PRESIDENT'S MESSAGE The Gold Cup was a true celebration of the diverse talent and skills in our region, producing entertaining football for fans watching from all over the world and inspiring players from all of our Confederation to strive for excellence. Our premier tournament for national teams attracted more than 500,000 spectators in 13 cities across the United States. After 25 exciting games where 12 countries from the region showcased their passion and talent, the United States collected their fifth CONCACAF Gold Cup title in front of a crowd of approximately 60,000 at a packed Soldier Field on Sunday, July 28, after winning against Panama. The 12th edition of Gold Cup was one of the most successful tournaments in the history of this competition. Television audience figures for the cup competition accumulated in excess of 100 million people, watching live or delayed coverage. The USA recorded the highest audience figures of the four markets, generating millions of viewers from five broadcasters including Fox, Fox Soccer, Unimas, Univision and Univision Deportes. The Gold Cup is vital to our wide-ranging plans across the region as it provides significant resources for development programs and is an excellent platform to encourage Member Associations to realize their vast potential. We extend a special thanks to all those Member Associations, officials, coaches, players, partners, media and fans for their invaluable support of the tournament. I trust you will find value in the contents of this report as we begin to turn our thoughts to assure the success of the 2015 Gold Cup. Sincerely,
2 Jeffrey Webb President of CONCACAF
GC13 COMMITTEE 1. Sunil Gulati
United States
President
Gold Cup Chairman
2. Alfredo Hawit
Honduras
General Secretary
Gold Cup Vice Chairman
3. Gordon Derrick
Antigua and Barbuda
General Secretary
Gold Cup Member
4. Victor Montagliani Canada President Gold Cup Member 5. Canover Watson
Cayman Islands
Treasurer
Gold Cup Member
6. Eduardo Li
Costa Rica
President
Gold Cup Member
7. Luis Hernandez Cuba President Gold Cup Member 8. Jean Francisca
Curacao President Gold Cup Member
9. Cheney Joseph Grenada President Gold Cup Member 10. Horace Burrell Jamaica President Gold Cup Member 11. Maurice Victoire
Martinique
General Secretary
Gold Cup Member
12. Justino Compean Mexico President Gold Cup Member 13. Pedro Chaluja Panama President Gold Cup Member 14. Richard Groden
1.
2.
Trinidad and Tobago
3.
4.
5.
Gold Cup Member
6.
7.
3 8.
9.
10.
11.
12.
13.
14.
4
EXECUTIVE SUMMARY
Overall, the 2013 Gold Cup was a very successful
For everyone involved, this edition of the Gold
all-around event, driven by the strong teamwork
Cup proved to be more challenging and at times
of
CONCACAF
frustrating due to the amount of new activities/
working together with the diverse agencies that
programs around Gold Cup. The communication
provided support all throughout the competition.
among the different departments can and
CONCACAF has reformed and grown significantly
must be more effective, and must have a
over the last twelve months, with many new
clear understanding of each other’s roles and
faces in different departments, new agencies
responsibilities, without this it was difficult to
supporting various functional areas, and the new
navigate through the event for some groups
leadership guiding the team as a whole to new
more than others. Also, it was unfortunate that
horizons. For those individuals that had worked
the participating teams had to experience some
in previous Gold Cups this was by far the best
problems caused by this lack of communication
edition. There was a noticeable improvement at
and follow through. Lastly, there were many added
the level of administration and professionalism
elements from previous editions, most of them
of all staff involved, impressive new branding
implemented late. These last minute changes
elements throughout the venues, significant
made, or new initiatives, were difficult to manage,
enhancements in TV production quality, and
however, once the competition started, all groups
overall the most organized Gold Cup to date in
came together and worked diligently towards
terms of preparation. Nevertheless, with all of the
the same objective: to deliver the best Gold Cup
positive feedback we undoubtedly have items to
imaginable for the fans, for the teams, and for
improve on which we need to carefully analyze in
CONCACAF.
all
functional
areas
within
order to prevent repetition and raise the level of this competition.
3
4
On the positive side, the advance preparation
The following Debrief Report is a summary of 64
invested into this Gold Cup, as opposed to
debrief reports submitted by each key staff person,
previous editions, was the revolving comment
partner agency and CONCACAF Departments. It is
across all of the debrief reports. The Team
a consolidation of all the positive and negative
Workshop held in Chicago in March, the Venue
areas that were observed throughout all phases
Operations Team Workshop held in Miami in May,
of the organization of the Gold Cup. The report is
and the monthly, then weekly, staffing calls were
broken down by department and/or by supporting
all vital to the success of the Gold Cup. For many
agencies and venues, with comments received
of the CONCACAF employees and several of the
by members reported on their own department,
agencies, this was their first Gold Cup, so these
as well as feedback that others had about
groundwork trainings were extremely beneficial
departments they interacted with. This report is
to them. Looking to 2015 and beyond there are a
not meant to point out anyone or any particular
handful of improvements to be done but without
department as the best or worst, but there are
a doubt, the 2013 Gold Cup was a very successful
areas that need more attention than others and
competition which will only get better with more
received more feedback.
integration and earlier planning.
