171118 portfolio cristina morbi interior landscape

Page 1

Portfolio

CRISTINA MORBI D E S I G N E R

INTERIOR|LANDSCAPE|EXHIBITION|LIGHTING


8 01-07/2016 Bangkok Thailand

BTS Bangkok Skywalk

Built Project

Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Role: Designer Stage: Concept Design, Schematic Design, Detail Design

Bangkok Skywalk has been my first project in Martha Schwartz Partners. I covered the role of designer from concept to design developement (Detail Design). My main task was involve in the Paving and Planters design. The canopies has been designed as a double laminated layer of glass, with OPV cells laminated in the double Layer. In the contruction process the design has been simplified towards Fiber glass circular canopyes, with water collection in the central spine. The project present a vibrant redesign of the area, creating a new landmark in Bangkok

Paving Plan Detail By Author


Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Martha Schwartz Partners

Pictures of Site after construction Source: BangkokPost

9


10

Role: Designer Stage: Concept Design, Schematic Design, Detail Design

01-07/2016 Bangkok Thailand

Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Detail Design Planter

Planter Detail By Author


Varies - 75 show

As manufactured and supplied by BEGA, Germany or similar approved.

6.

All dimensions are in millimeters, unless stated otherwise.

Base of light to finish flush with finished soil/mulch level

01

Bitumen waterproofing layer to inside of channel to engineer's specification

TYPICAL SPIKE LIGHT: SECTION SCALE: 1:10

200mm wide frosted ring to reflect light and create glowing edge to glass sheet 1

200 x 100 x 8mm aluminum structural outer ring section to engineer's details

Plaza paving by others on mortar bed and compacted sub-base

5

10

BEGA In-ground light LED '77146' set flush with paving. All wiring to be concealed beneath paving level. Internal lamp fitting to be arranged at different angles to illuminate canopies to engineer's approval.

Bottom layer - laminated coloured glass double layer laminated low iron toughened glass with central polka dot and coloured PVB interlayers

30

Colour & Finish: Refer to MSP-0037-L550 Lighting schedule Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities Installation: Fixture face set flush with paving as per manufacturers specification.

205

As manufactured and supplied by BEGA, Germany or similar approved.

Canopy metal outer ring profile folded 316L stainless steel Size: 430 x 153mm x 4mm thick

151

Top of light to finish flush with finished paving level

75

BEGA In-ground light 316L stainless steel housing set on concrete footing with drainage outlet. Product refence: 70 680 Min 100mm depth concrete footing with weep holes for drainage or similar approved base to manufacturer's specification

02

Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Martha Schwartz Partners

98

Additional welded upright to form drainage channel to engineer's specification

7

Gravel mulch

05

Aurora Flexible LED Strip Light 'AU-ST100IP' set within canopy folded steel profile. Self-adhesive backing (must be applied to clean surfaces). Conceal wiring within canopy profile as per manufacturer's recommendation

TYPICAL LED STRIP LIGHT IN CANOPY: DETAIL SCALE: 1:1

TYPICAL IN-GROUND LIGHT: SECTION SCALE: 1:10

Bespoke LED lighting tile. Frosted glass fixture, 316L Marine Grade Stainless Steel housing. All wiring to be concealed beneath paving level. Colour & Finish: Refer to MSP-0037-L550 Lighting schedule Installation: Fixture face set flush with paving as per manufacturers specification. Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities As manufactured and supplied by BEGA, Germany or similar approved. 430

Preformed cavity for lighting fitting and cable conduit. Min 15mm (W) x 8mm (D) to manufacturers specification

125

Top of light to finish flush with finished paving level

Precast planter walls and capping modules to be fixed and sealed together on site with epoxy joint filler and stainless steel dowels as per manufacturers specification

Ceramic paving tile: Sfera Size: 430mmĂ˜ x 10mm thick Colour: Refer to MSP-0037-L410 Paving plan Finish: Refer to MSP-0037-L450 Material schedule Pattern: As drawn and as per manufacturers recommendation Installation: Laid on 25mm thick latex modified mortar bed over concrete slab as per engineer's specification Supplier: Equipe, Spain or similar approved

A -

Light wiring beneath structural slab

Rev

15

100

SCALE: 1:10

Client

Aurora Flexible LED Strip Light 'AU-ST100IP' recessed within planter profile. Self-adhesive backing. To be detailed by manufacturer.

Martha Schwartz Partners Ltd 65-69 East Road London, N1 6AH, UK T: +44 (0)20 7549 7497 F: +44 (0)20 7520 0988 www.marthaschwartz.com

Light wiring hidden within planter wall

Š copyright Martha Schwartz Partners Ltd. 2016 Project Title

BEGA Recessed light LED '33109' set flush with step riser. All wiring to be concealed in steps internally. Colour & Finish: Refer to MSP-0037-L550 Lighting schedule

150

50 50

BTB Skywalk Link Bridge

Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities

25

15

Siam Piwat Company Limited 8th floor Siam Piwat Tower, 989 Rama 1 Road, Pathumwan Bangkok 10330, Thailand

Landscape Architect

Steps by others.

70

Description / Drawn / Approved

ISSUE

5

TYPICAL LIGHT TILE: SECTION

27/05/2016 100% DD SUBMISSION

Purpose of Issue

10

8

03

03/06/2016 100% DD SUBMISSION - REVISION A

Date

Installation: Fixture face set flush with step riser as per manufacturers specification.

