COPPER Architecture FORUM
32
www.copperconcept.org
The Regeneration Issue
EDITORIAL
The Regeneration Issue
Architecture from
Holland Hungary
ˇ FÓRUM O MEDI
Italy
Poland Russia
Belgium Czech Republic Denmark Finland France
Czech Republic • Denmark
Spain Sweden Switzerland UK
Greece Germany Holland
Inspirational architecture
Italy
and design with copper from:
Norway Poland
Austria • Belgium
Russia Spain Sweden
Czech Republic • Denmark
Switzerland UK
Finland • France Greece • Germany Holland • Hungary
EHTI KUPARIN AIKAKAUSL
KÄYTÖSTÄ
OLLISUUDES AKENNUSTE
SA• 24/2008
Austria
• Belgiu
m
Czech Repub
lic • Denm
Finland
ark
lehti
FO OR UM
kuparis
ta arkkite
htuuris
sa • 28 /20
I
10
Obytný komplex Frederikskaj v Kodani
Russia • Spain
• Hungary
Nová měděná střecha pro katedrálu v Roskilde
Sweden • Switzerland
Italy • Luxem
burg
Norway
KU PA RI
Norway • Poland
any
Holland
Greece • Germany
Holland • Hungary Italy • Luxemburg
• Franc e
Greece • Germ
Accordia – britský bytový komplex
United Kingdom
• Polan
d
Sportovní hala v Budapešti
Russia
Italy • Luxemburg
• Spain
www.copperconcept.org Sweden
Norway • Poland
• Switzerland
26
United Kingd
om
Russia • Spain Sweden • Switzerland
www.co
pperconc ept.org
United Kingdom
minassa ri Kööpenha pääkontto eskus n juutalaisk Nordin uusi GN Store skus voittaja: Müncheni vierailuke Copper Awardin kansallispuiston uusi Unkarin Aggtec –
KAUNIS
KoKo VUoSIS
28
8 Transparenta inskriptioner i Lettland – 10 Treklöver i koppar 22 Cipea Villa Nanjing i Kina – 26 En flytande bronstrapp – 36 Dipoli, en modern klassiker
www.copperconcept.org
Finland • France
2 9/20 10
FOORUMI
Hungary Luxemburg
I ture from UMitec ORArch KU PAR IFO
TIDNING FÖR BYGGBRANSCHEN OM KOPPAR I
KUPARI
New Initiatives from Copper in Architecture
Č ASOPIS O MĚDI A JE JÍM V YUŽITÍ VE STAVEBNIC T VÍ • 26/2009
Austria • Belgium
Norway
24
www.copperconcept.org
France Greece Germany
Luxemburg
MI
© Copper Architecture Forum 2012
IN ARCHITETT
Austria
KUPARIFOORU
birgit.schmitz@copperalliance.de kazimierz.zakrzewski@copperalliance.pl marco.crespi@copperalliance.it nick.hay@copperalliance.org.uk nick.vergopoulos@copperalliance.gr nuno.diaz@copperalliance.es olivier.tissot@copperalliance.fr paul.becquevort@copperalliance.be pia.voutilainen@copperalliance.fi robert.pinter@copperalliance.hu vadim.ionov@copperalliance.ru
DEL RAME
Forum Copper Architecture from with Architecture
30
Printing: Strålins Grafiska AB 2012, Sweden
LA RIVISTA
Finland
www.copperconcept.org
Layout and technical production: Naula Grafisk Design, Sweden
Denmark 3 1/20 11
COPPER ARChitECtuRE FORuM
Publisher: Nigel Cotton, ECI
3 0/20 11
Austria Belgium Czech Republic
URA I
oNKo KUPAR
29
Address: CAF, European Copper Institute, Avenue de Tervueren 168 b-10, B-1150 Brussels, Belgium
DAS MAGAZIN FÜR KUPFER UND ARCHITEKTUR I
Copper Architecture Forum with Architecture from
COPPER ARChitECtuRE FORuM
Front Cover Lund Cathedral Visitors’ Centre (pages 4-7). Photo: Åke E:son Lindman
Back cover The Granary, London (pages 12-15). Photo: Tim Crocker
Register now at www.copperconcept.org to make sure you receive your copy of issue 33.
The European Copper in Architecture Campaign was set up by panEuropean and local industry associations with the support of participating copper fabricators to promote copper and its alloys in architectural applications. It achieves this through various means, principally:
Editorial team: Lennart Engström, Ari Lammikko, Chris Hodson, Hannele Kuusisto, Hermann Kersting, Robert Pinter, Irina Dumitrescu E-mail: editorialteam@copperconcept.org
Editorial panel: Birgit Schmitz, De Kazimierz Zakrzewski, Pl Marco Crespi, It Nicholas Hay, UK Nikolaos Vergopoulos, Gr Nuno Diaz, Es Olivier Tissot, Fr Paul Becquevort, Benelux Pia Voutilainen, Se, No, Fi, Dk Robert Pintér, Hu, Cz, SVK Vadim Ionov, Ru
Shown here is a competition visual for The Museum of the History of Polish Jews in Warsaw - but how will it look in reality? You can find out in our next issue. The competition-winning design, by Architects Lahdelma & Mahlamäki (working in conjunction with Kurylowic & Associates in Poland) aims to create a ‘lantern in the park’. The design features a layered facade design using pre-patinated copper in combination with glazing. The play of advanced LED lighting behind the decorated glass on the green corrugated copper will play a key role in this luminescence.
31
The magazine is distributed to architects and professionals in the building construction industry in Belgium, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Italy, Netherlands, Norway, Poland, Russia, Spain, Sweden, Ukraine and United Kingdom.
Project Preview
rconcept.org ww w.coppe
Copper Architecture Forum is part of the ”European Copper In Architecture Campaign”. It is published twice a year and has a circulation of 25.000 copies.
Editorial Team
With a change of direction, our next issue focuses on new-build copper projects and how they are achieved. Alongside comprehensive case studies, including Copper in Detail working drawing and Close-up focus pages, we shall be discussing technical and topical issues – notably the impact of “Building Information Modelling” (BIM) techniques on architectural freedom.
FORuM
Copper Architecture Forum 32, April 2012
sion to a restored London warehouse (p 12–15) uses bronze cladding to define its thoroughly contemporary massing. In this case, an uncompromising form reflects the gabled profile of the original, creating a unified composition. A similar but lower key approach is taken with a London church extension (p 32–33). The relationship of new and old linked buildings is also explored with a new country house ‘orangery’ (p 8–11) in the Netherlands. This fresh take on an old typology is a heavily glazed pavilion with a curved, green pre-patinated copper roof which bonds it with the original house. A more literal stance is taken with Warsaw’s new water treatment plant (p 22–25) that refers strongly to the gabled forms and curved-head windows of its 19th century neighbours. Here, copper plays a more traditional role as a roofing material. And we consider the part played by copper in different forms – transparent and modulated – to regenerate uninspiring 20th century buildings (p 16–17 and p 30–31). We end as we began, with another example of a copper intervention reshaping the urban context of its older host – this time the former public baths in Thiene, Italy (p 36–38). Here, a redundant building has been given a new life as a unique youth centre defined by organic, curved copper shell additions. We hope you enjoy this journey around these inspirational projects, where copper acts as a catalyst for inventive architectural and urban regeneration.
