CONTENTS Company Profile
2
Health & Safety
2
Civils Portfolio
2
Fullabrook Windfarm, Bittadon, Devon, EX31 4HL.
4
Freefoam Plastics Ltd. St James Mill Road, Northampton, NN5 5JP.
4
Rathcahill Windfarm, Tournafulla, Co Limerick
4
Greensbridge, New Road Surface Water Drainage Scheme, Kilkenny
5
Maudlins Industrial Estate Waste Water Treatment Plant, Naas, Co. Kildare
5
Ballinora to Lehenaghmore Gas Pipeline, Cork – Reinstatement
5
Ballinora to Lehenaghmore Gas Pipeline, Cork
6
Midleton to Whitegate Gas Pipeline, Co. Cork
6
Fairfield Meadows Housing Development, Cork – Phase 2
6
Cluid Housing Development, Newmarket, Co. Cork
7
Oakfield Housing Development, Co. Clare
7
Cluid Housing Development, Rathgoggin, Charleville, Co. Cork
7
Milestream Housing Development, Shanakiel, Blarney Rd, Cork – Phase 2
8
Infrastructure Enabling Works, Milestream, Shanakiel, Blarney Rd, Cork
8
Fairfield Meadows Housing Development, Fairhill, Cork
9
Orchard Heights Housing Development, Charleville, Co. Cork
9
Underground Car Park, Harty’s Quay Apartment Development, Mahon, Cork
10
Askeaton High Pressure Gas Pipeline to Wyeth Pharmaceutical Factory, Askeaton, Co. Limerick
11
Brideholm Apartment Development, Commons Road, Blackpool, Cork
12
Ballincollig By–Pass, Ballincollig, Cork
12
Firhouse Road, Realignment, Firhouse Road, Tallaght, Dublin
13
Curragh Sewerage Scheme, Curragh Camp, Co. Kildare
14
Gas Pipeline to the West, Bruff, Co. Limerick to Crusheen, Co. Galway
14
M1 Motorway, Drogheda By–Pass, Co. Louth
15
Cork Main Drainage, Mahon, Cork
15
Ballincollig to Ballineen Gas Pipeline, Cork
15
Construction Portfolio
16
Warehousing
17
Government Contracts
17
Commercial
17
Luxury Dwellings
18
Apartments
18
Offices
18
Marine
19
Small Works
19
Pharmaceutical
19
2
COMPANY PROFILE
“At Roadform Ltd., our overriding mission is to establish lasting
relationships with our customers, by exceeding their expectations and gaining their trust through exceptional performance.”
Roadform Ltd. is an international civil engineering company with offices in Cork, Dublin and London. We place a strong emphasis on performance, quality, safety, teamwork and a “hands-on” management approach to ensure client satisfaction. We have been involved in medium to large scale infrastructure developments since 1998 and have built a reputation for being a contractor of choice for pipeline construction, windfarm development, bulk excavations, road building, groundworks, utilities and reinforced concrete contracts. Our workforce and modern fleet of plant and equipment is readily mobilised allowing us to undertake projects on a nationwide basis.
Roadform Ltd. recognise the importance of trust, certainty, conformance and value to our clients and can be relied upon to deliver projects safely, on time and on budget. A company is only as good as its employees and we place great emphasis on employee development and training at all levels which creates a competent culture in our company. As part of our commitment to safety, health and environment all our operatives are CSCS / CPCS qualified and undergo regular training. Our management team have extensive experience in construction projects demonstrated by our company’s wide range of successfully completed contracts. We are committed to high levels of quality, safety and environmental performance and pride ourselves on our standards and record. We have a zero accident record since the business began in 1998. We are certified to ISO 9001, ISO 14001, OHSAS18001 and to Achilles Building Confidence, CHAS and Constructionline. Our management team place great emphasis on communicating the company’s quality, environmental, safety and health standards to our workforce, and consulting them and others on continual improvement.
CIVILS PORTFOLIO
Civils Portfolio
4
Contract: Fullabrook Windfarm, Bittadon, Devon, EX31 4HL.. Client
John Sisk & Son Ltd
Duration:
October 2010 – November 2011
Contact:
Alan Donnelly PM - 07407 732099
Contract Details: Main Civils Contract for the construction of a 22 turbine, 66 megawatt windfarm. This includes the upgrading of existing public roads and junctions, site enabling works, construction of 15km of access roads, base excavations, cable ducting, base and access road reinstatement.
Contract: Freefoam Plastics Ltd. St James Mill Road Northampton Northamptonshire NN5 5JP. Client
Freefoam Plastics Ltd.
