Portfolio
CRISTINA MORBI D E S I G N E R
INTERIOR|LANDSCAPE|EXHIBITION|LIGHTING
8 01-07/2016 Bangkok Thailand
BTS Bangkok Skywalk
Built Project
Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Role: Designer Stage: Concept Design, Schematic Design, Detail Design
Bangkok Skywalk has been my first project in Martha Schwartz Partners. I covered the role of designer from concept to design developement (Detail Design). My main task was involve in the Paving and Planters design. The canopies has been designed as a double laminated layer of glass, with OPV cells laminated in the double Layer. In the contruction process the design has been simplified towards Fiber glass circular canopyes, with water collection in the central spine. The project present a vibrant redesign of the area, creating a new landmark in Bangkok
Paving Plan Detail By Author
Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Martha Schwartz Partners
Pictures of Site after construction Source: BangkokPost
9
10
Role: Designer Stage: Concept Design, Schematic Design, Detail Design
01-07/2016 Bangkok Thailand
Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Detail Design Planter
Planter Detail By Author
Varies - 75 show
As manufactured and supplied by BEGA, Germany or similar approved.
6.
All dimensions are in millimeters, unless stated otherwise.
Base of light to finish flush with finished soil/mulch level
01
Bitumen waterproofing layer to inside of channel to engineer's specification
TYPICAL SPIKE LIGHT: SECTION SCALE: 1:10
200mm wide frosted ring to reflect light and create glowing edge to glass sheet 1
200 x 100 x 8mm aluminum structural outer ring section to engineer's details
Plaza paving by others on mortar bed and compacted sub-base
5
10
BEGA In-ground light LED '77146' set flush with paving. All wiring to be concealed beneath paving level. Internal lamp fitting to be arranged at different angles to illuminate canopies to engineer's approval.
Bottom layer - laminated coloured glass double layer laminated low iron toughened glass with central polka dot and coloured PVB interlayers
30
Colour & Finish: Refer to MSP-0037-L550 Lighting schedule Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities Installation: Fixture face set flush with paving as per manufacturers specification.
205
As manufactured and supplied by BEGA, Germany or similar approved.
Canopy metal outer ring profile folded 316L stainless steel Size: 430 x 153mm x 4mm thick
151
Top of light to finish flush with finished paving level
75
BEGA In-ground light 316L stainless steel housing set on concrete footing with drainage outlet. Product refence: 70 680 Min 100mm depth concrete footing with weep holes for drainage or similar approved base to manufacturer's specification
02
Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Martha Schwartz Partners
98
Additional welded upright to form drainage channel to engineer's specification
7
Gravel mulch
05
Aurora Flexible LED Strip Light 'AU-ST100IP' set within canopy folded steel profile. Self-adhesive backing (must be applied to clean surfaces). Conceal wiring within canopy profile as per manufacturer's recommendation
TYPICAL LED STRIP LIGHT IN CANOPY: DETAIL SCALE: 1:1
TYPICAL IN-GROUND LIGHT: SECTION SCALE: 1:10
Bespoke LED lighting tile. Frosted glass fixture, 316L Marine Grade Stainless Steel housing. All wiring to be concealed beneath paving level. Colour & Finish: Refer to MSP-0037-L550 Lighting schedule Installation: Fixture face set flush with paving as per manufacturers specification. Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities As manufactured and supplied by BEGA, Germany or similar approved. 430
Preformed cavity for lighting fitting and cable conduit. Min 15mm (W) x 8mm (D) to manufacturers specification
125
Top of light to finish flush with finished paving level
Precast planter walls and capping modules to be fixed and sealed together on site with epoxy joint filler and stainless steel dowels as per manufacturers specification
Ceramic paving tile: Sfera Size: 430mmĂ˜ x 10mm thick Colour: Refer to MSP-0037-L410 Paving plan Finish: Refer to MSP-0037-L450 Material schedule Pattern: As drawn and as per manufacturers recommendation Installation: Laid on 25mm thick latex modified mortar bed over concrete slab as per engineer's specification Supplier: Equipe, Spain or similar approved
A -
Light wiring beneath structural slab
Rev
15
100
SCALE: 1:10
Client
Aurora Flexible LED Strip Light 'AU-ST100IP' recessed within planter profile. Self-adhesive backing. To be detailed by manufacturer.
Martha Schwartz Partners Ltd 65-69 East Road London, N1 6AH, UK T: +44 (0)20 7549 7497 F: +44 (0)20 7520 0988 www.marthaschwartz.com
Light wiring hidden within planter wall
Š copyright Martha Schwartz Partners Ltd. 2016 Project Title
BEGA Recessed light LED '33109' set flush with step riser. All wiring to be concealed in steps internally. Colour & Finish: Refer to MSP-0037-L550 Lighting schedule
150
50 50
BTB Skywalk Link Bridge
Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities
25
15
Siam Piwat Company Limited 8th floor Siam Piwat Tower, 989 Rama 1 Road, Pathumwan Bangkok 10330, Thailand
Landscape Architect
Steps by others.
70
Description / Drawn / Approved
ISSUE
5
TYPICAL LIGHT TILE: SECTION
27/05/2016 100% DD SUBMISSION
Purpose of Issue
10
8
03
03/06/2016 100% DD SUBMISSION - REVISION A
Date
Installation: Fixture face set flush with step riser as per manufacturers specification.
