FIRE STATION 22
THOMAS HARTMAN | ADE 522 | CODY YAZZIE
TABLE OF CONTENTS SITE P 3 SITE LAYOUT P 4 SITE PLAN P 5 GROUND LEVEL P 6 SECOND LEVEL P 7 PRESSURE ZONE GROUND LEVL
P8
PRESSURE ZONE SECOND LEVEL
P9
CIRCULATION P 10 SECTIONS P 11-15 GROUND LEVEL STRUCTURE
P 16
SECOND LEVEL STRUCTURE
P 17
MATERIALS P 18 PICTURES P 19-21
SITE
INDUSTRIAL
COMMERICAL
RESIDENTIAL
3
BROADWAY RD
CORONA AVE
2ND ST
CENTRAL AVE
FIRE STATION 22 SITE
SITE PLAN
BROADWAY RD
F F DW
2ND ST
CENTRAL AVE CORONA AVE
5
GROUND LEVEL
1 2
16
15 4
17
3
19 18
6
5
6
20 24
9
F
7
10
8
F
12
21
6 DW
11
6
3 3 14
13 14 14 14
6
22
14
1. Main Entry 2. Lobby 3. Receptionist 4. Training Room 5. Restroom 6. Elevator 7. Janitors Closet 8. Mechanical 9. Break/Day Area 10. Dinning Area 11. Kitchen 12. Fitness Room
13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24.
Electrical Dormitory Apparatus Bay IDC Closet EMS Storage Electrical Exterior Generator Decontamination/Eyewash Turnout Storage SCBA Storage/Hose Storage Mezzanine Storage Exterior Storage
23
SECOND LEVEL
1
1
1
1
1 1
1
1
1
1
5
DR
4
DR
4
DR
4
W
DR
4
W
4
DR
4
W
DR
4
W
W
W
2 4
4
4
4
4
4
3
6 6 4 4
6 6
1. Battalion Chief's Office Battalion Offices Captain's Office District Chief's Office District Staff Office Alternate Response Personnel Office Radio Room Watch Room 2. Laundry Room 3. Library 4. Dormitories 5. Deck 6. Restroom
DW
F
F
PRESSURE ZONES GROUND LEVEL
POSITIVE NEUTRAL NEGATIVE NEGATIVE DECONT.
PRESSURE ZONES SECOND LEVEL
DR
DR
DR
W
DR
W
DR
W
DR
W
W
W
POSITIVE
DR
DR
DR
DR
W W
DR
W
W
DR
W
DW
F
F
CIRCULATION
W
DW
F
F
SECTION
DW
F
F
SECTION
DW
F
F
SECTION
SECTION
SECTION
GROUND LEVEL STRUCTURE
PRIMARY STRUCTURE SECONDARY STRUCTURE
SECOND LEVEL STRUCTURE
PRIMARY STRUCTURE SECONDARY STRUCTURE
MATERIALS EIFS WATERPROOFING MASONRY METAL FRAMING INSULATION GYPSUM BOARD CONCRETE SLAB METAL DECKING STEEL STRUCTURE FINISHING CEILING