RETAIL RESIDENTIAL FASHION SHOWROOM HEALTHCARE CONSTRUCTION DOCUMENTS COMPETITION
01
Located in Manayunk, Philadelphia, Drift is a Retail Store focusing on surfboards and skateboards. Inspired by the means of transportation which surfboards and skateboards provide, the design of this Retail Store follows the concept of movement. The goal is to display high-end products in a sophisticated environment by using rusticated materials which relates back to clients.
01
01
02
This project was completed in my Advanced Visualization course whose focus relied on 3D modeling and the result of realistic renderings. The goal for this project was to design a Studio Apartment by using and learning the program of Revit. The use of rusticated materials such as wood, brick, steel, and concrete was the inspiration driving the design for this space.
02
03
The purpose of this project was to design a Showroom for a fashion designer, this case being Rami Kadi. Inspired by the divergence of Rami Kadi’s collections, this Fashion Showroom is designed with the intent of giving the client two completely different experiences with the usage of contrasting architectural elements.
03
03
04
Cascade is a Dental office designed with the intent of creating a space that helps calm the human mind and body. Inspired by the motion of breathing, this Dental office is designed with the usage of continuous curved lines that will define aspects such as circulation, material usage, and design structures. This will help the patients feel at ease during their visit.
04
04
05
This section showcases my ability and understanding of how Contract Documents work. This project consisted of redesigning a building on the Thomas Jefferson University Campus and documenting its design for contractors to understand and build. The goal for this project was to learn how to put a construction document packet together by using the program of Revit.
05 1
2
3
4
5
DC
6
12
11' - 10 1/2"
1
1.
12' - 1 1/2"
2. 1
12
3. 12
12
12
12
4. 12
9' - 11"
1
3' - 11"
6' - 4 1/2"
0' - 11"
9' - 11"
2' - 9"
6' - 10"
1' - 0" 3' - 6"
9' - 0"
14' - 4 1/2"
5. 12
6. 10' - 0 1/2"
4' - 7"
7.
12
A 2
14
0' - 6 1/2"
6' - 2"
A 14
14
8.
14
19' - 10 1/2"
9.
12
12
10.
B
B
19' - 6 1/2"
11. 12. 13. 14.
1
15.
C
16.
C 9' - 1"
1
5' - 9"
GWB PARTITION: REMOVE ITEMS ATTACHED TO WALL SURFACE, SUCH AS BASE. REMOVE EXISTING DRYWALL. DISCONNECT AND REMOVE ALL MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT. REMOVE METAL FRAMING, TRACKS AND BRACING IN THEIR ENTIRETY. CMU PARTITION: REMOVE ITEMS ATTACHED TO WALL SURFACE, SUCH AS BASE. REMOVE EXISTING DRYWALL, IF ANY. DISCONNECT AND REMOVE ALL MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT. REMOVE CMU AND BRACING IN THEIR ENTIRETY. WALL FINISHES: REMOVE EXISTING WALL FINISHES, EXCEPT PAINT, TO SUBSTRATE. PREPARE SUBSTRATE/PAINTED SURFACES TO RECEIVE NEW FINISHES PER DIV 02 SECTION “ALTERATION PROJECT PROCEDURES.” CERAMIC TILE WALLS: REMOVE WALL TILE AND EXISTING GWB OR CEMENT BOARD SUBSTRATE AND INSTALL NEW SUBSTRATE APPROPRIATE TO RECEIVE NEW WALL FINISHED PER DIVISION 09 SECTION “DRYWALL SYSTEMS.” WHERE SO NOTED ON THE DRAWINGS, AREAS WHERE EXISTING CERAMIC TILE CAN BE COVERED BY NEW FURRING AND SUBSTRATE, THE EXISTING TILE NEED NOT BE REMOVED. LAY IN CEILING: REMOVE ALL CEILING TILES. DISCONNECT AND REMOVE ALL MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT SUPPORTED ON FRAMING GRID. REMOVE CEILING GRID AND HANGERS IN THEIR ENTIRETY. LAY IN CEILING & PLASTER CEILING: REMOVE ALL CEILING TILES. DISCONNECT AND REMOVE ALL MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT SUPPORTED ON FRAMING GRID AND IN PLASTER CEILING ABOVE. REMOVE CEILING GRID AND HANGERS IN THEIR ENTIRETY. REMOVE PLASTER CEILING AND SUPPORT HANGERS ABOVE LAY IN CEILING. GWB CEILING: REMOVE ALL EXISTING DRYWALL. DISCONNECT AND REMOVE ALL MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT. REMOVE CEILING FRAMING AND SUPPORTS IN THEIR ENTIRETY. PARTIAL CEILING: REMOVE EXISTING CEILING MATERIAL ONLY AS REQUIRED TO INSTALL NEW WORK ABOVE CEILING. STORE UNDAMAGED CEILING AND SUPPORT GRID FOR REINSTALLATION. REPLACE ALL DAMAGED MATERIAL IN KIND. FLOOR FINISHES: MECHANICALLY REMOVE EXISTING FLOORING AND UNDERLAYMENT MATERIALS TO CONCRETE SLAB IN THEIR ENTIRETY. SCARIFY CONCRETE AS REQUIRED TO REMOVE ALL ADHESIVE RESIDUE. THE USE OF REMOVAL CHEMICALS IS NOT PERMITTED. CERAMIC TILE FLOORS: REMOVE EXISTING CERAMIC TILE, MATS AND SETTING BED TO STRUCTURAL SLAB AND INSTALL UNDERLAYMENT TO RECEIVE NEW FINISHES. INSTALL UNDERLAYMENT PER DIVISION 03 SECTION “GYPSUM CEMENT UNDERLAYMENT.” CASEWORK: DISCONNECT MECHANICAL AND ELECTRICAL SERVICES. REMOVE CASEWORK CABINETS [AND TOPS] IN THEIR ENTIRETY. DOOR/FRAME/HARDWARE: REMOVE EXISTING DOOR, FRAME AND HARDWARE. [SALVAGE DOOR FRAME HARDWARE AS INDICATED.] WINDOW/FRAME/VISION PANEL: REMOVE EXISTING WINDOW, FRAME, SILL AND LENTIL. NEW DOOR/WINDOW IN MASONRY: INSTALL CONCRETE LINTEL IN MASONRY WALL AS DIRECTED BY STRUCTURAL ENGINEER. SAW CUT NEW OPENING IN MASONRY WALL SUFFICIENT TO INSTALL NEW HOLLOW METAL FRAME TO DIMENSIONS INDICATED. NEW DOOR/WINDOW IN GWB: REMOVE DRYWALL TO THE NEXT FULL STUD IN EACH DIRECTION. RELOCATE EXISTING MECHANICAL AND ELECTRICAL DEVICES, IF ANY. SAW CUT EXISTING METAL FRAMING SUFFICIENT TO INSTALL NEW BOX HEADER WITH TRACK AND DOUBLE JAMB STUD FRAMING TO STRUCTURE, EACH SIDE. INSTALL NEW WELDED FRAME PRIOR TO INSTALLING DRYWALL. STAIR: DISCONNECT AND REMOVE ALL MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT. REMOVE EXISTING STAIR, INCLUDING STRINGERS, TREADS, RISERS, PLATFORMS, SUPPORT FRAMING AND DEVICES AND RAILINGS IN THEIR ENTIRETY.
15 12
12
5' - 3"
12
1
1
1
1
General Notes 1. 1
2.
1
3.
D
D
4.
12 1
6' - 0"
1
5.
1
6. 7.
30' - 5"
12' - 0 1/2"
23' - 1 1/2"
8. 9. 10.
