Role: Design Leader Stage: Constructed

05/2018 TuopaiShede, China

T uopai Winery East Gate

Gateway Design

S P R I N G G AT E WA Y

Spring, Winery Gateway, Sculptural approach, Tradition and Technology

The Baijiu wine produced by Tuopai winery has in essence in water: in this area of Chengdou a spring was discovered and allows the production of the most traditional Chinese wine. From the legend, to nowadays, water is the key element of the production. The Spring Gateway, with a cantilever structure, is support by cascade inspired columns. It allows the collection of the heavy rainwater of Chengdu province into the column, which is then directed to a central water channel, inspired by the Qing dynasty design. The terrine of the wine is reused to break and direct the water in a dynamic landscape.

Spring Inspiration: Waterfall by Hiroshi Senju


Spring, Winery Gateway, Sculptural approach, Tradition and Technology

Company: Martha Schwartz Partners Engineer Consultant: AtelierOne

Spring Gateway Design

3


Spring, Winery Gateway, Sculptural approach, Tradition and Technology 05/2018 TuopaiShede, China

Gateway Design

4

Role: Design Leader Stage: Constructed


Spring, Winery Gateway, Sculptural approach, Tradition and Technology

Company: Martha Schwartz Partners Engineer Consultant: AtelierOne

5


6

Role: Design Leader Stage: Constructed

05/2018 TuopaiShede, China

Spring, Winery Gateway, Sculptural approach, Tradition and Technology

Prototype

Prototype Gateway - Stainless Steel 1:10 Model Reflections study

Prototype Gateway - Stainless Steel 1:10 Model China


Spring, Winery Gateway, Sculptural approach, Tradition and Technology

Company: Martha Schwartz Partners Engineer Consultant: AtelierOne

Construction Pictures of Tuopain Winery Gateway Cantilevered Columns and Frames

Construction Pictures of Tuopain Winery Gateway

7


8

Role: Project Manager, Design Leader Stage: Concept Design, Schematic Design, Design Developement

05/2018 TuopaiShede, China

Completition

After Construction Picture

After Construction Pictures


Company: Martha Schwartz Partners Engineer Consultant: AtelierOne

1 year After Construction - View of Tuopai Winery Spring gateway

9


10 01-07/2016 Bangkok Thailand

Lotus Pond Skywalk

Built Project

Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Role: Designer Stage: Concept Design, Schematic Design, Detail Design

Bangkok Skywalk is an ambitious project of redevelopement of one of the most high-traffic intersection in Bagkook. The aim of the project is creating a pedestrian landmark in the city, through the use of sculptural canopies and iconic paving design. The canopies have been designed as a double laminated layer of glass, with OPV cells laminated in the PVB layer. During design developement and value engineering process the design has been simplified towards Fiber glass circular canopies, with water collection in the central spine. To iterate the local culture, artist sfrom Thailand have been invited to appropriate the canopy creating a Public Art perfromance and dialogue between architecture and art. The project creates a vibrant sense of arrival and experiencing an unique atmosphere. The paving, using Sphera Equipe circular ceramic tiles, is designed following a pointillisme technique of color coding and complex layout of 16 different gradients of colors, inspired to the infinite water variations of lotus ponds-from which Pathumwan name, ‘Lotus Pond’.

Paving Plan Detail


Paving Detail Sphera Equipe Tiles

Color Coding Detail Tiles - Paving Plan

Construction Pictures Source: BangkokPost

Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Company: Martha Schwartz Partners Team: Martha Schwartz, Alicia Hidalgo, Cristina Morbi, Claudia Pandasi, Matthew Williams

11


12

Role: Designer Stage: Concept Design, Schematic Design, Detail Design

01-07/2016 Bangkok Thailand

Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Detail Design Planter

Planter Detail


Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Company: Martha Schwartz Partners Team: Martha Schwartz, Alicia Hidalgo, Cristina Morbi, Claudia Pandasi, Matthew Williams

Pictures of Site after construction Source: Eugene Goes Places

13


14 Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Role: Designer Stage: Concept Design, Schematic Design, Detail Design

Canopy Detail


Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Company: Martha Schwartz Partners Team: Martha Schwartz, Alicia Hidalgo, Cristina Morbi, Claudia Pandasi, Matthew Williams

Pictures of Artist drawing on Canopy Source: Eugene Goes Places

15


16

Role: Designer Stage: Constructed

01/06/2018 Vilnius Lithuania

Vilnius Plaza

1st Prize Competition

Plaza, Wayfinding, Gateway

The noticeable progression running along the North South axis of the development site when extended into the wider urban context informed the strategy of our design. Historical, traditional, demographic and cultural influences were apparent from the Old City to the south through to the more developed residential areas to the north. Physical topographical changes and progressions through the landscape were abstracted to create the overall design narrative of a “surging landscape.” We envisage the site as a place that will continue to evolve and adapt without abandoning its rich landscape spectrums, where the site becomes a place that existing landscape elements are celebrated, and the future is promoted for the welfare of new generations.