Drawing Title

Lighting Details

As manufactured and supplied by BEGA, Germany or similar approved. Project Number

0037

Drawing Number

MSP-0037-L741

04

TYPICAL RECESSED LIGHT: SECTION SCALE: 1:10

06

TYPICAL LED STRIP LIGHT IN PLANTER: DETAIL SCALE: 1:2

Scale - A1 Sheet

Revision

Drawn

Approved

1:10

Date

MW

A AH

North

Z:\Projects\0037 BTB Skywalk_Link Bridge\400 Design\450 Design Development\451 Drawings CAD\04 Plotsheets\MSP-0037 BTB Skywalk Link Bridge_L741_Lighting Details.dwg 03 June 2016 3:20:23 PM

Min 50

Min 50mm depth concrete structural slab to prevent the need for additional substructure

Pictures of Site after construction Source: Eugene Goes Places

11


12 Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Role: Designer Stage: Concept Design, Schematic Design, Detail Design

Canopy Detail, By Author


BEGA Compact Floodlight LED '77325' with spike to be located in planting beds. All wiring to be concealed beneath planting soil. Light fittings to be arranged at different angles to illuminate trees and canopies to engineer's approval. Colour & Finish: Refer to MSP-0037-L550 Lighting schedule Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities

Top layer - laminated coloured glass - double layer laminated low iron toughened glass with central coloured PVB interlayer and OPV Belectric cells

Installation: spike driven into good ground. Optional for ground floor only: concrete haunching as necessary. Ensure min 50mm soil/mulch cover. Varies - 75 shown

As manufactured and supplied by BEGA, Germany or similar approved.

Skywalk, Landmark, TRransition, Canopies, Paving, Redesign, Urban Art

Martha Schwartz Partners

Notes 1. This document should not be relied on or used in circumstances other than those for which it was prepared and for which Martha Schwartz, Inc. was commissioned. Martha Schwartz, Inc. accepts no responsibility for this document to any other party other than the person by whom it was commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figured dimensions to be worked to in all cases. 4. To be read in conjunction with all other drawings and specifications inc. structural and service engineers' drawings. 5. Where an item is covered by drawings to different scales the larger scale drawing is to be worked to. 6. All dimensions are in millimeters, unless stated otherwise.

Base of light to finish flush with finished soil/mulch level

01

98

Additional welded upright to form drainage channel to engineer's specification Bitumen waterproofing layer to inside of channel to engineer's specification

TYPICAL SPIKE LIGHT: SECTION SCALE: 1:10

200mm wide frosted ring to reflect light and create glowing edge to glass sheet 1

200 x 100 x 8mm aluminum structural outer ring section to engineer's details

Plaza paving by others on mortar bed and compacted sub-base

5

10

BEGA In-ground light LED '77146' set flush with paving. All wiring to be concealed beneath paving level. Internal lamp fitting to be arranged at different angles to illuminate canopies to engineer's approval.

Bottom layer - laminated coloured glass double layer laminated low iron toughened glass with central polka dot and coloured PVB interlayers

30

Colour & Finish: Refer to MSP-0037-L550 Lighting schedule Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities Installation: Fixture face set flush with paving as per manufacturers specification.

205

As manufactured and supplied by BEGA, Germany or similar approved.

Canopy metal outer ring profile folded 316L stainless steel Size: 430 x 153mm x 4mm thick

151

Top of light to finish flush with finished paving level

75

BEGA In-ground light 316L stainless steel housing set on concrete footing with drainage outlet. Product refence: 70 680 Min 100mm depth concrete footing with weep holes for drainage or similar approved base to manufacturer's specification

02

7

Gravel mulch

05

Aurora Flexible LED Strip Light 'AU-ST100IP' set within canopy folded steel profile. Self-adhesive backing (must be applied to clean surfaces). Conceal wiring within canopy profile as per manufacturer's recommendation

TYPICAL LED STRIP LIGHT IN CANOPY: DETAIL SCALE: 1:1

TYPICAL IN-GROUND LIGHT: SECTION SCALE: 1:10

Bespoke LED lighting tile. Frosted glass fixture, 316L Marine Grade Stainless Steel housing. All wiring to be concealed beneath paving level. Colour & Finish: Refer to MSP-0037-L550 Lighting schedule Installation: Fixture face set flush with paving as per manufacturers specification. Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities As manufactured and supplied by BEGA, Germany or similar approved. 430

Preformed cavity for lighting fitting and cable conduit. Min 15mm (W) x 8mm (D) to manufacturers specification

125

Top of light to finish flush with finished paving level

Precast planter walls and capping modules to be fixed and sealed together on site with epoxy joint filler and stainless steel dowels as per manufacturers specification

Ceramic paving tile: Sfera Size: 430mmĂ˜ x 10mm thick Colour: Refer to MSP-0037-L410 Paving plan Finish: Refer to MSP-0037-L450 Material schedule Pattern: As drawn and as per manufacturers recommendation Installation: Laid on 25mm thick latex modified mortar bed over concrete slab as per engineer's specification Supplier: Equipe, Spain or similar approved

A -

Light wiring beneath structural slab

Rev

15

Client

5

TYPICAL LIGHT TILE: SECTION

100

SCALE: 1:10

Aurora Flexible LED Strip Light 'AU-ST100IP' recessed within planter profile. Self-adhesive backing. To be detailed by manufacturer.

Š copyright Martha Schwartz Partners Ltd. 2016 Project Title

BEGA Recessed light LED '33109' set flush with step riser. All wiring to be concealed in steps internally. Colour & Finish: Refer to MSP-0037-L550 Lighting schedule

BTB Skywalk Link Bridge

Layout: Refer to MSP-0037-L510 Lighting plan for arrangement and quantities

150

25 50 50

Siam Piwat Company Limited 8th floor Siam Piwat Tower, 989 Rama 1 Road, Pathumwan Bangkok 10330, Thailand

Martha Schwartz Partners Ltd 65-69 East Road London, N1 6AH, UK T: +44 (0)20 7549 7497 F: +44 (0)20 7520 0988 www.marthaschwartz.com

Light wiring hidden within planter wall

15

Description / Drawn / Approved

Landscape Architect

Steps by others.

70

27/05/2016 100% DD SUBMISSION

ISSUE

8

03

03/06/2016 100% DD SUBMISSION - REVISION A

Date

Purpose of Issue

10

Installation: Fixture face set flush with step riser as per manufacturers specification.