Duration:
December 2010 to date
Contact:
Colin St. John - 01604 591110
Contract Details: This contract involved the design and build of a nationwide distribution centre extension. This involved site clearance, fill importation, retaining structure and the supply of finishing of 6500m2 of reinforced concrete. Contract: Rathcahill Windfarm, 38KVA Cable Installation Toornafulla, Co. Limerick (IRE) Client: Duration Contact:
John Sisk & Son Ltd February – April 2011 John O’Connor, Contracts Manager
Contract Details: This contract involved the installation of 4.2 km of 38KVA underground ducting and cabling. It also consisted of the construction of insitu jointing chambers along the route. The route consisted of 2.9km in greenfield and 1.3 km on primary public road. This road had to remain live at all times through active traffic management. The purpose of this cabling was to connect Rathcahill Windfarm Tournafulla, Co Limerick (IRE) to the national grid.
Civils Portfolio
Contract: Greensbridge, New Road Surface Water Drainage Scheme, Kilkenny. Client:
Kilkenny County Council
Duration:
August – September 2009
Contact:
Michael Murphy 056 7752699
Contract Details: This involved the installation of a 450mm pipe for road surface water drainage over 200 linear metres in Kilkenny city. Works were carried out around live services and involved the supply of plant, labour and materials. Setting out, engineering services and traffic management were also provided by Roadform Ltd. Upon installation of the pipeline, permanent reinstatement works were carried out.
Contract: Maudlins Industrial Estate, Waste Water Treatment Plant, Co. Kildare. Client:
QK Coldstores Ltd
Duration:
May to July ‘09
Contact:
John Hennebury, 045 894100
Contract Details: This contract involved the construction of an over ground waste water treatment tank with a capacity of 3,600,000 litre. Our contract involved the supply of plant, labour and materials. Works involved the supply and fixing of 140 tonne of steel, the supply and placing of 1,500 m3 of concrete, 300 linear metres of contraction joints, 500 linear metres of water bar and 2,200 m2 of formwork.
Contract: Ballinora to Lehenaghmore Gas Pipeline Phase 2 Reinstatement Contract Client:
P.J. Hegarty Ltd
Duration:
May to June 2009
Contact:
Maurice Killeen, PM 086 8116469
Contract Details:
Land drainage, sub-soil ripping, topsoiling and
boundary reinstatement of 6km gas pipeline.
5
Civils Portfolio
Contract: Ballinora to Lehenaghmore Gas Pipeline
Main Contractor:
P.J. Hegarty Ltd.
Duration:
August 2008 to October 2008
Contact:
Maurice Killeen, PM 086 8116469
Contract Details: The details of our contract included the stripping and benching, pipe stringing, trench excavation, sanding and backfill for a 250mm gas pipeline. This includes rock excavation and road and stream crossings for the construction of 6.0km of the gas pipeline
Contract: Midleton to Whitegate Gas Pipeline, Cork Main Contractor:
Murphy International Ltd
Duration:
May 2008 to July 2008
Contact:
Danny Corr, CM 087 2553509
Contract Details: The details of our contract included the stripping and benching, trench excavation and backfill for a 600mm gas pipeline. This included rock excavation for the construction of 16.5km of the gas pipeline.
Contract: Fairfield Meadows – Phase 2 Main Contractor: Duration: Contact:
Coleman Brothers Developments March 2008 to March 2009 Michael Coleman, MD 087 2465837
Contract Details: The details of our contract included the supply of plant, labour and materials for the excavation and groundwork’s of 24 residential units from a green field site to floor level. The project consisted of site excavations, rock excavations, main drainage and services, house bases, paths, paving, roadways and landscaping etc.
6
Civils Portfolio
Contract: Cluid Housing Development, Newmarket, Co. Cork.
Client:
Atlantic Developments, Briarhill, Galway
Duration:
April 2007 to June 2008
Contact:
John Brady, PM, 087 2529688
Contract Details: The details of our contract included the supply of plant and labour for 37 residential units from green field to floor level which includes site clearance and excavations, main drainage, house bases, landscaping, roads, paths and paving etc.
Contract: Oakfield Housing Development Client:
Burke Building and Civil Engineering, Atlantic Road, Lisdoonvarna, Co. Clare.
Duration:
October 2007 to March ‘09
Contact:
Kevin Enright, PM, 086 2313716
Contract Details: The details of our contract included the supply of plant and labour for the groundworks contract of 164 residential units from green field to floor level. This includes earthworks, drainage, site services, house bases, roads, paths and paving, landscaping, boundary fencing etc. Contract: Cluid Housing Development, Rathgoggin, Charleville, Co. Cork Client: Duration: Contact:
Atlantic Developments, Briarhill, Galway January to December 2007 John Brady, PM, 087 2529688
Contract Details: The details of our contract included groundworks for 48 residential units from green field to floor level. This included site excavations, main drainage, house bases, water mains, house services, landscaping, roads, paths and paving etc.
