INDEX

1. THE DISCOVERING OF THE PARK 1.1 Profiling Forlanini Location Transport

2. SELECTION OF INTERESTING AREAS 2.1 Concept Space selection

Indoor space quality Activity requirements

The size: park, natural elements

Open- space Sum up Masterplan

1.3 Activities Function division Function sum up Outdoor areas

3.0 Five points strategy 3.1 Novegro

Indoor space

How easy it is: with bus,with car

Interviews and activities

3. STARTING FROM THE STREETS

Identify the morphology Requalify the infrastructure Recognize the trigger Define policies Plan a time line transformation Main street: via Novegro Details and visions 3.2 Block of sport Sum up of five strategy points 3.3 Block of music Sum up of five strategy points


CHAPTER 1 THE DISCOVERING OF THE PARK The Host park project starts from the idea of hospitality and the Forlanini park is a combination of hospitality and fragmentation at the same time. Starting from a vision of the entire city of Milan, the park is located in the area adjacent to the Linate airport, the Forlanini district and the Ortica district, all of which do not 'consider' it as a resource but as an 'unseen' element. The Grande Parco Forlanini meanwhile remains an active reality, where the centre of the immigrants of Milan are, Cascinet, the reality of a 'young' farmstead and the city of Novegro, which offers possibilities of wide spaces. This first chapter of analysis wants to define some information collected during the various inspections, starting from the width of this area and its natural resources. From the interviews it appears that the park is not known and perceived by people. People know the Idroscalo and the Forlanini park, but do not have the perception of what we define as Grande Parco Forlanini. Another analysis concerns accessibility, the area is accessible, but we perceive a gap towards the city. Subsequently the analysis of the activities, there are many activities in the area that can become a fundamental resource for change, as well as open space and the presence of large green areas. We wanted to schematize with a series of diagrams and a classification to outline, not only the denser areas of activity and population but also the different functional categories to be able to use them in a more specific design context.


PROFILING THE GRANDE PARCO FORLANINI The location


PROFILING THE GRANDE PARCO FORLANINI The accessibility

The Grande Parco Forlanini is surrounded by numeros public transportation facilities. At present it has 6 different bus lines. These bus lines and bus stops are providing easy access to different parts of the Grande Parco Forlanini. And these bus lines come directly from different direction of Milan city. The most easy access way is the M4 line, which is under construction at the momemnt. M4 line will have 2 stops in the Grande Parco Forlanini. It will make the park much more accessible.

500 M

Comfortable distance for walk / from bus stop

500 M

Comfortable distance for walk / from car parking lot

These two diagrams on the left shows the Grande Parco Forlanini covered by 500 meters circles. 500 meters is a comfortable distance for average people to cross. Bus stop represents center of the circle. As you can see from the bus stops you can get most of the area of the park by 500 meters-walk. In the scond diagram, the center of the circles are the public car parking spots of the Grande Parco Forlanini. These circles shows that after you get to the park by bus or by car you can easly go to the most of the park by foot.


PROFILING THE GRANDE PARCO FORLANINI The size and activities inside

=

The Grande Parco Forlanini is a very big park that includes the Idroscalo, Parco Forlanini and the field area between the Ortica and Forlanini. Because of the size and geographic position, it is holding differnt type of activities.

X 720

The Grande Parco Forlanini is the biggest park in Milan. And the covered area equals to 720 football fields.

PUBLIC GREEN AREA

GREEN AREAS AND NATURAL WATER SYSTEM OF MILAN

WATER AREA

GRANDE PARCO FORLANINI

As we can see from the diagrams, the Grande Parco Forlanini has the biggest natural green and water area in the Milan.


PROFILING THE GRANDE PARCO FORLANINI Interview

To understand the Park we went to the Park and made interview with 42 people at different parts of the Grande Parco Forlanini. During the interview we asked some typical question to understand better what do the people think about the park. How frequently do they come to the park? What kind of transportation do they use to get to the park? What they like to do in the park? Etc... After reviewing the interviewed candidates we made statistics on the interview data and selected the important information to understand the stuation. Where do they come from and by what transportation?

Transportation

Type of people

What do they think about the park?


