5 minute read
Comments
BUDGET $80 million DESCRIPTION The project's scope of work involves the construction of an integrated recreational complex with open spaces for walking in Yanbu, Saudi Arabia. The scope also includes construction of a large leisure club, restaurants, international shops, huge amusement parks, live entertainment facilities and parking facilities. COMPLETION 12/30/25
RETAIL Riyadh Exit 10 Mall
TERRITORY Riyadh, Saudi Arabia CLIENT Saudi Entertainment Ventures BUDGET $50 million DESCRIPTION The project's scope of work involves the construction of a mall, shops, food court, entertainment area, infrastructure works, parking facilities and associated facilities in King Abdullah Road in Riyadh, Saudi Arabia. COMPLETION 9/30/24
COMMERCIAL Diriyah Gate Development Super Basement Package
TERRITORY Riyadh, Saudi Arabia CLIENT Diriyah Gate Development Authority BUDGET $70 million DESCRIPTION The project's scope of work involves the construction of large basement car parking structure on an area of 750000m2, civil works, structural works, tunnels, parking space to accommodate more than 10,000 cars and associated facilities in Diriyah Gate Development, Riyadh, Saudi Arabia. COMPLETION 12/30/23
OMAN
INFRASTRUCTURE Al Aflaj Road Work
Governorate, Oman CLIENT Oman Ministry of Transport & Communications BUDGET $25 million DESCRIPTION The project's scope of work involves the construction of a 22 km single carriageway in the North Al Sharqiyah Governorate, Oman. The scope covers floodways, culverts, type-A junction and associated facilities. COMPLETION 7/30/23
HOSPITALITY Hayy Al Sharq Hotels
TERRITORY Barka, Oman CLIENT Muscat National Development & Investment Company (ASAAS) BUDGET $150 million DESCRIPTION The project's scope of work involves construction of a three-star 247-room hotel under the ‘Arjaan by Rotana’ brand, a four-star 263-room hotel under the ‘Reyhaan by Rotana’ brand in Barka, Batinah South, Oman. Facilities within the hotels include restaurants, lobby lounge, an executive lounge and parking facilities. COMPLETION 12/30/24
HOSPITALITY
Ibis Styles Muscat
TERRITORY Muscat, Oman CLIENT Oman Tourism Development Company (Mina Sultan Qaboos Waterfront Company BUDGET $45 million DESCRIPTION The project's scope of work consist of a hotel building with 280 keys located adjacent to the Oman Convention Exhibition Centre, Muscat, Oman. The scope also includes construction of banquet halls and meeting hall, conference halls, children’s club, recreational and leisure facilities, the exhibition center, a meeting hall, an all-day dining restaurant, parking facilities and installation of elevators and security systems. COMPLETION 12/30/23
BAHRAIN
COMMERCIAL Bahrain International Airport Cargo Village Package (Phase 1A)
TERRITORY Bahrain International Airport, Bahrain CLIENT Bahrain Airport Company BUDGET $50 million DESCRIPTION The project's scope of work involves the construction of phase 1A of the Cargo Express Village at Bahrain International Airport in Bahrain. The scope covers construction of access road from Al Rayya highway, parking facilities, security guardhouse, two power substations, FedEx warehouse (5,000m2) and its associated fitout works, a common processing facility warehouse 2 (2,500m2) and core & shell, warehouse 3 (2,500m2), warehouse 4 (2,500m2), water tanks, pumping station, airside security wall with associated works, an emergency gate, airside roads and yards. COMPLETION 12/30/24
RESIDENTIAL Al Ramli Housing Development (Plot No. 4)
TERRITORY Salmabad, Bahrain CLIENT Eskan Bank BUDGET $27 million DESCRIPTION The project's scope of work consists of 4 residential buildings each comprising 10 floors above 3 storey parking podium located at Salmabad, Bahrain. The project also includes car parking (2 per each apartment) and retail area of 1,152 square meters. The project featuring a total of 300 apartments all of which are 3 bedroom apartments divided as 160 units of 3 bedrooms apartments and 140 units of 4 Bedrooms apartments,
