MODDERFONTEIN REGENERATION

Modderfontein Regeneration Final Workshop Report July 28th and 29th, 2015

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

ATTENDEES

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

DEVELOPER Zendai

TECHNICAL TEAM Atkins: Environment, Masterplanning, Socioeconomics, Public Engagement, Planning, Transport and Infrastructure overview, Cost Consulting Colliers: Commercial Assessment Arup: Transport and Infrastructure

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

PRESENTATION – Day One 1. 2. 3. 4. 5. 6. 7. 8.

Method Option selection workshop summary What has happened since Context Framework – Big ideas Environment Transport Infrastructure

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

PRESENTATION – Day Two 1. Urban Design Guidelines 2. Economics – Commercial 3. Socio-economics

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

DAY ONE Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

METHOD Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Typical delivery process:

REVIEW Site Conditions

Civil Infrastructure

Funding Options

Market Study & Programme

VISION Concept Masterplan

P3 Opportunities

Cost Estimates

Preliminary Infrastructure

We are here

PLAN Investment & Financial Plan

Developer Packages

Phasing & Delivery Plan

DELIVER Infrastructure Mobilisation

Building Design

Developer Evaluation

SELL Developer Agreements

Modderfontein Regeneration Final Workshop July 2015

Completion of Land Sales

Infrastructure Planning

Team Economics Design + Planning Architecture Engineering Programme + Construction Management


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

OPTION SELECTION WORKSHOP SUMMARY

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

OBJECTIVES

We agreed objectives. (updated from the Vision Workshop)

ENVIRONMENT • Conserve water resources & biodiversity • Sustainable urban drainage • Best practice/sustainable approach

INFRASTRUCTURE • Resilient supply • Demand reduction • Affordable

DEVELOPMENT PLANNING • Social integration • Quality public realm • Development delivered as promised • Positively transform the city • Urban efficiency: job density, modal density, people density.

TRANSPORT • Catalytic • Affordable • Connected • Integrated • Internally and externally linked – When? For whom? Linking what/where to what where (hub to hub approach). • Look at bike store systems for nonmotorised transport with the development. Also look at the feasibility of the umbrella organisation operating a car share system.

ECONOMICS • Job creation • Foreign direct investment • A place of opportunity • Financial sustainability for region • GDP/GVA • Ensuring key levers exist to attract FDI (e.g. services, infrastructure and incentives for investment). • Unique value proposition to avoid cannibalising biz from one area to another.

Modderfontein Regeneration Final Workshop July 2015

ALL • Productive


MODDERFONTEIN REGENERATION

DESIGN PRINCIPLES – consistent in all options Principles from the Vision Workshop: • Environmental areas of importance are integrated into the development and maintained and/or improved. • Our site is fully integrated into the fabric of the city • The Gautrain station area will be designed as a mixed use hub. • Each part of the development will be designed as a fully functional neighbourhood, with access to amenities and community faciliteis. • Green linkages define the neighbourhoods and provide urban access to nature. • Green corridors and high quality public realm are integrated into the neighbourhoods for increased access. • Cycles routs and pedestrian routes are integrated into the scheme to ensure walkability. • Founder’s Hill is preserved as a cultural and academic area. • Development plans are flexible and allow for a mix of uses and incomes. • A significant amount of public spaces and amenities are maintained to promote social integration. New Principles from Option Selection Workshop: • Vibrant indoor stations – retail, biz etc. (mixed) where passengers walk thru retail area. Example: Penn Station and Washington DC. • Decentralised water and electricity supply for development given the electricity crisis and potential water crisis SA is facing. • Improve eco-efficiency = reduce waste and other outputs by development. • Energy efficiency measures to be implemented in the buildings. • Reduce ecological footprint. • Types of education? Public? Private? Tertiary? Technical?

Modderfontein Regeneration Final Workshop July 2015

We confirmed design principles.


MODDERFONTEIN REGENERATION

OPTION SELECTION WORKSHOP

Modderfontein Regeneration Final Workshop July 2015

We worked together.


MODDERFONTEIN REGENERATION

1 – Up, Not Out

We evaluated the options.

Modderfontein Regeneration Final Workshop July 2015

2 – Distinct 3 – Linear Cores Neighbourhoods


MODDERFONTEIN REGENERATION

KEY COMMENTS DEVELOPMENT PLANNING “On what basis was the deprivation assessment completed?” Liana Strydom (Development Planning) Action: Atkins to arrange video conference with Socio Economics team to discuss in detail. OPTION 1: “Option 1 works because density in the form of economic opportnties, people and buildings makes public transport work. It is also in line with the Transformation agenda that CoJ is moving towards.” Ayanda Masuku (Development Planning) “It’s better when the M60 avoids the wetlands.” “Could be very vibrant.” “Shortest water bulk line, cheapest infrastructure and good/easier for demand reduction.” “Best Option.” “Most density, best economic outputs and best connectivity.” “Inclusionary housing works best in Option 1.” Ayanda Masuku (Development Planning) “More links to surrounding areas are needed.” “Be weary about the Eskom power line running through the site. Option 1 is the only one that avoids it.” OPTION 2: “Strong sense of community in neighbourhoods.” “Option 2 is not viable as the distance travelled should be short.” Mohini “Communities are fragmented and hard to travel between.” OPTION 3: “It is private car oriented and not sustainable due to lower densities.” “Development is too spread out.” “More green!” “Routes through site are too long.” “Very car oriented with a very low density. Option 3 encroaches to much on the green spaces.” (Note from Atkins: The density is lower in Option 3 than 1&2 but still much higher than the average residential neighbourhood in Joburg.)

(This is an example slide. Please see Option Selection Workshop Report for the full slide deck.) Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS ENVIRONMENT “Are the flood lines certified and the wetlands delineated?” Lebo Molefe (EISD) Answer: Yes. “We need to review the reports that were used to complete the sensitivity maps.” Jane Eagle (EISD) Action: Zendai to issue reports Other comments: • How do we code public space? • How can we regulate regeneration over such a long time span? • We need to use policy mechanisms to ensure funding goes to the right place. (land trust) • Leticia Potts (Zendai) explained that all the open space will be managed by an Umbrella Organisation. It has already been established. Any business that operates a business or lives in Modderfontein will pay a contribution to the Umbrella Organisation. The Modderfontein Reserve is already under the ownership of the Umbrella Organisation and is being funded by tenants. The Umbrella Organisation will have charge for design for individual sites as they are developed. • In projects of this scale, you can’t code all of the environmental areas. What can we do instead to ensure future delivery team engage and deliver to the principles we have established?

(This is an example slide. Please see Option Selection Workshop Report for the full slide deck.) Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS INFRASTRUCTURE “There are limits on existing capacity and no expansion plans until 2025. Cogeneration and a proactive plan are both critical.” Hein Schuld (Plantech Associates) .

ECONOMICS “How do we manage to ensure that we don’t repeat the same mistakes that happen when Sandton was developed?” Herman Pienaar (Development Planning) TRANSPORT . “Public transit can help avoid what happened in Sandton.” Gugu Mbambo (Transportation) “Public transport should be linked to areas of development that investment sectors are likely to target. This could lead to a requirement for 24 hour service.” Beatrice Abil (Economic Development) “We have not looked at rail specifically in the SDF process yet but this discussion might help incorporate it.” Herman Pienaar (Development Planning) Modderfontein Regeneration Final Workshop July 2015

(This is an example slide. Please see Option Selection Workshop Report for the full slide deck.)


MODDERFONTEIN REGENERATION

We understood how to deal with potential obstacles.

BREAK OUT SESSIONS - Environment Most important elements for inclusion in the masterplan

Potential obstacles that might hinder implementation

What we might do to mitigate the obstacle

Maintaining environmental performance & functionality Mapping of environmental potential and status – need to identify where we can make it better as well as where is already good Identifying and respond to impacts – don’t try to pretend there aren’t any Heritage and visual impacts need to be included Understand geohydrology

Lack of stakeholder involvement (including Zendai, CoJ, plot developers) Lack of and/or poor quality of existing and new information; Information Verification Defining Ecological Potential Habitat Restoration costs Transport corridors have to cross the site Competitive demand for land uses Budget constraints upfront

Economic analysis of value added Funding models (c.f. umbrella body) Education and awareness To all stakeholders Developing high quality environment; Maintaining and managing access

Design principles and codes SUDS Integration of ecological and hydrological environment (blue and green) with the built environment Permeability and accessibility for people and ecology Inclusivity Inclusion of all sensitive elements Building and maintaining resilient and robust ecosystems Linkages and synergies

Lack of coding – or lack of respect of codes Misinterpretation/misapplication of principal codes at all scales Lack of institutional memory as staff move on Benchmarks – what is good?; Competency of professional team and authority’s staff Limited experience of projects of this scale Poor investigation, lack of multidisciplinary approach Time and budget constrains Lack of ownership and sense of place; Lack of awareness Landscape architecture need to be core (nearly as important as geohydrology);

Umbrella Body (Independent of Zendai) Management plans Compliance to Framework Enforcement Permits and Licences Maintenance Development of robust codes Review process – what is working and what isn’t? Inclusive of built and unbuilt environment (not just green space) Prioritisation of implementation of amenities Education for all

(This is an example slide. Please see Option Selection Workshop Report for the full slide deck.) Modderfontein Regeneration Final Workshop July 2015

Order of importance

1 2


MODDERFONTEIN REGENERATION

Environment Most important elements for inclusion in the masterplan

Potential obstacles that might hinder implementation

What we might do to mitigate the obstacle

Sustainability: Food security Protection Rehabilitation/habitat creation; Transport Open space management; Shared resources Water security Dynamic and constant review Safe workable spaces Liveability

Exclusivity Perceptions Safety and security concerns Sensitivity Lack of access to public transport (phasing) Poorly designed space Lack of choice/variety of spaces; Linkage to amenity/nature Transaction of issues Resilient thinking/flexibility

Climate Proofing Robustness Resilient Infrastructures Open Space/Greening carbon offset Roof top solar Recycle SUDS and flood risk management

Oversight and audit: Getting the right people Building the right team

Budget constraints upfront; Valuing of open space Social Economy Environment Inter geo-environmental dependencies (financial contributions used elsewhere ) Business case not strong enough

Interdisciplinary sensitivity (team) Legal controls and agreements; Core part of design and land use planning from initiation Now) Throughout process (resource management, compatible activities’ and land use of planning) Appropriate composition of team

Green economy opportunities and integration with hard infrastructure

Commitment (developer, residents & city) Open attitude Budget constraints Skills and expertise Definition of “Green Economy”

Micro enterprises – adding value and usability of the spaces Street trading – strategy from the start to manage appropriately Skills development programme

(This is an example slide. Please see Option Selection Workshop Report for the full slide deck.) Modderfontein Regeneration Final Workshop July 2015

Order of importance

3 4 5


MODDERFONTEIN REGENERATION

WHAT HAS HAPPENED SINCE

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

YOUR COMMENTS AND FEEDBACK We received quite a lot of feedback at the workshop and this was recorded in the Option Selection Workshop Report. Thank you! We have not received any further comments. We presume the workshop report was considered to be a complete and accurate record of any comments and we have developed the final framework plan on this basis.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

PROJECT PROGRESS 1. Individual workshops with CoJ: Socioeconomics (July 30th), Housing (July 30th), Next Steps with Development Planning (29th July), Environment CoJ (July 30th) and GDARD (July 31st) (see appendix) 2. Environmental principles written 3. Social Housing workshop JOSHCO (June 2015) 4. Preferred Framework developed 5. Trigger points for CoJ support identified for preferred framework 6. Delivery strategy identified 7. Commercial Assessment for the preferred framework developed 8. Framework tested in terms of: Environmental sensitivities Job creation Transport and infrastructure capacity Socio economic impacts Value Cost 9. Public Engagement Exhibition (July 24th and 25th, 2015) 10. Updated Structure for Modderfontein Communication and Engagement Strategy (based on completed public engagement)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Public Engagement

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Public Engagement

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

CONTEXT Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

ALIGNS WITH THE COMPACT CITY • Link with the Corridors of Freedom • Develop around transit • Mix of appropriate densities • Provide access to services and amenities

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

SPATIAL DEVELOPMENT FRAMEWORK Where does Modderfontein fit in?

SDF Goals: • City-wide modal shift towards public transit • Development follows transit • Create multi-modal hubs • Zoning around hubs enforces higher density and mixed use development • Support regeneration and new build within the ‘Strategic Development Zone’ • Support new jobs where connectivity is improved and land value increases

Modderfontein Regeneration Final Workshop July 2015

East/West corridor identified at SDF Workshop 3 “Airport Corridor”


MODDERFONTEIN REGENERATION

CONTEXT

Isando

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

During this stage of work, we will create one singular and agreed plan to use as a framework for future development.

2015 “We must think strategically and that includes Gauteng Province. We can benefit from each other, if we work together.” -- Estee Campher, Gauteng Office of the Premier: Planning Division “Modderfontein does not just effect Johannesburg. It is also a critical component in the wider region, including Gauteng Province and Ekurhuleni Municipality.” -- Martin Bekker, Ekurhuleni

Approved framework plan Modderfontein Regeneration Final Workshop July 2015

Submitted framework plan (not approved)

The final framework plan (approval coming later this year)


MODDERFONTEIN REGENERATION

THINGS HAVE CHANGED • Environmental sensitives are better understood • The market has started to demand new typologies of development • Attitudes toward public transit have improved • The site footprint has reduced/ ownership changed

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

EXISTING RIGHTS What is already in place?

Approved development applications in place: • • • • • • • •

Longlake Westlake Founders Hill Pinelands Highlands K113 New Road Marlboro Road Extension Centenary Road Extension

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

INDICATIVE OPEN SPACE

Our spatial design is informed by the environment: ON THE GROUND AND BELOW

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Balance

VISION

SOCIAL CONTEXT

Modderfontein Regeneration Final Workshop July 2015

ECONOMY

“A clear need to maintain a balance”


MODDERFONTEIN REGENERATION

Summary version (please see Vision Workshop Report for full set of slides) Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environmental sustainability leads to successful development.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Make the most of tourism opportunities.

Sustainable Urban Drainage can be beautiful, provide amenity and link into city wide plan.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

TOD How do you make the most of the station?

Rosebank, Johannesburg

Kings Cross, London

We can do better.

(shops, restaurants, post office, bar, hotel)

Increasing activity is a good way to increase safety. Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Inclusionary housing means integrating social housing with market rate housing.

Parking rates can be reduced in social housing schemes.

Modderfontein Regeneration Final Workshop July 2015

Social housing is only 4-5 years old in South Africa. This is our chance to provide something really innovative that caters to what people really need and want.


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

FRAMEWORK Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Objective Themes:

Social integration Protection of environmental sensitivities

Resilient resources

Safe places to live, work and play Quality public places Job creation

Modderfontein Regeneration Final Workshop July 2015

Efficient transportation


MODDERFONTEIN REGENERATION

Options were tested against the agreed objectives. The preferred option (1) delivers best for:

Resilient resources

Job creation Social integration

Safe places to live, work and play

Protection of environmental sensitivities

1: Up, Not Out

Modderfontein Regeneration Final Workshop July 2015

Quality public places

2: Distinct Neighbourhoods

Efficient transportatio n

3: Linear Cores


MODDERFONTEIN REGENERATION

DELIVERY STRATEGY

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

DELIVERY Phasing will change as key influencers become clear.

Delivery plan must respond to: • Environment • Socio-economics • Infrastructure (on-site and off-site needs) • Market Demand (including other planned projects such as Corridors of Freedom) As these elements change over time, our plan will adapt.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

First 5 years LIVING AND WORKING 1. Start Pinelands, Founders Hill, Longlake + bulk electrical substation, town centre planning 2. Deliver hospital 3. Continue Westlake delivery 4. Light industrial jobs 5. Family style residential MOVEMENT 1. Deliver major north/south connection K113 2. Maximise connections to the airport and adjacent land 3. Begin design of the Gautrain Station 4. Complete Centenary Road extension 5. Build major east/west road connection CONNECTING TO THE ENVIRONMENT 1. Deliver pedestrian and cycle connections 2. Continue Modderfontein Reserve management 3. Prepare full site Open Space Strategy including habitat & wetland restoration, landscape design and phasing 4. Provide green cushion between housing and reserve 5. Deliver public parks

Modderfontein Regeneration Final Workshop July 2015

5,300 new homes 7,000 new jobs

4. 5.

1.

2.

5.

1.

4. 5.

5. 2.

1. 2.

3.

3. 1. 1. 3.

4.

5.


MODDERFONTEIN REGENERATION

By 2030 LIVING AND WORKING 1. Begin delivering first phase of the town centre 2. Begin delivering mixed use neighbourhoods MOVEMENT 1. Build second major east/west connecting road 2. Gautrain station and associated development opens (station may be operational earlier) 3. Kempton Park Road is completed 4. High capacity transit station sites are safeguarded 5. Extension of Marlboro Road is built CONNECTING TO THE ENVIRONMENT 1. Deliver public parks (designed to support SUDS) 2. Expand pedestrian and cycle connections 3. Wetland restoration programme continues – part of SUDS 4. Modderfontein River Corridor Restoration starts VIABILITY 1. Check the market: Plots could be either residential or light industrial depending on demand 2. New neighbourhoods are delivered when the market confirms the need

Modderfontein Regeneration Final Workshop July 2015

14,000 new homes 35,000 new jobs 2 new schools

4. 1. 1. 1.

1. 4. 2.

4. 2.

3.

4.

5.

2. 4.

3. 2. 4.

1.

1.


MODDERFONTEIN REGENERATION

By 2040 LIVING AND WORKING 1. Begin second part of the town centre 2. Build landbridge to connect the north and south parts of the town centre 3. Begin delivering the next mixed use neighbourhood MOVEMENT 1. Build first north/south connecting road 2. Build high capacity public transit line and stations where development is present CONNECTING TO THE ENVIRONMENT 1. Deliver major Central Park (designed to support SUDS) 2. Connect pedestrians & cycles to south sites VIABILITY 1. Check market viability for: • Landbridge • type of high capacity public transit (ridership projections and available technology) • Office space requirements • Additional mixed use neighbourhoods

Modderfontein Regeneration Final Workshop July 2015

14,500 new homes 37,000 new jobs 2 new schools

2. 3.

2.

2. 1. 1. 2. 2.

2.

1.


MODDERFONTEIN REGENERATION

By 2050

17,000 new homes 35,000 new jobs 2 new schools

LIVING AND WORKING 1. Begin last phase of town centre 2. Begin delivering additional mixed use neighbourhood MOVEMENT 1. Build additional high capacity public transit stations 2. If required, build a supporting north/south road CONNECTING TO THE ENVIRONMENT 1. Complete Central Park 2. Complete pedestrian and cycle connections

1. 2.

2.

1.

VIABILITY 1. Check public transit usage rates at time of delivery in order to assess necessity of additional north/south road 2. Check market viability before starting next mixed use neighbourhood

Modderfontein Regeneration Final Workshop July 2015

1. 2.

1.


MODDERFONTEIN REGENERATION

By 2060

17,000 new homes 35,000 new jobs 2 new schools

LIVING AND WORKING 1. Begin the remaining mixed use neighbourhood

MOVEMENT 1. If required, completed Marlboro Road. 2. Build additional high capacity public transit stations

CONNECTING TO THE ENVIRONMENT 1. Provide green cushion between housing and reserve VIABILITY 1. Investigate the possibility of increasing capacity of alternative east/west connection in lieu of completing Marlboro Road.

Modderfontein Regeneration Final Workshop July 2015

1.

1. 1.

2.

1.

2.


