SKETCHBOOK DAAN JANSSENS
Timeline School Work SW 001
SW 003
SW 006
SW 008
SW 002
SW 004
SW 007
SW 009
OW 003
OP 004
SW 010
SW 005
Own Projects OP 001
OP 002
OP 006
OP 005
2009
2010
2011
2012
2013
SW 011
Office Work
2014
BEL Architecten
ZICHT Architecten
OW BEL 001
OW ZICHT 001
OW BEL 002
OW ZICHT 002
OW BEL 003
OW ZICHT 003
OP 007
OP 008
2015
OP 009
2016
2017
2018
School Work
SW 001 | infodesk location: start: end:
Maria Hendrikapark, Ostend September 2009 October 2009
Inspired by the beamdrop of Chris Burden, used as a shelter, a bench or an info point, but infopunt is conceived as a flat concrete roof that also allows a new experience of the environment is dropped on a forest of I-beams of different by means of a ‘promenade architectural’. lengths. The I-beams at times penetrate the concrete and at times remain untouched, which generates a field of tension between the functional and the esthetical. The concrete volume can be
SW 002 | beachmachine location: start: end:
beach in front of the Royal Galleries, Ostend october 2009 december 2009
Beach cabins (Dutch: strandcabine) are a poetic, to that of the cabins and the Royal Galleries. The but also a space consuming form of leisure diagonal beams disrupt the rhythms inside and infrastructure. Therefore beachmachine became filter the light in a playful way. a thirty meter long box that floats above the beach and is reminiscent of an early flying machine. Much attention was paid to the design of the wooden trusses. The rhythm of the vertical beams refers
SW 003 | OUTSIDEhouse location: start: end:
fictional February 2010 April 2010
On a plot of 15 by 15 meter full of trees, every student was asked to design a small type of holiday home that can be built in series to form a (fictional) resort. My goal was to give inhabitants a feeling of ‘living outside on the inside’. Therefore I proposed a compact glasshouse and intersected this by two large terraces. These ‘floating’
terraces contain holes and the glasshouse is cut in two by a small courtyard, so trees can grow around and in the house. The terraces lie 90 cm above the ground and continue into the interior, becoming worktops and shelves and so blurring the division between outside and inside.
SW 004 | d.a.n.d.i location: start: end:
Frans Nensstraat 13, Leuven April 2010 June 2010
The assignment was to create a family home with a practice space. I saw this as an opportunity to design both my own home and future architectural office. D.a.n.d.i, stands for dirty architecture ‘n’ design institute. I began with a simple box and divided it into four equal cubes. The first contains the office, the second a patio, and the third and
fourth the house itself. Fully glazed, the box also reflects the way I live and work, and serves as a sort of ‘business card’. But it also respects the privacy of the other inhabitants and neighbours by using different sorts of glass, screens and even the image of Le Corbusier.
B
B
15
140
20 120
02
03 1
30
1
01
2
A
500
560
A
A
2
30
15
530
A
492
30
519
30
519
30
550
2170
549
B
549
C
550
15
D
B
B
A
549
A
E
PARKEERPLAATSEN
02
FIETSENSTALLING
03
BERGING
DAAN JANSSENS 2 BIRA 08.08.2011 1:100
B
A
B
C
D
C
D
E
E
D
DAAN JANSSENS 2 BIRA 08.08.2011 1:100
30
B
21
0
01
57
15
D 05
140
D 02
6.52
444
460
30
40
15
6.52
1
D 04
05
06
08
4.10
4.10
30
480
500
A 560
530
A
38
07 890
04
D 03
15
30
2
370
40
370
D 01
40
505
30
519
585 30
519
1098 30
519
30
