About me I am an Architect graduated from the Integral University of Lucknow, India. I had my Internship during VIIITh, IXth semester and in Xth semester I had my thesis at the university. I obtained a grant to one of the best thesis records at the Integral University in Lucknow. After finishing my Bachelor of Architecture, I am working as an Architect and have an one n half year of experience. Now I am seeking for a job to gain practical experience and understanding, and at the same time polish my skills and contribute to the success of projects. As an architect, I always try to find the best possible solution for every project. I am currently based in Kolkata and working as a Freelance Architect, improving and refining my design skills, critical thinking, theoretical knowledge. This experience has shown me that I am an active and eager person at work, with the ability to adapt myself to different tasks and work as a team or individually.I consider myself a responsible, organized and creative person who is always quite attentive to details.
MOHAMMAD DANISH SIDDIQUI 1st June 1991 Kolkata,West Bengal India +91 8948897938 dencesid@gmail.com facebook.com/dencesid instagram.com/dencesid/ linkedin.com/in/danish-sid-
Skills Autocad Sketchup Vray(sketchup) Lumion Adobe Photoshop Adobe Illustrator Adobe Indesign Adobe Premiere Pro Adobe After Effect Microsoft Office
Interests
About my personal interests, I am a passionate about videography, cinematography, photography and the power of visual arts, as much in architecture and design as in fashion. I am really curious about the different cultures and places that exist around the world, because of that, I love travelling, always having a very open mind to new knowledge. I like to design leather Products.
Education 2012-2017
Bachelor of Architecture (5 years) Integral University, Lucknow, India (Thesis- International Passenger Cruise Terminal, Kochi, India)
2008-2010
Higher Secondary Examination Doon Public School, Dhanbad, India
2007
Secondary School Certificate A.G.Church School, Durgapur, India
Experience 2016 2016
2016
Internship Four months of architectural training in KSADPS, Ahmedabad, India Stadium of Delhi Public School, Ahmedabad
Four months of architectural training in Atul associates, Durgapur, India India International school, Andal, West Bengal, India Workshop Sacred Groves, Auroville, India Low-Cost Housing of Sacred Groves (Practical work)
2017
Junior Architect Two months of experience as a Junior Architect in KMBD, Siliguri, India
2018
Four months of experience as a Junior Architect in Designaware, Hyderabad, India
2018-2019
One year plus of experience as an Architect in Vastu Srajan, Lucknow, India
2017 2018
Freelancer Salahuddin House (Residence) Fahad Residence
2018 2019
Videography / Cinematography, Photography & Architectural Presentational Videos Melting Moment-Hyderabad, Mixed Use Building-Lucknow The Vault-Lucknow, Master Plan of Ayodhya-Ayodhya
Contents 1. Thesis
The International Cruise Terminal, Kochi, India
2. Office Work
Melting Moment, Hyderabad, India The Vault, Lucknow, India Bansalji Office's Interior, Lucknow, India
3. Internship
India International School, Andal, West Bengal, India
4. Workshop
Sacred Grooves, Auroville, India
5. Freelancing
Salauddin House, Andal, West Bengal, India Fahad Residence, Lucknow, India
6. Product Design
Cupboard Leather Satchel Camera Stabilizer Light house/Light box
7. Extra
Structural Model Making Photography Sketches
01-20 23-24 25-26 27-30 31-34 35-42 45-48 49-50 53-54 55-56 57-58 59-60 63-64 65-68 69-70
01. T H E S I S International Cruise Terminal, Kochi Project Type : Thesis / 5th yr (Final Sem) Location : Kochi, India Project Year : 2017 Area : 15 Acres
01
Cruise Terminal is a platform for the passenger’s trip of tourism. The Terminal serves as a worldclass International Cruise Tourism for both the passengers of arrival and departure. Why in Kochi? Kochi is known as a Queen of Arabian sea. The city is known for their cleanliness and natural beauty of nature. Kochi is one of the most attractive city for the tourist. Every year several of people from all over the world come to visit this city for the witness of the beauty of Queen of Arabian sea, Kochi. The International Cruise Terminal is a new cruise terminal in Kochi which will be located at Ernakulam wharf. The new cruise terminal will follow all International immigration standard operating procedures, which would mean a structure analogous to international airports. Presently, all cruise ships longer than 250m are docked at Ernakulam wharf where there are no immigration facilities. A cruise ship that is longer than 250m will have around 2,000 passengers. Makeshift immigration counters, which are made at the wharf for the immigration process for such a huge crowd of passengers, are highly unprofessional. 02
The site is on Willingdon Island Kochi. Cochin is the colonial name of Kochi, India, a major port city by the Arabian Sea on the southern part of India’s west coast.Kochi is one of the most popular places in Kerala. Cochin is famous for their port, their beaches, their cleanliness. Area Analysis Plot Area = 60702 Sq.m (15 Acres) (Achieve) Total Build Area Ground Floor = 11784 Sq.m First floor = 10978 Sq.m Second floor = 10158 Sq.m Total Buildup Area =32920 Sq.m Achived F.A.R. = .55 Total area of basement = 16.62 % (10083 Sq.m) 03
Ernakulam Wharf, Willingdon Island, Kochi
Concept
04
05
Zoning
Ground Level Zonnig This is the ground level zoning of the terminal, this zoning shows the movement of the arrival passenger on the way of parking and pickup point from terminal exit and also shows the movement of the staffs.
