
Budget 2023/2024
141
Financial Analysis & Business Support Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
Operating Grants & Contributions
0
0
0
Other Revenue
0
0
0
0
0
0
Internal Income
Net Gains from Disposal of Assets
(5,424,168)
(5,424,168)
(4,771,373)
ABC Recovery
(953,723)
(953,723)
(991,871)
0
0
0
(6,377,891)
(6,377,891)
(5,763,244)
5,656,454
5,656,454
4,888,803
303,155
303,155
297,155
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs Materials Contracts & Consultancies Legal Expenses
0
0
741
3,604
150,741
150,741
200,000
0
0
0
Depreciation
0
0
0
Insurance Expenses
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses
0
0
0
Other Operating Expenses
0
0
0
Subscriptions & Memberships
3,900
3,900
4,000
Internal Expenses
250,500
250,500
250,500
ABC Distribution
145,020
145,020
151,195
Internal Plant Hire
0
0
0
Total Expenditure
6,510,511
6,510,511
5,795,257
132,620
132,620
32,013
0
0
0
132,620
132,620
32,013
Net Operating Result for the year before Grants & Contributions provided for capital purposes Capital Grants & Contributions
Operating Result for the Year
142
0 741
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0
Depreciation
0
0
0
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments
0
0
0
Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
0
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
0
0
0
Net Service Result after Transfers to/from Reserves
0
0
0
132,620
132,620
32,013
NET RESULT
Summary Income Statement
Budget 2023/2024
143
Information Services & Corporate Systems Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
Operating Grants & Contributions
0
0
0
Other Revenue
0
0
0
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
(45,000)
ABC Recovery
(2,378,581)
(2,378,581)
(2,473,779)
0
0
0
(2,378,581)
(2,378,581)
(2,518,779)
1,356,112
1,356,112
1,516,979
0
0
0
3,665
3,665
3,230
0
0
0
265,000
265,000
275,600
0
0
0
Depreciation
480,526
480,526
496,483
Insurance Expenses
20,141
20,141
23,162
0
0
0
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs Materials Contracts & Consultancies Legal Expenses
Donations, Contributions & Taxes Administration Expenses
69,641
69,641
69,641
Other Operating Expenses
2,764,525
2,764,525
3,049,986
Subscriptions & Memberships
0
0
0
Internal Expenses
0
0
0
ABC Distribution
124,754
124,754
129,745
Internal Plant Hire
0
0
0
Total Expenditure
5,084,364
5,084,364
5,564,826
Net Operating Result for the year before Grants & Contributions provided for capital purposes
2,705,783
2,705,783
3,046,047
0
0
0
2,705,783
2,705,783
3,046,047
Capital Grants & Contributions
Operating Result for the Year
144
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
80,000
80,000
0
0
0
0
Capital Works - Renewal
508,710
468,710
541,600
Depreciation
(496,483)
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New Capital Works - Upgrade Capital Works - Expansion
(480,526)
(480,526)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
8,274
8,274
9,424
0
0
0
116,458
76,458
54,541
0
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
0
0
0
Net Service Result after Transfers to/from Reserves
0
0
0
2,822,241
2,782,241
3,100,588
NET RESULT
Summary Income Statement
Budget 2023/2024
145
Corporate & Customer Experience Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
(63,900)
(63,900)
(66,456)
Statutory & Regulatory User Charges General User Fees
0
0
0
Interest Income
0
0
0
Operating Grants & Contributions Other Revenue
0
0
0
(61,500)
(61,500)
(60,000)
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
(2,341,636)
(2,341,636)
(2,435,316)
0
0
0
(2,467,036)
(2,467,036)
(2,561,772)
1,629,238
1,629,238
1,746,093
5,000
5,000
5,000
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs Materials
479
0
10,000
10,000
Contracts & Consultancies
64,979
64,979
70,137
Legal Expenses
34,875
34,875
36,270
Depreciation Insurance Expenses Donations, Contributions & Taxes Administration Expenses Other Operating Expenses
456
456
11
973,281
973,281
1,119,274
0
0
0
62,608
62,608
65,112
0
0
0
Subscriptions & Memberships
18,227
18,227
18,956
Internal Expenses
8,000
8,000
8,000
ABC Distribution
472,997
472,997
492,871
Internal Plant Hire
0
0
0
Total Expenditure
3,280,140
3,280,140
3,571,724
813,104
813,104
1,009,952
0
0
0
813,104
813,104
1,009,952
Net Operating Result for the year before Grants & Contributions provided for capital purposes Capital Grants & Contributions
Operating Result for the Year
146
479 10,000
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0 (11)
Depreciation
(456)
(456)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
2,225
2,225
0
0
0
0
1,769
1,769
(11)
0
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
0
0
0
Net Service Result after Transfers to/from Reserves
0
0
0
814,873
814,873
1,009,941
NET RESULT
Summary Income Statement
Budget 2023/2024
147
People & Culture Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
(186,290)
(186,290)
(193,742)
0
0
0
Operating Grants & Contributions Other Revenue Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
(1,055,050)
(1,055,050)
(1,113,071)
0
0
0
(1,241,340)
(1,241,340)
(1,306,813)
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts
541,016
541,016
972,239
Other Employee Costs
284,000
284,000
286,000
Borrowing Costs
0
0
0
Materials
0
0
0
Contracts & Consultancies
30,301
30,301
111,513
Legal Expenses
50,000
50,000
52,000
361
361
768
Insurance Expenses
Depreciation
0
0
0
Donations, Contributions & Taxes
0
0
0
49,007
49,007
50,967
0
0
0
Administration Expenses Other Operating Expenses
32,500
32,500
33,800
Internal Expenses
Subscriptions & Memberships
0
0
0
ABC Distribution
59,245
59,245
61,615
Internal Plant Hire
0
0
0
Total Expenditure
1,046,430
1,046,430
1,568,902
Net Operating Result for the year before Grants & Contributions provided for capital purposes
(194,910)
(194,910)
262,089
0
0
0
(194,910)
(194,910)
262,089
Capital Grants & Contributions
Operating Result for the Year
148
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0 (768)
Depreciation
(361)
(361)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
(361)
(361)
(768)
0
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
0
0
0
Net Service Result after Transfers to/from Reserves
0
0
0
(195,271)
(195,271)
261,321
NET RESULT
Summary Income Statement
Budget 2023/2024
149
Safety & Risk Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
(117,000)
(117,000)
(153,900)
0
0
0
Operating Grants & Contributions Other Revenue Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
(362,670)
(362,670)
(382,617)
0
0
0
(479,670)
(479,670)
(536,517)
393,182
393,182
400,794
3,000
3,000
3,120
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
0
0
0
Materials
0
0
0
70,000
70,000
72,800
0
0
0
Contracts & Consultancies Legal Expenses Depreciation
0
0
0
Insurance Expenses
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses
0
0
0
