April 22, 2013
Members of the Board of Ethics City of Racine 730 Washington Avenue Racine, WI 53403 Dear Members of the Board of Ethics: I wish to file a Complaint alleging violations of Section 2-581(f) 4 of the City of Racine Code of Ethics. Mark Yehlen, in his official capacity as Commissioner of Public Works of the City of Racine, violated the following section of the City of Racine’s Code of Ethics: (f) Misconduct in office. Public officials and employees are prohibited from: 4) Intentionally falsifying an account, record book, return, certificate, report or statement in the officer or employee’s official capacity. Mark Yehlen, Commissioner of Public Works, violated the specifications and instructions of the City of Racine official RFP # 18 as it pertains to the Racine City Ordinance (see attached RFP # 18). Mark Yehlen falsified information to the Racine Common Council during the discussion of Change Order # 1 and #2 (see attached Architect letter, ARC Contract document, Change Order #1 and #2). Yehlen stated there would not be any more change orders. The ARC letter instructs to “Allow a period of two (2) working days during the period of demolition for the City to determine, consider, and direct the final extent of common walls demolition.” A problem also needs to be addressed where existing footings at 1514 and 1518 Washington Ave. are exposed to the weather. Additional work to the neighboring roof at 1514 Washington Ave. was required to repair damage from the demolition (see attached Racine Merchandise Mart and Carlson Roofing letters). Mark Yehlen falsified information to the Public Works and Services Committee. Yehlen stated, “the bricks were deteriorating on Linea Anthony building, 1514 Washington Ave.,” however they were not.