About me I am an Architect graduated from the Integral University of Lucknow, India. I had my Internship during VIIITh, IXth semester and in Xth semester I had my thesis at the university. I obtained a grant to one of the best thesis records at the Integral University in Lucknow. After finishing my Bachelor of Architecture, I am seeking for a job to gain practical experience and understanding, and at the same time polish my skills and contribute to the success of projects. As an architect, I always try to find the best possible solution for every project. I am currently based in Kolkata working as a Freelancer Architect, improving and refining my design skills, critical thinking, theoretical knowledge. This experience has shown me that I am an active and eager person at work, with the ability to adapt myself to different tasks and work as a team or individually.I consider myself a responsible, organized and creative person who is always quite attentive to details.
MOHAMMAD DANISH SIDDIQUI 1st June 1991 Kolkata,West Bengal India +91 8948897938 dencesid@gmail.com facebook.com/dencesid instagram.com/dencesid/ linkedin.com/in/danish-sid-
Education 2012-2017
Bachelor of Architecture (5 years) Integral University, Lucknow, India (Thesis- International Passenger Cruise Terminal, Kochi, India)
2008-2010
Higher Secondary Examination Doon Public School, Dhanbad, India
2007
Secondary School Certificate A.G.Church School, Durgapur, India
Experience 2016
Skills Autocad Sketchup Vray(sketchup) Lumion Revit Adobe Photoshop Adobe Illustrator Adobe Indesign Adobe Premiere Pro Adobe After Effect Microsoft Office
Interests About my personal interests, I am a passionate about photography and the power of visual arts, as much in architecture and design as in fashion. I am really curious about the different cultures and places that exist around the world, because of that, I love travelling, always having a very open mind to new knowledge. I like to design leather Products.
2016
2016
2017
Internship Four months of architectural training in KSADPS, Ahmedabad, India Stadium of Delhi Public School, Ahmedabad
Four months of architectural training in Atul associates, Durgapur, India India International school, Andal, West Bengal, India Workshop Sacred Groves, Auroville, India Low-Cost Housing of Sacred Groves (Practical work) Freelancer Salahuddin House (Residence)
Rewards/Competition 2012-2013
Zonal National Association of Student of Architecture (participation) (IIEST Shibpur,Kolkata)
2013-2015
worked as an NSS volunteer and participated in various social service activities like nukkad natak, voter awareness rallies, blood donation camps, cleanliness drives, tree plantation camps etc.
2014-2015
won 2nd prize in computer gaming of college fest.
Contents 1. Thesis
The International Cruise Terminal, Kochi, India
2. Internship
India International School, Andal, West Bengal, India Cricket Stadium of D.P.School, Ahmedabad, India
3. Workshop
Sacred Grooves, Auroville, India
4. Freelancing
Salauddin House, Andal, West Bengal, India
5. Product Design
Leather Satchel Camera Stabilizer Light house/Light box
6. Extra
Structural Model Making Photography Sketching n Painting
01-20 21-24 25-28 29-40 41-46 49-50 51-52 53-54 57-58 59-66 67-70
01. T H E S I S International Cruise Terminal, Kochi Project Type : Thesis / 5th yr (Final Sem) Location : Kochi, India Project Year : 2017 Area : 15 Acres
01
Cruise Terminal is a platform for the passenger’s trip of tourism. The Terminal serves as a worldclass International Cruise Tourism for both the passengers of arrival and departure. Why in Kochi? Kochi is known as a Queen of Arabian sea. The city is known for their cleanliness and natural beauty of nature. Kochi is one of the most attractive city for the tourist. Every year several of people from all over the world come to visit this city for the witness of the beauty of Queen of Arabian sea, Kochi. The International Cruise Terminal is a new cruise terminal in Kochi which will be located at Ernakulam wharf. The new cruise terminal will follow all International immigration standard operating procedures, which would mean a structure analogous to international airports. Presently, all cruise ships longer than 250m are docked at Ernakulam wharf where there are no immigration facilities. A cruise ship that is longer than 250m will have around 2,000 passengers. Makeshift immigration counters, which are made at the wharf for the immigration process for such a huge crowd of passengers, are highly unprofessional. 02
The site is on Willingdon Island Kochi. Cochin is the colonial name of Kochi, India, a major port city by the Arabian Sea on the southern part of India’s west coast.Kochi is one of the most popular places in Kerala. Cochin is famous for their port, their beaches, their cleanliness. Area Analysis Plot Area = 60702 Sq.m (15 Acres) (Achieve) Total Build Area Ground Floor = 11784 Sq.m First floor = 10978 Sq.m Second floor = 10158 Sq.m Total Buildup Area =32920 Sq.m Achived F.A.R. = .55 Total area of basement = 16.62 % (10083 Sq.m) 03
Ernakulam Wharf, Willingdon Island, Kochi
Concept
04
05
Zoning
Ground Level Zonnig This is the ground level zoning of the terminal, this zoning shows the movement of the arrival passenger on the way of parking and pickup point from terminal exit and also shows the movement of the staffs.