5
6
SUCCESS STORIES • Preparation for the 2013 Gold Cup was better than previous editions. Great team workshop in Chicago and Staff Workshop in Miami giving everyone the chance to meet members of other areas involved. • Starting venue inspections 9 months out was very beneficial to the success of the event. • All Agency meetings were very helpful and allowed continued dialogue with the venues • Adding the extra 30 minutes in between games was well received by teams and TV, and made it easier on game operations to get second games started on time. • CONCACAF staff appointed as Pod Managers/ Account Managers was well received by teams, thankful to work with the same person before and during the Gold Cup. The Pod Managers also acting as Assistant General Coordinators was an extra resource to the General Coordinators • The Venue Team concept worked well, having primarily the same group of staff work across different venues maintaining consistency across all venues . • The General Coordinator Handbook and the Pod Managers Manual were excellent tools.
• The regulations improved overall, allowing more flexibility on selecting players, but could still use some work to clarify some grey areas. • The charter flights in general worked great, with very few inconveniences. • Quality of TV production was a huge improvement from the past. • New media elements were great: new Gold Cup website, Gold Cup app, video footage/golden moments, live game tracking online, statistics reports, behind the scenes documentaries. • The Interactive Gold Cup was a great innovative idea, and the stage for it could not have been better. This project has great potential and should be fully supported across departments. • Nice to see more branding all around the stadiums but also the cities. • A great security plan around Team Cuba accomplished that all members of the Cuban Delegation returned home, first time ever in history of Gold Cup.
7
8
GENERAL COMMENTS AND RECOMMENDATIONS ABOUT COMPETITIONS • Need to revise 35-man roster whether it should be binding or not and the deadline • Need to review whether we should allow any changes to be made to the 23-man roster and a deadline. As well as to make injury changes to 23man roster after the teams’ first games, especially if we don’t continue with the 4 player exchange clause after group stage • 4 Player Exchange - a very positive addition with very little down side for the competition. Accepted in this case due to player release issues and one we should apply to 2017 Edition, but not the 2015 edition • Need to add to regulations that CONCACAF shall release rosters first to the general public
• Need to review whether we book air travel for teams or simply give them a travel grant • We should consider fines for late submission on paper work; need to emphasize more discipline • Need to add a clause about players getting replaced from the start list before kickoff after an injury during warm-ups. This created a lot of confusion in one match and we should clarify the procedure • Should add a clause about blood on the uniforms • Need to add a clause for teams to autograph balls and jerseys for CONCACAF to use for promotion of the Gold Cup; it’s not professional for CONCACAF staff to ask for these items during the competition
9
10
• Reconsider if teams playing in the first round
• Careful consideration should be given to how
together should play each other again before the
many officials are appointed for the Gold Cup, as
final
it made it very difficult to find adequate seating
• Should the numbers on jerseys only be from 1-23,
areas for the larger delegation we had. We also
if the 35 roster is non-binding, or just 1-35
need more and better suites
• The Observer program should have a dedicated
• The concept of an Event HQ (either at a hotel
staff member to look after them at all times,
or CONCACAF office) was a positive initiative.
should be more organized
However, key personnel should be concentrated
• There should be an application process and
in one place to ensure that time is not wasted
deadline to better focus and direct observers to
in dealing with on-going issues and immediate
get the most out of the program and to ensure
actions can be decided upon. Otherwise, A daily
CONCACAF’s investment
call between key operators and HQ is something
• The Observers for Gold Cup should attend other
we should do
CONCACAF events prior to Gold Cup
• CONCACAF needs to have stricter guidelines
• Need to assign a CONCACAF official to deal with
as to what teams are allowed to do with regards
all doping control needs prior to the competition
to playing friendlies in the same venues as they
and the Doping Control officer should attend the
will play in the Gold Cup. Perhaps a 3 week buffer
workshops
period whereas a team that will play in Gold Cup
• There were many new match commissioners
cannot play in a friendly in a venue that will host a
appointed that had little to no experience in their
Gold Cup game
role
• The team uniform guidelines and requirements
• Communication
of
Match
Commissioner
need to be included in the regulations
assignments per game should be done by
• Fines should be imposed for late submission of
Competitions HQ directly with the Match
the team forms
Commissioners at least two days in advance • CONCACAF should make all match forms available electronically to all match officials • TSG, MC, DC, observers need a staff/liaison to be with them upon arrival at venues and assist them throughout the competition; need to clarify F&B at stadiums and per diems
11
12
GENERAL COMMENTS ABOUT REFEREE MATTERS
GENERAL COMMENTS ABOUT TECHNICAL STUDY GROUP (TSG):
• CONCACAF Elite Referee Course needs to be
• Proper accommodations need to be set and
better incorporated into the Gold Cup.
communicated throughout well in advanced for
• Venue Managers should be in greater contact
each venue.
with the Referee Department during the planning
• TSG will be better integrated into the planning
phase.
phase for future editions.