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015

Modderfontein is NOT business as usual.


MODDERFONTEIN REGENERATION

Modderfontein provides a genuine opportunity to provide place people want to live, work and play

TODAY.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

COMMUNITY

Our spatial design is informed by the environment and linked by community

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

OPEN SPACE

Primarily a conservation area that is punctuated with soft leisure features that do not interfere with conservation.

Flood control that is also public space. Conservation area that is accessible by the public.

Conservation edge meets urban area. Modderfontein Regeneration Final Workshop July 2015

Urban agriculture.


MODDERFONTEIN REGENERATION

Likely to be too steep for effective development.

Area may be too contaminated to warrant landscape regeneration. Might only be feasible as development.

Placement of additional green has been selected to promote sustainable urban drainage.

Additional buffer added to protect Modderfontein Reserve.

Modderfontein Regeneration Final Workshop July 2015

Missing the Egoli granite grassland.


MODDERFONTEIN REGENERATION

DENSITY

Modderfontein Regeneration Final Workshop July 2015

Density needs functional components to be liveable: • Parks • Public Transit • Reliable Infrastructure • Community Facilities


MODDERFONTEIN REGENERATION

DENSITY

Density saves money

Greenwich Millennium Village, scale and density kick-start regeneration

Density allows privacy and stunning views Modderfontein Regeneration Final Workshop July 2015

Source: Superdensity -- Design for London


MODDERFONTEIN REGENERATION

At the average Johannesburg density, it would take almost

4 times the amount of space to support the same number of people.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

LOW TO MEDIUM DENSITY

96 dwellings per hectare Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

MEDIUM DENSITY

200 dwellings per hectare Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

HIGH DENSITY

293 dwellings per hectare Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

PUBLIC TRANSIT

Potential rail connection

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

PUBLIC TRANSIT: example

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

ROAD HIERARCHY

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

LAND USES

Active centres increase offpeak demand on public transit

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

OFFICE – Town Centre

1,468,000 sqm office

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

RESIDENTIAL – Town Centre

21,792 units 27% mid/low density 40% medium 33% high

High density examples. Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

RESIDENTIAL – Mdf North

33,388 units 6% 37% 35% 22%

low density mid/low medium high

Modderfontein Regeneration Final Workshop July 2015

Medium density examples.


MODDERFONTEIN REGENERATION

CHARACTER

2

3 2 2

2

1 2

1

1 3

Modderfontein Regeneration Final Workshop July 2015

2

798 Beijing


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015

SIGNIFICANT BENEFITS


MODDERFONTEIN REGENERATION

ENVIRONMENT

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Plan (Vision/ Framework)

Mitigation & Design

Implications & scoping

Modderfontein Regeneration Final Workshop July 2015

Data Gathering & Mapping

Conceptual Model


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Modderfontein Reserve: • Forms core of the site (even though outside ownership) • Education • Recreation • Conservation Evidence of previous use: • Dams and abstractions • Channel modifications • Bunkers

Modderfontein Regeneration Final Workshop July 2015

Environmental Conditions


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Modderfontein Reserve: • Forms core of the site (even though outside ownership) • Education • Recreation • Conservation Current uses: • Walking • Bird watching • Picnics and barbeques • Bee keeping • Mountain biking • Functions e.g. Weddings • Environmental education

Modderfontein Regeneration Final Workshop July 2015

Environmental Conditions


MODDERFONTEIN REGENERATION

Environment

Environmental Conditions

Protection and Enhancement

Zendai Land Pasture

Granite outcrops

Extensive Green Space

Modderfontein Regeneration Final Workshop July 2015

Invasive species


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Zendai Land: • Exotic (but valuable) trees • Reed-dominated valley bottom wetlands Oryx (2007) Environmental Sensitivity Report - Plants • 215 plant species recorded • 89% of the area transformed • natural areas still contained a significant number of species • proposals made to amend the Conservation Area boundary to capture additional “sensitive” vegetation • invasive plant community at the site represents a substantial threat to its ecology

Modderfontein Regeneration Final Workshop July 2015

Environmental Conditions


MODDERFONTEIN REGENERATION

Environment

Environmental Conditions

Protection and Enhancement

Amur Falcon Oryx (2007) Environmental Sensitivity Report - Fauna • Natural communities, dams, wetlands and riparian areas most “sensitive” • Open areas important for bird life • 259 bird species recorded of which c. 183 “regular” • (at Klipriviersberg >215 bird species , but no wetlands) • Raptors of special interest e.g. Long-crested Eagle • Blue Cranes breed • Best birding site in greater Johannesburg Plant Nursery • Includes native species • Composting being investigated

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Zendai Land Previous and current uses: • Dumps • Bunkers • Channel modifications

Modderfontein Regeneration Final Workshop July 2015

Environmental Conditions


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Part of Wetlands in WMZ-1 Overall site categorised as Class E/F Wetland Consulting Services (Pty.) Ltd, 2009. Wetland and Riparian Protection and Management Plan for the City of Johannesburg City of Johannesburg (2010) State of the Rivers

Modderfontein Regeneration Final Workshop July 2015

Bioregional Plan for the City of Johannesburg (October 2011) Land Cover Map

Wetland management zones and broad vegetation types (2009) Holness, S. And Skowno, A., 2010. Draft Bioregional Plan for the Gauteng Metropolitan Municipalities (City of Johannesburg, City of Tshwane and Ekurhuleni Metropolitan Municipality)


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Summarises main opportunities and constraints : • Wetlands +30m • Watercourses +32m • 100–year Floodlines • Granite outcrops • Contaminated Land & Dumps • Modderfontein Reserve

Modderfontein Regeneration Final Workshop July 2015

Environmental Sensitivity Map


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Key Features • Large areas of built up land • Large areas of pasture and “old fields” • Egoli Granite Grassland is degraded and in the Mdf Reserve • Areas with “Exotic” species and landscaped • Transformed Areas = Dumps • Smaller patches of other vegetation may have some ecological value

Modderfontein Regeneration Final Workshop July 2015

Vegetation Map – Zendai and Adjoining Land


MODDERFONTEIN REGENERATION

Indicative Open Space Key areas where • Development would not be permitted • Unless essential for infrastructure connections • Wetlands would be restored and enhanced • Conservation would be the priority • Public access would be managed

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Conceptual Site model: • Variable soil profile • Ferricrete supporting multiple perched water tables • Wetter areas where water table intersects surface • Limited fracture flow in the bedrock • Valley bottom wetlands collect soils washed from wider area – supports extensive reed growth

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Conceptual Site model: • Variable soil profile • Ferricrete supporting multiple perched water tables • Wetter areas where water table intersects surface • Limited fracture flow in the bedrock • Valley bottom wetlands collect soils washed from wider area – supports extensive reed growth

Modderfontein Regeneration Final Workshop July 2015

WETLAND AND RIPARIAN PROTECTION AND MANAGEMENT PLAN FOR THE CITY OF JOHANNESBURG December 2009


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

North side: • Elevated Platforms and Bridge • High embankments • Drainage/culverts need managing • Modderfontein Spruit and valley “woodland” in poor ecological condition • Special approach to planning and design required to incorporate the watercourses, biodiversity and access to the station into a unique, attractive and functioning ecosystem for people and nature

Modderfontein Regeneration Final Workshop July 2015

Town Centre and Gautrain Station


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Local Best Practice

Cedar Lofts – Johannesburg • Wetland incorporated into flood management system • Minimally invasive – lots of habitat undisturbed • Spillways provided • Properties raised to minimise impact on shallow water table • Providing bacteriological and nutrient treatment on incoming storm waters • Building within 32m wetland buffer permitted

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environment Protection and Enhancement

Camley Street Natural Park – Kings Cross, London 1950s

TODAY

An urban oasis for wildlife and people • Only 1 hectare • Provides access to nature in a densely populated area • Plays a role in providing a habitat and nursery for wildlife • Plays a role in the property market • Plays a role in reducing noise • Adjacent houses and commercial properties more likely to command higher sale prices • The total ecosystem services value is £2.8 million per annum

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Placemaking and the Environment ‘Placemaking’ is paramount in regeneration schemes • A recent report by Savills has highlighted that redevelopment at Kings Cross and Stratford (the 2012 Olympic Park) are already creating vibrant new communities, whilst redevelopment in Paddington worked less well thanks to “little early investment in the wider environment” Our research has shown that the features homeowners value most about their home are not necessarily associated with the building itself, but more with the environment in which it is located

Modderfontein Regeneration Final Workshop July 2015

http://www.savills.co.uk/research_articles/186866/181237-0


MODDERFONTEIN REGENERATION

Placemaking and the Environment ‘Placemaking’ is paramount in regeneration schemes Factors such as neighbourhood, safety, greenery and access to amenities are cited as more important than simply building attractive buildings”

These must be created by focussing on the relationship between individual developments and the wider area or in other words ‘placemaking’ Modderfontein Regeneration Final Workshop July 2015

http://www.savills.co.uk/research_articles/186866/181237-0


MODDERFONTEIN REGENERATION

Placemaking and the Environment ‘Placemaking’ is paramount in regeneration schemes

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environmental Framework Report (EFR) •

Sets out overall Environmental Principles to guide further development and implementation of the Zendai Modderfontein Masterplan

Report provides evidence-base for these Environmental Principles

Opportunities and constraints have helped to shape the Masterplan – to be understood and taken into account in detailed planning and design

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environmental Vision • • •

Zendai initiative to invest in Modderfontein is resulting in some important changes to the Vision for the development of the site. An opportunity to consider how environmental factors (and sustainability) are to be incorporated into the new Vision and Masterplan Complex environmental situation on the site • • •

Environmental legacy from past uses Geohydrology Sensitivities where there are features of value (especially wetlands and grassland habitats)

“The environment is integral to the development of Zendai Modderfontein” Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environmental Principles •

The Environment Principles recognise that: • In many cities there is a growing disconnect between people and nature • Ecosystem services provide a foundation for human well-being

The Environment Principles are: • A means to ensure that environmental factors are incorporated into the new Masterplan • Grouped according to two broad stages of the project cycle – “Strategic Planning” and “Design and Management”

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environmental Principles - Strategic •

The natural environment (natural and semi-natural habitats, including rivers, wetlands, grasslands and other environmental features) will be treated as a core theme of the development. • •

High biodiversity areas will be identified & safeguarded Open space will be planned, designed and managed to maximise its value Blue and green infrastructure will be given the same importance as more traditional infrastructure

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environmental Principles - Strategic •

Ecological connectivity will be maintained and enhanced wherever reasonably possible • • •

Within Zendai Modderfontein - especially to the Modderfontein Reserve Regionally - especially along river corridors Across roads public transportation routes and associated infrastructure

Where there are proposals for essential infrastructure that impacts on environmentally sensitive receptors and satisfactory alternative solutions cannot be found then consideration will be given to offsetting measures that compensate for the impact.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environmental Principles - Strategic •

The use of indigenous plants will be promoted in both the public realm and on private property

Wetland systems will be properly investigated to the level needed for each design stage

Watercourses and wetlands, and their associated vegetation, will be integrated into the overall landscape and restored/ enhanced where possible, to improve their hydrological and ecological function

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environmental Principles - Strategic •

Water management on the site will apply the principles of Sustainable Drainage Systems (SuDS) and Water Sensitive Design Systems (WSUD).

The project is focused on the reclamation of degraded land which is considered more sustainable than expanding Johannesburg onto pristine greenfield sites. Development sites will be appropriately investigated and remediated to protect both human health and the environment prior to development.

To reduce environmental impacts there will be a commitment to the adoption of sustainable infrastructure wherever practical and at an early stage.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environmental Principles - Strategic •

To ensure that the these environmental policies and other opportunities and constraints are recognised and incorporated within ongoing plans and designs: •

An “Open Space” Strategy and Plan will be prepared, taking into account the Masterplan’s requirements for urban/infrastructure development

Implementation mechanisms, including environmental and design guidelines, will be put in place

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environmental Principles – Design and Management •

Landscaping guidelines and plant palettes will be prepared for the Zendai Modderfontein area that are supportive of water conservation measures and the provision of food sources for foraging birds and insects. Gautrain Station and the Town Centre provide an opportunity for integration of the built environment with blue-green infrastructure, including the Modderfontein Spruit, the floodplain and the reserve. The design of the Centre will adopt a creative design response which provides for the restoration of the wetland system and its linkages to the systems beyond and an attractive public realm in an urban setting.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environmental Principles – Design and Management •

Wildlife Conservation/Management Plans will be prepared for the Modderfontein Reserve and areas of Open Space (on the Zendai property) and these will be monitored and updated on a regular basis (at least every 5 years) as a tool for implementing the above policies/principles.

Urban design guidelines will be prepared that seek to maximise the connectivity of residential areas and their communities to the planned areas of open space and will incorporate “safe by design” principles so that open space is used, valued and protected by residents and visitors.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Mitigation – Geo-hydrology •

Complete avoidance of wetlands and watercourses isn’t possible • Connections needed for NMT, public transit and even roads • Valley bottom wetlands and streams are linear features which often extend outside the site – we can’t just go round them. • Design standards (gradients etc) mean that not all hill slope wetlands can be completely avoided Mitigation approach: • Identify – high level surveys have been done, ongoing programme • Avoid - where possible • Sensitive design approach - next slide • Mitigation - next slide

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Mitigation – Geo-hydrology •

Zendai can maximise the value of the environmental assets of its landholding (sensitive design approach) • Work with topography, avoid cut-and-fill where possible • Piling in sensitive areas to reduce excavations Mitigation • Preserve flow paths – permeable sub-base for roads • Provide alternative flow paths – gravel/pipes to carry water around foundations to prevent flooding and “groundwater shadows” • SuDS/WSUD to enhance wetland function Compensation • SuDS/WSUD used to provide additional wetland habitat where loss is unavoidable

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Environment – Way Forward/Next Steps Key Objectives • Zendai to maximise the value of the environmental assets of its landholding Way Forward (post Framework Plan approval) • An Open Space Strategy and Plan will be prepared including: • Ecological Grading of Open Space • Integration of the Modderfontein open space network with Regional Open Space • Environmental principles to be incorporated into the next level of planning – Township Establishment Plans

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

TRANSPORT

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Agenda • • • • • • • •

Introduction Transport Masterplanning principles Accessibility of the node Transport demand Public Transport Network Roads Master Plan Transport Modelling Findings and recommendations

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Framework Masterplan Concept: Land Use

K58

N3

R25

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Transport planning principles •

Capitalise on existing transport assets and planning: •

Gautrain and future station – opportunity for TOD development

BRT planning by COJ and EMM

National, Provincial and Local Road Network Planning

Railway extension opportunities

Focus on: •

Establishing connections to major transport infrastructure & nodes surrounding Modderfontein

Improving the permeability of the area – HCT link

Enhanced interchanges between all modes

Interweaved pedestrian and cycle movements and access

Create logical road and public transport hierarchies

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Accessibility to key nodes in the vicinity

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Access to ORTIA/Aerotropolis

1 1 2

K60

ACCESIBILITY LEGEND: Existing major roads Proposed major roads Gautrain

OR Tambo Intnl / Aerotropolis

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Access to Joburg CBD

1 1 3

K60

Sandton

To Joburg CBD Modderfontein Regeneration Final Workshop July 2015

ACCESIBILITY LEGEND: Existing major roads Proposed major roads Gautrain


MODDERFONTEIN REGENERATION

Access to Marlboro Gautrain Station

1 1 4

K60

ACCESIBILITY LEGEND: Existing major roads Proposed major roads Gautrain

Marlboro Stn

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Access to Wynberg and Alexandra

1 1 5

K60

ACCESIBILITY LEGEND: Existing major roads Proposed major roads Gautrain

Alexandra Wynberg

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Access to Sandton

1 1 6

K60

Sandton

Modderfontein Regeneration Final Workshop July 2015

ACCESIBILITY LEGEND: Existing major roads Proposed major roads Gautrain


MODDERFONTEIN REGENERATION

Access to Waterfall

1 1 7

Waterfall K60

Modderfontein Regeneration Final Workshop July 2015

ACCESIBILITY LEGEND: Existing major roads Proposed major roads Gautrain


MODDERFONTEIN REGENERATION

Access to Midrand and beyond Midrand

1 1 8

K60

Modderfontein Regeneration Final Workshop July 2015

ACCESIBILITY LEGEND: Existing major roads Proposed major roads Gautrain


MODDERFONTEIN REGENERATION

Access to Thembisa & Ivory and Ebony Park

Thembisa Ivory Park

1 1 9

K60

Modderfontein Regeneration Final Workshop July 2015

ACCESIBILITY LEGEND: Existing major roads Proposed major roads Gautrain


MODDERFONTEIN REGENERATION

Access to Kempton Park

1 2 0

K60

ACCESIBILITY LEGEND: Existing major roads Proposed major roads Gautrain

Kempton Park

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Access to Germiston & Boksburg

1 2 1

K60

ACCESIBILITY LEGEND: Existing major roads Proposed major roads Gautrain

Isando To Boksburg Germiston Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Transport demand

Modderfontein Regeneration Final Workshop July 2015


South

North

Total

Town Centre Retail m2 GLA

92,000

58,000

150,000

Neigbourhood Retail m2 GLA

15,000

6,000

21,000

1,468,000

-

1,468,000

0

808,000

808,000

School pupils

3,200

7,300

10,500

University

3,000

-

3,000

0

2,500

2,500

Low-Medium Density Res units

6,000

13,500

19,500

Medium Density Res units

10,000

12,000

22,000

High Density Res units

10,000

7,500

17,500

Resi - CoJ developed affordable

1,000

1,000

2,000

Total residential units

27,000

36,500

63,500

Office m2 GLA Warehouse/ Light Industrial m2 GLA

Low Density Res units

Modderfontein Regeneration Final Workshop July 2015

PM trip attractors

Land use

PM trip generators

MODDERFONTEIN REGENERATION

Land-use: key attractors & generators during PM peak


PEAK HOUR PERSON TRIPS 50,000

AM PEAK

45,000

PERSON TRIPS PER HOUR

MODDERFONTEIN REGENERATION

Person trip generation by land-use type

40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 -

INBOUND

Modderfontein Regeneration Final Workshop July 2015

OUTBOUND


PEAK HOUR PERSON TRIPS 50,000

PM PEAK

45,000

PERSON TRIPS PER HOUR

MODDERFONTEIN REGENERATION

Person trip generation by land-use type

40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000

-

INBOUND

Modderfontein Regeneration Final Workshop July 2015

OUTBOUND


MODDERFONTEIN REGENERATION

Transport modal split AM peak hour Modderfontein Framework: modal split

Sustainable Modal Split Target Joburg Inner City Walk 6%

Walk & cycle 16% Public Transport 51%

Private Car 24%

Internal Trips (35-45%)

Private Car 33%

Modderfontein Regeneration Final Workshop July 2015

Public Transport 70%


MODDERFONTEIN REGENERATION

Car Parking Provision Land Use

Current Minimum Parking Standards

Proposed Minimum Parking Standards

Retail

6 bays per 100sqm

3 bays per 100sqm

Office

4 bays per 100sqm

2 bays per 100sqm

Warehouse

2 bays per 100sqm

1 bays per 100sqm

Residential

1 bay per unit

1 bay per unit

• Revise the Modderfontein Town Planning Scheme • Reduction of minimum parking standards • Motivate in consideration of expected future mode share