E
E
Demolition Plan
F Course
1
2
3
4
5
6
Semester Student Instructor
1
First Floor_Demolition_Plan 3/16" = 1'-0"
INTD 308 CAD 2 Fall 2017
Daniela Cintron Jake Tucci
A101
12/11/2017 6:53:05 PM
F
11.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND POSTING ALL REQUIRED LOCAL AND STATE CONSTRUCTION PERMITS. VERIFY ALL EXISTING FIELD CONDITIONS ARE CONSISTENT WITH THE DOCUMENTS BEFORE PROCEEDING. REPORT INCONSISTENCIES TO THE ARCHITECT. ACCESS TO AREAS OUTSIDE THE PROJECT AREA LINE SHALL BE COORDINATED IN ADVANCE WITH THE OWNER. ALL UTILITY SHUT DOWNS OR SUSPENSION OF MECHANICAL OR ELECTRICAL SERVICES SHALL BE SCHEDULED IN ADVANCE WITH THE OWNER. UNLESS OTHERWISE NOTED ON DOCUMENTS, ALL PAINTING SHALL BE FROM A CORNER TO A CORNER AND CEILING TO FLOOR REGARDLESS OF AREA ACTUALLY DISTURBED. WHERE CERAMIC TILE EXISTS WITHIN A SCHEDULED WALL PAINT FINISH AREA, THE TILE SHALL NOT BE PAINTED. MECHANICAL AND ELECTRICAL DEVICES, FIXTURES, PANELS AND EQUIPMENT INSTALLED IN FINISHED SPACES SHALL BE INSTALLED SO ONLY THE DEVICE, FIXTURE OR EQUIPMENT IS EXPOSED. NO PIPE, DUCT, CONDUIT, WIRE OR OTHER SUCH ELEMENT SHALL BE EXPOSED. PRIOR TO SCHEDULED FINISHING OF EXISTING WALLS, REPAIR MINOR DENTS, IMPERFECTIONS AND SCRAPES. NEW CEILINGS SHALL BE SUSPENDED FROM STRUCTURAL ELEMENTS AND BE INSTALLED PER DIVISION 09 SECTION “DRYWALL SYSTEMS.” NEW WALLS SHALL BE ERECTED AS INDICATED AND PER DIVISION 09 SECTION “DRYWALL SYSTEMS.” NEW UL RATED WALLS SHALL BE ERECTED BY HOURLY RATING PRIORITY IN DESCENDING ORDER AND SHALL BE ERECTED PRIOR TO NON-RATED WALLS. UL RATED WALLS INTERSECTING EXTERIOR WALLS SHALL BE EXTENDED THROUGH TO THE EXTERIOR SHEATHING. REMOVE EXTERIOR WALL AS REQUIRED TO PROPERLY INSTALL AND REPAIR IN KIND.
Jefferson University
10' - 6"
4201 Henry Avenue Jefferson University, Philadelphia, PA, 19144
10' - 6"
1
On-Campus Daycare Center
4' - 7"
KEYED DEMOLITION NOTES 13
2
3 20' - 0"
20' - 0"
3 5
21' - 5"
21' - 5"
22' - 4"
18' - 10" 110
111
Mana er s Office
7' - 0"
OPEN CUBBIES
Restroom 1a
1a
112
112
Loun e Area
Infant Class Room 4' - 9 1/2"
109
6' - 0"
22' - 4"
24' - 1"
FLOATING CEILING ABOVE
9' - 5"
11' - 2"
111
IT 6' - 4 1/2"
0' - 11"
9' - 11"
2' - 9"
6' - 10"
1' - 0" 3' - 6"
113
113
4' - 4"
108 109
DC
6
5
20' - 0"
Nurse Office
13' - 7"
5
5
Jefferson University
23' - 3"
4
REF.
1
114
42' - 3 1/2"
5
FLOATING CEILING ABOVE
4' - 10"
114 1 A502
A
Corri or
6' - 2"
4' - 7"
A
125
10' - 4"
3' - 11 1/2"
9' - 2"
5' - 0 1/2"
3
B
101
Lo
7' - 2"
Restroom
7' - 1"
FLOATING CEILING ABOVE
UP
107
6' - 11 1/2"
Corri or
121A
3' - 11"
Restroom
122
OPEN CUBBIES
7' - 0"
ELEVATOR
5' - 6 1/2" 4' - 0"
5' - 2 1/2"
Stora e
116
117
Corri or
DOORS ALIGN
125
116
C
117
5' - 7"
5' - 7"
13' - 0"
125a
7' - 0"
Restroom
5' - 0"
121 1a
7' - 0"
Closet
120
119
GENERAL CONSTRUCTION NOTES 1.
FLOATING CEILING ABOVE
Electrical Waitin Area
104
D
FLOATING CEILING ABOVE
3
OPEN CUBBIES
D
OPEN CUBBIES
123 8' - 2"
1a
3. 4.
3
Ol er To ler Class Room
Pre Sc ool Class Room
120
119
6.