Other Operating Expenses
0
0
0
Subscriptions & Memberships
0
0
0
Internal Expenses
0
0
0
ABC Distribution
23,307
23,307
24,239
Internal Plant Hire
0
0
0
Total Expenditure
489,489
489,489
500,953
9,819
9,819
(35,564)
0
0
0
9,819
9,819
(35,564)
Net Operating Result for the year before Grants & Contributions provided for capital purposes Capital Grants & Contributions
Operating Result for the Year
150
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0
Depreciation
0
0
0
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments
0
0
0
Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
35,000
35,000
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
35,000
35,000
0
44,819
44,819
(35,564)
Summary Income Statement
Budget 2023/2024
151
Community & Industry Engagement Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
Operating Grants & Contributions Other Revenue
0
0
0
(1,281)
(1,281)
(101,332)
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
(260,413)
(260,413)
(270,830)
0
0
0
(261,694)
(261,694)
(372,162)
636,189
636,189
804,402
1,050
1,050
1,050
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
300
300
0
Materials
Borrowing Costs
121,116
126,116
137,442
Contracts & Consultancies
109,889
104,889
187,017
0
0
0
10,034
10,034
8,300
0
0
0
Donations, Contributions & Taxes
135,000
135,000
135,000
Administration Expenses
167,354
167,354
188,579
0
0
0
Legal Expenses Depreciation Insurance Expenses
Other Operating Expenses Subscriptions & Memberships
25,210
25,210
44,546
Internal Expenses
25,520
25,520
26,599
ABC Distribution
204,213
204,213
212,836
Internal Plant Hire
0
0
0
Total Expenditure
1,435,875
1,435,875
1,745,771
Net Operating Result for the year before Grants & Contributions provided for capital purposes
1,174,181
1,174,181
1,373,609
0
0
0
1,174,181
1,174,181
1,373,609
Capital Grants & Contributions
Operating Result for the Year
152
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0 (8,300)
(10,034)
(10,034)
Employee Leave Accruals
Depreciation
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
1,390
1,390
0
0
0
0
(8,644)
(8,644)
(8,300)
0
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
0
0
0
Net Service Result after Transfers to/from Reserves
0
0
0
1,165,537
1,165,537
1,365,309
NET RESULT
Summary Income Statement
Budget 2023/2024
153
Community Development Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
(20,566)
(20,566)
(21,389)
Interest Income
(27,318)
(27,318)
(28,137)
Operating Grants & Contributions
(96,231)
(96,231)
0
0
0
0
Other Revenue Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(144,115)
(144,115)
(49,526)
874,892
874,892
746,331
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
0
0
0
Materials
Borrowing Costs
25,439
25,439
26,455
Contracts & Consultancies
121,800
111,800
131,272
0
0
0
Legal Expenses
154
Depreciation
149,258
149,258
130,642
Insurance Expenses
28,008
28,008
32,209
Donations, Contributions & Taxes
100,000
100,000
104,000
Administration Expenses
24,381
24,381
25,356
Other Operating Expenses
13,465
13,465
14,139
Subscriptions & Memberships
27,055
27,055
28,138
Internal Expenses
10,250
10,250
10,357
ABC Distribution
296,235
296,235
308,704
Internal Plant Hire
0
0
0
Total Expenditure
1,670,783
1,660,783
1,557,603
Net Operating Result for the year before Grants & Contributions provided for capital purposes
1,526,668
1,516,668
1,373,609
Capital Grants & Contributions
(1,451,648)
(951,648)
(455,945)
Operating Result for the Year
75,020
565,020
1,052,132
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
100,000
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
635,000
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
500,000
0
0
Depreciation
(149,258)
(149,258)
(130,642)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
985,742
(49,258)
(130,642)
(635,000)
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
978,966
978,966
0
Net Service Result after Transfers to/from Reserves
343,966
978,966
0
1,404,728
1,494,728
921,490
NET RESULT
Summary Income Statement
Budget 2023/2024
155
Library Services Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
(10,300)
(10,300)
(10,712)
Interest Income
(10,019)
(10,019)
(10,320)
Operating Grants & Contributions
(488,167)
(488,167)
(293,925)
(5,364)
(5,364)
(5,579)
Other Revenue Net Gains from Disposal of Assets Internal Income
0
0
0
(1,169,113)
(1,169,113)
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(1,682,963)
(1,682,963)
(320,536)
1,564,952
1,564,952
1,685,733
3,800
3,800
2,912
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
1,885
1,885
1,709
Materials
37,015
37,015
38,003
Contracts & Consultancies
100,545
100,545
138,784
0
0
0
Depreciation
382,663
382,663
414,367
Insurance Expenses
34,430
34,430
39,595
0
0
0
Legal Expenses
Donations, Contributions & Taxes Administration Expenses
27,527
27,527
30,417
Other Operating Expenses
181,583
181,583
201,354
106,045
106,045
136,552
Internal Expenses
Subscriptions & Memberships
1,207,614
1,207,614
39,077
ABC Distribution
432,759
432,759
451,400
Internal Plant Hire
0
0
0
Total Expenditure
4,080,818
4,080,818
3,179,903
Net Operating Result for the year before Grants & Contributions provided for capital purposes
2,397,855
2,397,855
2,859,367
0
0
0
2,397,855
2,397,855
2,859,367
Capital Grants & Contributions
Operating Result for the Year
156
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
345,000
345,000
352,889
Depreciation
(414,367)
(382,663)
(382,663)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments
0
0
0
4,132
4,132
4,986
0
0
0
(33,531)
(33,531)
(56,492)
Internal Reserves
0
0
0
External Reserves
(1,330,782)
Total Balance Sheet Movements / Non-Cash Adjustments
Adjust for Transfers to/from Reserves 102,287
102,287
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
102,287
102,287
(1,330,782)
2,466,611
2,466,611
1,472,093
Summary Income Statement
Budget 2023/2024
157
Cultural Services Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
(83,440)
(83,440)
(86,778)
0
0
0
Operating Grants & Contributions
(125,000)
(125,000)
0
Other Revenue
(43,047)
(43,047)
(44,768)
General User Fees Interest Income
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(251,487)
(251,487)
(131,546)
440,549
440,549
455,242
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
6,367
6,367
4,692
Materials
Borrowing Costs
100,750
100,750
104,781
Contracts & Consultancies
127,155
127,155
132,241
0
0
0
Legal Expenses Depreciation
4,578
4,578
4,971
Insurance Expenses
19,038
19,038
21,894
Donations, Contributions & Taxes
26,000
26,000
27,040
Administration Expenses
34,206
34,206
35,575
Other Operating Expenses
49,566
49,566
52,005
Subscriptions & Memberships
4,824
4,824
5,017
Internal Expenses
19,886
19,886
20,629
ABC Distribution
106,649
106,649
111,414
Internal Plant Hire
0
0
0
Total Expenditure
939,568
939,568
975,501