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Total transport demand •

Peak hour person trips

TOTAL PERSON TRIPS - AM PEAK

Town Centre & SE Zones North Zones

250,000

234,538

PERSON TRIPS / HOUR

Total (North & South) 200,000

150,000

114,019

120,519

100,000

50,000

0

Modderfontein Regeneration Final Workshop July 2015

Existing development rights (Longlake, Westlake, Foundershill and Pinelands


MODDERFONTEIN REGENERATION

Public transport demand AM peak hour person trips

PUBLIC TRANSPORT TRIPS Town Centre & SE Zones

100,000 87,247

90,000

North Zones Total (North & South)

PERSON TRIPS / HOUR

80,000 70,000 60,000 50,000 40,000 30,000 20,000

10,000 0

Modderfontein Regeneration Final Workshop July 2015

43,844

43,404


MODDERFONTEIN REGENERATION

Walking and cycling demand AM peak hour person trips

NON-MOTORISED TRANSPORT TRIPS 60,000

Town Centre & SE Zones North Zones Total (North & South)

PERSON TRIPS / HOUR

50,000

40,000

30,000

27,057

20,000 12,210 10,000

0

Modderfontein Regeneration Final Workshop July 2015

14,847


MODDERFONTEIN REGENERATION

Private vehicle demand AM peak hour Peak hour person trips in private cars

PRIVATE VEHICLE TRIPS

Town Centre & SE Zones North Zones

80,000

PERSON TRIPS / HOUR

70,000 57,443

60,000 50,000

40,000 30,000 20,000 10,000 0

Modderfontein Regeneration Final Workshop July 2015

28,775

28,667


MODDERFONTEIN REGENERATION

Private vehicle demand AM peak hour Peak hour vehicle trips in private cars

PRIVATE VEHICLE TRIPS

Town Centre & SE Zones

80,000

North Zones

VEHICLE TRIPS / HOUR

70,000

Total (North & South)

60,000 50,000 38,471

40,000 30,000

20,554 20,000 10,000 0

Modderfontein Regeneration Final Workshop July 2015

17,917


MODDERFONTEIN REGENERATION

Residential densities proposed in support of public transit technology RESIDENTIAL POPULATION DENSITIES VS MOST VIABLE PUBLIC TRANSPORT MODE

Town Centre & SE Zones North Zones

450

RESIDENTIAL POPULATION (PERSONS/HA)

400

Average for the area

Heavy

350 300

LRT

250 200

BRT

150 100 50

0 Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Public Transport

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

External Public Transport Planning Leralla

Kaalfontein

Van Riebeeck Park

Kempton Park

BRT Planning Possible BRT Extensions

Knights Park Station

Modderfontein Regeneration Final Workshop July 2015

Germiston


MODDERFONTEIN REGENERATION

Potential high capacity transit around development

Planned BRT Routes (COJ, Gautrans & Ekurhuleni BRT Potential HCT extensions

Gautrain Existing Rail Station

Potential Rail Station

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Potential high capacity transport linkage within development Option 1 Planned BRT Routes (COJ, Gautrans & Ekurhuleni BRT Potential HCT extensions

Gautrain Existing Rail Station

Potential Rail Station Modderfontein HCT Services & Stations

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Potential high capacity transport linkage within development Option 2 Planned BRT Routes (COJ, Gautrans & Ekurhuleni BRT Potential HCT extensions

Gautrain Existing Rail Station

Potential Rail Station Modderfontein HCT Services & Stations

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Medium capacity transport linkages within development

Planned BRT Routes (COJ, Gautrans & Ekurhuleni BRT Potential HCT extensions

Gautrain Existing Rail Station

Potential Rail Station Modderfontein HCT Services & Stations Feeder bus routes and stops

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Potential rail extension – to Joburg CBD & Soweto Leralla

Kaalfontein

Van Riebeeck Park

Kempton Park

Rail Extension route Internal High Capacity PT BRT Planning Knights Park Station

Modderfontein Regeneration Final Workshop July 2015

Germiston


MODDERFONTEIN REGENERATION

Roads Masterplan

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Roads masterplan

Modderfontein Regeneration Final Workshop July 2015

Class 2 roads Class 3 roads proposed Class 3 possible links Class 4 roads


MODDERFONTEIN REGENERATION

Transport Modelling

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Transport Modelling

• Transport modelling assisted in determining – Where do people come from? – Which routes do they take ? – Number of internal roads required – Lane requirements on roads – Appropriate intersection layout

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Cross-sections proposed in masterplan

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Cross sections – Class 4 road

Modderfontein Regeneration Masterplan Workshop July 2015

• 25% of space – private vehicle • 30% of space – walking and cycling • 26% of space – Public transport


MODDERFONTEIN REGENERATION

Cross sections – Class 3 road

Modderfontein Regeneration Masterplan Workshop July 2015

• 30% of space – private vehicle • 18% of space – walking and cycling • 16% of space – Public transport


MODDERFONTEIN REGENERATION

Transport masterplan conclusions • Space for the provision of transportation infrastructure is limited requiring optimising public transit modes and the combination thereof • The transport network requires roads for public transit as well • A public transport hierarchy caters for both short and long distance travel needs • The number of transfers from one mode to another and passenger travel time kept to a minimum – through one transfer any destination can be reached • The transport Masterplan proposes some high capacity transit systems and the technology will be finalised as development and public transport demand grows • Initial choice of public transit technology along each corridor considers the required frequency and capacity of modes • Technology choice will be based on future technology availability • Pedestrian and cycle paths to be provided on all roads & segregated cycle lanes on Class 3 and 4 roads

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Transport masterplan conclusions • The Modderfontein development is ideal for creating a sustainable transit liveable city high density housing, employment, educational & shopping opportunities and social interaction • The above activities will generate new trips within the area but will generate a significant proportion of internal trips • The land-uses were aimed at balancing supply and demand and optimal all day use of infrastructure i.e. directional flow of people to be balanced and with significant in off-peak demands • Transport use and modal shares depend on the type and quantity of transportation infrastructure that is provided • The success and attractiveness of the development depends on the level of accessibility that can be maintained within and around the area

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

INFRASTRUCTURE

Modderfontein Regeneration Final Workshop July 2015


AGENDA CIVILS

• INTRODUCTION • AREAS WITH EXISTING RIGHTS • MASTERPLAN AREA  DEMOGRAPHICS  WATER  SEWER  STORMWATER  ROADS  ICT  SOLID WASTE

ENERGY


CIVILS


MODDERFONTEIN REGENERATION

Introduction

Modderfontein Regeneration Final Workshop July 2015

AREAS WITH EXISTING RIGHTS

MASTERPLAN AREA


MODDERFONTEIN REGENERATION

Format of Presentation EXISTING AREAS

MASTERPLAN AREAS

WATER

WATER

SEWER

SEWER ROADS STORMWATER

STATUS QUO

OBJECTIVES/ STRATEGY DEMAND ANALYSIS/ REDUCTION

ICT SOLID WASTE

Modderfontein Regeneration Final Workshop July 2015

PHASING


MODDERFONTEIN REGENERATION

Areas with Existing Rights-Context

Longlake

Westlake

Pinelands

Founders Hill

Modderfontein Regeneration Final Workshop July 2015


900k 800k 700k 600k

GFA (m2)

MODDERFONTEIN REGENERATION

Areas with Existing Rights-GFA by Land Use

500k 400k 300k 200k 100k

-

Founders Hill Modderfontein Regeneration Final Workshop July 2015

Longlake

Westlake

Pinelands


MODDERFONTEIN REGENERATION

Areas with Existing Rights-GFA by Area GFA (m2) Total 2,129,000 m2 57k

303k

227k

1,542k

Modderfontein Regeneration Final Workshop July 2015

Founders Hill

Longlake

Westlake

Pinelands


MODDERFONTEIN REGENERATION

Areas with Existing Rights-Water/Sewer Demands Water

Sewer Area

AADD (L/day)

Area

Peak Flow (l/s)

Longlake

2,110,847.4

Longlake

79.3

Westlake

114,400.0

Westlake

4.2

Pinelands

373,600.0

Pinelands

13.8

Founders Hill

645,634.0

Founders Hill

24.2

Total

3,244,481.4

Total

121.5

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Areas with Existing Rights-Connections LEGEND Sewer Discharge

Water Supply

Longlake

Pinelands Founders Hill Westlake

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Areas with Existing Rights-Summary Area

Water Source

Sewer Discharge

Longlake

To be supplied from existing Linbro Park Reservoir

** Discharges to Modderfontein Outfall Sewer

Westlake

To be supplied from existing Linbro Park Reservoir

** Discharges to Modderfontein Outfall Sewer

Pinelands

*Supplied from Modderhill/ Kempton Park West Reservoir

** Discharges to Modderfontein Outfall Sewer

Founders Hill

*Supplied from Modderhill/ Kempton Park West Reservoir

** Discharges to Modderfontein Outfall Sewer

* Could potentially be supplied off new reservoir – would add additional 1.02 ML/day ** Assumed these flows are already assigned to SEWSAN sewer model

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Masterplan Area-Context MASTERPLAN AREA Residential Population: Residential Units: Business Population: Offices: 1,468,000 m2

North South

Modderfontein Regeneration Final Workshop July 2015

196,004 63,403 81,980


MODDERFONTEIN REGENERATION

Masterplan Area-Base Data (Colliers)

Modderfontein Regeneration Final Workshop July 2015


250,000

196,004

200,000

Nr. of People

MODDERFONTEIN REGENERATION

Masterplan Area-Population

150,000

100,000

81,980

50,000

-

Business Population Modderfontein Regeneration Masterplan Workshop July 2015

Residential Population


MODDERFONTEIN REGENERATION

Masterplan Area-Population by Region 140,000 120,250

120,000

Nr. of People

100,000

75,754

80,000 67,767 60,000

40,000

20,000

14,214

-

South Employees Total Modderfontein Regeneration Final Workshop July 2015

North Residents Total


MODDERFONTEIN REGENERATION

Masterplan Area-Residential Spread 120,000 110,864

100,000

Nr. of People

80,000

60,000 40,910

40,000

20,000

17,497

14,625

9,386 -

Mdf South

2,723

Pinelands Town Fringe Centre South

Modderfontein Regeneration Masterplan Workshop July 2015

-

Town Centre

Town Centre North

-

Mdf Mdf East Highlands Central

Mdf North


MODDERFONTEIN REGENERATION

Masterplan Area-Business Spread 25,000

23,703

23,557

20,000

Nr. of People

17,827

15,000

10,000 6,293 5,157

5,000 2,307

1,830 850

457

Mdf Pinelands Town South Fringe Centre South Modderfontein Regeneration Final Workshop July 2015

Town Centre

Town Centre North

Mdf Mdf East Highlands Mdf Central North


MODDERFONTEIN REGENERATION

Masterplan Area-Summary 160,000 Total Pop. 143,521

140,000

Total Pop. 134,464

120,000

Axis Title

100,000

75,754

80,000 120,250

60,000 40,000 67,767

20,000 14,214

South Employees Total Modderfontein Regeneration Final Workshop July 2015

Residents Total

North


MODDERFONTEIN REGENERATION

Water-Existing Supply Chloorkop Reservoir Rand Water Bulk supply Klipfontein Reservoirs Kempton Park West Reservoir Kempton Park West Reservoir

Modderfontein Regeneration Final Workshop July 2015

Kempton Park West Reservoir


MODDERFONTEIN REGENERATION

Water-Strategy • • • •

Robust Supply Demand Reduction Capture and Reuse Possibility of TSE for irrigation

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Demand Calculations-Per Area Supply Zone

Location

AADD (l/day)

Highlands

629,349

Mdf East

230,698

North

South

Mdf North

18,457,565

Mdf Central

1,599,519

Town Centre North

8,314,484

Town Centre

4,636,621

Town Centre South

1,422,505

Pinelands Fringe Mdf South Total Modderfontein Regeneration Final Workshop July 2015

AADD (l/day)

36 Hours Storage (l/day)

20,917,131

31,375,697

17,091,973

25,637,959

38,009,104

57,013,656

157,560 2,560,802 38,009,104


North Supply Zone

AADD (l/day)

MODDERFONTEIN REGENERATION

Water Demand Calculations-Per Area South Supply Zone

20,000,000 18,000,000 16,000,000 14,000,000 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 2,000,000 Highlands Mdf East

Mdf North

Mdf Central

Town Centre North

Area

Modderfontein Regeneration Final Workshop July 2015

Town Centre

Town Pinelands Centre Fringe South

Mdf South


MODDERFONTEIN REGENERATION

Water Demand Calculations-Per Land Use Land Use

Town Centre Retail Neighbourhood Retail Office

AADD (L/day)

300,000 42,000 2,935,674

Town Centre Leisure Neighbourhood Leisure Market Residential Live/Work

184,000 75,000 32,588,733 90,000

Community Facilities

187,500

Warehouse/Light Industrial

808,047

Hotels

316,000

Education Campus

132,150

Education Primary/secondary

350,000

Total Modderfontein Regeneration Final Workshop July 2015

38,009,104


35,000,000 30,000,000 25,000,000

AADD (l/day)

MODDERFONTEIN REGENERATION

Water Demand Calculations-Per Land Use

20,000,000 15,000,000 10,000,000 5,000,000 -

Land Use Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Spatial Demand Distribution

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Network Layout

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Network Phasing Water Demand (AADD) l/d

Cumulative Demand (AADD) l/d

Phase

Years

Duration of phase (years)

1

2015-2016

2

Longlake, Westlake, Pinelands, Founders Hill, City Centre Planning, K113

655,799

655,799

2

2017

1

Highlands and Mdf East Light Industrial, Mdf North and South Residential

327,900

983,699

2b

2018-2020

3

Highlands and Mdf East Light Industrial, Mdf North and South Residential

1,296,000

2,279,698

3

2021-2025

5

First Phase Town Centre, Mdf North Mixed Use Neighbourhood

3,260,762

5,540,460

4

2026-2030

5

Mdf North Mixed Use Neighbourhood

3,754,454

9,294,914

5

2031-2035

5

Town Centre North, Landbridge

4,486,991

13,781,906

6

2036-2040

5

Town Centre South, Mdf North Mixed Use Neighbourhood

4,486,991

18,268,897

7

2041-2045

5

Mdf North Mixed Use Neighbourhood

4,935,052

23,203,948

8

2046-2055

10

Balance of Town Centre North

9,870,104

33,074,052

9

2056-2060

5

Final Mixed Use Neighbourhoods

4,935,052

38,009,104

Modderfontein Regeneration Final Workshop July 2015

Area Developed


MODDERFONTEIN REGENERATION

Water Network –Phase 1 (2015-2016)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Network –Phase 2 (2017)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Network –Phase 2b (2018-2020)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Network –Phase 3 (2021-2025)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Network –Phase 4 (2026-2030)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Network –Phase 5 (2031-2035)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Network –Phase 6 (2036-2040)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Network –Phase 7 (2041-2045)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Network –Phase 8 (2046-2055)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Water Network –Phase 9 (2056-2060)

Modderfontein Regeneration Final Workshop July 2015


40000000 35000000 9

30000000

TOTAL AADD (L/day)

MODDERFONTEIN REGENERATION

Water – Trigger Points (versus JW Masterplan)

25000000 8

20000000 7

15000000 6

10000000

5

5000000

4

2

0 2010

1

2015

3

2020

2025

1 Phase

Trigger

Masterplan Areas

Modderfontein Regeneration Final Workshop July 2015

2030

2035 2040 Year

Existing Areas

2045

2050

2055

JW Maximum Capacity

2060

2065


MODDERFONTEIN REGENERATION

Water-Demand Reduction Strategies Potential Demand Reduction (ML/day) 45.00 Aspirational Medium to Long Term. MORE DIFFICULT TO IMPLEMENT

40.00 35.00 30.00 25.00

3.40 20.00

9.99

38.01 32.43

15.00

24.98

10.00

24.28

20.88

3.40 10.89

5.00 *15%

*34%

*36%

*45%

*71%

+Education and Smart Meetering

+Efficient fixtures and fittings

+Xeroscape

TSE for Xeroscape

TSE For Xero + Cooling + Flushing Toilets

0.00 Baseline

Potable * % Reduction in Potable Water Modderfontein Regeneration Final Workshop July 2015

TE for Irrigation

TE for Cooling and flushing toilets


MODDERFONTEIN REGENERATION

Effect of Demand Reduction Strategies 40,000,000 35,000,000 15% red. 30,000,000 25,000,000

34% red.

20,000,000 15,000,000 10,000,000 5,000,000 0 2010

2015

2020

2025

2030

2035

2040

2045

2050

2055

Masterplan Areas

Education and smart metering

Efficient Fixtures and Fittings

JW Maximum Capacity

Modderfontein Regeneration Final Workshop July 2015

2060

2065


MODDERFONTEIN REGENERATION

Water – Meeting with Johannesburg Water  Existing Masterplan for Modderfontein  WADISO Model of Network  Masterplan Allowance for Modderfontein is below current demand estimation  Robust Rand Water Supply to the area  JW can review Masterplan for chosen option  JW has no funding for immediate review and update of WADISO Model

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Sewer – Existing Infrastructure CONNECTION TO BRUMA OUTFALL

MODDERFONTEIN OUTFALL SEWER

Modderfontein Regeneration Final Workshop July 2015

PHASE 1 OUTFALL DESIGNED FOR PEAK FLOWS OF (Knutton, 2006): a) Capacity at 80% full: 1,100 l/s b) Pump Station elimination: 130 l/s c) Areas with existing rights: 122 l/s d) Contingency: 98 l/s e) Spare Capacity for future development: 750 l/s


MODDERFONTEIN REGENERATION

Sewer-Strategy • Conventional gravity system • Make use of existing Modderfontein Outfall Sewer • Alternative peripheral connections for early phases

• Discharge reduced as water demand reduces • Investigate existing Treated Sewage Effluent (TSE) pipeline to east of site • Possibility of TSE for irrigation in medium to long term

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Sewer Demands  Calculated as a percentage of water consumption, returned to sewer  Market Residential - Low density – 70% returned - Low/medium density – 80% returned - Medium density – 85% returned - High density – 90% returned  Other – 80% returned [includes Town Centre Retail; Neighbourhood Retail; Office; Town Centre Leisure; Neighbourhood Leisure; Live/Work; Community Facilities; Warehouse/Light Industrial; Hotels; Education Campus; Education Primary/secondary]

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Sewer Demand (AADD) Supply Zone

Location

AADD (l/day)

Highlands

957,358

Mdf East

369,117

North

South

Mdf North

15,038,749

Mdf Central

1,302,590

Town Centre North

6,832,488

Town Centre

3,871,675

Town Centre South

1,129,692

Pinelands Fringe

Modderfontein Regeneration Final Workshop July 2015

83,760

Mdf South

2,164,343

Total

31,749,773


MODDERFONTEIN REGENERATION

Sewer Demand (Peak Flow) Supply Zone

North

South

Modderfontein Regeneration Final Workshop July 2015

Location

Peak Flow (l/s)

Highlands

44.3

Mdf East

17.1

Mdf North

696.2

Mdf Central

60.3

Town Centre North

316.3

Town Centre

179.2

Town Centre South

52.3

Pinelands Fringe

3.9

Mdf South

100.2

Total

1,469.9


MODDERFONTEIN REGENERATION

Sewer Network Layout

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Sewer – Trigger Points (Outfall) 1800 1600 9

1400

AADD (l/s)

1200

8

1000

7

800 5

600

6

4

400 3 2

200 1

0 2010 1 Phase

2015

2020

2025

2030

Trigger

Masterplan Areas

Existing Areas

Modderfontein Regeneration Final Workshop July 2015

2035 2040 Year

2045

2050

Outfall Sewer Spare Capacity

2055

2060

2065

Masterplan+Existing


40,000,000 35,000,000 9

30,000,000

AADD (L/day)