Drawing Title

Lighting Details

As manufactured and supplied by BEGA, Germany or similar approved. Project Number

0037

Drawing Number

MSP-0037-L741

04

TYPICAL RECESSED LIGHT: SECTION SCALE: 1:10

06

TYPICAL LED STRIP LIGHT IN PLANTER: DETAIL SCALE: 1:2

Scale - A1 Sheet

Revision

Drawn

Approved

1:10

Date

MW

A AH

North

Z:\Projects\0037 BTB Skywalk_Link Bridge\400 Design\450 Design Development\451 Drawings CAD\04 Plotsheets\MSP-0037 BTB Skywalk Link Bridge_L741_Lighting Details.dwg 03 June 2016 3:20:23 PM

Min 50

Min 50mm depth concrete structural slab to prevent the need for additional substructure

Pictures of Artist drawing on Canopy Source: Eugene Goes Places

13


14 01/09/2017 Shunde, China

Joy Marina

Deatil Design

Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

Role: Designer, Lighting Stage: Concept Design, Schematic Design, Detail Design

I’ve been involved in this project from the Charrette in 2015 till Design Developement in summer 2017. Aside from designing with the team the hole ara, my main focus was the transitional corridor which connect the main axes of the marina. I designed a bespoke paving in brushed and polished concrete, which represent the a transitional breaking of the rocks from the urban to the uman scale. The red floating canopies like leaves protect from the sun and create a filtered view, projecting colored shadows and overlapping their pattern to the paving.

Illustrative Plan Transitional Corridor By Author


Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

Martha Schwartz Partners

Design and View By Author

15


16

Role: Designer, Lighting Stage: Concept Design, Schematic Design, Detail Design

300

0

30

30

01

60 .0°

01/09/2017 Shunde, China

300 0 120.0° 0 60

60 .0°

0 60

02

P11 参照0044-L350-物料清单 P11. REFER TO 0044-L350-MATERIALS SCHEDULE

120.0°

P12-13 参照0044-L350-物料清单 P12-13. REFER TO 0044-L350-MATERIALS SCHEDULE

01

02

P11 参照0044-L350-物料清单 P11. REFER TO 0044-L350-MATERIALS SCHEDULE

Deatil Design

P12-13 参照0044-L350-物料清单 P12-13. REFER TO 0044-L350-MATERIALS SCHEDULE P12-13 参照0044-L350-物料清单 P12-13. REFER TO 0044-L350-MATERIALS SCHEDULE

平面 PLAN

平面 PLAN

P11 参照0044-L350-物料清单 P11. REFER TO 0044-L350-MATERIALS SCHEDULE

FFL

FFL

P12-13 参照参照工程师图纸 0044-L350-物料清单 压实基层 P12-13. REFER SUB-BASE TO 0044-L350-MATERIALS SCHEDULE COMPACTED TO ENGINEER'S SPECIFICATION P11 参照0044-L350物料清单 土工布 参照工程师图纸 P11. REFER TO 0044-L350-MATERIALS SCHEDULE GEOTEXTILE TO ENGINEER'S SPECIFICATION 最少30mm厚乳胶改良砂浆层 压实基层 参照工程师图纸 MIN 30MM THICK LATEX MODIFIED MORTAR BED COMPACTED SUB-BASE TO ENGINEER'S SPECIFICATION 钢筋混凝土基层 参照工程师图纸

平面 PLAN FFL

平面 PLAN SL FFL

土工布 参照工程师图纸 REINFORCED CONCRETE BASE LAID TO FALLS TO ENGINEER'S SPECIFICATION GEOTEXTILE TO ENGINEER'S SPECIFICATION 填充物料 参照工程师图纸 最少30mm厚乳胶改良砂浆层 VOID FILLER TO ENGINEER'S SPECIFICATION MIN 30MM THICK LATEX MODIFIED MORTAR BED 钢筋混凝土基层 参照工程师图纸 REINFORCED CONCRETE BASE LAID TO FALLS TO ENGINEER'S SPECIFICATION 防水卷材 参照工程师图纸 填充物料 参照工程师图纸 WATERPROOFING MEMBRANE TO ENGINEER'S SPECIFICATION VOID FILLER TO ENGINEER'S SPECIFICATION 建筑结构板 参照工程师图纸 BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION

SL

SL

剖面 SECTION

SL

剖面 SECTION

排水管参照建筑师图纸 防水卷材 参照工程师图纸 DRAINAGE COORDINATED BY ARCHITECT WATERPROOFING MEMBRANE TO ENGINEER'S SPECIFICATION

标准结构上六边形花岗岩铺装详图 建筑结构板 参照工程师图纸 TYPICALL GRANITE HEXAGON PAVER OVER STRUCTURE

01

SCALE : 1:20

SCALE : 1:20

SCALE : 1:20

剖面 SECTION

排水管参照建筑师图纸 DRAINAGE COORDINATED BY ARCHITECT

标准结构上六边形花岗岩铺装详图 TYPICALL GRANITE HEXAGON PAVER OVER STRUCTURE

01

标准结构上 TYPICAL CO

02

BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION

@ A1

剖面 SECTION

02

@ A1

@

标准结构上混 TYPICAL CO SCALE : 1:20

@

P06 参照0044-L350-物料清单 P06. REFER TO 0044-L350-MATERIALS SCHEDULE

面 N TRANSITION PLAN

50

240

L709 01 L707

900

240 50

03

300

02 L709

03 L709

04 L709

05 04 L709

02 L707

03 L707

04 L707

05 04 L707

E01 参照0044-L350-物料清单 E01 FLUSH WITH SURFACE, REFER TO 0044-L350-MATERIALS SCHEDULE

P09 参照0044-L350-物料清单 P09. REFER TO 0044-L350-MATERIALS SCHEDULE

300

900

03 01

300

Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

300

E01 参照0044-L350-物料清单 E01 FLUSH WITH SURFACE, REFER TO 0044-L350-MATERIALS SCHEDULE P06 参照0044-L350-物料清单 P06. REFER TO 0044-L350-MATERIALS SCHEDULE