PROFILING THE GRANDE PARCO FORLANINI Existing activities

DISCOTEQUE


PROFILING THE GRANDE PARCO FORLANINI Classification of the existing activities industrial areas

public assosiations

residential areas

sport areas

commercial areas

potential areas


PROFILING THE GRANDE PARCO FORLANINI Classification of outdoor spaces

RESIDUAL AREAS PUBLIC GREEN AREAS AGRICOLTURAL PRODUCTION PRIVATE GREEN AREA CONSTRUCTION AND PARKING AREAS


CHAPTER 2 SELECTION OF INTERESTING AREAS Grande Parco Forlanini should be a part of cities everyday life. We tried to satisfy some needs of Milan and the area around the Grande Forlanini Park and that the new project it will be a key to connect the outside areas and also the city. Milan is a city full of art, performance and creative people, but also a city with the necessity of space. In this park the ‘space’ is a plus value and to improve it we also need people that want to make it more lively. We considered that the Grande Parco Forlanini can be an ideal space to host all of these activities. For this reason, we named our project THE HOST PARK, that can host music, sport and performance art inside and make the best use of the existing spaces in it. At the previous stage we began with surveying through on-the-spot investigation. Through analysis and interpretation of the site we found out that there are some unused or redundant buildings around the Grande Parco Forlanini. Some of them are temporary buildings that will be free after the metro construction. And the most part of these redundant buildings are some industrial buildings. They are in good condition and have a lot of space. For taking full advantages of these existing buildings, we classified them by their quality. Since we want to reuse these buildings for the project, we took spatial size, building age, facilities, modifiability and the quality as the key point of our classification and analysis. Afterwards we analyzed the requirements of the activities in our project idea: Music, Street sport and the Performative art. Because different activities have different requirements of the space. By these analyses and comparisons, we have a clear picture about the potential of the buildings.


CONCEPT The advantages and opportunities

Grande Parco Forlanini has plenty of advantages that can be used to serve the city, at the same time we tried to find some needs of Milan and the area around the Grande Parco Forlanini that can be reached or met by the new vision of the park.

What does Grande Parco Forlanini have around ...

What does Grande Parco Forlanini have inside temporary cascina productive redundant redundant park sport exhibition redundant idroscalo fields spaces industrial area center industrial park buildings buildings buildings

reusing

to be guests known

What does it need...

reusing

metro

• forlanini ortica • music school

space for activities

street sporter

space for training

performing artists

linate airport shopping center

space for playing space for perfomance

What does it need...

After a series of analyzes and inspections of the area, its multi-functionality, multi-ethnicity and multiplicity have prompted us to think of Host. Host means hosting and welcoming, with special attention to communities, both new and old. Milan is a city full of art, performer and creativity people, but also a city with the necessity of space. In this park the ‘space’ is a plus value and to improve it we also need people that want to make it more lively. We considered that the Grande Parco Forlanini can be an ideal space for host all of these kind of activities. For this reason, we named our project THE HOST PARK, hoping it to host music, sport and performance art inside and make the best use of the existing spaces in it.


CONCEPT Space selection/indoor At the previous stage we began with surveying through on-the-spot investigation. Through analysis and interpretation of the site we found that there are some unused or redundant buildings around the Grande Parco Forlanini. Some of them are temporary buildings that will be free after the metro construction. And the most part of these redundant buildings are some industrial buildings. They are in good condition and have a lot of space. For taking full advantages of these existing buildings, we classified them by their quality. Since we want to reuse these buildings for our project, we took spatial size, building age, facilities, modifiability and the quality as the key point of our classification and analysis. Afterwards we analyzed the requirements of the activities in our project idea: Music, Street sport and the Performance art. Because different activities have different requirements for the space. By these analyses and comparisons we have a clear picture about the potential of the buildings.

Classification of the availbale buildings

other buildings residences available potential buildings available potential open spaces

Industrial buildings A

Temporary container buildings

Industrial buildings B

The quality of the buildings Spatial Size

Quality

Spa�la size

Spatial size

9

9

9

8

8

8

7

7

7

6

6

6

5

5

5

4

4

Building Life

3

Quality

1

0

Facilities

Industrial building B

0

Modifiability Music

Building Life

3 2

1

0

Industrial building A

Quality

2

1

Modifiability

4

Building Life

3

2

Containers

Comparision of the Quality of buildings and the Requirement of the activities

The requirement of the activities

ModiďŹ ability

Facilities Sport

Performance art

Containers

Industrial buildings A

Facili�es

Industrial buildings B

Music

Sport

Performance art


CONCEPT Space selection/outdoor Classification of the availbale buildings

Big open-space, Close to the Road and Easy access Suitable for holding big events and concerts.

