Facilities Committee Report Marina East Refurbishment & Replacement Program
A24
A22
C24
B16
B15
C23
A20 B13
B14 C21
A18 B12 C19
A16 B11
C18
A14
B10
C17
B9 C15
C13
B8
A10 A11 A12 B7
B6 C11
B5
B4
C9
B3
C1
The overall status of the upgrade to marina east is shown in the marina east plan, pictured right.
C7
B1
The Facilities Committee extends its thanks, on behalf of all Senior Members, to the Club’s marina east crew, Shannon Gilchrist and Todd Clark for their ongoing dedication to this essential task.
B2
The Facilities Committee is now addressing a long-term strategy to deal with the main pontoons which, while generally in reasonable condition and with a few sections having been replaced or refurbished, will need further attention going forward.
C5
A1 A2 A3 A4 A5 A6 A7 A8
MARINA EAST CAPITAL REFURBISHMENT / REPLACEMENT PLAN
C3
Members should see the completion of refurbishment or replacement of the fingers throughout marina east in 2021/22. This has been the Club’s most significant ongoing capital commitment over the past few years.
Capital works in the pipeline in 2020/21 where planning and design has been undertaken and where expenditure will carry into 2021/22 are: • • • • •
Replacement of the slipway wedge and rails Relocation of the winch motor/installation of a new motor Re-fit of the office area to accommodate Youth Academy staff Replacement of the outdated computer server Pt Vincent clubhouse facilities (delayed due to builder issues)
Facilities Committee: David Murray (Chair) Ken Amos, Mark Hutton, Adam Hays (General Manager)
Cruising Yacht Club of SA | 2020/2021 Annual Report
12
E13
D20 F14
F12
F10
E9 E10 E11
D15 D16 D17 D18
D14
E1 E2 E3 E4 E5 E6 E7 F6 F7 F8
•
F4
•
F2
•
D3 D4 D5 D6 D7 D8 D9 D10 D11 D12
•
Replacement of the jib crane and reinforcement of the crane wharf Replacement of the kitchen floor and acquisition of additional kitchen equipment Stripping out and completely re-furbishing the shower and toilet facilities in the main clubhouse building Upgrading parts of the Pt Vincent marina to improve marina integrity and to address localised end-of-life issues Purchase of six Elliot 7 training keelboats
D1
•
D2
Other significant capital items in 2020/21 were:
SCHEDULED REFURBISHMENT SCHEDULED REPLACEMENT
THIS PLAN IS SUBJECT TO CHANGE - NO
UNDER CONSTRUCTION
• • •
REFURBISHED / NEW DENOTES REFURBISHED DENOTES 2ND GENERATION (NEW) NEW MAIN WALKWAY
ALL FINGERS ARE EXPECTED TO BE COM NEW FINGERS C5, F4, E7, E23 READY F NEW WALKWAY PONTOONS TO BE INS