COPPER ARChitECtuRE
This entire issue is dedicated to the ingenuity of architects in regenerating the environments that we live and work in. Preserving and adapting existing buildings and townscapes to suit new uses is sustainable, saving on resources and making the most of assets. But it also carries with it a challenge for designers in developing their particular interpretation of history and context for the 21st century. The diverse projects that we explore here demonstrate different approaches to this challenge and range from additions and interventions with existing structures, to new buildings interacting with the old to reshape urban areas. But one common strand runs through them all: the unique and numerous possibilities offered by copper and its alloys for architectural expression. Our cover story ably demonstrates this. Here, brass-clad forms worm their way amongst the urban fabric, defining new vistas and a fresh focus on Lund Cathedral. Initially bright and modern, the brass surfaces will soon darken and mellow, taking on a timeless feel. The same quality applies to the pre-oxidised copper interventions to an historic Italian villa (p 18–21), redirecting axes and circulation to suit the building’s new role as a hotel. Copper’s ageless and permanent nature is further reinforced by the brass elements added to a Spanish castle (p 34–35). Here, there is no pretence at literal reference but an abstract aesthetic totally in keeping with the massive stone remains. This approach has parallels with the use of copper to clearly express modern additions to a traditional Luxembourg village house (p 26–29). On a bigger scale, the new exten-
Copper Architecture Forum 33
ADAN – TAI PIDEM PÄÄNK VUoDEN IN • KUPAR 2009 I INSPIR IARKKITEHTU KUPARIPALKI oI • KUPAR NNoN VoITTA URI KESTÄ I oSUI KULTA JA • ISLAND VÄÄ? • SUoNE HAKAN CoPPER EN IEMENRANTA 6 – KUNNo STUSPRoJEK T
• an architect-focused website copperconcept – with a substantial and rapidly growing project gallery. • a pan-European architectural awards programme – the latest, 15th iteration attracting 66 entries of a particularly high standard. • Copper Architecture Forum magazine – with a circulation of over 25,000 throughout Europe and beyond. We are always looking for new ways to engage with architects and designers, particularly to find out about and publish inspirational designs and projects. Now, we are introducing a number of new initiatives: • Share your copper project – simply upload images and information yourself by following the instructions on the website. • Copperconcept Newsletter – register now via the website for this short, emailed update and you could win an iPad. • Copper and the Home Awards 2012 – seeking innovative and inspirational design ideas for the home from furniture to fittings and finishes, with categories for professional designers and students.
Register for the Copperconcept newsletter for a chance to win an
iPad 2!
Register for our NEWSLETTER in any of the available 17 languages to find out about the latest copper clad buildings and for a chance to win an iPad 2. All new registrations between
1 March and 30 June 2012
will be entered into a prize draw for an iPad 2. The winner will be informed via e-mail.
More information on these and all our initiatives can be found on the website – www.copperconcept.org
Contact us now. We do want to hear from you, both with your comments on Copper Architecture Forum and suggestions for projects or topics that we can cover in future. Simply email the editorial team or your local editorial panel member, listed above. COPPER ARCHITECTURE FORUM 32/2012
39
32
4
8
12
16
18
22
2 The Regeneration Issue – editorial comment
4–7 Divine Intervention
– a new visitors’ centre for Lund Cathedral, Sweden
8–11 Copper Continuity
– redefining the country house Orangery in the Netherlands
12–15 A Fusion of New and Old
– a modern bronze extension rejuvenates a traditional London warehouse
16–17 Copper Skyline
– regenerating wasted rooftop space in Helsinki’s city centre
18–21 Timeless Copper
– a copper-clad intervention restructures an Italian villa for new uses
22–25 Pure Water under Copper Roofs
– Warsaw’s new water plant refers to neighbouring 19th century buildings
26–29 Copper Cottage
– additions to a traditional Luxembourg house are expressed in modern forms
30–31 Box Top
26
30
– transforming a 1970s office building with a transparent copper skin
32–33 Copper for House on the Rock
– returning a 19th century London church to religious and community use
34–35 Timeless Brass 32
34
– simplicity and permanence define additions to an ancient Spanish castle
36–38 Urban Shell – distinctive copper-clad forms redefine the urban role of a disused
bath house in Italy
39 Back to the Future
– new projects in our next issue and Copper Architecture news.
36
COPPER ARCHITECTURE FORUM 32/2012
3
Divine Intervention A new visitors‘ centre in the southern Swedish city of Lund uses brassclad faceted forms to link together disparate existing buildings and to regenerate the square fronting the 12th century cathedral that it serves. by Chris Hodson
4
COPPER ARCHITECTURE FORUM 32/2012
Architect Carmen Izquierdo’s de-
pressive form – the auditorium –
ral way by capturing the scale and
sign, developed from a competi-
terminating with a funnel window,
lines of the existing buildings. The
tion-winning entry, is centred on
symbolically reaching up towards
motto of the winning entry was
the historic towers.
‘Portal and Atrium’, and the ambi-
way between several old build-
Adding to the Historical Strata
followed up with a completely new
ings, binding them to the com-
Carmen Izquierdo said: “The vi-
programme in the final design.”
a thoroughly contemporary brass
tions of the original proposal are
and glass intervention winding its
plete scheme. The street front-
sion was to create a contempo-
age to Kyrkogatan incorporates
rary building that adds a new
a brass canopy, simply continu-
layer to the historical strata that
ing the roof plane of the adjacent
make up central Lund. The new
building, with an entry forecourt
building endeavours to blend in
below. The building continues
with the townscape in a natu-
back to Kungsgatan, then extends towards the cathedral with an ex-
Brass... a natural material that gives a rich vibrant surface mellowing with age to blend in with the townscape.
COPPER ARCHITECTURE FORUM 32/2012
5
Internally, the dominant space is the entrance lobby, served both from the cathedral square and Kungsgatan. With its double height atrium, it is a convivial meeting place used for reception, exhibitions and refreshments, overlooked by offices on the upper floor. Here, the solidity of the plank shuttering embossed concrete walls contrasts with the openness created by fully glazed partitions. The expressive auditorium is designed as a unique space with
Architect: Carmen Izquierdo
its distinctive, trapezoidal funnel window framing views of
Copper Installer: Malmö Plåtservice AB
the cathedral spires.
A Gateway for Visitors Carmen Izquierdo added: “The building creates interesting
outer and inner sequential spaces and will be a gateway for visitors to the Cathedral and a forum for in-depth study and discussion. The new building has a simple but expressive design that interplays with the surrounding townscape through its angles and declivities. Brass was chosen for the new building’s external skin as a natural material that gives a rich, vibrant surface. As the material mellows with age, the building will gradually blend in with the townscape.”