520
0.00
30
0.00
2228 15
549
B
A
549
B
549
C
550
15
D
E
1
04
KANTOOR
05
TERRAS
06
ZITRUIMTE
07
EETRUIMTE
08
KEUKEN
DAAN JANSSENS 2 BIRA 08.08.2011 1:100
A 1
B
10
10 4.10
40
505
30
519
585 30
519
1098 30
519
30
520
30
2228 15
549
B
A
549
B
370
370
2
15
30
38
10
09
890
A 560
A 530
460
480
444
30
40
500
40
1
30
15
140
30
21
57
2
0.00 549
C
550
D
15
E
09
DUPLEX KANTOOR
10
SLAAPKAMERS
01 02 03 04 05 06 07 08
parking fietsenstalling berging bureau terras living eetkamer keuken
DAAN JANSSENS 2 BIRA 1:100 08.08.2011
GELIJKVLOERS
SW 005 | the cloud location: start: end:
B 02
01
05
Rijschoolstraat 4, Leuven February 2011 August 2011
05
07
A
04
06
NIVEAU 2
03
A
05
01 02 03 04 05 06 07
B
B 05 06
03
03
06
entrance bicycle garage car park fountains storage room toilet hockey field
+2
01 02 03 04 05 06 07
reception toilet changing room canteen kitchen terras skylight
How to redesign an out-dated hockey hall housed in a former riding school with limited historical value? Students were given the choice: reconversion or demolition. I was charmed by the massive sidewalls in warm masonry and convinced of the historical value of the neoclassical façade, so I went for the first. I started off by removing
02
A
07
01 02 03 04 05 06 07
03
04
A
+0
03
02
01
B
everything but the three outer walls to create a ruin-like space. This felt like the ideal playground for hockey. The sidewalls were over-dimensioned, so I installed the utilities on the roof in the form of a ‘cloud of steal’. A skylight provides a visual connection between the hall and ‘the cloud’.
01 02 03 04 05 06 07
SW 007 | concrete houses Fernand Demetskaai 10, Anderlecht February 2012 May 2012
01 350
160
4
1290
GEPREFABRICEERD ELEMENT IN ZICHTBETON
255
ZINKSLAB
520
location: start: end:
600
DAKDICHTING
340
THERMISCHE ISOLATIE - STIJVE PLATEN MET AFSCHOT 25 MM/M - MIN. DIKTE 60 MM
230
THERMISCHE ISOLATIE - STIJVE PLATEN - 120 MM
DAMPSCHERM
150
THERMISCHE ISOLATIE - STIJVE PLATEN - 2 x 80 MM
ELASTISCHE KIT/ZWELBAND BREEDVLOERPLATEN MET GLADDE ONDERZIJDE - 50 MM
50
DRUIPRAND
DRUKLAAG - 150 MM
120
+ 16.04
90
EPDM-FOLIE WBP MULTIPLEX - 18 MM
MULTIPLEX - 18 MM
+ 15.92
ELASTISCHE KIT/ZWELBAND
92
102
92
01
D.01
100
DORPEL - HARDHOUT - 150 x 50 MM
ELASTISCHE KIT/ZWELBAND
BETONTEGELS - 50 MM
145
BETONTEGEL - 50 MM
150
WBP MULTIPLEX - 18 MM
100
WBP MULTIPLEX - 18 MM MUURKAP - GEANODISEERD ALUMINIUM
+ 13.80
+ 13.80
30
+ 13.80
10
VLOERAFWERKING - KERAMISCHE TEGELS IN MORTELBED
CELLENGLAS - 150 MM DEKVLOER - 100 MM
450
50
PE-FOLIE
DAKDICHTING
DAKDICHTING
270
650
STIJVE ISOLATIEPLATEN MET AFSCHOT 25 MM/M - MIN. 60 MM
RANDISOLATIE - 10 MM
UITVULLAAG - LICHT BETON O.B.V. VERMICULIET - 270 MM
THERMISCHE ISOLATIE - STIJVE PLATEN - 120 MM
STIJVE ISOLATIEPLATEN - 120 MM
DAMPSCHERM
DAMPSCHERM
160
200
WBP MULTIPLEX - 18 MM
DAMPSCHERM
DRAAGVLOER IN TER PLAATSE GESTORT BETON 200 MM DRUKLAAG - 150 MM
200
60 BETON DRAAGVLOER - TER PLAATSE GESTORT 200 MM
STIJVE ISOLATIE - 50 MM
CELLENBETON - 150 mm THERMISCHE ISOLATIE - STIJVE PLATEN MET AFSCHOT 25 MM/M - MIN. DIKTE 60 MM
BREEDVLOERPLATEN MET GLADDE ONDERZIJDE - 50 MM
VERT. REGELWERK VERANKERD MET GEVELSCHROEVEN OSB-PLAAT - 15 MM
STIJVE ISOLATIEPLAAT BEIDE ZIJDEN BEKLEED MET ALU-FOLIE - 60 MM
+ 13.15
+ 13.15
THERMISCHE ISOLATIE - MINERALE WOL - 145 MM OSB-PLAAT - 15 MM GIPSKARTONPLAAT - 12.5 MM DAMPSCHERM EPDM FOLIE
D.02D.03
+ 12.80 ELASTISCHE KIT/ZWELBAND
92
