E-522 E-523 1st Recovery Reboiler 2nd Recovery Reboiler Duty: 247 kJ/hr Duty: 105 kJ/hr
E-521 Removal Reboiler Duty: 218 kJ/hr
E-524 Flue Gas Heater Duty: 525 kJ/hr
E-525 E-526 E-527 1st Synthesis Heater 2nd Synthesis Heater 3rd Synthesis Heater Duty: 45 kJ/hr Duty: 227 kJ/hr Duty: 58 kJ/hr
S-5202 T: 374 C P: 41 ATM
T-521
T-522
E-528 4th Synthesis Heater Duty: 44 kJ/hr
S-5204 T: 152 C P: 3.7 ATM
E-529 5th Synthesis Heater Duty: 171 kJ/hr
E-523
S-5201 T: 482 C P: 95 ATM T-528
T-523
T-529
T-524
S-5203 T: 374 C P: 41 ATM
T-525
E-529
To Section 1 T-526 E-528
T-527 E-527
E-524
S-5206 T: 10 C P: 1 ATM
E-526
E-521
E-522 E-525
S-5205 T: 152 C P: 95 ATM
P-521 Steam System Pump Work: 1257 kW T-527 3 Syn Comp Turbine Work: 10 kW rd
PLANT LOCATION – REPUBLIC OF TATARSTAN, RUSSIA AMMONIA PROCESSING PLANT STEAM SYSTEM PROCESS FLOW DIAGRAM
SECTION 5 - UTILITIES APPROVED BY: CRYSTAL LIN, PM
MY CHEMICAL ROMANCE SOLUTIONS INC. LOS ANGELES, CALIFORNIA SCALE
PROJECT NUMBER
DRAWING NUMBER
REV
NONE
01-2012
108A-PANG-108B
6
DATE
06-09-2012 CLIENT – HP CHEMICAL
SHEET
3 OF 3
T-521 st 1 Pre-Cryo Comp Turbine Work: 15853 kW
T-523 th 4 Syn Comp Turbine Work: 60 kW
T-522 2 Pre-Cryo Comp Turbine Work: 5132 kW
T-524 Recovery Pump Turbine Work: 25 kW
nd
T-525 st 1 Syn Comp Turbine Work: 9.21 kW
T-526 2 Syn Comp Turbine Work: 9.47 kW nd
P-521
T-528 Removal Pump Turbine Work: 1673 kW T-529 Steam System Pump Turbine Work: 1257 kW