Second level Zoning This is the second level zoning of the terminal, this zoning shows the movement of the arrival and departure passengers through gangway of the terminal. Arrival Passengers Movement Departure Passengers Movement Staffs movement Trucks movement
First Level Zoning This is the first level zoning of the terminal, this zoning shows the movement of the departure passengers through the bridge at the drop-off point.
Vertical Zoning
Vertical Zoning shows basement for staffs, VIP parking, the ground floor is for admin, 1st floor is for departure passengers process and also plaza for arrival passengers, 2nd floor is connected through a 06 gangway to cruise ship for arrival & departure passengers.
Ground Level Movement on the Site Plan : This is the ground level movement on the site plan of the terminal, this shows the movement of the arrival passenger on the way of parking and pickup point from the terminal exit and also shows the movement of the staffs.
07
Front Elevation
Ground Floor Plan
08
First Floor Plan
09
Section AA’
First Level Movement on the Site Plan : This is the first level movement on the site plan of the terminal, this shows the movement of the departure passengers through the bridge at the drop-off point.
10
Second Level Movement on the Site Plan : This is the second level movement on the site plan of the terminal, this shows the movement of the arrival and departure passengers through gangway of the terminal.
11
Side Elevation
e
Second Floor Plan
12
Basement Plan
Structural System : The pile found because it's a coastal area and gla Ferrocement has been used on the
13
dation has been used in this structure system of the building ass facade has been used for this building for an aesthetic look. e rooftop because to avoid the disaster of the coastal area.
All FLoor Structural Plan
Section BB’ 14
15
Site Section
16
17
18
19
20
02. I N T E R N S H I P India International School, Andal Project Type : Internship / 5th yr (9th sem) Location :Andal, West Bengal, India Project Year : 2016 Area : 3 Acres
21
India International School is located in Andal, West Bengal. The total Site of this project is 3 acres. The construction of the school has been started from 2016 and right now it is 50% completed means half of the school has been completed. The classes of the children are going on. The owner of the school has been taking admission in the school.The school have been serving with the international facilities. The higher studies of the school are from 12th standards from nursery standards right now. Later on, the school would take more admissions of the students in every class standards. What was my role in this project? *Elevation *Presentation *Site Visit 22
Fr
Real Side View
Roof Plan Side Elevation
1st & 2nd Floor Plan
Half-Constructed Building View
Ground Floor Plan 23
Section BB'
Se
ront Elevation
ection AA'
Real Entrance View
BackSide Elevation
Real Side View
24
02. I N T E R N S H I P Cricket Stadium of D.P. School, Ahmedabad Project Type : Internship / 4th yr (8th sem) Location :Ahmedabad, India Project Year : 2016 Area : 9910 Sq.Ft
25
An arena in which a cricket match is played; a cricket field plus the viewing areas, pavilion etc.An outdoor game played with bats, a ball, and wickets by two teams of 11 players each. This stadium is currently constructing in Gandhinagar, Gujrat.It is a part of Delhi Public School Gandhinagar, Gujrat. The stadium is constructing for the purpose of playing cricket, inside the stdium their are two changing room with locker and washrooms for both male and female. What was my role in this project? *Conceptual Drawing *Planning *Elevation *Presentation *Working Drawing *Site Visit
26
My main role in this project was working drawings, presentation, site visit & estimation of this school stadium. Well, this project was the main project for me which I did in Ahmedabad internship.By this project, I learned more about detailing.
