ARTICULATION JOINTS

MARLBROUGH STREET PROPOSED COMMUNITY HOUSING COMPLEX

ARTICULATION JOINTS ARE TO BE SPACED IN ACCORDANCE WITH THE SOIL REPORT AND THE CEMENT AND CONCRETE ASSOCIATION OF

SHEET LIST

AUSTRALIA TECHNICAL NOTE 61. JOINTS ARE TO BE LOCATED AS FAR AWAY FROM A CORNER AS THE HEIGHT OF THE WALL, AT CHANGES IN WALL HEIGHTS AND CHANGES IN FOUNDING MATERIALS. THEY ARE REQUIRED TO BE 10mm FOR MASONRY UP TO 3m AND 15mm FOR MASONRY UP TO

SHEET NAME

6m AND ARE TO BE FILLED WITH MASTIC.

CONSULTANTS

REFER TO ENGINEERS DRAWING

Structural Engineer

HAC Engineers

Building Surveyer

Traffic Engineer

Traffix Engineering

Fire Engineer

Hydrolic Engineering

Cjarms Hydrolic Services

Landscape Architect

Rick Day Landscaing

FOR LOCATIONS

WINDOW POSITIONING:

PLP Building Surveyers IFS Consultants

ALL WINDOW OPENINGS ARE TO BE CONSTRUCTED TO BE EITHER; A) ALWAYS LOCATED TO BE CENTRE WITHIN LENGTH OF WALLS OR, B) AS DIMENSIONED. C) WINDOW HEADS AT NOMINAL AS SHOWN,

INTERNAL DOORS POSITIONING: ALL DOOR OPENINGS ARE TO BE CONSTRUCTED TO BE EITHER;

GENERAL NOTES

A) ALWAYS LOCATED TO BE CENTRE WITHIN LENGTH OF WALLS OR,

FOR ALL JOINERY DETAILS AND DIMENSIONS REFER TO CABNETMAKERS DRAWINGS

ALL GLAZING IS TO BE IN ACCORDANCE WITH AS 1288-2006

B) ALWAYS TO BE AT AN OFFSET OF 120mm FROM ADJOINING WALL OR,

FOR ALL STRUCTURAL ELEMENTS AND DETAILS REFER TO ENGINEERS DRAWINGS

SLABS AND FOOTINGS TO BE CONSTRUCTED IN ACCORDANCE WITH AS 2870-1996

C) AS DIMENSIONED.

ALL TIMBER CONSTRUCTION IS TO BE IN ACCORDANCE WITH AS-1684.2-2006

WET AREAS ARE TO HAVE WATERPROOF MEMBRANES INSTALLED IN ACCORDANCE WITH AS 3740-2004

D) DOOR HEADS AT NOMINAL 2400mm.

SMOKE ALARMS: - PROVIDE SMOKE ALARMS WHERE LOCATED ON FLOOR PLAN AND CONNECT TO MAIN POWER SOURCE WITH BATTERY BACK-UP IN ACCORDANCE WITH AS 3786 & B.C.A.

SOIL CLASSIFICATION

SHEET NO.

SITE/LANDSCAPE PLAN COVER BASEMENT GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR ROOF PLAN ELEVATIONS 01 ELEVATIONS 02 APARTMENT LAYOUT SECTIONS LONG SECTION DETAILS SECTION DETAILS

A01 A00 A02 A03 A04 A05 A06 A07 A08 A09 A10 A11 A12 A13

- CLASS A REFER TO SOIL REPORT

TERMITE TREATMENT - SITE TO BE TREATED AGAINST SUBTERRANEAN TERMITES IN ACCORDANCE WITH AS.3660.1 TO LOCAL AUTHORITIES SATISFACTION.

SECURITY: BUILDER IS TO MAKE SITE SECURE AND SAFE ON ALL BOUNDARIES.

INFERRED WORKS: ANY WORKS NOT SPECIFICALLY CALLED FOR BY THE CONTRACT DOCUMENTS AND DRAWINGS, BUT REASONABLY OR OBVIOUSLY NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORKS SHALL BE DONE AT EXTRA COST TO THE OWNER. BUILDER SHALL PAS ON VIA VARIATION.