Concrete houses are part of phase two of project Scheutveld, a redevelopment of a brownfield situated in Anderlecht in an area with many industrial artefacts. We wanted our new housing to match the rough look of these artefacts. Therefore went for a brutalist approach (think Chandigargh or the work of Bob Bardi and de
195
Rocha). The two blocks I designed consist of two parts: a concrete structure and a wooden infill. The blocks have a typical section: tree duplexes are stacked on top of each other, the lowest have their accesses at street level and the other two are accessed by two galleries and share a ‘nightlevel’.
SW 008 | maggie’s centre location: start: end:
hill next to KHLeuven, Gasthuisberg, Leuven September 2012 November 2012
Maggie’s centres are the fulfilling of the last wish of a broad-minded woman called Maggie, who wanted to find a peaceful place after being diagnosed with cancer. With this in mind, I opted for a safe haven, without concealing the building’s function. I designed an ‘open bunker’. That’s perhaps why, during final deliberation, someone described the
design as ‘a bit cold’ and ‘not really cosy’. But that was actually the purpose. The building is designed to let people focus on the outside. The openings demonstrate the beauty of the surroundings: the horizon, a sunset, rabbits playing in the grass,…
SW 010 | a.r.g.o. location: start: end:
kasteel Arenberg, Heverlee November 2013 December 2013
the boat
the sauna
A.r.g.o. stands for ‘Architecten Rust-, Groeps- en Ontspanningsruimte’. It’s a getaway for architecture students and consists of two parts ‘the boat’ and ‘the sauna’. The boat contains a reading area, a bar/ worktable and a kitchen. The sauna is set aside for meetings. ‘Do call me Huib!’ is a side-project aimed at the decoration of leather cushions with Warhol-like portraits of the architectural heroes of the students.
‘Do call me Huib!’
SW 011 | Care-housing Spoor Oost location: start: end:
Spoor Oost, Antwerp September 2013 January 2015
Serre-woningen Type maisonette
01 hal 02 living 03 leefkeuken 04 badkamer
duplex-unit
Spoor Oost
snede
05 06 07 08
slaapkamer berging wintertuin voortuin
1:200
07
05
05
02 06
Concepten
2. Woontoren Op het geluidsmuur-gebouw komt een woontoren, die er deel
03
gevel spoor oost 1:200
3. Woonpark De zone die wordt afgeschermd door de geluidswal wordt
van uitmaakt. deze vormt de echte ‘kop’ van de ontwikkeling ingevuld met een woonpark. Dit park voorziet enerzijds in worden regels opgesteld 1. Geluidsmuur 06 en anderzijds in de vraag naar op Spoor Oost en een oriëntatiepunt in de wijk. Er wordt het nijpend tekort aan groen, poor Oost, een zone die Zoals de geluidskaarten in de omgevingsanalyse aantoonden gekozen voor een woontoren, omwille van de grote vraag naar woningen. Het park bestaat uit een publiek wijkpark en vier 03 05 ns is deze zone één van de vormt akoestiek een groot probleem. De eerste ingreep van woningen, en omdat wonen de hoofdfunctie is van de nieuwe semi-publieke tuinen. Het wijkpark zorgt er tevens voor dat de 04 01 an Nieuw Schijnpoort (zie het masterplan is dan ook het optrekken van een geluidsmuur wijk. De toren maakt ook deel uit van de drie stapstenen in geluidshinder van het spoor kan gebufferd worden. oort) en zijn er dus enkele in de vorm van een L-vormig gebouw. Dit gebouw bevat het masterplan Nieuw Schijnpoort en is dus het gevraagde In dit park staan de zes bouwstroken zo opgesteld in, ze