P09 参照0044-L350-物料清单 P09. REFER TO 0044-L350-MATERIALS SCHEDULE P06 参照0044-L350-物料清单 P06. REFER TO 0044-L350-MATERIALS SCHEDULE P09 参照0044-L350-物料清单 P09. REFER TO 0044-L350-MATERIALS SCHEDULE

平面 PLAN FFL

FFL

SL

SL

剖面 SECTION

标准结构上花岗岩铺装详图@曲水湾走道 建筑结构板 参照工程师图纸 TYPICAL GRANITE PAVER ON STRUCTURE @ WATER CORRIDOR BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION SCALE : 1:20

剖面 SECTION

03

FFL

E01 参照0044-L350-物料清单 P06 0044-L350物料清单REFER TO 0044-L350-MATERIALS SCHEDULE E01参照 FLUSH WITH SURFACE, P06. REFER TO 0044-L350-MATERIALS SCHEDULE P09 参照0044-L350-物料清单 土工布 参照工程师图纸 P09. REFER TO 0044-L350-MATERIALS SCHEDULE GEOTEXTILE TO ENGINEER'S SPECIFICATION E01 参照0044-L350-物料清单 压实基层 E01 FLUSH 参照工程师图纸 WITH SURFACE, REFER TO 0044-L350-MATERIALS SCHEDULE COMPACTED SUB-BASE TO ENGINEER'S SPECIFICATION 最少30mm厚乳胶改良砂浆层 土工布 参照工程师图纸 MIN 30MM THICK LATEX MODIFIED MORTAR BED GEOTEXTILE TO ENGINEER'S SPECIFICATION 钢筋混凝土基层 参照工程师图纸 压实基层 参照工程师图纸 REINFORCED CONCRETE BASE LAID TO FALLS TO ENGINEER'S SPECIFICATION COMPACTED SUB-BASE TO ENGINEER'S SPECIFICATION 填充物料 参照工程师图纸 最少 30mm厚乳胶改良砂浆层 VOID FILLER TO ENGINEER'S SPECIFICATION MIN 30MM THICK LATEX MODIFIED MORTAR BED 防水卷材 参照工程师图纸 钢筋混凝土基层 参照工程师图纸 WATERPROOFING MEMBRANE ENGINEER'S SPECIFICATION REINFORCED CONCRETE BASE LAID TO TO FALLS TO ENGINEER'S SPECIFICATION 建筑结构板 参照工程师图纸 填充物料 参照工程师图纸 BUILDING STRUCTURAL SLAB PER ENGINEER'S SPECIFICATION VOID FILLER TO ENGINEER'S SPECIFICATION 排水管道参照建筑师图纸 防水卷材 参照工程师图纸 DRAINAGE COORDINATED BY TO ARCHITECT WATERPROOFING MEMBRANE ENGINEER'S SPECIFICATION

平面 PLAN

03

平面 PLAN

@ A1

排水管道参照建筑师图纸 DRAINAGE COORDINATED BY ARCHITECT

标准结构上花岗岩铺装详图@曲水湾走道 TYPICAL GRANITE PAVER ON STRUCTURE @ WATER CORRIDOR SCALE : 1:20

T2

FFL

SL

SL

剖面 SECTION

04

Detail Strategy T3 Paving T4 By Author

标准结构上 TYPICAL GR SCALE : 1:20

剖面 SECTION

04

@ A1

T1

平面 PLAN

T5

@

标准结构上花 TYPICAL GR SCALE : 1:20

@


Martha Schwartz Partners

01 L709

02 L709

03 L709

04 L709

05 L709

06 L709

01 L707

02 L707

03 L707

04 L707

05 L707

06 L707

T1

01

T2

T3

T4

T5

T6

07 L708

T5

08 L708

T4

09 L708

01 L708

T3

T2

铺装图案过渡平面 PAVING PATTERN TRANSITION PLAN SCALE : 1:500

@ A1

Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

Notes 1. This document should not be relied on or used in circumstances other than those for which it was prepared and for which Martha Schwartz Partners was commissioned. Martha Schwartz Partners accepts no responsibility for this document to any other party other than the person by whom it was commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figured dimensions prevail in all cases. 4. To be read in conjunction with all other drawings and specifications including but not limited to structural and service engineers' drawings. 5. Where an item is covered by drawings to different scales the larger scale drawing is to prevail. 6. All dimensions are in millimeters, unless stated otherwise.

100% DD 100% 方案设计

21/08/2017 23/06/2017 Rev Date 修订 日期

50% DD 50% 方案设计 Description / Drawn / Approved

描述 / 画图 / 批准

Purpose of Issue 出图目的

P10 参照0044-L350-物料清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE P11 参照0044-L350-物料清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

300 30

30

0

0

0 30

0

300

Client 业主 Guangdong Shunde OCT Industrial Development Co. Ltd Shunde District, Foshan City, Guangdong Province, 528300 T: 0757-29299013 www.chinaoct.com/ Landscape Architect 景观建筑师 Martha Schwartz Partners Ltd Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.com