Covered open-space: Suitable for holding street sport activities

At the same time, we analyzed the available outdoor spaces and other existing elements to find some interesting and valuable spaces for our project. And there are two different spaces that we consider as valuable. One is the big open space that for now is being used for the metro construction. After the metro construction it will be very suitable for big events like music concerts because of the easy accessible position and unobstructed sigh. Meanwhile there is no high-density residence and offices in the disturbance range.

Exhibition area: Suitable for holding big indoor show and performance activities

Thanks to the big size of Viadotto Parchi, it has a big semi-open space under. It’s a nice space with the green elements around and the “shelter” above, but because it is not noticed from the highway it can’t be used as demanding function. The type of the space is ideal area for younglings to do sport or other motion activities such as skateboarding and parkour. Near the Novegro, there is an exhibition area, that can hold different kind of events and shows inside. It would be really helpful if we had performance art workshop around.


CONCEPT Space selection

Block for host street sport activities: • Street sport trainning • Street sport performing • Realated servieces and activities

Block for host music activities: • Music trainning • Music performing • Music events and concerts

Block for host performance art: • Performance art studio • Performancing spaces • Craft and other art work shop

After the full analysis and classification of the potential buildings and area in the Grande Parco Forlanini, we chose three different area for the three-specific different kind of activities by the different character. These three areas will work as three theme blocks: Block for music, Block for street sport and Block for performance art. We tried to make the quality and character of these spaces in order to meet the requirement of the selected activities in the highest level.


CONCEPT Master plan


CHAPTER 3 STARTING FROM THE STREETS The street is the real public space that we have in all the cities. In this chapter we want to explain the strategy that we are following, starting from the requalification of Novegro’s streets. First of all we need to identify the streets: main importance and secondary; the city of Novegro presents one main street that connects via Corelli to the airport but with the arrival of the future bridge that will reach the Idroscalo this situation will change. We established the work first on Via Novegro and requalified it with an abacus of elements (green, furniture, light, pattern) and also gave more importance to the bus stops that are crucial for people that live there ( in order to reach the city, everyday). Novegro has the opposite problem of parking that we have in Milan. There is a lot of space and people tend to park in the street. But we know that in the area we have also a lot of parking lot for the airport; the idea is to use these zones and move the cars from the streets to the authorized parkings. Then we want to trigger something, in this case an opportunity to work, with a lot of common spaces as coworking areas. A covered square and some laboratories in order to bring people together and to make the area attractive for young people and for people that want a different place to work. We start from the idea of industrial building of Novegro that can be useful, first for coworking and then to make a creativity hub for art, show, dance; all the disciplines that create a performance. The last operation is about the time line and the expectation that we will have in the future.


5 POINTS STRATEGY

5 POINTS STRATEGY 1

IDENTIFY THE MORPHOLOGY

2

REQUALIFY THE INFRASTRUCTURE

IDENTIFY

TRIGGERING POLICY IMPLIMENTING

REQUALIFYING

3

RECOGNIZE THE TRIGGER

4

DEFINE POLICIES

5

PLAN A TIME LINE TRANSFORMATION

First of all we need to identify the streets, the city of Novegro presents one main street now that connect via Corelli to the

e O ff

airport but with the arrival of the bridge to reach the Idroscalo this situation will change. an abacus of elements and also give more importance to the

form

ancing

ty uni mm co

Ho sti ng

r fo nt e v

per

space

for

Community Park

the

art

Perf or

ist

s

ma nc es ho w

to

th

nit mu om ec

e

We ipotize to work first on Via Novegro and requalify it with

g rin

e th

TRANSFORMATION

y

NOVEGRO

bus stops that are crucial for people that lives there. Then we want to activate a trigger, in that case an opportunity to work, with a lot of common space to bring people there and to make the area attractive. With the trigger we start

Exhibition Hall

Performancing & Co-Working

rin

With some policies we want to involve community and asso-

O ff e

performance.

g

The time line has to show all this process in a sequence in wich its possible move trought.

e

other in order to Host a lot of people and mixed funcitions.

