![](https://assets.isu.pub/document-structure/210610160436-4f458834579c38fe83fab01a81c5def9/v1/314eac69ca714aaaa2505d4eaaf57598.jpeg?width=720&quality=85%2C50)
1 minute read
6.1.4.2. Creating jobs
Wind Plant PESRL, Costa Rica
(203-1, 203-2, 103-1, 103-2, 103-3) (SDGs 5.4, 9.1, 9.4, 11.2, 1.2, 1.4, 3.8, 8.2, 8.3, 8.5)
Advertisement
• Building four new bus stops in Quebrada Grande, Cluster Liberia. • Materials for the construction of two bus stops in neighborhood
Los Moisos, Cluster Tilarán. • Support for improvements in the cell of the police delegation of
Quebrada Grande, Cluster Liberia. • Infrastructure Improvement of Basic Comprehensive Healthcare
Teams - EBAIS - from Quebrada Grande, Cluster Liberia. • Repairs at the community hall San Antonio in Quebrada Grande,
Cluster Liberia. • Support for improvements in the perimeter wall of the police delegation of Quebrada Grande, Cluster Liberia. • Maintenance for the blade donated for the remodeling of the park in Quebrada Grande, Cluster Liberia. This contribution contributes to the construction of the theme park design related to wind generation. • Support for improvements in the cell of the police delegation of
Quebrada Grande, Cluster Liberia. Arrangements were also made on three kilometers of roads in the community Parcelas de Quebrada Azul in Tilarán, benefiting 1800 people, which meant an investment of US$ 68,365.00.
6.1.4.2. Creating jobs
(GRI 203-2, 103-2, 103-3) (GRI 413-1,103-2, 103-3) (SDGs 1.2, 1.4, 3.8, 8.2, 8.3, 8.5) We also generate employment throughout the year, hiring up to 81 people, through the operation and maintenance company of CMI Capital, CROMSA. In Cluster Liberia, 83 percent of our total workers are residents of the area near this operation. While 17% are employees hired from the Guanacaste area. In Cluster Tilarán, 90% are local workers and 10% are hired from the Guanacaste area.