27
Working Drawings
28
03. W O R K S H O P Sacred Grooves, Auroville Project Type : Internship / 5th yr (9th sem) Location :Andal, West Bengal, India Project Year : 2016 Area : 3 Acres
29
Sacred Groves is a practical knowledge on sustainability in every aspect and not just in design. As this project provides hands on experience it provides more Room for doubts and ideas. A chance to explore different methods of construction and Expermentation. Learn about different materials and techniques. Many of the problems of earth,soul and society are caused by the high-earning,high pressure, high carbon individualistic urban lifestyle. The aim is to provide low cost, low maintenance, off grid ecological Housing incorporating. Energy self sufficiency using solar wind,pumped storage and bio mass System. water self sufficiency from rain water and grey water harvesting. There is an acute shortage of affordable housing Auroville which deters many good people from joining the community. The sacredgroves project was conceived to alleviate this problem with the construction of 108 new homes for newcomers,Aurovilians and longterm volunteers, in a manner consistent with The Mother’s vision for Auroville.
30
Sacred Groves
Why Sacred Groves? A practical knowledge on sustainability in every aspect and not just in design. As this project provides hands on experience it provides more Room for doubts and ideas. A chance to explore different methods of construction and Expermentation. Learn about different materials and techniques.
31
Ecological community living Many of the problems of earth,soul and society are caused by the high-earning,high pressure, high carbon individualistic urban lifestyle. The aim is to provide low cost, low maintenance, off grid ecological Housing incorporating. Energy self sufficiency using solar wind,pumped storage and bio mass System.water self sufficiency from rain water and grey water harvesting.
Ecological living on a budget There is an acute shortage of affordable housing Auroville which deters many good people from joining the community. The sacredgroves project was conceived to alleviate this problem with the construction of 108 new homes for newcomers,Aurovilians and long-term volunteers, in a manner consistent with The Mother’s vision for Auroville.
Ecological-Construction The sacred groves project offers an alternative model of construction by using the following elements:-reusing waste building rubble to construct house made of earth concrete - a much less cement. -intensive material. -recycling wood from packing crates. -reusing discarded petrol pump pipes for shuttering. -reusing tetra-pack cartons to make innovative furniture. -being mindful of our own construction waste by reusing, recycling and composting as much as possible. 32
33
1.Soil TEST is initially done to find out the amount of clay and sand in the soil The required amount of clay must be 5-20% whereas sand is around 60% The earthen walls are made of cob Cob is a earth containing proper amounts of sand, silt and clay that is mixed with straw for tensile strength The bottom plinth is made of earthcrete which is followed by cob from the sill above The walls start out at 2’ thickness and reduce by 6 on each floor above.
There are two main ways of laying the cob:-Normal method where the chunks are laid side by side perpendicular to the wall -Rib and spine method where the gaps are filled with rubble
2.Cob is prepared and premix is made by stamping on the tarps The cob is then subjected to three tests before the batch is declared to be usable
Crunch test The premix is made into a ball and crunched This indicates the presence of enough sand Drop test The premix is rolled into a ball which is then droppen on a spf surface from a height of 1 metre The ball should not crack or lose it shape completely Cigar test A cigar shape is rold both ends are held twisted and pulled Resistance indicates enough straws 34
Flooring
Earthen flooring The floor is the area in a house with which we have the most daily physical contact. An earthen floor is both functional and beautiful. The earthen floor we did has been adapted from both the europeanearth building traditions and the north american adobe tradition. Earthen floors are beautiful, non-toxic, extremely durable, easily repairable, inexpensive, kind to the planet, and can be tailor-made with local coloured clays.