MODDERFONTEIN REGENERATION

Sewer – Trigger Points (Northern WWTW)

25,000,000

8

20,000,000 6

15,000,000

7

5 4

10,000,000 3 2

5,000,000 1

1 Phase

0 2010 2015 2020 2025 2030 2035 2040 2045 2050 2055 2060 2065 Year Trigger Masterplan Areas

Modderfontein Regeneration Final Workshop July 2015

Existing Areas

NWTW Spare Capacity

Masterplan+Existing


MODDERFONTEIN REGENERATION

Sewer – Meeting with Johannesburg Water  Construction on Modderfontein Outfall Sewer Ongoing  SEWSAN Model of existing system  Impact of proposed demands on downstream system to be evaluated in SEWSAN Model

 Northern Wastewater Treatment Works currently has 25ML/day spare capacity  Upgrades to NWTW every 5 years

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Stormwater – Strategy Minimise/Mitigate Flood Risk on site and elsewhere • • • •

No increase in runoff No interruption of flood plain conveyance No reduction in floodplain storage Reduce the causes and impacts of flooding across the area

Promote the use of SUDS • Mimic the way existing groundwater and wetlands are supplied with water • Manage runoff close to source • Integrate stormwater control into landscape design • Aim for greenfield runoff rates

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Stormwater – Existing Masterplan

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Stormwater – Model 2 Pre-development

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Stormwater – Model 2 Post-development

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Stormwater – Model 2 Discharges Pre-development

Post-development

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Stormwater – Model 2 Pond Volumes

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Stormwater – Model 2 Pond Characteristics

Catchment 2 highlights: • • •

58,350m2 (5.8 ha) footprint for attenuation Smallest pond 590m2 i.e. 14m x 42m Largest pond 9,000m2 i.e. 54m x 164m

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Stormwater – Storage Footprint  Plot area 721.9 ha  Developable area 505.3 ha (70%)  Public Realm 303.1 ha (42%)  New green areas 50 ha  Total public realm/new green areas 353.1 ha

 Required Stormwater Footprint 69.2 ha  20% of total public realm/new green areas available for stormwater storage Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Roads-Hierarchy and Layout

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Road Sections – Class 4A (2-lane, shared bus)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Road Sections – Class 3A (2-lane + HCT)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

ICT-Primary Infrastructure Number of ducts by type of Network: • Primary: 8 • Secondary: 6 • Tertiary: 4 Integrated Mobile + Wifi Towers: 5/6 number POP (Point of Presence): 2 Buildings (10x10m + 15m diam service area) Satellite Farm: 2 number

Mobile + WiFi Towers POP (Point of Presence) Satellite Farm

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Solid Waste-Volumes Estimated Waste Generation (tonnes/annum) 225,000 200,000 175,000 150,000 125,000 100,000 75,000 50,000 25,000 0

Organic Waste

Proportional Waste

Dry mixed recyclabes

Residual Waste

TYPE OF WASTE Organic Waste Dry mixed recyclabes Residual Waste TOTAL (tonnes/annum) Modderfontein Regeneration Final Workshop July 2015

Organic Waste Residual Waste

ESTIMATED WASTE GENERATION (tonnes/annum) 33,268 117,292 60,149 210,709

Dry mixed recyclabes


MODDERFONTEIN REGENERATION

Solid Waste-Plant Requirements TYPE OF WASTE Materials recovery facility Anaerobic digestion Gasification TOTAL (m2)

ESTIMATED LAND TAKE (m2) 32,255 12,476 6,917 51,648

Material recovery facility Anaerobic digestion Gasification

Modderfontein Regeneration Final Workshop July 2015


ENERGY


MODDERFONTEIN REGENERATION

Data – Building breakdown per area and Demand

Town Centre Retail Town Centre Leisure Resi - Affordable Warehouse/ Light Industrial Education - Primary/Secondary

Modderfontein Regeneration Masterplan Workshop July 2015

Neighbourhood Retail Neighbourhood Leisure Live/Work Hotel / Conference Centre/ Resort

Office Resi - Market Community Facilities Education - Campus


MODDERFONTEIN REGENERATION

Results – Peak Demand by Zone 70000

60000

50000

40000

30000

20000

10000

0 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

Modderfontein South

Pinelands Fringe

Town Centre South

Town Centre

Modderfontein Centre

Modderfontein East

Highlands

Modderfontein North

Modderfontein Regeneration Masterplan Workshop July 2015

20

21

22

23

Town Centre North

24


MODDERFONTEIN REGENERATION

Results – Peak Demand by Zone and Total Demand 200000

180000

160000

140000

120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

Modderfontein South

Pinelands Fringe

Town Centre South

Town Centre

Town Centre North

Modderfontein Centre

Modderfontein East

Highlands

Modderfontein North

Total Peak

Modderfontein Regeneration Masterplan Workshop July 2015

24


MODDERFONTEIN REGENERATION

Results – Peak Demand by Building Type 120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

Town Centre Retail

Neighbourhood Retail

Office

Town Centre Leisure

Neighbourhood Leisure

Resi - Market

Resi Affordable

Live/Work

Community Facilities

Warehouse / Light Industrial

Hotel / Conference Centre / Resort

Education Campus

Education - Primary / Secondary

Modderfontein Regeneration Masterplan Workshop July 2015

23

24


MODDERFONTEIN REGENERATION

Results – Installed PV vs Peak Demand in Summer 200000

180000

160000

140000

120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

Modderfontein Regeneration Masterplan Workshop July 2015

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24


MODDERFONTEIN REGENERATION

Results – Installed PV vs Peak Demand in Summer 200000

180000

160000

140000

120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

Modderfontein Regeneration Masterplan Workshop July 2015

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24


MODDERFONTEIN REGENERATION

Results – Installed PV vs Peak Demand in Summer 200000

180000

160000

140000

120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

Modderfontein Regeneration Masterplan Workshop July 2015

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24


MODDERFONTEIN REGENERATION

Results – Installed PV vs Peak Demand in Summer 200000

180000

160000

140000

120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

Modderfontein Regeneration Masterplan Workshop July 2015

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24


MODDERFONTEIN REGENERATION

Results – Installed PV vs Peak Demand in Summer 200000

180000

160000

140000

120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

Summer Peak Demand

Modderfontein Regeneration Masterplan Workshop July 2015

8

9

10

100% Installed PV

11

12

13

14

75% Installed PV

15

16

17

50% Installed PV

18

19

20

25% Installed PV

21

22

23

24


MODDERFONTEIN REGENERATION

Results – Installed PV vs Peak Demand in Winter 200000

180000

160000

140000

120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

Modderfontein Regeneration Masterplan Workshop July 2015

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24


MODDERFONTEIN REGENERATION

Results – Installed PV vs Peak Demand in Winter 200000

180000

160000

140000

120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

Modderfontein Regeneration Masterplan Workshop July 2015

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24


MODDERFONTEIN REGENERATION

Results – Installed PV vs Peak Demand in Winter 200000

180000

160000

140000

120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

Modderfontein Regeneration Masterplan Workshop July 2015

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24


MODDERFONTEIN REGENERATION

Results – Installed PV vs Peak Demand in Winter 200000

180000

160000

140000

120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

Modderfontein Regeneration Masterplan Workshop July 2015

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24


MODDERFONTEIN REGENERATION

Results – Installed PV vs Peak Demand in Winter 200000 180000 160000 140000

120000 100000 80000 60000 40000 20000 0 1

2

3

4

5

6

7

Winter Demand

Modderfontein Regeneration Masterplan Workshop July 2015

8

9

10

100% Installed PV

11

12

13

75% Installed PV

14

15

16

50% Installed PV

17

18

19

25% Installed PV

20

21

22

23

24


MODDERFONTEIN REGENERATION

Results – Energy Efficiency Measures in Summer 200000 180000 160000 140000 120000 100000 80000 60000 40000 20000

0 1

2

3

4

5

6

7

8

Summer Peak Demand

Modderfontein Regeneration Masterplan Workshop July 2015

9

10

11

Efficient Lights

12

13

SWH - 50%

14

15

SWH - 75%

16

17

SWH - 100%

18

19 HVAC

20

21

22

23

24


MODDERFONTEIN REGENERATION

Results – Energy Efficiency Measures in Winter 200000

180000

160000

140000

120000

100000

80000

60000

40000

20000

0 1

2

3

4

5

6

7

8

Winter Peak Demand

Modderfontein Regeneration Masterplan Workshop July 2015

9

10

11

Efficient Lights

12

13

SWH - 50%

14

15

SWH - 75%

16

17

SWH - 100%

18

19 HVAC

20

21

22

23

24


Modderfontein Regeneration Masterplan Workshop July 2015

2060

Phase 9

Phase 8

Phase 7

300,000

2058 2059

2057

2056

2055

2054

2053

2052

2050 2051

2049

2048

2047

2046

2045

2044

2043

Phase 6

250,000

2041 2042

2040

2039

2038

2037

2036

2035

Phase 5

Phase 4

Phase 3

Phase 2 and 2b

200,000

2033 2034

2032

2031

2030

2029

2028

2027

2025 2026

2024

2023

2022

2021

2020

2019

150,000

2017 2018

Phase 1

100,000

2016

2015

MODDERFONTEIN REGENERATION

Results – Phasing Peak Demand

50,000

0


MODDERFONTEIN REGENERATION

Results – External Electrical Reticulation – Phase 1

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Results – External Electrical Reticulation – Phase 2

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Results – External Electrical Reticulation – Phase 2b

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Results – External Electrical Reticulation – Phase 3

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Results – External Electrical Reticulation – Phase 4

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Results – External Electrical Reticulation – Phase 5

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Results – External Electrical Reticulation – Phase 6

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Results – External Electrical Reticulation – Phase 7

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Results – External Electrical Reticulation – Phase 8

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Results – External Electrical Reticulation – Phase 9

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Results – Substation Areas and Capacity Primary Substation

Satellite Substation (end state year 2060)

Areas Supplied

PS4 – 20MVA 11kV

J,H

S1 – 10MVA 11kV

Westlake , M, K

S23 – 20MVA 11kV

Longlake

PS1– 20MVA 11kV

Longlake

S26– 20MVA 11kV

X,Y,W

PS5– 20MVA 11kV

W,V,Z

S28– 20MVA 11kV

AA

S34– 20MVA 11kV

T,U

PS6– 20MVA 11kV

U,Z

S20– 20MVA 11kV

P,L

PS2– 20MVA 11kV

K

S36– 20MVA 11kV

Q,R

S18– 20MVA 11kV

S, N ,H ,Pinelands

Founders Substation 90MVA 132/11kV (2020)

S17– 20MVA 11kV

Pinelands, Founders, D,E,F,G

Existing Esther Park SS 150MVA 132/11kV??

S5 – 10MVA 11kV

A,B,C

280MVA (Installed Capacity)

≈ 273MVA (Estimated Demand)

Existing Westfield SS 90MVA 132/11kV (37MVA) Spare

Longlake SS 135MVA 132/11kV (2016)

Klipfontein SS 90MVA 132/11kV (2018)

CBD Substation 90MVA 132/11kV (2018)

Total Capacity

**Note: The capacity indicated for the Primary SS is the safe capacity Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Conclusions • Electrical infrastructure to be developed in parallel with the phasing of the development; • No demand trigger points anticipated to happen. Any delay in the primary substation development might cause a trigger point which will need to be addressed; • The electrical infrastructure is going to be built but the capacity on this infrastructure is dependent on the transmission lines supplying Sebenza Substation; • Rooftop PV to be installed in parallel with the phasing on the development; • Rooftop PV to offset the daily demand from the grid; • Ground mounted PV could be built in the AECI land. Conversations already happening and the installed capacity could be round around 60MWp; • For 50% water supply from solar we would require 11% of the total roofs to have Solar Water heating systems installed; • Waste to energy is an option for the energy production mix which can potentially add 17MW to the generation side.

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

Next Steps • Discuss further energy efficiency options that could be implemented in the project; • Investigate further the proposed transmission lines to supply the development; • Guidelines for the Energy Efficiency as well as PV installation for the developers building in the Modderfontein land;

Modderfontein Regeneration Masterplan Workshop July 2015


MODDERFONTEIN REGENERATION

DAY TWO

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

URBAN DESIGN GUIDELINES Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

1. 2. 3. 4.

Guidelines for Developers Guidelines for a Public Audience Parcel Guidelines Heritage Guidelines

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Guidelines for Developers

Guidelines used for developer packages.

42 ha site Defined • Building Heights • GFA • Land Use • Frontage • Access • Setbacks Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Building Heights

Land Uses

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Required Frontage

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Required Access

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Required Setback

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Encouraged

‘Required’ changes to ‘Encouraged’.

Building Frontage Hierarchy Primary frontage Secondary frontage Façade Standards Rhythm Ground floor treatment Character and materials

Primary Frontages

Modderfontein Regeneration Final Workshop July 2015

Secondary Frontages


MODDERFONTEIN REGENERATION

Encouraged

Modderfontein Regeneration Final Workshop July 2015

Passive Design


MODDERFONTEIN REGENERATION

Encourage variety (Similar project in Middle East)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Guidelines for Public Audience

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Guidelines for Public Audience Greenwich Millennium Village Guidelines used for design team alignment and public engagement. Not used for Planning Permissions.

12 ha site Encouraged: • Character • Massing • General uses

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

The Guidelines

Land Uses

Character

Indicative Layout Modderfontein Regeneration Final Workshop July 2015

Movement

Building Heights


MODDERFONTEIN REGENERATION

The Guidelines

Indicative Building Layout Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Parcel Guidelines

Guidelines used for Outline Planning Application (successful) and public engagement.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Parcel Guidelines

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

26 ha site Defined • Plots (development and open space) • Public Transit • Roads • Infrastructure Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Selected Area

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

The Guidelines

Frontage and Access (fixed)

Indicative Layout, Building Height Limits Confirmed

Extent of maximum potential overhang

Land Uses (Ground and Typical Upper Floor) Modderfontein Regeneration Final Workshop July 2015

Indicative Section

Extent of plot boundary Extent of building footprint

Parcel Setbacks (fixed)


MODDERFONTEIN REGENERATION

Nova Luz, Sao Paulo

Guidelines used for future consultant alignment and was approved by the local authority. Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Heritage Guidelines

50 ha site

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

ECONOMICS Commercial Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Our Role What type, form and scale of property use should be planned for Modderfontein?

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

An Uncertain World

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Our Philosophy FACTOR 1 Physical Conditions

Optimal Approach FACTOR 3 Deliverability Conditions

Modderfontein Regeneration Final Workshop July 2015

FACTOR 2 Market Conditions


MODDERFONTEIN REGENERATION

What we have done Market Assessment Report

Commercial Appraisal of Options

Commercial Development Framework Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Overall Strategy A huge development site in a strategic location, close to major employment nodes and the Airport

TOWN CENTRE Mixed-use hub around the station with apartments, retail, leisure and offices NORTH Family-orientated mixed income housing, especially for people who work nearby, plus light industrial / distribution M

A different style of development to any existing area of Johannesburg Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Mix of Uses

South Zone

Plot Name

Developable Gross Floor Space Area

A Mdf South 1 B Mdf South 2

153k

107k

304k

213k

C Mdf South 3 D Mdf South 4

12k

9k

14k

10k

E Mdf South 5 F Pineland Fringe 1

10k

7k

189k

132k

G Pineland Fringe 2 H Town Centre South 1

4k

3k

108k

76k

J Town Centre South 2 K Town Centre P Town Centre North 1

13k House orientated residential 23k House orientated residential 16k House orientated residential 40k Education campus 13k Offices 370k Office-led mixed use 179k Office district

52k

37k 258k

406k

284k

Q Town Centre North 2 R Town Centre North 3

539k

377k

21k

15k

L Town Centre North 4 M Town Centre North 5

29k

20k

11k

8k

N Town Centre North 6

47k

33k

2,266k

1,587k

S Mdf Central T Mdf East

278k

194k

471k

330k

AA Highlands U Mdf North 1

1,140k

798k

760k

532k

V Mdf North 2 W Mdf North 3 X Mdf North 4

195k

136k

818k

573k

233k

163k

Y Mdf North 5 Z Mdf North 6

525k

367k

534k

374k

Sub-total North Zone

4,953k

3,467k

5,169k

TOTAL

7,219k

5,053k

9,603k

Modderfontein Regeneration Final Workshop July 2015

Main Uses

161k House orientated residential 319k House orientated residential

369k

Sub-total South Zone

North Zone

Plot Area (m ²)

1,285k Mixed office, apartments, retail & leisure 838k Residential-led mixed use 998k Residential-led mixed use 34k Apartment oriented residential 46k Office district 18k Office district 82k Office-led mixed use 4,434k 345k Family residential neighbourhoods 231k Warehouses & light industrial with offices 598k Warehouses & light industrial with offices 1,063k Family residential neighbourhoods 204k Family residential neighbourhoods 1,145k Family residential neighbourhoods 294k Family residential neighbourhoods 540k Family residential neighbourhoods 748k Family residential neighbourhoods


MODDERFONTEIN REGENERATION

Strategy for Residential Cosmo City

Main focus on providing housing for middle income couples and families that work in the nearby employment nodes

Waterfall

A more dense and sustainable arrangement than the norm in South Africa

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Residential Mix South

North

Total

South

North

Total

Land allocated for residential development (ha):

156

373

529

30%

70%

100%

Residential units:

27k

36k

63k

43%

57%

100%

Residential units per ha of land (inc roads etc) allocated to residential:

174

97

120

Residents (including resident domestic workers):

64k

97k

161k

Low Density - detached houses

-

2k

2k

0%

7%

4%

Low/Medium Density - attached houses

6k

14k

20k

23%

37%

31%

Medium Density - low rise apartments

11k

12k

23k

39%

34%

36%

High Density - high rise apartments

10k

8k

18k

39%

21%

29%

Total

27k

36k

63k

100%

100%

100%

-

10k

10k

0%

10%

6%

Low/Medium Density - attached houses

19k

43k

62k

30%

44%

38%

Medium Density - low rise apartments

25k

30k

55k

39%

31%

34%

High Density - high rise apartments

20k

15k

35k

31%

15%

21%

Total

64k

97k

161k

100%

100%

100%

No. of Residential Units - by Density Category

Resident Population (inc. resident domestic workers) - by Density Category Low Density - detached houses

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Residential Phasing South

North

Total

South

North

Total

Phase 1

-

-

-

0%

0%

0%

Phase 2

4k

-

4k

15%

0%

6%

Phase 3

3k

2k

5k

10%

6%

8%

Phase 4

3k

3k

6k

9%

9%

9%

Phase 5

3k

5k

7k

10%

12%

11%

Phase 6

3k

5k

7k

10%

12%

11%

Phase 7

3k

5k

9k

12%

15%

13%

Phase 8

6k

11k

17k

23%

30%

27%

Phase 9

3k

5k

9k

12%

15%

13%

27k

36k

63k

100%

100%

100%

Total

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Strategy for Offices

SPINNINGFIELDS 450,000 m² Past 10 Years

MEDIA CITY UK 50,000 m² offices phase 1

AIRPORT CITY 500,000 m² Next 10 Years Modderfontein Regeneration Final Workshop July 2015

A major office hub in the long term, focused on users that find value in proximity to the Airport


MODDERFONTEIN REGENERATION

Office Development Trends • About 200,000 m² of office space completed each year over the past 5 years in Gauteng • New supply peaked at 600,000 m² in 2008 • Development at Sandton is constrained. In the longterm, new space will be needed in other locations