7
Civils Portfolio
Contract: Milestream Housing Development, Shanakiel, Blarney Road, Cork – Phase 2 Main Contractor:
Roadform Ltd.
Client:
Coleman Brothers Developments Ltd, Tower, Blarney, Co. Cork.
Duration:
April 2007 to August 2008
Contact:
Michael Coleman, MD, 087 2465837
Contract Details: The details of our contract included the supply of plant, labour and materials for Phase 2, a groundworks contract for 45 residential units. This includes house bases, boundary fencing, landscapes, services, footpaths, public footpaths, road paving and kerbing etc, from green field to floor level.
Contract: Infrastructure Enabling Works Milestream Housing Development, Shanakiel, Cork Main Contractor:
Roadform Ltd.
Client:
Coleman Brothers Developments Ltd, Tower, Blarney, Co. Cork.
Duration:
August 2006 to May 2007
Contact:
Michael Coleman, MD, 087 2465837
Contract Details: The details of our contract involved the supply of plant, labour, materials and setting out of levels for the construction of a new road junction on the Blarney Rd, and 350 metres of a single carriageway link road to service 104 residential units on a green field site. The project consisted of bulk excavation of 30,000m3 of rock, rock crushing and screening for reuse. Main drainage, water mains, ESB, telecom, gas for house services, public footpaths, boundary walls, slip form kerbing, road paving and the construction of storm water attenuation tank. The earthworks in this project were completed for a proposed site for 104 units which were linked to the Blarney Road with the new link road.
8
Civils Portfolio
Contract: Fairfield Meadows, Fairhill, Cork. Main Contractor:
Roadform Ltd.
Client:
Coleman Brothers Developments Ltd, Tower, Blarney, Co. Cork.
Duration:
April 2006 to March 2007
Contact:
Michael Coleman, MD, 087 2465837
Contract Details: The details of our contract included the supply of plant and labour for the excavation and groundwork’s of 44 residential units from a green field site to floor level. The project consisted of site excavations, rock excavations, main drainage and services, house bases, paths, paving, roadways and landscaping etc.
Contract: Orchard Heights Housing Development, Charleville, Co. Cork Main Contractor:
Burke Building & Civil Eng., Atlantic Road, Lisdoonvarna, Co. Clare.
Duration:
November 2005 to October 2007
Contact:
Kevin Enright, 086 2313716
Contract Details: The details of this contract included the groundwork’s contract for 92 residential units. The work carried out was from a green field site to floor level. This project consisted of site excavation, main drainage, water mains, house services, house bases, public roads, paths, paving and landscaping etc.
9
Civils Portfolio
10
Contract: Underground Car Park at Jacob’s Island Development, Mahon, Cork
Main Contractor:
Ridge Developments Ltd. Dunderrow, Kinsale, Co. Cork
Duration:
June 2004 to February 2005
Contact:
Brian Keohane
Contract Details: Construction of an underground car park capable of accepting 70 parking spaces along with bin-stores/bike shed/service areas and two lifts the basement covers the whole footprint of the first 2 blocks. 9000 cubic metres of excavation took place before the piled foundations of up to 17m deep took place. An intricate system of ground beams/pile-caps and in-situ reinforced frame was constructed below high water level. A sophisticated dewatering system allowed construction to continue during heavy rains and high tides throughout the winter.
Civils Portfolio
Contract: Askeaton High Pressure Gas Pipeline to Wyeth Pharmaceutical Factory, Askeaton, Co. Limerick. Main Contractor:
Roadform Ltd & Murjoy Ltd - A joint venture.
Duration:
July 2004 to July 2005
Contact:
Michael Murphy, MD, 087 2556967
Contract Details: The details of this contract included the construction of 2.6 km, 150mm high pressure gas pipeline which was a branch off of the main national gas pipeline to supply Wyeth Pharmaceutical Factory in Askeaton. For this project Roadform were the main civil contractors and Roadform's contract was the stripping and benching of an 18meter wide 2.6km way leave through fields, trench excavation, pipe ditching, back-filling and spread reinstatement. Murjoys contract was the connection to the existing main line by means of a hot-tap, 2.6km of pipe welding and construction of an AGI at Wyeth’s.
11
Civils Portfolio
Contract: Brideholm Apartment Developments, Commons Road, Blackpool, Cork. Main Contractor:
Coleman Brothers Developments Ltd, Tower, Blarney, Co. Cork.
Duration:
November 2003 to March 2004
Contact:
Michael Coleman, MD, 087 2465837
Contract Details: The details of this contract included bulk excavation for two apartment blocks adjacent to the main CorkMallow Road, Blackpool. The project consisted of excavation of 17,500m3 of rock and 13,000m3 of subsoil. This also involved the disposal of materials off site.