Plaza, Wayfinding, Gateway

Company: Martha Schwartz Partners Team: Diego Pacheco, Cristina Morbi, Jinkoo Park

Construction Pictures

17


18

Role: Designer Stage: Constructed

01/06/2018 Vilnius Lithuania

REINFORCED CONCRETE DETAIL AND SPECIFICATION TO SPECIALIST

400

2000

R2

Detail Design Prototype

R2

0

0

400

R2

2000

R2

50 300 50 R2

0

0

REINFORCED CONCRETE DETAIL AND SPECIFICATION TO SPECIALIST

50 300 50 R2

0

0

R2

0

R2

1200

1200

0

DRAINAGE CELL REFER TO ENGINEER'S SPECIFICATION

BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION. GEOTEXTILE ENGINEER'S DRAINAGETO CELL REFER TOSPECIFICATION ENGINEER'S SPECIFICATION

SECTION

01

PLANTER TYPE01 SCALE : 1:20 SECTION

01

@ A1

HDPE ROOT BARRIER SCREED LAID TO FALL TOWARDS DRAINAGE POINT REFER TO ENGINEER'S SPECIFICATION PERFORATED DRAINAGE PIPE, CONNECT BACK TO WATERPROOFING TO ENGINEER'S SPECIFICATION STORMWATER DRAINSMEMBRANE PER ENGINEER'S DRAWINGS

2800

PLANTER TYPE01 SCALE : 1:20

SCREED LAID TO FALL TOWARDS DRAINAGE POINT BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION. REFER TO ENGINEER'S SPECIFICATION WATERPROOFING ENGINEER'S SPECIFICATION GEOTEXTILE TOMEMBRANE ENGINEER'STO SPECIFICATION

2800

@ A1

HDPE ROOT BARRIER PERFORATED DRAINAGE PIPE, CONNECT BACK TO STORMWATER DRAINS PER ENGINEER'S DRAWINGS

HARDWOOD TIMBER CLADDING (2000X50X30MM) DETAIL AND SPECIFICATION TO SPECIALIST POWDER COATED STEEL FRAME STRUCTURE TO ENGINEER'S SPECIFICATION

500

1840

1150 440

1150 440

50 250 °

FALL

50 250

R400

° 54.5

R400

R400

54.5

120.0°

1030

1065

LED LIGHT PER LIGHTING CONSULTANT

120.0°

R400

1030

1200

1065

.5° 54

250 50

00

.5°

R1

FALL

1200

1300

54

250 50

VOID

VOID

0

450

00

R1

10

R6

1300 450

0

R6 FALL

R300

R310

VOID

GRANITE STONE DETAIL AND SPECIFICATION TO SPECIALIST R300

R230

VOID

° 0.0

R300

R310

00

R3

10

R300

R230

00

R3

° 0.0

HARDWOOD (2000X50X30MM) GRANITE STONETIMBER DETAIL CLADDING AND DETAIL AND SPECIFICATION SPECIFICATION TO SPECIALIST TO SPECIALIST POWDER COATED STEEL FRAME LEDSTRUCTURE LIGHT PER TO LIGHTING ENGINEER'S SPECIFICATION CONSULTANT

FALL

1840 8235

500

SECTION

1840

1840 8235

02

PLANTER TYPE01 SCALE : 1:20 SECTION

02

@ A1

PLANTER TYPE01 SCALE : 1:20

0

@ A1

Plaza, Wayfinding, Gateway

0

Construction Pictures


Plaza, Wayfinding, Gateway

Company: Martha Schwartz Partners Team: Diego Pacheco, Cristina Morbi, Jinkoo Park

Notes 1. This document should not be relied on or used in circumstances other than those for which it was prepared and for which Martha Schwartz Partners was commissioned. Martha Schwartz Partners accepts no responsibility for this document to any other party other than the person by whom it was commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figured dimensions prevail in all cases. 4. To be read in conjunction with all other drawings and specifications including but not limited to structural and service engineers' drawings. 5. Where an item is covered by drawings to different scales the larger scale drawing is to prevail. 6. All dimensions are in millimeters, unless stated otherwise.

21/09/2017 100% SD Submission Description / Drawn / Approved Rev Date Purpose of Issue

UAB 'Hanner' Konstitucijos pr. 7, Vilnius, Lithuania +370 5 248 7521 www.hanner.It

Landscape Architect Martha Schwartz Partners Ltd Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.com © copyright 2017 Martha Schwartz Partners Ltd. Project Title

0072 Vilinius Plaza Lithuania Drawing Title

Details- Planter 1

Project Number

0072

Drawing Number

0072-L751

Scale - A1

Revision

Drawn

Approved

1:20 MA

1m

Date

----

29/09/2017

ES

North

Z:\Projects\0072 Vilinius Plaza - Lithuania\400 Design\440 Schematic Design\441 Drawings CAD\04 Plotsheets\0072-L751 Details- Planter2.dwg 9/27/2017 3:59 PM

100% SD Addendum Submission Client

Final Photographs Source: Martha Schwartz Partners

19


20

Role: Designer Stage: Constructed

01/06/2018 Vilnius Lithuania

Costruction

Plaza, Wayfinding, Gateway

Lighting Features Detail Antracite Powder Coating SSteal , Linear LED 3000K translucend Polycarbonate profile extrusion