In its new, bright state, the building is certainly asser-
tive and demands a response from visitors. But as the brass darkens naturally with age over the first few years, it will take on a more subtle, timeless quality. The forms and movement of the building across the site succeed in preserving important historic views while also creating new perspectives. More intimate and varied public spaces are also generated around and within the visitors’ centre. At its opening last year, Bishop Antje Jackelén aptly described the new building as “the Cathedral’s extended embrace”.
6
COPPER ARCHITECTURE FORUM 32/2012
Copper Product: Nordic Brass Photos: Åke E:son Lindman
DEPOT GROUP ROOM
CONFERENCE AND CHAT ROOMS BOOKSTORE ARKEN
OFFICE
AUDITORIUM
CLEANNING STAFF BOOKSTORE
KITCHEN LAURENTIIHALL OPEN AREA DOWN
PASSAGE
OFFICE
DEPOT / STORE
HALL BOOKSTORE ARKEN
YARD
YARD STAIRWELL
STAIRWELL
CONFERENCE
RESTROOM
FOYER
OFFICE
ELEV.
ELEV.
STAFF
DEPOT
EXHIBITION
ELEKTRICITY
INFORMAL MEETINGPOINT
YARD KUNGSGATAN
CHECKROOM
WAITING
RESTROOM
DEPOT / STORE PORTAL KYRKOGATAN
REPRO/ PRINTING
OFFICE
CLEANING
ENVIRONMENTAL ROOM
OPEN AREA DOWN
PASSAGE/ LIBRARY GROUP ROOM
OFFICE
REFRESHMENT OFFICE
DEPOT / STORE
DEPOT / STORE
GROUP ROOM
TECHNIQUE
ACTIVITY ROOM STAIRS
Ground Floor Plan Upper Floor Plan
COPPER ARCHITECTURE FORUM 32/2012
7
Copper Continuity Architects Braaksma & Roos’ interpretation of the country house Orangery uses copper to provide contextual continuity – but as a thoroughly modern material, as they discuss here. Commissioned by SAS Institute Inc., we developed a plan for their headquarters in The Netherlands. SAS (formerly known as “Statistical Analysis System”) is based in a grand, historic country house in Huizen. When the company approached us, the house had an extension wing that dated from the early 1960’s in decay. The essence of our design concept lay in replacing this extension with a contemporary interpretation of the Orangery – a traditional outbuilding associated with grand country houses. This was intended as a legible addition to the historical context of the original house, whilst at the same time setting itself apart as a thoroughly modern building.
8
COPPER ARCHITECTURE FORUM 32/2012
©Kim Zwarts ©Kim Zwarts
A dialogue was developed between old and new. A dialogue was developed between old and new. The original house is mainly defined by white plaster with glass as the collateral material, whereas the new Orangery is effectively built of glass with secondary internal elements executed as white plastered boxes. The entire Orangery roof is covered in copper, just as the distinctive, original curved bays of the house. Pre-patinated copper perforated screens are used to form the main doors to the east elevation, adding to the Orangery’s air of transparency.
COPPER ARCHITECTURE FORUM 32/2012
9
©Kim Zwarts
Transparent Copper With the transparency of its glass and perforated copper facades and its physical separation, the Orangery stands apart from the main house and the surrounding landscape “washes” through its space. To further diffuse the transition from inside to out, the interior stone floor extends outside to follow the outline of the roof’s projection. A wooden deck extends around this stone floor, given more width on the South side to form a fine terrace.
The main function of the Orangery on the ground floor is to “Meet & Greet”, largely within the dining area. In addition, a separate interior and exterior Auditorium and a lecture room are also situated here. The first floor accommodates two open plan offices, as well as cellular offices, while secondary spaces are contained within the white boxes. Above these boxes, situated on the north side, the copper roof lifts up like a bonnet, to house the air exhaust.
Architect: Braaksma & Roos Architectural Office www.braaksma-roos.nl Copper Installers Roof: Ridder Metalen Dak- en Wandsystemen BV Screens: Non Ferro BV Copper Products Roof: TECU® Patina Screens: TECU® Patina Mesh Photos: Paul Becquevort, Kim Zwarts
10 COPPER ARCHITECTURE FORUM 32/2012
DETAILS
Detailed cross section
DETAILS Detailed transverse cross section
COPPER ARCHITECTURE FORUM 32/2012
11
Pollard Thomas Edwards architects
A FUSION OF
NEW AND OLD This project showcases creation of a new life for old buildings with facilities to meet 21st century needs, whilst respecting and celebrating their integrity. A new bronze-clad extension is both a dramatic statement and a delicate intervention – the whole is a harmonious fusion of new and old. Located in the Abbey Road Riverside Conservation Area of the Roding Valley in east London, the locally listed Granary building had been derelict and unoccupied for some considerable time and was in urgent need of comprehensive restoration to bring it back into use. In 2009 planning permission was granted for a scheme designed by Schmidt Hammer Lassen (SHL) for a new Creative Industries Quarter centred on the former Granary and Malthouse buildings.
A Light Gentle Touch Pollard Thomas Edwards architects (PTEa) was subsequently appointed to develop the SHL scheme – the essence being to optimise the use of the space, both in the new and old buildings, whilst at the same time preserving the original character and historical references. Although substantial work was needed to repair and restore the original fabric, as far as possible the ethos of the conversion was sensitive restoration – a light and gentle touch. The refurbished Granary, with its new bronze-clad extension will form the new headquarters base for the developer and contractor Rooff, as well as occupation by other creative and commercial users. Rooff have introduced sustainable construction methods, to deliver the highest quality working environment at a viable cost. The plan form and shape of the new extension is respectful of the original building and takes its cue from its strong gabled form. The new materials, notably bronze panels, further complement the original. The entrance opens directly into a central vertical circulation hub between the two wings, which has been carefully inserted into the old building fabric – with modern materials, colour and lighting complementing the background historic fabric. This hub gives a new and dynamic heart to the building, fully accessible to the public who enter. The new accommodation is attached to the existing via the vertical circulation core and a high-level bridge link.
12 COPPER ARCHITECTURE FORUM 32/2012
River frontage before work commenced...
...and after completion.
Catalyst for Regeneration The completion of the Granary and the construction of the stunning new bronze clad extension form part of the first phase of the longer term regeneration objectives for the Roding riverside frontage and is very much seen as an important catalyst for further regeneration in the area. It is being held up as a beacon of good design and conservation practices, delivered in one project, and won the ‘Commercial’ sector of the 2011 World Architecture News Awards.
Architects: Pollard Thomas Edwards architects - www.ptea.co.uk Initial design architects: Schmidt Hammer Lassen Copper installer: Roles Broderick Roofing Ltd Copper products: TECU® Bronze Photos: ©Tim Crocker
The entrance opens directly into a central vertical circulation hub between the two wings.