• Lead Referee Instructors need to be identified and incorporated in the planning phase: Summit, Workshop, etc. • Referees and Officials should be provided with all meals, eliminating the need for meal per diems. • Wire transfers continued to be an issue. CONCACAF must look into alternatives to simplify this procedure. • With the foreseeable termination of the CONCACAF New York studios, CONCACAF will need to find a suitable location for the two FIFA Referee representatives.
13
14
GENERAL COMMENTS ABOUT OPERATIONS • To have consistency across all venues, CONCACAF
was very successful and a good initiative but we
should request the use of standardized equipment
must make appointments earlier and include all
for all venues, such as using the same team/
key departments in this concept
referee benches, goals, nets, corner flags, etc
• A Replay in stadium Policy needs to be developed,
• Goldcup.org email address was a great idea but
whether in a video or presentation form
should be implemented much sooner and the
• All PA announcers need to be screened ahead
webmail portal was bulky and inefficient
of match day to evaluate quality and bilingual
• The blackberries should be pre-programed with
capabilities. PA announcers must attend MD-2 or
all phone numbers/profiles before distributing
MD-3 staff meetings and MD-1 rehearsals
them
• There needs to be more match day radios, at
• Event contact lists should have photos of
least 30 per venue
everyone and be completed much earlier
• Need
• Adding last minute elements to the pre-
management, thunder and lightning, detailed
game ceremonies should be avoided. Pre-game
security plans, pitch invasions management, and
ceremonies are rehearsed on MD-1 and making
other emergency scenarios including anti-racism
changes or adding presentations to politicians
and discrimination
or adding kids to player escorts on game day
• All General Coordinators should enforce the daily
jeopardizes the execution of the ceremony
staff meetings at hotels including representatives
• The photo boards were never discussed with
from transport, protocol, POD managers, media,
game operations, and should be reconsidered
public relations, sponsorships, others
• TGI at were very helpful but had too much on
• Stadium field width’s was much better overall
their plate with all the new elements introduced
than in 2011, but we can still improve this
for this Gold Cup: ball stand, entrance tunnel,
• Going forward, it is suggested that a referee
photo boards, and UNAIDS boards
instructor and the VPO attend the Team Arrival
• Ticketing- there should be a department assigned
Meetings and have brief meetings with the teams
just to manage tickets, suites, and hospitality
on their respective areas
• The newly implemented Venue Team Concept
to
formalize
protocol
for
crisis
15
16
GENERAL COMMENTS ABOUT STADIUMS • Jeld-Wen Field- Portland
• Sports Authority Field at Mile High- Denver
o Practice times was difficult to plan for as we
o CONCACAF or SUM needs to further designate
didn’t get a schedule until 1-2 days before the
roles of each agency: Rapids, SUM, etc. It felt like
event.
the Rapids were unclear on a few things leading
o No CONCACAF Staff on-site when many
into event.
questions needed to be directed towards
o VM was great to work with but there were several
CONCACAF.
items we had discussed that we had to re-hash
o Different information from GC and VM, they were
before the event; I think he was just stretched too
not on the same page which caused confusion
thin.
with our staff. We had to repeat and give out the
o Lack of communication on who was running
same information multiple times because not all
point for the in-game presentation and big screen
CONCACAF staff were given details prior to their
tv production; a handful of folks that we met on
arrival.
the initial meetings weren’t part of market team.
o We needed a better understanding and more
o The stadium turned into a warehouse and
advanced notice of the credentialing system.
distribution point for housing posters/flyers, which we were happy to do, but was not expecting that role.
• AT&T Stadium- Dallas o Concerned
about
the
teams’
satisfaction
o Having one master checklist that the group
regarding the condition of the pitch.
can share with amongst each other would be
o Our team received an inventoried donated
beneficial and more time with the GC and VM to
beverage product without prior notice.
cross references our checklists.
o On MD-1 and MD we were receiving last minute calls to move the product while we were also
• Century Link Field- Seattle
preparing the stadium for the event; Ideally this
o Very small window to sell tickets- we had last
would take place 10 days prior to the match.
minute notice that we were able to sell these
o Confusion with Futbol Fiesta as we did not
as group tickets and with more notice we would
receive information until a week prior to load-in.
have been able to loop these ticket offers in with
o To improve, the stadium will clarify the usage of
Sounders offers and had more success.
suites, including the Owner’s Suite in the contract
o There was a lack of knowledge within our fan
17
18
base about this event. o We successfully built relationships with Mexican
VENUE MANAGERS
store owners for future events.
• Lack of communication with Referee group
o We could be more help with ticket sales if SUM
and Venue managers at many venues to confirm
consulted us about the market.
water/Gatorade requests; this caused problems when their schedule changed.