Construction Pictures Source: Slava Sizov


Plaza, Wayfinding, Gateway

Company: Martha Schwartz Partners Team: Diego Pacheco, Cristina Morbi, Jinkoo Park

Concrete pre-casted Planter, Timber Larice 100 mm natural finish installed on-site

Final Photographs Source: Martha martha Schwartz Partners

21


22

Role: Designer Stage: Concept Design, Schematic Design, Detail Design

01/09/2017 Shunde, China

Shunde Joy Marina

Deatil Design

TRANSITIONAL CORRIDOR OPEN AIR MUSEUM

Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

Part of a extensive masterplan, Joy MArina use the geological geometry of the rocks to brand the new developement in Shunde, China. The transitional corridor connects the main axes of the marina with the entrance of the Shopping Mall, and in our vision break down to the human scale at the entrance. The bespoke paving in brushed and polished concrete, represent breaking of the rocks from the urban to the human scale, creating a unique perception while walking to the main entrance. The red floating canopies like leaves protect from the sun and create a filtered view, projecting colored shadows and overlapping their pattern to the paving, appearing as an element of urban interior.

Illustrative Plan Transitional Corridor


Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

Company: Martha Schwartz Partners Team: Diego Pacheco, Thomas Knockman, Claudia Pandasi

Transitional corridor View

23


24

01 L709

02 L709

03 L709

04 L709

05 L709

06 L709

01 L707

02 L707

03 L707

04 L707

05 L707

06 L707

07 L708

08 L708

09 L708

01 L708

Role: Designer Stage: Concept Design, Schematic Design, Detail Design

T1

01

T2

T3

T4

T5

T6

T5

T4

T3

T2

铺装图案过渡平面 PAVING PATTERN TRANSITION PLAN SCALE : 1:500

@ A1

-

21/08/2017

100% DD

23/06/2017 Rev Date 修订 日期

50% DD 5 Descriptio

描述 / 画

01/09/2017 Shunde, China

Purpose of Issue 出图目的

100% DD 100% 方案

P10 参照0044-L350-物料清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

Client 业主 Guangdong Shunde O Co. Ltd Shunde District, Fosha Province, 528300 T: 0757-29299013 www.chinaoct.com/

P11 参照0044-L350-物料清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE 30 0

30 0 600

300

Landscape Architect 景观建筑师 Martha Schwartz Partn Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.

0 30

30 0

300

300

参照0044-L400系列放线与铺装图案详图 REFER TO 0044- L400 SERIES FOR SETTING OUT AND PATTERN

© copyright 2017 Marth Project Title 项目

Shunde Joy Mar

顺德华侨城欢乐海岸 - 综合商业区 Drawing Title 图标

Detail Paving Sheet 7 景观详图 - 铺装

Deatil Design

Project Number 项目号

0044

Drawing Number 图号

0044-L706

铺装图案模块

铺装图案元件

D01

PAVING PATTERN SINGLE ELEMENTS SCALE : 1:20

D02

@ A1

SCALE : 1:20

铺装石块方案

PAVING PATTERN MODULES COMBINATION

D03

@ A1

SCALE : 1:20

Scale - A1 比例- A1

Revision

Drawn 画图

Approve

As Shown

铺装图案模块组合

PAVING PATTERN MODULE

PAVING ROCK SCHEME

D04

@ A1

SCALE : 1:20

CM

@ A1

----

MS

Date 日期

Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

21/08/2017

01 L709

02 L709

03 L709

04 L709

05 L709

01 L707

02 L707

03 L707

04 L707

05 L707

L

L

S

M

M

L

L P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

T1

L

L

面 N TRANSITION PLAN

M

L

M

M

S

M

T3

M

L M

L

S

M

标准过渡样图T3

TYPICAL EXAMPLE OF TRANSITION T1

TYPICAL EXAMPLE OF TRANSITION T2

TYPICAL EXAMPLE OF TRANSITION T3

02

@ A1

S M

S

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

M

M

S M

S

M

M S

03

@ A1

M

M

S

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

x1

S

S

S S

S S

S S

@ A1

PTransitional Paving detail

S

S S

SCALE : 1:50

M

P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large Size x5 x8 x4 P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size x4 x2 x1 P12 每单元小号石材铺地砌片 x1 P12 Tiles per Rock Small Size x2 或用1/3石块替代 P12 每单片模块石材铺地砌片 Alternate 31 of the Rocks P12 Tiles per Single module Rock 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

x4

M

M

S

SCALE : 1:50

P12 每单元大号石材铺地砌片 P12 TIles per Rock Large Size x5 x8 P12 每单元中号石材铺地砌片 P12 TIles per Rock Medium Size x4 x2 P12 每单元小号石材铺地砌片 P12 TIles per Rock Small Size x2 x1 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

x4

M

M

L

标准过渡样图T2

SCALE : 1:50

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

M

标准过渡样图T1

P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large size: x5 x8 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

T5

S

M

M

L

T4

M

S

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

S

M

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

M

L L

T2

M

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

L

L

S S

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

L

01

M

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

Notes 1. This document should not be circumstances other than tho prepared and for which Mart was commissioned. Martha S accepts no responsibility for other party other than the pe commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figure in all cases. 4. To be read in conjunction wi and specifications including structural and service engine 5. Where an item is covered by scales the larger scale drawi 6. All dimensions are in millime otherwise.

