Role: Design Leader Stage: Constructed
05/2018 TuopaiShede, China
T uopai Winery East Gate
Gateway Design
S P R I N G G AT E WA Y
Spring, Winery Gateway, Sculptural approach, Tradition and Technology
The Baijiu wine produced by Tuopai winery has in essence in water: in this area of Chengdou a spring was discovered and allows the production of the most traditional Chinese wine. From the legend, to nowadays, water is the key element of the production. The Spring Gateway, with a cantilever structure, is support by cascade inspired columns. It allows the collection of the heavy rainwater of Chengdu province into the column, which is then directed to a central water channel, inspired by the Qing dynasty design. The terrine of the wine is reused to break and direct the water in a dynamic landscape.
Spring Inspiration: Waterfall by Hiroshi Senju
Spring, Winery Gateway, Sculptural approach, Tradition and Technology
Company: Martha Schwartz Partners Engineer Consultant: AtelierOne
Spring Gateway Design
3
Spring, Winery Gateway, Sculptural approach, Tradition and Technology 05/2018 TuopaiShede, China
Gateway Design
4
Role: Design Leader Stage: Constructed
Spring, Winery Gateway, Sculptural approach, Tradition and Technology
Company: Martha Schwartz Partners Engineer Consultant: AtelierOne
5
6
Role: Design Leader Stage: Constructed
05/2018 TuopaiShede, China
Spring, Winery Gateway, Sculptural approach, Tradition and Technology
Prototype
Prototype Gateway - Stainless Steel 1:10 Model Reflections study
Prototype Gateway - Stainless Steel 1:10 Model China
Spring, Winery Gateway, Sculptural approach, Tradition and Technology
Company: Martha Schwartz Partners Engineer Consultant: AtelierOne
Construction Pictures of Tuopain Winery Gateway Cantilevered Columns and Frames
Construction Pictures of Tuopain Winery Gateway
7
8
Role: Project Manager, Design Leader Stage: Concept Design, Schematic Design, Design Developement
05/2018 TuopaiShede, China
Completition
After Construction Picture
After Construction Pictures
Company: Martha Schwartz Partners Engineer Consultant: AtelierOne
1 year After Construction - View of Tuopai Winery Spring gateway
9
10 01-07/2016 Bangkok Thailand
Lotus Pond Skywalk
Built Project
Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Role: Designer Stage: Concept Design, Schematic Design, Detail Design
Bangkok Skywalk is an ambitious project of redevelopement of one of the most high-traffic intersection in Bagkook. The aim of the project is creating a pedestrian landmark in the city, through the use of sculptural canopies and iconic paving design. The canopies have been designed as a double laminated layer of glass, with OPV cells laminated in the PVB layer. During design developement and value engineering process the design has been simplified towards Fiber glass circular canopies, with water collection in the central spine. To iterate the local culture, artist sfrom Thailand have been invited to appropriate the canopy creating a Public Art perfromance and dialogue between architecture and art. The project creates a vibrant sense of arrival and experiencing an unique atmosphere. The paving, using Sphera Equipe circular ceramic tiles, is designed following a pointillisme technique of color coding and complex layout of 16 different gradients of colors, inspired to the infinite water variations of lotus ponds-from which Pathumwan name, ‘Lotus Pond’.
Paving Plan Detail
Paving Detail Sphera Equipe Tiles
Color Coding Detail Tiles - Paving Plan
Construction Pictures Source: BangkokPost
Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Company: Martha Schwartz Partners Team: Martha Schwartz, Alicia Hidalgo, Cristina Morbi, Claudia Pandasi, Matthew Williams
11
12
Role: Designer Stage: Concept Design, Schematic Design, Detail Design
01-07/2016 Bangkok Thailand
Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Detail Design Planter
Planter Detail
Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Company: Martha Schwartz Partners Team: Martha Schwartz, Alicia Hidalgo, Cristina Morbi, Claudia Pandasi, Matthew Williams
Pictures of Site after construction Source: Eugene Goes Places
13
14 Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Role: Designer Stage: Concept Design, Schematic Design, Detail Design
Canopy Detail
Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Company: Martha Schwartz Partners Team: Martha Schwartz, Alicia Hidalgo, Cristina Morbi, Claudia Pandasi, Matthew Williams
Pictures of Artist drawing on Canopy Source: Eugene Goes Places
15
16
Role: Designer Stage: Constructed
01/06/2018 Vilnius Lithuania
Vilnius Plaza
1st Prize Competition
Plaza, Wayfinding, Gateway
The noticeable progression running along the North South axis of the development site when extended into the wider urban context informed the strategy of our design. Historical, traditional, demographic and cultural influences were apparent from the Old City to the south through to the more developed residential areas to the north. Physical topographical changes and progressions through the landscape were abstracted to create the overall design narrative of a “surging landscape.” We envisage the site as a place that will continue to evolve and adapt without abandoning its rich landscape spectrums, where the site becomes a place that existing landscape elements are celebrated, and the future is promoted for the welfare of new generations.
