Danica Yee / Architecture Portfolio

Page 1

A

R

C

H

I

T

E

C

T

U

R

E 1

DANICADESIGN YEE STUDIO / 2011-2015


INTRODUCTION About Me 3 Resume 4

DESIGN STUDIOS Stacks-On! 8 RMIT Upper Pool Studio // 2015

2

The Days of the Fool RMIT Upper Pool Studio // 2015

12

The Conan Doyle Mystery Theatre UMelb Architectural Design Studio 4: Fire // 2013

14

B.E.R.T. (Gateway to Wyndham City) UMelb Architectural Design Studio 3: Air // 2013

18

Boathouse 22 UMelb Architectural Design Studio 2: Water // 2012

WORK EXPERIENCE Open Heart Surgery 26 WOWOWA Architecture & Interiors // 2015 Construction Documentation 28 Williams Boag Architects // 2014

CREATIVE WORK Collage // 2015 36 INTRODUCTION Hand Drawings // 2015

INTRODUCTION

38


Hello. I’m glad you’re perusing my portfolio. Here you’ll find a selection of my work from 2011-2015, including coursework from the Bachelor of Environments at the University of Melbourne and the Masters of Architecture at RMIT. Along with these projects are examples of work produced during my time as a Student Architect at Williams Boag architects and work experience at WOWOWA Architecture & Interiors. I am passionate about how architecture is able to shape our everyday lives and believe that we must continue to advocate for the value of the profession at every scale.

Danica Yee +61430530874 danicayee@gmail.com 50 Bemboka Rd, Croydon Hills, VIC 3136

INTRODUCTION

3


EDUCATION 2015 2011-2013 2005-2010

Masters of Architecture RMIT (Proposed completion 2016) Bachelor of Environments, Architecture Major The University of Melbourne Completing VCE with a score of 94.00 Oxley College, Chirnside Park

ARCHITECTURAL EXPERIENCE 2015

Work Experience - WOWOWA Architecture & Interiors, Carlton - Lighting design - Rendering

2014 - 2015

Undergraduate Student Architect - Willams Boag architects, Carlton - Preliminary, Town Planning & Construction Documentation - Trade Literature Librarian - Interior design schemes - Expression of Interest & Tender Applications for Councils and Private Entities - Liason with Clients and Sub-consultants - Administrative tasks

2013

Architectural Intern - ID Architects, Singapore - Drafting - Presentation graphics - Assisted with interior design schemes

2008

Work Experience - Tonya Hinde Interior Design, Melbourne - Drafting - Bathroom design - Administrative tasks

4

AWARDS 2011 2010

Shortlisted for Top Designs - Unit 3 work Highest Achiever in Visual Communications and Design for the Class of 2010

INTRODUCTION


CAD SKILLS Beginners

REVIT Rhino / Grasshopper Vray

IntermediateAdvanced

Sketchup Vectorworks AutoCAD Adobe Photoshop Adobe Illustrator Adobe InDesign

WORK HISTORY 2014-2015 2012 2010-2012 2010-2012 2008-2011 2008-2009 2008

5

Jewellery design & production - Nothing From Nowhere Sales Assistant - Jeanswest, Box Hill Team Member - Salsas Mexican Grill, Ringwood Law Clerk - ML Law Hub, Blackburn Piano Teacher Team Member - New Zealand Natural, Ringwood Sales Assistant - Virgin Music, Ringwood

OTHER QUALIFICATIONS

2012 2010

Victorian Drivers License Fluent in writing, reading and speaking English Basic in writing, reading and speaking Mandarin Leadership roles at “Student Life”, a Melbourne University Student Union club Certificate III in Hospitality Certificate IV in Business Administration Senior School Leader - Oxley College

THINGS I DO FOR FUN Photography, weaving, necklace making, cheese consuming, crafting, piano & ukelele playing

INTRODUCTION



D

E

S

I

G

N 7

2011-2015 INTRODUCTION


S 8

tacks on! is a bold studio tackling social housing in Melbourne’s inner city suburbs. This studio reimagines the current Carlton Social Housing site as a place where the public and private housing developments do not remain separate. Public architecture such as libraries, pools, sports centres and childcares provide amenities for onsite and surrounding residents and the hotel and office tower allow private sector profits to fund public housing. The architecture is colourful and ornate, attempting to address the smallest human scale all the way to the largest monumental civic scale. One message is clear: build quality!

Monique Woodward & Simon Linardi RMIT UPPER POOL STUDIO // 2015

DESIGN STUDIO


9

DESIGN STUDIO


10

DESIGN STUDIO


11

DESIGN STUDIO


T 12

his studio is a six-week intensive run as an Upper Pool RMIT studio, where students explore the relationship between filmmaking and architectural discourse. Over the six weeks, we explored digital fabrication controlled by Grasshopper scripts creating a logic for clay extrusion by a Kuka robot. We travelled to Bangkok in order to fabricate our architecture, studying under Francois Roche and Camille Lacadee of New Territories, and further wrote, directed and filmed a movie with the architecture playing a key role in conveying a scenario. The finished film, entitled ‘emet’ can be viewed at: https://vimeo.com/131708676

Gwyllim Jahn, Francois Roche & Camille Lacadee RMIT UPPER POOL STUDIO // 2015

DESIGN STUDIO


13

DESIGN STUDIO


T

he brief was to design a theatre based on the Sherlock Holmes series, by Sir Arthur Conan Doyle, to be situated at the corner of Spencer and Bourke Streets in Melbourne’s CBD. The building comprised of a 250-seat cinema, a 250-seat black box theatre and a 500-seat proscenium theatre, as well as a restaurant and bar, and ample functional back of house services including dressing rooms, offices, rehearsal spaces and a carpentry workshop.