• Rentschler Field- Hartford
• Venue Managers had difficulties dealing with
o There could have been a better job of co-
Protocol especially when they were requesting
promoting the event using our marketing strengths
police escorts the day before the match which was
We were not aware on match day that we were
very difficult.
responsible for putting up additional signage; we
• We need to create a hierarchy for MD-2 until
need to know ahead of time to help facilitate.
kick-off on who is the final decision maker as
o We will look into power redundancy for the lights
some Venue Managers had had GC and AGC’s
and building.
contradicting each other and AGC v AGC as well
o CONCACAF needs to improve on management of
• The lack of coolers across the 13 cities was an
team vehicles, organization of suite assignments,
issue and messy. All sorts of colors, types, brands
VIPS not having the proper credentialing.
(covered with tape). It would be more consistent and improve the look if all were the same. • Most cities used 3 practice facilities, which we should plan better and not contract fields that were not used as the charges are high for these fields. • The addition of a contract manager was great help for the Venue Managers. • CONCACAF should consider using its own staff as Venue Managers in future editions if it wants to have more control of the operations
19
GENERAL COMMENTS ABOUT BROADCAST
20
• From a Broadcast point of view, the early
differences
selection on venues was a huge help for planning
• more information flow between HB and
• All information going to broadcast networks
operations team of concacaf
need to be funneled through one point
• plan for next GC to have television coverage of
• TV production was not consulted on important
teams’ trainings
maters i.e. 3D rugs for field- company making rugs
• A representative from the TV production team
did not consult with production directly regarding
should be in venue by MD-3 to attend the last all
camera positions and was not aware that in some
agency meeting with the venue team
stadiums we had moved our camera positions
• The CONCACAF production team should consider
enhance production
having three crews of production teams traveling
• Best crews/teams for production since the World
around the venues, to reduce the risks, and to
Cup which resulted in world class production
have production crew in venues earlier than MD-2
• There needs to be full integration between
• CONCACAF should include in the regulations
production and web production to increase
that the host broadcast should have access to the
uniformity and control of product. Two separate
team locker rooms before the teams arrive to the
departments causes duplication of effort and
stadium.
GENERAL COMMENTS AND RECOMMENDATIONS ABOUT MEDIA • Media should not receive “all venues” credentials
active and involved with assisting VPO on MD-1
(except right holders). They should select which
and MD. It seemed they were being pulled away
venue they will attend during the application
from Media Ops to cover other demands
process
• Need more clarity on the role of the Broadcast
• An idea would be to issued secondary access
Liaison BLO vs. the role of the VPO
devices to the Media, SADs, to give them access to
• The VPOs should attend the Team Arrival
the venues with all access credentails
Meetings going forward, as media’s section during
• Need to create a centralized formal system for
the Match Coordination Meetings was too long
seat reservations/ticketing for press box
• The stats portal was a bit challenging being off-
• Need to reconsider if Coach press conference on
site. The communication between the stadium
MD-1 should take place before training or after
and stat crew should have begun well in advance
training to facilitate things for the media
to game day
• Data Factory- stats crew had issues with them
• Some VPOs were busy working on MLS All-Star
and Data Factory said they would consider the
Game, which caused disorganization
solutions, they never made any changes; the
• Directional signage needs to be much bigger
program is also in Spanish not English
• Need
• Game notes were not delivered until game day;
between tv, media, and competitions concerning
unacceptable during knock out round
operational issues such as half-time and full-time
• Game notes should also be shared with the host
interviews, filming in the locker rooms before
broadcaster and rights holders
team arrival, etc
• Lineups to VIP suites need to be better
• For flash interviews, it is suggested that a
coordinated with a representative from protocol
secondary location be identified in each venue for
• Media gifts were very well received and a trophy
doing interviews in rainy conditions
coordinator was key on publicity front • CONCACAF Press Ops needs to be more present,
clearer
guidelines
pre-tournament
21
22
GENERAL COMMENTS ABOUT MARKETING • Considering Traffic did not have a lot of time to
should be considered to raise awareness and
sell the GC, they worked hard; however should they
promote the event. Also consider co-funding with
pursue GC ’15 they need to hire more staff and be
the cities to promote the destination
more organized
• We need a to set a cutoff date to make activation
• Partnership marketing needs to be more involved
go smoother as there were too many last minute
in the coordination among the video producer, PA
deals being done and created a lot of confusion,
announcer, and cameraman to be able to pull off
especially with local sponsors
all the expectations of the sponsors
• Field boards- we had to angle field boards in
• Suggest that a sponsor representative participate
venues because there were too many. This became
directly in the jumbotron rehearsals together with
a problem when field boards were invading the
Traffic on MD-1 which could protect Traffic and
warm-up space for substitute players
CONCACAF when execution fails
• Mstyle should be included from the early stages
• PM needs to designate an internal member of its
of planning and site inspections. M Style will
team to centralize artwork and pre-approvals
also provide a dedicated creative hub and FTP for
• Traffic wants to participate in stadium décor and
all parties and stakeholders for access to brand
sponsor exposure process, hotel & transportation
assets, as well as a single destination for all
branding, and engage in planning meetings with
approvals on creative and brand elements.