Plaza, Wayfinding, Gateway
Company: Martha Schwartz Partners Team: Diego Pacheco, Cristina Morbi, Jinkoo Park
Construction Pictures
17
18
Role: Designer Stage: Constructed
01/06/2018 Vilnius Lithuania
REINFORCED CONCRETE DETAIL AND SPECIFICATION TO SPECIALIST
400
2000
R2
Detail Design Prototype
R2
0
0
400
R2
2000
R2
50 300 50 R2
0
0
REINFORCED CONCRETE DETAIL AND SPECIFICATION TO SPECIALIST
50 300 50 R2
0
0
R2
0
R2
1200
1200
0
DRAINAGE CELL REFER TO ENGINEER'S SPECIFICATION
BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION. GEOTEXTILE ENGINEER'S DRAINAGETO CELL REFER TOSPECIFICATION ENGINEER'S SPECIFICATION
SECTION
01
PLANTER TYPE01 SCALE : 1:20 SECTION
01
@ A1
HDPE ROOT BARRIER SCREED LAID TO FALL TOWARDS DRAINAGE POINT REFER TO ENGINEER'S SPECIFICATION PERFORATED DRAINAGE PIPE, CONNECT BACK TO WATERPROOFING TO ENGINEER'S SPECIFICATION STORMWATER DRAINSMEMBRANE PER ENGINEER'S DRAWINGS
2800
PLANTER TYPE01 SCALE : 1:20
SCREED LAID TO FALL TOWARDS DRAINAGE POINT BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION. REFER TO ENGINEER'S SPECIFICATION WATERPROOFING ENGINEER'S SPECIFICATION GEOTEXTILE TOMEMBRANE ENGINEER'STO SPECIFICATION
2800
@ A1
HDPE ROOT BARRIER PERFORATED DRAINAGE PIPE, CONNECT BACK TO STORMWATER DRAINS PER ENGINEER'S DRAWINGS
HARDWOOD TIMBER CLADDING (2000X50X30MM) DETAIL AND SPECIFICATION TO SPECIALIST POWDER COATED STEEL FRAME STRUCTURE TO ENGINEER'S SPECIFICATION
500
1840
1150 440
1150 440
50 250 °
FALL
50 250
R400
° 54.5
R400
R400
54.5
120.0°
1030
1065
LED LIGHT PER LIGHTING CONSULTANT
120.0°
R400
1030
1200
1065
.5° 54
250 50
00
.5°
R1
FALL
1200
1300
54
250 50
VOID
VOID
0
450
00
R1
10
R6
1300 450
0
R6 FALL
R300
R310
VOID
GRANITE STONE DETAIL AND SPECIFICATION TO SPECIALIST R300
R230
VOID
° 0.0
R300
R310
00
R3
10
R300
R230
00
R3
° 0.0
HARDWOOD (2000X50X30MM) GRANITE STONETIMBER DETAIL CLADDING AND DETAIL AND SPECIFICATION SPECIFICATION TO SPECIALIST TO SPECIALIST POWDER COATED STEEL FRAME LEDSTRUCTURE LIGHT PER TO LIGHTING ENGINEER'S SPECIFICATION CONSULTANT
FALL
1840 8235
500
SECTION
1840
1840 8235
02
PLANTER TYPE01 SCALE : 1:20 SECTION
02
@ A1
PLANTER TYPE01 SCALE : 1:20
0
@ A1
Plaza, Wayfinding, Gateway
0
Construction Pictures
Plaza, Wayfinding, Gateway
Company: Martha Schwartz Partners Team: Diego Pacheco, Cristina Morbi, Jinkoo Park
Notes 1. This document should not be relied on or used in circumstances other than those for which it was prepared and for which Martha Schwartz Partners was commissioned. Martha Schwartz Partners accepts no responsibility for this document to any other party other than the person by whom it was commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figured dimensions prevail in all cases. 4. To be read in conjunction with all other drawings and specifications including but not limited to structural and service engineers' drawings. 5. Where an item is covered by drawings to different scales the larger scale drawing is to prevail. 6. All dimensions are in millimeters, unless stated otherwise.