14

The final design shown here was inspired by the classic film noir image of the proganist pulling back the blinds and peeking through to see glimpses of the mysterious figures on the other side.

Derham Groves & Anthony Windust UMELB STUDIO: FIRE // 2013

DESIGN STUDIO


15

DESIGN STUDIO


KITCHEN RESTAURANT & BAR

RESTAURANT & BAR

BIO BOX

CINEMA

CINEMA

VISITOR & DIRECTOR’S OFFICES DRESSING ROOM

PROSCENIUM THEATRE MANAGEMENT

16

DRESSING ROOM WARDROBE

PROSCENIUM THEATRE

DRESSING ROOM BIO BOX

PROSCENIUM

STAGE & FLY TOWER BACKSTAGE WORKSHOP DRESSING ROOM

WINGS

REHEARSAL SPACES

BLACK BOX THEATRE

BLACK BOX THEATRE

DRESSING ROOM WARDROBE

Main Spaces

Public vs. Private Areas

DESIGN STUDIO


PUBLIC RAMP

Spencer Street Elevation

17

PUBLIC STAIRS

STAFF STAIRS

MAIN ENTRANCE

Bourke Street Elevation

STAFF LIFT

PUBLIC LIFT

LOADING DOCK

Circulation of Spaces

Godfrey Street Elevation

DESIGN STUDIO


T

his was a design for a highway installation commissioned by Wyndham City. Our design approach was to focus on biomimicry. We decided to incorporate Arduino sensors into our design to allow this architectural installation to become interactive and functional.

18

B

.E.R.T. (Biological Environmentally Responsive Transients) are fictional organisms that behave according to information received from several data sources. This data includes: traffic volume, rainfall and air pollution levels (carbon dioxide levels), These B.E.R.T. organisms present the data in an abstracted way within an online space that shows these organisms projected onto the physical cage structure found on site at Wyndham city. Thus, this project has a two fold approach, the first being the physical (cage structure) and the second being the virtual (Arduino sensors + website visualisation).

Stanislav Roudavski, Gwyllim Jahn & Angela Woda UMELB STUDIO: AIR // 2013

DESIGN STUDIO


19

DESIGN STUDIO


20

DESIGN STUDIO


21

DESIGN STUDIO


T

he ‘boathouse’ is a restaurant, cafe, kiosk and boat hire centre that also includes an administration office, all stationed by the Yarra River. Our studio studied the ‘master’ Mies Van Der Rohe, whose minimalist, rectilinear, clean style utilizing industrial materials of steel and glass was the inspiration behind this project. The design idea behind this boathouse was to frame different views, achieved primarily using platforms at varying heights.

22

Jianfei Zhu & UMELB STUDIO: WATER // 2012

DESIGN STUDIO


23

DESIGN STUDIO



W

O

R

K 25

INTRODUCTION


T

hese images were created during the sketch design phase of this project both for WOWOWA’s web portfolio and for client presentation.

26

WOWOWA Architecture & Interiors 2015

WORK EXPERIENCE


27

WORK EXPERIENCE


T

his is a selection of documentation that I produced during the time I worked as a Student Architect at Williams Boag architects. I worked on various teams under the leadership of several different project architects. The following drawings were part of packages for a residential refurbishment and a child care & community centre. These were produced on Vectorworks.

28

Williams Boag Architects 2014

WORK EXPERIENCE


Note: refer cover sheet for drawing legend NOTES: ALL GAPS & CRACKS TO NEW WINDOW / DOOR FRAMES ARE SEALED ON CONSTRUCTION. ALL NEW WINDOWS AND EXTERNAL DOORS ARE SEALED AND WEATHER STRIPPED. DOOR / WINDOW ELEVATIONS FROM EXTERNAL VIEW - UNLESS OTHERWISE NOTED. ALL GIVEN DIMENSIONS TO BE CONFIRMED ON SITE. 500

