STRATEGIC
PLAN
2014-17
PURPOSE PURPOSE AND SCOPE >
T
he purpose of this plan is to provide internal and external constituencies with the proposed Strategic Plan for the period of 2014-2015 through and including 2016-2017. The plan was developed with the input and analysis of both the CU Athletics Department Core Team, as well as from a broader group of individuals representing CU Athletics Department staff, current student-athletes and alumni, donors, University representatives. During the Fall 2013 and Spring 2014 semesters, multiple planning meetings were held, and historical data corresponding to the CU Athletics Department were carefully analyzed. The plan presented in this document represents the results of these meetings and analyses.
2 2014-17 S T R AT EGIC PL A N
DEFINITIONS DEFINITIONS OF TERMS >
This Strategic Plan was developed using the Business Performance Excellence model supported by the Office for Performance Improvement (OPI) at the University of Colorado Boulder. The following terms apply to the Strategic Plan which follows: VISION: Vision statements generally encompass a 15-20 year period, and describe in very broad terms the aspirations of the organization. MISSION: The mission statement for the organization represents a 3-5 year subset of the Vision. In broad terms, the Mission Statement identifies: what the organization does; who are its critical & significant clients; and on a short-term (relative to the Vision) basis, where the organization is attempting to go, and how it will ‘appear’ when it arrives. VISION & MISSION STATEMENT REQUIREMENTS: Vision & Mission Statements should be: (1) concise; (2) precise; (3) measureable; and with targets that are both (4) aspirational yet achievable. VALUE PROPOSITION: The Value Proposition for an organization describes those compelling value-added elements or features of its products &/or services. CONSTRUCT ANALYSIS: The process of identifying major constructs, or themes, in the Vision and Mission, which are then translated into Critical Performance Measures (CPMs). These CPMs are subsequently used to generate associated metrics or measures to be employed and deployed (cascaded) throughout the organization. CRITICAL PERFORMANCE MEASURES: Critical Performance Measures (CPMs) are metrics which indicate the overall health of the program, unit, or area. Basically, they are the primary indicators of whether the organization’s strategic and business plans are working effectively and efficiently. CPMs are further classified as KPIs or NFIs. KPIs: ‘Key Performance Indicators’ - CPMs which are financially-based, such as ROI (Return on Investment), ROCE (Return on Capital Expended), or Net Revenue. NFIs: ‘Non-Financial Indicators’ - CPMs which are non-financial in nature, such as assessed quality on a survey, percent of alumni engaging in an event, or the average GPA for student-athletes on a particular team.
3 2014-17 S T R AT EGIC PL A N
4 2014-17 S T R AT EGIC PL A N
COMPONENTS COMPONENTS OF A STRATEGIC PLAN: >
STRATEGIC ITEMS
– Require a significant change from the current level
– Require improvements that would not occur from day-to-day, tactical or continuous improvement (Kaizen) activities.
TACTICAL ITEMS
– Are part of normal business activity
– Require maintenance or Kaizen improvement to prevent backsliding
STRATEGIC INTENT:
– A broad goal or objective
– One of the ‘critical few’
STRATEGIC OBJECTIVE:
– A sub-component of a Strategic Intent
– Includes a specific target or achievement
– Still relatively broad. May encompass a number of administrative areas
FOCAL POINT:
– A sub-component of a Strategic Objective
– Highly specific; includes a target to be achieved and its milestone date
TACTICAL OBJECTIVE:
– A sub-component of a Strategic Intent
– Includes a specific target or achievement
– As compared to a Strategic Objective, requires a low improvement rate; or simple maintenance
CHECK POINT:
– A sub-component of a Tactical Objective
– Highly specific
– Includes a target to be achieved, or a level to be maintained, and its milestone date
ENABLER:
– Typically an information system or database that must be created in order to measure a CPM or set a Target, or both
VALIDATION METRICS: – External measures over which the Lead Team has no control, only influence, but which can reflect evidence that to external constituencies, the Strategic Plan is working to achieve the stated objectives and goals.
5 2014-17 S T R AT EGIC PL A N
PROCESS PROCESS OWNER: OWNER >
In the context of the Strategic Plan which follows, the Process Owner is the individual responsible for following progress on achieving the identified Target for each CPM, making certain that the appropriate resources are dedicated to the successful achievement of that Target, and bringing resource requirements to the CU Athletics Department Lead Team when necessary.