COPPER ARCHITECTURE FORUM 32/2012
13
Ground Floor Plan 3rd Floor Plan
INTERVIEW Chris Hodson discusses the design of the bronze cladding on this project with Andrew Stokes, project architect at Pollard Thomas Edwards architects. CH: How did you develop the design of the prismatic extension? AS: Initially, working with SHL, we used techniques such as solid and void relationship studies to explore form, fenestration and sun control.
Studies for the extension exploring solid and void relationships.
14 COPPER ARCHITECTURE FORUM 32/2012
CH: How did the selection of bronze cladding for the new extension come about? AS: The initial SHL proposal used Corten steel but this was changed to copper due to client concerns over weathering and waterproofing details. We then reviewed copper, bronze and brass and various other metal cladding materials but in the end bronze was chosen. The design intention was for a modern aesthetic and detailing to the extension, to contrast dynamically with the historic context, whilst at the same time acknowledging this history by using a traditional building material like bronze or copper.
CH: Did you also consider material changes over time? AS: The weathering characteristics were also key, as the roof – or inclined wall – is very visible and will weather differently to vertical surfaces. We were advised that in the short to medium term the bronze was likely to weather slightly more evenly. CH: What about sustainability and environmental considerations – were they important? AS: Yes, definitely. Like copper, bronze has sound and proven sustainable credentials in terms of its exceptional durability and lifespan, the fact that it is virtually maintenance free and that it can be completely recycled. CH: How was successful detailed design of the facades achieved? AS: We used envelope working models to explore different ways of expressing the metal cladding – for example, panel shape and size, and vertical, horizontal or inclined joints. The shape of the building called for a more 3 dimensional approach, as the roof is essentially an inclined wall, and these models allowed us to understand the interplay of key elements such as windows, rooflights and the main gutter with various metal panel configurations.
Cross section through new extension, hub and existing building.
The models enabled us to explore solutions for maintaining the integrity of the prismoidal shape by creating a similar appearance on all faces of the building, not only in terms of the cladding, but in the form, shape and detailing of the windows and the roof-lighting which we felt should be expressed as ‘windows in the roof ’ rather than traditional rooflights.
Like copper, bronze has sound and proven sustainable credentials in terms of its exceptional durability and lifespan.
CH: How do you feel about the completed bronze cladding? AS: We are very pleased with the final realisation. The bronze is weathering well, the edge, reveal and arris details are crisp and clean, and the horizontal format of the panels and staggered vertical joints integrate well with the random window location and sizing. The subtle undulations of the panels lighten and soften the ‘newness’ of the extension, which marries well with the patina of age we endeavoured to leave evident on the historic buildings. Careful consideration was given, in liaison with the cladding subcontractor, to all junctions of materials with the cladding and the detailing and setting-out of all joints, which has paid off in the final look of the building. Extension envelope working models.
COPPER ARCHITECTURE FORUM 32/2012
15
COPPER
SKYLINE
The regeneration of rooftop areas above Helsinki’s City Centre Mall provides a sustainable solution to providing much-needed office space. Extensive use of pre-patinated copper cladding to this new intervention adds to the historic green copper backdrop of the city’s skyline.
by Hannele Kuusisto and Chris Hodson
The Evli Bank Office Tower is a new build-
The new five-storey building uses up wast-
many copper-clad buildings in the vicinity.
ing in an unusual location – constructed
ed roof top space including old car park-
Its high level location demanded a prestig-
on top of the huge City Centre Mall in the
ing areas. The crisp commercial-style
ious material and the parent buildings of
very heart of Helsinki city, which houses
building sits within a paved forum setting,
the Mall already had copper façades.
a mixture of offices and shops. Evli Bank
partly enclosed by high-level parts of the
The Evli Bank façades use pre-pati-
already operated from various locations in
existing Mall. The copper-clad, L-shaped
nated copper with flecks of green reveal-
the mall, but wanted to have its entire staff
office building defines a new, fully glazed
ing a little of the dark oxide below, giving a
under the same roof. It is nearly impossi-
atrium box, flooding light into the internal
varied, lively surface. This material is then
ble to find empty building land in the centre
windows. This space then burrows down-
used in two forms: curved profile sheets
of Helsinki and to build a new office at the
wards within the original building below,
as a continuous, modulated surface and a
old familiar address on top of the mall pro-
introducing daylight and providing vertical
horizontal system of profiled louvers cre-
vided a neat solution.
circulation.
ating transparency. The 90mm deep louvre sections are fixed to assembly profiles,
Architects: Arkkitehtitoimisto CJN Oy Copper Installer: Suomen Ohutlevyasennus Oy, Lai-Teräs Oy (louvre system) Copper Products: Nordic Green™ Living profiled sheets and Nordic Green™ Living Louvred System Photos: Matti Kallio
16 COPPER ARCHITECTURE FORUM 32/2012
Material Determined by Context
which have a dark oxidised copper surface,
According to Olli Rouhiainen of architects
using acid-proof rivets. The combinations
CJN, the two most important considera-
of profiled and louvred facades, enhanced
tions in choosing copper for the façades
with their living pre-patinated copper sur-
were the important cultural and historic
faces, add a rich, green layer to Helsinki’s
city centre context, and the presence of
historic skyline.
Cross section through the Mall showing the new building‘s rooftop position.
COPPER ARCHITECTURE FORUM 32/2012
17
18 COPPER ARCHITECTURE FORUM 32/2012
by Chris Hodson
Timeless
COPPER In its inspirational rural setting at the foot of Italy’s Monferrato Hills, Rocca Civalieri was the summer sanctuary of Piedmontese nobles from the late Middle Ages. The villa and its associated buildings have now been restored, adapted and drawn together by a thoroughly contemporary, copper-clad intervention which fully respects the original building fabric, to create a convention centre, hotel and spa.
A timeless skin of pre-oxidised copper is used to express the new additions, starting as a ‘rusticated’ base to the original classical villa. The horizontally stratified dark copper then develops into a new spa building which defines and divides separate external areas either side. The overall composition aims to create “a place with clearly recognizable connotations – respecting the existing architectonic and landscape values.” As architect Stefania Masera explained: “The demands of a building complex accommodating various different functions but still presenting itself as unitary whole suggested the creation of new circulation routes on two levels leading into a new addition. This addition then defines a new, open, main entrance courtyard to the complex. It also establishes, in conjunction with existing buildings now converted to bedrooms and suites, a more intimate courtyard characterised by a central, light timber pergola structure. The copper additions draw together the diversity of buildings and their spatial organisation, creating a place with clearly recognizable connotations.”