Restaurant

th

some discounts, events and promotions to collaborate each

P

to

rant, graphic industries and parking) trough the creation of

g

with the envolvment of the pre-existance activities ( restau-

in

ve art street in Novegro. The idea its to collaborate and share,

rk

Idroscalo create a net of advertising to share the performati-

pa

siation and with the visibility of the Exhibition center and the

Pa rk sha ring to

hub for arts, show, dance; all the discipline that create a

e for th ods o f ng eri Off

events

be usefull first for coworking and then to make a creativity

the w orkers

from the idea that some industrial building of Novegro can

vi

si

to

rs

du

rin

Offeri ng parks for the guests g

the

even

ts

Parking


5 POINTS STRATEGY

1

IDENTIFY THE MORPHOLOGY

2

Definire la morfologia

TIPOLOGY OF THE STREETS - tipologia delle strade

REQUALIFY THE INFRASTRUCTURE Riqualificare le infrastrutture

ABACUS of ELEMENTS - abaco degli elementi TREES

e Lin y r da n co Se Main Lin

e

create a space and give direction

BUS STOP

STAGE

LIGHT

PATTERN


5 POINTS STRATEGY

3

RECOGNIZE THE TRIGGER

DEFINE POLICIES

4

Riconoscere il ‘grilletto’ - innescare

Definire le politiche di pianificazione

10% 50% 40%

MAIN POLICIES - principali politiche

MIXED TRIGGER - innescare le funzioni COWORKING AREA PUBLIC COVERED SPACE COWORKING AREA

PRIVATE/ ADMINISTRATION OFFICES LAB

EXCHANGE FACILITIES

ADVERTISING

INVOLVE COMMUNITY

Services

Exhib

P Discounts Events Promotions

DEFINE THE USE TYPOLOGY

Coworking

Idro

Host associations work with community

Performance areas


5 POINTS STRATEGY PLAN A TIME LINE TRANSFORMATION

TIME LINE AND ACTORS This time line tranformation it’s a sum up of the abacus of element that we want to use, mixed together the trigger and all the buildings that we want to reactivate. Via Novegro will be the first one with stage, trees, pattern and light, it will be the central part of all the city and a very strong connection between the Exhibition center and the Idroscalo. With the shadow in the second draw we want to suggest the spread of the changing of the street and also the idea that this type of intervention need to keep place in a time sequence. Starting from Novegro we want to create an Hub of arts in wich people have space to show some particular ability or only stay and see the others. We consider also the actors that takes part in this project in order to understand in wich way the pre-existance activity are involved and what is the change in time. If in the first part the project starts from the trigger, than we can see that we have the spread of the activities. With the involvment of community we can make cascina Novegro a good place to host assosiation and with the starting point of the trigger we can image that, in the last part of our time line, the area of coworking can be spread out of the Hub and all the entire Hub can be full of place in which people can practice art, dance, theater; for a city that becomes more than a city.

li a r ti st i

li

HUB

3

eg

30%

In ou dus t o trie ft s he OU HU T B

du st rie s

HU

B

60%

Vi ad

el Vi aD 20%

In

ov eg ro

2

Vi aP as co

ed

on ta le 80%

10%

aN

Gr ap hi cP ha rm a

1

40%

Ca sc in

50%

BUILDINGS

NOW

Vi aM

ar ac ca Vi aB

Vi aN

STREETS

da

Pianificare la trasformazione nel tempo

ov eg ro

5

4

Actors


5 POINTS STRATEGY ACTORS ANALISY

1

Pre existance actors involved

Exchange facilities

4 restaurants

1

2 graphic industries

P P

P P P

P

6 parking Advertising

Exhibition center Novegro Idroscalo New actors involved

The trigger

2 2 Pre existance actors involved

Involved community

School New actors involved

Cascina Novegro

3 3

Pre existance actors involved

New actors involved

4

4 Pre existance actors involved HUB New actors involved

Re-define the use typology

HUB

Industries HUB

Re-define the use typology Industries OUT of the HUB


5 POINTS STRATEGY Novegro performance arts street

Collaboration with ex-industries to improve the possibility to host assosiation

GPF

METRO

IDROSCALO

The new connection with the metro station its crucial for the activation of all the activity of the cluster, now there is a completely exchange near the activity CLUSTER of performative arts

SUPPORTIVE activity of the performative cluster


5 POINTS STRATEGY Novegro performance arts street

A

A B

B


5 POINTS STRATEGY Novegro performance arts street

B B A

A


5 POINTS STRATEGY

AA’