Net Operating Result for the year before Grants & Contributions provided for capital purposes
688,081
688,081
843,955
0
0
0
688,081
688,081
843,955
Capital Grants & Contributions
Operating Result for the Year
158
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
24,000
24,000
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
24,000
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0 (4,971)
(4,578)
(4,578)
Employee Leave Accruals
Depreciation
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments
0
0
0
36,317
36,317
13,693
0
0
0
55,739
55,739
32,722
Internal Reserves
0
0
0
External Reserves
Total Balance Sheet Movements / Non-Cash Adjustments
Adjust for Transfers to/from Reserves 114,414
114,414
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
114,414
114,414
0
858,234
858,234
876,677
Summary Income Statement
Budget 2023/2024
159
3000 - Works & Civil Management Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
(41,734)
(41,734)
0
0
0
0
General User Fees Interest Income Operating Grants & Contributions Other Revenue
0
0
0
(265,214)
(265,214)
(275,823)
Net Gains from Disposal of Assets
(1,535,117)
(1,535,117)
(1,535,117)
Internal Income
(1,525,325)
(1,525,325)
(1,373,653)
(679,878)
(679,878)
(707,074)
Internal Plant Hire
ABC Recovery
(7,976,273)
(7,976,273)
(10,542,339)
Total Income (Excluding Capital Grants & Contributions)
(12,023,541)
(12,023,541)
(14,434,006)
1,130,483
1,130,483
1,133,110
8,000
8,000
8,320
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs Materials Contracts & Consultancies Legal Expenses Depreciation Insurance Expenses Donations, Contributions & Taxes Administration Expenses Other Operating Expenses Subscriptions & Memberships
556
504
3,868,736
4,162,333
446,872
446,872
438,394
0
0
0
2,980,727
2,980,727
3,288,635
588,222
588,222
676,457
0
0
0
0
0
0
45,047
45,047
47,299
1,250
1,250
1,300
Internal Expenses
171,400
171,400
172,694
ABC Distribution
830,954
830,954
864,729
Internal Plant Hire
23,575
23,575
24,518
Total Expenditure
10,095,822
10,095,822
10,818,293
Net Operating Result for the year before Grants & Contributions provided for capital purposes
(1,927,719)
(1,927,719)
(3,615,713)
0
(200,600)
0
(1,927,719)
(2,128,319)
(3,615,713)
Capital Grants & Contributions
Operating Result for the Year
160
556 3,868,736
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
202,000
Capital Works - Upgrade
0
200,600
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
5,396,986
5,396,986
5,650,000
Depreciation
(3,288,635)
(2,980,726)
(2,980,726)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments
0
0
0
1,218
1,218
1,470
0
0
0
2,417,478
2,820,078
2,362,835
Internal Reserves
(1,540,894)
(1,540,894)
477,528
External Reserves
Total Balance Sheet Movements / Non-Cash Adjustments
Adjust for Transfers to/from Reserves 512,219
512,219
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
(1,028,675)
(1,028,675)
477,528
(538,916)
(336,916)
(775,350)
Summary Income Statement
Budget 2023/2024
161
3020 - Strategic Infrastructure & Planning Coordination Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
(56,305)
(56,305)
(195,402)
0
0
0
Operating Grants & Contributions Other Revenue Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(56,305)
(56,305)
(195,402)
638,154
638,154
827,839
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
0
0
0
Materials
Borrowing Costs
3,857
3,857
4,011
Contracts & Consultancies
71,296
71,296
314,148
0
0
0
Legal Expenses Depreciation
0
0
0
Insurance Expenses
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses
0
0
0
Other Operating Expenses
0
0
0
0
0
0
Internal Expenses
Subscriptions & Memberships
48,500
48,500
48,500
ABC Distribution
55,702
55,702
58,137
Internal Plant Hire
0
0
0
Total Expenditure
817,509
817,509
1,252,635
Net Operating Result for the year before Grants & Contributions provided for capital purposes
761,204
761,204
1,057,233
0
0
0
761,204
761,204
1,057,233
Capital Grants & Contributions
Operating Result for the Year
162
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
17,833
17,833
0
Capital Works - Renewal Depreciation
0
0
0
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
17,833
17,833
0
0
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
0
0
0
Net Service Result after Transfers to/from Reserves
0
0
0
779,037
779,037
1,057,233
NET RESULT
Summary Income Statement
Budget 2023/2024
163
3120 - Quarries Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
(6,140)
(6,140)
(6,386)
Interest Income
(3,628)
(3,628)
(3,737)
Operating Grants & Contributions
0
0
0
Other Revenue
0
0
0
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(9,768)
(9,768)
(10,123)
128,401
128,401
133,745
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
0
0
0
Materials
Borrowing Costs
29,129
29,129
30,294
Contracts & Consultancies
324,500
324,500
437,480
0
0
0
Legal Expenses
29,443
29,443
17,947
Insurance Expenses
Depreciation
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses
0
0
0
Other Operating Expenses
0
0
0
0
0
0
Internal Expenses
Subscriptions & Memberships
15,818
15,818
16,935
ABC Distribution
9,161
9,161
9,569
Internal Plant Hire
0
0
0
Total Expenditure
536,452
536,452
645,970
Net Operating Result for the year before Grants & Contributions provided for capital purposes
526,684
526,684
635,847
Capital Grants & Contributions
(24,563)
(24,563)
(15,600)
502,121
502,121
620,247
Operating Result for the Year
164
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
41,000
41,000
30,000
Depreciation
(17,947)
(29,443)
(29,443)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
11,557
11,557
12,053
(538,241)
(538,241)
(632,300)
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
24,563
24,563
0
(513,678)
(513,678)
(632,300)
0
0
0
Summary Income Statement
Budget 2023/2024
165
3010 - Emergency Services Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
(597,320)
(597,320)
0
0
0
0
Operating Grants & Contributions Other Revenue Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(597,320)
(597,320)
0
159,462
159,462
2,588
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
1,051
1,051
952
Materials
Borrowing Costs
460,906
460,906
473,741
Contracts & Consultancies
274,557
274,557
272,808
0
0
0
Depreciation
171,877
171,877
148,719
Insurance Expenses
39,062
39,062
44,922
1,212,160
1,212,160
1,765,080
Legal Expenses
Donations, Contributions & Taxes Administration Expenses
19,849
19,849
19,645
Other Operating Expenses
90,168
90,168
94,306
Subscriptions & Memberships
1,272
1,272
0
Internal Expenses
38,119
38,119
34,876
ABC Distribution
537
537
558
Internal Plant Hire
0
0
0
Total Expenditure
2,469,020
2,469,020
2,858,195
Net Operating Result for the year before Grants & Contributions provided for capital purposes
1,871,700
1,871,700
2,858,195
0
(10,028,571)
0
1,871,700
(8,156,871)
2,858,195
Capital Grants & Contributions
Operating Result for the Year
166