with a component of a Retail at the ground floor level. COMPLETION 12/30/23
INFRASTRUCTURE Askar Engineered Landfills
TERRITORY Bahrain CLIENT Bahrain Ministry of Municipalities Affairs & Urban Planning BUDGET $10 million DESCRIPTION The project's scope of work involves an engineered landfill for the disposal of waste. The scope of work also involves a site investigation, site preparation, lining of the site, installation of gas and leachate collection systems, operation and maintenance of the site and final restoration. COMPLETION 12/30/23
QATAR
HEALTHCARE Lusail Diabetes Hospital
TERRITORY Lusail,Qatar CLIENT Integrated Intelligence Services (IIS Holding) BUDGET $45 million DESCRIPTION The project's scope of work consist of a 4-storey diabetes hospital building located in Lusail, Qatar. It also includes an intensive care unit, labs, pharmacy and parking facilities. COMPLETION 12/30/23
HEALTHCARE Al Wakra New Mental Health & Psychiatry Hospital
TERRITORY Al Wakra, Qatar CLIENT Hamad Medical Corporation (HMC) BUDGET $165 million DESCRIPTION The project's scope of work consist of a mental health and psychiatry hospital building located at Al Wakra, Qatar. The project also includes 160-bed hospital expandable upto 208-bed capacity, 30,000 square meters accommodation over three levels, 45,000 square meters gardens over three levels, 6,000 square meters recreational space, 750 capacity car parking spaces in basement. COMPLETION 12/30/23
ENERGY Facility E Integrated Water & Power Plant (IWPP)
TERRITORY Ras Rakan, Qatar CLIENT Qatar Electricity & Water Company (QEWC) BUDGET $3 billion DESCRIPTION The project's scope of work involves the construction of Facility E Independent Water and Power Plant located at Ras Rakan, Doha, Qatar. The project shall cover the installation of a combined cycle power plant with a net power capacity in the range of 2000–2500 megawatt (MW) and a net water production capacity in the range of 100-130 Million Imperial Gallons per Day (MIGD) and design seawater temperature of a maximum of 38°celsius. The project also includes 378,541 cubic meters per day of water. The desalination plant will be based either on the multi-stage flash process (MSF) or on a multiple effect distillation process (“MED”) or on a hybrid solution of MSF or MED plant supplemented by reverse osmosis plant (“RO”) or 100% RO. The project also includes laying of transmission lines and pipelines, installation of substations, transformers, switchgear, turbines, and generators. COMPLETION 12/30/24
KUWAIT
District 300kV UG Cables Extension
TERRITORY Al Sabah Medical District,Kuwait CLIENT Kuwait Ministry of Electricity & Water BUDGET $25 million DESCRIPTION The project's scope of work involves the construction of a 300kV underground cables at Al Sabah Medical District in Kuwait. COMPLETION 12/30/24
TERRITORY Jaber Al Ahmed City, Kuwait CLIENT Public Authority for Housing Welfare BUDGET $70 million DESCRIPTION The project's scope of work involves the construction of a private university, a library, infrastructure work, parking facilities and associated facilities on a plot area of 88,977m2 in Jaber Al Ahmed City, Kuwait. COMPLETION 12/30/24
HEALTHCARE Jaber Al Ahmad Private Hospital (J5)
TERRITORY Jaber Al Ahmed City, Kuwait CLIENT Public Authority for Housing Welfare BUDGET $50 million DESCRIPTION The project's scope of work involves the construction of a hospital on a design, build, finance, operation, maintenance and transfer basis within a plot of 40,798 square meters and located adjacent to residential area and proximate to the private university (J4) and the Public Authority for Applied Education and Training sites in Jaber Al Ahmed City, Kuwait. The facility also includes parking facilities and associated facilities. COMPLETION 12/30/24