35
Aquaponics
Aquaponics is essentially the tion of Aquaculture and Hyd Aquaculture, also known as ing, is the farming of aquatic such as fish, crustaceans, mo aquatic plants. Hydroponics is a method of plants using mineral nutrien in water, without soil. The id making an aquaponics syste collaboration with people fro ation. The plants are potted in A pl with holes at the base. The s placed with coco peit and co provides a light ground for th to grow. The water is checke for the ph levels, ammonia, nitrates. Because of the low of fishes the nitrate levels m which is compensated by ad high in nitrate contents for t being. There are about 300es in the pool which can eas 2000 fishes for this sort of sy fishes required for this syste ones that produce more exc this is used to produce the n the water. The fishes we are using are catfish.Tilapia and
s
e combinadroponics. aqua farmc organisms ollusks and
Lime Chucky The story behind the lime is there are two type of lime extraction one is hydraulic lime (sea shell) and non hydraulic (stones).The non hydraulic ones are those we use for construction because it’s really stable .you need to heat the lime stones in 700 - 900 celcius and allow it to cool.
growing nt solutions, dea of em came up om aurocre-
lastic pot soil is reoir which he plants ed regulrly nitrites and population may be low dding water the time -400 fishsily house ystem. The em are the creta as nitates in e currently common
lime is eco friendly and it recquires less energy to produce than cement. The strength of the lime starts to increase after 70 years of the construction over.life span of building is more than 300 years. Which is also hihger than concrete. The walls for the trench is made of earthcrete. The flooring for the trench is made by broken tile peaces and earthcrete. Tetrapack sheets were used for the shuttering The lime plastering is very smooth even an ant can’t climb over it Example- Golkonde in pondicherry 36
-Manual levelling done with trowels while following the markings created by water level with respect to the drain. -Second layer ( F.F.L) done with 1:5 mortar mix of concrete and quarry dust. CUBICAL 1 - MARBLE WASTE. CUBICAL 2 - PABBLES. CUBICAL 3 - MARBLE WASTE. CUBICAL 4 - SANDSTONE.
MATERIALS-Concrete. Earthcrete,broken tile pieces,unpolished granite stones,shipping planks,kerala ropes,nylon ropes,tetrapack sheets. 37
The two shower areas on site collapsed owing majority their shaded location where the bamboo supports were exposed to more water and less-sunlight. According to the plan, the bamboo reinforced structure was supposed to last only six months but even when the slab being exposed to lots of water and air the structure lasted for a year. The dry compost toilet constructed along with the shower is still in use because considerably the compost area is exposed only to less amount of water. DOORS Tetrapack sheets with shipping crate planks as panels fixed with nails of 1 1/2 inches. PARTITION WALLS Tetrapcak sheets tied with nylon ropes. SHADE Shade net over the entire shower area to prevent leaves from falling into the shower area and blocking the drain. DRAINAGE Waste water drained towards the natural water treatment system. DIFFICULTIES Creating a slope for water to drain out beacuase of the irregular surface of the area. PLUMBING Shower heads avoided to reduce wastage of water. 38
STEP 1: Digging of the foundation trench on the site, prepared for the same i.e.Site devoid of organic matter, top soil, etc.
Build free
STEP 2: Laying of the water channel Placing of stones horizontally and vertically to form a channel.
Introduction
STEP 3: Dry rubble packing around the water channel
Ubuntu house
The core concept behind the house was the African word ‘Ubuntu’ meaning ‘I am what I am, because of who you are’ allowing ‘many’ to function as ‘one’ through meditation,which is the core principle of Ubuntu.
STEP 4: Dry rubble packing with small and big rubble pieces up to the ground level. STEP 5: Making and mixing of infusions made from neem and calatropis for the foundation and the house to make it termite-proof.
39
STEP 6: Pouring the fermented plant extracts intothe foundation trench using funnels,etc.