124
14' - 7 1/2"
23' - 6"
39' - 10"
43' - 2 1/2"
124
7' - 1"
3' - 3"
7' - 1"
10' - 8 1/2"
9' - 2"
E Stora e Room
Restroom 120A 6' - 1"
5.
FLOATING CEILING ABOVE
3
STEPS UP
18' - 2"
106
1a
FLOATING CEILING ABOVE
30' - 5"
1a
Stora e
REF.
106
REF.
30' - 5"
105
5' - 0"
Telep one
6' - 7 1/2"
15' - 0"
105
2.
7.
E 8.
Restroom 119A
6' - 2"
9.
6' - 4"
F
F 1
2
3
4
5
6
VERIFY ALL EXISTING FIELD CONDITIONS ARE CONSISTENT WITH THE DOCUMENTS BEFORE PROCEEDING. REPORT INCONSISTENCIES TO THE ARCHITECT. ALL PARTITION DIMENSIONS ARE FROM FACE OF PARTITION UNLESS OTHERWISE NOTED. PRIOR TO SCHEDULED FINISHING OF EXISTING WALLS, REPAIR MINOR DENTS, IMPERFECTIONS AND SCRAPES. ALL SURFACES OR FINISHES TO REMAIN, IF DAMAGED DURING DEMOLITION OR ANY STAGE OF THE WORK, SHALL BE REPAIRED BY G.C. AT THEIR EXPENSE TO “LIKE NEW” CONIDTION. TI SHALL BE THE G.C. S RESPONSIBILITY TO DOCUMENT ANY PRE-EXISTING DAMAGE AND NOTIFY THE DESIGNER OF ANY SUCH DAMAGE PRIOR TO PRICING OR BIDDING. UNLESS OTHERWISE NOTED ON DOCUMENTS, ALL PAINTING SHALL BE FROM A CORNER TO A CORNER AND CEILING TO FLOOR REGARDLESS OF AREA ACTUALLY DISTURBED. WHERE CERAMIC TILE EXISTS WITHIN A SCHEDULED WALL PAINT FINISH AREA, THE TILE SHALL NOT BE PAINTED. NEW UL RATED WALLS SHALL BE ERECTED BY HOURLY RATING PRIORITY IN DESCENDING ORDER AND SHALL BE ERECTED PRIOR TO NON-RATED WALLS. UL RATED WALLS INTERSECTING EXTERIOR WALLS SHALL BE EXTENDED THROUGH TO THE EXTERIOR SHEATHING. REMOVE EXTERIOR WALL AS REQUIRED TO PROPERLY INSTALL AND REPAIR IN KIND. IMPACT RESISTANT GYPSUM WALL BOARD SHALL BE USED IN CORRIDORS AND STAIRS AS INDICATED IN THE UNIVERSITY CONSTRUCTION STANDARDS REFER TO ROOM FINISH SCHEDULE ALONG WITH PROJECT SPECIFICATIONS, FOR FURTHER FINISH INFORMATION.
Proposed Floor Plan
Course
Student Instructor
1
Proposed_Floorplan 3/16" = 1'-0"
INTD 308 CAD 2
Semester
Fall 2017
Daniela Cintron Jake Tucci
A10
12/11/2017 7:25:19 PM
Closet 118
PT-3
6' - 0"
C
REF.
121
4201 Henry Avenue Jefferson University, Philadelphia, PA, 19144
125
On-Campus Daycare Center
Youn To ler Class Room
Mec anical
19' - 4"
115
REF.
14' - 7 1/2"
125
B
Staff Loun e
101 4' - 2 1/2"
100
y
23' - 11"
100
23' - 5"
8' - 4"
121B
23' - 6"
6' - 11 1/2"
Restroom
15' - 0"
115
5
05 1
2
3
4
5
DC
6
RCP LEGEND LIGHT FI TURES
GYP. BD.
1
2X4 ACT
4
8'-2 AFF
A201
8'-2 AFF
4" X 4' LED LINEAR SURFACE MOUNTED
2
8'-0 AFF
3
2X4 ACT 8'-2 AFF SD
2X4 ACT
SD
SD
8'-2 AFF
4' X 4' LED DECORATIVE PENDANT GYP. BD.