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
10,028,571
0 (148,719)
(171,877)
(171,877)
Employee Leave Accruals
Depreciation
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
2,302
2,302
2,778
0
0
0
(169,575)
9,858,996
(145,941)
0
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
(31,996)
(31,996)
0
Unexpended Grant Reserves S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
(31,996)
(31,996)
0
1,670,129
1,670,129
2,712,254
Summary Income Statement
Budget 2023/2024
167
2010 - Property Services Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
Operating Grants & Contributions
(17,405)
(17,405)
(18,101)
Other Revenue
(495,824)
(495,824)
(515,657)
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(513,229)
(513,229)
(533,758)
252,961
252,961
258,656
0
0
0
199
199
180
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs Materials Contracts & Consultancies
50,061
50,061
56,428
Legal Expenses
23,973
23,973
8,863
Depreciation Insurance Expenses Donations, Contributions & Taxes Administration Expenses Other Operating Expenses Subscriptions & Memberships
0
0
19,973
22,969
0
0
0
0
0
0
5,045
5,045
5,297
0
0
5,200
Internal Expenses
27,302
27,302
29,111
ABC Distribution
9,686
9,686
10,072
Internal Plant Hire
0
0
0
Total Expenditure
389,200
389,200
396,776
Net Operating Result for the year before Grants & Contributions provided for capital purposes
(124,029)
(124,029)
(136,982)
0
0
0
(124,029)
(124,029)
(136,982)
Capital Grants & Contributions
Operating Result for the Year
168
0 19,973
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0
Depreciation
0
0
0
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
435
435
525
0
0
0
435
435
525
(66,039)
(66,039)
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
(66,039)
(66,039)
0
(189,633)
(189,633)
(136,457)
Summary Income Statement
Budget 2023/2024
169
3100 - Roads Infrastructure Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
(600,000)
User Charges
0
0
0
(89,600)
(89,600)
(93,184)
General User Fees
(1,773,196)
(1,773,196)
(62,034)
Interest Income
(79,028)
(79,028)
(81,399)
(7,353,632)
(8,203,596)
(7,888,448)
(30,000)
(30,000)
(31,200)
Statutory & Regulatory User Charges
Operating Grants & Contributions Other Revenue Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(9,325,456)
(10,175,420)
(8,756,265)
6,731,365
6,731,365
5,936,202
4,000
4,000
4,000
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
407,859
407,859
284,508
Materials
Borrowing Costs
2,026,749
2,883,213
1,830,680
Contracts & Consultancies
2,336,648
2,346,648
1,925,987
0
0
0
20,811,627
20,811,627
20,657,209
2,587
2,587
2,975
0
0
0
Legal Expenses Depreciation Insurance Expenses Donations, Contributions & Taxes Administration Expenses Other Operating Expenses Subscriptions & Memberships Internal Expenses
0
0
460,782
483,822
4,550
4,550
4,732
334,015
334,015
327,443
ABC Distribution
1,973,431
1,973,431
2,058,102
Internal Plant Hire
3,022,512
3,020,912
2,997,188
Total Expenditure
38,116,125
38,980,989
36,512,848
Net Operating Result for the year before Grants & Contributions provided for capital purposes
28,790,669
28,805,569
27,756,583
Capital Grants & Contributions
(32,334,140)
(58,428,138)
(99,680,103)
(3,543,471)
(29,622,569)
(71,923,520)
Operating Result for the Year
170
0 460,782
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
2,034,843
2,122,843
6,154,929
Capital Works - Upgrade
9,021,178
33,397,194
75,006,481
0
0
0
Capital Works - Renewal
35,087,887
36,766,764
23,614,113
Depreciation
Capital Works - Expansion
(20,811,625)
(20,811,625)
(20,657,209)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments
0
0
0
1,318,375
1,318,375
830,237
0
0
0
26,650,658
52,793,551
84,948,551
Internal Reserves
(5,583,125)
(5,583,125)
(240,000)
External Reserves
(28,050)
(28,050)
(8,599)
0
0
0
(5,967,573)
(5,967,573)
(140,000)
Total Balance Sheet Movements / Non-Cash Adjustments
Adjust for Transfers to/from Reserves
Unspent Loans Unexpended Grant Reserves S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
(204,805)
(204,805)
0
(11,783,553)
(11,783,553)
(388,599)
11,323,634
11,387,429
12,636,432
Summary Income Statement
Budget 2023/2024
171
3200 - Parks & Open Spaces Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
(645,927)
(645,927)
(671,764)
Interest Income
(3,084)
(3,084)
(3,176)
Operating Grants & Contributions Other Revenue Net Gains from Disposal of Assets Internal Income
0
0
0
(152,447)
(152,447)
(158,545)
0
0
0
(1,000,000)
(1,190,500)
(1,000,000)
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(1,801,458)
(1,991,958)
(1,833,485)
3,850,629
3,850,629
2,956,596
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
80,257
80,257
53,995
Materials
442,443
305,833
318,065
3,773,170
3,773,170
3,164,896
0
0
0
Contracts & Consultancies Legal Expenses
2,531,997
2,531,997
2,455,312
Insurance Expenses
Depreciation
231,282
231,282
265,975
Donations, Contributions & Taxes
29,527
29,527
30,708
Administration Expenses
6,224
6,224
6,473
Other Operating Expenses
116,696
116,696
122,531
1,737
1,737
1,806
Internal Expenses
Subscriptions & Memberships
871,217
871,217
736,529
ABC Distribution
834,046
834,046
869,610
Internal Plant Hire
96,000
896,000
931,840
Total Expenditure
12,865,225
13,528,615
11,914,336
Net Operating Result for the year before Grants & Contributions provided for capital purposes
11,063,767
11,536,657
10,080,851
(139,071)
(12,213,259)
(8,048,271)
10,924,696
(676,602)
2,032,580
Capital Grants & Contributions
Operating Result for the Year
172
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
179,000
3,679,000
9,645,239
Capital Works - Upgrade
8,138,047
5,849,125
1,919,772
Capital Works - Expansion
1,759,632
0
0
Capital Works - Renewal
1,300,000
4,231,989
8,920,000
Depreciation
(2,455,312)
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
(2,531,997)
(2,531,997)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
0
0
(8,500,000)
226,477
226,477
157,565
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
9,071,159
11,454,594
9,687,264
(9,389,423)
(1,219,694)
(987,000)
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
(212,828)
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
974,936
707,436
(356,941)
(8,414,487)
(725,086)
(1,343,941)
11,581,368
10,052,906
10,375,903
Summary Income Statement
Budget 2023/2024
173
3220 - Buildings & Facilities Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
Operating Grants & Contributions Other Revenue
0
0
0
(198,478)
(198,478)
(206,416)
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
(266,907)
(266,907)
(277,581)
0
0
0
(465,385)
(465,385)
(483,997)
797,816
797,816
410,348
0
0
0
Borrowing Costs
11,687
11,687
7,680
Materials
3,072
3,072
3,195
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
Contracts & Consultancies
86,447
86,447
89,905
Legal Expenses
22,909
22,909
23,825
1,287,114
1,287,114
1,335,212
