Control Sheet 22 (March 2015)

Page 1

Control Sheet Cosylab’s Newsletter Volume 22

ISSN: 1855-9255

March 2015 Table of Contents Proven methods for estimating the cost of a control system

2

top-down

Bob Dalesio (BNL) shares his insights with combining top-down and bottom-up estimation techniques for getting reliable control system cost figures.

bottom-up

3

First Beam at iBNCT

5

All’s FAIR in the City of Science

The “iBNCT” project is being constructed northeast of Tokyo at the Ibaraki Neutron Medical Research Center.

FAIR at GSI is adding to Darmstadt’s list of scientific research institutions.

On bugs

Time to Fix/Cost of Bugs 400000

9

Love them or hate them, they are a fact of the development process.

300000

250000

200000

Cost

7

350000

150000

100000

50000

0

Design

Implementation

Testing

Post‐Release

The Picture Board Pictures from Cosylab’s 2014 end-of-year party.

Cosylab d.d., Teslova ulica 30, SI-1000 Ljubljana, SLOVENIA Phone: +386 1 477 66 76 Email: controlsheet@cosylab.com URL: www.cosylab.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.