Drawing Title
Lighting Details
As manufactured and supplied by BEGA, Germany or similar approved. Project Number
0037
Drawing Number
MSP-0037-L741
04
TYPICAL RECESSED LIGHT: SECTION SCALE: 1:10
06
TYPICAL LED STRIP LIGHT IN PLANTER: DETAIL SCALE: 1:2
Scale - A1 Sheet
Revision
Drawn
Approved
1:10
Date
MW
A AH
North
Z:\Projects\0037 BTB Skywalk_Link Bridge\400 Design\450 Design Development\451 Drawings CAD\04 Plotsheets\MSP-0037 BTB Skywalk Link Bridge_L741_Lighting Details.dwg 03 June 2016 3:20:23 PM
Min 50
Min 50mm depth concrete structural slab to prevent the need for additional substructure
Pictures of Site after construction Source: Eugene Goes Places
11
12 Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Role: Designer Stage: Concept Design, Schematic Design, Detail Design
Canopy Detail, By Author
BEGA Compact Floodlight LED '77325' with spike to be located in planting beds. All wiring to be concealed beneath planting soil. Light fittings to be arranged at different angles to illuminate trees and canopies to engineer's approval. Colour & Finish: Refer to MSP-0037-L550 Lighting schedule Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities
Top layer - laminated coloured glass - double layer laminated low iron toughened glass with central coloured PVB interlayer and OPV Belectric cells
Installation: spike driven into good ground. Optional for ground floor only: concrete haunching as necessary. Ensure min 50mm soil/mulch cover. Varies - 75 shown
As manufactured and supplied by BEGA, Germany or similar approved.
Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art
Martha Schwartz Partners
Notes 1. This document should not be relied on or used in circumstances other than those for which it was prepared and for which Martha Schwartz, Inc. was commissioned. Martha Schwartz, Inc. accepts no responsibility for this document to any other party other than the person by whom it was commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figured dimensions to be worked to in all cases. 4. To be read in conjunction with all other drawings and specifications inc. structural and service engineers' drawings. 5. Where an item is covered by drawings to different scales the larger scale drawing is to be worked to. 6. All dimensions are in millimeters, unless stated otherwise.
Base of light to finish flush with finished soil/mulch level
01
98
Additional welded upright to form drainage channel to engineer's specification Bitumen waterproofing layer to inside of channel to engineer's specification
TYPICAL SPIKE LIGHT: SECTION SCALE: 1:10
200mm wide frosted ring to reflect light and create glowing edge to glass sheet 1
200 x 100 x 8mm aluminum structural outer ring section to engineer's details
Plaza paving by others on mortar bed and compacted sub-base
5
10
BEGA In-ground light LED '77146' set flush with paving. All wiring to be concealed beneath paving level. Internal lamp fitting to be arranged at different angles to illuminate canopies to engineer's approval.
Bottom layer - laminated coloured glass double layer laminated low iron toughened glass with central polka dot and coloured PVB interlayers
30
Colour & Finish: Refer to MSP-0037-L550 Lighting schedule Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities Installation: Fixture face set flush with paving as per manufacturers specification.
205
As manufactured and supplied by BEGA, Germany or similar approved.
Canopy metal outer ring profile folded 316L stainless steel Size: 430 x 153mm x 4mm thick
151
Top of light to finish flush with finished paving level
75
BEGA In-ground light 316L stainless steel housing set on concrete footing with drainage outlet. Product refence: 70 680 Min 100mm depth concrete footing with weep holes for drainage or similar approved base to manufacturer's specification
02
7
Gravel mulch
05
Aurora Flexible LED Strip Light 'AU-ST100IP' set within canopy folded steel profile. Self-adhesive backing (must be applied to clean surfaces). Conceal wiring within canopy profile as per manufacturer's recommendation
TYPICAL LED STRIP LIGHT IN CANOPY: DETAIL SCALE: 1:1
TYPICAL IN-GROUND LIGHT: SECTION SCALE: 1:10
Bespoke LED lighting tile. Frosted glass fixture, 316L Marine Grade Stainless Steel housing. All wiring to be concealed beneath paving level. Colour & Finish: Refer to MSP-0037-L550 Lighting schedule Installation: Fixture face set flush with paving as per manufacturers specification. Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities As manufactured and supplied by BEGA, Germany or similar approved. 430
Preformed cavity for lighting fitting and cable conduit. Min 15mm (W) x 8mm (D) to manufacturers specification
125
Top of light to finish flush with finished paving level
Precast planter walls and capping modules to be fixed and sealed together on site with epoxy joint filler and stainless steel dowels as per manufacturers specification
Ceramic paving tile: Sfera Size: 430mmĂ˜ x 10mm thick Colour: Refer to MSP-0037-L410 Paving plan Finish: Refer to MSP-0037-L450 Material schedule Pattern: As drawn and as per manufacturers recommendation Installation: Laid on 25mm thick latex modified mortar bed over concrete slab as per engineer's specification Supplier: Equipe, Spain or similar approved
A -
Light wiring beneath structural slab
Rev
15
Client
5
TYPICAL LIGHT TILE: SECTION
100
SCALE: 1:10
Aurora Flexible LED Strip Light 'AU-ST100IP' recessed within planter profile. Self-adhesive backing. To be detailed by manufacturer.
Š copyright Martha Schwartz Partners Ltd. 2016 Project Title
BEGA Recessed light LED '33109' set flush with step riser. All wiring to be concealed in steps internally. Colour & Finish: Refer to MSP-0037-L550 Lighting schedule
BTB Skywalk Link Bridge
Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities
150
25 50 50
Siam Piwat Company Limited 8th floor Siam Piwat Tower, 989 Rama 1 Road, Pathumwan Bangkok 10330, Thailand
Martha Schwartz Partners Ltd 65-69 East Road London, N1 6AH, UK T: +44 (0)20 7549 7497 F: +44 (0)20 7520 0988 www.marthaschwartz.com
Light wiring hidden within planter wall
15
Description / Drawn / Approved
Landscape Architect
Steps by others.