W01

1610 NEW OPENING

LOCATION

W07

A

GROUND FLOOR BATHROOM U-VALUE: 5.75 SHGC: 0.69

DETAILS

50 W06

W02

W06

W08

WORKSHOP

LIGHT SHAFT SKYLIGHT

TWO EQUAL PANELS BIFOLD WINDOWS

BREEZWAY ALTAIR 152 MANUALLY OPERATED LOUVRE WINDOWS WITH RING PULL IN ALUMINIUM FRAME

U-VALUE: 5.75 SHGC: 0.69

U-VALUE: 7.32 SHGC: 0.77

EQ

EQ

EQ

EQ

2746

EQ

EQ

1570

EQ

EQ

40

W04 D08

STEEL COLUMN POSITION BEHIND

1490

40

1400

W07

2100

2100

D07

LOW PROFILE SILL FLUSH WITH FLOOR

700

920

STEEL LINTEL POSITION BEHIND

NEW BRICKWORK TO MATCH EXISTING

152MM LOUVRE PANELS

KITCHEN

5315 CONFIRM ON SITE

NEL

50

W08

FIXED PANEL IN GLAZING CHANNEL RECESSED ALL ROUND U-VALUE: 5.75 SHGC: 0.69

EQ

610

710 FLUSH WITH BENCHTOP

200 DOOR / WINDOW NUMBER

710

50

FLUSH WITH CUPBOARD SIDE

930

G NG

50

3480 (TBC ON SITE)

650

W02

1160

2360

W01

EQ

1385

710

CORNER DETAIL

810

EQ

590

1000

1570 OVERHEAD CUPBOARDS

2435

MEETING LOCKING EDGE

MEETING LOCKING EDGE

DOOR / WINDOW NUMBER

W04 & D08

D07

LOCATION

CORRIDOR

LIVING ROOM

WORKSHOP

DETAILS

CORNER DOOR - PANEL SIZE OF D07 & D08 TO MATCH, MEET AND LOCK AT CORNER HAFELE JUNIOR TRACK 80/Z

CORNER DOOR - PANEL SIZE OF D07 & D08 TO MATCH, MEET AND LOCK AT CORNER HAFELE JUNIOR TRACK 80/Z

ALUMINIUM FRAME FITTED WITH TWO 'ANEETA' DOUBLE GLAZED SASHLESS WINDOWS. SPECIAL EXTERNAL SECURITY SHUTTER SCREENS BY CLIENT INSTALLED ONTO FRAME - 4 EQUAL FRAMES.

U-VALUE: 5.75 SHGC: 0.69

W07

U-VALUE: 5.75 SHGC: 0.69

720

1585 EQ

960

720

EQ

1585 EQ

960 EQ

DOOR / WINDOW NUMBER

D01

LOCATION

FRONT DOOR

BEDROOM 1

DETAILS

NEW VICTORIAN 4 PANELLED DOOR FITTED TO EXISTING FRAME REUSE EXISTING DEAD LOCK NEW DOOR FURNITURE PAINT FINISH

'AP' SHUTTER 64 WIDE BLADE SET INTO 80 X 35MM HARDWOOD FRAME. HAFELE JUNIOR TRACK 80/Z.

NOTE: HEIGHT OF EXISTING OPENING IN FRONT WALL TBC ON SITE AND DOORS CONSTRUCTED TO SUIT

D02

'FORCEFIELD' PATENTED WOVEN STAINLESS STEEL SECURITY 11MM SECURITY WINDOW FRAME SET INTO 80 X 35MM HARDWOOD FRAME. HAFELE JUNIOR TRACK 80/Z. U-VALUE: 5.75 SHGC: 0.69

600

1810 880

50

D03

LOCATION

BEDROOM 1

DETAILS

FUTURE SCREEN TO FUTURE DETAIL HAFELE JUNIOR TRACK 80/Z

D04

SATIN CHROME FLUSH PULL ON LEADING EDGE AND CIRCULAR FLUSH PULL, SET DEAD FLUSH WITH DOOR SURFACE

800

2100 SPECIAL SCREEN TO DETAIL

2000

D03

2250

2700

50 50

880

40

920

2590

450

880

G & PAINT INTERNAL BRICK LL INCLUDING NEW FACE CK FORMING WINDOW ENING

DOOR / WINDOW NUMBER

30-10-14 04-09-14 03-09-14 29-08-14 27-08-14 25-08-14 18-07-14 14-07-14 Date

c05 c04 c03 c02 c01 c01 p01 No.

LAUNDRY DETAILS DOOR & WINDOW NOTES DOOR & WINDOW NOTES DOOR & WINDOW SCHED FOR CONSTRUCTION FOR CONSTRUCTION FOR INFORMATION FOR ISSUE Amendments

1000

50

D05

SATIN CHROME LEVEL HATCH

920

40

D06

DEAD LATCH OPERATION, KEY SHAPE TO D01

800

1350

2360

1350

800

1350

29

CL

2250

2100

D02

800

2250

800

800

DOOR HANDLE BY CLIENT, REUSE EXISTING DEAD LOCK

1401

SATIN CHROME FLUSH PULL ON LEADING EDGE AND CIRCULAR FLUSH PULL, SET DEAD FLUSH WITH DOOR SURFACE

CL

CL

D01

VISIBLE PART OF FRAME TO BE 80MM. TOP / END RAIL TO SUIT SLIDING TRACK AND PELMET COVER.

