A Box of Meandrous Lines | CASA Playhouse

Page 12

CASA PLAYHOUSE
Bost | Final Presentation Christopher C. Gibbs College of Architecture| ARCH 4970/5970_Spring 2020|Jun 2020| Francesco Cianfarani|Lecturer of Architecture
Colin

Index of Contents

1. Assignment A1 - Precedent Study

1.1 The Observatory Pavilion

1.2 Disassembled Building Components

1.3 Construction Phases

1.4 Axonometric Section

2. Assignment A2 - A Box of Meandrous Lines

2.1 Renderings

2.2 Perspective Section

2.3 Exploded Axonometric

2.4 Process

2.5 Elevations

3. Assignment A3 - Construction

3.1 Materials

3.2 Construction Phases

3.3 Puzzle Mechanics

Colin Bost | page 2.

1. Assignment A1 Precedent Study

Colin Bost | page 3.

Assignment A1

1.1 The Observatory Pavilion

The observatory draws upon the image of cabin architecture, but explores more complex geometry achieved through straight lines and rationalized by responding to a series of ramps. The observer experiences a gradient of increasing transparency in the observatory’s skin while progressing up the ramps.

$ lbs

Estimated Material Cost : $1,580

Estimated Weight : 850 lbs.

Materials : Douglas Fir Lumber

2x - 1 in. x 2 in. x 8 ft. Lumber

28x - 2 in. x 3 in. x 12 ft. Lumber

36x - 2 in. x 4 in. x 14 ft. Lumber

7x - 2 in. x 6 in. x 12 ft. Lumber

30x - 2 in. x 8 in. x 14 ft. Lumber

17x - 2 in. x 10 in. x 14 ft. Lumber

18x - 4 in. x 4 in. x 14 ft. Lumber

>600x - Wood Screws

Expected Assembly Tools : Circular Saw, Drill, Jigsaw, Pocket Hole Jig

Colin Bost | page 4.
8’-3” 13’-0” 14’5”
Colin Bost | page 5. Assignment A1
2
4in.x4in.DouglasFirLumber in. x 4 in. Douglas Fir Lumber 2in.x3in.DouglasFirLumber 2in.x8in.DouglasFirLumber 1 in. x 2 in. Douglas Fir Lumber 2in.x10inDouglasFirLumber 2in.x6inDouglasFirLumber

Assembly Phase 1

- construction of the primary vertical structure and base

Assembly Phase 2

- construction of the primary horizontal structure and secondary structure to attach the facade

Colin Bost | page 6. Assignment A1
Colin Bost | page 7.
Assembly Phase 4 - installation of the floor panels Assembly Phase 3 - construction of the structure of the pitched roof

Assembly

Colin Bost | page 8.
Phase 6 - construction of the roof members and completion of the observatory Assembly Phase 5 - construction of the vertical facade members

Architects : JCPCDR Architects

Original Site : Giez, France

While designed with a specific site in mind, the observatory is demountable and suitable for any reasonably flat surface.

Colin Bost | page 9.
Colin Bost | page 10.

Assignment A1

Colin Bost | page 11.
2 ft. 4 ft. 8 ft.
1.4 Axonometric Section

1. Assignment A2 A Box of Meandrous Lines

Colin Bost | page 12.

Assignment A2

2.1 Renderings

Colin Bost | page 13.

A Box of Meandrous Lines

A balance between convention and interest drives the design as it aims to balance pure orthogonal geometry with interrupting points of aesthetic, and even interactive interest. A puzzle on the interior, in which gears must be placed in the correct spot, operates a pulley system once complete, allowing small objects to be lifted to the roof in a box. The roof is accessible via climbing elements matching the meandering pattern running through the entire structure.

Colin Bost | page 14.

Assignment A2

2.2 Perspective Section

Colin Bost | page 15.
Colin Bost | page 16. Legend
1. Primary Structure 2. Secondary Structure 3. Skin 4. Floor 5. Acrylic Windows 6. Mullions 7. Doors 8. Climbing Structure 9. Climbing Elements 10. Roof 11. Roof Railing 12. Puzzle System 13. Acrylic Erase Board
1 2 2 3 3 4 5 6 3 7 7 2 3 8 9 10 11 12 13 14
14. Step

Assignment A2

2.4 Process

An early concept iteration aimed to intersect two rectangular forms, one form for vertical circulation and another as a destination. Later iterations attempted to create a less visually stark division between space for movement and rest.

Colin Bost | page 17.
Concept A Concept B
Colin Bost | page 18.
Facade Design

Assignment A2

2.4 Elevations

Colin Bost | page 19.
2
4 ft. 8
ft.
ft.
2 ft. 4 ft. 8 ft.
Right Elevation Front Elevation
Colin Bost | page 20. 2 ft. 4 ft. 8 ft.
2 ft. 4 ft. 8 ft.
Left Elevation
Back Elevation

1. Assignment A3 Construction

Colin Bost | page 21.

Assignment A3

3.1 Materials

$ lbs

Estimated Material Cost :

$1,380

Estimated Weight : 1,400 lbs.

Materials : Douglas Fir Lumber

13x - 1 in. x 4 in. x 8 ft. Lumber

32x - 2 in. x 2 in. x 8 ft. Lumber

66x - 2 in. x 4 in. x 8 ft. Lumber

2x - 2 in. x 4 in. x 10 ft. Lumber

20x - 2 in. x 8 in. x 8 ft. Lumber

11x - 4 in. x 4 in. x 8 ft. Lumber

>800x - 2” Wood Screws

13x - 2” Bolt Screws

4x - 2 ft. x 4 ft. x 1/4 in. Wood

7x - 2 ft. x 4 ft. x 1/8 in. Acrylic

4x - 3 in. Satin Nickel Square Corner

Door Hinge

2x - 1-1/2 in. Zinc-Plated Wall/Ceiling

Mount Pulley

1x - 2-1/2 in. Satin Nickel Surface Bolt

1x - 3-1/2 in. Stainless Steel Adjustable

Staple Safety Hasp

1x - 2-1/2 in. Chrome-Plated Rope Cleat

1x - 1/4 in. Rope

10x - 1 qt. Wood Stain

Expected Assembly Tools : Circular Saw, Drill, Jigsaw, Pocket Hole Jig

Laser Cutter (optional)

Colin Bost | page 22.
Wood Metal
Dark
Wood
7’-2” 8’-6” 8’0”
Wood Stained Light Grey Wood Stained
Grey
Stained Aqua

Assignment A3

3.2 Construction Phases

Assembly Phase 1

- construction of the primary vertical structure and base

Assembly Phase 2

- construction of the secondary structure to attach the facade and the primary structure of the ramp

Colin Bost | page 23.
Colin Bost | page 24.
Assembly Phase 4 - addition of the two doors Assembly Phase 3 - construction of the floor, roof, step, and mullions
Colin Bost | page 25.
Assembly Phase 6 - addition of the facade along the narrow faces and completion of the roof raling. Assembly Phase 5 - construction of the gear puzzle and pulley system
Colin Bost | page 26.
Assembly Phase 8 - construction of the skin design etched onto acrylic with a laser cutter Wood stained (grey) and painted (blue) Assembly Phase 7 - installation of the acrylic windows

Temporary control will be added to prevent children from using the climbing elements during display !

- addition of temporary controls for display and completion of the playhouse

Colin Bost | page 27.
Assembly Phase 10 Assembly Phase 9 - construction of the climbing elements

Assignment A3

3.3 Puzzle Mechanics

Fixed Puzzle Components

Possible Configurations

Provided Gears

Colin Bost | page 28.
1 ft. 2 ft. 4 ft.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.