MAN HOLES: PROVIDE MAN HOLES IN CEILINGS TO PROVIDE ACCESS TO ALL AREAS WITHIN THE ROOF SPACE. PROVIDE LIGHT AND LIGHT SWITCH ADJACENT TO OPENING. CONFIRM FINAL POSITION AND TYPE WITH OWNER.

HEATING AND COOLING: BUILDER TO CONFIRM WITH OWNER ALL REQUIREMENTS FOR HEATING AND COOLING INCLUDING TYPE, INSTALLATION DETAILS, MANUFACTURERS REQUIREMENTS, ELECTRICAL AND PLUMBING REQUIREMNTS, DUCTWORK AND CONTROLLERS BEFORE COMMENCING ANY WORKS.

EXHAUST FANS:

MARLBROUGH STREET COMMUNITY HOUSING COMPLEX Project number

PROVIDE SELECTED EXHAUST CEILING FANS AND INSTALL TO MANUFACTURERS DETAILS.

Date Project Adress

WINDOWS / GLAZING:

Drawn by

- TIMBER FRAMED WINDOWS AS SELECTED. (WINDOW DIMENSIONS GIVEN ARE NOMINAL ONLY) CONFIRM ON SITE. BEFORE COMMENCING ANY WORKS)

Client

01 03/05/13 48-58 MALRBROUGH STREET BALACLAVA Designer RMIT DEISGN TAFE

Scale

As indicated

A00

WINDOWS IN BUILDINGS IN TO BE IN ACCORDANCE WITH AS 2047-1999

COVER

GLAZING, INCLUDING MIRRORS, WITHIN 2000mm OF THE FLOOR LEVEL IN BATHROOMS AND ENSUITES SHALL BE GRADE A SAFETY GLASS.

DO NOT SCALE DRAWING GLAZED PANELS WITHIN 500mm OF THE FINISHED FLOOR LEVEL ARE TO BE GRADE A SAFETY GLASS. GLAZED PANELS IN DOORS AND SIDE PANELS WITHIN 1200mm OF THE FINISHED FLOOR LEVEL ARE TO BE GRADE A SAFETY GLASS.

LIFT OFF HINGES: - PROVIDE LIFT-OFF HINGES TO WC DOORS WHEN WITHIN 1200mm RADIUS OF PAN. TO BE CONFIRMED ON SITE.

THE CONTRACTOR, OR ANY SUBCONTRACTED NOMINEES OF THE CONTRACTOR ENGAGED IN THE WORKS AS INDICATED IN THE PERFORMANCE DOCUMENTATION, SHALL VERIFY ALL DIMENSIONS PRIOR TO THE COMMENCEMENT OF WORKS ANY DISCREPANCIES AFFECTING THE SET OUT AND PERFORMANCE OF THE WORKS OR PROCUREMENT OF THE WORKS DUE TO ANY CIRCUMSTANCE, NOT LIMITED TO IN SITU CONDITIONS OR ANY PROHIBITIVE RESTRICTION ENCOUNTERED DURING ANY PERIOD OF THE CONSTRUCTION, SHALL BE REFERRED TO G.M DESIGN ITSELF; DUE TO ANY UNSEEN CIRCUMSTANCE. THE CONTRACTOR, ANY SUB CONTRACTOR OR PROVIDER OF ANY BUILDING OR LABOUR MATERIAL NOT BEING LIMITED TO THE DOCUMENTATION AS SET OUT, SHALL SUPPLY FULL SHOP DRAWINGS AND WHERE NECESSARY UNDER THE BUILDING CODE OF AUSTRALIA OR ANY AUSTRALIAN OR INTERNATIONAL STANDARDS, PROVIDE CERTIFICATIONS AND COMPLIANCE DOCUMENTATION TO FACILITATE FULL CLARIFICATION OF ALL WORKS TO BE COMMENCED OR REQUIRED