21/09/2017 100% SD Submission Description / Drawn / Approved Rev Date Purpose of Issue
UAB 'Hanner' Konstitucijos pr. 7, Vilnius, Lithuania +370 5 248 7521 www.hanner.It
Landscape Architect Martha Schwartz Partners Ltd Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.com © copyright 2017 Martha Schwartz Partners Ltd. Project Title
0072 Vilinius Plaza Lithuania Drawing Title
Details- Planter 1
Project Number
0072
Drawing Number
0072-L751
Scale - A1
Revision
Drawn
Approved
1:20 MA
1m
Date
----
29/09/2017
ES
North
Z:\Projects\0072 Vilinius Plaza - Lithuania\400 Design\440 Schematic Design\441 Drawings CAD\04 Plotsheets\0072-L751 Details- Planter2.dwg 9/27/2017 3:59 PM
100% SD Addendum Submission Client
Final Photographs Source: Martha Schwartz Partners
19
20
Role: Designer Stage: Constructed
01/06/2018 Vilnius Lithuania
Costruction
Plaza, Wayfinding, Gateway
Lighting Features Detail Antracite Powder Coating SSteal , Linear LED 3000K translucend Polycarbonate profile extrusion
Construction Pictures Source: Slava Sizov
Plaza, Wayfinding, Gateway
Company: Martha Schwartz Partners Team: Diego Pacheco, Cristina Morbi, Jinkoo Park
Concrete pre-casted Planter, Timber Larice 100 mm natural finish installed on-site
Final Photographs Source: Martha martha Schwartz Partners
21
22
Role: Designer Stage: Concept Design, Schematic Design, Detail Design
01/09/2017 Shunde, China
Shunde Joy Marina
Deatil Design
TRANSITIONAL CORRIDOR OPEN AIR MUSEUM
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
Part of a extensive masterplan, Joy MArina use the geological geometry of the rocks to brand the new developement in Shunde, China. The transitional corridor connects the main axes of the marina with the entrance of the Shopping Mall, and in our vision break down to the human scale at the entrance. The bespoke paving in brushed and polished concrete, represent breaking of the rocks from the urban to the human scale, creating a unique perception while walking to the main entrance. The red floating canopies like leaves protect from the sun and create a filtered view, projecting colored shadows and overlapping their pattern to the paving, appearing as an element of urban interior.
Illustrative Plan Transitional Corridor
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
Company: Martha Schwartz Partners Team: Diego Pacheco, Thomas Knockman, Claudia Pandasi
Transitional corridor View
23
24
01 L709
02 L709
03 L709
04 L709
05 L709
06 L709
01 L707
02 L707
03 L707
04 L707
05 L707
06 L707
07 L708
08 L708
09 L708
01 L708
Role: Designer Stage: Concept Design, Schematic Design, Detail Design
T1
01
T2
T3
T4
T5
T6
T5
T4
T3
T2
铺装图案过渡平面 PAVING PATTERN TRANSITION PLAN SCALE : 1:500
@ A1
-
21/08/2017
100% DD
23/06/2017 Rev Date 修订 日期
50% DD 5 Descriptio
描述 / 画
01/09/2017 Shunde, China
Purpose of Issue 出图目的
100% DD 100% 方案
P10 参照0044-L350-物料清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
Client 业主 Guangdong Shunde O Co. Ltd Shunde District, Fosha Province, 528300 T: 0757-29299013 www.chinaoct.com/
P11 参照0044-L350-物料清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE 30 0
30 0 600
300
Landscape Architect 景观建筑师 Martha Schwartz Partn Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.
0 30
30 0
300
300
参照0044-L400系列放线与铺装图案详图 REFER TO 0044- L400 SERIES FOR SETTING OUT AND PATTERN
© copyright 2017 Marth Project Title 项目
Shunde Joy Mar
顺德华侨城欢乐海岸 - 综合商业区 Drawing Title 图标
Detail Paving Sheet 7 景观详图 - 铺装
Deatil Design
Project Number 项目号
0044
Drawing Number 图号
0044-L706
铺装图案模块
铺装图案元件
D01
PAVING PATTERN SINGLE ELEMENTS SCALE : 1:20
D02
@ A1
SCALE : 1:20
铺装石块方案
PAVING PATTERN MODULES COMBINATION
D03
@ A1
SCALE : 1:20
Scale - A1 比例- A1
Revision
Drawn 画图
Approve
As Shown
铺装图案模块组合
PAVING PATTERN MODULE
PAVING ROCK SCHEME
D04
@ A1
SCALE : 1:20
CM
@ A1
----
MS
Date 日期
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
21/08/2017
01 L709
02 L709
03 L709
04 L709
05 L709
01 L707
02 L707
03 L707
04 L707
05 L707
L
L
S
M
M
L
L P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
T1
L
L
面 N TRANSITION PLAN
M
L
M
M
S
M
T3
M
L M
L
S
M
标准过渡样图T3
TYPICAL EXAMPLE OF TRANSITION T1
TYPICAL EXAMPLE OF TRANSITION T2
TYPICAL EXAMPLE OF TRANSITION T3
02
@ A1
S M
S
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
M
M
S M
S
M
M S
03
@ A1
M
M
S
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
x1
S
S
S S
S S
S S
@ A1
PTransitional Paving detail
S
S S
SCALE : 1:50
M
P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large Size x5 x8 x4 P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size x4 x2 x1 P12 每单元小号石材铺地砌片 x1 P12 Tiles per Rock Small Size x2 或用1/3石块替代 P12 每单片模块石材铺地砌片 Alternate 31 of the Rocks P12 Tiles per Single module Rock 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
x4
M
M
S
SCALE : 1:50
P12 每单元大号石材铺地砌片 P12 TIles per Rock Large Size x5 x8 P12 每单元中号石材铺地砌片 P12 TIles per Rock Medium Size x4 x2 P12 每单元小号石材铺地砌片 P12 TIles per Rock Small Size x2 x1 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
x4
M
M
L
标准过渡样图T2
SCALE : 1:50
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
M
标准过渡样图T1
P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large size: x5 x8 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
T5
S
M
M
L
T4
M
S
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
S
M
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
M
L L
T2
M
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
L
L
S S
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
L
01
M
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
Notes 1. This document should not be circumstances other than tho prepared and for which Mart was commissioned. Martha S accepts no responsibility for other party other than the pe commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figure in all cases. 4. To be read in conjunction wi and specifications including structural and service engine 5. Where an item is covered by scales the larger scale drawi 6. All dimensions are in millime otherwise.