S

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

-

21/08/2017

100% DD 100%

23/06/2017 Rev Date 修订 日期

50% DD 50% 方 Description / D

描述 / 画图 /

Purpose of Issue 出图目的

100% DD 100% 方案设

Client 业主 Guangdong Shunde OCT In Co. Ltd Shunde District, Foshan Ci Province, 528300 T: 0757-29299013


Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

Company: Martha Schwartz Partners Team: Diego Pacheco, Thomas Knockman, Claudia Pandasi 300

0

30

0

60

60

.0°

120.0°

01 P11 参照0044-L350-物料清单 P11. REFER TO 0044-L350-MATERIALS SCHEDULE P12-13 参照0044-L350-物料清单 P12-13. REFER TO 0044-L350-MATERIALS SCHEDULE

P12-13 参照0044-L350-物料清单 P12-13. REFER TO 0044-L350-MATERIALS SCHEDULE

平面 PLAN

P11 参照0044-L350-物料清单 P11. REFER TO 0044-L350-MATERIALS SCHEDULE

FFL

压实基层 参照工程师图纸 COMPACTED SUB-BASE TO ENGINEER'S SPECIFICATION 土工布 参照工程师图纸 GEOTEXTILE TO ENGINEER'S SPECIFICATION 最少30mm厚乳胶改良砂浆层 MIN 30MM THICK LATEX MODIFIED MORTAR BED 钢筋混凝土基层 参照工程师图纸 REINFORCED CONCRETE BASE LAID TO FALLS TO ENGINEER'S SPECIFICATION 填充物料 参照工程师图纸 VOID FILLER TO ENGINEER'S SPECIFICATION SL

防水卷材 参照工程师图纸 WATERPROOFING MEMBRANE TO ENGINEER'S SPECIFICATION 建筑结构板 参照工程师图纸 BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION

剖面 SECTION

排水管参照建筑师图纸 DRAINAGE COORDINATED BY ARCHITECT

标准结构上六边形花岗岩铺装详图 TYPICALL GRANITE HEXAGON PAVER OVER STRUCTURE

01

SCALE : 1:20

@ A1

06 L709

P06 参照0044-L350-物料清单 P06. REFER TO 0044-L350-MATERIALS SCHEDULE

07 L708

08 L708

09 L708

300

06 L707

01 L708

E01 参照0044-L350-物料清单 E01 FLUSH WITH SURFACE, REFER TO 0044-L350-MATERIALS SCHEDULE

900 50

03

240

P09 参照0044-L350-物料清单 P09. REFER TO 0044-L350-MATERIALS SCHEDULE

L

L

S

M

平面 PLAN

L P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

L

L

M

L

M

L

M M

L

L

L

02

@ A1

P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large size: x5 x8 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

S

Notes 1. This document should not be relied on or used in circumstances other than those for which it was prepared and for which Martha Schwartz Partners was commissioned. Martha Schwartz Partners accepts no responsibility for this document to any other party other than the person by whom it was commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figured dimensions prevail in all cases. 4. To be read in conjunction with all other drawings and specifications including but not limited to structural and service engineers' drawings. 5. Where an item is covered by drawings to different scales the larger scale drawing is to prevail. 6. All dimensions are in millimeters, unless stated otherwise.

M

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

M

T5

M

S

S

M

M

M

M

S S

M

剖 S

0

P12 Tiles per Rock Large Size x5 x8 x4 P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size x4 x2 x1 P12 每单元小号石材铺地砌片 x1 P12 Tiles per Rock Small Size x2 或用1/3石块替代 P12 每单片模块石材铺地砌片 Alternate 31 of the Rocks P12 Tiles per Single module Rock 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

S

S

T4

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

T3 S

S S

S

S S

S

M

T2

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

S

S

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

S

M

S

S

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

-

21/08/2017

100% DD 100% 方案设计

23/06/2017 Rev Date 修订 日期

50% DD 50% 方案设计 Description / Drawn / Approved

描述 / 画图 / 批准

Purpose of Issue 出图目的

100% DD 100% 方案设计 Client 业主 Guangdong Shunde OCT Industrial Development Co. Ltd Shunde District, Foshan City, Guangdong Province, 528300 T: 0757-29299013 www.chinaoct.com/ Landscape Architect 景观建筑师 Martha Schwartz Partners Ltd Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.com

S

S S

© copyright 2017 Martha Schwartz Partners Ltd.