COPPER ARCHITECTURE FORUM 32/2012
19
Alterations to the original fabric have been minimised and focused on the creation of flexible spaces to meet changing needs of the complex. On the ground floor, in addition to entrance, reception and bar, there are various communal and meeting rooms. The first floor houses a conference room with a small foyer and restaurant with kitchen and staff room, and hotel rooms and suites occupy the second floor. Architects: Studio Baietto Battiato Bianco Associated Architects www.baiettobattiatobianco.com Copper Product: TECU速 Oxid Photos: Studio Baietto Battiato Bianco - Torino TO
20 COPPER ARCHITECTURE FORUM 32/2012
Site plan
South-East facade
South-West facade
COPPER ARCHITECTURE FORUM 32/2012
21
by Chris Hodson
Pure Water under
Copper Roofs Commissioned in 1876, the Filtry Waterworks was designed by British engineer William Lindley, who had previously gained recognition working with railways and, particularly, municipal infrastructure projects in numerous European cities. He designed the first underground sewers in continental Europe and, together with his sons, he designed systems for cities in Germany and elsewhere – including St. Petersburg, Budapest, Prague and Moscow – also turning his attention to urban planning. At Warsaw, he created a water purification system that continued to operate until the latest regeneration work. Here, he also collaborated with the architect Julian Herde with a complex of buildings generally faced with red ceramic tiles and decorative sandstone elements. Roofs were metal sheet on structural steel and windows steel-framed. A key aspect of Filtry’s success in its urban context is the green landscape covering about 70% of the site area. This unique and historic infrastructure complex is ‘protected’ locally and listed as a UNESCO World Heritage Site.
Upgrading Performance The well-loved landmark endured various changes after the 19th-century including additions in the 1970’s which took no account of the local environment and attached no importance to the original buildings’ scale and form. In the mid-1980s, restoration of the original buildings began under the current architect, Richard Sobolewski of Dorjon International, including replacement of the zinc-coated iron plate roofs with copper. Technical and performance requirements have driven the latest, recently completed new treatment building. Water quality has now been improved within modern parameters and in line with European Union standards, and the use of chlorine dioxide for water disinfection and treatment has also been substantially reduced.
With thanks to Richard Sobolewski of Dorjon International for help with this article. Architect: Dorjon International Copper Products: Nordic Brown™ Light Copper Installer: Eurodach, Piaseczno Photos: Sebastian Taciak (new building exteriors), Richard Sobolewski (original buildings and interior)
22 COPPER ARCHITECTURE FORUM 32/2012
Site Plan, showing the 30ha complex, with the new building highlighted red and original 19th century buildings black.
The regeneration of a remarkable 19th-century water treatment complex serving Warsaw takes a traditional approach – with steeply-pitched copper roofs above brick walls, referencing without copying the style of the original architecture.
Original 19th century buildings (shown black on the Site Plan) have already been restored with copper roofs.
COPPER ARCHITECTURE FORUM 32/2012
23
The architects faced major challenges in accommodating the
ding dominate internally. Natural daylighting plays an important
complex technical demands of the plant upgrade. From an ar-
role where appropriate, via generous provision of rooflights and
chitectural perspective, they have taken the original buildings as
substantial vertical glazing.
their reference point. They have rejected the notion of introducing modern forms and interventions as a contrast to the remaining
Bringing Life to Surfaces
fabric. Instead, they have embraced the architectural language of
The problem of large windowless façades, dictated by buildings
massive 19th century infrastructure buildings. Richard Sobolews-
of this type, has been successfully resolved by planted embank-
ki commented: “ We have not replicated the original architecture
ments, creating a park-like landscape, as well as contrasting
but have developed a similar character for the new block using
material textures and colours. The interplay of surfaces is also
modern materials. Extensive copper roofing plays a central role
emphasised by the way the roofs are faceted and shaped. Differ-
here and gives the permanence that buildings of this type merit.”
ent forms of pre-oxidised copper sheet have been used, including standing-seams alternating with the wider batten-role joints to
Key to the architects’ approach is the differentiation of architec-
generate a rhythm across the long-strip installation.
tural forms for individual building elements. For example, steeply pitched roofs with strongly expressed gables covering particular
It is particularly appropriate that such a large amount of copper
areas contrast with landscaped ‘green’ roofs over the main filter
roof surface is used on a complex dedicated to the delivery of
hall. Dramatic interiors result from the large spaces generated by
clean water to a city’s population. This is a clear reminder of cop-
this type of infrastructure building, and brick and ceramic clad-
per’s long history in serving us with safe water within our homes.
24 COPPER ARCHITECTURE FORUM 32/2012
Cross Section through the new building
COPPER ARCHITECTURE FORUM 32/2012
25
Copper Cottage Architects team31 explain the rationale behind contemporary interventions to a traditional Luxembourg village house.
26 COPPER ARCHITECTURE FORUM 32/2012
T
he owners of this 19th century cottage in a small village north of Luxembourg decided that they would retire there. The house, as it was, had the charm of an old cottage but did not offer the required comfort for a main Photo: Paulo Lobo – Luxedit
residence. The attached barn was being used as a garage and shed and the idea was to transform this huge empty volume into a new living room with a kitchen and to alter the existing cottage as little as possible. Various considerations influenced our design. The existing cottage has very small windows which give uninteresting views of neighbouring buildings, roofs and streets. The owners wanted views of their own property, gardens and the landscape. The existing stairs in the cottage were narrow, too steep and considered to be dangerous. It was decided that they should be replaced with wider and less steep staircases for safety and comfort.
COPPER ARCHITECTURE FORUM 32/2012
27
As the cottage will now be used by older people wishing to spend the rest of their lives there, it seemed obvious to design the layout in preparation for potential future mobility issues. As a result, it was necessary to locate a kitchen, living room, office, sanitary facilities and sleeping rooms all on the ground floor of the building, whilst the cottage. From an architectural point of view, we considered it necessary to clearly define the new parts of the building and the existing 19th century building. The owners wished to retain the authenticity of the existing cottage, which was probably built between 1805 and 1820.
Designers’ Response
Photo: Paulo Lobo – Luxedit
retaining the possibility of a second, independent living space in
Working with the interior designer, our analysis of the owners’ proposal rapidly revealed that the barn was not big enough to accommodate the new living room and kitchen. Moreover, there were not enough windows on the facade to allow sufficient light into the living room and they did not offer the desired views of the landscape and the property. It was therefore obvious that an extension was necessary. In accordance with the wishes of the owners, the forms of the new volumes signal a contrast between our way of living now and the way we lived some 200 years ago. As a result, the old and the new are interrelated - yet provide a
contrasting effect. The transition from old to new does not operate on one precise borderline but rather by the effects of transparency and sightlines from old to new and vice versa. The new, very large plate glass windows open the perspectives up to the more set back
Photo: Paulo Lobo – Luxedit
location of the cottage. The old cottage has been kept in its original
Photo: Paulo Lobo – Luxedit
state (almost), with its configuration of small rooms, low ceilings and exposed beams and old stone and parquet floors.
The facades and roofs of the new volumes are characterised
by a covering of copper – used here as a modern material. It is both rustic and modern, and with a visual appearance that develops in
Architects: team31 architecture office (Folmer/Rodesch/Weyland) www.team31.lu Interior Designer: Laurent Biever Copper Installer: KALBFUSS GMBH Copper Products: TECU® Classic and TECU® Zinn
28 COPPER ARCHITECTURE FORUM 32/2012
Photo: team31
sympathy with the rural setting in the north of the country.