171,516
171,516
197,244
0
0
0
Depreciation Insurance Expenses Donations, Contributions & Taxes Administration Expenses Other Operating Expenses Subscriptions & Memberships
174
288
288
300
305,724
305,724
321,009
0
0
0
Internal Expenses
409,079
409,079
121,790
ABC Distribution
184,009
184,009
191,827
Internal Plant Hire
0
0
0
Total Expenditure
3,279,661
3,279,661
2,702,335
Net Operating Result for the year before Grants & Contributions provided for capital purposes
2,814,276
2,814,276
2,218,338
Capital Grants & Contributions
(2,678,689)
(2,678,689)
(21,055,193)
Operating Result for the Year
135,587
135,587
(18,836,855)
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
1,678,689
1,678,689
21,864,286
268,600
268,600
65,000
0
0
0
Capital Works - Renewal
2,253,188
2,253,188
9,091,104
Depreciation
(1,335,212)
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New Capital Works - Upgrade Capital Works - Expansion
(1,287,115)
(1,287,115)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
0
0
1,115,301
33,321
33,321
22,408
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
2,946,683
2,946,683
30,822,887
(720,099)
(720,099)
(4,940,000)
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
(3,049,896)
(720,099)
(720,099)
(7,989,896)
2,362,171
2,362,171
3,996,136
Summary Income Statement
Budget 2023/2024
175
3250 - Saleyards Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
(289,988)
(289,988)
(301,588)
Interest Income
(4,607)
(4,607)
(4,745)
Operating Grants & Contributions Other Revenue
0
0
0
(1,288)
(1,288)
(1,340)
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(295,883)
(295,883)
(307,673)
156,636
156,636
141,897
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
2,996
2,996
0
Materials
5,181
5,181
5,388
102,061
102,061
106,144
0
0
0
105,504
105,504
120,485
4,210
4,210
4,842
0
0
0
Contracts & Consultancies Legal Expenses Depreciation Insurance Expenses Donations, Contributions & Taxes Administration Expenses Other Operating Expenses
0
0
10,522
10,994
Subscriptions & Memberships
1,944
1,944
2,022
Internal Expenses
24,127
24,127
25,448
ABC Distribution
22,072
22,072
22,996
Internal Plant Hire
0
0
0
Total Expenditure
435,253
435,253
440,216
Net Operating Result for the year before Grants & Contributions provided for capital purposes
139,370
139,370
132,543
0
0
0
139,370
139,370
132,543
Capital Grants & Contributions
Operating Result for the Year
176
0 10,522
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
50,000
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New Capital Works - Upgrade
158,000
158,000
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0
(105,504)
(105,504)
(120,485)
Employee Leave Accruals
Depreciation
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
13,906
13,906
0
0
0
0
66,402
66,402
(70,485)
(205,772)
(205,772)
(62,058)
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
(205,772)
(205,772)
(62,058)
0
0
0
Summary Income Statement
Budget 2023/2024
177
3110 - Regional Airport Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
(36,452)
(36,452)
(37,910)
0
0
0
Operating Grants & Contributions
(17,565)
(17,565)
0
Other Revenue
(3,056)
(3,056)
(3,178)
General User Fees Interest Income
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(57,073)
(57,073)
(41,088)
162,157
162,157
166,701
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
22,758
22,758
4,872
Materials
3,023
3,023
3,144
Contracts & Consultancies
15,546
15,546
16,168
0
0
0
215,588
215,588
243,700
3,603
3,603
4,143
0
0
0
Legal Expenses Depreciation Insurance Expenses Donations, Contributions & Taxes Administration Expenses Other Operating Expenses
0
0
14,459
15,182
Subscriptions & Memberships
2,153
2,153
2,239
Internal Expenses
17,445
17,445
17,627
ABC Distribution
20,613
20,613
21,479
Internal Plant Hire
0
0
0
Total Expenditure
477,345
477,345
495,255
Net Operating Result for the year before Grants & Contributions provided for capital purposes
420,272
420,272
454,167
0
0
0
420,272
420,272
454,167
Capital Grants & Contributions
Operating Result for the Year
178
0 14,459
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
200,000 (243,700)
(215,588)
(215,588)
Employee Leave Accruals
Depreciation
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
115,670
115,670
130,696
0
0
0
(99,918)
(99,918)
86,996
0
0
(200,000)
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
0
0
0
Net Service Result after Transfers to/from Reserves
0
0
(200,000)
320,354
320,354
341,163
NET RESULT
Summary Income Statement
Budget 2023/2024
179
3260 - Holiday Parks Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
(4,250,284)
(4,250,284)
(8,702,151)
Interest Income
(57,730)
(57,730)
(59,462)
Operating Grants & Contributions
(25,224)
(25,224)
(26,233)
0
0
0
Other Revenue Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(4,333,238)
(4,333,238)
(8,787,846)
119,179
119,179
194,819
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs Materials Contracts & Consultancies Legal Expenses
0
0
210,415
367,256
2,614,342
2,614,342
2,966,099
198
198
26,781
Depreciation
698,477
698,477
706,486
Insurance Expenses
39,900
39,900
45,885
Donations, Contributions & Taxes
430,663
430,663
474,777
Administration Expenses
107,644
107,644
128,256
Other Operating Expenses
378,045
378,045
401,503
Subscriptions & Memberships
8,673
8,673
0
Internal Expenses
1,306,478
1,496,978
1,302,970
ABC Distribution
124,164
124,164
129,214
Internal Plant Hire
2,370
2,370
0
Total Expenditure
6,040,548
6,231,048
6,744,046
Net Operating Result for the year before Grants & Contributions provided for capital purposes
1,707,310
1,897,810
(2,043,800)
0
0
0
1,707,310
1,897,810
(2,043,800)
Capital Grants & Contributions
Operating Result for the Year
180
0 210,415
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
205,000
400,000
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New Capital Works - Upgrade
55,000 1,660,000
0
0
0
0
0
Capital Works - Renewal
1,670,000
3,180,000
1,180,000
Depreciation
Capital Works - Expansion
(698,477)
(698,477)
(706,486)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments
0
0
0
2,686,523
2,686,523
873,514
Internal Reserves
0
0
0
External Reserves
1,170,286
Total Balance Sheet Movements / Non-Cash Adjustments
Adjust for Transfers to/from Reserves (4,393,833)
(4,584,333)
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
(4,393,833)
(4,584,333)
1,170,286
0
0
0
Summary Income Statement
Budget 2023/2024
181
3300 - Watercycle Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
(2,575,008)
(2,575,008)
(3,082,036)
User Charges
(15,764,000)
(15,764,000)
(12,372,749)
(40,700)
(40,700)
(42,328)
General User Fees
(2,292,235)
(2,292,235)
(2,314,677)
Interest Income
(632,081)
(632,081)
(651,043)
(2,319,347)
(2,319,347)
(364,684)
(140,596)
(140,596)
(146,220)
Statutory & Regulatory User Charges