04

标准过渡样图T4

标准过渡样图T5

TYPICAL EXAMPLE OF TRANSITION T4

TYPICAL EXAMPLE OF TRANSITION T5

SCALE : 1:50

平 P

05

@ A1

P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock

x4

x2

x1

x2 或用1/3石块替代 Alternate 31 of the Rocks

x1

SCALE : 1:50

P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock

Project Title 项目

标准过渡样图T6

06

@ A1

x1

x2 或用1/3石块替代 Alternate 31 of the Rocks

TYPICAL EXAMPLE OF TRANSITION T6 SCALE : 1:50

Shunde Joy Marina

@ A1

P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock

或用1/3石块替代 Alternate 31 of the Rocks

顺德华侨城欢乐海岸 - 综合商业区 Drawing Title 图标

Detail Paving Sheet 10 景观详图 - 铺装 - 10

Project Number 项目号

0044

Drawing Number 图号

0044-L709

Scale - A1 比例- A1

Revision 修订 North 北

Drawn 画图

Approved 批准

As Shown

CM

Date 日期

----

21/08/2017

Transitional Paving detail

MS

Z:\Projects\0044 Shunde Joy Marina\400 Design\450 Design Development\451 Drawings CAD\04 Plotsheets\0044-L709 Detail Paving.dwg 6/23/2017 6:23 PM

M

S

M

04

标准结构上花岗岩铺装详图@曲水湾走道 P12 @ 每单元大号石材铺地砌片 PAVER ON STRUCTURE WATER CORRIDOR

@ A1

P12 每单元大号石材铺地砌片 TYPICAL GRANITE 03 x5SCALE : 1:20x8 @ A1 x4 P12 TIles per Rock Large Size P12 每单元中号石材铺地砌片 P12 TIles per Rock Medium Size x4 x2 x1 P12 每单元小号石材铺地砌片 P12 TIles per Rock Small Size x2 x1 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

x4

0

M

M

S

T6

剖面 SECTION TYPICAL EXAMPLE OF TRANSITION T2 SCALE : 1:50

剖 S

填充物料 参照工程师图纸 VOID FILLER TO ENGINEER'S SPECIFICATION 防水卷材 参照工程师图纸 S WATERPROOFING MEMBRANE TO ENGINEER'S SPECIFICATION M M 建筑结构板 参照工程师图纸 BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION 标准过渡样图T3 排水管道参照建筑师图纸 TYPICAL EXAMPLE OF TRANSITION T3 COORDINATED BY ARCHITECT 03 DRAINAGE SCALE : 1:50 @ A1

M

标准过渡样图T2

TYPICAL EXAMPLE OF TRANSITION T1 SCALE : 1:50

M

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE SCHEDULE

平 P

P11 参照0044-L350-物料 S 清单 M 土工布 参照工程师图纸 P11 REFER TO M ENGINEER'S SPECIFICATION GEOTEXTILE TO 0044-L350-MATERIALS M SCHEDULE 压实基层 参照工程师图纸 COMPACTED SUB-BASE TO ENGINEER'S SPECIFICATION P12 参照0044-L350-物料 清单 最少30mm厚乳胶改良砂浆层 L P12 REFER TO MIN 30MM THICK LATEX MODIFIED MORTAR BED 0044-L350-MATERIALS M 钢筋混凝土基层 参照工程师图纸 SCHEDULE L M REINFORCED CONCRETE BASE LAID TO FALLS TO ENGINEER'S SPECIFICATION

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

M

标准过渡样图T1

01

S SL

M L

E01 参照0044-L350-物料清单 S E01 FLUSH WITH SURFACE, REFER TO 0044-L350-MATERIALS M

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

M

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

L

FFL

S

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

L

S

M L P06 参照0044-L350-物料清单 P06. REFER TO 0044-L350-MATERIALS SCHEDULE P09 参照0044-L350-物料清单 S M TO 0044-L350-MATERIALS SCHEDULE P09. REFER

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

02

25


26

Role: Designer, Lighting Stage: Concept Design, Schematic Design, Detail Design

01/09/2017 Shunde, China

Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

Prototype

PA I FA N G R O C K S C U L P T U R E

Rock Sculpture Detail and Construction


Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

Company: Martha Schwartz Partners Team: Diego Pacheco, Thomas Knockman, Claudia Pandasi

WIRED METAL CANOPY

Wired Canopies Detail and Construction

27


28 01/09/2017 Shunde, China

Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

Construction

Role: Designer, Lighting Stage: Concept Design, Schematic Design, Detail Design


Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

Company: Martha Schwartz Partners Team: Diego Pacheco, Thomas Knockman, Claudia Pandasi

29


30

Role: Designer Stage: Concept/Schematic Design

04/2018 Shanghai China

MIRROR LAKE

Residential

I N F I N I T E WAV I N G

Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway

Water is the key agent of our design for this new development in China, generating a reflection performance. Designing interlocking rooms, which create an intimate place in the landscape, our design aims to collect rainwater to create reflection pool and illusions. Six pavillons host different activities for the local community, allowing the appropriation of space: swings, small coutiard gardens, sunken plazas and arboretum. Challenging the climate of Shanghai, with heavy rainfalls, the landscape collect water and create unexpected reflections, with water planting to clean and purifying the ponds.

Elephant Gateway


Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway

Company: Landmark Studio Collaborator: Matthew Short

Elephant Gateway

31


32

Role: Designer Stage: Concept/Schematic Design

04/2018 Shanghai China

MIRRORED ARBORETUM

Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway

Residential

The most poetic lieu, the Arboretum, reflects the bonsai andthe different botanical species, exhibited as in a landscape cabinet of curiosities. The interlocking system of mirrored bricks, is the background of each tree, it breaks and multiply the visions. Mirror Lake use the sponge city concept and adapts it to a poetical vision of landscape.