1 2

AA’ 1,2 5,6 mt

BB’

3,6

3

CC’

BB’

4

12 mt

3

CC’ 2,5

6 mt

1

2

3

4

1

2

3


5 POINTS STRATEGY

3 2

1

DD’

DD’

2,1

3

EE’

EE’

12 mt

27 mt

1

2

3


PERFORMATIVE MUSIC AND SPORT 3.2 Block of Music The same design procedures are to be applied to the areas of sport and music. For the music block, starting from the street we want to activate a pedestrian and bicycle line in order to create the good conditions to start with the trigger. The Crazy jungle building will become a music and laboratory center, in which people will create their own instrument or produce music. The neighbourhood school of music and the ‘ScuoleCiviche Di Milano-Fondazione Di Partecipazione’ can have a place to stay and to share music, in which it will be possible to organise events ( also with the collaboration of Cascinet ). When the metro will comes we have all the conditions to host the music village. With the reusing of the containers we can create a place for community in which will also be possible to cultivate their own urban garden.

3.3 Block of Sport In the block of sport we are planning to build a pedestrian line and a bridge on the Lambro to connect the two main areas of this project. The triggering in this case is about open spaces. One is the space under the bridge and the other one is a new adventure park that permit the relation with the river with a different point of view. In this way the adventure park will be the first park over a real river and the idea is also to make the river area more visible and recognizable. Of course we need to requalify the river and some policies to activate also the industrial area near it, in order to create the conditions to make sport activity indoor. When the entire trigger starts to work the last step is about the real meaning of host: an Hostel. The area near the immigrants accommodation will host some buildings in which artist and people from all over the world can stay, with the improvement of facilities there is the possibility to improve also the quality of this area and create comfortable green zone for everybody.


5 POINTS STRATEGY Block of Music

+

Street light

Potential buildings Potential areas

1.Identify the morphology

2.Requalify the infrastructure

3.Activate the trigger

In this step our project is aiming to improve the quality of street by means of add bicycle path to the main street to make the area more accessible in different way, and install street light to the pedestrian section.

In this step we will activate the first building of our project - the Crazy Jungle. Change it to music lab and music studio for the students of musical school. Provide them a place and opportunity to training and produce their own music.

Via Cavriana

LOCATION

RECOGNIZING ACTION

Music lab/studio for students

REQUALIFICATION

ACTIVATION

Via Alfonso Gatto

POLICY

change the Creazy Jungle to Music Lab

arriving of metro line 4

change the empty area to event space

between Via Cavriana-Via Alfonso Gatto

create Music Village

Open the street to public

4.Define the policy By this step we will define and carry out some policy which are beneficial to our project. In this case our policy is opening the east-end part of the Via Alfonso Gatto and make also a link with Piazza dell’Artigianato. It will make the big area (which planned to host big events and concerts in the future) accessible. At the same time we will encourage the Cascinet to hold more cooprated musicial events with the Music Lab.

5.Develop and expand This is the last step of the project that wants to implement programs to approach the final view of the project. We will change some of the temporary buildings left after the metro construction to music studio for the young musicians and create “Music Village” in this area.


5 POINTS STRATEGY Block of Sport +

Potential buildings Potential areas

1.Identify the morphology

via Corelli

LOCATION

ACTION

RECOGNIZING

REQUALIFICATION

connect the via Privata Aquila and via Salesina

ACTIVATION

2.Requalify the infrastructure

3.Activate the trigger

4.Define the policy

In this step we are planning to build a pedestrian line and a birdge on the Lambro to connect the two main areas of this project.

After the requalification of the area, we will build the skateboard park under the Viadotto Parchi, and activate it as a trigger of this project. A the same time we will build an adventure park and improve the number of trees in the area near the Lambro river.

In this case one of our policies is about preventing and cleaning up the pollution of the Lambro river. We will mobilize the immigrants help to do this work. And we can provide free gym using to the workers of the industrial area as the exchange of more space to achieve the final goal of the project.

under the Viadotto Parchi

via Salesina

Street Sport Park

Advanture Park

arriving of metro line 4

between Viale Envico Forlanini and via Salesina

POLICY

change the empty industrial building to trainning space

between via Privata Aquila-Via Corelli

create hostel, bar and restaurant

5.Develop and Expand This step is about expand the project to a higher level to support the upfront activities and host more relative activities. In this project the goal is to have bar, restaurant and hostel for the street sport in the millitary area and build gym,indoor trainning space for street sports and peripheral product sale in the available industrial buildings.