70
27/05/2016 100% DD SUBMISSION
ISSUE
8
03
03/06/2016 100% DD SUBMISSION - REVISION A
Date
Purpose of Issue
10
Installation: Fixture face set flush with step riser as per manufacturers specification.
Drawing Title
Lighting Details
As manufactured and supplied by BEGA, Germany or similar approved. Project Number
0037
Drawing Number
MSP-0037-L741
04
TYPICAL RECESSED LIGHT: SECTION SCALE: 1:10
06
TYPICAL LED STRIP LIGHT IN PLANTER: DETAIL SCALE: 1:2
Scale - A1 Sheet
Revision
Drawn
Approved
1:10
Date
MW
A AH
North
Z:\Projects\0037 BTB Skywalk_Link Bridge\400 Design\450 Design Development\451 Drawings CAD\04 Plotsheets\MSP-0037 BTB Skywalk Link Bridge_L741_Lighting Details.dwg 03 June 2016 3:20:23 PM
Min 50
Min 50mm depth concrete structural slab to prevent the need for additional substructure
Pictures of Artist drawing on Canopy Source: Eugene Goes Places
13
14 01/09/2017 Shunde, China
Joy Marina
Deatil Design
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
Role: Designer, Lighting Stage: Concept Design, Schematic Design, Detail Design
I’ve been involved in this project from the Charrette in 2015 till Design Developement in summer 2017. Aside from designing with the team the hole ara, my main focus was the transitional corridor which connect the main axes of the marina. I designed a bespoke paving in brushed and polished concrete, which represent the a transitional breaking of the rocks from the urban to the uman scale. The red floating canopies like leaves protect from the sun and create a filtered view, projecting colored shadows and overlapping their pattern to the paving.
Illustrative Plan Transitional Corridor By Author
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
Martha Schwartz Partners
Design and View By Author
15
16
Role: Designer, Lighting Stage: Concept Design, Schematic Design, Detail Design
300
0
30
30
01
60 .0°
01/09/2017 Shunde, China
300 0 120.0° 0 60
60 .0°
0 60
02
P11 参照0044-L350-物料清单 P11. REFER TO 0044-L350-MATERIALS SCHEDULE
120.0°
P12-13 参照0044-L350-物料清单 P12-13. REFER TO 0044-L350-MATERIALS SCHEDULE
01
02
P11 参照0044-L350-物料清单 P11. REFER TO 0044-L350-MATERIALS SCHEDULE
Deatil Design
P12-13 参照0044-L350-物料清单 P12-13. REFER TO 0044-L350-MATERIALS SCHEDULE P12-13 参照0044-L350-物料清单 P12-13. REFER TO 0044-L350-MATERIALS SCHEDULE
平面 PLAN
平面 PLAN
P11 参照0044-L350-物料清单 P11. REFER TO 0044-L350-MATERIALS SCHEDULE
FFL
FFL
P12-13 参照参照工程师图纸 0044-L350-物料清单 压实基层 P12-13. REFER SUB-BASE TO 0044-L350-MATERIALS SCHEDULE COMPACTED TO ENGINEER'S SPECIFICATION P11 参照0044-L350物料清单 土工布 参照工程师图纸 P11. REFER TO 0044-L350-MATERIALS SCHEDULE GEOTEXTILE TO ENGINEER'S SPECIFICATION 最少30mm厚乳胶改良砂浆层 压实基层 参照工程师图纸 MIN 30MM THICK LATEX MODIFIED MORTAR BED COMPACTED SUB-BASE TO ENGINEER'S SPECIFICATION 钢筋混凝土基层 参照工程师图纸
平面 PLAN FFL
平面 PLAN SL FFL
土工布 参照工程师图纸 REINFORCED CONCRETE BASE LAID TO FALLS TO ENGINEER'S SPECIFICATION GEOTEXTILE TO ENGINEER'S SPECIFICATION 填充物料 参照工程师图纸 最少30mm厚乳胶改良砂浆层 VOID FILLER TO ENGINEER'S SPECIFICATION MIN 30MM THICK LATEX MODIFIED MORTAR BED 钢筋混凝土基层 参照工程师图纸 REINFORCED CONCRETE BASE LAID TO FALLS TO ENGINEER'S SPECIFICATION 防水卷材 参照工程师图纸 填充物料 参照工程师图纸 WATERPROOFING MEMBRANE TO ENGINEER'S SPECIFICATION VOID FILLER TO ENGINEER'S SPECIFICATION 建筑结构板 参照工程师图纸 BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION
SL
SL
剖面 SECTION
SL
剖面 SECTION
排水管参照建筑师图纸 防水卷材 参照工程师图纸 DRAINAGE COORDINATED BY ARCHITECT WATERPROOFING MEMBRANE TO ENGINEER'S SPECIFICATION
标准结构上六边形花岗岩铺装详图 建筑结构板 参照工程师图纸 TYPICALL GRANITE HEXAGON PAVER OVER STRUCTURE
01
SCALE : 1:20
SCALE : 1:20
SCALE : 1:20
剖面 SECTION
排水管参照建筑师图纸 DRAINAGE COORDINATED BY ARCHITECT