D02

2100

2100

259

150

725

150

ALUMINIUM FRAME FITTED WITH 2 X DOUBLE HUNG WINDOWS WITH SCREEN PROVIDED BY CLIENT EXTERNALLY

U-VALUE: 7.32 SHGC: 0.77

D04

D05

D06

BEDROOM 1

BATHROOM

DINING / COURTYARD 1

CAVITY SLIDER FLUSH PANEL PAINT FINISH HAFELE JUNIOR TRACK 40/Z

TIMBER FRAMED DOOR FITTED WITH DOUBLE GLAZED 'ANEETA' SASHLESS WINDOW WITH ALUMINIUM GUIDES. NOTE: DOOR TO BE FULL HEIGHT. CONFIRM HEIGHT ON SIZE FOLLOWING DEMOLITION

RD WALL

Williams Boag Architects Williams Boag Architects 51 Leicester Street Carlton 3053 51 Leicester61.3 Street Carlton Telephone 9388 6000 3053 Facsimile 61.3 9388 6060 Telephone 61.3 9388 6000 Facsimile 61.3 9388 6060 Email intray@williamsboag.com.au Email intray@williamsboag.com.au Williams Boag Architects Level 1/43 Williamson Street Bendigo 3550 Telephone 61.3 5441 7855 Facsimile 61.3 5441 7436 Email intray@williamsboag.com.au

U-VALUE: 7.32 SHGC: 0.77

Project

HOLDING ALTERATIONS

20 FERGIE ST, NTH FITZROY

770

50

ROUTED FINGER GRIP 10MM DEEP

DOOR / WINDOW NUMBER

800

CL D09

SATIN CHROME FLUSH PULL ON LEADING EDGE AND CIRCULAR FLUSH PULL, SET DEAD FLUSH WITH DOOR SURFACE

D10

2100

D10

800

EXTERNAL PIVOT HUNG TOP & BOTTOM

2100

2190

D11 D09

TO SUIT NEW CEILING HEIGHT DEAD LATCH OPERATION, KEY SHAPE TO D01

Status

WBa Drawn 1:100@A1 Scale Drawing No.

N

LIVING ROOM / CORRIDOR

WORKSHOP

CORRIDOR / BACK DOOR

DETAILS

FROM CORRIDOR SOLID CORE FLUSH PANEL

HAFELE JUNIOR TRACK 80/Z. FLUSH PANEL DOOR WITH REMOVEABLE TOP PANEL.

GLASS LOUVRES U-VALUE: 7.32 SHGC: 0.77

Revision

WORK EXPERIENCE

Checked WBa

D11

LOCATION

c05

11-001

JOINERY DETAILS & DOOR / WINDOW SCHEDULE FOR CONSTRUCTION

a604 c05

ng prepared with VectorWorks-15.0.4 for Macintosh

TO SUIT CORRIDOR WIDTH WALL TO BIFOLD DOOR

Title

Monday, 27 June 2011 5:09:01 PM • File: WBa DRAWING TEMPLATE.vwx • Drawi

Project No. OPERABLE LOUVRE PANEL OVER

Plot Date:

1350

40 450

1100 APPROX.


EXISTING FENCE & GATE WITH BLUESTONE FOOTING

GENERALLY DOUBLE BRICK CONSTRUCTION

OPERABLE SHADE AWNING ABOVE

FENCED LANDSCAPE/GARDEN

GAS METER

GARDEN BED

BED 1

XD05

TIMBER

XD03

FFL AHD 32.12

COURT 1

XW02

TILE

DECKING

XD08

KITCHEN STUDY

SHELF

DECKING

VERANDAH

TILE

ROBE

5070 FERGIE STREET

FFL AHD 32.12

XD06

XD07

XD02

STORE

CT

XD04

XW01

BATH

TIMBER

DINING

TIMBER

FRIDGE TIMBER

HALL XD01

FFL AHD 32.13

FFL AHD 32.13

TIMBER

SKYLIGHT OVER

33920

LOW LEVEL BULKHEAD

01

Existing Ground Floor Plan

BULKHEAD

VAULTED CEILING OVER

DEMOLISH WALL, BATH, BASIN & WC. RETAIN BATHROOM HOOKS AND RELOCATE TO FIRST FLOOR BATHROOM.

DEMOLISH FLOOR TILING TO CEILING SPACE ABOVE BATHROOM: REMOVE OLD DUCTED HEATING SYSTEM INCLUDING DUCT AND ALL RESISTERS AND GAS HOT WATER DEVICE

REMOVE SHUTTERS & RETAIN AND REHANG FRENCH DOORS

DEMOLISH LOWER TWO STEPS ONLY

DEMOLISH DECKING

REMOVE JOINERY

DEMOLISH WALL, DOORS & JOINERY NOTE: RETAIN SHELVING FOR USE IN WORKSHOP AREA

DEMOLISH WINDOW

DEMOLISH DOORS, WALLS & JOINERY

GARDEN BED

BATH

COURT 1

STORE BED 1 KITCHEN

30

DINING

DECKING

VERANDAH

STUDY EXTENT OF VAULTED CEILING

HALL RETAIN HALLWAY DECORATIVE ARCH

REMOVE SHELF HERE REMOVE SLIDING DOORS, TRACK & PELMET DEMOLISH BULKHEAD HERE

02

Ground Floor Demolition Plan

RETAIN EX. DISHWASHER AND RELOCATED TO WORKSHOP

DEMOLISH VAULTED SECTION OF EX. CEILING & TIMBER VENEER PANELS

REMOVE EXISTING SUNSHADE

XD05

STUDY TIMBER

DECKING

TIMBER

DINING FRIDGE TIMBER

HALL XD01

FFL AHD 32.13

FFL AHD 32.13

TIMBER

RE-TAIN EX. AND RE-DIRECT EXISTING SKYLIGHT OVER

01

FFL AHD 32.12

COURT 1

KITCHEN

ROBE

XD03

XW02

1160

FFL AHD 32.12

TILE

SHELF

DECKING

VERANDAH

TIMBER

TILE

Roof / Level 1 Demolition Plan NOTE: LEVEL 1 DEMOLITION PLAN SHOWN WITH GROUND FLOOR ROOF DEMOLITION PLAN.