Pic:- The UBUNTU HOUSE under construction............... 40
04. F R E E L A N C I N G Salauddin House Project Type : Own Client Project Location : Andal, West Bengal, India Project Year : 2017 Area : 720 Sq.Ft
41
The site is in Andal, West Bengal. The main about this site is that this is the reconstruction of house. First the whole house had been demolished and then the reconstruction started. The reason behind the reconstruction of this house is just because the Indian Railway government had been taken plot for their railway purpose.The Indian Railway track are just beside the site of Salauddin House. So now the area of this plot is 715 Sq.ft and it was 1480 Sq.Ft before the reconstruction of the house. The Indian Railway government gave money to all the people who's plot had been came into Indian Railway requirement and have been taken their plots. This is one of that client (Mr.Salauddin) who came to me for their residence planning. So being an architect my job is to fulfil the client's requirement at their affordable expense and my focus is to make them happy with a good solution. 42
43
Elevation
Plan
Section
44
The site is 715 Sq.Ft in which 3 rooms including with kitchen, toilet, dining area and staircase connected to terrace. The construction has been started in which the foundation and layout of the residence are finished and now the wall, staircase constructions are going on. All images have been click on the site of the Salauddin's house which is under construction.
45
Salauddin House Under Construction.........
46
05. P R O D U C T D E S I G N Leather Satchel Camera Stabilizer Light House / Light Box
47
48
LEATH E R SATC H E L
Belt Holder on bo
Handle
Leather Satchel is a bag which always fully made up of pure leather. Leather Satchel is very important for workers who carry their personel use of things like laptops, small clothes, foods, documents, etc. Being an architect my job is to design Leather Satchel which can carry my all stuffs in one place. So this Leather Satchel is designed by me and it is fully made up of pure leather. Pocket Cover
Left Side Pocket 49
Front Middle Pocket Right Side Pocket
In
oth Sides
Satchel Leather Belt
nternal look
50
CAM E RA STAB I LI Z E R Camera Stabilizer is very important for those who record videos for their filmmaking or else for their personal use. Camera Stabilizers avoid the shaky from the hand of the cinematographer and makes the videos more stable. So as an architect it is also very important for me to record our environment to learn from this. So this camera stabilizer is designed by me which is cheap in price and easy to carry everywhere and it is also easy to make this by everyone.
1/2” Metal Flange 1/2” Basic Joint Tee
2 x 1kg weight
Mach 3 x 3/4" Screws
1/2” Metal End Cap 1" Thick Wood
51
Step 1
2
Step 2
Step 3
2 x Leather Handle Grips
Joint Tee
3 x 1/2� Steel pipe
hine Bolt
Step 4
Step 5
Step 6
52
LIGHT BOX/LIGHT HOUSE Lightbox is box which is used for product photography It is very useful and easy to carry in home for product photography. How does it work? Well, a photographer snaps a shot for his/her images but it's not easy to click a nice shot without a good background so for that photographer makes their studios for photoshoot either that can be for a portrait mode or landscape mode of photography. But it's not easy for everyone to make his/her studios for photography because it’s unfordable. So this lighthouse easy to make at home with cheap price and it helps to take professional images like a photographer clicks on his /her studios or either a perfect background. What’s new? Most of the people made this types of the lighthouse but being an architect it's important to make something new which will be more attractive and useful. 53
The material used in this lightbox are cardboard, white cartridge paper, tracing paper, cello tape and glue. The lightbox is open from front side because to click the images of the product and had been cut it from all sides and covered all the cut it sides with tracing paper. Here are the formation and final images of the lighthouse and also the final results from this lightbox.
And the final result....... 54
06. E X T R A Structural Model Making Photography Painting & Sketching
55
56
STRUCTURAL MODEL MAKING
Acqueduct A bridge that is Constructed to Convey water over An obstacle such as A ravine or valley. The material used For this model are Thermocol,water Colour,tissue paper. The bridge, mountains Are made up of Thermocol and the River made up of Tissue paper with Water colour Coating. It is prismatic System (surface Active).
57
58
PHOTOGRAPHY Amer Fort, Rajasthan
59
60
St.Mary Church, Pune 61
Infosys Campus, Pune
62
Jetty of Willingdon Island, Kochi
63
Victoria Memorial, Kolkata
64
Solang Valley, Manali
65
Auroville Bakery, Auroville 66
PAI NTI N G & S K ETC H I N G
67
68
69
70
THANK YOU
Kolkata,West Bengal India +91 8948897938 dencesid@gmail.com