bij reeds van toepassing. een gemixte programma van woningen, kantoren, winkels schakelpunt tussen de twee masterplannen. enerzijds vier semi-publieke tuinen definiëren en anderzijds drie woonstraten. et ontwerpend onderzoek en ateliers. De woningen dienen zoveel mogelijk te bestaan 09 masterplan gegeven: Kop uit meegroeiwoningen. De winkels zijn gesitueerd aan 3. Woonpark 5. Doorsteek 4. Passage worden tot een inclusieve Schijnpoortweg, omwille van de reeds aanwezige commerciële ontoren, die er deel De zone die wordt afgeschermd door de geluidswal wordt Ter hoogte van het kruispunt krijgt de geluidswal een doorsteek Achter de geluidswal en het woonpark loopt een nieuwe ar ook aangenaam is voor activiteit. De kantoren staand langs de Singel en de ateliers an de ingevuld metvlakbij een het woonpark. Dit zodat park ze voorziet inpassage. Deze is bedoeld voor de bewoners en wil een voor voetganger en fietsers, die verbonden wordt met de den aanontwikkeling een geïntegreerde liggen marktplein, kunnenenerzijds meegenieten maisonette aan en anderzijds in de vraag naarinformele verbinding vormen tussen Schijnpoortweg en het passage. Deze fungeert als extra1:200 toegang tot het woonpark g de wijk. Er wordt het nijpend van detekort activiteit opgroen, dit plein. 168 de grote vraag naar woningen. Het park bestaat uit een publiek wijkpark en viermarktplein. Daarom wordt in de passage doorgaand verkeer en verbetert zo bereikbaarheid ervan. ie is van de nieuwe semi-publieke tuinen. Het wijkpark zorgt er tevens voor dat degeweerd. Enkel hulpdiensten en plaatselijk verkeer zijn drie stapstenen in geluidshinder van het spoor kan gebufferd worden. toegestaan. Deze kunnen de passage langs Schijnpoortweg dus het gevraagde In dit park staan de zes bouwstroken zo opgesteld in, zeinrijden en verlaten deze via het marktplein. Voor bezoekers . enerzijds vier semi-publieke tuinen definiëren en anderzijds drieen externe zorgverlening (cf. Veldwerk) worden in de passage woonstraten. ies 7. Ondergrondse parking bovengrondse parkeerplaatsen voorzien. Om te vermijden woonstrook vervangen door Om de wijk zo autovrij mogelijk te maken wordt een ondergrondse dat de passage de publieke activiteit langs de Singel zou doen 6. Zwembad met nevensportfuncties 7. Ondergrondse parking ewicht fungeert voor de urban parking voorzien. Bewoners dienen hun auto hier te parkeren afnemen, krijgen de kantoren, ateliers en winkels hun adres Aan het marktplein wordt één woonstrook vervangen door Om de wijk zo autovrij mogelijk te maken wordt een ondergrondse ktplein (zie MSO ’12-’13). Dit en kunnen van hieruit hun woning bereiken. Maar ook de aan de Singel.
Many care-dependent people don’t find a housing solution for their more specific needs. My sister grootschalig gebouw, dat als tegengewicht fungeert voor de urban ended up in a wheelchair after an accident. farm aan de overkant van het marktplein (zie MSO ’12-’13). Dit gebouw krijgt de functie van zwembad met nevensportfuncties yoga en danszaal) en een kantine. In het Reason enough to see my(fitnesscentrum, thesis as a chance to zwembad wordt een revalidatie-zwembad voorzien worden om tegemoet te komen aan de wensen van rolstoelgebruikers. solve this!
mbad met nevensportfuncties al) en een kantine. In het embad voorzien worden om n van rolstoelgebruikers.
kantoorbedienden, eigenaars en bezoekers van de winkels en 120 ateliers kunnen hier parkeren.