Operating Grants & Contributions Other Revenue Net Gains from Disposal of Assets
(449,382)
(449,382)
(76,701)
Internal Income
(727,573)
(727,573)
(737,489)
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(24,940,922)
(24,940,922)
(19,787,927)
3,244,701
3,244,701
3,157,749
400
400
550
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
1,546,764
1,546,764
1,302,043
Materials
1,332,054
1,332,054
1,104,504
Contracts & Consultancies
1,583,047
1,583,047
1,645,813
7,000
7,000
5,000
6,688,985
6,688,985
7,170,668
81,888
81,888
94,172
0
0
0
Legal Expenses Depreciation Insurance Expenses Donations, Contributions & Taxes Administration Expenses
24,839
24,839
904
Other Operating Expenses
258,258
258,258
271,171
Subscriptions & Memberships
17,143
17,143
22,792
Internal Expenses
912,274
912,274
1,203,027
ABC Distribution
2,559,113
2,559,113
2,664,178
Internal Plant Hire
579,750
579,750
567,986
Total Expenditure
18,836,216
18,836,216
19,210,557
Net Operating Result for the year before Grants & Contributions provided for capital purposes
(6,104,706)
(6,104,706)
(577,370)
Capital Grants & Contributions
(2,259,796)
(2,259,796)
(1,993,807)
(8,364,502)
(8,364,502)
(2,571,177)
Operating Result for the Year
182
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
1,260,000
3,270,000
12,590,000
Capital Works - Upgrade
4,932,000
877,000
325,000
0
0
0
Capital Works - Renewal
8,329,761
11,404,761
13,609,480
Depreciation
(7,170,668)
Capital Works - Expansion
(6,688,986)
(6,688,986)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments
0
0
0
1,086,588
1,086,588
1,352,974
0
0
0
8,919,363
9,949,363
20,706,786
Internal Reserves
0
0
0
External Reserves
(18,135,609)
Total Balance Sheet Movements / Non-Cash Adjustments
Adjust for Transfers to/from Reserves (1,814,657)
(2,844,657)
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
1,259,796
1,259,796
0
Net Service Result after Transfers to/from Reserves
(554,861)
(1,584,861)
(18,135,609)
0
0
0
NET RESULT
Summary Income Statement
Budget 2023/2024
183
3310 - Sewer Services Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Annual Charges
(18,610,383)
(18,610,383)
(21,066,852)
User Charges
(2,240,000)
(2,240,000)
(1,299,052)
(40,400)
(40,400)
(42,016)
Income Rates Income
Statutory & Regulatory User Charges General User Fees
(636,757)
(636,757)
(697,672)
Interest Income
(230,286)
(230,286)
(259,326)
Operating Grants & Contributions
(366,690)
(366,690)
(352,377)
Other Revenue
(25,285)
(25,285)
(6,254)
Net Gains from Disposal of Assets
(48,005)
(193,863)
(53,564)
Internal Income
(496,028)
(496,028)
(525,613)
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(22,693,834)
(22,839,692)
(24,302,726)
1,180,407
1,180,407
1,316,276
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
3,797,628
3,797,628
3,030,208
Materials
1,467,000
1,467,000
1,480,514
Contracts & Consultancies
1,249,000
1,249,000
1,118,575
0
100,000
0
Legal Expenses
9,112,699
9,112,699
8,648,103
Insurance Expenses
Depreciation
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses Other Operating Expenses Subscriptions & Memberships Internal Expenses
576
0
682,795
716,935
0
0
0
285,782
285,782
232,688
ABC Distribution
36,918
36,918
38,436
Internal Plant Hire
598,815
598,815
424,219
Total Expenditure
18,411,620
18,511,620
17,005,954
Net Operating Result for the year before Grants & Contributions provided for capital purposes
(4,282,214)
(4,328,072)
(7,296,772)
Capital Grants & Contributions
(1,442,787)
(1,442,787)
(743,004)
(5,725,001)
(5,770,859)
(8,039,776)
Operating Result for the Year
184
576 682,795
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
2,626,358
2,045,000
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New Capital Works - Upgrade
80,500 1,659,000
0
0
0
0
0
Capital Works - Renewal
4,012,368
3,025,510
10,049,672
Depreciation
Capital Works - Expansion
(9,112,700)
(9,112,700)
(8,648,103)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments
0
0
0
5,247,500
5,247,500
5,194,850
0
0
0
1,886,668
1,786,668
8,641,419
Internal Reserves
0
0
0
External Reserves
(1,344,647)
Total Balance Sheet Movements / Non-Cash Adjustments
Adjust for Transfers to/from Reserves 2,395,546
2,541,404
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
1,442,787
1,442,787
743,004
Net Service Result after Transfers to/from Reserves
3,838,333
3,984,191
(601,643)
0
0
0
NET RESULT
Summary Income Statement
Budget 2023/2024
185
3320 - Floodplain & Estuary Management Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
(491,200)
(491,200)
0
0
0
0
Operating Grants & Contributions Other Revenue Net Gains from Disposal of Assets Internal Income
0
0
0
(97,883)
(97,883)
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(589,083)
(589,083)
0
863,284
863,284
579,551
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
40,287
40,287
20,812
Materials
14,610
74,610
15,194
Contracts & Consultancies
460,136
460,136
62,541
0
0
0
Legal Expenses
1,699,557
1,699,557
1,731,860
Insurance Expenses
Depreciation
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses
288
288
300
Other Operating Expenses
6,944
6,944
7,291
Subscriptions & Memberships
2,266
2,266
2,357
Internal Expenses
33,916
33,916
33,953
ABC Distribution
208,235
208,235
216,941
Internal Plant Hire
0
0
0
Total Expenditure
3,329,523
3,389,523
2,670,800
Net Operating Result for the year before Grants & Contributions provided for capital purposes
2,740,440
2,800,440
2,670,800
Capital Grants & Contributions
(800,000)
(2,477,805)
(1,684,551)
1,940,440
322,635
986,249
Operating Result for the Year
186
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
30,000
340,000
320,000
300,000
0
0
0
0
710,000
2,377,805
2,074,078 (1,731,860)
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New Capital Works - Upgrade Capital Works - Expansion Capital Works - Renewal
(1,699,557)
(1,699,557)
Employee Leave Accruals
Depreciation
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
215,265
215,265
60,732
0
0
0
(454,292)
1,223,513
742,950
(116,000)
(116,000)
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
(116,000)
(116,000)
0
1,370,148
1,430,148
1,729,199
Summary Income Statement
Budget 2023/2024
187
4000 - Environment & Planning Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
Operating Grants & Contributions
0
0
0
Other Revenue
0
0
0
0
0
0
Internal Income
Net Gains from Disposal of Assets
(43,304)
(43,304)
0
ABC Recovery
(376,806)
(376,806)
(391,879)
0
0
0
(420,110)
(420,110)
(391,879)
431,842
431,842
492,490
0
0
0
Internal Plant Hire Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
0
0
0
Materials
0
0
0
Contracts & Consultancies
0
0
0
Legal Expenses
0
0
0
Depreciation
0
0
0
Insurance Expenses
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses
0
0
0
Other Operating Expenses
0
0
0
0
0
0
Internal Expenses
Subscriptions & Memberships
8,000
8,000
8,000
ABC Distribution
382,136
382,136
397,463