Photo: Paulo Lobo – Luxedit
Copper – rustic and modern... developing in sympathy with the rural setting setting.
COPPER ARCHITECTURE FORUM 32/2012
29
Photo:Hans van Nieuwkoop
BOX TOP
by Chris Hodson
An undistinguished 1970s office building in the Netherlands has been transformed with a rooftop extension encased by a transparent copper skin enveloping the original building.
express the company’s innovative nature in the expansion of their office building. As well as upgrading with higher energy performance and other improvements, the project also needed to create more space. This was achieved with a rooftop extension providing
Photo: Erik ten Hove
The building owners, Trinité Automation Uithoorn (NL), sought to
a canteen and meeting rooms, as well as a large multi-purpose
Original office building before alteration.
seminar room. Here, high, sloping ceilings give a distinctive character to the internal space.
Externally, the intervention is conceived as a three dimensional box-like form, firmly integrated into the existing building fabric and reacting with existing facades – not just a new storey sat on top. The new box is completely covered in a transparent copper mesh skin, simply passing over windows, frames and solid walls
Drawing: Erik ten Hove
Integrating Intervention
behind, providing a seamless continuum expressing the geometric shape of the addition.
30 COPPER ARCHITECTURE FORUM 32/2012
Cross section showing new roof level intervention.
COPPER CLOSE-UP
Drawings: Erik ten Hove
The designers, Architektenburo Ten Hove, commented:
“We deliberately chose copper for the mesh skin, where the colour of the material naturally changes over time and therefore indicates the age of the building.” Using a grid of equilateral triangles gives freedom from the constraints of linear structures and, with the copper mesh, diffuses the box surfaces externally. But internally, the mesh screen still allows clear views to the outside while providing solar shading, and inward opening windows allow ventilation and cleaning.
pro
l fie
Ω-
pro
fie l
Ω-
Ω-profiel
Photo: Erik ten Hove
Photo: Hans van Nieuwkoop
Photo: Erik ten Hove
Photo: Hans van Nieuwkoop
l fie
pro
pro
Ω-
Ω-
fie l
Ω-profiel
Architect: Architektenburo Ten Hove, www.archiTENHOVE.nl
Copper products: TECU®Classic Mesh
Copper Installer: Vetkamp Soest bv
Photos: Hans van Nieuwkoop, Erik ten Hove
COPPER ARCHITECTURE FORUM 32/2012
31
Copper for house on the rock Regeneration of this 19th century London church involved an extensive refurbishment programme to return the building to its former use. But it also involved a modern extension to provide a permanent home for the growing, 3,000 or so, congregation of the Nigerian-based‚ House on the Rock‘ church, as architects Paul Davis + Partners describe.
St George’s Church in the Tufnell Park Conservation Area was built in 1867 as a historical, circular building based on a 5th Century Greek Church and modelled on Shakespeare’s Globe Theatre. The building has had a colourful past. Saved from demolition in 1973, actor George Murcell turned the church into the St George’s Theatre. More recently it fell into the hands of squatters and it was only when they were finally evicted in 2006 that the project was able to commence. As well as its primary function as a church, the building is also used as a community 32 COPPER ARCHITECTURE FORUM 32/2012
centre, adult learning centre, crèche and a venue for other social events. To meet these demands, a new, copper-clad extension creates a contemporary architectural solution – contrasting with the church aesthetic, yet remaining subservient to the original building and making no attempt to emulate its style. This modern 2-storey extension links the existing church and the bell tower and provides flexible multi-purpose spaces to meet the needs of both church and community. The new intervention is separated from the original fabric of the church by a continuous band of glazing.
Matching the contemporary materiality of the new building with the stone and slate of the existing church provided a welcome opportunity to explore solutions for an ever-occurring challenge. Copper, with timber cladding and glass, provided the answer with a naturally changing surface and an air of permanence. The designers endeavoured to minimise energy demand by considering the embodied energy of materials and using recycled materials wherever possible.
Copper... a naturally changing surface and an air of permanence
GENERAL NOTES. All dimensions to be che and/or preparation of any Sizes of and dimensions See structural engineers Sizes of and dimensions See service engineers d This drawing to be read specifications and other
DO NOT SCALE F
Cons PRAYER ROOM
FFL 38.440
D
B
C
(00)113
(00)111
(00)112
16 15 14 13 12 11 10 9
8 7
6 5
Architects: Paul Davis + Partners - www.pauldavisandpartners.com Copper Installer: Guaranteed Asphalt Ltd Copper Product: TECU® Oxid Photos: Adam Parker
SECOND FLOOR TOWER 1 2 3 4 5 6 7 8 9
10
LOBBY
11
13 12
OFFICE
OFFICE
SHOWER ROOM
14 15 16 17 18 19 20
SOUND
C'BD
VOID TO BELOW
RECEPTION OFFICE MEETING ROOM
PASTORS OFFICE
LIFT Trusses
13
14
12
15
11
16
10
1
2
3
9 8
A
A 7
(00)110
(00)110
FOYER 6
N
Rooflight over
1 5
2 4
3
A
V VOID TO BELOW
STORE
E
S
T
A
G
E
VOID TO BELOW
STAIR 9
8 7
6 5
4 3 2
1
FELLOWSHIP HALL COMMUNITY USE
MEETING ROOM VOID TO BELOW
VIDEO C'BD 15 14
13 12
LOBBY 11 10
First floor plan
X
D
B
C
(00)113
(00)111
(00)112
description
project no.
drawing no
drawing
COPPER ARCHITECTURE FORUM 32/2012
33
Genera
First Flo project
FIRST
FLOOR PLAN
St. Geo Tufnell
X
1:100 @ A1
Record
revision
1306 (00)
9/10/09
1306-(00)-102
Work In Progress
1 2 3 4 5 6 7 8 9
client
House
Timeless
BRASS
Castle entrance approached via the straight staircase bridge with curved brass handrail.
A gradual regeneration is taking place to the ancient Ribadavia Castle in the Ourense area of north-west Spain, heralded by new brass elements transforming the entrances to the castle. Architect Miguel Angel Calvo Salve describes his approach to these interventions, which add an ageless simplicity and sense of permanence.
