Facilities Committee Report Marina East Refurbishment & Replacement Program

A24

A22

C24

B16

B15

C23

A20 B13

B14 C21

A18 B12 C19

A16 B11

C18

A14

B10

C17

B9 C15

C13

B8

A10 A11 A12 B7

B6 C11

B5

B4

C9

B3

C1

The overall status of the upgrade to marina east is shown in the marina east plan, pictured right.

C7

B1

The Facilities Committee extends its thanks, on behalf of all Senior Members, to the Club’s marina east crew, Shannon Gilchrist and Todd Clark for their ongoing dedication to this essential task.

B2

The Facilities Committee is now addressing a long-term strategy to deal with the main pontoons which, while generally in reasonable condition and with a few sections having been replaced or refurbished, will need further attention going forward.

C5

A1 A2 A3 A4 A5 A6 A7 A8

MARINA EAST CAPITAL REFURBISHMENT / REPLACEMENT PLAN

C3

Members should see the completion of refurbishment or replacement of the fingers throughout marina east in 2021/22. This has been the Club’s most significant ongoing capital commitment over the past few years.

Capital works in the pipeline in 2020/21 where planning and design has been undertaken and where expenditure will carry into 2021/22 are: • • • • •

Replacement of the slipway wedge and rails Relocation of the winch motor/installation of a new motor Re-fit of the office area to accommodate Youth Academy staff Replacement of the outdated computer server Pt Vincent clubhouse facilities (delayed due to builder issues)

Facilities Committee: David Murray (Chair) Ken Amos, Mark Hutton, Adam Hays (General Manager)

Cruising Yacht Club of SA | 2020/2021 Annual Report

12

E13

D20 F14

F12

F10

E9 E10 E11

D15 D16 D17 D18

D14

E1 E2 E3 E4 E5 E6 E7 F6 F7 F8

F4

F2

D3 D4 D5 D6 D7 D8 D9 D10 D11 D12

Replacement of the jib crane and reinforcement of the crane wharf Replacement of the kitchen floor and acquisition of additional kitchen equipment Stripping out and completely re-furbishing the shower and toilet facilities in the main clubhouse building Upgrading parts of the Pt Vincent marina to improve marina integrity and to address localised end-of-life issues Purchase of six Elliot 7 training keelboats

D1

D2

Other significant capital items in 2020/21 were:

SCHEDULED REFURBISHMENT SCHEDULED REPLACEMENT

THIS PLAN IS SUBJECT TO CHANGE - NO

UNDER CONSTRUCTION

• • •

REFURBISHED / NEW DENOTES REFURBISHED DENOTES 2ND GENERATION (NEW) NEW MAIN WALKWAY

ALL FINGERS ARE EXPECTED TO BE COM NEW FINGERS C5, F4, E7, E23 READY F NEW WALKWAY PONTOONS TO BE INS