DROP CLG
3.5" X 3.5" LED RECESSED DOWNLIGHT
8'-0 AFF
SWITCHING CIRCUIT
8'-2 AFF
SD
8'-0 AFF
6" X 8' LED LINEAR PENDANT
2X2 ACT SD SD
4' LED RECESSED ACT
2 'X 2' LED RECESSED ACT
SD
GYP. BD.
12'-0" AFF
LIGHT SWITCH
MECHANICAL
2X2 ACT
24" X 24" RETURN
A
2X4 ACT
A
8'-2 AFF
SD
SD
SPRINKLER HEAD
SD
SD
SD
8'-0 AFF
2X2 ACT 8'-2 AFF
GYP. BD.
8'-2 AFF DROP CLG
8'-0 AFF
8'-2 AFF
DROP CLG
SD DROP CLG
OPEN TO ABOVE
GYP. BD.
2X4 ACT
8'-0 AFF
8'-2 AFF
12'-0" AFF
2X2 ACT
8'-2 AFF SD
SD
C
SD
8'-2 AFF
2X2 ACT
2X4 ACT
SD
8'-2 AFF
2X2 ACT 8'-2 AFF
C
SD
GYP. BD.
SD
2X2 ACT
2X2 ACT 8'-2 AFF 6 SD A201
SD
GYP. BD.
2X2 ACT
2X4 ACT
8'-2 AFF
SD
SD
8'-0 AFF
SD
GYP. BD.
8'-0 AFF
8'-0 AFF
8'-0 AFF
OPEN TO ABOVE
SD
OPEN TO ABOVE
GYP. BD.
D
2X2 ACT
8'-2 AFF
DROP CLG
2X4 ACT
8'-0 AFF
SD
SD
SD
SD
DROP CLG
SD GYP. BD.
8'-2 AFF
GYP. BD.
SD
2X4 ACT SD
8'-0 AFF
GYP. BD.
GYP. BD.
E
GYP. BD. GYP. BD.
SD
8'-2 AFF
8'-0 AFF
DROP CLG
8'-0 AFF
DROP CLG
DROP CLG
DROP CLG
8'-2 AFF 2X4 ACT
D
GYP. BD.
8'-0 AFF DROP CLG
2X2 ACT
SD
E
SD 5
OPEN TO ABOVE
DROP CLG
OPEN TO ABOVE
A201
OPEN TO ABOVE
OPEN TO ABOVE
F
F 1
2
3
4
5
6
Reflected Ceilin PlanLi htin , S itchin , Mechanical Fire Course
INTD 308 CAD 2
Semester Student Instructor
1
Reflected Ceilin Plan 3/16" = 1'-0"
Fall 2017
Daniela Cintron Jake Tucci
A10
12/11/2017 8:54:22 PM
2X4 ACT
SD
EXIT SIGN WALL MOUNTED
DROP CLG
8'-0 AFF
SD
B
4201 Henry Avenue Jefferson University, Philadelphia, PA, 19144
SD
SMOKE DETECTOR DIRECTIONAL EXIT SIGN CEILING MOUNTED
SD
On-Campus Daycare Center
DROP CLG
2X2 ACT 8'-2 AFF
24" X 24" SUPPLY DIFFUSER
FIRE PROTECTION
GYP. BD.
B
Jefferson University
8'-2 AFF
2'
GYP. BD.
SD
2X4 ACT
DROP CLG
SD
2
3
4
5
DC
6
6' - 5"
SYMBOL LEGEND
Mana er s Office
11' - 9"
Loun e Area
112
108 8' - 0"
5' - 8 1/2"
Infant Class Room
FOAM PLAYMATS
114
1' - 7 1/2"
IT
GFI DUPLEX ABOVE COUNTER - 44" AFF
4' - 2" 8' - 3"
2' - 11 1/2"
DUPLEX RECEPTACLE GFI 44"AFF
Restroom GFI 44" AFF
5' - 2"
109 F
3' - 1 1/2"
RECPTACLES - TO BE ALL CHILD TAMPER RESISTANT 2' - 10 1/2"
4' - 6"
4' - 6 1/2"
3' - 9 1/2"
2' - 10 1/2"
111
3' - 7"
3' - 0"
44" GFI AFF 44" AFF REF.