121
gevel singel 1:200
The backbone of my proposal for Spoor Oost is a big L-shaped building containing 112 houses, parking voorzien. Bewoners dienen hun auto hier te parkeren atelier-spaces, commercial space en offices kunnen van hieruitspace, hun woning bereiken. Maar ook de kantoorbedienden, eigenaars en bezoekers van de winkels en ateliers kunnen hier parkeren. and a communal space. This building functions as a sound wall to protect an inner area with 107 houses. 121
+1,50
+1,26
+0,72
+0,00
+ 0,00
+ 0,00
+ 0,00 + 0,00
+ 0,00 ,00
+ 0,50
+ 0,00
+ 0,00 ,00
+0 0,00 + 0,00 ,00
+2,00
+0,00
+ 0,00 ,00
+1,50
01 hal 02 living 03 eetkamer A B 04 keuken 05 bureau 06 badkamer
group house
woonunit 1 - duplex met leefkeuken - rolstoelbezoekbaar - 3 slaapkamers - terras aan collectieve tuin +0,54 - 160 m2
gevel straat
07 slaapkamer 08 berging 09 C vestiaire 10 leefkeuken 11 bijkeuken
C
B
A
C
B
A
woonunit 2 - meegroeiwoning - 1 slaapkamer - terras aan collectieve tuin - 87 m2
+0,72 +0 ,72
+0,72
A 03
B
C
gevel straat 03 07
gevel tuin
02
02 04 02
11
09
gevel tuin
snede A
snede B
snede B
snede C
08
01
01
10
niv 0
1:200
alle bewoners gebruiken dezelfde inkom de overdekte buitenplaats is naast een fiestenstalling, ook een ontmoetingsruuimte
snede A
As an exemple of care-housing (care + cohousing) I light out the group house in my design. It consists of seven housing units that are stacked in an interesting way, encompassing four different housing-types: two duplexes and two types of apartments. All units share the same
front door, parking area and bicycle storage and have access to the roof-terrace. To enhance the assisting, the displacement between units is made interesting by connecting the landings on the first three floors with a small void and a large window and by placing a part of the circulation outside.
175
Office Work
OW BEL 001 | 3x48 social housing location: period: status:
Moenshof, Zonhoven March 2015 - April 2015 competition VALT WEG BIJ 2S-4P
VALT WEG BIJ 2S-3P
7,5
15
3,7
7,5 2,8
0,05
7,5 2,2
0,05
2,2
0,2
3,6
3,7
0,1
SLAAPKAMER GROOT 12 M2
VE
W
O
O 0,1 N
TERRAS 3,7 x 2,45 = 9 M2
VO O R
SLAAPKAMER KLEIN / BUREAU 9 M2
SLAAPKAMER KLEIN / BUREAU 4,5 x 3,7 = 9 M2
7
4,2
SCHEIDINGSMUUR SLAAPKAMERS BIJ 2S-4P
G
VE
IN
R
R
BU
N O O
W
IG EN
SLAAPKAMER KLEIN 9 M2
R O VO
SLAAPKAMER GROOT 12 M2
EN IG
BU
R
R
IN
G
0,1
SCHEIDINGSMUUR SLAAPKAMERS BIJ 2S-4P
3,6
EETKAMER 3,6 x 3,27 = 12 M2
BADKAMER 1,7 x 2,8 = 4,76 M2
WC 1,74 M2
INKOM 3,74 M2
BERGING 2,6 x 1,4 = 3,64 M2
KEUKEN 3,7 x 2,9 = 10 M2
NATTE ZONE LEIDINGLENGTES BLIJVEN MINIMAAL
0,1
0,9
0,1
WC 1,26 M2
WC 1,26 M2
1,7
0,2
0,1
2,2
BADKAMER 1,7 x 2,8 = 4,76 M2
TYPE 3S4P 1/50
OPPERVLAKTE - incl. terras - excl. terras
7 x 15 = 105 M2 105 - 10 = 95 M2
- 3 slaapkamers: 2 ouders / 1 kind / 1 kind
The social housing company Vooruitzien asked for 48 apartments on a terrain that is for 1/3 dry, for 1/3 is covered with puddles and for 1/3 looks like a mangrove-like pool. The entire program could be realized using only the dry part, so we triplicated the program. We divided the terrain in three zones based on the soil condition. Then
we introduced for each zone a different typology: the urban villa, the circular building block and the residential tower. The villas form the connection with the existing neighbourhood, the circle expresses with its omnidirectional orientation the feeling of truly living in the forest and the tower serves as a new landmark for the park.