30

600

100% DD 100% 方案设计

300

参照0044-L400系列放线与铺装图案详图 REFER TO 0044- L400 SERIES FOR SETTING OUT AND PATTERN

© copyright 2017 Martha Schwartz Partners Ltd. Project Title 项目

Shunde Joy Marina

顺德华侨城欢乐海岸 - 综合商业区 Drawing Title 图标

Detail Paving Sheet 7 景观详图 - 铺装 - 7

Project Number 项目号

0044

Drawing Number 图号

0044-L706

D01

铺装图案模块

铺装图案模块组合

铺装石块方案

PAVING PATTERN SINGLE ELEMENTS

PAVING PATTERN MODULE

PAVING PATTERN MODULES COMBINATION

PAVING ROCK SCHEME

@ A1

D02

SCALE : 1:20

@ A1

D03

SCALE : 1:20

Revision 修订 North 北

Drawn 画图

Approved 批准

As Shown

铺装图案元件 SCALE : 1:20

Scale - A1 比例- A1

@ A1

D04

SCALE : 1:20

CM

@ A1

Date 日期

----

21/08/2017

06 L709 06 L707

T6

07 L708

Paving Detail Strategy T5 By Author

08 L708

T4

09 L708

T3

01 L708

T2

MS

17


18

Role: Designer, Lighting Stage: Concept Design, Schematic Design, Detail Design

01/09/2017 Shunde, China

Deatil Design L

L

S

M

M

L

L P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

L

L

M

L

S S

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

L

M M

M L L

01

M

S

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

M

L M

L

S

M

标准过渡样图T2

标准过渡样图T3

TYPICAL EXAMPLE OF TRANSITION T1

TYPICAL EXAMPLE OF TRANSITION T2

TYPICAL EXAMPLE OF TRANSITION T3

02

03

@ A1

S M

S

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

M

M

S M

S

M

M

M

M

S S

M

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

SCALE : 1:50

M

@ A1

P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large Size x5 x8 x4 P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size x4 x2 x1 P12 每单元小号石材铺地砌片 x1 P12 Tiles per Rock Small Size x2 或用1/3石块替代 P12 每单片模块石材铺地砌片 Alternate 31 of the Rocks P12 Tiles per Single module Rock 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

x4 x1

M

M

S

SCALE : 1:50

P12 每单元大号石材铺地砌片 P12 TIles per Rock Large Size x5 x8 P12 每单元中号石材铺地砌片 P12 TIles per Rock Medium Size x4 x2 P12 每单元小号石材铺地砌片 P12 TIles per Rock Small Size x2 x1 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

x4

M

M

L

@ A1

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

M

M

标准过渡样图T1 SCALE : 1:50

S

M

M

L

P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large size: x5 x8 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

S

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

S

M

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

M M

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

L

L

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

Notes 1. This document should not be circumstances other than tho prepared and for which Mart was commissioned. Martha S accepts no responsibility for other party other than the pe commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figure in all cases. 4. To be read in conjunction wi and specifications including structural and service engine 5. Where an item is covered by scales the larger scale drawi 6. All dimensions are in millime otherwise.

M

S

S

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

S

S

S S

S

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

S

S S

S

S

M

S

S

M

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

21/08/2017

100% DD 100%

50% DD 50% 方 Description / D

描述 / 画图 /

Purpose of Issue 出图目的

100% DD 100% 方案设

Client 业主 Guangdong Shunde OCT In Co. Ltd Shunde District, Foshan Ci Province, 528300 T: 0757-29299013 www.chinaoct.com/

Landscape Architect 景观建筑师 Martha Schwartz Partners Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.com

S

S

-

23/06/2017 Rev Date 修订 日期

S

© copyright 2017 Martha Sc

04

标准过渡样图T4

标准过渡样图T5

TYPICAL EXAMPLE OF TRANSITION T4

TYPICAL EXAMPLE OF TRANSITION T5

SCALE : 1:50

05

@ A1

P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock

x4

x2

x1

x2 或用1/3石块替代 Alternate 31 of the Rocks

x1

SCALE : 1:50

P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock

Project Title 项目

标准过渡样图T6

06

@ A1

x1

x2 或用1/3石块替代 Alternate 31 of the Rocks

TYPICAL EXAMPLE OF TRANSITION T6 SCALE : 1:50

Shunde Joy Marina

@ A1

P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock

或用1/3石块替代 Alternate 31 of the Rocks

顺德华侨城欢乐海岸 - 综合商业区 Drawing Title 图标

Detail Paving Sheet 10 景观详图 - 铺装 -

Project Number 项目号

0044

Drawing Number 图号

0044-L709

Scale - A1 比例- A1

Revision 修订

Drawn 画图

Approved 批准

As Shown

CM

Date 日期

----

21/08/2017

Transitioning Paving Detail By Author

MS


M

M

L

L P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

L

L

M

L

S S

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

L

M M

M L L

01

S

M

S

M

L M

L

S

M

标准过渡样图T2

标准过渡样图T3

TYPICAL EXAMPLE OF TRANSITION T1

TYPICAL EXAMPLE OF TRANSITION T2

TYPICAL EXAMPLE OF TRANSITION T3

SCALE : 1:50

02

@ A1

03

@ A1

S M

S

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

M

M

S M

S

M

M

M

M

S S

M

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

SCALE : 1:50

M

@ A1

P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large Size x5 x8 x4 P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size x4 x2 x1 P12 每单元小号石材铺地砌片 x1 P12 Tiles per Rock Small Size x2 或用1/3石块替代 P12 每单片模块石材铺地砌片 Alternate 31 of the Rocks P12 Tiles per Single module Rock 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

x4 x1

M

M

S

SCALE : 1:50

P12 每单元大号石材铺地砌片 P12 TIles per Rock Large Size x5 x8 P12 每单元中号石材铺地砌片 P12 TIles per Rock Medium Size x4 x2 P12 每单元小号石材铺地砌片 P12 TIles per Rock Small Size x2 x1 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

x4

M

M

L

标准过渡样图T1

P12 每单元大号石材铺地砌片 P12 Tiles per Rock Large size: x5 x8 参照0044-L400系列放线与铺装图案详图 Refer to 0044-L400 Series For setting out and Pattern

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

M

M

M

L

S

M

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

S

M

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

M M

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

L

L

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

Notes 1. This document should not be relied on or used in circumstances other than those for which it was prepared and for which Martha Schwartz Partners was commissioned. Martha Schwartz Partners accepts no responsibility for this document to any other party other than the person by whom it was commissioned. 2. NOT FOR CONSTRUCTION 3. Do not scale drawing. Figured dimensions prevail in all cases. 4. To be read in conjunction with all other drawings and specifications including but not limited to structural and service engineers' drawings. 5. Where an item is covered by drawings to different scales the larger scale drawing is to prevail. 6. All dimensions are in millimeters, unless stated otherwise.