Office space planned and completed in Gauteng (sq m) Building Permits / Statistics South Africa Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Strategy for Offices c.1.5 million m² GFA at Modderfontein Town Centre c.15% of current total stock in Johannesburg / Centurion i.e. adding about 0.5% per annum over 30 years

Phase 1

Phase 2

Phase 3

Phase 4

Phase 5

(4 years 2017 - 2020)

(5 years 2021-25)

(5 years 2026-2030)

(10 years 2031-2040)

(20 years 2041-2060)

6k

108k

168k

538k

648k

1,468k

0.4%

7%

11%

37%

44%

100%

Offices %

Modderfontein Regeneration Final Workshop July 2015

Total


MODDERFONTEIN REGENERATION

Warehouse & Light Industrial 800,000 sq metres of space in the North, offering proximity to the N1 Corridor and Airport Phase 1

Phase 2

Phase 3

Phase 4

Phase 5

(4 years 2017 - 2020)

(5 years 2021-25)

(5 years 2026-2030)

(10 years 2031-2040)

(20 years 2041-2060)

Warehouse / Office & Light Industrial

202k

404k

202k

-

-

808k

%

25%

50%

25%

0%

0%

100%

Modderfontein Regeneration Final Workshop July 2015

Total


MODDERFONTEIN REGENERATION

Retail & Commercial Leisure Retail / leisure offer mainly to support residents, given the substantial existing and planned shopping mall provision in the area

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Destination Leisure Opportunities to create a regionalscale destination e.g. a retail outlet village and/or an outdoor attraction using the natural features of the site Outlet Village

Modderfontein Regeneration Final Workshop July 2015

Surf Lagoon

Downhill Sports Centre


MODDERFONTEIN REGENERATION

Summary South Allocation of Space (m²) Open Space Between Development Plots Area Roads & Open Space Within Development Net Developable Area Total Site (Red Line Area) Gross Floor Area - by Use Type (m²) Town Centre Retail Neighbourhood Retail Offices Town Centre Leisure Neighbourhood Leisure Market Residential Subsidised Residential Live Work Community Facilities Warehouse/ Office & Light Industrial Hotel/ Conference Centre/ Resort Education - Campus Education - Primary/Secondary Total Employees (full time equivalent)

Modderfontein Regeneration Final Workshop July 2015

North

Total

2.3m 0.7m 1.6m

5.0m 1.5m 3.5m

8.6m 7.2m 2.2m 5.1m 15.8m

92k 15k 1,468k 46k 8k 2,622k 13k 36k 63k 40k 32k 4,434k 68k

58k 6k 22k 4,124k 23k 39k 808k 16k 73k 5,169k 14k

150k 21k 1,468k 46k 30k 6,745k 36k 75k 808k 79k 40k 105k 9,603k 82k

South

North

Total 54% 46% 14% 32% 100%

2% 0% 33% 1% 0% 59% 0% 0% 1% 0% 1% 1% 1% 100% 83%

1% 0% 0% 0% 0% 80% 0% 0% 1% 16% 0% 0% 1% 100% 17%

2% 0% 15% 0% 0% 70% 0% 0% 1% 8% 1% 0% 1% 100% 100%


MODDERFONTEIN REGENERATION

Phasing Phase Phase Phase Phase Phase Phase Phase Phase Phase Total 1 2 3 4 5 6 7 8 9 17k 27k 24k 24k 14k 29k 14k 150k 12k 4k 0k 1k 3k 1k 21k 6k 108k 168k 269k 269k 162k 324k 162k 1,468k 6k 6k 6k 6k 6k 11k 6k 46k 6k 2k 3k 5k 5k 2k 5k 2k 30k 384k 497k 624k 776k 776k 922k 1,844k 922k 6,745k 5k 10k 7k 3k 3k 2k 4k 2k 36k 11k 8k 10k 9k 9k 7k 15k 7k 75k 202k 404k 202k 808k 5k 11k 13k 13k 9k 19k 9k 79k 20k 20k 40k 6k 10k 13k 13k 16k 32k 16k 105k 645k 1,087k 1,066k 1,118k 1,118k 1,142k 2,284k 1,142k 9,603k

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

SOCIOECONOMICS Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

SOCIO-ECONOMICS Outline of Presentation 1. Baseline assessment: socio-economic drivers, constraints and opportunities – implications for Modderfontein. 2. Policy drivers.

3. Socio-economic impacts. 4. Conclusions – Implications of the development

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

SOCIOECONOMICS What is the socioeconomic profile of area?

Population • •

Gauteng has consistently increased its share of national population • 19% in 1996 to 24% in 2011. Currently 12.9 million people

Modderfontein site is at the geographical heart of this growth.

Young Population • Approx. 20% youth labour • Two-thirds under age of 34

Age Pyramid, City of Johannesburg, 2011 85+ 80-84 75-79 70-74 65-69 60-64 55-59 50-54 45-49 40-44 35-39 30-34 25-29 20-24 15-19 10 - 14. 5. - 9. 0-4

Substantial youth bulge – plentiful labour supply BUT – skills and education?

Male

Source: 2011 Census, Statistics South Modderfontein Regeneration Final Workshop JulyAfrica 2015

Female


MODDERFONTEIN REGENERATION

SOCIOECONOMICS What is the socioeconomic profile of area?

Population - Migration • • • •

Gauteng grew faster than any other province between 2006 and 2011 (2.9% pa) Growth driven by net-migration Gauteng is the largest net-gainer of inter-provincial migrants (approx. 1.5m net-migrants since 2011) If rate continues – Gauteng’s population will double by 2035 1,600,000

Domestic Provincial Net Migration, 2001 – 2016

1,400,000

2001-2006

1,200,000

2006-2011

2011-2016

1,000,000 800,000

600,000 400,000 200,000 0 (200,000) Eastern Cape

Gauteng

Limpopo

Northern Cape

Western Cape

(400,000)

• • • •

Approx. 22% of Gauteng’s migrants are international International migration led by other African nations Gauteng successful in attracted highly educated individuals less skills-constrained than other provincial economies.

International Migration Patterns into South Africa

Advantage: “The Demographic Dividend” •

• •

Existing demographic and health profile has favourable dependency ratios

However, rapid rate of population growth is not sustainable Likely to lead to higher levels of congestions and increased pressure on services

African

Asian

White

2001-2005

769,000

23,300

-133,800

2006-2010

922,900

34,700

-112,00

2011-2015

1,100,000

41,000

-95,200

Modderfontein Regeneration Final Workshop July 2015 Source: Mid-Year Population Estimates, Statistics South Africa, “Internal Migration to Gauten Province”, Uni of Cape Town 2004


MODDERFONTEIN REGENERATION

SOCIOECONOMICS What is the socioeconomic profile of area?

Economy •

• • •

Gauteng is the launching pad for many domestic and international businesses looking to expand into Africa Africa's financial services capital: >70 foreign banks' head offices, several domestic banks, stockbrokers and large insurance firms; JSE Securities Exchange. Dominates the South African economy in every major sector except Agriculture, Mining and Quarrying Provincial Economy leading sectors:

• • • •

Financial, Real Estate & Business; Manufacturing; Government Services; and Trade & Accommodation

Contribution to GDP per Sector; Gauteng Provincial & National Level

25%

% of GDP (Gauteng) 20% % of GDP (South Africa) 15% 10% 5%

Source: Gauteng Online, Statistics Africa Modderfontein Regeneration Final Workshop South July 2015

Other

Agriculture, forestry and fishing

Electricity, Gas and Water

Mining and quarrying

Personal services

Construction

Transport, storage and communication

Taxes less subsidies on products

Wholesale, retail, motor trade and accommodation

General government services

0%

Manufacturing

• •

Response to building a Smart Province; Expanded Tertiary Sector which now contributes 60+% to growth. Major Shopping attraction in Africa Currently low labour demand in formal sectors

Finance, real estate and business services


MODDERFONTEIN REGENERATION

SOCIOECONOMICS What is the socioeconomic profile of area?

Labour Participation Rates; SA, Gauteng & CoJ

Employment & Occupational Structure • •

Gauteng has highest level of Labour Market Participation Largest amount of employees within all sectors (except Agri.)

Contains 33%-45% of SA’s employees in: • Financial sector; • Transport sector; • Trade & Accommodation sector; and • Manufacturing sector

• •

Level

Labour Participation Rate

South Africa

64.4%

Gauteng

76.7%

CoJ

70%

In Gauteng, employment focuses mainly in Finance, Trade and Community & Social Services Manufacturing and Construction still strong, despite recent contraction (due to reduced credit access)

50% Proportion of National Employment in Gauteng’s Economic Sectors 40% 30% 20%

Private Households

Finance

Community and Social Services

Modderfontein Regeneration FinalForce Workshop July 2015 Source: Quarterly Labour Survey, 2015,

Transport

Trade

Construction

Utilities

Manufacturing

Mining

0%

Agriculture

10%

Statistics South Africa

Proportion of Gauteng’s Labour Force per Economic Sectors


What is the socioeconomic profile of area?

Provincial Unemployment Rate against National Unemployment Rate 40% 35%

Unemployment & Economic Inactivity

30% 25% 20%

• • •

10% 5%

Limpopo

Western Cape

KwaZulu-Natal

Gauteng

North West

Mpumalanga

0%

Eastern Cape

15%

Moderate unemployment rate - in line with National rate Unemployment rates in CoJ and Tshwane below the Provincial level and on par with SA

Free State

Northern Cape

MODDERFONTEIN REGENERATION

SOCIOECONOMICS

Unemployment in Ekurhuleni and NonUnemployment Rate per Province metropolitan municipalities exceed both Provincial South African - Unemployment Rate Gauteng’s Municipality Unemployment Rates against Provincial and and National levels National Rates 31% Since 2008 crisis, Gauteng experiencing 30% continued increase in unemployment Challenges of Province’s labour market - creating29% employment opportunities, specifically for youth 28% labour 27%

26%

25%

24%

CoJ

Ekurhuleni

Unemployment Rate per Municipality Gauteng Unemployment Rate

Modderfontein Regeneration FinalForce Workshop July 2015 Source: Quarterly Labour Survey, 2015,

Statistics South Africa

City of Tshwane

Non-metro

South African - Unemployment Rate


MODDERFONTEIN REGENERATION

SOCIOECONOMICS What is the socioeconomic profile of area?

The Informal Economy

Formal & Informal Labour per Economic Industry 100%

75%

50%

25%

Formal %

Modderfontein Regeneration FinalForce Workshop July 2015 Source: Quarterly Labour Survey, 2015,

Statistics South Africa

Other

Community and social services

Informal %

Finance

Transport

Trade

Construction

Utilities

Manufacturing

Mining

0%


MODDERFONTEIN REGENERATION

SOCIOECONOMICS What is the socioeconomic profile of area?

Income Levels • • •

Average annual incomes across SA have doubled since 2001 Gauteng’s av. annual income considerably higher than other Provinces - grew at 7% per annum Av. Household income in CoJ amongst the highest in SA

175,000

Average Annual Incomes per Province (ZAR), 2001 – 2011

150,000

2001

125,000 100,000

2011

75,000

50,000 25,000 0

North West

Eastern Cape

Limpopo

R2,457,601+

R1,228,801 R2,457,600

R614,001 R1,228,800

R307,601 - R614,400

R153,801 - R307,600

R76,401 - R153,800

Average Annual Household Income Distribution, 2011

18% 16% 14% 12% 10% 8% 6% 4% 2% 0%

R38,201 - R76,400

Source: 2011 Census, Statistics South Modderfontein Regeneration Final Workshop JulyAfrica 2015

Free State

R19,601 - R38,200

Although incomes concentrated in Middle Range – approx. 17% reported having “No Income” Income disparities highest in Gauteng’s major cities (CoJ, Ekurhuleni, Tshwane) Ranking amongst the most unequal societies globally

Mpumalanga

R9,601 - R19,600

KwaZulu-Natal

R4,801 - R9,600

Northern Cape

R1 - R4,800

Western Cape

None income

Gauteng


MODDERFONTEIN REGENERATION

SOCIOECONOMICS What is the socioeconomic profile of area?

Deprivation •

Still challenges facing racially skewed ownership, employment opportunities and structural imbalances

UNHabitat & GCRO Quality of Life Survey: CoJ Gini-coefficient of 0.75 In Gauteng, proportion of population under the Poverty-Line (R305/ month) at 10% (increase from 7% in 2005)

• • •

Given by largely urban character, CoJ has problem with urban poverty - driven by migration. Poverty concentrated in defined pockets - most located on outer edges of Johannesburg conurbation

Source: 2011 Census, Statistics South Modderfontein Regeneration Final Workshop JulyAfrica, 2015 CASASP,

2005


MODDERFONTEIN REGENERATION

SOCIOECONOMICS What is the socioeconomic profile of area?

Housing •

Demand for affordable (and desired) housing outstripping supply

Challenge for bringing about the right balance of affordable formal housing remains large and pressing.

Dwelling Types in Gauteng; 1996, 2001, 2011 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 1996 Formal Dwelling

Source: 2011 Census, Statistics South Modderfontein Regeneration Final Workshop JulyAfrica 2015

2001 Informal Dwelling

2011 Other


MODDERFONTEIN REGENERATION

SOCIOECONOMICS What is the socioeconomic profile of area?

Housing • •

Residential ownership dramatically decreased since 1996 Rental units and dwellings occupied rent-free have increased Household Tenure in Gauteng; 1996, 2001, 2011

Tenure Status Rented Occupied rent free

Owned and fully paid off Owned but not yet paid off Other • • •

1996

2001

26%

45%

72%

53%

2%

3%

2011 41% 16%

24% 17% 3%

Population densities continue to exert pressures on the housing stock (esp. in CoJ) Private developers and Government (Joshco) need to collaborate to ensure demands are adequately met Promoting socio-economic growth and empowerment in safe, well-managed and well-serviced neighbourhoods

Source: 2011 Census, Statistics South Modderfontein Regeneration Final Workshop JulyAfrica 2015


MODDERFONTEIN REGENERATION

SOCIOECONOMICS What is the socioeconomic profile of area?

Strategic Economic Prospects & Drivers •

Economic growth is slowly recovering reflecting stronger world trade and past depreciation of the Rand

However, infrastructure insufficiencies (mostly electricity shortages) are slowing the economy.

Exports will rely on manufacturing goods, as commodities remain depressed by low international prices.

Infrastructure investment will contribute to growth - providing demand and alleviating bottlenecks.

As incomes increase & confidence slowly improves - private domestic demand is projected to pick up.

Fiscal policy will remain mildly restrictive, as the government seek to stabilise public debt and contain inflation pressures

High levels of inactivity and unemployment add to high inequality - require structural reforms to boost employment creation and make growth more inclusive.

Source: OECD, June 2015 Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

SOCIOECONOMICS Strategic Economic Prospects & Drivers • •

While SA is forecast to grow at 4.5% by 2030, Gauteng is forecast to grow by 5.2% Currently, Gauteng contributes approx. 35% of GDP – set to grow to 38% in 2030, 40% by 2050

Gauteng’s economy will be driven by the:

• • • • •

Wholesale, retail & motor trade sector – growing at 5.2%; Catering & accommodation sector – growing at 5.2%; General government services – growing at 5%; Financial, real estate & business services – growing at 4.9%; and Manufacturing sector – growing at 4.6%.

Source: ASSA, 2011; OECD,Final June 2015; World Modderfontein Regeneration Workshop JulyBank 2015 Databank, 2015; Trading Economics Forecast, 2015; Statistics South Africa


MODDERFONTEIN REGENERATION

Population Projections National Population Projections, 2010-2030 (World Bank) 900 800 700 600 500 400 300 200

100

Modderfontein Regeneration Final Workshop July 2015

2049

2047

2045

2043

2041

2039

2037

2035

2033

2031

2029

2027

2025

2023

2021

2019

2017

2015

2013

2011

2009

-


MODDERFONTEIN REGENERATION

SOCIOECONOMICS Inward Investment Activity & Major Projects • •

Major Infrastructure and Development Projects planned for Gauteng. Supported by increased government spending in Residential, Infrastructural and Commercial projects Sector

Rail

Retail

Retail

Industrial

Name

Description

GauTrain Rail System Extension

A link to the High speed Rail from Johannesburg and Durban and a rapid rail link to allow high mobility corridors

-

Midrand Mall of Africa

Two-story, 130,000.0m2 shopping mall. It includes the construction of 300 stores, a VIP lounge, a spa, a baby nursery, a children’s park, a two-level basement parking garage and related facilities.

US$350 million

Mogale City Mall Development

A shopping mall consisting of a 53,000 sqm of retail space, leisure units, parking facilities, as well as the installation of security systems.

PET-P Plant

Polyethylene Terephthalate recycling plant 600,000 sqm Manufacturing Plant

Light Industrial

Institutional

Value

Upgrading the existing hospital, incl. construction of a new hospital, an OPD center, a parking facility, other related infrastructure facilities, and the installation of safety systems.

CHB Academic Hospital Revitalisation

Source: CIC Construction South Africa, Sept Modderfontein Regeneration FinalinWorkshop July 2015

2014

US$168 million

-

-

-


MODDERFONTEIN REGENERATION

SOCIOECONOMICS Policy Context National Development Plan 2030

3 priorities for economic future: • Raising employment through faster economic growth • Improving quality of education and skills development • Building capability of the state to play transformative role

Industrial Policy Action Plan (IPAP) • • • •

Highlights need for adequate job creation Promote Labour-absorbing industrialisation Raise competitiveness Focus on the Manufacturing sector due to its high multiplier benefits to GDP and employment

Gauteng Employment Growth and Development Strategy (GEGDS) • • •

Initiate programmes that can maximise employment creation in the medium term. Address inequality through the investment in people and the progressive realisation of decent jobs. Support social cohesion through interventions that directly contribute towards employment creation and a healthy, well nourished and safe labour force.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

SOCIOECONOMICS Policy Context Corridors of Freedom

• • • • • •

Alleviate deprivation and guide accessible and sustainable development Well-planned transport arteries Linked mixed-use compact development Adequate provision of commercial (retail & office) uses Good access to sufficient provision of community services (education, leisure & recreation) Addresses sustainability of access and movement of residents – social cohesion “a larger proportion of the population living closer to places of work, and the transport they use to commute should be safe, reliable and energy efficient”

Black Economic Empowerment • • •

Gauteng Provincial Government (GPG) launched Broad Based Black Economic Empowerment Strategy. Aim to address inequalities & bring about significant increases in the number of black people that manage, own and control the economy. Recognises SMEs as major lever for BEE - providing opportunities to increase black participation in economic activities “GPG will support for micro enterprise in general, small business development in high-growth sectors and the growth of SMEs owned and managed by black people and black women in particular, the youth, the disabled and cooperatives.”