Second level Zoning This is the second level zoning of the terminal, this zoning shows the movement of the arrival and departure passengers through gangway of the terminal. Arrival Passengers Movement Departure Passengers Movement Staffs movement Trucks movement
First Level Zoning This is the first level zoning of the terminal, this zoning shows the movement of the departure passengers through the bridge at the drop-off point.
Vertical Zoning
Vertical Zoning shows basement for staffs, VIP parking, the ground floor is for admin, 1st floor is for departure passengers process and also plaza for arrival passengers, 2nd floor is connected through a 06 gangway to cruise ship for arrival & departure passengers.
Ground Level Movement on the Site Plan : This is the ground level movement on the site plan of the terminal, this shows the movement of the arrival passenger on the way of parking and pickup point from the terminal exit and also shows the movement of the staffs.
07
Front Elevation
Ground Floor Plan
08
First Floor Plan
09
Section AA’
First Level Movement on the Site Plan : This is the first level movement on the site plan of the terminal, this shows the movement of the departure passengers through the bridge at the drop-off point.
10
Second Level Movement on the Site Plan : This is the second level movement on the site plan of the terminal, this shows the movement of the arrival and departure passengers through gangway of the terminal.
11
Side Elevation
e
Second Floor Plan
12
Basement Plan
Structural System : The pile found because it's a coastal area and gla Ferrocement has been used on the
13
dation has been used in this structure system of the building ass facade has been used for this building for an aesthetic look. e rooftop because to avoid the disaster of the coastal area.
All FLoor Structural Plan
Section BB’ 14
15
Site Section
16
17
18
19
20
02. O F F I C E W O R K Melting Moment
Project Type : Hospitality Location :Hyderabad, Telangana, India Project Year : 2018 Area : 2000 Sq. Ft
The Vault
Project Type : Hospitality Location :Lucknow, Uttar Pradesh, India Project Year : 2019 Area : 7000 Sq. Ft
Bansalji Office's Interior Project Type : Commercial Location :Lucknow, Uttar Pradesh, India Project Year : 2019 Area : 7000 Sq. Ft
21
22
M E LTI N G M O M E NT
23
After completion of the project ............
During construction of the project ....... 24
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
TH E VAU LT MESH RAILING (3'-6" HEIGHT)
TABLE MESH (1' HEIGHT)
During construction of the project .......
WATER BODY (6" TOP LEVEL)
GRASS FLOORING (2" THICK SHEET) ROTATING BAR CHAIR
MS TABLE (4' HEIGHT)
FALSE JALI WALL(10' HEIGHT)
STAIRCASE MESH RAILING (3' HEIGHT)
STAIRCASE MESH RAILING (3' HEIGHT)
BROKEN WALL
WOODEN FLOORING
LIQUOR STACKING (5' HEIGHT) BROKEN WALL
COUNTER TABLE (3' HEIGHT)
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
WOODEN TREAD
TRUNK TABLE (1'-3" HEIGHT)
WOODEN FLOORING
ORCHESTRA AREA
WATER BODY BIO-WALL (10' HEIGHT WALL)
LOW HEIGHT SEATING (MATTRESS WITH JUTE SHEET COVER)
MESH GLASS WALL (3" THICK GLASS)
LOW HEIGHT PARTITION WALL
PLAN OF UPPER PART PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
25
LOW HEIGHT PARTITION WALL
WOODEN FLOORING
.