WORK EXPERIENCE

615

BED 1

XD06

XD07

XD02

STORE

CT

XD04

XW01

GARDEN BED

BATH

ALLOW FOR NEW SKYLIGHT

XD08

EXISTING


Note: refer cover sheet for drawing legend

ROLLER DOOR OVER

REMOVE OPERABLE SHADE AWNING ABOVE INCLUDING ALL TRACKS AND GUIDES

AHD 31.87

GARDEN BED

PVC HYDR PIPE AT GROUND LEVEL

AHD 31.67

XW03

AHD 31.62

FFL AHD 31.49

COURT 2 WM / DRYER

FFL AHD 32.12

TIMBER

XD10

FFL AHD 31.54

XD14

DECKING

XD09

LIVING

GARAGE CONCRETE

STAIR 1 XW04

CARPET

CORRIDOR XD11

STAIR 2

FFL AHD 32.13

TIMBER

XD12

XD13

FFL AHD 31.68

CONCRETE FFL DP AHD 32.03

REAR LANEWAY ACCESS

BULKHEAD

5110

LOW LEVEL BULKHEAD

PATH

FFL AHD 31.51

CONCRETE

FFL AHD 31.85

BOUNDARY LINE

EXTENT GLAZED ROOF OVER

TIMBER FRAMED SLIDING GLAZED DOORS

EXISTING DOWNPIPE

DEMOLISH TIMBER SLIDING DOORS DEMOLISH EX. TIMBER DECKING RETAIN STEEL CHANNEL IN PLACE DEMOLISH WALL FROM 560mm AFFL TO NOMINATED LEVEL, REFER ELEVATIONS

GARDEN BED

RETAIN EXIST PVC SWD PIPE AT GROUND LEVEL

DEMOLISH SECTION OF WALL TO UNDERSIDESTRINGER LEVEL ONLY

c02

COURT 2

GARAGE

DEMOLISH EX. ROLLER DOORS

LIVING STAIR 1 04.09.14 27-08-14 25-08-14 11-08-14 05-08-14 22-07-14 18-07-14 14-07-14 Date

CORRIDOR PATH DP

GENERAL: SAND BACK ALL EX. TIMBER FLOORING

RETAIN COLUMN & BEAM OVER

RETAIN EXISTING B/H

ROOF

EXISTING WIDE GUTTER

RETAIN AND PROTECT EXISTING TREE

REMOVE EXISTING TIMBER FLOOR

c02 c01 c01 p02 p02 p02 p01 No.

31

DEMO PLAN UPDATE FOR CONSTRUCTION FOR CONSTRUCTION SOLARATE CALCULATION FOR INFORMATION SOLARATE HEAT CALC FOR INFORMATION FOR INFORMATION Amendments

REMOVE EXISTING STEPS AND CONCRETE SLAB

RETAIN EXISTING DOWNPIPE

NOTE: FULL EXTENT OF WORK MAY NOT PROCEED TO ENSUITE - NO DEMOLITION TO TAKE PLACE UNLESS DIRECTED, EXCEPT BASIN REMOVAL & REPLACEMENT

LINE OF WALL UNDER REMOVE EXISTING AUTO SUN BLONDS, GUIDE RAILS AND HOUSING

DEMOLISH EX. FLOOR & WALL TILING

XW04

XD15 FFL AHD 31.54

STAIR 1

RETAIN EXISTING SPLIT SYSTEM

XD16

CARPET

CORRIDOR XD11 TIMBER

REMOVE GLAZING FROM GLAZING BARS AND RETAIN STRUCTURE INCLUDING GLAZING BARS

FFL AHD 32.13

EXISTING BAY WINDOW RETAIN & REPAINT

CONCRETE

STAIR 2 XD12

CONCRETE FFL DP AHD 32.03

FFL AHD 31.68 FFL AHD 31.85

Project

20 FERGIE ST, NTH FITZROY Project No. Title

XD13 PATH CONCRETE

FFL AHD 31.51

DEMOLISH PART OF EX. SLOPING ROOF

HOLDING ALTERATIONS

Status

11-001

EXISTING

CONDITIONS & DEMO PLANS

FOR CONSTRUCTION

WBa Drawn 1:100@A1 Scale Drawing No.