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

SOCIOECONOMICS Policy Context Policy Drivers

Policy Plan National Development Plan 2030

• • •

IPAP

• • •

Modderfontein Adherence

Raising employment through faster economic growth Improving quality of education and skills development Building capability of the state to play transformative role

Promote Labour-absorbing industrialisation Raise competitiveness Focus on the Manufacturing sector

• •

• •

Corridors of Freedom

• • • • •

BEE

• •

Modderfontein Regeneration Final Workshop July 2015

Alleviate deprivation Well-planned transport arteries Linked mixed-use compact development Good access to sufficient provision of community services (education, leisure & recreation) Addresses sustainability and social cohesion

Significant increases in the number of black people that manage, own and control the economy. Recognises SMEs as major lever for BEE providing opportunities to increase black participation in economic activities

• • • • •

Creation of new work premises for growing economy (and labour demand) Provision of new health and educational facilities to upskill and enhance life quality of increasing population Major infrastructure investment provides opportunities for involvement of state to play transformative role (e.g. through PPP) Provision of capacity for manufacturing and light industrial operations Further strengthening key provincial and national sectors Providing path to upskilling of labour through vocational industrial experience TOD opportunity at GauTrain Hub Provision of transport “will enable fast, safe and affordable mobility along the transport corridors” Located adjacent to targeted Corridors of Freedom [Sandton/ Randburg- Diepsloot] Move away from previous sprawling low-density areas without viable public transport systems The Master Plan centres the population towards areas of economic activity, educational opportunities and enhanced mobility

• Integration of BEE & SME in line with Modderfontein’s community-level businesses • Support and investment provided from local authorities generate greater economic activity and higher value through high-density development (“Clustering Effect”)


MODDERFONTEIN REGENERATION

SOCIOECONOMICS

Drivers of Guateng’s Employment Growth and Development Strategy GEGDS Drivers

Objective

Modderfontein Adherence •

• Developmental Green Economy

Deliver better returns on natural, human and economic capital investment Reducing greenhouse emissions, using fewer natural resources & reducing social disparities

• • Economic, Socio-economic and bulkInfrastructure

• • •

Community-led Economic Development (CLED)

• • •

Quality Education, Skills Development & Capacity Building

• •

Uplift society; creating an inclusive economy through infrastructure enhancement Spending on infrastructure is leveraged to stimulate economy and address job creation over short-medium term (esp. in Construction sector) Positioning province for growth in long term

• • •

Sustainable economic growth that brings economic benefits and quality of life improvements in the community Community participation with various public works programmes to stimulate entrepreneurial spirit in communities Develop infrastructure networks in local communities so they can access markets

Address poverty and inequality by focusing on skills development, vocational training, capacity building and re-skilling Emphasis placed on quality early childhood development Reduce unemployment in the long-term

• •

• •

• • •

Youth Employment Initiative • Modderfontein Regeneration Final Workshop July 2015

Focus on youth labour participation by intervening more directly Proactively focus on young school leavers

• •

Providing compact business districts with provincially supportive economic activity provides real efficiency gains Corridors of Freedom and provision of good public transport delivers enhanced mobility to opportunities across all groups Centre will be developed around major rail infrastructure provision High density development will align the main transport corridors; benefitting several residents Phased construction will feed into local and Provincial construction sector (Priority Sector) Connecting local economy to CBD and Sandton, to support and benefit from economic activity Employment in high density mixed-use development promotes local community engagement BEE Strategy objectives to enable community entrepreneurialism Planned investment in local and inter-provincial infrastructure will reduce transaction costs, attract job seekers, and promote employment. Provision of 40,000 sqm Tertiary Education Campus Provision of 105,000 sqm Primary & Secondary Educational facilities SME employment will promote on-the-job training & knowledge transfers Modderfontein’s TOD & CLED enhances social mobility and produces a more inclusive an productive economy Opportunity to migrate unemployed youth to tertiary education Promote youth entrepreneurship through BEE Incorporate GEGDS to leverage partnerships with placement agencies and connect school leavers to jobs


MODDERFONTEIN REGENERATION

SOCIOECONOMICS Strengths

Weaknesses

• • • •

• • • • • •

• • •

Located in economic centre of the nation Located along Rail investment corridor Housing offer to meet variety of needs Establish residential-led communities that have community services at their heart for all residents. Plan focuses on safe and good access to jobs and services High-density sustainable development Promoting a move away from sprawled inaccessible areas Focus of enhancing QoL for residents

Informal employment Uncertainty of affordable housing provision Isolation of southern residential community Implementation will take considerable length of time Sluggish recovery from recession Value of the Rand

Opportunities

Threats

• Feed into Provincial key economic sectors, in supportive capacity – economic diversification • Become Johannesburg’s 3rd Economic Hub • Connect to wider region through Gautrain • Reduce QoL disparities and inequalities through community-led development • Support SME’s to achieve BEE • Increasing house prices promising for absorption of units • National employment and residential demand and entice FDI • Construction of site will spike labour demand within sector • Phasing of educational/ vocational facilities can be frontloaded to help upskill labour & prepare for the economic activity envisioned for the area. • Phasing of residential development can be in line with increase in mortgage advances • Development of high-quality housing & infrastructure

• Demand uncertainty • Competitiveness threats from other countries, particularly in manufacturing • Potential skills-gap • Energy gap • Challenges creating employment opportunities with the ability to absorb labour, specifically youth labour • Steady increases in informal sector

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

SOCIOECONOMICS Economic Impact – Construction Jobs

CAPEX (USD) Attributable to Labour Labour Cost (USD) Person years of employment FTEs (USD)

17,120,000,000 20% 3,424,000,000 285,333 28,533

GDP per worker GDP from construction (USD)

7,000 199,733,333

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

SOCIOECONOMICS Economic Impact - Jobs

Direct Jobs Profile

GDP per worker 2015(USD)

Displacement & Deadweight

Net Direct Jobs

Regional Type II Multiplier

Indirect & Induced Jobs

Total Net Jobs

Manufacturing Utilities Construction Trade Transport Finance & business services Government services Personal services

15580 820 1640 20500 12300 16400 4920 9840

17,260 38,384 6,333 10,932 22,764 21,810 10,915 10,088

0.2 0.1 0.1 0.15 0.2 0.15 0.05 0

12,464 738 1,476 17,425 9,840 13,940 4,674 9,840

2 1.7 3 1.4 1.6 2 1.5 1.5

12464 516.6 2952 6970 5904 13940 2337 4920

24,928 1,255 4,428 24,395 15,744 27,880 7,011 14,760

Total

82000

50,004

120,401

Sector

Total Jobs including construction impact Source: Atkins

Modderfontein Regeneration Final Workshop July 2015

70,397

148,934


MODDERFONTEIN REGENERATION

Economic Impact - GDP

Sector Manufacturing Utilities Construction Trade Transport Finance & business services Government services Personal services

GDP per worker 17,260 38,384 6,333 10,932 22,764 21,810 10,915 10,088

Total Total GDP including construction impact Source: Atkins

Modderfontein Regeneration Final Workshop July 2015

10 yr Productivity Uplift 2.0 1.4 1.2 1.3 1.7 1.8 1.2 1.2

GDP per worker uplift 34,521 53,738 7,599 14,211 38,698 39,258 13,098 12,106

Total Net Jobs 24,928 1,255 4,428 24,395 15,744 27,880 7,011 14,760

860,533,309 67,419,844 33,650,112 346,680,019 609,263,547 1,094,503,643 91,832,617 178,677,927

120,401

3,282,561,018

GDP (USD)

3,482,294,351


MODDERFONTEIN REGENERATION

CONCLUSIONS – IMPLICATIONS FOR THE DEVELOPMENT  Economic diversification and competitiveness – capturing latent economic growth potential

 Economic additionality  Broad range of job opportunities with diverse skills needs  Opportunities for development of SME sector

 Raising standards of living and improving quality of life for all  Contributing to alleviation of inequalities, unemployment, deprivation and access to employment

 Strategic policy fit – meeting NDP, IPAP and GEGDS objectives  Corridor of Freedom compliant  Investment in education and training

 Enhancement of economic effect through increased spending power  Creating a bright future through substantial new opportunities Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Thank you! Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

COMMENTS

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS DEVELOPMENT PLANNING Herman Pienaar, Development Planning, CoJ: “We are very happy with the level of detail and rigour apparent in the development of the framework plan and in these presentations.” Who attended the public engagement sessions? Key community groups and the general public. Invitations were made in newspapers and social media, as well as directly to key stakeholder groups. Full details can be found in the report. What is the breakdown of number of units for each phase? Overall numbers can be found in the Delivery Strategy and details can be found in the Colliers Commercial Report. The N/W and N/E connections seem to improve permeability on the site. Are there any more opportunities to connect to the S/W? We have linked to every available connection that borders our ownership boundary. Can the proposed public transit link in with city-wide networks? Yes, we link to all existing and proposed public transit networks that border our site. The BRT networks in the City of Johannesburg and Ekurheleni are both included.

Have we conducted an EIA as part of this process? Response: No new EIA’s are needed at this stage. Further EIA’s will be required when precinct plans are produced. What is the breakdown of the lower income housing provided on-site? We are in negotiations with CoJ Housing and can provide details of our agreements when consensus has been reached. What level of detail is being prepared for this planning submission? Is it a township establishment for the entire 1,600 ha? No, this is only the framework masterplan. Further detail will be submitted at the stage of future planning phases for individual neighbourhoods within the 1600 ha. Township establishments are yet to come and we understand they will require a higher level of detail. Development sites within the overall 1600 ha should only be released with careful urban design guidelines, so the vision is sure to be maintained. Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS DEVELOPMENT PLANNING Emannuel Sotomi, Housing, CoJ: What are the functional socio-economic linkages of this project? The socio-economic links created by the regeneration of Modderfontein are improved public transit, new pedestrian and cycle connections, more jobs and better access to public realm/parks. Herman Joubert, Transport: How are we ensuring that the traffic impact on the city is manageable? Busses won’t be enough. We have developed a traffic model to indicate the level of traffic increase at each stage of this regeneration project. Public transit plays a role in decreasing demand and new roads are introduced when the model indicates that they are needed. We agree that it is unlikely that busses will provide enough capacity to support the level of density preferred by CoJ. Have you considered the Gauteng Environmental Framework? We have considered key connections to the wider environmental network that surrounds our site. Most of the connections within our site boundary are made via river corridors. It is likely that these link to the new Gauteng Environmental Framework. Constand Van Deventer, Urban Dynamics: What is the phasing strategy for social housing? The framework provides a location for lower income housing in each of the mixed use neighbourhoods and it is therefore phased in throughout the full delivery of the scheme, along with the required community amenities. What is the difference between the level of detail needed now and later for the environmental work? The level of detail is consistent with what is needed for a framework plan at this stage. Later when individual sites/neighbourhoods are put forward for further planning approvals, EIA’s will be required. Even though an EIA is not needed now, please keep the key stakeholders in the loop, so when an EIA is needed, we already understand the context. This will lead to quicker approvals.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS ENVIRONMENT - Summary Herman Joubert, Transport: What is the environmental impact of the landbridge? We know that the town centre needs a connection between the north and south sites. The landbridge offers the most environmentally friendly intervention as it is not at grade and allows ecological crossings. The height of the bridge will determine the quality of the space under it, so we are investigating the maximum viable height. Jane Eagle (EISD): “The detailed design stage, that comes after the framework plan, is really important. We need to ensure that the next round of design work incorporates the ideas and principles from the framework plan appropriately.� Building on the wetlands is not the norm. This must only be allowed when appropriate justification is given. The normal wetland buffer is 32 meters. This can be increased or decreased depending on the site and the design of the scheme. The actual buffer width for each site should be determined by a detailed study, at the next level of planning approval. Rehabilitation of non-pristine areas is as important as conserving pristine areas. We have an opportunity to do some rehabilitation on this site. These areas should be highlighted in the a more detailed study after the framework is approved. In the next stage of work, detailed design will be needed for the landbridge. Ensure the landbridge allows visual and ecological connections. It must also allow natural light and be scaled appropriately. Make the most of the stormwater and get a team on-board, at the next stage, that can deliver innovative and efficient systems and solutions. How do we reduce our carbon footprint? How do we minimize the lose of wildlife? What is the most important environmental asset?

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS ENVIRONMENT – Detailed notes Province/GDARD:  Question: It is important that environmental issues are incorporated into the plan – as per the presentations - but at what level of detail does the Framework Plan stop and the EIA process start.  Answer: The Framework Plan is strategic and will be subject to modification due to changing circumstances, especially in the longer term. The Framework Plan does not have sufficient detail to provide the basis for one or more EIAs which it is suggested are best carried out at precinct level. The Framework Plan recognises environmental issues and establishes principles and key next steps for addressing the issues.  Response: It will be important to have a good working relationship with GDARD on environmental matters e.g. establish a pre-application process for EIA, with consultation/involvement of Gauteng Province.  Statement (GDARD): A new Environmental Management Framework (EMF) for Gauteng Province was gazetted in June which will be applicable to Zendai Modderfontein.  Answer: Zendai would appreciate a copy of this EMF and will take this into account going forward, especially at the precinct level. (Post-meeting Note – a copy of the EMF was provided by GDARD to Atkins/Zendai on 31 July 2015). Herman Joubert, Transport:  Question: Town Centre and the connection across the Modderfontein Spruit – is this achievable? The project should not head towards the side of an (immovable) mountain.  Response: Subject to sound environmental (water, ecology, landscape) and engineering studies an elevated connection should be possible in which a restored watercourse and riparian vegetation in the river corridor are valuable (visual and functional) assets to the Town Centre. The water course would be designed and managed to accommodate flooding but public access would be facilitated and ecological connectivity along the river and to the reserve would be retained.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS ENVIRONMENT – Detailed notes CoJ (Jane Eagle) – seven precautionary points:  Point 1: Cedar Loft at Fourways – the main lesson/principle learned was to avoid Wetlands, they should not be built on. Nevertheless, where there is a compelling case to develop close to Wetlands (<30m), applications will be considered but given careful scrutiny with respect to design details and their approach to restoration of degraded wetlands.  Point 2: Though wetlands have been delineated and sub-catchment studies done, the source of all the ground/surface water on the site and the flow paths are not fully understood (“where does all the water come from and go?”). A geo-hydrological study for the whole site is still required.  Answer: Zendai recognise this, and that the results of the study may affect the details of development for some precincts and infrastructure, and proposes that such a study is done post-approval of the Framework Plan to inform the more detailed development plans.  Point 3: Wetland Buffers. It is suggested that a standard buffer (30m) should be applied to all wetlands, recognising that this can be increased (e.g. to 60m) or decreased subject to detailed requirements and studies.  Answer: Atkins/Zendai understand this and will state this in their Framework Plan, but prefer to show the delineated wetlands as the absolute “no go” zone and then to explore appropriate buffers (e.g. 10m to 30m or 60m) as a part of the Open Space Planning and Precinct Plans. Some of the medium to long term developments are so far in the future and will need review/revision anyway so the exact buffer is not critical at this stage.  Point 4: The principle that much of the site is degraded (from an ecological perspective) is understood. This is typical of Johannesburg and Gauteng Province where most land is degraded, but does not necessarily mean that development of all such degraded areas is acceptable – and there may be areas of non-degraded land. The BioRegional Plan for the CoJ identifies Critical Biodiversity Areas (CBAs) and Ecological Support Areas that may still be of environmental value and factored into the Framework Plan.  Answer: Atkins/Zendai have looked more closely at the Bio-Regional Plan GIS data provided by CoJ. Though the full meta-data is not readily accessible Atkins/Zendai still believe that the mapping of the CBAs etc was done at such a scale that it cannot be applied directly to the environmental sensitivity maps that have been prepared. (Post-meeting Note: Atkins/Zendai agreed to meet CoJ Biodiversity/GIS specialists on 30/07/2015 to review the data/situation in more detail).

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS ENVIRONMENT – Detailed notes   

 

Point 5: The scale of the proposed crossing/land bridge at the future Town Centre is of some concern e.g. a large dark culvert would not be a good solution. Light, air, safety are all required to make a sustainable solution. Answer: Atkins/Zendai agree completely that this crossing has to be designed to a very high standard; the soft and hard landscaping and ecological connectivity required mean that this is a very important piece of “Green Infrastructure”. Point 6: Drainage. Water conservation is a big issue in South Africa. Healthy wetlands need to depend on properly functioning drainage regimes, to factor in uses/pressures from people and play a role in “water efficiency”. How can stormwater serve people and the natural environment (role in hydrological and ecological connectivity) ate the same time? A highly professional team is required to work on the SuDS for the development; there a limited number of local engineers with the necessary experience and Zendai should look at bringing in expertise to assist – including wetlands specialists (i.e. not a task for engineers alone). Answer: Zendai appreciates the complexity of the stormwater drainage SuDS challenge and will take this point into consideration. Point 7: Ecological connectivity. The problem of the fence with very limited passageways for animals, that was noticed on the bus trip/site visit associated with the Options Workshop, highlights the need for mechanisms to be found for environmental commitments to be carried through (in this case to maintain ecological connectivity). Answer: Atkins/Zendai understand this point and that such details need to be addressed both by “Environmental Principles” to be adopted by Zendai and competent EIAs with mitigation for precincts and infrastructure and the active involvement of those managing the Modderfontein Reserve (currently the Endangered Wildlife Trust).

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS TRANSPORT Herman Joubert, Transport: Can the landbridge help deal with off-peak storage of public transit, when extra trains/busses are not needed? Yes, there will be extra space for both car parking and pubic transit storage on either side of the park and under the place where the bridge meets the development site. Please see the report for a conceptual section, to better understand the way this will work. Herman Pienaar, Development Planning, CoJ: We would like a meeting with the transport team and CoJ Transport to discuss the traffic modelling. We need to understand that sufficient connections are being made through the site, as well as within. What is the impact of freight traffic on the masterplan? Light-industrial and warehouse land uses have been placed adjacent to roads that allow (and are appropriate for) freight traffic. The traffic model accounts for freight traffic and has confirmed the agreed roads are likely to handle the traffic sufficiently.

We need to ensure that ‘through routes’ don’t become highways that are only used to speed through the site. We agree. The road network has been designed with placemaking and appropriate road hierarchy in mind. Through routes and internal roads have different land use and density adjacencies. The width and number of directional changes has also been adapted to encourage or discourage speed as appropriate. Areas where large trucks and service vehicles are prevalent, has been matched with roads to link to the major roads adjacent to the site, and do not require passage through residential neighbourhoods. We must replace ineffective transport with efficient and accessible public transport.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS INFRASTRUCTURE Herman Pienaar, Development Planning, CoJ: Have we included other new development in our capacity study? Yes, we have included other new development that we are aware of. Have we met with Joburg Water to agree a strategy? Yes, Joburg Water is supportive of our approach but does not have funding to produce a new water masterplan at this time. We must confirm that we have up-to-date information on supply timelines. There are delays sometimes. Are there additional green/renewable systems that could be considered? We must ensure any upgrades that are required actually happen and keep pace with the delivery of new development. Victor Chewe (Joburg Water): Upgrades to the water supply are coming and will support this masterplan. Very little wind is available on-site for wind turbines. Municipalities should be investing in renewable power.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS INFRASTRUCTURE Jane Eagle (EISD): Short term tie-ins to existing sewer system do not always work well and sometimes cause overflow. We must avoid this. Has consideration been given to an onsite treatment plant? Arup met with Johannesburg Water (JW) to discuss the sewer aspects of the development. The Modderfontein site is well served by a large diameter sewer outfall running through the valley of the catchment and sewage discharges from the site have already been incorporated into the JW sewer masterplan for the area (the masterplan does however need to be reviewed and possibly updated for the current scale of development). Considering that JW has already invested heavily in infrastructure to collect sewage produced on the site, it makes sense to use this connection. Furthermore JW stated that there is a new 150 MLD sewage treatment plant planned near Lanseria airport that would alleviate potential capacity issues at the Northern Wastewater Treatment plant. Nonetheless, onsite sewage treatment has not been ruled out and is being considered as part of the medium to long term strategy with due consideration of: • Required land take in a suitable location and of a suitable size. • The need for a critical mass of people (a plant is not viable in the short term when sewage production is low). • Complexities around operating a high tech piece of equipment and where the responsibilities lie for operating the plant. • The potential to recover and use treated sewage effluent for irrigation of landscaped areas.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS URBAN DESIGN GUIDELINES Herman Pienaar, Development Planning, CoJ: “Design is not about what it looks like but how it functions and this is apparent in the design guidelines you have shared with us and the examples you have used.” The city is transforming towards design that encourages public transit. Best practice and international examples can really help us shape the future Johannesburg. We must get the urban design right. Landscape design is often used to cover up poor urban design. Modderfontein is and opportunity to get both right. “We must incorporate the principles of the design guidelines now, so when the work is implemented in the future, our intentions are still clear.” Anton Comrie, Landscape Architect: How can the environment be linked into the urban design guidelines? We often design the landscape guidelines in parallel to the urban design guidelines. This allows appropriate integration. Parking requirements often hinder the public realm – what can be done? We have proposed a lower minimum provision of parking in Modderfontein. If this is approved, we might be able to provide less parking, as supported by our public transit strategy. How do you ensure the residential design works on the inside? We often design indicative layouts to ensure appropriate building widths for internal design. How is local culture incorporated? We often work with local design teams. Emannuel Sotomi, Housing, CoJ: Is there a method to determine how much low value housing is supported by a certain amount of high value housing? This is a delicate balance and will be reviewed when overall quantity of housing types are agreed with CoJ. Commercial considerations will factor into this discussion.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS COMMERCIAL ECONOMICS Emannuel Sotomi, Housing, CoJ: Working from home might effect our overall office provision. Continuous engagement is needed with CoJ housing. We must establish a model for how much social housing is viable based on the overall commercial assessment. Waterfall ran past us. We want Modderfontein to take us with them (in the planning process). Johannesburg’s CBD is disorganized and crowed. We must do better at Modderfontein.