Architect: Miguel Angel Calvo Salve Copper Specialist: Aceros Argimiro Photos: Miguel Angel Calvo Salve
Since 1999 we have been working on a
Establishing a Methodology
Strength and Malleability
lengthy process of study, research, con-
We believe that maintaining, transforming
A part of the intervention was to design
solidation and retrieval of the remains
or reusing this historic building requires at
the entrances to the ruins of the Castle.
of Ribadavia Castle. The remains are ex-
least that we understand its physical and
It was decided to make various individual
tremely fragile due to their abandonment
emotional realities, in its present state
elements in brass, and also bronze, to give
and the neglect of local government in the
and throughout its history. Through very
a jewel-like quality amongst the ancient
past. Ribadavia Castle is located within the
careful observation and systematic docu-
building fabric. These included access
historic area of the village and was built in-
mentation, intensive research of histori-
bridges with stairs, gateway doors and
corporating the old wall and supported by
cal sources, technical analysis, study of
exhibition display elements. The choice
a series of circular and square towers on
pathologies, identification of traces and
of brass was based on its qualities as a
a large rock outcrop. There is no record of
memories, and finally a reflective intuition,
material that ages with time, developing a
the earliest human settlement, apart from
we have established a methodology ex-
patina – just as the stone walls have done.
the fact that a necropolis and a temple ex-
pressed in a “Master Plan� for this castle
Its strength and malleability was essen-
isted in the upper part of the town, where
that will substantiate the basis for future
tial in the creation of these disparate ele-
the castle now stands.
interventions in the monument, thus creat-
ments.
ing the potential for its transformation and reuse. 34 COPPER ARCHITECTURE FORUM 32/2012
The brass main doors appear impenetrable with a strong silhouette and square apertures reminiscent of a portcullis.
Smaller brass doors in the Necropolis share the open linear grid.
Simple, folded brass elements are used to hold information display boards.
The choice of brass was based on its qualities as a material that ages with time, developing a patina – just as the stone walls have done.
The brass Necropolis door is more open in character with a linear grid highlighting the stone archway.
COPPER COPPER ARCHITECTURE ARCHITECTURE FORUM FORUM32/2012 32/2012
35
36 COPPER ARCHITECTURE FORUM 32/2012
URBAN SHELL Architect Luisa Fontana explains how a shell-like copper and glass intervention regenerates a disused public bath house and reorientates the building to define a new urban square.
The original, early 20th century building had been unused for over 40 years and its previously hidden, undistinguished rear façade was exposed by the creation of a new public square in the 1980s. The restoration and expansion of the building provided an opportunity to redefine a new urban role. The European funded project is for a new Centre for Cultural Activities for Youth and is unique in Italy. It provides a link between the University and the World of Employment, creating an international focus to serve the local community.
Rear facade of the disused bath house before addition and renovation.
A Bold Approach The regeneration – carried out in conjunction with engineers Arup (structure and energy strategies) and Manens (installation) – reflects a bold architectural and urban planning approach. It involves restoration of the original building and addition of a new volume, in the form of “shell” made of steel, copper and glass. The profile of the shell develops a close relationship with its urban context. It is ‘closed’ next to the old buildings, form-
N E
ing an intimate interior space, then open-
W S
ing up with a large glazed front drawing in the new square. The main façade onto the square is completely glazed, with micropArchitect: Luisa Fontana / FONTANAtelier Copper Installer: Roberto Canova
Floor Plan and Urban Context
erforated brise soleil that protect the interior from direct sunlight, and character-
Copper Product: TECU® Classic
ised by different heights. A second opening
Photos: FONTANAtelier
– smaller and varying in shape, is on the north side, opposite the old buildings.
COPPER ARCHITECTURE FORUM 32/2012
37
Energy Independent The building is also an example of smart design and energy self-sufficiency, to minimise energy consumption and carbon emissions. Dynamic thermal modelling software, developed for the Arup building energy simulation, enabled solutions to be optimized and energy saving benefits quantified. The project has achieved an ‘A’ certification in the Eco Domus energy class with a system developed by VI. Energy. The result is an integrated organism, energy independent from the network, where climate and environment interact. Various renewable techniques are incorporated including geothermal energy, the pre-heating of primary air through an underground maze and self-generation of electricity using biodiesel. The design optimizes natural lighting and ventilation, while the building materials provide a high performance, thermal inertia envelope.
Volumetric Design Studies
38 COPPER ARCHITECTURE FORUM 32/2012
Cross Sections
EDITORIAL
The Regeneration Issue
Architecture from
Holland Hungary
ˇ FÓRUM O MEDI
Italy
Poland Russia
Belgium Czech Republic Denmark Finland France
Czech Republic • Denmark
Spain Sweden Switzerland UK
Greece Germany Holland
Inspirational architecture
Italy
and design with copper from:
Norway Poland
Austria • Belgium
Russia Spain Sweden
Czech Republic • Denmark
Switzerland UK
Finland • France Greece • Germany Holland • Hungary
EHTI KUPARIN AIKAKAUSL
KÄYTÖSTÄ
OLLISUUDES AKENNUSTE
SA• 24/2008
Austria
• Belgiu
m
Czech Repub
lic • Denm
Finland
ark
lehti
FO OR UM
kuparis
ta arkkite
htuuris
sa • 28 /20
I
10
Obytný komplex Frederikskaj v Kodani
Russia • Spain
• Hungary
Nová měděná střecha pro katedrálu v Roskilde
Sweden • Switzerland
Italy • Luxem
burg
Norway
KU PA RI
Norway • Poland
any
Holland
Greece • Germany
Holland • Hungary Italy • Luxemburg
• Franc e
Greece • Germ
Accordia – britský bytový komplex
United Kingdom
• Polan
d
Sportovní hala v Budapešti
Russia
Italy • Luxemburg
• Spain
www.copperconcept.org Sweden
Norway • Poland
• Switzerland
26
United Kingd
om
Russia • Spain Sweden • Switzerland
www.co
pperconc ept.org
United Kingdom
minassa ri Kööpenha pääkontto eskus n juutalaisk Nordin uusi GN Store skus voittaja: Müncheni vierailuke Copper Awardin kansallispuiston uusi Unkarin Aggtec –
KAUNIS
KoKo VUoSIS
28
8 Transparenta inskriptioner i Lettland – 10 Treklöver i koppar 22 Cipea Villa Nanjing i Kina – 26 En flytande bronstrapp – 36 Dipoli, en modern klassiker
www.copperconcept.org
Finland • France
2 9/20 10
FOORUMI
Hungary Luxemburg
I ture from UMitec ORArch KU PAR IFO
TIDNING FÖR BYGGBRANSCHEN OM KOPPAR I
KUPARI
New Initiatives from Copper in Architecture
Č ASOPIS O MĚDI A JE JÍM V YUŽITÍ VE STAVEBNIC T VÍ • 26/2009
Austria • Belgium
Norway
24
www.copperconcept.org
France Greece Germany
Luxemburg
MI
© Copper Architecture Forum 2012
IN ARCHITETT
Austria
KUPARIFOORU
birgit.schmitz@copperalliance.de kazimierz.zakrzewski@copperalliance.pl marco.crespi@copperalliance.it nick.hay@copperalliance.org.uk nick.vergopoulos@copperalliance.gr nuno.diaz@copperalliance.es olivier.tissot@copperalliance.fr paul.becquevort@copperalliance.be pia.voutilainen@copperalliance.fi robert.pinter@copperalliance.hu vadim.ionov@copperalliance.ru
DEL RAME
Forum Copper Architecture from with Architecture
30
Printing: Strålins Grafiska AB 2012, Sweden
LA RIVISTA
Finland
www.copperconcept.org
Layout and technical production: Naula Grafisk Design, Sweden
Denmark 3 1/20 11
COPPER ARChitECtuRE FORuM
Publisher: Nigel Cotton, ECI
3 0/20 11
Austria Belgium Czech Republic
URA I
oNKo KUPAR
29
Address: CAF, European Copper Institute, Avenue de Tervueren 168 b-10, B-1150 Brussels, Belgium
DAS MAGAZIN FÜR KUPFER UND ARCHITEKTUR I
Copper Architecture Forum with Architecture from
COPPER ARChitECtuRE FORuM
Front Cover Lund Cathedral Visitors’ Centre (pages 4-7). Photo: Åke E:son Lindman
Back cover The Granary, London (pages 12-15). Photo: Tim Crocker
Register now at www.copperconcept.org to make sure you receive your copy of issue 33.