Checked WBa

N

a101 Revision

WORK EXPERIENCE

c02

ng prepared with VectorWorks-15.0.4 for Macintosh

XD10

GARAGE

ENSUITE

Monday, 27 June 2011 5:09:01 PM • File: WBa DRAWING TEMPLATE.vwx • Drawi

TIMBER

WM / DRYER

XD14

XW06

FFL AHD 32.12

XW05

XD09

DECKING

Williams Boag Architects Level 1/43 Williamson Street Bendigo 3550 Telephone 61.3 5441 7855 Facsimile 61.3 5441 7436 Email intray@williamsboag.com.au

Plot Date:

FFL AHD 31.49

BEDROOM COURT 2

LIVING

Williams Boag Architects Williams Boag Architects 51 Leicester Street Carlton 3053 51 Leicester61.3 Street Carlton Telephone 9388 6000 3053 Facsimile 61.3 9388 6060 Telephone 61.3 9388 6000 Facsimile 61.3 9388 6060 Email intray@williamsboag.com.au Email intray@williamsboag.com.au

RETAINPVC EXIST HYDR PVCPIPE SWD ATPIPE GROUND AT GROUND LEVEL LEVEL

AHD 31.67

REAR LANEWAY ACCESS

GARDEN BED

XW07

AHD 31.87

XW03

AHD 31.62


EXISTING

DP

CARPARK

D

A301

3500

DP

1 5700

3100

420

1500

600

0 300 20

02

601 20

FW

2

DP 1300

OMMUNITY ROOM 1

GROMET HOLES

750

250

420

420

300

610

750

600

FIX PIN BOARD TO INSIDE FACE OF DESK SOLID END ABOVE DESK

LINE OF WINDOW BEHIND PB WALL SHOWN DASHED

DP

600 100

W01

NOM. 2780

DP

70

450 70

601

1째

1810

2800

33mm THK SOLID END & BACK PANELS

08

A101

CONS. ROOM 11

EXIS

A601

T EI N A301

G

425

EQ

KITCHENEETE

100 600

EQ

EQ

AS

RAIL

ELEVATION

MW TL1

750

11

A601

CONS. ELEVATION ROOM 11 STAFF ROOM EQ

EQ

945 CUPB'D

RETURN TILES TO WINDOW REVEALS (TYPICAL)

BUILDING

A

TL1

A

CL

GPO

FS

NEW INTERNAL DRAWER

OFFICE

CL

GPO

AS

DP

CONS. ROOM 10

SK1 FILE DRAWERS WITH INTERMEDIATE PARTITIONS

2700

J03 OPEN SHEL WITH LAMINATE F MATCH FRIDGE W

CL

DP

FS 600

100 2000

D03

1000 1520

EXISTING CUPB'D

REM

EXISTING BENCH

800 W60

TL1

GL9 GL3

B C

B B

W60

DP

A

PTD

FW

GL3

B B A

800

EQ PTD

850 C C 5 L C 5 L 42 CL 425 L 42

A A301

14

WC

A601

EQ PTD

A

ELEVATION

15

WC 4

A601

16

WC 4

A601

1100

S

LOCKER

PLAN

WC4/ROOM 3

STORE 2

J06

J08

19 90 380

B A301

C-5

MULTI PURPOSE ROOM 2 PB1

F A301

STAFF ROOM

C-5 CL

C-31

601

EYEHOOK

DP

PB1

EYEHOOK

PIN PB1

C-5

18

PB1 TL1

2010

E A301 J01

AS

18 KITCHEN A601

ENTRY 7

ELEVATION ROOM 3

A A301

FW

FW

AS

600

13

A101

350

STERILIZING ROOM

WC 4

30

2367 6 No. EQ LOCKERS

ELEVA

FHR IN FULL-HEIGHT CABINET INTEGRATED WITH JOINERY UNIT. ENSURE COMPLIANCE WITH CODE

580 9 No. EQ

4355 12 No. EQ LOCKERS

350

A

ELEVATION

2450

EAR 1500 CL

URPOSE ROOM ONS. ROOM 7 2

A

DP DP

PROVIDE ADDITIONAL BLOCKING TO SUPPORT EYEHOOKS

CLEANER STORE 370

C

A

CONTINUE C-5 PAINT COLOUR ON WEST WALL

840

J06

GL3

MULTI PURPOSE ROOM 1

802

NOM.

GL9

RF3 COVED SKIRTING TO ALL WALLS

02

J06

GL9

A

A

C

EQ

A

16

200 WB

NEW 25mm THK SIDE PAN LAMINATE FINISH TO MA EXISTING BENCH & CUPB PROVIDE NEW HANDLES

B

C

601 15

25

DP

EQ

17

50 600

C

X-RAY

D

ANT ROOM ENTRY 6

EQ

EQ

800

MULTI PURPOSE ROOM 1 ONS. ROOM 6

IVITIES OM 1

EQ

A

450

ONS. ROOM 8

W61

14

DENTAL OFFICE

ENTRY 7

EQ

ELEVATION

900 EQ

RESOURCE ROOM

FW

EQ

OVEN

AS

100

ONS. ROOM 5

1000 W41

OFFICE 1

EQ

AS

PB1

GL3

C 09 A301

FW

DP EQ

MSSB

B A301 PLAN

GL3

700 PTD

CONS. ROOM 10

09

601

100

DP

W41

FL 65.06 1100

CONS ROOM 9

515 W61

PB1

1033

ONS. ROOM 4

AS

WAITING ROOM 1

1530

2000 W41

RECEPTION

D03

450

32

W61

AS

M'WAVE

AS

05

06

300 300 300 33

W41

AS

A601

65.

