steam system PFD

Page 1

E-522 E-523 1st Recovery Reboiler 2nd Recovery Reboiler Duty: 247 kJ/hr Duty: 105 kJ/hr

E-521 Removal Reboiler Duty: 218 kJ/hr

E-524 Flue Gas Heater Duty: 525 kJ/hr

E-525 E-526 E-527 1st Synthesis Heater 2nd Synthesis Heater 3rd Synthesis Heater Duty: 45 kJ/hr Duty: 227 kJ/hr Duty: 58 kJ/hr

S-5202 T: 374 C P: 41 ATM

T-521

T-522

E-528 4th Synthesis Heater Duty: 44 kJ/hr

S-5204 T: 152 C P: 3.7 ATM

E-529 5th Synthesis Heater Duty: 171 kJ/hr

E-523

S-5201 T: 482 C P: 95 ATM T-528

T-523

T-529

T-524

S-5203 T: 374 C P: 41 ATM

T-525

E-529

To Section 1 T-526 E-528

T-527 E-527

E-524

S-5206 T: 10 C P: 1 ATM

E-526

E-521

E-522 E-525

S-5205 T: 152 C P: 95 ATM

P-521 Steam System Pump Work: 1257 kW T-527 3 Syn Comp Turbine Work: 10 kW rd

PLANT LOCATION – REPUBLIC OF TATARSTAN, RUSSIA AMMONIA PROCESSING PLANT STEAM SYSTEM PROCESS FLOW DIAGRAM

SECTION 5 - UTILITIES APPROVED BY: CRYSTAL LIN, PM

MY CHEMICAL ROMANCE SOLUTIONS INC. LOS ANGELES, CALIFORNIA SCALE

PROJECT NUMBER

DRAWING NUMBER

REV

NONE

01-2012

108A-PANG-108B

6

DATE

06-09-2012 CLIENT – HP CHEMICAL

SHEET

3 OF 3

T-521 st 1 Pre-Cryo Comp Turbine Work: 15853 kW

T-523 th 4 Syn Comp Turbine Work: 60 kW

T-522 2 Pre-Cryo Comp Turbine Work: 5132 kW

T-524 Recovery Pump Turbine Work: 25 kW

nd

T-525 st 1 Syn Comp Turbine Work: 9.21 kW

T-526 2 Syn Comp Turbine Work: 9.47 kW nd

P-521

T-528 Removal Pump Turbine Work: 1673 kW T-529 Steam System Pump Turbine Work: 1257 kW