NH3 Recovery PFD

Page 1

D 203 NH3 Absorption Column

D 204 NH3 Stripping Column

V203 NH3 Stripper Condenser Accumulator

E 206 Ammonia Recovery Fisrt Heat Exchanger 0.383 GJ/hr

E 203 NH3 Stripper Condenser 4.47 GJ/hr

E 204 NH3 Stripper Reboiler 7.22 GJ/hr

Cooling Water

E 207

S-2101

Waste Gas 112 °C 166 atm

LC S-2102

Recycled H2O 123 °C 166 atm

1

1 S-2105

2

V 203

2

80 °C 2 atm

4

2 °C 166 atm

Recovered NH3 98 °C 2 atm

S-2104 27°C 166 atm

TC

9

7

LC E 206 S-2100

10

8

LC

From Purge Stream 2 °C 166 atm

HP STEAM

D 204

D 203

S-2107

S-2103 S-2106

Cooling Water

S-2109 S-2108

P 202 E 208

TC PLANT LOCATION – REPUBLIC OF TATARSTAN, RUSSIA AMMONIA PROCESSING PLANT NH3 RECOVERY PROCESS FLOW DIAGRAM

SECTION 2 – REMOVAL AND RECOVERY APPROVED BY: CRYSTAL LIN, PM

MY CHEMICAL ROMANCE SOLUTION INC. LOS ANGELES, CALIFORNIA SCALE

PROJECT NUMBER

DRAWING NUMBER

REV

NONE

01-2012

108A-PANG-108B

3

DATE

06-06-2012

CLIENT – HP CHEMICAL

SHEET

2 OF 2

P201 H2O Recycle Pump 25.31 kW


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.