Sunken Plaza


Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway

Company: Landmark Studio Collaborator: Matthew Short

Arboretum

102x62 mm Concrete bricks mounted on steel structure and cladded with 12mm mirrored polished steel

33


34

Role: Designer Stage: Concept/Schematic Design

04/2018 Shanghai China

Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway

Residential

Arboretum Constructed Picture Source:Landmark Studio


Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway

Company: Landmark Studio Collaborator: Matthew Short

Details of central Sales centre Atrium, Glass drops jointed to brass tension cables and 3000k light LED

Details of Landscape Rooms typologies, water features and filtered alluminum rods

35


36 10/2017 Paris France

Courbevoie

2nd Prize Competition

Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard

Role: Project Manager, Design Leader, Lighting Consultant Stage: Concept/Schematic Design

CONTROLLED FLOODING LANDSCAPE In Courbevoie competition I had the role of Project Manager and design leader for MSP Team. Thr streetscape use a porous paving surface and rain gardens, the concept aim to generate the bed of the river in the raindays in Paris. The rooftop is an orchid of 100 trees ( column= 1 tree) with roof-like canopies and furnituresintegrated with the nature. I invested the role of Lighting Consultant, creating bespoke pole light and special features using Globes Projector with water inspired textures.

Avenue Gambetta: Weaving Language River Diagram


Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard

Company: Martha Schwartz Partners+Atelier Fois Team: Carolina Fois(AF)

Avenue Gambetta weaving water streetscape and rooftop design Visualization: Plasticine

37


38

Role: Design Leader Stage: Competition

05/2019 Bologna Italy

7+1 Plastic Wonders

Public Art

2 7 ?

5

4 1 3

Climate Change, Plastic Pollution, Public Art

6

Seven Plastic Wonders of the World (+1), as the name may hint, draws parallels between one of the most recognised historical phenomena, and the current worldwide situation. In the 20th century, the new symbol of modern society was to become Plastic. 7 types of plastic - to revolutionise the way we interact with the world, to build a new society. But as time and societal turbulence have taken a toll on six of the original Seven Wonders of the World, so has our perception of Plastic shifted from pinnacle to disaster.

1

2

3

4

5

6

7

?

PETE

HDPE

PVC

LDPE

PP

PS

OTHER

PHA

200 M T

60 M T

240

40 M T 64

52

20 M T 33 TON OF PLASTIC PRODUCED PER YEAR

38

68

43 25 POSSIBILITY OF RECYCLING

MILLIONS TONNES OF PLASTIC DISCARDED PER YEAR


Climate Change, Plastic Pollution, Public Art

Company: Design the Unpredictable Consultant: Cristina Morbi,Laura Rigoni, Kristina Michkute

Axonometric Sections

39


40

Role: Design Leader Stage: Competition

05/2019 Bologna Italy

Detail Design

We propose a large installation composed of 8 separate structures: 7 structures to represent each of the seven different types of plastics, and the 8th - to represent the new generation degradable plastic PHA, which from first glance may be perceived just as regular type of plastic, yet which is produced and performs completely differently. To create the artificial plastic ‘storm’ we would encourage people to bring their domestic plastic waste to the installation to contribute in creating the plastic ‘climate performance’. 7 pyramids. The seven types of different plastic are: 1.

Polyethylene Terephthalate (PETE or PET)

2.

High-Density Polyethylene (HDPE)

3.

Polyvinyl Chloride (PVC)

4.

Low-Density Polyethylene (LDPE)

5.

Polypropylene (PP)

6.

Polystyrene or Styrofoam (PS)

7. Miscellaneous plastics (includes polycarbonate, polylactide, acrylic, acrylonitrile butadiene, styrene, fiberglass, and nylon) These seven structures would compose a monumental visual ‘landscape’, which would be continuously dynamic, and change depending on participant interaction.


Company: Design the Unpredictable Consultant: Cristina Morbi,Laura Rigoni, Kristina Michkute

Black Dapple - 80% 50% 30% 10 % DARK AGGREGATE Made from chopping boards and plastic packaging

1 Modular metal substructure 2 20 x 20 Cm recycled plastic Terrazzo tiles 3 Steel angle 4 Threaded rod in steel CHS 5 Polyethylene mesh 6 Steel cable 8 Steel SHS supporting structure 9 Steel fin plate 10 Steel grating and plate 11 Steel kedar 12 Aluminium sheet