future hospitality vendor to negotiate trade
• Need to add pre-game and halt time concerts at
and sponsorship investment with air, hotel, and
each game
transportation partners prior to negotiating
• CONCACAF needs to have a dedicated trophy
exclusive service agreements
tour person or even agency that can protect the
• Activation areas need to be strategically selected
overall image of the trophy and how it is used in
based on fan traffic flow
different events across the markets
• The presence of out-of-home media in key areas such as airports, major transportation modes, and key transportation arteries and near venues
23
24
GENERAL COMMENTS ABOUT TRAFFIC' • For Traffic, it would have been helpful to
• Traffic observed questionable marketing support
have a clearer understanding of CONCACAF’s
in key cities with large venues. The perception was
negotiations with each venue so they could
that the advertising and promotional campaign
contractually commit to important elements for
investments were insignificant or non-existent.
sponsors like field appearances, player escorts, ball kids • Traffic was not prepared to review the Certificate of Insurance forms that were required to complete the Activation Forms so time was spent to review before sending to CONCACAF for approval • Traffic feels they could have managed tickets and hospitality suites if the allocation could have been given a month in advance taking the pressure off CONCACAF.
25
26
GENERAL COMMENTS ABOUT TRANSPORTATION / ACCOMODATION
private meal and meeting room that is adequate.
• Gameday was great to work with, were always
staff who then had to deal with the team
willing to help and solve issues and transport
complaints
hardly failed, considering how late they joined
• Teams didn’t find out about their hotel until very
the program. We need to be more precise with
late; extra rooms were an issue to request; Cartan
our staff and officials and outline what’s allowed
took decisions before the tournament without
regarding cars, buses, to avoid confusion
asking teams
• Transportation managers need to make sure
• Cartan needed to arrive to hotels prior to teams
drivers learn the routes to stadiums and training
to iron out all meal/meeting arrangements
fields
• Flights of MC, DC, TSG, Observers, Referees took
• Credentials should be given to bus drivers,
3 weeks to book when list is submitted in advance
equipment drivers, because they had issues
• Cartan did not include a block of rooms for SUM
entering
staff working Gold Cup, such as Venue Managers,
• Working staff from agencies should take taxis to
Press officer, or the Traffic team and Sponsors
hotel instead of private car service
• There was very little branding at hotels, which
• All hotels need to have the matches available on
was under everyone’s impression that Cartan was
their televisions.
responsible for, and received branding from Mstyle
Some teams were presented with insulting meals and meeting rooms • Cartan had multiple issues with bookings hotel rooms, meeting rooms, lunch rooms and information was very late in coming to CONCACAF
in advance
CARTAN
• The office space chosen at each hotel was shared
• Cartan was not up to the task in terms of hotel
among many departments, which was not efficient
bookings which made operations very difficult
• HQ hotels should not be picked in large hotels
• They seemed disorganized and they were not
near convention centers, too much going on
prepared for the amount of work required for this
• The breakfast fixed amount needs to be
event
reconsidered
• Guidelines were given to Cartan very early on that teams should not be in same hotel and that teams must be on a single floor, must have their own
27
BYROM • Byrom could have assisted more at the stadium
• Protocol in the hotels should have been Byrom’s
in both protocol and hospitality fields
exclusive responsibility
• Some properties chosen were due to the fact that
• Byrom did not have access to hotel contracts
there were no other options available because of
so were not able to foresee issues that were
the contracting decision took place only 5 months
encountered
(Feb 2013) prior to the start of the GC • Inspections should be done between 2 years in advance allowing enough time to negotiate rates • In some specific cases with hotels, information was not complete and therefore Byrom had to improvise and find alternative solutions for situations that could have been avoided • TPS data entry for participants should not be
28
the sole responsibility of the accommodation department; this should be a shared responsibility between every department as it will speed the data entry process
CHARTERS • Charters worked great, Miami Air was better than Allegiant Air, who had mostly old planes • Miami Air needs to clarify the of departure/ check-in time to ensure this is a smooth process • CONCACAF must send a letter to TSA to request that use of Gold Cup credentials instead of government issued ID to board the plane as it delayed the process several times • Cartan did a good job with the Agreement with Miami Air but needed to understand when to allow CONCACAF to handle it. Did not investigate Allegiant Air well and were not up to the level of Miami Air in key cities with large venues. The perception was that the advertising and promotional campaign investments were insignificant or non-existent.
29
30
GENERAL COMMENTS ABOUT PROTOCOL • Protocol was one of the weakest groups of the
of these persons well ahead of time.