标准结构上六边形花岗岩铺装详图 TYPICALL GRANITE HEXAGON PAVER OVER STRUCTURE
01
标准结构上 TYPICAL CO
02
BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION
@ A1
剖面 SECTION
02
@ A1
@
标准结构上混 TYPICAL CO SCALE : 1:20
@
P06 参照0044-L350-物料清单 P06. REFER TO 0044-L350-MATERIALS SCHEDULE
面 N TRANSITION PLAN
50
240
L709 01 L707
900
240 50
03
300
02 L709
03 L709
04 L709
05 04 L709
02 L707
03 L707
04 L707
05 04 L707
E01 参照0044-L350-物料清单 E01 FLUSH WITH SURFACE, REFER TO 0044-L350-MATERIALS SCHEDULE
P09 参照0044-L350-物料清单 P09. REFER TO 0044-L350-MATERIALS SCHEDULE
300
900
03 01
300
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
300
E01 参照0044-L350-物料清单 E01 FLUSH WITH SURFACE, REFER TO 0044-L350-MATERIALS SCHEDULE P06 参照0044-L350-物料清单 P06. REFER TO 0044-L350-MATERIALS SCHEDULE
P09 参照0044-L350-物料清单 P09. REFER TO 0044-L350-MATERIALS SCHEDULE P06 参照0044-L350-物料清单 P06. REFER TO 0044-L350-MATERIALS SCHEDULE P09 参照0044-L350-物料清单 P09. REFER TO 0044-L350-MATERIALS SCHEDULE
平面 PLAN FFL
FFL
SL
SL
剖面 SECTION
标准结构上花岗岩铺装详图@曲水湾走道 建筑结构板 参照工程师图纸 TYPICAL GRANITE PAVER ON STRUCTURE @ WATER CORRIDOR BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION SCALE : 1:20
剖面 SECTION
03
FFL
E01 参照0044-L350-物料清单 P06 0044-L350物料清单REFER TO 0044-L350-MATERIALS SCHEDULE E01参照 FLUSH WITH SURFACE, P06. REFER TO 0044-L350-MATERIALS SCHEDULE P09 参照0044-L350-物料清单 土工布 参照工程师图纸 P09. REFER TO 0044-L350-MATERIALS SCHEDULE GEOTEXTILE TO ENGINEER'S SPECIFICATION E01 参照0044-L350-物料清单 压实基层 E01 FLUSH 参照工程师图纸 WITH SURFACE, REFER TO 0044-L350-MATERIALS SCHEDULE COMPACTED SUB-BASE TO ENGINEER'S SPECIFICATION 最少30mm厚乳胶改良砂浆层 土工布 参照工程师图纸 MIN 30MM THICK LATEX MODIFIED MORTAR BED GEOTEXTILE TO ENGINEER'S SPECIFICATION 钢筋混凝土基层 参照工程师图纸 压实基层 参照工程师图纸 REINFORCED CONCRETE BASE LAID TO FALLS TO ENGINEER'S SPECIFICATION COMPACTED SUB-BASE TO ENGINEER'S SPECIFICATION 填充物料 参照工程师图纸 最少 30mm厚乳胶改良砂浆层 VOID FILLER TO ENGINEER'S SPECIFICATION MIN 30MM THICK LATEX MODIFIED MORTAR BED 防水卷材 参照工程师图纸 钢筋混凝土基层 参照工程师图纸 WATERPROOFING MEMBRANE ENGINEER'S SPECIFICATION REINFORCED CONCRETE BASE LAID TO TO FALLS TO ENGINEER'S SPECIFICATION 建筑结构板 参照工程师图纸 填充物料 参照工程师图纸 BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION VOID FILLER TO ENGINEER'S SPECIFICATION 排水管道参照建筑师图纸 防水卷材 参照工程师图纸 DRAINAGE COORDINATED BY TO ARCHITECT WATERPROOFING MEMBRANE ENGINEER'S SPECIFICATION
平面 PLAN
03
平面 PLAN
@ A1
排水管道参照建筑师图纸 DRAINAGE COORDINATED BY ARCHITECT
标准结构上花岗岩铺装详图@曲水湾走道 TYPICAL GRANITE PAVER ON STRUCTURE @ WATER CORRIDOR SCALE : 1:20
T2
FFL
SL
SL
剖面 SECTION
04
Detail Strategy T3 Paving T4 By Author
标准结构上 TYPICAL GR SCALE : 1:20
剖面 SECTION
04
@ A1
T1
平面 PLAN
T5
@
标准结构上花 TYPICAL GR SCALE : 1:20
@
Martha Schwartz Partners
01 L709
02 L709
03 L709
04 L709
05 L709
06 L709
01 L707
02 L707
03 L707
04 L707
05 L707
06 L707
T1
01
T2
T3
T4
T5
T6
07 L708
T5
08 L708
T4
09 L708
01 L708
T3
T2
铺装图案过渡平面 PAVING PATTERN TRANSITION PLAN SCALE : 1:500
@ A1
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
Notes 1. This document should not be relied on or used in circumstances other than those for which it was prepared and for which Martha Schwartz Partners was commissioned. Martha Schwartz Partners accepts no responsibility for this document to any other party other than the person by whom it was commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figured dimensions prevail in all cases. 4. To be read in conjunction with all other drawings and specifications including but not limited to structural and service engineers' drawings. 5. Where an item is covered by drawings to different scales the larger scale drawing is to prevail. 6. All dimensions are in millimeters, unless stated otherwise.