Internal Plant Hire
0
0
0
Total Expenditure
821,978
821,978
897,953
Net Operating Result for the year before Grants & Contributions provided for capital purposes
401,868
401,868
506,074
0
0
0
401,868
401,868
506,074
Capital Grants & Contributions
Operating Result for the Year
188
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0
Depreciation
0
0
0
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments
0
0
0
Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
(129,911)
(129,911)
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
(129,911)
(129,911)
0
271,957
271,957
506,074
Summary Income Statement
Budget 2023/2024
189
4120 - Environmental Services Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
(398,309)
(398,309)
(414,241)
(1,150)
(1,150)
(1,196)
0
0
0
Statutory & Regulatory User Charges General User Fees Interest Income Operating Grants & Contributions Other Revenue
0
0
0
(11,109)
(11,109)
(11,553)
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(410,568)
(410,568)
(426,990)
548,235
548,235
427,211
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs Materials Contracts & Consultancies Legal Expenses
0
0
1,200
1,248
190,000
190,000
292,200
0
0
0
Depreciation
0
0
0
Insurance Expenses
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses
0
0
0
Other Operating Expenses
0
0
0
Subscriptions & Memberships
0
0
0
Internal Expenses
35,000
35,000
35,000
ABC Distribution
378,129
378,129
393,545
Internal Plant Hire
0
0
0
Total Expenditure
1,152,564
1,152,564
1,149,204
741,996
741,996
722,214
0
0
0
741,996
741,996
722,214
Net Operating Result for the year before Grants & Contributions provided for capital purposes Capital Grants & Contributions
Operating Result for the Year
190
0 1,200
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0
Depreciation
0
0
0
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments
0
0
0
Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
(368,347)
(368,347)
(287,034)
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
(150,000)
(150,000)
0
Net Service Result after Transfers to/from Reserves
(518,347)
(518,347)
(287,034)
223,649
223,649
435,180
NET RESULT
Summary Income Statement
Budget 2023/2024
191
4110 - Regulatory Services Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
0
0
0
Interest Income
0
0
0
Operating Grants & Contributions
(75,000)
(75,000)
0
Other Revenue
(122,654)
(122,654)
(127,560)
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(197,654)
(197,654)
(127,560)
878,998
878,998
940,463
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
978
978
252
Materials
Borrowing Costs
14,507
14,507
15,087
Contracts & Consultancies
160,200
160,200
93,608
0
0
0
Legal Expenses Depreciation
698
698
735
Insurance Expenses
259
259
298
0
0
0
Donations, Contributions & Taxes Administration Expenses Other Operating Expenses Subscriptions & Memberships
0
0
5,318
5,584
0
0
0
Internal Expenses
104,028
104,028
104,262
ABC Distribution
151,546
151,546
157,897
Internal Plant Hire
0
0
0
Total Expenditure
1,316,532
1,316,532
1,318,186
Net Operating Result for the year before Grants & Contributions provided for capital purposes
1,118,878
1,118,878
1,190,626
0
0
0
1,118,878
1,118,878
1,190,626
Capital Grants & Contributions
Operating Result for the Year
192
0 5,318
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
10,000
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
10,000
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0 (735)
Depreciation
(699)
(699)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
3,854
3,854
736
0
0
0
13,155
13,155
1
0
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
(10,000)
(10,000)
0
Unexpended Grant Reserves S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
(10,000)
(10,000)
0
1,122,033
1,122,033
1,190,627
Summary Income Statement
Budget 2023/2024
193
3210 - Natural Resource Management Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
0
0
0
Interest Income
General User Fees
(51,807)
(51,807)
(53,361)
Operating Grants & Contributions
(357,000)
(357,000)
(284,493)
0
0
0
Other Revenue Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(408,807)
(408,807)
(337,854)
576,571
576,571
297,087
1,800
1,800
1,872
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
0
0
0
Materials
Borrowing Costs
375,566
250,566
260,587
Contracts & Consultancies
162,833
277,833
302,571
0
0
0
Legal Expenses
288
288
183
Insurance Expenses
Depreciation
0
0
0
Donations, Contributions & Taxes
0
0
0
Administration Expenses
0
0
0
Other Operating Expenses
0
0
0
Subscriptions & Memberships Internal Expenses
0
0
16,000
16,000
ABC Distribution
129,441
129,441
135,076
Internal Plant Hire
107,800
107,800
112,112
Total Expenditure
1,370,299
1,360,299
1,125,488
Net Operating Result for the year before Grants & Contributions provided for capital purposes
961,492
951,492
787,634
Capital Grants & Contributions
(131,000)
(131,000)
(43,025)
830,492
820,492
744,609
Operating Result for the Year
194
0 16,000
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
131,000
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
131,000
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0 (183)
Depreciation
(288)
(288)
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
130,712
130,712
(183)
43,386
43,386
(50,000)
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
(25,000)
(25,000)
0
Unexpended Grant Reserves S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
18,386
18,386
(50,000)
979,590
969,590
694,426
Summary Income Statement
Budget 2023/2024
195
3230 - Waste Services Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income
(10,255,117)
(10,255,117)
(10,676,529)
User Charges
Annual Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
General User Fees
(5,836,055)
(5,836,055)
(6,069,498)
Interest Income
(184,679)
(184,679)
(209,688)
Operating Grants & Contributions
(186,100)
(186,100)
(193,544)
Other Revenue
(782,235)
(782,235)
(764,412)
Net Gains from Disposal of Assets Internal Income
(141)
(141)
(55,487)
(3,338,971)
(3,338,971)
(3,105,211)
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(20,583,298)
(20,583,298)
(21,074,369)
1,322,524
1,320,475
1,196,715
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
331,477
331,477
240,988
Materials
308,290
308,290
102,804
9,977,435
9,977,435
7,363,014
0
0
0
1,260,217
1,260,217
633,654
20,470
20,470
23,540
3,227,017
3,227,017
3,356,098
Contracts & Consultancies Legal Expenses Depreciation Insurance Expenses Donations, Contributions & Taxes Administration Expenses
13,222
13,222
13,752
Other Operating Expenses
86,769
86,769
90,318
Subscriptions & Memberships Internal Expenses
45,496
47,316
3,235,888
3,025,502
ABC Distribution
513,669
513,669
534,631
Internal Plant Hire
203,975
203,975
212,134
Total Expenditure
20,546,449
20,544,400
16,840,466
Net Operating Result for the year before Grants & Contributions provided for capital purposes