M

S

S

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

S

S

S S

S

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

S

S S

S

S

M

S

S

M

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

P10 参照0044-L350-物料 清单 P10 REFER TO 0044-L350-MATERIALS SCHEDULE

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

P11 参照0044-L350-物料 清单 P11 REFER TO 0044-L350-MATERIALS SCHEDULE

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

P12 参照0044-L350-物料 清单 P12 REFER TO 0044-L350-MATERIALS SCHEDULE

21/08/2017

100% DD 100% 方案设计

50% DD 50% 方案设计 Description / Drawn / Approved

描述 / 画图 / 批准

Purpose of Issue 出图目的

100% DD 100% 方案设计

Client 业主 Guangdong Shunde OCT Industrial Development Co. Ltd Shunde District, Foshan City, Guangdong Province, 528300 T: 0757-29299013 www.chinaoct.com/ Landscape Architect 景观建筑师 Martha Schwartz Partners Ltd Piano House, 2nd floor 9 Brighton Terrace Brixton London SW9 8DJ +44 (0) 20 7549 7497 www.marthaschwartz.com

S

S

-

23/06/2017 Rev Date 修订 日期

S

© copyright 2017 Martha Schwartz Partners Ltd.

04

标准过渡样图T4

标准过渡样图T5

TYPICAL EXAMPLE OF TRANSITION T4

TYPICAL EXAMPLE OF TRANSITION T5

SCALE : 1:50

05

@ A1

P12 每单元中号石材铺地砌片 P12 Tiles per Rock Medium Size P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock

x4

x2

x1

x2 或用1/3石块替代 Alternate 31 of the Rocks

x1

SCALE : 1:50

P12 每单元小号石材铺地砌片 P12 Tiles per Rock Small Size P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock

Project Title 项目

标准过渡样图T6

06

@ A1

x1

x2 或用1/3石块替代 Alternate 31 of the Rocks

TYPICAL EXAMPLE OF TRANSITION T6 SCALE : 1:50

Shunde Joy Marina

@ A1

P12 每单片模块石材铺地砌片 P12 Tiles per Single module Rock

或用1/3石块替代 Alternate 31 of the Rocks

顺德华侨城欢乐海岸 - 综合商业区 Drawing Title 图标

Detail Paving Sheet 10 景观详图 - 铺装 - 10

Project Number 项目号

0044

Drawing Number 图号

0044-L709

Scale - A1 比例- A1

Revision 修订 North 北

Drawn 画图

Approved 批准

As Shown CM

Date 日期

----

21/08/2017

Transitioning Paving Detail By Author

MS

Z:\Projects\0044 Shunde Joy Marina\400 Design\450 Design Development\451 Drawings CAD\04 Plotsheets\0044-L709 Detail Paving.dwg 6/23/2017 6:23 PM

L

L

S

Rock, Voronoid, Retail, Canopies, Paving, Marina, Transitional

Martha Schwartz Partners

19


20

Role: Project Manager, Design Leader Stage: Concept Design

09/2017 TuopaiShede, China

T uopai Winery East Gate

Spring, Winery Gateway, Sculptural approach, Tradition and Technology

Gateway Design

Spring Inspiration: Waterfall by Hiroshi Senju


Spring, Winery Gateway, Sculptural approach, Tradition and Technology

Martha Schwartz Partners

Images and Design By Author

21


22

Role: Project Manager, Design Leader Stage: Concept Design

09/2017 TuopaiShede, China

Spring, Winery Gateway, Sculptural approach, Tradition and Technology

Gateway Design

Images and Design By Author


Spring, Winery Gateway, Sculptural approach, Tradition and Technology

Martha Schwartz Partners

Images and Design By Author

23


24 10/2017 Paris France

Courbevoie Competition

Streetscape Design

Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard

Role: Project Manager, Design Leader, Lighting Consultant Stage: Concept/Schematic Design

In Courbevoie competition I had the role of Project Manager and design leader for MSP Team. Thr streetscape use a porous paving surface and rain gardens, the concept aim to generate the bed of the river in the raindays in Paris. The rooftop is an orchid of 100 trees ( column= 1 tree) with roof-like canopies and furnituresintegrated with the nature. I invested the role of Lighting Consultant, creating bespoke pole light and special features using Globes Projector with water inspired textures.

Avenue Gambetta: Weaving Language River Diagram


Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard

Martha Schwartz Partners Atelier Fois

Avenue Gambetta weaving water streetscape Design By Author, Visualization: Plasticine

25


26

Role: Project Manager, Design Leader, Lighting Consultant Stage: Concept/Schematic Design

10/2017 Paris France

Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard

Rooftop Design

Rooftop Charras: Linear orchard diagram


Porous Landscape, Water Carpet, Paving, Sculptural features, Fertility, Orchard

Martha Schwartz Partners Atelier Fois

Charras Rooftop Orchard Design By Author Visualization: Plasticine

27


28 04/2017 Shanghai China

MIX C Retail

Concept Design

Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway

Role: Designer Stage: Concept Design

This design option I designed for a commercial project in China use the infinite waving pattern to create rooms in the landscape, and elephant trunk gateway with mist, a ludic example of sculptural landscape.

IllIustrative Plan By Author


Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway

Martha Schwartz Partners

PDesign and erspective view rooms By author

29


30

Role: Designer Stage: Concept Design

04/2017 Shanghai China

Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway

Concept Design

Elephant Gateway design By Author


Retail, Shopping Mall, Waeving,Rooms, Sculptural Gateway

Martha Schwartz Partners

Gateway entrance Design and View By Author

31


32

Role: Designer Stage: Concept Design

02/03/2017 Shanghai China

DJI Headquarter

Drones Park, Pixels, LIDA Color Pattern, Rooms, Gradient

Competition

Illustrative Plan and Design By Author


Drones Park, Pixels, LIDA Color Pattern, Rooms, Gradient

Martha Schwartz Partners

Views and Design By Author

33


34 07/2017 Glasgow, UK

High Street Glasgow

Concept Design

Arcades, Shopping Street, Gateway, Sculptural Feature, Linear

Role: Designer Stage: Concept Design

Designer for the Arcade of this shopping avenue in Glasgow, inspired to the art nouveau movement, with the use of steel and laminated glass to create a iconic gateway and landmark.