100% DD 100% 方案设计
21/08/2017 23/06/2017 Rev Date 修订 日期
50% DD 50% 方案设计 Description / Drawn / Approved
描述 / 画图 / 批准
Purpose of Issue 出图目的
P10 参照0044-L350-物料清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE P11 参照0044-L350-物料清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
300 30
30
0
0
0 30
0
300
Client 业主 Guangdong Shunde OCT Industrial Development Co. Ltd Shunde District, Foshan City, Guangdong Province, 528300 T: 0757-29299013 www.chinaoct.com/ Landscape Architect 景观建筑师 Martha Schwartz Partners Ltd Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.com
30
600
100% DD 100% 方案设计
300
参照0044-L400系列放线与铺装图案详图 REFER TO 0044- L400 SERIES FOR SETTING OUT AND PATTERN
© copyright 2017 Martha Schwartz Partners Ltd. Project Title 项目
Shunde Joy Marina
顺德华侨城欢乐海岸 - 综合商业区 Drawing Title 图标
Detail Paving Sheet 7 景观详图 - 铺装 - 7
Project Number 项目号
0044
Drawing Number 图号
0044-L706
D01
铺装图案模块
铺装图案模块组合
铺装石块方案
PAVING PATTERN SINGLE ELEMENTS
PAVING PATTERN MODULE
PAVING PATTERN MODULES COMBINATION
PAVING ROCK SCHEME
@ A1
D02
SCALE : 1:20
@ A1
D03
SCALE : 1:20
Revision 修订 North 北
Drawn 画图
Approved 批准
As Shown
铺装图案元件 SCALE : 1:20
Scale - A1 比例- A1
@ A1
D04
SCALE : 1:20
CM
@ A1
Date 日期
----
21/08/2017
06 L709 06 L707
T6
07 L708
Paving Detail Strategy T5 By Author
08 L708
T4
09 L708
T3
01 L708
T2
MS
17
18
Role: Designer, Lighting Stage: Concept Design, Schematic Design, Detail Design
01/09/2017 Shunde, China
Deatil Design L
L
S
M
M
L
L P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
L
L
M
L
S S
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
L
M M
M L L
01
M
S
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
M
L M
L
S
M
标准过渡样图T2
标准过渡样图T3
TYPICAL EXAMPLE OF TRANSITION T1
TYPICAL EXAMPLE OF TRANSITION T2
TYPICAL EXAMPLE OF TRANSITION T3
02
03
@ A1
S M
S
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
M
M
S M
S
M
M
M
M
S S
M
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
SCALE : 1:50
M
@ A1
P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large Size x5 x8 x4 P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size x4 x2 x1 P12 每单元小号石材铺地砌片 x1 P12 Tiles per Rock Small Size x2 或用1/3石块替代 P12 每单片模块石材铺地砌片 Alternate 31 of the Rocks P12 Tiles per Single module Rock 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
x4 x1
M
M
S
SCALE : 1:50
P12 每单元大号石材铺地砌片 P12 TIles per Rock Large Size x5 x8 P12 每单元中号石材铺地砌片 P12 TIles per Rock Medium Size x4 x2 P12 每单元小号石材铺地砌片 P12 TIles per Rock Small Size x2 x1 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
x4
M
M
L
@ A1
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
M
M
标准过渡样图T1 SCALE : 1:50
S
M
M
L
P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large size: x5 x8 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
S
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
S
M
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
M M
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
L
L
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
Notes 1. This document should not be circumstances other than tho prepared and for which Mart was commissioned. Martha S accepts no responsibility for other party other than the pe commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figure in all cases. 4. To be read in conjunction wi and specifications including structural and service engine 5. Where an item is covered by scales the larger scale drawi 6. All dimensions are in millime otherwise.
M
S
S
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
S
S
S S
S
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
S
S S
S
S
M
S
S
M
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
21/08/2017
100% DD 100%
50% DD 50% 方 Description / D
描述 / 画图 /
Purpose of Issue 出图目的
100% DD 100% 方案设
Client 业主 Guangdong Shunde OCT In Co. Ltd Shunde District, Foshan Ci Province, 528300 T: 0757-29299013 www.chinaoct.com/
Landscape Architect 景观建筑师 Martha Schwartz Partners Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.com
S
S
-
23/06/2017 Rev Date 修订 日期
S
© copyright 2017 Martha Sc
04
标准过渡样图T4
标准过渡样图T5
TYPICAL EXAMPLE OF TRANSITION T4
TYPICAL EXAMPLE OF TRANSITION T5
SCALE : 1:50
05
@ A1
P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock
x4
x2
x1
x2 或用1/3石块替代 Alternate 31 of the Rocks
x1
SCALE : 1:50
P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock
Project Title 项目
标准过渡样图T6
06
@ A1
x1
x2 或用1/3石块替代 Alternate 31 of the Rocks
TYPICAL EXAMPLE OF TRANSITION T6 SCALE : 1:50
Shunde Joy Marina
@ A1
P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock
或用1/3石块替代 Alternate 31 of the Rocks
顺德华侨城欢乐海岸 - 综合商业区 Drawing Title 图标
Detail Paving Sheet 10 景观详图 - 铺装 -
Project Number 项目号
0044
Drawing Number 图号
0044-L709
Scale - A1 比例- A1
Revision 修订
Drawn 画图
Approved 批准
As Shown
CM
Date 日期
----
21/08/2017
Transitioning Paving Detail By Author
MS
M
M
L
L P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
L
L
M
L
S S
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
L
M M
M L L
01
S
M
S
M
L M
L
S
M
标准过渡样图T2
标准过渡样图T3
TYPICAL EXAMPLE OF TRANSITION T1
TYPICAL EXAMPLE OF TRANSITION T2
TYPICAL EXAMPLE OF TRANSITION T3
SCALE : 1:50
02
@ A1
03
@ A1
S M
S
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
M
M
S M
S
M
M
M
M
S S
M
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
SCALE : 1:50
M
@ A1
P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large Size x5 x8 x4 P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size x4 x2 x1 P12 每单元小号石材铺地砌片 x1 P12 Tiles per Rock Small Size x2 或用1/3石块替代 P12 每单片模块石材铺地砌片 Alternate 31 of the Rocks P12 Tiles per Single module Rock 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
x4 x1
M
M
S
SCALE : 1:50
P12 每单元大号石材铺地砌片 P12 TIles per Rock Large Size x5 x8 P12 每单元中号石材铺地砌片 P12 TIles per Rock Medium Size x4 x2 P12 每单元小号石材铺地砌片 P12 TIles per Rock Small Size x2 x1 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
x4
M
M
L
标准过渡样图T1
P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large size: x5 x8 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
M
M
M
L
S
M
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
S
M
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
M M
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
L
L
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
Notes 1. This document should not be relied on or used in circumstances other than those for which it was prepared and for which Martha Schwartz Partners was commissioned. Martha Schwartz Partners accepts no responsibility for this document to any other party other than the person by whom it was commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figured dimensions prevail in all cases. 4. To be read in conjunction with all other drawings and specifications including but not limited to structural and service engineers' drawings. 5. Where an item is covered by drawings to different scales the larger scale drawing is to prevail. 6. All dimensions are in millimeters, unless stated otherwise.