Gold Cup, but considering how late protocol was
• Would be a great idea to create a profile on each
organized, with Morevents joining as late as May,
ExCo member i.e. likes, dislikes, family member
things went ok
names, primary language, allergies, favorite food,
• The invitation process to VIP events, party, etc
doesn’t like to share cars, etc;
should have been completed much earlier and
• Welcome letters, hotel check in, departure letters
could also be distributed and confirmed via an
need to be prepared much more in advance
online process
• Protocol staff needed more TPS Training. They
• There were multiple lists of VIPs being sent
did not care to use TPS and relied on Byrom and
around, which caused confusion and duplication
Adriana
of efforts
• The VIPS that were on charters were not noted in
• Morevents assisting with airport pickups caused
TPS so it created confusion
confusion of who was ultimately responsible
• Establish budgets ahead of time for F&B in each
• There were multiple working officials that were
city for VIPS to maintain a consistent product
also VIPS- all agencies need to know the treatment
31
32
AREAS FOR IMPROVEMENT • Hotels for the teams were poorly selected and
• The Observer program was not organized properly
were not prepared to meet their needs
and many observers were appointed late
• Travel agency need to improve in terms of hotel
• The Technical Study Group as well as Disciplinary
bookings which made operations difficult, did not
Committee and other appointed officials were a
inform CONCACAF of the issues until it was too
problem in more than one venue, making many
late and the teams got frustrated and upset
demands and setting high expectations
• Transportation was very efficient but also very
• The Gold Cup Regulations, although improved,
confusing as to who (internal staff, vips, guest,
created a lot of confusion at the start of the
etc..) was entitled to have transportation; some
competition with the binding vs. non-binding
venues had cars while others had minivans and
rosters
even 50 passenger buses
• Some General Coordinators were more experienced
• The training fields were not all up to the standards
than others. Time permitting, would be a good idea
for an international competition
to have prospective GC’s travel to other CONCACAF
• There was poor communication among different
matches (CCL, U-20, U-17) to gain experience in
functional groups and agencies, creating extra
CONCACAF events, this way Gold Cup is not their
work for others and frustration among the group
first event
• Unclear roles and responsibilities among several
• Pre-game protocol was messy at times due to
groups
new elements added late and different from past
• CONCACAF’s Protocol department was difficult
editions without much consideration given to
to work with, did not share information and
starting games on time for broadcasters
created confusion at many of the stadiums
33
34
FUTURE PLANNING AND PREPARATION: • Planning for the 2015 Gold Cup should start even
security plans for each venue and a detailed Gold
earlier, September or October of 2013
Cup specific security plan should be mandatory
• Ideally, all venues for the 2015 Gold Cup should be
as part of the venue selection process. We should
selected by no later than september 2014
consider the appointment of a security officers
• The stadiums’ selection criteria was largely left
per each venue and use highly experienced FIFA
to SUM. CONCACAF should lead this process and
Security Officers from our region
include cities, states, sports commission etc.. as
• Security for teams such as Cuba should be
part of the bidding process
planned early on and involve the security officer in
• Active participation of the Host City in our events
the planning process and hotel selection process
should be a requirement in the Venues selection
• The Team Workshop perhaps was too early being
• Careful consideration must be given to other
four months to the start of the competition as
events taking place in the venue, including in the
many teams forgot most of the points. Ideally it
negotiations that no other event can take place at
should be held three weeks before teams have to
least three weeks before the Gold Cup games. We
submit all the forms, or 8 weeks from start of the
had some close calls with the concert in Chicago
tournament
and the football/lacrosse line in Denver
• The Venue Team Workshop for the staff needs