WC 1,74 M2
OW BEL 002 | bicycle spiral location: period: status:
Martelarenplein, Leuven March 2015 - April 2015 competition
How to go from A to B? In this case ‘A’ is Leuven and ‘B’ is Kessel-Lo, a peripheral municipality of Leuven. At the moment the two are like Romeo and Juliet, close but tragically separated by a powerful institution, in this case Leuven’s central station. To remedy this, we created the ideal bicycle-spiral: perfect bicycle-slopes and optimal bicycle-turning-circles. Let the cycling begin!
OW BEL 003 | osumi island location: Berat, Albania period: May 2015 - June 2015 status: competition
Osimi Island is in fact a small, almost negligible mud bank in Osumi River. It happens to lie perfectly in the centre of the city of Berat, that is one of the numerous Albanian cities that were recently affected by heavy floods. So the goal of the competition was this: find a new urban destination for the island, which at the same time
prevents Osumi Island and Berat from flooding! We proposed one big waterpark of which the eyecatcher is Berat’s Blue Diamond: a public round square on the river with a giant swimming pool. The square forms a connection with the island, but prevents it from being submerged by people. This way it can stay the peaceful oasis it is nowadays.
OW ZICHT 001 | H&S location: period: status:
Antwerpen Augustus 2015 - Januari 2016 in progress
The first design I made with ZICHT-architecten was the reconversion of an old factory and some adjacent warehouses. Once, this ensemble should have been a beautiful, harmonious ensemble of brickwork buildings enclosing a paved courtyard, but now it looked like one big bricolage of steel and sandwichpanels, that lacked any entering
of daylight and was glued to a beautiful old warehouse. The intervention came down to this: we made a hole in the given mass and shot off the remaining structure with a new brick faรงade. Just by bringing some colour, fresh materials and a new staircase in, the building got straight from zero to hero.
OW ZICHT 001 | BEN location: period: status:
Antwerpen Augustus 2015 in progress +1226 +1171
VL CV
60
VL
VL Badkamer Ø 160
zwevende tengellat tussen kepers voorzien ifv inblaasisolatie
- NT recuperatie pannen, muldenpan, rood - NT 4 pan- en tengellatten - NT onderdak, Solitex mento+ - BT 6 kepers - BT 17 gordingen - NT 23 cellulose ingeblazen tussen grodingen en kepers - NT Proclima Intello+ - NT 2 lattenwerk damprem - NT 4 draagstructuur - NT 2 gipskarton nieuwe gording plaatsen in functie van nieuw dakvlakraam
bestaand gabarit LINKER buurwoning
+1030
Midden van de bovenste stijl van vast kader uitzetten op het midden van de breedte van de slaapkamer en op 1m32 van ringbalk. Onderzijde evenwijdig met achtergevel.
nieuwe gording plaatsen in functie van nieuw dakvlakraam
R2.1
428
Uitzetten R2.2, zie detailplannen badkamer.
bestaand gabarit RECHTER buurwoning
R2.2
BADKAMER VH max 348 P +700 4.90 M2
D TRAP
D01
SLAAPKAMER VH max 428 P +690 7.9 M2
VL leiding sluit aan op afvoeren douche en toilet
+762
+762
+736 132
31
19
+690
RWA
RWA
+700
25
- ALU-plooiwerk gelijmd op multiplex, zelfde oppervlakteafwerking als raam - 2 multiplex - 10 PUR, platen, vastgeschroefd aan ringbalk, lambda 0.024 W/mK - 18 Nieuwe betonnen ringbalk, bestaande muur gebruiken om bekisting bovenop te zetten. Volgens opgave IRS - 1 bezetting
LIVING
+450
227
VH 308 P +363 9.5 M2
+440 Planken afzagen tot aan eerste balk en nieuwe koppen plaatsen.