M
S
S
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
S
S
S S
S
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
S
S S
S
S
M
S
S
M
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE
21/08/2017
100% DD 100% 方案设计
50% DD 50% 方案设计 Description / Drawn / Approved
描述 / 画图 / 批准
Purpose of Issue 出图目的
100% DD 100% 方案设计
Client 业主 Guangdong Shunde OCT Industrial Development Co. Ltd Shunde District, Foshan City, Guangdong Province, 528300 T: 0757-29299013 www.chinaoct.com/ Landscape Architect 景观建筑师 Martha Schwartz Partners Ltd Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.com
S
S
-
23/06/2017 Rev Date 修订 日期
S
© copyright 2017 Martha Schwartz Partners Ltd.
04
标准过渡样图T4
标准过渡样图T5
TYPICAL EXAMPLE OF TRANSITION T4
TYPICAL EXAMPLE OF TRANSITION T5
SCALE : 1:50
05
@ A1
P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock
x4
x2
x1
x2 或用1/3石块替代 Alternate 31 of the Rocks
x1
SCALE : 1:50
P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock
Project Title 项目
标准过渡样图T6
06
@ A1
x1
x2 或用1/3石块替代 Alternate 31 of the Rocks
TYPICAL EXAMPLE OF TRANSITION T6 SCALE : 1:50
Shunde Joy Marina
@ A1
P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock
或用1/3石块替代 Alternate 31 of the Rocks
顺德华侨城欢乐海岸 - 综合商业区 Drawing Title 图标
Detail Paving Sheet 10 景观详图 - 铺装 - 10
Project Number 项目号
0044
Drawing Number 图号
0044-L709
Scale - A1 比例- A1
Revision 修订 North 北
Drawn 画图
Approved 批准
As Shown CM
Date 日期
----
21/08/2017
Transitioning Paving Detail By Author
MS
Z:\Projects\0044 Shunde Joy Marina\400 Design\450 Design Development\451 Drawings CAD\04 Plotsheets\0044-L709 Detail Paving.dwg 6/23/2017 6:23 PM
L
L
S
Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional
Martha Schwartz Partners
19
20
Role: Project Manager, Design Leader Stage: Concept Design
09/2017 TuopaiShede, China
T uopai Winery East Gate
Spring, Winery Gateway, Sculptural approach, Tradition and Technology
Gateway Design
Spring Inspiration: Waterfall by Hiroshi Senju
Spring, Winery Gateway, Sculptural approach, Tradition and Technology
Martha Schwartz Partners
Images and Design By Author
21
22
Role: Project Manager, Design Leader Stage: Concept Design
09/2017 TuopaiShede, China
Spring, Winery Gateway, Sculptural approach, Tradition and Technology
Gateway Design
Images and Design By Author
Spring, Winery Gateway, Sculptural approach, Tradition and Technology
Martha Schwartz Partners
Images and Design By Author
23
24 10/2017 Paris France
Courbevoie Competition
Streetscape Design
Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard
Role: Project Manager, Design Leader, Lighting Consultant Stage: Concept/Schematic Design
In Courbevoie competition I had the role of Project Manager and design leader for MSP Team. Thr streetscape use a porous paving surface and rain gardens, the concept aim to generate the bed of the river in the raindays in Paris. The rooftop is an orchid of 100 trees ( column= 1 tree) with roof-like canopies and furnituresintegrated with the nature. I invested the role of Lighting Consultant, creating bespoke pole light and special features using Globes Projector with water inspired textures.
Avenue Gambetta: Weaving Language River Diagram
Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard
Martha Schwartz Partners Atelier Fois
Avenue Gambetta weaving water streetscape Design By Author, Visualization: Plasticine
25
26
Role: Project Manager, Design Leader, Lighting Consultant Stage: Concept/Schematic Design
10/2017 Paris France
Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard
Rooftop Design
Rooftop Charras: Linear orchard diagram
Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard
Martha Schwartz Partners Atelier Fois
Charras Rooftop Orchard Design By Author Visualization: Plasticine
27
28 04/2017 Shanghai China
MIX C Retail
Concept Design
Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway
Role: Designer Stage: Concept Design
This design option I designed for a commercial project in China use the infinite waving pattern to create rooms in the landscape, and elephant trunk gateway with mist, a ludic example of sculptural landscape.
IllIustrative Plan By Author
Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway
Martha Schwartz Partners
PDesign and erspective view rooms By author
29
30
Role: Designer Stage: Concept Design
04/2017 Shanghai China
Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway
Concept Design
Elephant Gateway design By Author
Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway
Martha Schwartz Partners
Gateway entrance Design and View By Author
31
32
Role: Designer Stage: Concept Design
02/03/2017 Shanghai China
DJI Headquarter
Drones Park, Pixels, LIDA Color Pattern, Rooms, Gradient
Competition
Illustrative Plan and Design By Author
Drones Park, Pixels, LIDA Color Pattern, Rooms, Gradient
Martha Schwartz Partners
Views and Design By Author
33
34 07/2017 Glasgow, UK
High Street Glasgow
Concept Design
Arcades, Shopping Street, Gateway, Sculptural Feature, Linear
Role: Designer Stage: Concept Design
Designer for the Arcade of this shopping avenue in Glasgow, inspired to the art nouveau movement, with the use of steel and laminated glass to create a iconic gateway and landmark.