• CONCACAF should select venues with natural
to be more dynamic and have more breakout
grass for all quarterfinals, semifinals and final
sessions to discuss real scenarios and solutions, as
games, or ensure that the best vendor possible is
opposed to just presentations. It would be a good
used for grass installation
idea to hold this workshop at one of the selected
• During the venue selection process, CONCACAF
stadiums and have real “what if” situations and
has to be clear with all venues on the requirements
solutions
for pitch cutting patterns as not all venues
• There should be two workshops, one 2-3 months
respected the policy in 2013
before the Gold Cup and the last one closer to the
• SUM and the ticket sales perspective should
start of the Gold Cup, once most of the information
remain a key factor in developing the venue
is confirmed. All hotels and trainings fields must
selection
be confirmed before the final workshop
• CONCACAF needs to be more involved in the
• The TLOs should be part of the workshops, so their selection should be done earlier
35
36
• The All Agency meetings were great, however, the
were towards NFL venues
GCs, VMs and representatives from all other areas
• For the 2015 Gold Cup planning phase, CONCACAF
need to attend, including partnership marketing,
President and General Secretary should meet
media, broadcast, accommodations and protocol
directly with the venues to get a feeling for their
• The training fields need to be inspected during
committmenet to Gold Cup
the venue site inspections and not leave it to SUM
• During the RFP process, CONCACAF should
to decide. The fields were decided very late and
provide content to the bidding venues, with video
left no time to inspect them, some were bad
clips, information on previous editions, to raise
• Team hotels should be picked after the training
their awareness of the Gold Cup
fields to assure distances are kept as short as
• For
possible
involvemement from local government and have
• CONCACAF should have a staff member
them be acting as LOC as opposed to SUM acting as
dedicated to hotels during the planning phase and
the LOC, as this will ensure greater committement
competition
from local authorities
• The account managers and an accommodations
• CONCACAF should appoint a local project
representative should go visit all hotels together
manager or marketing manager in each venue a
with a representative from their teams, at least six
year or six months before the Gold Cup to oversee
weeks before the Gold Cup or after the
all preparations for the Gold Cup
2015,
CONCACAF
should
get
more
• A timeline needs to be created for the planning process of the 2015 Gold Cup, with dates for meetings • Develop a budget to any major spending, which should be a key part of the early planning stages • All General Coordinator checklists need to be revised and improved • CONCACAF needs to make sure that all venues selected for the 2015 Gold Cup truly value the Gold Cup as a major event, and not just a regular one off game on their calendar • During the planning phase of the 2013 Gold Cup, SUM was not as critical towards MLS venues regarding their contractual obligations as they
37
38
CONCACAF GOLD CUP 2013: DATA POINTS GENERAL Matches 25 Venues 13 Teams Participating
12
Tickets Sold
432,660
Fans in Attendance
511,524
Average Fans in Attendance
39,348 MATCH STATISTICS
Goals 67 Shots on Goal
574
Assists 44 Passes
13,114
Corner Kicks
231
Penalties 10 Referee Matters Referee Delegation Size
55
Referres and Assistant Refs
30
Referees In-Training
9
Referees retained for quarterfinals and semifinals
21
Referees retained for Finals
5
# of Nations Referees Were From
12
Hours Spent Training on the Field during Gold Cup
66
Hours spent in post-game debrief sessions
82
Game Clips Prepared and reviewed during debrief sessions
226
Total Yellow Cards
71
Total Red Cards
3 TRANSPORT & ACCOMODATIONS
Total Miles Traveled (Charters)
20,124.95
Total Passengers on All Flights (Charters)
1,753
Total Flights (Charters)
20
Total # of Hotels
76
Room nights
10860
Rooms (Peak night)
630
Guests 920 Flights (including Team)
3199
39
40
MEDIA & BROADCAST Total Air Segments
446
Total Crew
719
Total Uplinks
27
Total Satellite Hours
293.5
Total Media Accreditation Requests
1748
Total Credentials Approved
2368
Total Media Outlets That Covered the Gold Cup
980
# of Counties Media Members Came From
30