STORIA SEMI-SERIA DEL GRANDE PARCO I l parco For lanini a soli 20 minuti dal centro r isulta essere uno di quei posti che fa pensare a cose belle mentre la realtà invece é che per anni ognuno si é preso il suo pezzetto. Hanno tutti pensato al proprio interesse in mezzo ad un'area che dovrebbe essere di tutti e per tutti. D opo una serie di analisi e sopralluoghi dell'area é propr io la sua multifunzionalità, la sua multietnicità e le sue molteplicità che ci hanno spinto a pensare ad Host. Host significa ospitare e accogliere, con un'attenzione par ticolare, per una volta, nella stor ia di questo parco, alle persone, alle comunità; nuove e vecchie. I l focus progettuale vuole considerare una serie di debolezze e di vuoti ( ma non mor fologici) da colmare e la par ticolar ità di questo progetto è che tutto quello che ser ve è già nell'area, nel suo contesto e nella bellezza di un parco che sarà a por tata di metro. Le aree maggior mente dense di popolazione o maggior mente potenziali r isultano essere quelle di via Cavriana, percorsa giornalmente e che affaccia su più realtà, la zona che ospita gli immigrati, vicino a un ponte e la zona di Novegro, centro cittadino dove l ’I ndustria e il signor denaro si sono presi quasi tutto per metterci auto a 8 euro al gior no. Ci sono però anche belle realtà che operano in questa distesa immensa che chiamiamo Grande parco, le cascine. E c'e un altro elemento ancor più bello per la città dei boschi ver ticali...lo spazio, ma quello vero, quello in or izzontale. Ci sono anche quar tieri, quar tiere For lanini con la sua realtà tranquilla ad un passo dall ’ essere inghiottita nella freneticità della metropoli e il quar tiere or tica, che alla balera è sempre festa. Poi c'è l' idroscalo, il mare di M ilano, che se ci vai sono tutti allegr i, che non impor ta quanta gente c'è, se ci sono i barbecue illegali, l' acqua è sporca ,'vedessi com'era bello 10 anni fa' ma 'alla fine veniamo lo stesso perchè ‘da Peschiera ci arriviamo in bici'. E allora pensavamo che magari, par tendo dalle zone residue, dal bene comune di tutti, senza andare a mangiare via altr i pezzettini da questa povera area, si potesse fare qualcosa. La strada è di tutti, è di chi vuole passeggiare con calma o che ci vuole passare veloce. La strada è dove si incontrano le persone, ancora come una volta. E visto che a Cascinet fanno la bella musica e c ’è anche la scuola civica che sicuramente vor rà condividere, perché non par tire da una strada della musica, impar iamo a costruire strumenti, attiviamo laboratori per imparare, nei quali pr ima di tutto c'è la comunità. D ove se non ho una chitar ra c'è sicuramente qualcuno che me la presta e se la musica italiana mi ha stancato posso incontrare tante persone e suonare tutte le musiche del mondo. Che poi la musica del parco For lanini non è mica solo questa. C'e anche quella che viene dall' autostrada, dal rumore di quel ponte ingombrante che poi l'hanno chiuso sotto e la gente ci va lo stesso. E allora apr iamo, facciamo in modo che una cosa così brutta diventi bella, facciamo in modo che la gente possa muoversi tutta e che il movimento delle macchine non sia nulla in confronto a quello degli sk ater dei par kouristi, di tutti quegli spor t strani con le corde e di chi semplicemente vuole guardar li, e allora si che la strada diventa dav vero un bene comune. M a ricordiamoci di non fermarci qui perché se ne avessimo voglia potremmo pure andare al mare e percor rere una strada che passa per Novegro. Perché poi dobbiamo immaginare che questi sono tra una ferrovia e un aereopor to, ma dopo una passeggiata nei campi romantici cosa si fa durante il gior no? E con tutte quelle industrie, la sera cosa si esce a fare? Forse Novegro è la risorsa più grande di tutte perché lei lo spazio ce l'ha per dav vero...e allora diciamoglielo a tutti quegli ar tisti, a tutti quei creativi in giro per M ilano che non sanno dove andare, ai professionisti, tutti in un co -wor k ing in corso G ar ibaldi; diciamoglielo che a Novegro abbiamo spazio, che c'è un cowor k ing che non ti fa spendere la metà di quello che guadagni e che ci sono un sacco di posti dove ognuno può espr imere ciò che vuole, teatro danza, ar te...diciamoglielo che la sera ci sono gli eventi, e che non bisogna più andare al M agnolia o al M c D onald davanti all' Europark , che ci sono bambini che vanno a scuola e che vogliono delle strade sicure , con marciapiedi grandi e spazi verdi, e che rendono bella la cascina Novegro con i loro disegni. Diciamogli che anche se siamo vicino all' aereopor to ci sarà la metro, tanto spazio e un luogo sano, e che se poi vogliono il mare basta attraversare la strada. È un futuro immaginabile e possibile, basta solo iniziare.