The European Copper in Architecture Campaign was set up by panEuropean and local industry associations with the support of participating copper fabricators to promote copper and its alloys in architectural applications. It achieves this through various means, principally:
Editorial team: Lennart Engström, Ari Lammikko, Chris Hodson, Hannele Kuusisto, Hermann Kersting, Robert Pinter, Irina Dumitrescu E-mail: editorialteam@copperconcept.org
Editorial panel: Birgit Schmitz, De Kazimierz Zakrzewski, Pl Marco Crespi, It Nicholas Hay, UK Nikolaos Vergopoulos, Gr Nuno Diaz, Es Olivier Tissot, Fr Paul Becquevort, Benelux Pia Voutilainen, Se, No, Fi, Dk Robert Pintér, Hu, Cz, SVK Vadim Ionov, Ru
Shown here is a competition visual for The Museum of the History of Polish Jews in Warsaw - but how will it look in reality? You can find out in our next issue. The competition-winning design, by Architects Lahdelma & Mahlamäki (working in conjunction with Kurylowic & Associates in Poland) aims to create a ‘lantern in the park’. The design features a layered facade design using pre-patinated copper in combination with glazing. The play of advanced LED lighting behind the decorated glass on the green corrugated copper will play a key role in this luminescence.
31
The magazine is distributed to architects and professionals in the building construction industry in Belgium, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Italy, Netherlands, Norway, Poland, Russia, Spain, Sweden, Ukraine and United Kingdom.
Project Preview
rconcept.org ww w.coppe
Copper Architecture Forum is part of the ”European Copper In Architecture Campaign”. It is published twice a year and has a circulation of 25.000 copies.
Editorial Team
With a change of direction, our next issue focuses on new-build copper projects and how they are achieved. Alongside comprehensive case studies, including Copper in Detail working drawing and Close-up focus pages, we shall be discussing technical and topical issues – notably the impact of “Building Information Modelling” (BIM) techniques on architectural freedom.
FORuM
Copper Architecture Forum 32, April 2012
sion to a restored London warehouse (p 12–15) uses bronze cladding to define its thoroughly contemporary massing. In this case, an uncompromising form reflects the gabled profile of the original, creating a unified composition. A similar but lower key approach is taken with a London church extension (p 32–33). The relationship of new and old linked buildings is also explored with a new country house ‘orangery’ (p 8–11) in the Netherlands. This fresh take on an old typology is a heavily glazed pavilion with a curved, green pre-patinated copper roof which bonds it with the original house. A more literal stance is taken with Warsaw’s new water treatment plant (p 22–25) that refers strongly to the gabled forms and curved-head windows of its 19th century neighbours. Here, copper plays a more traditional role as a roofing material. And we consider the part played by copper in different forms – transparent and modulated – to regenerate uninspiring 20th century buildings (p 16–17 and p 30–31). We end as we began, with another example of a copper intervention reshaping the urban context of its older host – this time the former public baths in Thiene, Italy (p 36–38). Here, a redundant building has been given a new life as a unique youth centre defined by organic, curved copper shell additions. We hope you enjoy this journey around these inspirational projects, where copper acts as a catalyst for inventive architectural and urban regeneration.
COPPER ARChitECtuRE
This entire issue is dedicated to the ingenuity of architects in regenerating the environments that we live and work in. Preserving and adapting existing buildings and townscapes to suit new uses is sustainable, saving on resources and making the most of assets. But it also carries with it a challenge for designers in developing their particular interpretation of history and context for the 21st century. The diverse projects that we explore here demonstrate different approaches to this challenge and range from additions and interventions with existing structures, to new buildings interacting with the old to reshape urban areas. But one common strand runs through them all: the unique and numerous possibilities offered by copper and its alloys for architectural expression. Our cover story ably demonstrates this. Here, brass-clad forms worm their way amongst the urban fabric, defining new vistas and a fresh focus on Lund Cathedral. Initially bright and modern, the brass surfaces will soon darken and mellow, taking on a timeless feel. The same quality applies to the pre-oxidised copper interventions to an historic Italian villa (p 18–21), redirecting axes and circulation to suit the building’s new role as a hotel. Copper’s ageless and permanent nature is further reinforced by the brass elements added to a Spanish castle (p 34–35). Here, there is no pretence at literal reference but an abstract aesthetic totally in keeping with the massive stone remains. This approach has parallels with the use of copper to clearly express modern additions to a traditional Luxembourg village house (p 26–29). On a bigger scale, the new exten-
Copper Architecture Forum 33
ADAN – TAI PIDEM PÄÄNK VUoDEN IN • KUPAR 2009 I INSPIR IARKKITEHTU KUPARIPALKI oI • KUPAR NNoN VoITTA URI KESTÄ I oSUI KULTA JA • ISLAND VÄÄ? • SUoNE HAKAN CoPPER EN IEMENRANTA 6 – KUNNo STUSPRoJEK T
• an architect-focused website copperconcept – with a substantial and rapidly growing project gallery. • a pan-European architectural awards programme – the latest, 15th iteration attracting 66 entries of a particularly high standard. • Copper Architecture Forum magazine – with a circulation of over 25,000 throughout Europe and beyond. We are always looking for new ways to engage with architects and designers, particularly to find out about and publish inspirational designs and projects. Now, we are introducing a number of new initiatives: • Share your copper project – simply upload images and information yourself by following the instructions on the website. • Copperconcept Newsletter – register now via the website for this short, emailed update and you could win an iPad. • Copper and the Home Awards 2012 – seeking innovative and inspirational design ideas for the home from furniture to fittings and finishes, with categories for professional designers and students.
Register for the Copperconcept newsletter for a chance to win an
iPad 2!
Register for our NEWSLETTER in any of the available 17 languages to find out about the latest copper clad buildings and for a chance to win an iPad 2. All new registrations between
1 March and 30 June 2012
will be entered into a prize draw for an iPad 2. The winner will be informed via e-mail.
More information on these and all our initiatives can be found on the website – www.copperconcept.org
Contact us now. We do want to hear from you, both with your comments on Copper Architecture Forum and suggestions for projects or topics that we can cover in future. Simply email the editorial team or your local editorial panel member, listed above. COPPER ARCHITECTURE FORUM 32/2012
39
COPPER Architecture FORUM
32
www.copperconcept.org
Le numéro de la rénovation