Aerial View Arcades By Author


Arcades, Shopping Street, Gateway, Sculptural Feature, Linear

Martha Schwartz Partners

Perspective View Arcades By Author

35


36

Role: designer Stage: Charrette

05/2017 Lebanon and China

Canopies and Bridges

3D Sketches

American University of Beirut Design and Images by Author


Martha Schwartz Partners

Ecocity RIverfront Bridge Design and Images by Author

37


38

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

01/10/2015 Kaifeng China

WUKU GRANARY

BACKGROUND

THE SITE

MAIN STREET

ABOVE THE GROUND/BELOW THE GROUND EXPLODED

KAIFENG NEW CITY

MAIN STREET

KAIFENG NEW CITY

WUANSUI MOUNTAIN 400,000 / PERSON

SITE

BOUNDUARY RUIN WALL

TOWER PARK 520,000 / PERSON

CONTEXT ANALYSIS

KAIFENG OLD CITY

SITE QINGMING RIVER PARK 1,350,000 / PERSON

NATURAL BORDER

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

The project is located in Henan province in the city of Kaifeng. The site is an abandoned grain storage for military use built in 1971. Is composed of Warehouses in the north, for productive use and lavoration of the crops and a below the ground corn storage in the south. The use of undeground storage is a common practice in Chinese culture in order to save agricultural land.

HANLIN BEILIN 880,000 / PERSON

DRAGON PAVILION PARK 845,000 / PERSON

KAIFENG OLD CITY

BACKGROUND OF THE SITE


ORIGINAL LANDSCPAE

YELLOW RIVER FLOOD

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015

LOESS SEDIMENT DEPOSITION

GENERATION OF THE SITE: FLOOD AND SEDIMENTATION

15.0 m 4.5 m 7.0 m

9.0 m 7.0 m15.0 m

0.0 m

0.0 m

SECTION GROUND BB’

B’

A’

SECTION GROUND AA’

5M 7M 10 M

C

C’

YELLOW RIVER

ABANDONED BUILDINGS

UNDERGROUND FOOD STORAGE

MAIN ROAD (NORTH GATE)

39


40 01/10/2015 Kaifeng China

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

PERFORMATIVE S PA C E

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

(RE)GENERAION OF THE SITE The landscape design is generated by the projection and intersections of the guidelines of the ruins, and the projection of the hipogeal architecture. The functions are aware of the local and memory valorization in order to regenerate the derelict area.

Plan and sections of the Project


Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015

P E R F O R M AT I V E S PA C E The underground space is refilled with the corn grains that are used as structures and create a new kind of space interaction, respecting the identity of the space. Visitors can climb, play and collect the corn floor, changing his shape with their presence. More the piece of art is contemporary and distant from the industrial past, more the climb will be physical but will remind of the time that separate us from our past.

Relationship Above the ground/ Below the ground

41


42

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

01/10/2015 Kaifeng China

EVERTED LANDSCAPE The evrted landscape, the hill of the site, will be regenerate using the productive crops, conceptually close to the plots of the site. The corn field will create an intresting landscape of paths and hights that will evoke teh past of the site and his futurem using the soil and soiless germination.

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

LANDSCAPE

PRODUCTIVE LANDSCAPE 1

2

3

SOILESS GERMINATION AQUAPONIC

INTERACTION HILL URBAN ORCHID

FLOOD LANDSCAPE WATER

WATERLAND

CONTAINERS

DESIGNED CROPS CORNFIELD

TERRACES BENCHES

4

INTERACTIVE CROPS

SPONTANEOUS CROPS THIRD LANDSCAPE

WHEAT, MILLET, KAOLIANG, SOYBEANS

BENCHES WALLS

WALLS SEEDS

1

3 2 4

FUTURE VISION

SOILESS GERMINATION

SOIL GERMINATION

PAST RAPRESENTATION

CROPS: PRODUCTIVE GERMINATION

Diagrams of Crops and paths in the everted landscape


PROMENADE The result of the projection of the introflexed landscape generate a promenade and terraces that cross the site and are a panoramic view of the old city.

TRASVERSAL SECTION OF THE EVERTED LANDSCAPE

3D VIEW OF THE PROMENADE OF THE EVERTED LANDSCAPE

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015

43


44

Personal Thesis Tutor: C. Xiaosheng, G Piccinno

01/10/2015 Kaifeng China

M E M O RY L A N D S C A P E

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

UNPREDICTABLE LANDSCAPE

The waterland is not just a mean to show the technical approach of soiless culture but it also has an indentity meaning: is inspired to the history of Kaifeng city and is closely link with the water source of the Yellow River. The waterland will on one hand represent the fertility of the water with the aquaponics system garden, on the other his destructive power with a controlled flood landscape.

SECTION EMERGED LANDSCAPE

Emerged landscape Perspective view

1642 Yellow River flood man-made disaster, 300.000 victims, the worst disaster of the city


Everted landscape navigator

SECTION FLOODED LANDSCAPE

Flooded landscape Perspective view

Everted, Introflected, Productive Landscape, Fertility, Ruins, Flood, Stratification

TSINGHUA UNIVERSITY POLITECNICO DI MILANO AA 2014/2015

45


46

COURSE: LAB. SINTESI FINALE PROF: G. PICCINNO, F. MURIALDO

30/01/2015 Genk Belgium

BORDER\MINE

BACKGROUND

IS DIRT MATTER OUT OF PLACE?

post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

The unique conguration of Waterschei Mine, in Genk (Belgium) is made up by tension areas arising from the territorial configuration, in order to show the Dirt aspect of the site: different matrix model to understand the law of the space organization, to underline a deep cracked landscape.