PB1

AS

900

FL

515

WAITING ROOM 1

AS

AS

RECEPTION AREA

DP

WAITING ROOM 2

AS

AS

3200

DP

FW

600

TL1

EQ

300

KITCHEN & ROOM 1 READING NOOK

AS

W48

800

600 J01

PLAN

DP

1500

04

TL1 RETURN TILES TO SIDE WALL TO DEPTH OF BENCH

07

06

EXISTING BUILDING A101

600 J10

FW 1 COMMUNITY ROOM DP

601 J01

ENTRY 2

DP

20

COMMUNITY ROOM 1

05

601

FRIDGE

3280 J01

600

EQ

300

600 J04

TL1 SPLASHBACK 300mm H x 600mm ABOVE BASIN

EQ

PB1

SERVERY SLIDING DOOR

OFFICE 1

J08

100

680

3200 J01

CL

870

CONS. OOM 11OFFICE 1

800 J10

800 W48

W51

900 J04

30

A301

2000 J10

1200

300

BULKHEAD

1200 W48

350 J10

J04

J01

FIXED PANEL

600

J10 OVER

W48

CONS ROOM 1 350 J08

CONS C ROOM 2

600J01 & 04

CONS ROOM 3

OPEN SHELVING W LOUVRE SLOTS FO VENTILATION FORF DRIVE & CABLE HO

ADMIN OFFICE / RECEPTION

A601

DP

SERVERY BENCH TOP TO PROJECT 20mm BEYOND THE LINE OF WALL LINING TO CORRIDOR SIDE

SWBD

RECEPTION

A101

2 No. FILE DRAWE 2No. PENCIL & 1No DRAWER

DP 02 ELEVATION

DP 1 ENTRY

PLAN

01

2100 W61

OOM 1 MCH OFFICE 4

SWBD

2850

1000 MSB

900

SERVERY & DISPLAY

2300 W60

450 70

03 10

PIN

93

169째

710

0

NOM. 324

FW DRESSED SOLID TIMBER KDHW RETURNS TO ENDS OF RECEPTION SERVERY & DISPLAY

200

J11

DP

1073

350

FW

450

DP

PIN

1250

SWBD

PB1 J02

WORK EXPERIENCE

DP

EQ

ACTIVITIES ROOM 1

DP

EQ 2010

DP

ENTRY 6

EQ

D A301

EQ

ALL CUP TO BE LO


8970

5330

A

1

2 5700

J11

D

PB1 140

A301 GL3

W43

775

D07

PB1 FOLDED ALUMINIUM COVER PLATE

W45

D08

W46

E

A301 GL3

GL10 450

ER o. FILE

450

700

1200

PIN

460

GL3 D05

515 W46

PB1

GL3

1073

1000

1600 1100

70 320 70

C

GL3

5650

GL3

640

1530

FRONT EDGE OF TIMBER FOLDED CEILING

GL3

GL10

A301

REM

8970

MSSB

03

SK1 420

SLIDING DOOR 580

A601

70mm THK KDHW DRESSED TIMBER BENCH & FRAME TO COUNTER

ELEVATION

OPEN SHELVING WITH LOUVRE SLOTS FOR VENTILATION FOR HARD DRIVE & CABLE HOLE TO SIDE

300

720

587

B

2No. PENCIL & 1No. FILE DRAWER

D

ADMIN OFFICE / RECEPTION

PB1

W01 PIN

OPEN SHELF

WITH OR RFW HARD OLE TO SIDE

5330

DRESSED KDHW TIMBER CANOPY & FRAME TO COUNTER

515 W43

640

02 201

A301 B

SLIDING GLASS WINDOWS (WN6)

1530

363

701

A

4 3320

710

B

3

C

14280

14280

ELEVATION

20

DP

ADMIN OFFICE/RECEPTION

A601

FIXED PANEL

10

EQ

20

250 CLEAR

DP

550

KITCHENEETE

25 10 SHADOWLINE 1975

STAFF ROOM

601 11

E

A

C

C

MR

B C

C

B

B

MR

MR

100 TPH

200PTD

EQ SD EQ SD EQ SD EQ SD CL

1000 PARTITION

WC 4

J12

C-5

DP

A A301

DP GL9

EQ

NOM. 580

F

GL3 GL3

NOTES:

2300 W60

GL9

Status

13-053 INTERNAL ELEVATIONS SHEET 01

2. REFER TILING LAYOUT IN SPECIFICATION FOR TILE COLOUR LOCATIONS Revision

DP

Checked

KF

DP

DP

800 W60

ROOM 3

c03

F A301

N

E A301 FW

DP

FW

D

FW

A A301 DP

WORK EXPERIENCE

E

MSB

FW

9600

B A301

FOR CONSTRUCTION

a601

1. PROVIDE SOLID BLOCKING BEHIND ALL FIXINGS.

ELEVATION

C

ASHBURTON

Project No.