Contract: Ballincollig By-Pass, Ballincollig, Cork Main Contractor:
Gama-Tubin Construction, Greenfields, Ballincollig, Cork
Duration:
August 2002 to March 2003
Contact:
Tansel Attagoue, 01 8629600
Contract Details: The details of this contract included the excavation of 50,000m3 of bog land, which was three meters below the water table and filling the excavation with rock on the Poulavone interchange as part of the formation of the main carriageway.
12
Civils Portfolio
13
Contract: Firhouse Road Realignment, Firhouse Rd, Tallaght, Dublin Main Contractor:
Regan Civil Engineering, Halverstown, Killcullen, Co. Kildare.
Duration:
May 2003 to November 2003
Contact:
Eoin Costello, PM 086 3845005
Contract Details: The details of this contract included the supply of all management, plant and labour for this project. This project consisted of realigning of the existing road from the M50 link road to Firhouse School which was approximately 500meters long including the construction of new water mains, storm pipeline, gas and eircom services, a new bus corridor and cycle path, new kerb lines and the paving of the realigned road. This construction work was carried out while keeping the traffic free flowing to and from the M50 interchange.
BUILDING & CIVIL ENGINEERING Civils Portfolio
14
Contract: Curragh Sewerage Scheme, Curragh Camp, Co. Kildare Main Contractor:
Regan Civil Engineering, Halverstown, Killcullen, Co. Kildare.
Duration:
November 2002 to June 2003
Contact:
Eoin Costello, PM 086 3845005
Contract Details: The details of this contract included the supply of all site management, plant and labour for the main contractor. The project consisted of laying storm and foul lines from an existing treatment plant through the Curragh army barracks and the Curragh village. Approximately 1.2km of precast concrete storm pipes (225mm–600mm), 800 meters of precast foul (225mm–450mm), 74 precast manholes and also the replacement of old connections with 225mm concrete into new storm and foul lines. Road and field reinstatement etc.
Contract: Gas Pipeline to the West Bruff, Co. Limerick to Crusheen, Co. Galway.
Client:
P.J. Hegarty Ltd & O’Regan Civil Engineering
Duration:
March 2002 to September 2002
Contact:
John Brady, PM, 087 2529688
Contract Details: The details of our contract included the stripping and benching of a 30 metre wide way leave through fields, 96 Km in length, to facilitate the construction of a 96 km 600mm diameter gas pipeline which was part of the national network.
Civils Portfolio
Contract: M1 Motorway, Drogheda By-Pass, Co. Louth Client:
SIAC O’Rourke & O’Regan Civil Engineering
Duration:
March 2001 to October 2001
Contract Details: The details of our contract included the bulk excavation, cut and fill and motorway drainage as part of the formation of the M1.
Contract: Cork Main Drainage, Mahon, Cork Main Contractors:
P.J. Hegarty Ltd & O’Regan Civil Engineering
Duration:
April 2001 to October 2002
Contact:
John Brady, PM, 087 2529688
Contract Details: The details of our contract were the supply of site management, plant & labour for a section of drainage on the Cork Main drainage scheme. This consisted of the construction of 1.2kms of two 1200 diameter, ductile iron sewer lines which were in the one trench. The sewer lines were laid on 900m of a public road and 300m in green areas. The majority of the trench depth was from 8 – 10 meters deep. All excavated material was disposed of off site and the trench was backfilled with stone, the complete road was also reinstated, we also excavated for a pumping station which was 8 meters deep in rock. Contract: Ballincollig to Ballineen Gas Pipeline, Co. Cork Main Contractor:
P.J. Hegarty Ltd & O`Regan Civil Engineering
Duration:
June 2000 to October 2000
Contact:
Eoin Costello, PM 086 3845005
Contract Details: The details of our contract included the stripping of top-soil and benching of a 28km long, 18meters wide way leave through fields for the construction of a 300mm diameter high pressure gas pipeline.We were also involved in trench excavations, pipe bedding, and pipe ditching, backfilling and field reinstatement when our stripping contract was completed.
15
BUILDING & CIVIL ENGINEERING
CONSTRUCTION PORTFOLIO
Construction Portfolio
17
WA R E H O U S I N G
GOVERNMENT CONTRACTS Bus Eireann, Bus Terminal, Cork..
Dept. of Defense, Naval Base.
COMMERCIAL
Irish Mail Sorting Office
Wagamama
Construction Portfolio
LUXURY DWELLINGS
A PA R T M E N T S
Apartments, Kilmacsimon
Harty’s Quay Apartments
OFFICES Musgrave Group Head Office
18
Construction Portfolio
MARINE
Retaining Walls to House. Kinsale. Co. Cork.
Washington Street Apartments
Retaining Wall, Castlepark.
SMALL WORKS Customs House, Port of Cork
PHARMACEUTICAL Lilly
St. Annes. Shandon, Refurbishment
19