(36,849)
(38,898)
(4,233,903)
Capital Grants & Contributions
(500,000)
0
0
(536,849)
(38,898)
(4,233,903)
Operating Result for the Year
196
45,496 3,235,888
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
4,290,000
5,603,320
3,000,000
2,468
2,468
0
0
0
0
120,000
120,000
1,421,197 (633,654)
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New Capital Works - Upgrade Capital Works - Expansion Capital Works - Renewal
(1,260,218)
(1,260,218)
Employee Leave Accruals
Depreciation
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments
0
0
0
609,751
609,751
703,241
0
0
0
3,762,001
5,075,321
4,490,784
Internal Reserves
(325,164)
(1,739,138)
(3,365,710)
External Reserves
3,108,829
Total Balance Sheet Movements / Non-Cash Adjustments
Adjust for Transfers to/from Reserves (2,899,988)
(3,297,285)
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
(3,225,152)
(5,036,423)
(256,881)
0
0
0
Summary Income Statement
Budget 2023/2024
197
3240 - Cemeteries Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
Statutory & Regulatory User Charges
0
0
0
(618,460)
(618,460)
(653,198)
0
0
0
General User Fees Interest Income Operating Grants & Contributions Other Revenue
0
0
0
(1,309)
(1,309)
(1,361)
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(619,769)
(619,769)
(654,559)
1,322,524
1,320,475
1,196,715
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs Borrowing Costs
331,477
331,477
240,988
Materials
308,290
308,290
102,804
9,977,435
9,977,435
7,363,014
0
0
0
1,260,217
1,260,217
633,654
20,470
20,470
23,540
3,227,017
3,227,017
3,356,098
Contracts & Consultancies Legal Expenses Depreciation Insurance Expenses Donations, Contributions & Taxes Administration Expenses
13,222
13,222
13,752
Other Operating Expenses
86,769
86,769
90,318
Subscriptions & Memberships Internal Expenses
45,496
47,316
3,235,888
3,025,502
ABC Distribution
513,669
513,669
534,631
Internal Plant Hire
203,975
203,975
212,134
Total Expenditure
20,546,449
20,544,400
16,840,466
187,695
187,695
168,730
0
0
0
187,695
187,695
168,730
Net Operating Result for the year before Grants & Contributions provided for capital purposes Capital Grants & Contributions
Operating Result for the Year
198
45,496 3,235,888
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
20,000
20,000
0
Capital Works - Expansion
Capital Works - Upgrade
0
0
0
Capital Works - Renewal
0
0
40,000 (37,538)
(33,949)
(33,949)
Employee Leave Accruals
Depreciation
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received Loan Repayments (Principal Only) Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
1,390
1,390
0
0
0
0
(12,559)
(12,559)
2,462
(20,000)
(20,000)
(40,000)
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves Net Service Result after Transfers to/from Reserves
NET RESULT
0
0
0
(20,000)
(20,000)
(40,000)
155,136
155,136
131,192
Summary Income Statement
Budget 2023/2024
199
4200 - Building & Planning Services Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
(2,251,750)
(2,251,750)
(2,441,820)
General User Fees
(108,749)
(108,749)
(113,098)
Interest Income
(30,627)
(30,627)
(31,546)
Statutory & Regulatory User Charges
Operating Grants & Contributions Other Revenue
0
0
0
(11,762)
(11,762)
(40,087)
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(2,402,888)
(2,402,888)
(2,626,551)
2,764,075
2,764,075
2,792,987
0
0
0
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
0
0
0
Materials
Borrowing Costs
6,581
6,581
6,844
Contracts & Consultancies
88,431
88,431
70,768
Legal Expenses
6,451
46,451
6,709
Depreciation
12,111
12,111
11,505
0
0
0
178,823
178,823
185,976
Insurance Expenses Donations, Contributions & Taxes Administration Expenses
0
0
0
Other Operating Expenses
0
0
0
Subscriptions & Memberships
11,796
11,796
12,268
Internal Expenses
69,500
69,500
69,500
ABC Distribution
755,321
755,321
786,410
Internal Plant Hire
0
0
0
Total Expenditure
3,893,089
3,933,089
3,942,967
Net Operating Result for the year before Grants & Contributions provided for capital purposes
1,490,201
1,530,201
1,316,416
Capital Grants & Contributions
(216,191)
(216,191)
(159,875)
1,274,010
1,314,010
1,156,541
Operating Result for the Year
200
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0 (11,505)
(12,111)
(12,111)
Employee Leave Accruals
Depreciation
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
(12,111)
(12,111)
(11,505)
(15,000)
(15,000)
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
246,818
246,818
0
Net Service Result after Transfers to/from Reserves
231,818
231,818
0
1,493,717
1,533,717
1,145,036
NET RESULT
Summary Income Statement
Budget 2023/2024
201
4100 - Land Use Planning Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
0
Income Rates Income Annual Charges
0
0
0
User Charges
0
0
0
(154,500)
(142,700)
(160,680)
Statutory & Regulatory User Charges General User Fees
0
0
0
(1,044)
(1,044)
(1,075)
Operating Grants & Contributions
(22,879)
(172,879)
(7,610)
Other Revenue
(78,227)
(2,773)
(80,317)
Interest Income
Net Gains from Disposal of Assets
0
0
0
Internal Income
0
0
0
ABC Recovery
0
0
0
Internal Plant Hire
0
0
0
(256,650)
(319,396)
(249,682)
1,048,120
1,048,120
1,051,054
300
300
312
Total Income (Excluding Capital Grants & Contributions)
Expenditure Salaries, Wages & Oncosts Other Employee Costs
0
0
0
Materials
Borrowing Costs
51,578
41,675
53,641
Contracts & Consultancies
299,500
441,000
176,880
0
0
0
Legal Expenses Depreciation
0
0
0
Insurance Expenses
0
0
0
Donations, Contributions & Taxes
0
0
0
5,609
0
5,833
0
0
0
Administration Expenses Other Operating Expenses
0
0
0
Internal Expenses
Subscriptions & Memberships
63,978
48,000
63,997
ABC Distribution
197,097
127,860
205,562
Internal Plant Hire
0
0
0
Total Expenditure
1,666,182
1,706,955
1,557,279
Net Operating Result for the year before Grants & Contributions provided for capital purposes
1,409,532
1,387,559
1,307,597
0
0
0
1,409,532
1,387,559
1,307,597
Capital Grants & Contributions
Operating Result for the Year
202
Clarence Valley Council
Description
Original Adopted Budget 2022/23
Current Revised Budget 2022/23
Original Budget 2023/24
0
0
Balance Sheet Movements / Non-Cash Adjustments Capital Works - New
0
Capital Works - Upgrade
0
0
0
Capital Works - Expansion
0
0
0
Capital Works - Renewal
0
0
0
Depreciation
0
0
0
Employee Leave Accruals
0
0
0
Employee Leave Paid
0
0
0
Loan Funds Received
0
0
0
Loan Repayments (Principal Only)
0
0
0
Long Term Debtor Repayments
0
0
0
Total Balance Sheet Movements / Non-Cash Adjustments
0
0
0
0
0
0
Adjust for Transfers to/from Reserves Internal Reserves External Reserves
0
0
0
Unspent Loans
0
0
0
Unexpended Grant Reserves
0
0
0
S64 / S94 Contribution Reserves
(61,743)
(61,743)
0
Net Service Result after Transfers to/from Reserves
(61,743)
(61,743)
0
1,347,789
1,325,816
1,307,597
NET RESULT
Summary Income Statement