Nurse Office
3' - 9 1/2"
7' - 5 1/2"
68041
7' - 2"
68041
3' - 9"
7' - 0"
68041
4' - 7"
QUADRUPLEX RECEPTACLE SC
113
COMMUNICATIONS 4' - 7"
SC
Corri or 125
5' - 0 1/2"
GFI 44" 44" AFF AFF
GFI 44"AFF 44" AFF GFI 44" AFF
B
M
115
REF.
C
44" AFF
Restroom
Stora e
116
117
CR
CARD READER
44" AFF
SC
PUSH BUTTON SWITCH - ENTRY DOOR
SC
Corri or
I
INTERCOM
125
SC
SC
E
GFI 44" AFF
GFI 44" 44" AFF AFF F
SC
5' - 0"
GFI 44" 44" AFF AFF
10' - 6 1/2"
5' - 7 1/2"
F
124
8' - 4 1/2"
E
7' - 2 1/2"
3' - 8"
7' - 6 1/2"
Stora e Room
GFI 44" AFF
5' - 6"
SC
106
REF.
Stora e
D
4' - 2 1/2"
44" AFF
3' - 7"
SECURITY CAMERA
STANDARD MOUNTING HEIGHTS
FOAM PLAYMATS
REF.
123
119
44" AFF
105
5' - 10 1/2"
Waitin Area
Pre Sc ool Class Room
120 44" GFI AFF 44" AFF
Telep one
Ol er To ler Class Room GFI 44" 44" AFF AFF
2' - 8"
104
SC
F
UNLESS OTHERWISE NOTED
SWITCHES
44" AFF
RECEPTACLES TYP.
18" AFF
TELA-DATA TYP.
18" AFF
FIRE MANUAL PULL STATION
44" AFF
FIRE ALARM HORN/STROBE
80" AFF OR 6" BFC
EGRESS EMERGENCY LIGHTING
ABOVE DOOR MAX 96" AFF
Furniture, E uipment, Po er And Telcoom Plan
F Course
1
2
3
4
5
6
Student Instructor
1
Furniture, E uipment, Po er and Telecom Plan 3/16" = 1'-0"
INTD 308 CAD 2
Semester
Fall 2017
Daniela Cintron Jake Tucci
A10
12/11/2017 9:02:17 PM
SC
SC
SC 3' - 0"
FOAM PLAYMATS
CR I
Electrical
D
M F GFI 44" AFF
SC
CR I
M
4' - 6"
F GFI 44" AFF
F
4201 Henry Avenue Jefferson University, Philadelphia, PA, 19144
GFI 44" AFF
44" AFF
F
SECURITY
On-Campus Daycare Center
44" AFF
EGRESS EMERGENCY LIGHTING
7' - 1"
121
FIRE ALARM MANUAL PULL STATION
FIRE ALARM COMBINATION HORN/STROBE
F
Staff Loun e
REF.
3' - 9"
Youn To ler Class Room
PT-3
FIRE PROTECTION
F
C
SC
4' - 0" 10' - 4 1/2"
Mec anical
9' - 4 1/2"
44" AFF
2' - 4 1/2"
FOAM PLAYMATS
3' - 7"
0' - 10"
5' - 7" 5' - 2"
101 10' - 11"
100
F
Restroom
F
Restroom
4' - 11 1/2"
B
9' - 2 1/2"
7' - 5 1/2"
107
4' - 3"
y
3' - 6"
Lo
DUAL TELE-DATA
M GFI 44" AFF
F
F
A
6' - 10 1/2"
6' - 0"
4' - 4 1/2"
A
Jefferson University
1
05 DC
7 A502
DOWN LIGHTS
DROP CLG.