S
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
-
21/08/2017
100% DD 100%
23/06/2017 Rev Date 修订 日期
50% DD 50% 方 Description / D
描述 / 画图 /
Purpose of Issue 出图目的
100% DD 100% 方案设
Client 业主 Guangdong Shunde OCT In Co. Ltd Shunde District, Foshan Ci Province, 528300 T: 0757-29299013
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
Company: Martha Schwartz Partners Team: Diego Pacheco, Thomas Knockman, Claudia Pandasi 300
0
30
0
60
60
.0°
120.0°
01 P11 参照0044-L350-物料清单 P11. REFER TO 0044-L350-MATERIALS SCHEDULE P12-13 参照0044-L350-物料清单 P12-13. REFER TO 0044-L350-MATERIALS SCHEDULE
P12-13 参照0044-L350-物料清单 P12-13. REFER TO 0044-L350-MATERIALS SCHEDULE
平面 PLAN
P11 参照0044-L350-物料清单 P11. REFER TO 0044-L350-MATERIALS SCHEDULE
FFL
压实基层 参照工程师图纸 COMPACTED SUB-BASE TO ENGINEER'S SPECIFICATION 土工布 参照工程师图纸 GEOTEXTILE TO ENGINEER'S SPECIFICATION 最少30mm厚乳胶改良砂浆层 MIN 30MM THICK LATEX MODIFIED MORTAR BED 钢筋混凝土基层 参照工程师图纸 REINFORCED CONCRETE BASE LAID TO FALLS TO ENGINEER'S SPECIFICATION 填充物料 参照工程师图纸 VOID FILLER TO ENGINEER'S SPECIFICATION SL
防水卷材 参照工程师图纸 WATERPROOFING MEMBRANE TO ENGINEER'S SPECIFICATION 建筑结构板 参照工程师图纸 BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION
剖面 SECTION
排水管参照建筑师图纸 DRAINAGE COORDINATED BY ARCHITECT
标准结构上六边形花岗岩铺装详图 TYPICALL GRANITE HEXAGON PAVER OVER STRUCTURE
01
SCALE : 1:20
@ A1
06 L709
P06 参照0044-L350-物料清单 P06. REFER TO 0044-L350-MATERIALS SCHEDULE
07 L708
08 L708
09 L708
300
06 L707
01 L708
E01 参照0044-L350-物料清单 E01 FLUSH WITH SURFACE, REFER TO 0044-L350-MATERIALS SCHEDULE
900 50
03
240
P09 参照0044-L350-物料清单 P09. REFER TO 0044-L350-MATERIALS SCHEDULE
L
L
S
M
平面 PLAN
L P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
L
L
M
L
M
L
M M
L
L
L
02
@ A1
P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large size: x5 x8 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
S
Notes 1. This document should not be relied on or used in circumstances other than those for which it was prepared and for which Martha Schwartz Partners was commissioned. Martha Schwartz Partners accepts no responsibility for this document to any other party other than the person by whom it was commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figured dimensions prevail in all cases. 4. To be read in conjunction with all other drawings and specifications including but not limited to structural and service engineers' drawings. 5. Where an item is covered by drawings to different scales the larger scale drawing is to prevail. 6. All dimensions are in millimeters, unless stated otherwise.
M
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
M
T5
M
S
S
M
M
M
M
S S
M
剖 S
0
P12 Tiles per Rock Large Size x5 x8 x4 P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size x4 x2 x1 P12 每单元小号石材铺地砌片 x1 P12 Tiles per Rock Small Size x2 或用1/3石块替代 P12 每单片模块石材铺地砌片 Alternate 31 of the Rocks P12 Tiles per Single module Rock 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
S
S
T4
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
T3 S
S S
S
S S
S
M
T2
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
S
S
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
S
M
S
S
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
-
21/08/2017
100% DD 100% 方案设计
23/06/2017 Rev Date 修订 日期
50% DD 50% 方案设计 Description / Drawn / Approved
描述 / 画图 / 批准
Purpose of Issue 出图目的
100% DD 100% 方案设计 Client 业主 Guangdong Shunde OCT Industrial Development Co. Ltd Shunde District, Foshan City, Guangdong Province, 528300 T: 0757-29299013 www.chinaoct.com/ Landscape Architect 景观建筑师 Martha Schwartz Partners Ltd Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.com
S
S S
© copyright 2017 Martha Schwartz Partners Ltd.