Total # of Photographers
534
Total # of Broadcasters
25
Univision Viewership GC13 Final
2,102,000
FOX Viewership GC13 Final
2,358,000
Total National Viewership of GC13 Final
4,460,000
Total Viewers Reached by Univision 18,000,000 PARTNERSHIP MARKETING Total Sponsorship Partners
9
Total Activation Area (sq. ft)
234,260
:15 PA Announcements Read
754
(3:14:00) :30 Sponsor Video Spots Played
650
(5:41:00) Player Escort Kids/Ball Kids/ Flag Kids 286/156/182 Official Gold Cup 2013 Programs
57,100
Suites used
147
Bottles of Water Consumed
35,184
WEB & SOCIAL MEDIA YouTube views
1,100,000
Minutes Watched on YouTube
1,800,000
YouTube Subscriber Growth
51%
Visits to CONCACAF.com
3,500,000
Unique Daily Visits to CONCACAF.com
1,600,000
CONCACAF.com Page Views
8,200,000
41
Return visits to CONCACAF.com
52%
CONCACAF.com Promotion Impressions
10,319,540
Twitter Followes
50,000
#CONCACAF Twitter Mentiosn
56,436
#COPAORO/GOLDCUP Twitter Mentions
40,903
Gold Cup Mobile App Downloads
21,600
Increase in Likes on Facebook
65%
Increase Engagement Rate on Facebook
45%
STAFF/ACCREDITATIONS CONCACAF Assistant General Coordinator
6
CONCACAF Assistant Referee
19
CONCACAF Executive
2
CONCACAF Guest
42
CONCACAF Official
6
CONCACAF Staff
104
CONCACAF Disciplinary Committee Member
11
CONCACAF Doping Control Staff
27
CONCACAF Executive Committee
14
CONCACAF General Coordinator
6
CONCACAF General Secretary
7
CONCACAF Gold Cup Committee
1
CONCACAF Match Commissioner
17
CONCACAF Observer
20
CONCACAF POD Manager
6
CONCACAF Referee
47
CONCACAF Referee Assessor
6
CONCACAF Referee Instructor
7
CONCACAF Referee Liaison
16
CONCACAF TLO
15
CONCACAF TSG
8
Cameraman 106
42
Engineer 9 Photographer 517 Producer 99 Videographer 71
Writer/Reporter 867 Host Broadcast
243
Radio Personnel
26
TV Personnel
624
Sponsor Activation Staff
260
Sponsor Staff
86
Assistant Venue Manager
14
Assistant Venue Press Officer
3
Broadcast Liaison
6
Day of Game Volunteer
116
Doctor/Medical Staff
22
Game Production
93
Local Team Liaison
42
MLS Team Staff
93
Photo Marshal
58
Press Box Staff
105
Protocol Staff
6
Security 77 Service Provider
324
Stretcher Crew
132
SUM/MLS Guest
10
SUM/MLS Official
49
Transportation Staff
2
Venue Manager
15
Venue Press Officer
5
Venue Staff
743
Volunteer Manager
10
Team Administrative Team Staff
66
Team Coach
68
Team Head of Delegation
11
Team Medical Staff
74
Player 427 Team President
7
Team Press Officer
14
TOTAL ACCREDITATIONS
5887 MISCELLANEOUS
Total Mariachis at Rose Bowl
566
Total Fans in Attendance for CIGC13 Final
81,410
43
ANNEXES GOLD CUP 2013 SCHEDULE GROUP A MEXICO
DATE
DAY OF WEEK
VENUE
LOCAL KO TIME
TEAM A
TEAM B
SUNDAY
PASADENA, CA ROSE BOWL
2:30 PT
5:30 ET
CANADA
vs
5:00 PT
8:00 ET
MEXICO
vs
PANAMA
MONDAY
HARRISON, NJ RED BULL ARENA
7:00 ET
7:00 ET
EL SALVADOR
vs
TRINIDAD & TOBAGO
9:30 ET
9:30 ET
HAITI
vs
HONDURAS
PORTLAND, OR JELD-WEN FIELD
5:30 PT
8:30 ET
COSTA RICA
vs
CUBA
8:00 PT
11:00 ET
BELIZE
vs
USA
5:30 PT
8:30 ET
PANAMA
vs
MARTINIQUE
8:00 PT
11:00 ET
MEXICO
vs
CANADA
7:00 ET
7:00 ET
TRINIDAD & TOBAGO
vs
HAITI
9:30 ET
9:30 ET
HONDURAS
vs
EL SALVADOR
GROUP STAGE JULY 7
PANAMA JULY 8 CANADA JULY 9
TUESDAY
MARTINIQUE GROUP B
EST KO TIME
JULY 11
THURSDAY
SEATTLE, WA CENTURYLINK FIELD
MARTINIQUE
HONDURAS
JULY 12
FRIDAY
MIAMI, FL SUN LIFE STADIUM
EL SALVADOR
JULY 13
SATURDAY
SALT LAKE CITY, UT RIO TINTO STADIUM
1:30 MT
3:30 ET
USA
vs
CUBA
4:00 MT
6:00 ET
COSTA RICA
vs
BELIZE
TRINIDAD & TOBAGO
JULY 14
SUNDAY
DENVER, CO SPORTS AUTHORITY FIELD
1:30 MT
3:30 ET
PANAMA
vs
CANADA
4:00 MT
6:00 ET
MARTINIQUE
vs
MEXICO
6:00 CT
7:00 ET
EL SALVADOR
vs
HAITI
8:30 CT
9:30 ET
HONDURAS
vs
TRINIDAD & TOBAGO
HAITI GROUP C USA
JULY 15
MONDAY
HOUSTON, TX BBVA COMPASS STADIUM
JULY 16
TUESDAY
HARTFORD, CT RENTSCHLER FIELD
5:30 ET
5:30 ET
CUBA
vs
BELIZE
8:00 ET
8:00 ET
USA
vs
COSTA RICA
3:00 ET
3:00 ET
A2*
vs
B2*
6:00 ET
6:00 ET
A1*
vs
B3/C3*
QUARTERFINALS
COSTA RICA
JULY 20
SATURDAY
ATLANTA, GA GEORGIA DOME
BELIZE
JULY 21
SUNDAY
BALTIMORE, MD M&T BANK STADIUM
4:00 ET
4:00 ET
B1*
vs
C2*
7:00 ET
7:00 ET
C1*
vs
A3/B3*
WEDNESDAY
ARLINGTON, TX COWBOYS STADIUM
6:00 CT
7:00 ET
QF4*
vs
QF3*
9:00 CT
10:00 ET
QF2*
vs
QF1*
SUNDAY
CHICAGO, IL SOLDIER FIELD
3:00 CT
4:00 ET
WINNER SF1
vs
WINNER SF2
CUBA
SEMIFINALS 7/24 FINALS 7/28
44
GOLD CUP 2013 MAP
45
CONCACAF All rights Reserved 2013 1000 5th Street. Suite 304. Miami Beach FL. 33139 Tel +1 305 704 3232 | Fax +1 305 397 8813 www.concacaf.com