20
+363
Nakijken of schuimuur is ingebonden met tuinmuur. Indien niet ingenbonden, chemische verankering en U-profiel plaatsen volgens opgave IRS.
110
VH 308 P +363 9.5 M2
100
R1.3 308
BUREAU
- 23 voorzetwand met ingeblazen celulose, lambda: 0.038 W/mK -Proclimo Intello+ - 1 steunplaat gipskarton - 1 gipskarton
- BT 17 balkrooster - BT 2 planken - NT planken waar nodig vervangen/bijleggen
Borstwering
BT - RWA loopt in goot buur
+440
- BT 17 balkrooster - BT 2 planken - NT 8 kepers - NT 2 multiplex met polyster afwerking
Nieuwe balk
nieuwe randbalken, zelfde hoogte als bestaand rooster
R1.1/ R1.2
NT Bakgoot, helling 1cm /m Constructie multiplex WBP bekleed met EPDM + zinken kraal
VL CV verloopt van midden naar scheimuur in dikte roostering.
343
KEUKEN VH 345 P +0 9.3 m2
+230
R0.3
Balken oude raveelconstructies verwijderen. Indien deel van planken hierdoor niet meer ondersteund, deel wegnemen en terug bijleggen in goede draagrichting.
PL beton
F+L
EETKAMER VH 345 P +0 9.5 M2
D0.1
TUIN P -10 11.3 M2
- BT tegelvloer - BT zandbedding - BT metselwerk tongewelf
+0
-12
+0
168
H aanzet boog 110
KELDER VHmax 168 P -195 12 M2
-195
VL WC
T
ex-I
VL kelder
H aanzet boog 110
168
bestaande hoofdafvoer PVC CV
-3
VL WC
F
As bestaande keldermuur
Small projects with small budgets ask for smart interventions. In this case it was the demolition of the entire back-façade and replace it by a structural glazing. Add a concrete staircase and job’s done.
- BT 17 balkrooster - BT 2 planken - NT planken waar nodig vervangen/bijleggen
- BT 18 balkrooster - BT 2 planken - NT planken waar nodig vervangen/bijleggen
100
Nieuwe balk
265
R0.2
VL WC in de opening van de nieuw VL-buis hangen
Betonzool 30x20
FUNDERINGS TEKENING VERMOEDELIJK
NT - Snede AA
ZICHT
architecten.be
VERBOUWEN VAN EEN RIJWONING Spoorstraat 15/3 2060 Antwerpen
OPDRACHTGEVER Benjamin De Bruyn Spoorstraat 15/3 2060 Antwerpen
datum 14/10/2016
schaal
1/50
dossier
volgnr
6/16
BEN
Nieuwe Toestand Snedes Alle maten dienen ter plaatse gecontroleerd te worden, bij tegenspraak wordt de architect geraadpleegd.
NT S A
OW ZICHT 003 | BIE Sinaai Augustus 2015 in progress
Alle maten dienen ter plaatse gecontroleerd te worden, bij tegenspraak wordt de architect geraadpleegd.
volgnr BIE Beatrijs De Backer Zakstraat 53 Sinaai-Waas 9112
dossier
OPDRACHTGEVER
Zakstraat 53 Sinaai-Waas 9112
ZICHT
architecten.be
VERBOUWEN VAN EEN VILLA
datum 04/05/2016
schaal
1/24
Nieuwe Toestand Plannen
N+0
location: period: status:
I will never forget the moment Pieter first showed me the pictures of an ornate villa in the village of Sinaai. They gave the impression some ancestor of Gaudi went completely berserk on lavish balustrades and a spiralling staircase. The story of the villa is composed of four main chapters: the original bungalow, an initial extension containing the current living room, the garage extension
and a conservatory extension. We were asked to write the final chapter; the one which links all the previous ones together. By copying existing materials (woods present in the Hobbit-doors), strengthening existing connections and spatial elements (eliminating the mezzanine in the living room); a lot is achieved with very little. (And that’s) Precisely the way I like it!