04
标准过渡样图T4
标准过渡样图T5
TYPICAL EXAMPLE OF TRANSITION T4
TYPICAL EXAMPLE OF TRANSITION T5
SCALE : 1:50
平 P
05
@ A1
P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock
x4
x2
x1
x2 或用1/3石块替代 Alternate 31 of the Rocks
x1
SCALE : 1:50
P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock
Project Title 项目
标准过渡样图T6
06
@ A1
x1
x2 或用1/3石块替代 Alternate 31 of the Rocks
TYPICAL EXAMPLE OF TRANSITION T6 SCALE : 1:50
Shunde Joy Marina
@ A1
P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock
或用1/3石块替代 Alternate 31 of the Rocks
顺德华侨城欢乐海岸 - 综合商业区 Drawing Title 图标
Detail Paving Sheet 10 景观详图 - 铺装 - 10
Project Number 项目号
0044
Drawing Number 图号
0044-L709
Scale - A1 比例- A1
Revision 修订 North 北
Drawn 画图
Approved 批准
As Shown
CM
Date 日期
----
21/08/2017
Transitional Paving detail
MS
Z:\Projects\0044 Shunde Joy Marina\400 Design\450 Design Development\451 Drawings CAD\04 Plotsheets\0044-L709 Detail Paving.dwg 6/23/2017 6:23 PM
M
S
M
04
标准结构上花岗岩铺装详图@曲水湾走道 P12 @ 每单元大号石材铺地砌片 PAVER ON STRUCTURE WATER CORRIDOR
@ A1
P12 每单元大号石材铺地砌片 TYPICAL GRANITE 03 x5SCALE : 1:20x8 @ A1 x4 P12 TIles per Rock Large Size P12 每单元中号石材铺地砌片 P12 TIles per Rock Medium Size x4 x2 x1 P12 每单元小号石材铺地砌片 P12 TIles per Rock Small Size x2 x1 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
x4
0
M
M
S
T6
剖面 SECTION TYPICAL EXAMPLE OF TRANSITION T2 SCALE : 1:50
剖 S
填充物料 参照工程师图纸 VOID FILLER TO ENGINEER'S SPECIFICATION 防水卷材 参照工程师图纸 S WATERPROOFING MEMBRANE TO ENGINEER'S SPECIFICATION M M 建筑结构板 参照工程师图纸 BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION 标准过渡样图T3 排水管道参照建筑师图纸 TYPICAL EXAMPLE OF TRANSITION T3 COORDINATED BY ARCHITECT 03 DRAINAGE SCALE : 1:50 @ A1
M
标准过渡样图T2
TYPICAL EXAMPLE OF TRANSITION T1 SCALE : 1:50
M
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE SCHEDULE
平 P
P11 参照0044-L350-物料 S 清单 M 土工布 参照工程师图纸 P11 REFER TO M ENGINEER'S SPECIFICATION GEOTEXTILE TO 0044-L350-MATERIALS M SCHEDULE 压实基层 参照工程师图纸 COMPACTED SUB-BASE TO ENGINEER'S SPECIFICATION P12 参照0044-L350-物料 清单 最少30mm厚乳胶改良砂浆层 L P12 REFER TO MIN 30MM THICK LATEX MODIFIED MORTAR BED 0044-L350-MATERIALS M 钢筋混凝土基层 参照工程师图纸 SCHEDULE L M REINFORCED CONCRETE BASE LAID TO FALLS TO ENGINEER'S SPECIFICATION
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
M
标准过渡样图T1
01
S SL
M L
E01 参照0044-L350-物料清单 S E01 FLUSH WITH SURFACE, REFER TO 0044-L350-MATERIALS M
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
M
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
L
FFL
S
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
L
S
M L P06 参照0044-L350-物料清单 P06. REFER TO 0044-L350-MATERIALS SCHEDULE P09 参照0044-L350-物料清单 S M TO 0044-L350-MATERIALS SCHEDULE P09. REFER
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
02
25
26
Role: Designer, Lighting Stage: Concept Design, Schematic Design, Detail Design
01/09/2017 Shunde, China
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
Prototype
PA I FA N G R O C K S C U L P T U R E
Rock Sculpture Detail and Construction
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
Company: Martha Schwartz Partners Team: Diego Pacheco, Thomas Knockman, Claudia Pandasi
WIRED METAL CANOPY
Wired Canopies Detail and Construction
27
28 01/09/2017 Shunde, China
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
Construction
Role: Designer, Lighting Stage: Concept Design, Schematic Design, Detail Design
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
Company: Martha Schwartz Partners Team: Diego Pacheco, Thomas Knockman, Claudia Pandasi
29
30
Role: Designer Stage: Concept/Schematic Design
04/2018 Shanghai China
MIRROR LAKE
Residential
I N F I N I T E WAV I N G
Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway
Water is the key agent of our design for this new development in China, generating a reflection performance. Designing interlocking rooms, which create an intimate place in the landscape, our design aims to collect rainwater to create reflection pool and illusions. Six pavillons host different activities for the local community, allowing the appropriation of space: swings, small coutiard gardens, sunken plazas and arboretum. Challenging the climate of Shanghai, with heavy rainfalls, the landscape collect water and create unexpected reflections, with water planting to clean and purifying the ponds.