5' - 0" 2' - 6"
1' - 6 1/2"
Jefferson University
4' - 0"
3
A502
6' - 0 1/2"
2' - 6"
0' - 8"
2' - 0"
1' - 0" 2' - 0"
5 Reception Desk - Rear 3' - 1 1/2" Elevation
2' - 2 1/2"
3' - 11 1/2"
6 A502
A502
Reception Side Elevation
ReceptionFree Standin Creden a 2 Elevation
1' - 6 1/2"
1' - 10"
2' - 6"
2' - 1"
2' - 6"
1' - 10"
8' - 0"
Reception- Free Standin Creden a Elevation
2' - 2"
3
1" = 1'-0"
Reception - Side Elevation 1" = 1'-0"
8' - 0"
2' - 1"
1' - 11"
3' - 1"
0' - 11 1/2"
DROP CEILING
0' - 4"
1' - 6 1/2"
2' - 2"
1' - 2"
2' - 1"
2' - 7" 2' - 2"
1' - 0" 1' - 2"
5
Reception Desk - Rear Elevation 1" = 1'-0"
0' - 1" 1' - 2"
0' - 3"
Proposed_Floorplan 0' - 0"
Mil orkReception Desk
1' - 3"
3' - 6"
1' - 11 1/2"
0' - 3"
0' - 4"0' - 3"
2' - 11 1/2"
0' - 4 1/2"
1' - 0 1/2"
1' - 7 1/2"
0' - 5"
0' - 8"
2' - 0"
2' - 3 1/2"
1" = 1'-0"
8' - 0"
Reception Desk- Front Elevation
0' - 4"
4
Proposed_Floorplan 0' - 0"
Proposed_Floorplan 0' - 0" Course
Proposed_Floorplan 0' - 0"
INTD 308 CAD 2
Semester Student
6
Reception Desk Detail Section 1 1" = 1'-0"
7
Reception Desk Detail Section 2 1" = 1'-0"
Instructor
Fall 2017
Daniela Cintron Jake Tucci
A 0
12/11/2017 10:38:09 PM
2
Proposed_Floorplan 0' - 0"
4201 Henry Avenue Jefferson University, Philadelphia, PA, 19144
1/2" = 1'-0"
0' - 4"
Proposed_Floorplan 0' - 0"
Reception Area Detail Plan
On-Campus Daycare Center
1
0' - 4"
1' - 2 1/2"
A502
2' - 6"
2' - 6"
2' - 11"
1' - 2"
Reception Desk- Front 4 Elevation
DC
E A
B
C
D
E
F
Gym Roof 19' - 1"
Gym Roof 19' - 1"
8' - 0"
6' - 3"
Me anine 9' - 11" Lo er Entry Roof 7' - 8 1/2"
Jefferson University
F
Proposed_Floorplan 0' - 0"
Me anine 9' - 11" 1
Buildin Section A 3/16" = 1'-0"
A
Lo er Entry Roof 7' - 8 1/2"
B
C
D
E
F
4" RUBBER BASE
Me anine 9' - 11" Lo er Entry Roof 7' - 8 1/2"
5' - 8"
4' - 0"
Proposed_Floorplan 0' - 0"
Wall Section- Classroom
4
1/2" = 1'-0"
6
Buildin Section B 3/16" = 1'-0"
5
4
2
3
A301
2
1
Gym Roof 19' - 1"
Buildin Sections
7' - 11 1/2"
8' - 0"
8' - 0"
8' - 0"
5' - 10"
Me anine 9' - 11" Lo er Entry Roof 7' - 8 1/2" 6' - 3"
2
Proposed_Floorplan 0' - 0"
Course Semester Student Instructor
3
Buildin Section C 3/16" = 1'-0"
INTD 308 CAD 2 Fall 2017
Daniela Cintron Jake Tucci
A 01
12/11/2017 8:44:55 PM
Proposed_Floorplan 0' - 0"
4201 Henry Avenue Jefferson University, Philadelphia, PA, 19144
Gym Roof 19' - 1"
TABLES CENTERED UNDER LIGHT FIXTURE
On-Campus Daycare Center
8' - 0"
DROP CLG. 8'-0" AFF
06
Second Place Finalist Located in the Philadelphia Naval Yard, this partner project deals with the design of a Transportation Hub linking the Navy Yard to other Philadelphia and New Jersey destinations via a new Navy Yard stop on the SEPTA Broad Street Line. It also includes a water taxi landing serving the Delaware and Schuylkill River destinations. This space contains work stations, a lobby, a cafÊ, and an innovation hub that has the potential of transforming into different spaces depending on its intended use. The design for this transportation hub was inspired by the constant evolution of Philadelphia’s culture. The goal was to demonstrate the transcending qualities of new styles, while showcasing that the city always stays true to its roots through art and expression.
06
06
06