" , / 4UESDAY TH *ANUARY WWW CONCRETE ONLINE CO UK )SSUE
The  Late  Shift  @  The  Library Library  to  trial  later  opening  hours  for  this  semester News,  p.  2
CHRISTMAS Â FLOOD Â IN Â ARTS
!N APPLE A DAY 7HATgS YOUR .EW 9EARgS RESOLUTION P
-ARCUS *ONES %DITOR /VER THE #HRISTMAS PERIOD THE !RTS TEACHING BLOCK SUFFERED FLOODING AS A RESULT OF A BURST RA DIATOR PIPE %LECTRICAL EQUIPMENT INCLUDING A NUMBER OF COMPUT ERS AS WELL AS SIGNIFICANT SECTIONS OF CARPET WERE ALL DESTROYED AS A CONSEQUENCE 4HE RADIATOR IS BELIEVED TO HAVE BURST AT SOME POINT OVER THE WEEKEND OF $ECEMBER TH WHEN THE BUILDING WAS EMPTY BECAUSE OF THE FESTIVE BREAK 5%! 3ECURITY INFORMED THE %STATES $IVISION OF THE LEAK ON -ONDAY ST AND !N DREW 7ATTS A 4EAM ,EADER IN THE %STATES AND "UILDING $IVISION DESCRIBED THE INITIAL DAMAGE TO #ONCRETE h4HE WATER WAS ABOUT AN INCH DEEP AND IT WAS OBVI OUSLY HOT TREATED WATER FROM THE HEATING SYSTEM 4HE WATER AFFECT ED THE COMPUTER LABS ON FLOOR OF THE !RTS BUILDING AND CASCADED DOWN TO FLOOR AND AFFECT ING THE ).4/ OFFICES AND THE FILM ARCHIVE v 2OGER &EW FROM THE /VERSEAS $EVELOPMENT 'ROUP WHO CAME INTO WORK ON THE -ONDAY WAS ALSO A WITNESS TO THE FLOOD AT ITS PEAK h) CAME IN ON .EW 9EAR S %VE THROUGH THE BACK ENTRANCE OF !RTS NEAR THE %AST !NGLIAN AR CHIVE ) NOTICED WATER COMING DOWN THE STEPS AND WATER COMING OUT THROUGH THE DOORS AND A FEW HOURS LATER WHEN ) LEFT THE CARPETS WERE SODDEN v (OWEVER AS SOME ONE WHO ACTUALLY LOOKS INTO FLOOD HAZARDS IN DEVELOPING COUNTRIES HE DID CONCEDE THAT HE HAS hA SLIGHTLY DIFFERENT DEFINITION OF A @FLOOD TO WHAT HAPPENED HERE v !LTHOUGH NOT DEVASTATING THE WATER DID STILL HAVE AN EFFECT h4HERE WAS EXTENSIVE DAMAGE TO CARPETS AND COMPUTERS AND WE HAD TO LOSE SOME ELECTRICAL EQUIP
&EATURES
3TUDENT STABBED !TTACKS ON STUDENTS MAR THE #HRISTMAS BREAK P &OC 3OC
"RIE LLIANT 7EgRE INTRODUCED TO THE #HEESE AND 7INE SOCIETY P -ARCUS *ONES
MENT v CONFIRMED -R 7ATTS h/N -ONDAY ; ST= WE ISOLATED IT ;THE FLOOD= AND DID AN INITIAL CLEAR UP /N 7EDNESDAY ND WE DID A MA JOR CLEAR UP AND DISPOSED OF THE RUINED STUFF v 4HE FLOODING CAME AT A PAR TICULARLY INOPPORTUNE TIME FOR THE ).4/ SCHOOL WHOSE ADMIN
ISTRATION OFFICES ARE BASED IN THE BUILDING ! WHOLE NEW INTAKE OF STUDENTS ARRIVING FOR THE NEW SE MESTER REQUIRED REGISTERING FROM THE START OF *ANUARY -R 7ATTS HOWEVER WAS CONFI DENT THAT THE !RTS TEACHING BLOCK WOULD BE FUNCTIONING FOR THE START OF THE NEW SEMESTER h7E HAD CAR
PETS BACK IN BY 4UESDAY TH AND WE RE JUST FINALISING ONE ELECTRICAL UNIT BUT OTHER THAN THAT EVERY THING IS READY FOR THE STUDENTS v h7E RE PLEASED WITH HOW THE CLEAR UP WENT NO MATTER HOW MUCH MAINTENANCE WE DO
#ONTINUED PAGE
-OB RULE 4HE %VENT LOOKS AT 'ANGSTER l LMS AND MEETS CAST MEMBERS FROM THE 2OYAL 3HAKESPEARE #OMPANY 4HE %VENT