DY Drawn Scale 1:50 @ A1 Drawing No.

100

AS

EQ

200

AS

AS

100

AS

AS

EQ

19

STAFF ROOM

GL3

AS

CRAIG CENTRE

DP Title

100

W60

900

2450

EYEHOOK CENTERED ON COL

EYEHOOK

TL1

A601

PLAN

300

EYEHOOK CENTERED ON COL

100

EYEHOOK

E

10

A101

E A301

PBOARDS LOCKABLE

05 401

EQ

CL

A A301 FAMILY

Project

FHR & COLUMN WITHIN FULL-HEIGHT 'CABINET' INTEGRATED WITHIN JOINERY UNIT

PROVIDE ADDITIONAL BLOCKING TO SUPPORT EYEHOOKS

D

Williams Boag Architects 51 Leicester Street Carlton 3053 Telephone 61.3 9388 6000 Facsimile 61.3 9388 6060 Email intray@williamsboag.com.au Williams Boag Architects Level 1/43 Williamson Street Bendigo 3550 Telephone 61.3 5441 7855 Facsimile 61.3 5441 7436 Email intray@williamsboag.com.au

DP

J12

ELEVATION

PB1

STEEL COLUMN. PAINT FINISH

DP

DP

PB2 BEHIND SHOWN DASHED

EQ

B F A301 A301

CL

9600

11450

17

FULL HEIGHT SHELVING UNIT SIMILAR TO DRAWING 12

600 BASIN

200

600

700 PTD

900 PAETITION

A B

C A301

E A301

C A

MSSB

A

A

B A301

DP

SIMILAR

33

BDG PERMIT CLARIFICATION TENDER CLARIFICATION FOR FW CONSTRUCTION Amendments

CLIENT PROJECT NO:

EX. BENCH 600

100 700 MR

B B

401

B B

c03 c02 c01 No.

101165 05

B

A

400 J03

DP

TL1

A

B

J03 OVER

DP

12

MSB

A601

A601

1135

701

NOTE: WEST SIDE SIMILAR

B

ATION

J01

J12

460

B

FW

C 15-09-14 23-07-14 07-07-14 Date

5650

EQ

ELEVATION

12

300

25 EQ 2675

B

FW

DP

DP

100

EQ

400 MR 400 400 MR 400 400 MR

CL

FW DP

C

B

ROOM 1 READING NOOK

DP

1000

800 WB

FW

10 SHADOWLINE 400

DP

JOINTS OF DRAWER FRONTS TO ALIGN WITH CUPBOARD DOORS ABOVE. 3 No. DRAWERS TOTAL

J04

40mm RADIUS TO TOP OF PARTITIONS

C

AS

AS

TL1

B

AS

AS

25mm LAMINATE SURROUND TO OPEN SHELVING WITH TIMBER EDGING.

F A301

AS

A A301

B

AS

451

AS

SELECT LAMINATE SHELVING WITH ABS EDGING

FW

AS

EX. BENCH 1945

D

NEL. ATCH B'D TO BE REUSED. S, LOCKS & SINK

AS

03

MIRRORED

AS

C A301

FS

A

SWBD

WB

5째

ELEVATION

A601

25mm THK A/A FACE PLYWOOD TO REVEAL SIDES

FW

FS

10

SK1 10mm SHADOWLINE TO BOTH SIDES

07

PB1

E A301

D A301

25mm THK LAMINATE VERTICALS WITH ABS EDGING TO ALIGN WITH CUPB'D DOOR JOINTS. TYPICAL FOR THIS UNIT

8970

701

J08

5650

J12

DP

AS

Plot Date:

ELEVATION

AS

8970

DP

3280

C A301

EXISTING CUPB'D TO BE REUSED

5330

EQ

20mm SHADOWLINE

10

EQ

11450

EQ

EQ

MSSB

EQ

7

5째

W51

11450

B A301 A601

5650

EQ

AS

2730

06

LVING UNIT FINISH. TO WIDTH.

EQ

FS

EQ

100

1830

AS

EQ

AS

300

EQ EQ EQ EQ 33

1600

C

DP

AS

800

1500 DOOR HANDLE

AS

1920 EXISTING UNIT EQ

100

650 400

2300 J04

450

500 350 100

850

TL1

DP

EQ

RETURN TILES TO SIDE WALL TO DEPTH OF BENCH

MSB

1050

WALL MOUNTED ZIP HOT WATER UNIT

GPO

DP

1370 J04 EQ

845

PB1

J04 SETOUT POINT OF NEW SHELVING & CUPBAORDS INTERNAL SOLID PANELS BEHIND CUPBOARD DOORS

25 EQ EQ EQ

A A301

CUTLERY TRAY TO TOP DRAWER

300

W

DP DP



C R E A T I V E 35

INTRODUCTION


36

From Collage to Architecture RMIT MASTERS ELECTIVE // 2015

CREATIVE WORK


37

CREATIVE WORK


38

Stacks-On Drawings RMIT UPPER POOL STUDIO // 2015

CREATIVE WORK


39

CREATIVE WORK


YOU


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.