Herman Pienaar, Development Planning, CoJ: The city wants more lower market accommodation. We want to plan for the ‘median’ income level. Getting a mortgage is a bigger issue for most – bigger than affordability. What makes Modderfontein special? Unique land uses? Niche market?

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

KEY COMMENTS SOCIO-ECONOMICS Liana Strydom, Development Planning, CoJ: “We seem to have reached an agreement on the masterplan and things seem to have settled into the right locations. However, the illustration of the displacement calculations must be clear.” The Airport Corridor of Freedom was identified as part of the SDF process and it is not yet confirmed. We must illustrate how the offering at Modderfontein is different than other nodes in Johannesburg – we must diversify. Emannuel Sotomi, Housing, CoJ: Expand the local study area and get more specific about areas such as Alexandra and Sandton. Herman Pienaar, Development Planning, CoJ: Make sure the outcomes of the study are manifested in the Framework Masterplan. Can we make a direct link with SME? Define the income level and job level of the new jobs we have shown. (Who are they really for?) Renewables offer significant impact in terms of jobs and economic uplift due to new facilities and implementation staffing.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

MASTERPLAN COMMENTS Give us your thoughts… Where can we find information about municipal services (health clinics, libraries, sports fields, swimming pools, rec facilities, community halls, public schooling, religious facilities and other social services)? At the stage of the framework masterplan, we have identified the neighbourhoods/locations of the community facilities and schools. Please see diagram called ‘Community’. The amount of community facilities and schools will be determined by population, which will be confirmed when the framework plan is approved and detailed design begins at the next stage.

We need the links to neighbouring areas. More than physical links – we also need socio-cultural links like agriculture and economic activity. When urban design guideline are required, review the Energy Efficiency Guidelines, Sustainable Human Settlement Index and Building Regulations for some minimum requirements applicable to CoJ. Include green elements and sustainability elements. Align to GDS204 principles.

Integrating planning between work streams is important. Sustainability and resilience principles in infrastructure is important. A regional attenuation pond could be useful. When rivers and wetlands are crossed, try to use underpasses, span bridges, other infiltration/mechanisms that enable/promote infiltration should be incorporated into the design. Pedestrian and cycle lanes, taxi ranks, and landscaping should all be done at the same time. Should be incorporated into planning upfront.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

MASTERPLAN COMMENTS Give us your thoughts‌ Zendai and CoJ should have a GIS session to check alignment of layers. Include sustainability principles. Offsets are not always implemented properly, so there is a negative perception towards the process. GDARD has plans to write environmental guidelines. At least two major parks will be needed. One in the north and one in the south. This will serve the higher density residential development.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

GROUP WORK (consultants, stakeholder and developer working together)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

GROUPS

Please see attendee list for actual participants

ENVIRONMENT Nozipho Maduse (EISD) Jane Eagle (EISD) Lebo Molefe (EISD) Tshilidzi Tshimange (EISD) Taariq Ismail (GDP-OOP Gauteng) Liziwe Ntshinga (Urban Management) Lynn Marais (Zendai, Environment) Luke (Ke Lu) (Zendai, Landscape) Ares Zhangyi (Zendai, Project Management) Mark Hanekom (Zendai, Environment) Anton Comrie (Green Inc) Ben Bradlow (Brown University) Phillip Harrison (WITS University) Yan Yang (WITS University) Temba Middelmann (WITS University) Robert Whitcombe (Atkins, Environment)*

DEVELOPMENT PLANNING Emannuel Sotomi (Housing) Liana Strydom (Development Planning) Martin Bekker (Ekurheleni) Nells Du Toit (OOP) Mannini Makhele (GPD - OOP Gauteng) Ronald Mathe (Gauteng) Taariq Ismail (Gauteng) Istell Orton (GIBB) Richard Ballard (GCEO) Gidion Cruywagen (Urban Management) Constand Van Deventer (Urban Dynamics, Planning) Jon Busser (Urban Dynamics, Planning) Nico Barnard (Zendai, Planning) Ann Sun (Zendai, PR) Lloyd Druce (Zendai, Planning) Richard Coburn (Atkins, Socioeconomics) Guy Briggs (DHK)*

INFRASTRUCTURE Riaan Swanepoel (City Power) Tony Whattaker (City Power) Gavin Jardine (City Power) Tebogo Mokanek (City Power) Xolani Lembede (City Power) Victor Chewe (Joburg Water) Hein Schuld (Plantech Associates) Nkateko Shipalana (Development Planning) Sibu Mthembu (Urban Management) Hein Schuld (Plantech) Joy Zang (Zendai, Urban Design) Tony Lu (Zendai, Infrastructure) Ian Carradice (Arup, Infrastructure) Mahandra Rooplall (Arup, Energy) Pedro Neto (Arup, Energy) Gregg Sim (Arup, Infrastructure)*

TRANSPORT Lisa Seftel (ED: Transportation) Daisy Dwango (Transportation) Gugu Mbambo (Transportation) Ayanda Masuku (Development Planning) Mohini Chanderalou (Development Planning) Esther Smith(JRA) Theo de Jager(JRA) Phelisa Staffa (JRA) Thabo Maifo (JRA) Inneke de Villiers-Engelbrecht (Urban Management) John Nsbirwa (Zendai, Transport) Herman Joubert (Zendai, Transport) Simon van Jaarsveld (Arup, Transport)* Madeleen Engelbrecht (Arup, Transport)

Modderfontein Regeneration Final Workshop July 2015

ECONOMICS Ravi Naidoo (ED: Economic Development) Herman Pienaar (Development Planning) Yondela Silimela (ED: Development Planning) Nick Theledi (Economic Development) Reginald Pholo (Economic Development) Monique Griffith (Economic Development) Beatrice Abil (Economic Development) Elliot Dubasi (Economic Development) Estee Campher (Gauteng Province) Lenette Fouche (Urban Management) Andrea Delport (Denacon) Barry Stegmann Guy Briggs (DHK, Urban Design) Damane Hlalele (Arup) Leticia Potts (Zendai, Development) Michael Inglesby (Colliers, Commercial) Margot Orr (Atkins, Masterplanning) David Geddes (Colliers, Commercial)*

* Group leader


MODDERFONTEIN REGENERATION

Break Out Session 1 DELIVERY STRATEGY: In this session we break into groups to discuss the delivery strategy from the perspective of each group’s specialization. What are the key elements required to move the project forward? Is there a particular order in which they need to be achieved? The group’s focus should be placed on the full delivery strategy. The objective of this session is to gain a shared understanding of what is likely to be needed to take the project from start to finish. ACTION: Record the key elements of the delivery strategy.

Modderfontein Regeneration Final Workshop July 2015


• •

Establish good relationships with authorities and other stakeholders Prepare Open Space Strategy and Landscape Masterplan o To include “Guidelines” for integration of open space with urban development o To include “Open Space Standards” (e.g. ratio of built vs unbuilt land in accordance with population served) o To achieve a balance between conservation and amenity uses o To investigate and determine requirement for one or more “Regional Parks” o To include spatial configuration/hierarchy of open/green space i.e. grading of ecological value and associated uses (conservation, walking, cycling, SUDS etc.) o To include broad design/development principles and management guidelines o To be integrated with infrastructure (“complete streets” etc.) o To be integrated with SUDS and Stormwater requirements and proposals Institutional/governance arrangements for management of “Open Space” to be established o Management Entity/Entities o Funding Environment Masterplan (will go beyond Open Space requirements to include other environmental tasks) including: o Setting out of priorities and phasing o Determination of Safety, Health and Environment (SHE) trigger points o EIA tasks o Preparation of Habitat Restoration and Rehabilitation Programme o Establishment of Waste Management Principles, Strategy and Systems (e.g. reduce, re-use, re-cycle; separate waste at source etc.) o Establishment of Water Management Principles, Strategy and Guidelines (e.g. Treated Sewage Effluent (TSE); use of grey water for landscape irrigation for all new projects; rain water harvesting and re-use)

Within 10 years •

Implementation of above i.e. put strategies, plans and guidelines into practice

Modderfontein Regeneration Final Workshop July 2015

Audit

• •

Key Message – “Environment is Part of the Solution and not Part of the Problem”

Regulatory Compliance

First 5 years

Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

Maintenance and Management

Key Tasks

Objective – Planning, Design and Management of the Environment (i.e. many environmental tasks are not about building/actions on the ground but about planning and management)

Funding Mechanisms

MODDERFONTEIN REGENERATION

DELIVERY STRATEGY -- ENVIRONMENT


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

DELIVERY STRATEGY – DEVELOPMENT PLANNING Key Tasks

Value Management

Formal Planning Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

First 5 years Design guidelines -

Existing approved areas

-

Town Centre precinct

1. D.F. must incorporate approved areas that are part of the functional area. DF targets (infra, social housing etc) broken up into clusters of sub-working groups (including political input in Sept). Formal city comment and refinement of D.F. Final submission Sept / Oct or more likely Jan 16. Plans for early phases (urban design framework) 2. Precinct plans for early phases (urban design framework). 3. Township establishment informed by Open Space Strategy.

Within 10 years

Sub phase SDP

-

Building plans submission

Precinct plans for next phases •

Within 15 years

-

Township establishment

Potential review

Precinct plans for next phases •

Not before 20 years Modderfontein Regeneration Final Workshop July 2015

Township establishment

Potential review

Potential review


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

DELIVERY STRATEGY -- TRANSPORT Key Tasks

Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

First 5 years 

 

 

The Gautrain Station is one of the most urgent pieces of infrastructure to be provided for Modderfontein from a Transportation point of view. Not only will the station make Modderfontein more accessible, but it will lend the area more gravity as a destination. The station is expected to act as a catalyst for first development to occur and will draw pioneering tenants to establish within the area. There is currently an undertaking with the Bombella concession to provide a station at Modderfontein. The Bombella concession expands over a 15 year period of which 5 years have expired. It is therefore imperative that the station is designed and built within a shorter timeframe rather than a longer one to avoid having to renegotiate the opportunity to provide a station with a future concession. As a starting point the transportation strategy needs to be carefully coordinated with transport network planning by provincial and local planning and transportation authorities. This includes provincial roads planning (including K routes and PWV routes) as well as public transport planning i.e. Rea Vaya by COJ Transport and the Tembisa to Boksburg BRT on Zuurfontein Road by EMM. Modderfontein planning needs to make the most of this infrastructure, by linking into it as far as possible. COJ have appointed consultants to develop a public transport plan for the North East Johannesburg area. These consultants needs to be informed of the planning for Modderfontein so it could be incorporated into the wider area planning. Zendai can provide infrastructure on land which they own. However this is not the case on third party land. Transport links between Modderfontein and surrounding areas such as Tembisa should be facilitated where possible with the support of local authorities; The K113 and Centenary Road will provide access for the development of existing planning rights including Longlake, Pinelands and Westlake and is therefore required within the short term; As the first stages of development starts to role out supporting access and internal roads will need to be provided. A link from the K113 to the first residential phase of the Modderfontein North residential development is required as well as Mastiff Road. Pedestrian and cycle infrastructure will be developed simultaneously with the role out of the development and road network.

Within 10 years 

    

The success of Gautrain is dependent on supporting transport facilities such as vehicle parking, road linkages and bus services. Due to the fall of the land, limited cutting and the proximity of the Gautrain to the green area to the north, all of the supporting transport facilities cannot be provided on the southern side of the Gautrain line. The proposed land bridge provides more space for supporting transport facilities within close proximity of the station and is therefore an opportunity to address the limited space issue. At this stage the southern town centre will be in place which will require strong public transport support. Further role out of the internal road network will be required to serve additional phases of the development; Metro rail services will be highly beneficial to Modderfontein during its later development phases. Further / more detailed exploration of bringing Metro rail serves into Modderfontein should be explored; At this stage Modderfontein North will require access from another direction. This can be provided by extending Marlboro Road further to the east, across the conservancy area; Enough demand will at this stage be established to start introduce local bus services / mid capacity public transport to provide people the opportunity and to get people into the habit of using public transport. Pedestrian and cycle infrastructure will be developed simultaneously with the role out of the development and road network.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

DELIVERY STRATEGY -- TRANSPORT Key Tasks

Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

Within 15 years 

     

At this stage both the town centre to the south and Modderfontein North is expected to have developed enough gravity in terms of demand that will warrant the proposed High Capacity Transport HCT system proposed. This system needs to be implemented, creating a north south link. Together with the HCT system, a road link, pedestrian and cycle link needs to be provided. Modderfontein North will require the first full east west link to provide access options from surrounding road networks It is expected that the warehouse and light industry uses adjacent to Zuurfontein Road will be well developed. To take advantage of the potential opportunities associated with direct linkage to the Aerotropolis area, it is proposed that the K115 is constructed; Kempton Park road will be required to provide additional east west linkage to and from Kempton Park. This road will provide a direct link from Kempton Park to the proposed town centre; The internal road network will be rolled out further to facilitate access to new development. Additional bus services / mid capacity transport needs to be rolled out and integrated with the HCT that have been provided; Pedestrian and cycle infrastructure will be developed simultaneously with the role out of the development and road network.

Not before 20 years   

Within the longer term, depending on the development densities achieved, a second north south link between Modderfontein North and the town centre would be required; A rail llink to Johannesburg City Centre should be seriously considered to tap into the extensive Metro rail network that provides vast coverage of Gauteng urban areas; General traffic growth will require strategic linkage within Gauteng. The PWV 3 provides this linkage between the N3 and the R21 freeways addressing a critical east west demand within Gauteng.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

DELIVERY STRATEGY -- INFRASTRUCTURE Key Tasks

Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

First 5 years 1.

2. 3.

Start work in areas with existing rights • Construct K113 • Continue with planning of new bulk watermain to Linbro Park reservoir • Complete Longlake substation • Construct sewer system to serve Mdf North residential and Highlands/Mdf East light industrial • Start planning new reservoir in the north Finalise position of south reservoir and start design Construct new Klipfontein substation and lines

4. 5. 6.

Develop concept for Gautrain station/city centre/land bridge Prepare development guidelines for Energy/ Infrastructure Update stormwater masterplan and submit to JRA for approval

Within 10 years 1. 2. 3. 4.

Construct Lanseria 150 MLD wastewater treatment plant and link to Northern WWTP outfall Construct southern and northern reservoirs Construct Founders substation Design and construct infrastructure for first phase of city centre

Within 15 years 1. 2. 3.

Continue to build satellite substations and additional transformers Continue with neighbourhoods/precincts in the north and associated infrastructure Construct balance of town centre

Not before 20 years 1. 2. 3. 4.

As per “within 15 years” above…..plus Strategy for waste to energy Investigate viability of gas to power Investigate options for utilising treated sewage effluent (TSE) for irrigation

Modderfontein Regeneration Final Workshop July 2015

5. 6.

Initiate discussions with AECI regarding the potential for ground mounted PV on their lands Design and construct first mixed use precinct and associated infrastructure


MODDERFONTEIN REGENERATION

DELIVERY STRATEGY -- ECONOMICS Key Tasks

Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

First 5 Years •

The Precinct Plan for the town centre should include analysis of issues such as engineering implications of land bridge and other options, and implications for other commercial hubs such as Sandton.

Completion of Longlake is the first development priority outside the town centre. Mixture of residential, light industrial, offices and retail. The same design guidelines should be applied there as are to be applied to the rest of the development. The opportunity should be taken to punch roads through to ensure east-west linkages across the development.

It is envisaged that residential units across the whole development will be developed at a steady pace c.1 -1,500 units per annum.

CoJ has aspiration for 30% of the residential to be affordable to people below median income.

Development of the light industrial-office zone on Allandale Road will also be a next priority.

Big support for Surf Lagoon and Downhill Sports Centre!

Establishment of a Modderfontein Development Agency – a partnership of key public sector organisations that co-ordinates and oversees the work needed by the public sector in working with Zendai to deliver the infrastructure and facilitate planning. It needs a small staff. THIS IS AGREED TO BE A MAJOR PRIORITY

The first development at the town centre should be planned to coincide with construction of the Gautrain station.

It should be a landmark that anchors the development and signposts the vision and intent, with enough critical mass to make the investment in infrastructure worthwhile.

It is envisaged as featuring a striking tower building. The idea of it being called something like World Trade Centre or Africa Trade Centre was supported. There could be a special emphasis on attracting tenants from China and other growing trading partners. It requires at least one large anchor tenant. It is also envisaged that the first phase of the town centre will include substantial residential in apartments (perhaps 5,000 units)

After First 5 Years •

Completion of Gautrain Station and key infrastructure improvements (especially road and electricity) shortly after 5 years, with development of phase 1 of town centre in similar time frame.

The overall Framework will need to be amended roughly every five years to take changing circumstances over time.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Break Out Session 2 HOW DO WE CONTINUE TO WORK TOWARDS OUR VISION: In this session we break out into groups and discuss what comes directly after the frame work plan. Groups are organized by area of expertise to encouraged focused and practical discussions. A focus should be placed on the next 1-5 years of the delivery strategy. The objective of these breakout groups is to understand what will be needed to implement early phases of Modderfontein.

ACTION: Record the next steps. Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

NEXT STEPS -- ENVIRONMENT First 5 years

Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

Start with your key tasks from yesterday. What needs to happen to ensure these actions are achieved?

Objective – Planning, Design and Management of the Environment (i.e. many of the next environmental steps are not about building/actions on the ground). Key Message – “Environment is Part of the Solution not Part of the Problem” • Establish good working relationships with authorities and institutions – on planning and permitting matters • Review of Masterplan/Framework to consider potential environmental and heritage impacts/issues e.g. road alignments, infrastructure proposals, development locations. (Suggest adjustments to these if required). • Prepare Open Space Strategy including:o standards, taking Modderfontein context into account and o accessibility/connectivity o use of a 3-D Terrain Model so that topography can factored in e.g. for pedestrian and cycle routes • Ensure Conservation Management Plan is under preparation for Reserve with participation of Zendai • Stormwater Management Plan for Whole Site (Update/Complete) • Engagement with catchment stakeholders e.g. with respect to: o Water quality improvements • Prepare Environmental and Sustainability Guidelines to dovetail (link) with Urban Design Guidelines • Prepare EIAs for Precinct Level Plans • Prepare Environmental Management Plans (EMPs) for both “Development/Construction” and “Operational” phases of the Modderfontein “project” • Prepare Landscape Development Plans at Precinct Level (Green infrastructure, cycle lanes, footpaths) • Prepare Biodiversity Codes (matrices) – taking into account that there should be integration of these into the built/urban form) • Start implementing Open Space Strategy • Plan and start implementation of rehabilitation programmes e.g. • Gypsum dump • Wetlands • Riparian zones (habitat restoration) – especially at the Gautrain Modderfontein Station where this task needs to be undertaken in preparation for the development of an attractive Town Centre • Establish system and programme of regular audits of the project and of the site’s environmental/ecological status (self/independent or combination?)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

NEXT STEPS – DEVELOPMENT PLANNING First 5 years

Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

Start with your key tasks from yesterday. What needs to happen to ensure these actions are achieved?

