Process Air 26.7°C 1.0 atm
C-101 1st Stage Natural Gas Compressor Power = 2,070.82 kW
E-101 Natural Gas Compressor Intercooler Duty = 7.52 GJ/hr
E-105 Steam Generation Exchanger Duty = 356.20 GJ/hr
E-109 2nd Stage Natural Gas-Flue Gas Exchanger Duty =27.28 GJ/hr
V-101 Natural Gas Knock-Out Drum 1.22m D X 1.22m H
R-101 Primary Reformer 1.76m D X 8m H
C-102 2nd Stage Natural Gas Compressor Power = 2113.57 kW
E-102 1st Stage Air Compressor Intercooler Duty = 15.12 GJ/hr
E-106 Shift Reactors Intercooler Duty = 238.45 GJ/hr
E-110 1st Stage Air-Flue Gas Exchanger Duty = 23.85 GJ/hr
V-102 1st Stage Air Knock-Out Drum 2.74m D X 2.74m H
R-102 Secondary Reformer 3.15m D X 5m H
C-103 1st Stage Air Compressor Power = 5,012.78 kW
E-103 2nd Stage Air Compressor Intercooler Duty = 21.33 GJ/hr
E-107 2nd Stage Air-Flue Gas Exchanger Duty = 33.42 GJ/hr
E-111 1st Stage Natural Gas-Flue Gas Exchanger Duty = 20.20 GJ/hr
V-103 2nd Stage Air Knock-Out Drum 1.83m D X 1.83m H
R-103 High Temperature Shift Reactor 4.89m D X 8m H
C-104 2nd Stage Air Compressor Power =5,893.63 kW
E-104 3rd Stage Air Compressor Intercooler Duty = 20.29 GJ/hr
E-108 Process Steam-Flue Gas Exchanger Duty = 16.25 GJ/hr
E-112 Exiting Flue Gas Cooler Duty = 39.98 GJ/hr
V-104 3rd Stage Air Knock-Out Drum 2.13m D X 2.13m H
R-104 Low Temperature Shift Reactor 1.14m D X 3m H
C-105 3rd Stage Air Compressor Power = 5,554.90 kW
Cooling Water
C-106 4th Stage Air Compressor Power = 4,533.60 kW
Cooling Water
S-1046
Cooling Water
S-1049
S-1050
S-1047
TIC
TIC
S-1022 S-1019
C-103
S-1024
S-1023
E-102
S-1027
E-103
C-104
V-102
S-1048
S-1030
S-1026
S-1020
S-1028
E-104
C-105
V-103
S-1021
S-1006
S-1004
S-1029
S-1055
Flue Gas 93.3°C 0.272 atm
S-1002 TIC
R-106
S-1001
S-1003
C-101 S-1007
S-1005
S-1012
S-1010
S-1009
TIC
E-101 V-101
S-1057
E-112
113.4°C 34.0 atm
S-1011 S-1008
S-1045
Cooling Water
S-1059
S-1056
Natural Gas 42°C 8 atm
C-106
V-104
S-1054
S-1025 S-1051
Cooling Water
S-1058 V-15
S-1060
E-111
C-102 S-1013
E-110
S-1031 145.5°C 34.0 atm
S-1029
E-109
R-107 Process Steam 373.3°C 40.8 atm
S-1032
E-108
S-1015
S-1014
Fuel Gas 42.0°C 40.8 atm
S-1041
Furnace Air 26.7°C 1atm
R-107 Desulfurization Swing Reactor 2 4.35m D X 5m H
S-1053
TIC
S-1018
R-106 Desulfurization Swing Reactor 1 4.35m D X 5m H
S-1052
BFW 90.5°C 95.3 atm
S-1039
E-107 S-1016 426.7°C
426.7°C
S-1033 482.2°C
S-1043
Cooling Water
TIC
SECTION 1 – FEED PREP AND REFORMING APPROVED BY: CRYSTAL LIN, PM
S-1062 S-1042
PLANT LOCATION – REPUBLIC OF TATARSTAN, RUSSIA
AMMONIA PROCESSING PLANT FEED PREPARATION REFORMING SHIFT REACTION PROCESS FLOW DIAGRAM
R-101 760.0°C
E-105
S-1017
R-102 880.3°C
SCALE
PROJECT NUMBER
DRAWING NUMBER
REV
NONE
01-2012
108A-PANG-108B
7
DATE
06-06-2012 CLIENT – HP CHEMICAL
SHEET
1 OF 1
TIC
S-1044 S-1034
MY CHEMICAL ROMANCE SOLUTION INC. LOS ANGELES, CALIFORNIA
S-1061
S-1035 387.8°C
S-1036
E-106 R-103 450.2°C
S-1063
S-1040
S-1037 160.0°C
S-1038
To Section 2 159.1°C 32.8 atm
R-104 159.1°C Steam (Utilities) 507.8°C 95.3 atm