NAME
INITIALS
NAME
INITIALS
Chris Bader
CMB
Nicole Kenneally
NK
Ceal Barry
CB
Prema Khanna
PK
Matt Biggers
MB
Liz Kritza
LK
Tad Boyle
TB
Linda Lappe
LL
Dave Callan
DC
Lindsay Lew
LEW
Lance Carl
LC
Kris Livingston
KL
Roy Edwards
RE
Mike MacIntyre
MM
Ann Elliott
AE
Gail Pederson
GP
JT Galloway
JG
Dave Plati
DP
Rick George
RG
Richard Rokos
RR
Kurt Gulbrand
KG
Danny Sanchez
DS
Anne Kelly
AK
Jim Senter
JS
Director of Annual Fund
TBA
Curtis Snyder
CS
Each Sport Process Owner
SPO
Mark Wetmore
MW
In the assignment of Process Owners, the guideline associated with the BPE model is that each individual CPM and its Target must have a single, identifiable, Process Owner accountable for the success of that portion of the Strategic Plan.
6 2014-17 S T R AT EGIC PL A N
CU ATHLETICS CORE VALUES, VISION, MISSION, VALUE PROPOSITION: >
CORE VALUES
The Athletics Department personnel are and will be exemplified by reflecting the following Core Values, including a sense of urgency (RAPID) in the achievement of this plan: •
Respect — Recognize and embrace each individual’s unique value to the department
•
Accountability — Take personal responsibility for actions and results
•
Passion — Personal energy that drives work ethic, focus, and a need to excel
•
Integrity — Always operate in an honest and ethical manner
•
Dedication — Unwavering loyalty to the department and our shared vision
VISION To be nationally recognized as a premier athletics department, by providing a world-class and holistic student-athlete experience, operating in a fiscally responsible manner, while consistently competing for and winning championships.
MISSION The CU Athletics Department personnel have committed to achieve the following goals during the next three (3) years: •
Provide a world-class and comprehensive student-athlete experience by enhancing our academic, health and wellness, and personal development programs.
•
Achieve a significant improvement in our financial condition by fiscal year 2016-17, focusing on operating efficiently and increasing total revenues through well-established and innovative initiatives.
•
Raise the level of competitive excellence for all teams and compete for and win championships.
In order to achieve these objectives, one of our major areas of emphasis (an Enabler to the Mission) will be to: •
Develop and renovate facilities that will provide a student-centered experience, enhanced recruiting opportunities, and new revenue streams.
VALUE PROPOSITION CU Athletics showcases the University nationally, transforming our broad and diverse communities into stakeholders by inspiring excellence, instilling pride, and celebrating success.
7 2014-17 S T R AT EGIC PL A N
CUSTRATEGIC ATHLETICS AND POLICY DEPLOYMENT PLAN >
VALIDATION METRICS 1. Number of National Broadcasts Each Year 2. Standings in the National Polls Each Year 3. Number of National Awards Won Each Year ATHLETICS DEPARTMENT CONSTRUCT ANALYSIS Using the Vision & Mission Statements, four major constructs (themes) have been identified: •
National Recognition
•
Operating in a Fiscally Responsible Manner
•
Consistently Competing for & Winning Championships
•
Offering and Operating World Class Programs
For each of the four Constructs, Lead Team Level (1) CPMs, and their associated measures (KPIs and NFIs), current state, and targets were identified. Based upon the size of the gap between the current or historical state of each KPI or NFI and the Target as identified by the Core Lead Team, each of the metrics were incorporated into the Strategic Plan as either a Focal Point or Check Point.