URBAN LANSCAPE

THOR PARK MUSEUM

WATERSCHEI MINE

NATURAL LANDSCAPE

LANDSCAPE EVOLUTION MAPPING

MINE MUSEUM

MINE BRIDGE+SQUARE

MINE LIFT

WATERSCHEI MINE MAIN NODE COMPOSITION


post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

POLITECNICO DI MILANO AA 2013/2014

WATERSCHEI COAL MINE LIFT GEOMETRIC MATRIX

WATERSCHEI COAL MINE RESIDUE ORGANIC MATRIX

WATERSCHEI COAL MINE BRIDGE DIRSPERSED MATRIX

WATERSCHEI COAL MINE MUSEUM DENSE MATRIX

47


48

COURSE: LAB. SINTESI FINALE PROF: G. PICCINNO, F. MURIALDO

30/01/2015 Genk Belgium

ANALYSIS GEOMETRIC AMORPHOUS

GEOMETRIC - AMOURPHOUS MAPPING

URBAN NOT URBAN

post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

NOISY - QUIET MAPPING

HOMOGENEUS HETEROGENEOUS

GARDEN - RESIDUE MAPPING

STATIC DYNAMIC

O RDER DISORDER

STATIC - DYNAMIC MAPPING

RETRAINED - ABANDONED MAPPING

Mapping Analysis of WaterscheiMine Landscape Background


post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

POLITECNICO DI MILANO AA 2013/2014

Border Lines Analysis

GEOMETRIC

AMORPHOUS

NOISY

QUIET

GARDEN

RESIDUE

DYNAMIC

STATIC

DENSE

DISPERSED

apping Analysis of WaterscheiMine Landscape Background

49


50 30/01/2015 Genk Belgium

D R AW I N G

COURSE: LAB. SINTESI FINALE PROF: G. PICCINNO, F. MURIALDO

Section Eroded Landscape

Section Original Landscape

post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

15 years erosion

30 years erosion

40 years erosion

Section Original Landscape

Section Natural Take over Landscape


post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

POLITECNICO DI MILANO AA 2013/2014

WATERSCHEI BORDER MINE ORIGINAL CRACK

WATERSCHEI BORDER MINE CRACK 60 YEARS LATER

WATERSCHEI BORDER MINE ORIGINAL CRACK

WATERSCHEI BORDER MINE CRACK 60 YEARS LATER

51


52

COURSE: LAB. SINTESI FINALE PROF: G. PICCINNO, F. MURIALDO

30/01/2015 Genk Belgium

post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

PERSPECTIVE VIEW

EXHAUSTION AND EROSION

The result of the border-lines overlap creates a crack in the ground, a tridimensional landscape that evoke the mine experience of descending in the earth. Moreover in the project the topic of exhausion is a key points: we created structures that allows the site to erose itself, and hiding new structures and space that will be visible once the exhausion has been reached.

CRACK PERSPECTIVE VIEW


post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

POLITECNICO DI MILANO AA 2013/2014

ARTIFICIAL CRACK SIDE VIEW

NATURAL CRACK SIDE VIEW

53


54

COURSE: LAB. SINTESI FINALE PROF: G. PICCINNO, F. MURIALDO

30/01/2015 Genk Belgium

post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

MAQUETTE

Study Model : layered cardboard sections


post-industrial,coal mine, abandoned, residue, memory, decay, time ruin

POLITECNICO DI MILANO AA 2013/2014

Photomontage on Model: Layered laser cut sections to define the tridimensional landscape

55


56

Personal Project Competition Design for Change 2014

30/03/2014 Lille France

FACTORY RIFT

PERSPECTIVE VIEW

POSSIBLE/IMPOSSIBLE LIFE

IMPOSSIBLE LIFE: ARTIFICIAL ELEMENTS

POSSIBLE LIFE: NATURAL GROWING

POSSIBLE LIFE:

Artificial, Natural, Industrial Eritage, Friches, Regeneration

NATURAL GROWING

The plates project will take all the site and no broken with interior and exterior, warehouse and building will not stop his spread. Also in the interior the space will not be divided, but underline the monumental status by keeping the open space solution in the top. an the foor the plates will create different space interaction. The main point of the industrial heritage are not only the open space but also the glass sheld roof, so we will divide the plates into life-possible plates, where the light arrives with a 45° angle, with a spontaneus plates garden where nature will take over, and areas where the natural light doesn’t arrive, will be artificially lighten and will be the relation and activity plates.

Reuse concept: Iron sheets as shared library


Artificial, Natural, Industrial Eritage, Friches, Regeneration

Faive Cail Babckook, Lille, France Competition 2014

AWA R D : The project has been selected for the Design For Change Competition , Lille, in 2014.

Reuse concept: Iron sheets as benches and tables(Above) Tracks as exhibition support (Below)

57


58 30/12/2012 Milan Italy

PARK[T]OUR

MAQUETTE AWA R D : The project was published on the magazine Domus in April 2013 The model of the project was exhibit in Michele De Lucchi studio for the Milano Design Week in April 2013

Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic

Course: Landmark Design Prof: A. Branzi, M. de Lucchi

MEGALITIV CITY - ANDREA BRANZI ARCHIZOOM The project strart from the idea of a Megalitic City of the future. The city landscape is made by same volume different by shape, each of them with different function/activity. The Park(T)out is a towr for the parkour, made by two different element. One, the stone, allow people to climb the steructure and its linked to the stone-age idea. The other, metal panel structure, its light, smooth and allow people to make free running. All these elements are linked with a watherfall that produces different kind of sound, underlying the different origins of the two elements.

Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars,Concrete


Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic

POLITECNICO DI MILANO AA 2012/2013

Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars,Concrete

59


60

Course: Landmark Design Prof: A. Branzi, M. de Lucchi

30/12/2012 Milan Italy

Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic

MAQUETTE

Physical Model of the Project 1:100 Materials: Aluminum Sheet,Aliminum Pillars, Concrete


Return to the Amygdala, Animal Democracy, Parkouring, Artificial and Organic

61


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.