11

5 8

6

8

6

5

9 2

12

1 3

5 4

10

6

3

41


42

Role: Design Leader Stage: Competition

05/2018 Bologna Italy

Climate Change, Plastic Pollution, Public Art

Visuals

Views


Climate Change, Plastic Pollution, Public Art

Company: Design the Unpredictable Consultant: Laura Rigoni, Kristina Michkute

Views

43


44

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

01/10/2015 Kaifeng China

WUKU GRANARY

BACKGROUND

THE SITE

MAIN STREET

ABOVE THE GROUND/BELOW THE GROUND EXPLODED

KAIFENG NEW CITY

MAIN STREET

KAIFENG NEW CITY

WUANSUI MOUNTAIN 400,000 / PERSON

SITE

BOUNDUARY RUIN WALL

TOWER PARK 520,000 / PERSON

CONTEXT ANALYSIS

KAIFENG OLD CITY

SITE QINGMING RIVER PARK 1,350,000 / PERSON

NATURAL BORDER

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

The project is located in Henan province in the city of Kaifeng. The site is an abandoned grain storage for military use built in 1971. Is composed of Warehouses in the north, for productive use and lavoration of the crops and a below the ground corn storage in the south. The use of undeground storage is a common practice in Chinese culture in order to save agricultural land.

HANLIN BEILIN 880,000 / PERSON

DRAGON PAVILION PARK 845,000 / PERSON

KAIFENG OLD CITY

BACKGROUND OF THE SITE


ORIGINAL LANDSCPAE

YELLOW RIVER FLOOD

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015

LOESS SEDIMENT DEPOSITION

GENERATION OF THE SITE: FLOOD AND SEDIMENTATION

15.0 m 4.5 m 7.0 m

9.0 m 7.0 m 15.0 m

0.0 m

0.0 m

SECTION GROUND BB’

B’

A’

SECTION GROUND AA’

5M 7M 10 M

C

C’

YELLOW RIVER

ABANDONED BUILDINGS

UNDERGROUND FOOD STORAGE

MAIN ROAD (NORTH GATE)

45


46

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

01/10/2015 Kaifeng China

(RE)GENERAION OF THE SITE The landscape design is generated by the projection and intersections of the guidelines of the ruins, and the projection of the hipogeal architecture. The functions are aware of the local and memory valorization in order to regenerate the derelict area.

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

PERFORMATIVE S PA C E

Plan and sections of the Project


Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015

P E R F O R M AT I V E S PA C E The underground space is refilled with the corn grains that are used as structures and create a new kind of space interaction, respecting the identity of the space. Visitors can climb, play and collect the corn floor, changing his shape with their presence. More the piece of art is contemporary and distant from the industrial past, more the climb will be physical but will remind of the time that separate us from our past.

Relationship Above the ground/ Below the ground

47


48

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

01/10/2015 Kaifeng China

EVERTED LANDSCAPE The evrted landscape, the hill of the site, will be regenerate using the productive crops, conceptually close to the plots of the site. The corn field will create an intresting landscape of paths and hights that will evoke teh past of the site and his futurem using the soil and soiless germination.

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

LANDSCAPE

PRODUCTIVE LANDSCAPE 1

2

3

SOILESS GERMINATION AQUAPONIC

INTERACTION HILL URBAN ORCHID

FLOOD LANDSCAPE WATER

WATERLAND

CONTAINERS

DESIGNED CROPS CORNFIELD

TERRACES BENCHES

4

INTERACTIVE CROPS

SPONTANEOUS CROPS THIRD LANDSCAPE

WHEAT, MILLET, KAOLIANG, SOYBEANS

BENCHES WALLS

WALLS SEEDS

1

3 2 4

FUTURE VISION

SOILESS GERMINATION

SOIL GERMINATION

PAST RAPRESENTATION

CROPS: PRODUCTIVE GERMINATION

Diagrams of Crops and paths in the everted landscape


PROMENADE The result of the projection of the introflexed landscape generate a promenade and terraces that cross the site and are a panoramic view of the old city.

TRASVERSAL SECTION OF THE EVERTED LANDSCAPE

3D VIEW OF THE PROMENADE OF THE EVERTED LANDSCAPE

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015

49


50

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

01/10/2015 Kaifeng China

M E M O RY L A N D S C A P E

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

UNPREDICTABLE LANDSCAPE

The waterland is not just a mean to show the technical approach of soiless culture but it also has an indentity meaning: is inspired to the history of Kaifeng city and is closely link with the water source of the Yellow River. The waterland will on one hand represent the fertility of the water with the aquaponics system garden, on the other his destructive power with a controlled flood landscape.

SECTION EMERGED LANDSCAPE

Emerged landscape Perspective view

1642 Yellow River flood man-made disaster, 300.000 victims, the worst disaster of the city


Everted landscape navigator

SECTION FLOODED LANDSCAPE

Flooded landscape Perspective view

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015

51


52

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

30/01/2013 Genk Belgium

BORDER\MINE

BACKGROUND

IS DIRT MATTER OUT OF PLACE?

post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

The unique conguration of Waterschei Mine, in Genk (Belgium) is made up by tension areas arising from the territorial configuration, in order to show the Dirt aspect of the site: different matrix model to understand the law of the space organization, to underline a deep cracked landscape.