Elephant Gateway
Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway
Company: Landmark Studio Collaborator: Matthew Short
Elephant Gateway
31
32
Role: Designer Stage: Concept/Schematic Design
04/2018 Shanghai China
MIRRORED ARBORETUM
Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway
Residential
The most poetic lieu, the Arboretum, reflects the bonsai andthe different botanical species, exhibited as in a landscape cabinet of curiosities. The interlocking system of mirrored bricks, is the background of each tree, it breaks and multiply the visions. Mirror Lake use the sponge city concept and adapts it to a poetical vision of landscape.
Sunken Plaza
Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway
Company: Landmark Studio Collaborator: Matthew Short
Arboretum
102x62 mm Concrete bricks mounted on steel structure and cladded with 12mm mirrored polished steel
33
34
Role: Designer Stage: Concept/Schematic Design
04/2018 Shanghai China
Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway
Residential
Arboretum Constructed Picture Source:Landmark Studio
Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway
Company: Landmark Studio Collaborator: Matthew Short
Details of central Sales centre Atrium, Glass drops jointed to brass tension cables and 3000k light LED
Details of Landscape Rooms typologies, water features and filtered alluminum rods
35
36 10/2017 Paris France
Courbevoie
2nd Prize Competition
Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard
Role: Project Manager, Design Leader, Lighting Consultant Stage: Concept/Schematic Design
CONTROLLED FLOODING LANDSCAPE In Courbevoie competition I had the role of Project Manager and design leader for MSP Team. Thr streetscape use a porous paving surface and rain gardens, the concept aim to generate the bed of the river in the raindays in Paris. The rooftop is an orchid of 100 trees ( column= 1 tree) with roof-like canopies and furnituresintegrated with the nature. I invested the role of Lighting Consultant, creating bespoke pole light and special features using Globes Projector with water inspired textures.
Avenue Gambetta: Weaving Language River Diagram
Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard
Company: Martha Schwartz Partners+Atelier Fois Team: Carolina Fois(AF)
Avenue Gambetta weaving water streetscape and rooftop design Visualization: Plasticine
37
38
Role: Design Leader Stage: Competition
05/2019 Bologna Italy
7+1 Plastic Wonders
Public Art
2 7 ?
5
4 1 3
Climate Change, Plastic Pollution, Public Art
6
Seven Plastic Wonders of the World (+1), as the name may hint, draws parallels between one of the most recognised historical phenomena, and the current worldwide situation. In the 20th century, the new symbol of modern society was to become Plastic. 7 types of plastic - to revolutionise the way we interact with the world, to build a new society. But as time and societal turbulence have taken a toll on six of the original Seven Wonders of the World, so has our perception of Plastic shifted from pinnacle to disaster.
1
2
3
4
5
6
7
?
PETE
HDPE
PVC
LDPE
PP
PS
OTHER
PHA
200 M T
60 M T
240
40 M T 64
52
20 M T 33 TON OF PLASTIC PRODUCED PER YEAR
38
68
43 25 POSSIBILITY OF RECYCLING
MILLIONS TONNES OF PLASTIC DISCARDED PER YEAR
Climate Change, Plastic Pollution, Public Art
Company: Design the Unpredictable Consultant: Cristina Morbi,Laura Rigoni, Kristina Michkute
Axonometric Sections
39
40
Role: Design Leader Stage: Competition
05/2019 Bologna Italy
Detail Design
We propose a large installation composed of 8 separate structures: 7 structures to represent each of the seven different types of plastics, and the 8th - to represent the new generation degradable plastic PHA, which from first glance may be perceived just as regular type of plastic, yet which is produced and performs completely differently. To create the artificial plastic ‘storm’ we would encourage people to bring their domestic plastic waste to the installation to contribute in creating the plastic ‘climate performance’. 7 pyramids. The seven types of different plastic are: 1.
Polyethylene Terephthalate (PETE or PET)
2.
High-Density Polyethylene (HDPE)
3.
Polyvinyl Chloride (PVC)
4.
Low-Density Polyethylene (LDPE)
5.
Polypropylene (PP)
6.
Polystyrene or Styrofoam (PS)
7. Miscellaneous plastics (includes polycarbonate, polylactide, acrylic, acrylonitrile butadiene, styrene, fiberglass, and nylon) These seven structures would compose a monumental visual ‘landscape’, which would be continuously dynamic, and change depending on participant interaction.
Company: Design the Unpredictable Consultant: Cristina Morbi,Laura Rigoni, Kristina Michkute
Black Dapple - 80% 50% 30% 10 % DARK AGGREGATE Made from chopping boards and plastic packaging
1 Modular metal substructure 2 20 x 20 Cm recycled plastic Terrazzo tiles 3 Steel angle 4 Threaded rod in steel CHS 5 Polyethylene mesh 6 Steel cable 8 Steel SHS supporting structure 9 Steel fin plate 10 Steel grating and plate 11 Steel kedar 12 Aluminium sheet
11
5 8
6
8
6
5
9 2
12
1 3
5 4
10
6
3
41
42
Role: Design Leader Stage: Competition
05/2018 Bologna Italy
Climate Change, Plastic Pollution, Public Art
Visuals
Views
Climate Change, Plastic Pollution, Public Art
Company: Design the Unpredictable Consultant: Laura Rigoni, Kristina Michkute
Views
43
44
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
01/10/2015 Kaifeng China
WUKU GRANARY
BACKGROUND
THE SITE
MAIN STREET
ABOVE THE GROUND/BELOW THE GROUND EXPLODED
KAIFENG NEW CITY
MAIN STREET
KAIFENG NEW CITY
WUANSUI MOUNTAIN 400,000 / PERSON
SITE
BOUNDUARY RUIN WALL
TOWER PARK 520,000 / PERSON
CONTEXT ANALYSIS
KAIFENG OLD CITY
SITE QINGMING RIVER PARK 1,350,000 / PERSON
NATURAL BORDER
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
The project is located in Henan province in the city of Kaifeng. The site is an abandoned grain storage for military use built in 1971. Is composed of Warehouses in the north, for productive use and lavoration of the crops and a below the ground corn storage in the south. The use of undeground storage is a common practice in Chinese culture in order to save agricultural land.