8 2014-17 S T R AT EGIC PL A N
CONSTRUCT CONSTRUCT ANALYSIS: >
CONSTRUCT: FISCALLY RESPONSIBLE CPM: Financial Sustainability Metrics (24)
Targets (24)
CPM: Sound Financial Plan Metrics (2)
Targets (2)
CONSTRUCT: NATIONAL RECOGNITION CPM: National (& Local) Press Coverage Metrics (11)
Targets (11)
CONSTRUCT: COMPETING FOR & WINNING CHAMPIONSHIPS CPM: Winning Championships Metrics (11)
Targets (11)
CPM: Competitive Performance Metrics (28)
Targets (28)
CPM: Effective Management Metrics (10)
Targets (10)
CONSTRUCT: WORLD CLASS PROGRAMS CPM: Academic Performance of Student-Athletes Metrics (7)
Targets (7)
CPM: Exemplary Health & Wellness Programs Metrics (6)
Targets (6)
CPM: Exemplary Personal Development Programs Metrics (5)
Targets (5)
9 2014-17 S T R AT EGIC PL A N
10 2014-17 S T R AT EGIC PL A N
HIGHLIGHTS FROM CU ATHLETICS DEPARTMENT 3-YEAR STRATEGIC PLAN: >
STRATEGIC INTENT 1: Significantly Improve the Financial Status of CU Athletics Department at the University of Colorado Boulder
Strategic Objective 1.1: Achieve a significant increase in annual Net Revenue
Focal Point 1.1.1: Achieve a Total Net Revenue of $4,414,197 by 2016-2017 (Operating
Revenue – Allocated Expenses) {RG}
Strategic Objective 1.2: Achieve a significant increase in annual Net Revenue Generated
From Targeted Sources of Operating Revenue
Focal Point 1.2.1: Achieve Total Annual Revenue Goal From Football Operations by 2016-17 {JS}
Tactical Objective 1.1: Maintain Current Levels, or Achieve Incremental Increases in Annual Net Revenue Generated From Non-Targeted Sources of Operating Revenue
Check Point 1.1.1: Achieve Total Annual Revenue Goal From Men’s Basketball Operations by 2016-17 {CB}
Tactical Objective 1.2: Maintain a Minimal Increase In Allocated Expenses Through 2016-2017
Check Point 1.2.1 Maintain Annual Increases in Total Allocated Expenses At Or
Below 3% per Year Through 2016-2017 {RG}
Tactical Objective 1.3: Maintain a Sound Financial Plan Through 2016-2017
Check Point 1.3.1 Maintain The Total Debt Load at $6,437,456 Through 2016-2017 {RG}
11 continued on pg. 12
2014-17 S T R AT EGIC PL A N
HIGHLIGHTS FROM CU ATHLETICS DEPARTMENT 3-YEAR STRATEGIC PLAN: >
STRATEGIC INTENT 2: Significantly Improve the Overall Competitiveness of CU Athletics Department at the University of Colorado Boulder
Strategic Objective 2.1: Win a Minimum of 2 Championships in Targeted Sports
Between 2014 and 2017
Focal Point 2.1.1: Compete in at Least 1 Pac-12 Championship Game in Football by 2016 {MM}
Tactical Objective 2.1: Win a Minimum of 12 Championships in Selected Sports Between 2014 and 2017
Check Point 2.1.1: Compete in at Least 1 Regular Season Pac-12 Championship in Men’s Basketball by 2017 {TB}
Strategic Objective 2.2: Significantly Improve the Overall Competitiveness for Targeted Sports Teams Between 2014 and 2017
Focal Point 2.2.2: Make At Least One (1) Appearance in the NCAA Sweet 16 In Women’s Basketball Between 2015 and 2017, Inclusive {LL}
Tactical Objective 2.2: Maintain or Incrementally Improve the Competitiveness of All Sports Teams between 2014 and 2017
Check Point 2.2.1: Receive a Bowl Bid in Football 2014 and 2015 {MM}
12 2014-17 S T R AT EGIC PL A N
continued on pg. 13
HIGHLIGHTS FROM CU ATHLETICS DEPARTMENT 3-YEAR STRATEGIC PLAN: >
Check Point 2.2.13: Appear in the 4th Round of the NCAA National Tournament
In Women’s Soccer At Least Once, Appearing in Round 3 or Higher in the Other 2 Years, Between 2014 and 2016, Inclusive {DS}
Check Point 2.2.18: Finish in the Top Half of the Season-Ending Men’s Outdoor
Track Pac-12 Championship Each Year Between 2015 and 2017, Inclusive {MW}
Strategic Objective 2.3: Achieve Significant Improvements In the Aspects of Effective