THE STORY OF GRANDE PARCO FORLANINI The par k For lanini only 20 minutes from the center is one of those places that makes you think of beautiful things while the realit y is that for years ever yone has taken their own piece. They all thought of their own interest in an area that should be for ever yone. Af ter a ser ies of analyzes and inspec tions of the area, it is precisely its multi-func tionalit y, its multi- ethnicit y and its multiplicit y that prompted us to think of Host. Host means hosting and welcoming, with special attention, for once, in the histor y of this par k , to people, to communities; new and old. The design focus wants to consider a ser ies of weak nesses and voids (but not morphological) to fill and the par ticular it y of this projec t is that all that is needed is already in the area, in its contex t and in the beaut y of a par k that will be reachable by metro line. The most densely areas populated or most potential are those of the street Cavriana, traveled daily and steered on more than one area, the area hosting immigrants, near a br idge and the area of Novegro, a cit y center where the industr y and M r. M oney took almost ever ything to put a car at 8 euros a day. But there are also beautiful realities operating in this vast expanse that we call Grande parco, the farmhouses. And there is another element even more beautiful for the cit y of the woods ver tical ... the space, but the real one, the horizontal one. There are also neighbourhoods, quar ters For lanini with its quiet realit y, one step away from being swallowed up in the freneticism of the metropolis and the Or tica. Then there is the H ydroscalo, the sea of M ilan, that if you go there are all happy, that does not matter how much people are there, if there are illegal bar becues, the water is dir t y, 'see how it was beautiful 10 years ago' but 'we come the same because we get from Peschiera by bike '. S o we thought that maybe, star ting from the residual areas, from the common good of all, without going to eat away other bits from this poor area, something could be done. The street is for ever yone, it is for those who want to take a leisurely walk or want to go fast. The road is where people meet, again as they once did. And since that in Cascinet they make beautiful music and there is also the civic school that will surely want to share, because not star ting from a path of music, we learn to build tools, we ac tivate wor kshops to learn, in which first of all there is the communit y. Where if I do not have a guitar, there is cer tainly someone who lends it to me and if the I talian music has tired me out I can meet many people and play all the music of the wor ld. What then the music of Forlanini par k is not just this. There is also that coming from the highway, from the noise of that cumbersome br idge that then closed it underneath and people go there any way. S o let's open, let's do it that something so bad becomes beautiful, we make sure that people can move around and that the movement of the machines is nothing compared to that of the sk aters of par kour ists, of all those strange things with ropes and those who simply want to look at them, and then that the road really becomes a common good. But let's remember do not stop here because if we wanted to, we could even go to the sea and take a road that passes through Novegro. Because then we must imagine that these are bet ween a railway and an airpor t, but af ter a walk in the romantic fields what do you do dur ing the day? And with all those industr ies, in the evening what do you go out to do? M aybe Novegro is the greatest resource of all because its really has the space ... and then let's tell it to all those ar tists, to all those creative people around M ilan that do not they k now where to go, to professionals, all in a co -wor k ing in Corso G ar ibaldi; let's tell him that in Novegro we have space, that there is a cowor k ing that does not make you spend it half of what you ear n and that there are a lot of places where ever yone can express what he wants, dance, theatre, ar t ... let's tell him that in the evening there are events, and that you do not have to go to M agnolia or M c D onald in front of Europar k , there are children who go to school and want safe streets, with big sidewalks and green spaces, and that make the Novegro far mhouse beautiful with their designs. Let's say that even if we are near the airpor t there will be a metro, a lot of space and a healthy place, e that if they want the sea then just cross the road. I t is an imaginable and possible future, you just have to star t.



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.