Aerial View Arcades By Author
Arcades, Shopping Street, Gateway, Sculptural Feature, Linear
Martha Schwartz Partners
Perspective View Arcades By Author
35
36
Role: designer Stage: Charrette
05/2017 Lebanon and China
Canopies and Bridges
3D Sketches
American University of Beirut Design and Images by Author
Martha Schwartz Partners
Ecocity RIverfront Bridge Design and Images by Author
37
38
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
01/10/2015 Kaifeng China
WUKU GRANARY
BACKGROUND
THE SITE
MAIN STREET
ABOVE THE GROUND/BELOW THE GROUND EXPLODED
KAIFENG NEW CITY
MAIN STREET
KAIFENG NEW CITY
WUANSUI MOUNTAIN 400,000 / PERSON
SITE
BOUNDUARY RUIN WALL
TOWER PARK 520,000 / PERSON
CONTEXT ANALYSIS
KAIFENG OLD CITY
SITE QINGMING RIVER PARK 1,350,000 / PERSON
NATURAL BORDER
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
The project is located in Henan province in the city of Kaifeng. The site is an abandoned grain storage for military use built in 1971. Is composed of Warehouses in the north, for productive use and lavoration of the crops and a below the ground corn storage in the south. The use of undeground storage is a common practice in Chinese culture in order to save agricultural land.
HANLIN BEILIN 880,000 / PERSON
DRAGON PAVILION PARK 845,000 / PERSON
KAIFENG OLD CITY
BACKGROUND OF THE SITE
ORIGINAL LANDSCPAE
YELLOW RIVER FLOOD
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015
LOESS SEDIMENT DEPOSITION
GENERATION OF THE SITE: FLOOD AND SEDIMENTATION
15.0 m 4.5 m 7.0 m
9.0 m 7.0 m15.0 m
0.0 m
0.0 m
SECTION GROUND BB’
B’
A’
SECTION GROUND AA’
5M 7M 10 M
C
C’
YELLOW RIVER
ABANDONED BUILDINGS
UNDERGROUND FOOD STORAGE
MAIN ROAD (NORTH GATE)
39
40 01/10/2015 Kaifeng China
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
PERFORMATIVE S PA C E
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
(RE)GENERAION OF THE SITE The landscape design is generated by the projection and intersections of the guidelines of the ruins, and the projection of the hipogeal architecture. The functions are aware of the local and memory valorization in order to regenerate the derelict area.
Plan and sections of the Project
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015
P E R F O R M AT I V E S PA C E The underground space is refilled with the corn grains that are used as structures and create a new kind of space interaction, respecting the identity of the space. Visitors can climb, play and collect the corn floor, changing his shape with their presence. More the piece of art is contemporary and distant from the industrial past, more the climb will be physical but will remind of the time that separate us from our past.
Relationship Above the ground/ Below the ground
41
42
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
01/10/2015 Kaifeng China
EVERTED LANDSCAPE The evrted landscape, the hill of the site, will be regenerate using the productive crops, conceptually close to the plots of the site. The corn field will create an intresting landscape of paths and hights that will evoke teh past of the site and his futurem using the soil and soiless germination.
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
LANDSCAPE
PRODUCTIVE LANDSCAPE 1
2
3
SOILESS GERMINATION AQUAPONIC
INTERACTION HILL URBAN ORCHID
FLOOD LANDSCAPE WATER
WATERLAND
CONTAINERS
DESIGNED CROPS CORNFIELD
TERRACES BENCHES
4
INTERACTIVE CROPS
SPONTANEOUS CROPS THIRD LANDSCAPE
WHEAT, MILLET, KAOLIANG, SOYBEANS
BENCHES WALLS
WALLS SEEDS
1
3 2 4
FUTURE VISION
SOILESS GERMINATION
SOIL GERMINATION
PAST RAPRESENTATION
CROPS: PRODUCTIVE GERMINATION
Diagrams of Crops and paths in the everted landscape
PROMENADE The result of the projection of the introflexed landscape generate a promenade and terraces that cross the site and are a panoramic view of the old city.
TRASVERSAL SECTION OF THE EVERTED LANDSCAPE
3D VIEW OF THE PROMENADE OF THE EVERTED LANDSCAPE
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015
43
44
Personal Thesis Tutor: C. Xiaosheng, G Piccinno
01/10/2015 Kaifeng China
M E M O RY L A N D S C A P E
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
UNPREDICTABLE LANDSCAPE
The waterland is not just a mean to show the technical approach of soiless culture but it also has an indentity meaning: is inspired to the history of Kaifeng city and is closely link with the water source of the Yellow River. The waterland will on one hand represent the fertility of the water with the aquaponics system garden, on the other his destructive power with a controlled flood landscape.
SECTION EMERGED LANDSCAPE
Emerged landscape Perspective view
1642 Yellow River flood man-made disaster, 300.000 victims, the worst disaster of the city
Everted landscape navigator
SECTION FLOODED LANDSCAPE
Flooded landscape Perspective view
Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification
TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015
45
46
COURSE: LAB. SINTESI FINALE PROF: G. PICCINNO, F. MURIALDO
30/01/2015 Genk Belgium
BORDER\MINE
BACKGROUND
IS DIRT MATTER OUT OF PLACE?
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
The unique conguration of Waterschei Mine, in Genk (Belgium) is made up by tension areas arising from the territorial configuration, in order to show the Dirt aspect of the site: different matrix model to understand the law of the space organization, to underline a deep cracked landscape.