Management That Are Critical to Competing for and Winning Championships
Focal Point 2.3.1: Successfully Execute All Level 2 Metrics and Requirements for Recruiting Plans Annually {Each Process Owner}
Focal Point 2.3.2: Successfully Execute All Level 2 Metrics and Requirements for
Non-Conference Game Schedules Annually {Each Process Owner}
Tactical Objective 2.3: Maintain or Incrementally Improve Those Aspects of Effective
Management That Are Significant Contributors to Competing for and Winning Championships
Check Point 2.3.1: 100% of Applicable Process Owners Annually Submit
Every Business Expense Reports On-Time Between 2014 and 2017, Inclusive {SPO}
13 continued on pg. 14
2014-17 S T R AT EGIC PL A N
HIGHLIGHTS FROM CU ATHLETICS DEPARTMENT 3-YEAR STRATEGIC PLAN: >
Tactical Objective 2.4: Incrementally Improve Those Aspects of National Recognition
That Are Required to Support the Objectives Related to Competing for and Winning Championships
Check Point 2.4.2: For All Website Engagements: Increase the Total Number of
Visits by 15% by 2017, Inclusive {CS}
Check Point 2.4.3: For All Website Engagements: Increase the Total Number of
Unique Visitors by 15% by 2017, Inclusive {CS}
STRATEGIC INTENT 3: Significantly Improve Academic and Personal Development Programs In Order to Achieve World- Class Status for Those Programs Serving Student-Athletes at the University of Colorado Boulder
Strategic Objective 3.1: Significantly Improve the Academic Performance of Student-
Athletes at the University of Colorado Boulder
Focal Point 3.1.1: Significantly Improve the Graduation Success Rate for 4 Year
Cohorts To 80% by 2017
Focal Point 3.1.2: Significantly Increase the Total Percentage of Teams With a
Perfect APR To 50% by 2017 {KL}
{KL}
Tactical Objective 3.1: Maintain or Incrementally Improve the Academic Performance of
Student-Athletes
14 2014-17 S T R AT EGIC PL A N
Check Point 3.1.1: Incrementally Improve the Graduation Rate of Seniors With Exhausted Eligibility To 100% Each Year Between 2014 and 2017 {KL} continued on pg. 15
HIGHLIGHTS FROM CU ATHLETICS DEPARTMENT 3-YEAR STRATEGIC PLAN: >
Check Point 3.1.2: Incrementally Improve the GPA for All Student-Athletes
To a Minimum of 2.95 Each Semester by 2017 {KL}
Check Point 3.1.3: Incrementally Improve the Academic Progress Rate (APR),
Combined for All Sports, To a Minimum of 980 Each Year
Between 2014 and 2017 {KL}
Strategic Objective 3.2: Significantly Improve Targeted Personal Development &
Leadership Programs at the University of Colorado Boulder
Focal Point 3.2.1: Significantly Increase the Total Hours Associated with All
Student-Athletes Participating in Service Programs to 3 per SA, Each Year, from 2014 to 2017 {DC}
Tactical Objective 3.3: Maintain or Incrementally Improve Selected Health & Wellness
Programs at the University of Colorado Boulder
Check Point 3.3.1: Improve the Weighted Total Injury Index to A Monthly
Average of TBD or Less Each Year Between 2014 and 2017
{MR}
15 2014-17 S T R AT EGIC PL A N
THANK YOUPLAN TEAM: CU ATHLETICS STRATEGIC >
PREPARED BY: JEFF LUFTIG — FACILITATOR Associate Vice Chancellor for Process Innovation & Director, Office for Performance Improvement
CORE TEAM Rick George
Ceal Barry
Matt Biggers
Tad Boyle
Emily Canova
Becky Gamble
Kris Livingston
Jim Senter
Catherine Shea
STRATEGIC WORKING TEAM David Clough
Kevin Fenton
Kurt Gulbrand
Cory Hilliard
Tom McGann
Gail Pederson
David Plati
Miguel Rueda
STRATEGIC SUPPORT TEAM
16 2014-17 S T R AT EGIC PL A N
Chris Brekke
Megan Eisenhard
Kelly Finley
Jim Geddes
Irene Griego
Dave Hoover
Hayley Hughes
Lindsay Lew
Colleen Magarity
Medford Moorer
Jim Packer
Juda Parker
Curtis Snyder
Ariel Solomon
Lisa Van Goor