URBAN LANSCAPE

THOR PARK MUSEUM

WATERSCHEI MINE

NATURAL LANDSCAPE

LANDSCAPE EVOLUTION MAPPING

MINE MUSEUM

MINE BRIDGE+SQUARE

MINE LIFT

WATERSCHEI MINE MAIN NODE COMPOSITION


post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

POLITECNICO DI MILANO AA 2013/2014

WATERSCHEI COAL MINE LIFT GEOMETRIC MATRIX

WATERSCHEI COAL MINE RESIDUE ORGANIC MATRIX

WATERSCHEI COAL MINE BRIDGE DIRSPERSED MATRIX

WATERSCHEI COAL MINE MUSEUM DENSE MATRIX

53


54

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

30/01/2015 Genk Belgium

ANALYSIS GEOMETRIC AMORPHOUS

GEOMETRIC - AMOURPHOUS MAPPING

URBAN NOT URBAN

post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

NOISY - QUIET MAPPING

HOMOGENEUS HETEROGENEOUS

GARDEN - RESIDUE MAPPING

STATIC DYNAMIC

O RDER DISORDER

STATIC - DYNAMIC MAPPING

RETRAINED - ABANDONED MAPPING

Mapping Analysis of WaterscheiMine Landscape Background


post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

POLITECNICO DI MILANO AA 2013/2014

Border Lines Analysis

GEOMETRIC

AMORPHOUS

NOISY

QUIET

GARDEN

RESIDUE

DYNAMIC

STATIC

DENSE

DISPERSED

apping Analysis of WaterscheiMine Landscape Background

55


56 30/01/2015 Genk Belgium

D R AW I N G

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

Section Eroded Landscape

Section Original Landscape

post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

15 years erosion

30 years erosion

40 years erosion

Section Original Landscape

Section Natural Take over Landscape


post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

POLITECNICO DI MILANO AA 2013/2014

WATERSCHEI BORDER MINE ORIGINAL CRACK

WATERSCHEI BORDER MINE CRACK 60 YEARS LATER

WATERSCHEI BORDER MINE ORIGINAL CRACK

WATERSCHEI BORDER MINE CRACK 60 YEARS LATER

57


58

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

30/01/2015 Genk Belgium

post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

PERSPECTIVE VIEW

EXHAUSTION AND EROSION

The result of the border-lines overlap creates a crack in the ground, a tridimensional landscape that evoke the mine experience of descending in the earth. Moreover in the project the topic of exhausion is a key points: we created structures that allows the site to erose itself, and hiding new structures and space that will be visible once the exhausion has been reached.

CRACK PERSPECTIVE VIEW


post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

POLITECNICO DI MILANO AA 2013/2014

ARTIFICIAL CRACK SIDE VIEW

NATURAL CRACK SIDE VIEW

59


60

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

30/01/2015 Genk Belgium

post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

MAQUETTE

Study Model : layered cardboard sections


post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

POLITECNICO DI MILANO AA 2013/2014

Photomontage on Model: Layered laser cut sections to define the tridimensional landscape

61


62

Personal Project Competition Design for Change 2014

30/03/2014 Lille France

FACTORY RIFT

PERSPECTIVE VIEW

POSSIBLE/IMPOSSIBLE LIFE The plates project will take all the site and no broken with interior and exterior, warehouse and building will not stop his spread. Also in the interior the space will not be divided, but underline the monumental status by keeping the open space solution in the top. an the foor the plates will create different space interaction. The main point of the industrial heritage are not only the open space but also the glass sheld roof, so we will divide the plates into life-possible plates, where the light arrives with a 45° angle, with a spontaneus plates garden where nature will take over, and areas where the natural light doesn’t arrive, will be artificially lighten and will be the relation and activity plates.

IMPOSSIBLE LIFE: ARTIFICIAL ELEMENTS

POSSIBLE LIFE: NATURAL GROWING

POSSIBLE LIFE:

Artificial, Natural, Industrial Eritage, Friches, Regeneration

NATURAL GROWING

Reuse concept: Iron sheets as shared library


Artificial, Natural, Industrial Eritage, Friches, Regeneration

Faive Cail Babckook, Lille, France Competition 2014

AWA R D : The project has been selected for the Design For Change Competition , Lille, in 2014.

Reuse concept: Iron sheets as benches and tables(Above) Tracks as exhibition support (Below)

63


64 30/12/2012 Milan Italy

PARK[T]OUR

MAQUETTE AWA R D : The project was published on the magazine Domus in April 2013 The model of the project was exhibit in Michele De Lucchi studio for the Milano Design Week in April 2013

Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic

Course: Landmark Design Prof: A. Branzi, M. de Lucchi

MEGALITIV CITY - ANDREA BRANZI ARCHIZOOM The project strart from the idea of a Megalitic City of the future. The city landscape is made by same volume different by shape, each of them with different function/activity. The Park(T)out is a towr for the parkour, made by two different element. One, the stone, allow people to climb the steructure and its linked to the stone-age idea. The other, metal panel structure, its light, smooth and allow people to make free running. All these elements are linked with a watherfall that produces different kind of sound, underlying the different origins of the two elements.

Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars,Concrete


Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic

POLITECNICO DI MILANO AA 2012/2013

Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars,Concrete

65


66

Course: Landmark Design Prof: A. Branzi, M. de Lucchi

30/12/2012 Milan Italy

Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic

MAQUETTE

Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars, Concrete


Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic

67