HANLIN BEILIN 880,000 / PERSON
DRAGON PAVILION PARK 845,000 / PERSON
KAIFENG OLD CITY
BACKGROUND OF THE SITE
ORIGINAL LANDSCPAE
YELLOW RIVER FLOOD
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015
LOESS SEDIMENT DEPOSITION
GENERATION OF THE SITE: FLOOD AND SEDIMENTATION
15.0 m 4.5 m 7.0 m
9.0 m 7.0 m 15.0 m
0.0 m
0.0 m
SECTION GROUND BB’
B’
A’
SECTION GROUND AA’
5M 7M 10 M
C
C’
YELLOW RIVER
ABANDONED BUILDINGS
UNDERGROUND FOOD STORAGE
MAIN ROAD (NORTH GATE)
45
46
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
01/10/2015 Kaifeng China
(RE)GENERAION OF THE SITE The landscape design is generated by the projection and intersections of the guidelines of the ruins, and the projection of the hipogeal architecture. The functions are aware of the local and memory valorization in order to regenerate the derelict area.
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
PERFORMATIVE S PA C E
Plan and sections of the Project
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015
P E R F O R M AT I V E S PA C E The underground space is refilled with the corn grains that are used as structures and create a new kind of space interaction, respecting the identity of the space. Visitors can climb, play and collect the corn floor, changing his shape with their presence. More the piece of art is contemporary and distant from the industrial past, more the climb will be physical but will remind of the time that separate us from our past.
Relationship Above the ground/ Below the ground
47
48
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
01/10/2015 Kaifeng China
EVERTED LANDSCAPE The evrted landscape, the hill of the site, will be regenerate using the productive crops, conceptually close to the plots of the site. The corn field will create an intresting landscape of paths and hights that will evoke teh past of the site and his futurem using the soil and soiless germination.
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
LANDSCAPE
PRODUCTIVE LANDSCAPE 1
2
3
SOILESS GERMINATION AQUAPONIC
INTERACTION HILL URBAN ORCHID
FLOOD LANDSCAPE WATER
WATERLAND
CONTAINERS
DESIGNED CROPS CORNFIELD
TERRACES BENCHES
4
INTERACTIVE CROPS
SPONTANEOUS CROPS THIRD LANDSCAPE
WHEAT, MILLET, KAOLIANG, SOYBEANS
BENCHES WALLS
WALLS SEEDS
1
3 2 4
FUTURE VISION
SOILESS GERMINATION
SOIL GERMINATION
PAST RAPRESENTATION
CROPS: PRODUCTIVE GERMINATION
Diagrams of Crops and paths in the everted landscape
PROMENADE The result of the projection of the introflexed landscape generate a promenade and terraces that cross the site and are a panoramic view of the old city.
TRASVERSAL SECTION OF THE EVERTED LANDSCAPE
3D VIEW OF THE PROMENADE OF THE EVERTED LANDSCAPE
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015
49
50
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
01/10/2015 Kaifeng China
M E M O RY L A N D S C A P E
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
UNPREDICTABLE LANDSCAPE
The waterland is not just a mean to show the technical approach of soiless culture but it also has an indentity meaning: is inspired to the history of Kaifeng city and is closely link with the water source of the Yellow River. The waterland will on one hand represent the fertility of the water with the aquaponics system garden, on the other his destructive power with a controlled flood landscape.
SECTION EMERGED LANDSCAPE
Emerged landscape Perspective view
1642 Yellow River flood man-made disaster, 300.000 victims, the worst disaster of the city
Everted landscape navigator
SECTION FLOODED LANDSCAPE
Flooded landscape Perspective view
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015
51
52
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
30/01/2013 Genk Belgium
BORDER\MINE
BACKGROUND
IS DIRT MATTER OUT OF PLACE?
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
The unique conguration of Waterschei Mine, in Genk (Belgium) is made up by tension areas arising from the territorial configuration, in order to show the Dirt aspect of the site: different matrix model to understand the law of the space organization, to underline a deep cracked landscape.