Town Centre Phase 1a – Station: Planning, design, construction (opening August 2018). Including retail, office mixed-use, piazza and park). Pinelands Phase 1a – Planning, design and construction (including campus, High Street, Welcome Centre, Park). Longlake Phase 1a – Guidelines, design, construction (including housing, hospital, retirement village, industry). Connectivity of above – planning, design and construction of roads etc: -

K113 Centenary Way Town Centre loop

Parkland related to station and / or Founders Hill. Potential need for transport shuttle between development parcels. High level phasing assumptions: 1. 2. 3.

Focus on existing planned areas plus town centre. Linear development along Allendale Road – industrial & affordable housing? Work into northern area.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

NEXT STEPS -- TRANSPORT First 5 years 

 

     

Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

Start with your key tasks from yesterday. What needs to happen to ensure these actions are achieved?

Integration into regional transport planning Ensure Modderfontein planning is incorporated into North East Public Transport Planning by COJ and vice versa Follow latest planning of any BRT infrastructure within the vicinity and update planning to enhance linkage between Modderfontein and planned routes within the surrounding area. Engage with Prasa to develop possible opportunities to connect Modderfontein to the Metro Rail network; As land use planning changes over time or is updated, transport demand and supply should be recalculated to ensure that the proposed infrastructure can accommodate the number of trips; Develop a working document where the operational aspects of public transport is constantly reviewed to achieve a system designed towards the comfort and convenience of the end user. This includes: Operational hours of the services (also operational off peak hours) Critical review of the number of stops / transfers proposed along a route to avoid waiting time; Consider appropriate operational speed and distance for each service type. Consider the strategy and role out of minibus taxi infrastructure within the short medium and long term. Provide laybyes along strategic routes, ranking areas within town centre areas and appropriate holding areas; Continue the design of the Gautrain Station within Modderfontein and how road linkage and secondary public transport linkage can be provided; As new developments occur, linkage to these developments from strategic routes should be provided together with internal / access routes servicing specific properties; Explore and agree with COJ end EMM how Modderfontein road and public transport linkages can be linked to adjacent areas such as Thembisa, Kempton Park and Linbro Park; To ensure that tenants, residents and visitors to Modderfontein gets into the habit of using public transport from the start, temporary public transport services i.e. shuttle services should be considered; Continue the role out of key road links including K113 and Centenary Road to open development opportunities.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

NEXT STEPS -- INFRASTRUCTURE First 5 years

Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

Start with your key tasks from yesterday. What needs to happen to ensure these actions are achieved?

ENERGY

WATER

SEWER

ROADS/ STORMWATER

GENERAL

• Update and finalise Modderfontein Power/Energy Masterplan • Construction of Sebenza to Westfield powerline • Construct AEL to Klipfontein View powerline • Construct Klipfontein View substation • Secure servitude from Sebenza to AEL

• JW to finalise position of southern reservoir • Water masterplan to be updated for new scale of development (requires funding) • Agree direct connection to Rand Water supply for early phases of Highlands/ Modderfontein East development • Investigate whether early phases of Modderfontein North residential development can be supplied from Linbro park via Longlake (otherwise new bulk pipelines required from Rand Water supply/new northern reservoir)

• Investigate alternate discharge location for early phases of Highlands and Modderfontein East (otherwise design and construct bulk sewers and pump station to connect to Modderfontein outfall sewer) • Update sewer masterplan and confirm spare capacity allocations for Modderfontein new areas

• Update stormwater masterplan and submit to JRA for approval • Construct K113 to unlock Longlake • Construct Centenary Road • Plan and construct road access for early phases of Modderfontein North residential development

• Finalise agreement between Zendai and COJ regarding all bulk services connections/ planning/ funding/roll-out • Align all planning and design with environmental constraints • Finalise bulk services alignments and secure wayleaves/ servitudes • Prepare development guidelines to achieve targets for energy efficiency and demand reduction

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

NEXT STEPS -- ECONOMICS First 5 years

Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

Start with your key tasks from yesterday. What needs to happen to ensure these actions are achieved?

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

NEXT STEPS -- ECONOMICS First 5 years

Don’t forget to assign an order to the actions, if they need to happen in a certain sequence.

Start with your key tasks from yesterday. What needs to happen to ensure these actions are achieved?

• The Precinct Plan for the town centre should include analysis of issues such as engineering implications of land bridge and other options, and implications for other commercial hubs such as Sandton. • Completion of Longlake is the first development priority outside the town centre. Mixture of residential, light industrial, offices and retail. The same design guidelines should be applied there as are to be applied to the rest of the development. The opportunity should be taken to punch roads through to ensure east-west linkages across the development.

• It is envisaged that residential units across the whole development will be developed at a steady pace c.1 -1,500 units per annum. • CoJ has aspiration for 30% of the residential to be affordable to people below median income. • Development of the light industrial-office zone on Allandale Road will also be a next priority. • Big support for Surf Lagoon and Downhill Sports Centre! • Establishment of a Modderfontein Development Agency – a partnership of key public sector organisations that co-ordinates and oversees the work needed by the public sector in working with Zendai to deliver the infrastructure and facilitate planning. It needs a small staff. THIS IS AGREED TO BE A MAJOR PRIORITY • The first development at the town centre should be planned to coincide with construction of the Gautrain station. • It should be a landmark that anchors the development and signposts the vision and intent, with enough critical mass to make the investment in infrastructure worthwhile. • It is envisaged as featuring a striking tower building. The idea of it being called something like World Trade Centre or Africa Trade Centre was supported. There could be a special emphasis on attracting tenants from China and other growing trading partners. It requires at least one large anchor tenant. It is also envisaged that the first phase of the town centre will include substantial residential in apartments (perhaps 5,000 units)

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Final Report

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Next Steps: Herman Pienaar, Development Planning, CoJ: “We have largely agreed on the masterplan and there is far more clarity in the technical elements presented in this workshop. However, there are still a few areas yet to be agreed. I want to thank Zendai for coordinating these workshops and am sure that the engagement that has come out of them has contributed positively to the outcome of a more robust masterplan. This process is an extremely useful model that we (CoJ) can use with other developments going forward.� Atkins understanding: The housing breakdown, commercial differentiators and some socio-economic elements must be clarified.

Final Framework Workshop Report Action: Zendai to submit to CoJ for confirmation week of 3rd August 2015. Action: CoJ comments due to Zendai within two weeks Draft Framework Report: Last week of August, 2015 Action: Zendai to submit to CoJ

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

APPENDIX

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Next Steps Meeting: July 29, 2015

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

ESID Meeting: July 30, 2015 Present: Robert Whitcombe (Atkins); Sonja Venter (Zendai); Livhuwani Nevhutalu (Senior Specialist, Biodiversity and Conservation Management, Environmental Management Department); Tshilidzi Tshimange (EISD); Jane Eagle (EISD) – 2nd part of meeting (her own meeting was cancelled). Objective: The objective of the meeting was to discuss the GIS datasets, especially those associated with the City of Jo’burg Bio-Regional Plan (Final Draft, October 2011) that CoJ had given to Zendai/Atkins. Jane Eagle had advised that Livhuwani was very familiar with these data layers and the underlying attributes that inform them. Jane had expressed her concern, at this week’s Workshop, that use should have been made of this information to inform the No Go/Open Space layer that is being proposed in the latest Mdf development framework. Discussion: LN stated that the various layers are a decision support tool – and are indicative. In particular, they guide what should be looked at more closely during the conduct of an EIA. They tell the user, at a crude level, which are the natural, degraded and non-natural areas and whether they are Critical Biodiversity Areas or Ecological Support Areas. Efforts should be made by projects to avoid particular sites (“conflict areas”) or to study them further. The Bio-Regional Plan mapping, based on satellite imagery, was not supposed to be applicable at a site specific scale but to provide guidance as to what might be expected. The data comes from the C-Plan (Conservation Plan) of GDARD and the detailed layers/attributes have to be provided by GDARD. The participants (CoJ/Atkins/Zendai) examined and made comparisons, on computer screens, of (i) the land cover/biodiversity mapping (Critical Biodiversity Area 1, 2 and associated layers) of various areas of the Zendai Mdf site (i.e. the GIS datasets used and provided by CoJ) and (ii) the GIS outputs of the Oryx Environmental Study (and the Specialist Report prepared by EkoInfo/W.H. de Frey), especially those used to generate the Vegetation, Sensitivity and Open Space Maps presented in the Workshops. Features such as the Gypsum Dump sites are visible on both sets of maps – i.e. “Transformed” areas. However, the CoJ data (which come from GDARD) tended to show more Natural and CBA classification than the “Oryx” vegetation mapping; the latter showed quite large areas of pasture, old fields, exotics etc. The latter was based on fieldwork over much of the site. LN showed some of the attribute data that are available (but it was mostly in annotated codes about fauna, plant species etc and the full information is not immediately accessible to Zendai). He explained that it was this kind of information that had informed the CoJ Bioregional Plan with its rather large areas of land zoned as Critical Biodiversity Area 1, etc. LN advised that the key points for CoJ EISD, with respect to the Zendai Mdf site, are the Wetlands and the Koppies (granite out crops and associated vegetation). These represent the key critical habitats and should be linked wherever possible by either suitable natural and/or degraded habitats. Ecological Support Areas (ESA 1) are potential links (corridors) believed to be of natural habitat, whilst ESA 2 are links of non-natural/degraded habitat. The main effort should be on identifying the habitats of importance – in their own right and taking into account their potential as biological corridors (connectivity). CoJ EISD emphasised that the width of wetlands was critical also – if too narrow they are treated like a ditch. Similarly wetlands and buffer zones can also be critical - the buffers must be sufficient to protect the habitat and/or the hydrology. The mapping has been done primarily at Province Level by taxonomic specialists in various groups (plants, birds, insects) as a part of their daily job; representative habitats are targeted (in the field) by the specialists to inform the Conservation and Bio-regional Plans. More detailed GIS data should be available from GDARD, but Zendai may have to pay for it. It is worth talking to the specialists who have done some of the surveys e.g. Craig WhittingtonJones (Birds) and Lorraine Mills (Plants). They can give more information on the distribution of particular species of importance that are known to occur on the Zendai areas.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

ESID Meeting: July 30, 2015 JE recognised that the whole site was not going to be “saved” for conservation and that much would be developed but it was important to identify the critical habitats and corridors for key species – maintaining ecological connectivity is the key “compromise” for biodiversity. The process for achieving this is not well defined – at what stages are particular levels of detail dealt with? An environmental objective for the CoJ is the adoption of a Spatial Framework that can be verified/refined at precinct then detailed site plan level. LN advised that the broad data from C-Plan is useful but more detailed knowledge from specialists and others who know the site are required to give spatial definition. Over-reliance on C-Plan at this scale may result in protecting the wrong areas. Conclusions: Atkins/Zendai believed that the Framework Plan had identified the key ecological and hydrological areas in the (indicative) “open space” figure and this should be sufficient for the Framework Plan to be approved. However, they recognised that an important next step would be the preparation of the Open Space Strategy and Plan that (i) responded to the proposed locations of urban development and infrastructure and (ii) took in to account the more detailed biodiversity data of GDARD/C-Plan and their specialists plus records of those with detailed knowledge of the flora and fauna of the Zendai Modderfontein site i.e. the Endangered Wildlife Trust and the Modderfontein Conservation Society. Together they could contribute to a Community Biodiversity Mapping exercise (using GIS) to inform the Open Space Strategy and Precinct level EIA’s. Post-Script – Wetland Delineations: Afterwards RW, SV and TT went to meet Emma Netshululu (EISD – with GIS capability) who has been assisting with use of the data that CoJ received from Zendai in relation to CoJ’s own wetland data sets. She will be examining this on behalf of EISD to make sure that the wetland delineation exercise covers all areas of the site and that there are no critical gaps. (SV is intending to do the same exercise for Zendai). Zendai explained how the Wetland layer was comprised of the results of a number of different studies by different specialists for different parts of the site at different times. Zendai believed that they were based on more fieldwork than the Level I and Level II wetland layers used by CoJ and for this reason were used as the basis for the indicative open space layer.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Housing Meeting: July 30, 2015 Present: Emannuel Sotomi, CoJ Housing Simon – Social housing JOSCHCO liaison, CoJ Moses – Research, CoJ Lucy – QS, civil engineer, CoJ Deputy Director – Land acquisition, CoJ Herman Pienaar, CoJ Development Planning Leticia Potts, Zendai Mr. Du, Zendai Joy Zang, Zendai Nico Barnard, Zendai Michael Inglesby, Colliers David Geddes, Colliers Margot Orr, Atkins Richard Coburn, Atkins Objective: Understand lower income housing objectives of the CoJ. Discussion: • We need to fully understand the make-up of each category of those defined in SA as in ‘need’. ‘Social housing’ is only one part of a bigger picture of need. CoJ agreed to provide us with details on the three key groups which make up need and the eligibility criteria for each supported group. They also agreed to give us information on the waiting list for these groups. (Action for Simon, CoJ) • CoJ expect to make reasonable contribution to CAPEX for providing public housing – including build cost and infrastructure. 160,000 rand per unit subsidy was mentioned, as well as the inclusion of a ‘Shared Ownership’ type model (based on the UK model). • Overall % of lower income housing that CoJ are targeting is 30% of new developments. 10% is envisioned as ‘social housing’ and the remaining 20% could be a combination of GAP/Flisp and Shared Ownership. Herman agreed to issue a detailed breakdown of their request. (Action for Herman, CoJ) • Inclusion policy is the key driver (Simon, CoJ to issue 2009 version) • CoJ’s aspirations are for integrated housing and layout design including vertical mix. When asked for examples of success in South Africa, this could not be provided. Reference made to NYC, London and Netherlands. • Despite CoJ statement of aspirations, there is an understanding from the City that the development must ‘work’ (from a viability perspective) and that negotiation and agreement is expected. • Zendai will negotiate with CoJ around quantity, tenant type and location within the Development. Conclusion: 1. Zendai to evaluate the commercial side of the lower income housing targets. 2. CoJ to supply materials discussed in the meeting to Zendai (noted above). 3. Zendai to arrange a follow up meeting to conclude the negotiation.

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

Socio-economics Meeting: July 30, 2015 Present: Ravi Naidoo (ED: Economic Development) Herman Pienaar, CoJ Development Planning Leticia Potts, Zendai Joy Zang, Zendai Nico Barnard, Zendai Michael Inglesby, Colliers David Geddes, Colliers Margot Orr, Atkins Richard Coburn, Atkins Objective: Present update on masterplan process (including the preferred option) and the socio-economic background of the economic discussion. Discussion: David Geddes presented update on commercial assessment for the preferred option. Richard Coburn presented socio-economics study completed on the preferred option. Key questions from CoJ: • How do we factor in the vacancies in the CBD? Does this effect the commercial assessment? (20% office vacancy and 16.5% average vacancy rates) • How many new markets can we open within this project? Providing new economies might limit displacement. The educational campus is a good example of this. • How do we ensure that what we agree now is actually delivered over the life of the project? • The city needs to promote balance. We need a better understanding of the methodology around the displacement assumptions. • What happens if the economy goes flat for 5 years? How does this change our action plan and the effect on the city? (Action for technical team to incorporate comments into the final report) Technical team would like more information regarding long term policy aspirations and how CoJ will assess diversified growth from an economic point of view. (Action for CoJ) Key messages to technical team: 1. demonstrate economic added-value 2. outline method for minimal displacement 3. provide high level economic impact / net value-added to JoBurg economy

Conclusion: 1. CoJ to issue information noted above 2. Technical team to incorporate comments into the final report

Modderfontein Regeneration Final Workshop July 2015


MODDERFONTEIN REGENERATION

GDARD Meeting: July 31, 2015 Present: Robert Whitcombe (RW, Atkins - on behalf of Zendai); Anton Comrie (AC, Green Inc – on behalf of Zendai); Marc Leroy (ML, Control Environmental Officer: Grade A. Environmental Planning and Impact Assessment). Gauteng Province Agriculture and Rural Development (GDARD). Objective: The main objective of the meeting was to learn more about and obtain a copy of the Gauteng Provincial (GPEMF) that was gazetted on 22nd May 2015 (NOTICE 1655 OF 2015). Discussion: ML had previously met Zendai representatives from China, perhaps a year or so ago, and is aware of the project. The approach to Environmental Assessment for Zendai Modderfontein was briefly discussed. Basic Assessments (EIA’s) are undertaken for infrastructure and may be required for precinct level approvals; EIA’s are normally undertaken for project “sites” within precincts. ML mooted whether a Strategic Environmental Assessment might be undertaken but was not clear of the legal requirement for this. RW pointed out that numerous environmental studies had been carried out on the site, some dating back to 2005. Atkins (as a part of the current Framework Plan) has been undertaking an environmental appraisal of the proposed development; this will be reported as an Environmental Management Framework). Atkins hopes that this should be sufficient for approval of the Framework Plan by CoJ and/or Gauteng Province. The new GPEMF categorises land in Gauteng into Five Zones – the previous EMF adopted 16 zones. The GPEMF sets out what Development and land-uses s are compatible, conditionally compatible and undesirable with respect to the EMF. The Five Zones are:  Zone 1 – Urban Development zone  Zone 2– High Control zone (within the urban development zone2  Zone 3 – High Control zone (outside the urban development zone  Zone 4 – Normal Control Zone  Zone 5 - Industrial and large commercial focus zone There are also “Protected areas”. ML advised that It is important to read through and understand the GPEMF and its implications for the project. There is a .pdf report covering each of the zones and GIS mapping and data illustrating the zones; the latter requires ArcReader software (note there may be compatibility issues – attributable to ESRI the software developer). ML advised that the zone descriptions for each potential use should be considered. The EMF is a planning and design “Decision Support Tool” – as is the latest version of Gauteng’s C-Plan for which the data was compiled by GDARD staff and other specialists. C- Plan does get updated from time-to-time, but the data layers of where plants and birds are found are not absolutely current and are not provided to the public. Nevertheless, Zendai should be able to obtain the habitat data that is available.

There are other data sets (decision support tools) that GDARD and the public may use, in particular:  Zones around known dump sites (shown on GDARD GIS layers) – with accompanying restrictions regarding development;  Ridges layer + 200m buffer – copy of this GIS layer provided by GDARD to Atkins/Zendai. The Zendai Modderfontein Environmental Framework needs to factor in the policies of GDARD with respect to various features such as the Ridge Layer. GDARD provided Atkins with publicly viewable layers including the Ridgelines plus 200m buffers – and also guidelines. The GPEMF is only a guide for potential occurrence of sensitive habitat, fauna, flora etc. It does not replace the need for individual studies at Masterplan/precinct level.

Modderfontein Regeneration Final Workshop July 2015


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.