URBAN LANSCAPE
THOR PARK MUSEUM
WATERSCHEI MINE
NATURAL LANDSCAPE
LANDSCAPE EVOLUTION MAPPING
MINE MUSEUM
MINE BRIDGE+SQUARE
MINE LIFT
WATERSCHEI MINE MAIN NODE COMPOSITION
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
POLITECNICO DI MILANO AA 2013/2014
WATERSCHEI COAL MINE LIFT GEOMETRIC MATRIX
WATERSCHEI COAL MINE RESIDUE ORGANIC MATRIX
WATERSCHEI COAL MINE BRIDGE DIRSPERSED MATRIX
WATERSCHEI COAL MINE MUSEUM DENSE MATRIX
47
48
COURSE: LAB. SINTESI FINALE PROF: G. PICCINNO, F. MURIALDO
30/01/2015 Genk Belgium
ANALYSIS GEOMETRIC AMORPHOUS
GEOMETRIC - AMOURPHOUS MAPPING
URBAN NOT URBAN
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
NOISY - QUIET MAPPING
HOMOGENEUS HETEROGENEOUS
GARDEN - RESIDUE MAPPING
STATIC DYNAMIC
O RDER DISORDER
STATIC - DYNAMIC MAPPING
RETRAINED - ABANDONED MAPPING
Mapping Analysis of WaterscheiMine Landscape Background
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
POLITECNICO DI MILANO AA 2013/2014
Border Lines Analysis
GEOMETRIC
AMORPHOUS
NOISY
QUIET
GARDEN
RESIDUE
DYNAMIC
STATIC
DENSE
DISPERSED
apping Analysis of WaterscheiMine Landscape Background
49
50 30/01/2015 Genk Belgium
D R AW I N G
COURSE: LAB. SINTESI FINALE PROF: G. PICCINNO, F. MURIALDO
Section Eroded Landscape
Section Original Landscape
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
15 years erosion
30 years erosion
40 years erosion
Section Original Landscape
Section Natural Take over Landscape
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
POLITECNICO DI MILANO AA 2013/2014
WATERSCHEI BORDER MINE ORIGINAL CRACK
WATERSCHEI BORDER MINE CRACK 60 YEARS LATER
WATERSCHEI BORDER MINE ORIGINAL CRACK
WATERSCHEI BORDER MINE CRACK 60 YEARS LATER
51
52
COURSE: LAB. SINTESI FINALE PROF: G. PICCINNO, F. MURIALDO
30/01/2015 Genk Belgium
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
PERSPECTIVE VIEW
EXHAUSTION AND EROSION
The result of the border-lines overlap creates a crack in the ground, a tridimensional landscape that evoke the mine experience of descending in the earth. Moreover in the project the topic of exhausion is a key points: we created structures that allows the site to erose itself, and hiding new structures and space that will be visible once the exhausion has been reached.
CRACK PERSPECTIVE VIEW
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
POLITECNICO DI MILANO AA 2013/2014
ARTIFICIAL CRACK SIDE VIEW
NATURAL CRACK SIDE VIEW
53
54
COURSE: LAB. SINTESI FINALE PROF: G. PICCINNO, F. MURIALDO
30/01/2015 Genk Belgium
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
MAQUETTE
Study Model : layered cardboard sections
post-industrial,coal mine, abandoned, residue, memory, decay, time ruin
POLITECNICO DI MILANO AA 2013/2014
Photomontage on Model: Layered laser cut sections to define the tridimensional landscape
55
56
Personal Project Competition Design for Change 2014
30/03/2014 Lille France
FACTORY RIFT
PERSPECTIVE VIEW
POSSIBLE/IMPOSSIBLE LIFE
IMPOSSIBLE LIFE: ARTIFICIAL ELEMENTS
POSSIBLE LIFE: NATURAL GROWING
POSSIBLE LIFE:
Artificial, Natural, Industrial Eritage, Friches, Regeneration
NATURAL GROWING
The plates project will take all the site and no broken with interior and exterior, warehouse and building will not stop his spread. Also in the interior the space will not be divided, but underline the monumental status by keeping the open space solution in the top. an the foor the plates will create different space interaction. The main point of the industrial heritage are not only the open space but also the glass sheld roof, so we will divide the plates into life-possible plates, where the light arrives with a 45° angle, with a spontaneus plates garden where nature will take over, and areas where the natural light doesn’t arrive, will be artificially lighten and will be the relation and activity plates.
Reuse concept: Iron sheets as shared library
Artificial, Natural, Industrial Eritage, Friches, Regeneration
Faive Cail Babckook, Lille, France Competition 2014
AWA R D : The project has been selected for the Design For Change Competition , Lille, in 2014.
Reuse concept: Iron sheets as benches and tables(Above) Tracks as exhibition support (Below)
57
58 30/12/2012 Milan Italy
PARK[T]OUR
MAQUETTE AWA R D : The project was published on the magazine Domus in April 2013 The model of the project was exhibit in Michele De Lucchi studio for the Milano Design Week in April 2013
Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic
Course: Landmark Design Prof: A. Branzi, M. de Lucchi
MEGALITIV CITY - ANDREA BRANZI ARCHIZOOM The project strart from the idea of a Megalitic City of the future. The city landscape is made by same volume different by shape, each of them with different function/activity. The Park(T)out is a towr for the parkour, made by two different element. One, the stone, allow people to climb the steructure and its linked to the stone-age idea. The other, metal panel structure, its light, smooth and allow people to make free running. All these elements are linked with a watherfall that produces different kind of sound, underlying the different origins of the two elements.
Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars,Concrete
Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic
POLITECNICO DI MILANO AA 2012/2013
Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars,Concrete
59
60
Course: Landmark Design Prof: A. Branzi, M. de Lucchi
30/12/2012 Milan Italy
Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic
MAQUETTE
Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars, Concrete
Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic
61