URBAN LANSCAPE
THOR PARK MUSEUM
WATERSCHEI MINE
NATURAL LANDSCAPE
LANDSCAPE EVOLUTION MAPPING
MINE MUSEUM
MINE BRIDGE+SQUARE
MINE LIFT
WATERSCHEI MINE MAIN NODE COMPOSITION
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
POLITECNICO DI MILANO AA 2013/2014
WATERSCHEI COAL MINE LIFT GEOMETRIC MATRIX
WATERSCHEI COAL MINE RESIDUE ORGANIC MATRIX
WATERSCHEI COAL MINE BRIDGE DIRSPERSED MATRIX
WATERSCHEI COAL MINE MUSEUM DENSE MATRIX
53
54
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
30/01/2015 Genk Belgium
ANALYSIS GEOMETRIC AMORPHOUS
GEOMETRIC - AMOURPHOUS MAPPING
URBAN NOT URBAN
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
NOISY - QUIET MAPPING
HOMOGENEUS HETEROGENEOUS
GARDEN - RESIDUE MAPPING
STATIC DYNAMIC
O RDER DISORDER
STATIC - DYNAMIC MAPPING
RETRAINED - ABANDONED MAPPING
Mapping Analysis of WaterscheiMine Landscape Background
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
POLITECNICO DI MILANO AA 2013/2014
Border Lines Analysis
GEOMETRIC
AMORPHOUS
NOISY
QUIET
GARDEN
RESIDUE
DYNAMIC
STATIC
DENSE
DISPERSED
apping Analysis of WaterscheiMine Landscape Background
55
56 30/01/2015 Genk Belgium
D R AW I N G
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
Section Eroded Landscape
Section Original Landscape
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
15 years erosion
30 years erosion
40 years erosion
Section Original Landscape
Section Natural Take over Landscape
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
POLITECNICO DI MILANO AA 2013/2014
WATERSCHEI BORDER MINE ORIGINAL CRACK
WATERSCHEI BORDER MINE CRACK 60 YEARS LATER
WATERSCHEI BORDER MINE ORIGINAL CRACK
WATERSCHEI BORDER MINE CRACK 60 YEARS LATER
57
58
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
30/01/2015 Genk Belgium
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
PERSPECTIVE VIEW
EXHAUSTION AND EROSION
The result of the border-lines overlap creates a crack in the ground, a tridimensional landscape that evoke the mine experience of descending in the earth. Moreover in the project the topic of exhausion is a key points: we created structures that allows the site to erose itself, and hiding new structures and space that will be visible once the exhausion has been reached.
CRACK PERSPECTIVE VIEW
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
POLITECNICO DI MILANO AA 2013/2014
ARTIFICIAL CRACK SIDE VIEW
NATURAL CRACK SIDE VIEW
59
60
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
30/01/2015 Genk Belgium
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
MAQUETTE
Study Model : layered cardboard sections
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
POLITECNICO DI MILANO AA 2013/2014
Photomontage on Model: Layered laser cut sections to define the tridimensional landscape
61
62
Personal Project Competition Design for Change 2014
30/03/2014 Lille France
FACTORY RIFT
PERSPECTIVE VIEW
POSSIBLE/IMPOSSIBLE LIFE The plates project will take all the site and no broken with interior and exterior, warehouse and building will not stop his spread. Also in the interior the space will not be divided, but underline the monumental status by keeping the open space solution in the top. an the foor the plates will create different space interaction. The main point of the industrial heritage are not only the open space but also the glass sheld roof, so we will divide the plates into life-possible plates, where the light arrives with a 45° angle, with a spontaneus plates garden where nature will take over, and areas where the natural light doesn’t arrive, will be artificially lighten and will be the relation and activity plates.
IMPOSSIBLE LIFE: ARTIFICIAL ELEMENTS
POSSIBLE LIFE: NATURAL GROWING
POSSIBLE LIFE:
Artificial, Natural, Industrial Eritage, Friches, Regeneration
NATURAL GROWING
Reuse concept: Iron sheets as shared library
Artificial, Natural, Industrial Eritage, Friches, Regeneration
Faive Cail Babckook, Lille, France Competition 2014
AWA R D : The project has been selected for the Design For Change Competition , Lille, in 2014.
Reuse concept: Iron sheets as benches and tables(Above) Tracks as exhibition support (Below)
63
64 30/12/2012 Milan Italy
PARK[T]OUR
MAQUETTE AWA R D : The project was published on the magazine Domus in April 2013 The model of the project was exhibit in Michele De Lucchi studio for the Milano Design Week in April 2013
Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic
Course: Landmark Design Prof: A. Branzi, M. de Lucchi
MEGALITIV CITY - ANDREA BRANZI ARCHIZOOM The project strart from the idea of a Megalitic City of the future. The city landscape is made by same volume different by shape, each of them with different function/activity. The Park(T)out is a towr for the parkour, made by two different element. One, the stone, allow people to climb the steructure and its linked to the stone-age idea. The other, metal panel structure, its light, smooth and allow people to make free running. All these elements are linked with a watherfall that produces different kind of sound, underlying the different origins of the two elements.
Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars,Concrete
Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic
POLITECNICO DI MILANO AA 2012/2013
Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars,Concrete
65
66
Course: Landmark Design Prof: A. Branzi, M. de Lucchi
30/12/2012 Milan Italy
Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic
MAQUETTE
Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars, Concrete
Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic