6055 730
6055
5325
1775
730
1775
5325
1775
D1
D1
2400
2400
socket @300
D1
waterproof socket @1100 DOUBLE
socket @1100
DOUBLE
socket @2350
DOUBLE
socket @650
single league single switch @1200
2438
2438
double league single switch
@1200
9w LED ceiling light IP66 outside wall light @2100
ceiling fan exhaust fan
1%
2438
2438
SMOKE ALARM
WM
1%
TV date
WM
DATA OUTLET
@300
8 circuit electric distribution box
1200
D2
2814
2527
2794
714
decking chassis Layout
REVISION
DETAILS
DWG BY
weak current box @300
1%
1200
1%
DATE
@1800
2567
cold water pipe
694
hot water pipe
electrical plan
PROJECT
710#- TOLMIE project
Drainage from the bottom directly
DRAWN BY
DATE
2019.08.22 CHECKED BY
SCALE CLIENT JOB NO
CLIENT CHARGED BY TITLE
JOB NUMBER
PROJECT NO
SHEET NO
SAVE CONTENTS
(living room wall) (bed room wall) 15mm Bamboo Floor
12mm gypsum board
12mm gypsum board
(bed room floor)
18 mm Cement board
BACK
(living room floor)
734
2000
2000
Corten corregated container top RHS strengthening PU+ rockwool insulation ceiling purlin (25mm) 12mm gypsum board (bathroom:12mm waterproof gypsum board)
60 714
M2 2000x2150mm
80
M1 2000x2150mm
RIGHT
80
2438
2158
M5 2158x2400mm
a C1 1800x450mm
1800
367 60 60
259 60
LEFT
2438
60 259
a
60
15mm Bamboo Floor 18 mm Cement board
6055
80
2794
774
2407
6055
FRONT
1# module
windows
25x1.0 SHS PU+ rockwool insulation 50mm purlin@400mm
BACK 6055 830
2407
774
Corten corregated container wall
1%
12 mm Cement board
C2 900x2150mm
a 964
60
900
60 830
2407
15mm bamboo floor(bathroom:300X300 floor tiles) 18mm cement board 80x40x2 RHS Rockwool insulation 0.5mm color-bond covered
60 714
a-a
6055
floor tiles
(Bathroom floor)
(kitchen floor)
Waterproof paint Cement mortar for slope 18 mm Cement board
102 80
200
2438
1800
M3 2407x2150mm
60
RIGHT
259 60
M4 800x2150mm
1758
WM
a
Waterproof paint
primary beam: 20# beam channel
C1 1800x450mm
1%
18
600 80 Wall tiles(Bathroom wall)
2438
LEFT
12mm gypsum board 12mm cement board
60 259
2044
15mm Bamboo Floor
(kitchen wall) Wall tiles Waterproof paint
18 mm Cement board
FRONT
12 mm Cement board
2# module
REVISION
DETAILS
DWG BY
DATE
PROJECT
710#- TOLMIE project
DRAWN BY
DATE
2019.08.22 CHECKED BY
SCALE CLIENT JOB NO
CLIENT CHARGED BY TITLE
JOB NUMBER
PROJECT NO
SHEET NO
SAVE CONTENTS
Corten corregated container wall
20# beam channel
∅75落水孔
774
60 367 60
2000
2000
319
734
2896
319
1800
319
319
1800 2438
6055
1# front
Corten corregated container wall 2438
2438
20# beam channel
∅75落水孔
20# beam channel
20# beam channel
corner post
corner post
2896
450
2496
2896
Open 1800*450
120X60X2 RHS
20# beam channel 964
60
900
60 830
2407
60
20# beam channel 60 714
774
20# beam channel 319
2044
1800
319
20# beam channel 319
1800
319
2438
2438
6055
1# back
2# front
DETAILS
830
2407
6055
REVISION
200
200
1100
Open 2407*2150
corner post
80X40X2 RHS 2466
2896
2150
120X60X2 RHS Open 900*2150
corner post
80X40X2 RHS
corner post 2896
corner post
2496
346
230
20# beam channel
1# right
1# left
1# back
Corten corregated container wall
200
20# beam channel
20# beam channel 60
2438
6055
2496
corner post
2496
120X60X2 RHS
20# beam channel 714 60
corner post
Open 1800*450
1700
Open 2000*2150
2496
2896
2496
2150
Open 2000*2150
200
200
2466
2896
120X60X2 RHS
20# beam channel 2407
450
corner post
80X40X2 RHS
80
2794
20# beam channel
2896
200
230
corner post
80X2 SHS
2438
20# beam channel
346
20# beam channel
Corten corregated container wall 2438
DWG BY
DATE
PROJECT
710#- TOLMIE project
1# right
1# left
DRAWN BY
DATE
2019.08.22 CHECKED BY
SCALE CLIENT JOB NO
CLIENT CHARGED BY TITLE
JOB NUMBER
PROJECT NO
SHEET NO
SAVE CONTENTS
410
785
M14 Tapping hole
XZ2
365
83
285
1
315
313
83
2598
2636
primary beam: 20# beam channel 1220
120 363
407
407
407
407
407
407
407
1220
407
407
407
407
407
870
672 6055
983
1220
120 363
407 166 120
407
1220
407
407
407
407
407
407
814
1220
407
407
407
407
407
100
primary beam: 20# beam channel
∅18 hole
20# beam channel 20# beam channel
30 800
800
800
800
800
858
o
198 1045
20# beam channel
1045
1045
1045
1045
816
2438
2438
800
30x3mm挡水条(通长)
80x40x2方管
2
20# beam channel
L-40X3 secondary beam: 2*40*80 RHS
Corten corregated container wall
∅18 hole
JB1 @800
20# beam channel 198
25x1.0 SHS@800
407 166 120
2# bottom frame ∅18 hole
20# beam channel
200
1098
6055
1# bottom frame
20# beam channel
secondary beam: 2*40*80 RHS
1220
6055
672
A-A
primary beam: 20# beam channel
1098
XZ1 M14 Tapping hole
1
2044
410
secondary beam: 2*40*80 RHS
1220
18
1220
A
∅18 hole
200
410
XZ1
83
18
∅18 hole
A
2496
1
313
102 80
XZ2
∅18 hole
315
365
18
XZ2
285
200
83
100
365
2896
2438
secondary beam: 2*40*80 RHS L-40X3
285
80x40x2 RHS
20# beam channel
2114
2420
2114 1592
2438 1758
2438 2114
2420
2114
2114
365
JB1
2035
secondary beam: 2*40*80 RHS 2438
XZ2
A 5695
658
100
285
1
L-40X3
5695
3.0MM steel plate flat roof
∅18 hole
2431
A
XZ1
410
2636
∅18 hole
503
XZ1
2598
∅18 hole
110
785
90
208
120
785
80 30
6055 785
785
2466
785
1747
830
1045
1045
1045
1045
1045
198 800
816
800
800
800
800
800
858
1-1
198
2
o
80x40x2 RHS 30
30x3mm挡水条(通长)
∅18 hole
JB1 @800
20# beam channel
20# beam channel
58
8mm steel plate
1# top frame
2# top frame
11
4
77
62
6055
6055
49 9
JB1
REVISION
DETAILS
DWG BY
DATE
PROJECT
710#- TOLMIE project
DRAWN BY
DATE
2019.08.22 CHECKED BY
SCALE CLIENT JOB NO
CLIENT CHARGED BY TITLE
JOB NUMBER
PROJECT NO
SHEET NO
SAVE CONTENTS
1770
150
1185 360 360 350 115 450
a
983
1050
100 672
672 100
2400
∅16
4xM5.5X19
100
B1
1200
1051
a
50
2516
CANOPY
420 420 420 420 420 427
100
785
40X40X3 RHS
40X40X1.5 RHS
150
∅16 100 785
U1 B1
40X40X3 RHS
50
100
2316
450
400 400 400 270 300
2527
450
D2(3 Pieces) 150x50x2 RHS U1
70 1030
50
70
U1 2P
25X2 SHS
2mm end cover plate
B1 4P
10
10
30
1450
∅8
B1
2200
∅10
B1 G1
12 13
2525
25 25
3mm plate 50
∅8 50
70
50 40 20
35 35
60
51 3mm plate
0.5mm color-bond
P1
60
150x50x2 RHS
50
D1(3 Pieces)
10
G1 2P a-a
REVISION
DETAILS
DWG BY
DATE
PROJECT
710#- TOLMIE project
DRAWN BY
DATE
2019.08.22 CHECKED BY
SCALE CLIENT JOB NO
CLIENT CHARGED BY TITLE
JOB NUMBER
PROJECT NO
SHEET NO
SAVE CONTENTS
50
45
160
160
50
50
The height of post depend to the corner lift.
45
45
120
176
4 Pieces
4 Pieces
50
REVISION
DETAILS
DWG BY
DATE
PROJECT
710#- TOLMIE project
160
DRAWN BY
DATE
2019.08.22 CHECKED BY
SCALE CLIENT JOB NO
CLIENT CHARGED BY TITLE
JOB NUMBER
PROJECT NO
SHEET NO
SAVE CONTENTS
674# Door& window list Name
Open size(WxH)
Szie(WxH)
Qty
Type
Mark
M1
2000x2150mm
1980x2130m
1
Sliding door
5+9+5mm Double glazing
M2
2000x2150mm
1980x2130m
1
Sliding door
5+9+5mm Double glazing
M3 M4 M5
2407x2150mm 800x2150mm 2158x2400mm
2387x2130m
1 1 1
Sliding door Open door Sliding door
5+9+5mm Double glazing
C1 C2
1800x450mm
1780x430mm
2
Sliding window
5+9+5mm Double glazing
900x2150mm
880x2130mm
1
Sliding window
5+9+5mm Double glazing
White paint wooden door White paint wooden door
2387 1980
880
1980
FIXED
FIXED
F
2130
430
2130
1780
1065
2130
2130
F
1065
FIXED
1065
FIXED
407
F
FIXED
F
1065
1980
F
C1(Window) M1 (Door)
M2 (Door)
M3 (Door)
C2(Window)
M5(Sliding woodend door)
Door & window list (From outside to inside)
REVISION
DETAILS
DWG BY
DATE
PROJECT
710#- TOLMIE project
DRAWN BY
DATE
CHECKED BY
SCALE
2019.08.22 CLIENT JOB NO
CLIENT CHARGED BY TITLE
JOB NUMBER
PROJECT NO
SHEET NO
SAVE CONTENTS