Own Projects
OP 001 | maison bordeaux
I was twelve years old, when I was leafing trough the ‘Phaidon Atlas of Contemporary World Architecture’ and my eye fell on a shocking box in rusted steel. It was warm and tempting. The pictures weren’t big, but the impact was enormous. I believe nothing has had more influence on
my architectural views and direction than the discovery and copying of maison Bordeaux. I can talk for hours on the subject, but I’ll be brief: a mas-ter-piece!
OP 002 | carrousel
OP 003 | tsak
A wink to Duchamp. Wasn’t that practical after all. I remember Tsak started off as something Next time a wider base. DonaJudd could have made. Then things started to slip. Why? Because all books topple after in the end.
OP 004 | café existenz
During the existenzweek, architecture students take over an old building and transform it into a creative platform for all sorts of arts: street art, dance, sculpting, light art and of course a large dose of architecture. I was responsible for the design of the café. I was inspired by Café Aubette.
In Aubette the centre is a dance floor, here it is the floating table Bangk. On both sides arise the seating areas. On the left a salon comfy grannycorner complete with sofa’s and carpets, and on the right holiday-chairs overlooking the skyline of Leuven.
OP 005 | zwaailamp
Since buying twenty ProuvĂŠ-lamps was slightly over budget, I designed a kind of tribute to the famous wall lamp with some planks, cable and some big black lampshades we found in the empty building across the street.
OP 006 | badkamer01
The bathroom is situated in a house that provides a nice example of the garden city movement. She wanted a bath, he preferred a rain shower. And I wanted to incorporate the garden city movement in, and wanted to give by giving them the impression of bathing in a forest. To achieve
this, I placed a freestanding bath in the room and gave the ceiling a print of foliage. I put a wall made out of wooden planks in front of the sloping wall, creating a secondary space with a toilet and a rain shower.
OP 007 | laurens
Testing the possibilities of corrugated plastic. The wave has to be higher next time, so the sheet bends less.
OP 008 |A&S
Finally! My first real house design. A friend of my mother and her husband bought a 120 m2 property in Ghent. The floor plan is L-shaped and encloses a very small courtyard. The house needs a new roof and something wrong with the circulation: to go to the attick, you have to cross the bathroom. Let’s fix this! I propose a concrete, spiraling staircase, that is as compact as possible.
To enlarge the dining area, I install a large folding window. This creates a new ‘loop’ in the house. By opening up the wall of the entrance hall, a large diagonal is created. But then the budget went from € 60.OOO to € 40.000. So the diagonal and the staircase have to go. But never say never!
OP 009 |co-existenzminimum befor:
after: 2.1
4.1
3
5 4.1
4.1
4.1
4.1 4.1
4.1
+0
Two friends and me had the idea of buying a small house in Antwerp to co-house. After me and Jens visited a row house that with its 100 m2 like a total no go.
4.1
+1
4.1
+2
But actually the streetside also was the southside. So, to further encourage the use of the communal space I placed it on the sunny side of the street. Plus, the individual units became bigger! A week later, the project got cancelled due to lack of But nothing attracts more then the almost finances. An interesting exercise though. impossible. So I stayed up late that night and designed. My first idea was more traditional with the communal space in the back.
WHAT’S NEXT?
About the author: To say that I’m passionate about architecture, would be an understatement. Soon as our father took us to the rooftop of Unité d’Habitation, I knew I wanted to do the same thing: let people enjoy life more trough buildings. Yes, I’m a a romantic idealist. Everything starts with a dream. And reality, I learned, is not something that kills your dreams. It’s just something that let you think better about them. Wanna know more? Let’s talk further at your office! name: Daan Janssens date of birth: 3 December 1991 e-mail: janssens_daan@hotmail.com gsm: 0032 487 56 87 30 languages:
Dutch > Englisch > French
programs: Vectorwoks, Autocad Adobe Indesign, Photoshop and Illustrator
Formations - Professional experience Drawing Acadamy - GASK OLVE-college - Science and mathematics KULeuven - Master of Engineering: Architecture, option: architectural design - with distinction freelance journalist for www.architecture.be Internship at BEL Architecten Internship at ZICHT architecten
1995
2000
2005
2010
2015
2020
2025
2030