After completion of the project ............
26
B
C'
BAN SALJ I O FFI C E ' S I NTE R I O R
O.
(BROWN FABRIC) PINBOARD
STORE
14'-
2"
4"
4"
4"
2'
2'
2'-2"
GROOVE LVL.+0'-6"
"
2'-2"
2'-8"
3'-121" 3'-3"
6"
VEENER CLADDING
2' 8" 3'-
2'
2'-9"
lvl.(+0'-6'')
3'-2"
+21" LVL Grooving In P.O.P (ANGORA ACOUNTSNEROLAC/DULEX) SECTION
12'-3" X 15'-3" ACOUNTS SECTION 12'-3" X 15'-3"
2'
CABINET
4" skirting 4"
lvl.(+0'-9'')
4"
4"
4" skirting
ELEVATION AA'
3'-7"
2'-9"
6'-5"
FIXED GLASS
10"
D'
12'-3" X 15'-3"
LVL.+0'-9"
5'-7"
4"
D WHITE NEROLAC
5'-7"
4"
2'
2'-6"
ELEVATION BB'
SECTION OF ACCOUNT SECTION
MICA FINISH ON CUPBOARD
2'-621"
4"
2'
7'-1"
6'-10"
6' 6'-10"
4"
2'
1
3'-121"
2'-2"
14'-02"
TOUGHEN GLASS
4" FIXED GLASS AS PER EXISTING
1
WOODEN DOOR
ACOUNTS SECTION
3" MICA BORDER (MAGIC BEANS)
421"
14'-02"
6'-3"
VENEER CLADDING
1 2
2'
A'
3'-4"
2'
A
2'-9
WHITE (NEROLAC)
A.C.
CEILING LIGHT
VENEER CLADDING (DYED KOTO LIGHT COFFEE)
14'-021"
1"
8"
5'-0" X 7'-8"
11'-9"
4'-521" 1'-8"
B'
C
CABINET
COLOR CODE (3002P)
KITCHEN 7'-2" X 9'-10"
EXPOSED BRIC WALL FROM TO TO BOTTOM
2'
2'
2'-8"
Server Shelf
221"
T=3'-0" R=0'-8"
(White)NEROLAC
OPENING
Wooden Cladding
2'-621"
13'-1121"
121"
5'-421"
5'-4"
121" 2"
P.O.P WORK LVL.+0'-6"FROM SLAB BOTTOM.
2' 4'-521"
SERVER SHELF
621"
RECEPTION TABLE
CABINET LVL + 0'-9"
ELEVATION AA'
ELEVATION BB'
D' P.O.P WORK LVL.+0'-6"FROM SLAB BOTTOM.
B
D
RECEPTION
2'-10"
RECEPTION COUNTER
SWITCH PANEL
lvl.(+0'-6'')
WOODEN BATTEN VARIES HEIGHT FROM CEILING TO THE FLOOR
3'-8"
WOODEN BATTEN VARIES HEIGHT FROM CEILING TO THE FLOOR
WOOD WORK 2" WIDE AND 1" THICK PLY
Wallpaper
WOODEN BATTEN 1½" WIDE AND 2½" THICK AT THE GAP OF 2 "
Reception table
4'-6"
3' WOODEN BATTEN 1½" WIDE AND 2½" THICK AT THE GAP OF 2 "
3'-2" 9"
T=3'-0" R=0'-8"
1'-6"
1'-6"
5"
1"
P.O.P WORK LVL.+0'-6"FROM SLAB BOTTOM.
3'-3"
2"
1"
1 821" 22"
5"
3'-021"
121"
To be packed
1'-321"
sill level 4' lintel lvl as per existing
UP
12'-10"
A
C
UP
Wooden Cladding
B'
lvl.(+0'-8'')
WOODEN BATTEN 1½" WIDE AND 2½" THICK AT THE GAP OF 2 "
A'
C'
PARKING AREA
LVL ±0'-0"
FLOO
27
B
SCREEN FOR PROJECTOR
.T.S
2"
WALL PAINTING
WALL PAINTING
2'-10"
1'
14'-3"
COVE LIGHT
WALL PAINTING
WALL PAINTING
1" GROOVE ON WALL
6'-4"
2" 1'
1'-8"
2'-9"
6MM GROOVE
COLOUR-WHITE ON WHITE (NEROLAC) OVER WALL
1'-7"
1'-021"
3'-8"
3"
6MM GROOVE
1'-11"
EXISTING DOOR POLISH
4" skirting
EXISTING DOOR AND WINDOW
CABINET
PLY WORK WITH VENEER
2" GROOVE ON WALL
EXISTING DOOR POLISH
1'
2'
COVE LIGHT
COLOUR-WHITE ON WHITE (NEROLAC) OVER WALL
6MM GROOVE
6"
1" 2'
6"
COVE LIGHT
2'-9"
A
2' 6MM GROOVE
3'-7"
2" GROOVE (IN P.O.P) COLOUR-WHITE ON WHITE (NEROLAC) OVER WALL
SCREEN FOR PROJECTOR
PLY WORK WITH VENEER (1"thick)
6MM GROOVE
2'-10"
VEENER CLADDING ON A' WOODEN WORK
CONFERENCE ROOM
2' 3'
3"
C' PANEL LIGHT
11'-11"
11'-11" X 15'-3"
COVE LIGHT
4'
C
PROJECTOR SCREEN
6'-4"
COVE LIGHT
2'-6"
4'-8" X 7'-8"
6"
STORE
-0" X 7'-8"
4" skirting
EXISTING DOOR
ELEVATION AA'
ELEVATION BB'
EPSON PROJECTOR
B'
MICA FINISH
2" GROOVE (IN P.O.P) COLOUR-WHITE ON WHITE (NEROLAC) OVER WALL
WHITE (NEROLAC)
lintel height - 6'-10"
11'-11"
WHITE (NEROLAC)
4'-2"
3'-3"
A
CABINET
1'-221"
B
D'
CABINET
A'
WHITE (NEROLAC)
2'
5"
1" 4'-2"
OPENING
6'-10"
10'-1"
TOILET 1 5'-0" X 8'-3"
LVL +0'-8"
lintel height - 8'-5"
UPVC DOOR
DOOR
4" skirting
ELEVATION AA'
4" skirting
4" skirting
ELEVATION BB'
graffiti wall on exposed brick B'
D
SLIDING DOOR
1'-3"
FILE CABINET
lintel height - 8'-4½"
1'-3"
SPLIT A.C. POSITION
EXPOSED BRICK
WHITE NEROLAC
2'-1021"
sill height 4'-0"
SALES HEAD DEPARTMENT 13'-4" X 12'-0"
P.O.P WORK 6" DOWN FROM SLAB BOTTOM
6'-5"
5'-0" X 8'-3"
8'-8"
6'-10"
TOILET 1
6'-10"
8'-621"
WAITING AREA 7'-7" X 8'-6"
exposed brick
P.O.P WORK 6" DOWN FROM SLAB BOTTOM
9"
C
10'-1"
WHITE (NEROLAC)
SINBAD 2965D NEROLAC/DULEX
WHITE NEROLAC/DULEX
exposed brick bottom to till false ceiling
6'-10"
O.T.S
5"
1"
lintel height - 7'-0"
C'
EXPOSED BRICK WALL FROM TOP TO BOTTOM
OR PLAN
LOBBY 10'-8" X 9'-11" 3'-7"
O.T.S
WAITING AREA 7'-7" X 8'-6" LVL +0'-8"
EXPOSED BRICK
nerolac white
EXPOSED BRICK WALL FROM TOP TO BOTTOM
WHITE (NEROLAC)
Lintel lvl 7' TARRAGON LEAVES 4007T-N (NEROLAC)
3'-6"
9'-5"
MICA FINISH
13'-4" 1'-10"
3'-4"
12'
GARDEN
COVE LIGHT
COVE LIGHT
P.O.P WORK
COVE LIGHT
COVE LIGHT
1'-521"
WHITE (NEROLAC)
5'-3"
6'-11"
SALES HEAD DEPARTMENT 13'-4" X 12'-0" LVL +0'-8"
FILE CABINET
WHITE (NEROLAC)
8'-421"
FILE CABINET
CK OP
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
FILE CABINET
LOBBY 10'-8" X 9'-11"
UPVC WINDOW
3'-10"
MICA FINISH
3'-6"
1'-4"
MICA FINISH
1'-3"
Lintel lvl as per existing
SECTIONAL ELEVATION CC'
SECTIONAL ELEVATION DD'
13'-4"
LAYOUT PLAN Lintel and sill lvl as per existing
WHITE (NEROLAC)
28
4'-7"
7'-4"
2'-11"
4'-4"
3'
F.T
5'-521"
Toilet 6'-11"x5'-6"
421" Ledge Wall at 4' Height
421"
421" 421"
Asb sh
Wall at ht.-9'
Lintel lvl 7'
2'-6"
421" 3' Lintel lvl 7'
10'-3" 3'-2"
To Be Packed
1'-6"
8' 10'-4"
8'
SERVANT ROOM 10'-4" X 10'-0"
Lintel lv Sill lvl 3 3'
Wall at ht.-10'-721"
2'
3'-4"
Lintel lvl 7' Sill lvl 6'
221" 9"
1'-6"
CIVIL WORK
Skirtin
2'
Counter At Ht.2'8"
9'-4"
Wardrobe at 7' ht.
4'-2"
4'
Wall ht.-9
Skirting 4"
5"
1'-6"
9"
1"
5"
10'-321"
2'
6'-421"
P.O.P WORK 6" DOWN FROM SLAB BOTTOM
WHITE NEROLAC
FIXED GLASS
3'-3"
UP LOGO ON WALL NEROLAC WHITE
DN LVL +11'-5"
7'
1'-1021"
SLIDING
4'
NEROLAC WHITE
3'-021"
1'-9"
4'-021"
A 4" SKIRTING
ELEVATION BB'
ELEVATION CC'
NEROLAC WHITE
NEROLAC WHITE
LOGO ON WALL
TOUGHEN GLASS ( LINTEL LEVEL AS PER EXISTING)
A'
C
1'-521"
Pooja
OFFICE LOUNGE 9'-4" X 10'-4"
1'-8
2'-4 1 2" 2'- 1 02 "
8"
"
SLIDING
9"
D
B'
FIXED GLASS (TILL FALSE CEILING)
lintel - 7' sill -4'
2'
FRAMELESS SLIDING DOOR (7' HEIGHT)
NEROLAC WHITE
C'
LINTEL LEVEL AS PER EXISTING
1'-8
"
2'-4 1 2" 2'- 1 02 "
FRAMELESS SLIDING DOOR
GLASS DOOR
4'
lintel height as per existing fixed glass
TOUGHEN GLASS ( LINTEL LEVEL AS PER EXISTING)
CABINET
10'-5"
3'
3'
10'-1"
SLIDING DOOR
B
D'
7'-2"
OFFICE LOUNGE 9'-4" X 10'-4"
LINTEL AS P EXIS
3'-6"
LAYOUT PLAN
29
FRAMELESS SLIDING DOOR (7' HEIGHT)
SECOND FLOO
O.T.S
bestos heet
P.O.P FALSE CEILING
2'-5"
3'-5½" 1"
2'-5"
GROOVE OF 1" DEPTH AND WIDE
1'-0"
WHITE NEROLAC/DULEX
3'-021"
5'-221"
1'-421" 6'
WHITE NEROLAC/DULEX
3'-8"
EXISTING WALL WILL BE DISMANTLE
1'-1"
EXISTING WALL WILL BE DISMANTLE TILL LINTEL LVL 6'10"
ELEVATION AA'
ELEVATION BB'
UPVC DOOR
2'-8"
C
ELEVATION DD'
4'-5"
4" SKIRTING
EXISTING WALL WILL BE DISMANTLE
3'-6"
LVL +0'-4"
4'-11" 4" SKIRTING
ELEVATION CC'
6mm GROOVE ON WALL (P.O.P)
POOJA
A'
721"
2'-6"
1'-6"
L LEVEL PER STING
C
C'
3' 6mm GROOVE ON WALL (P.O.P)
2'-9"
SPLIT A.C. POSITION
1'
1'-
11 1 2"
5'-9"
1'-8 1 2"
12'
2'-8"
1'-11"
3'
OFFICE 13'-4" X 12'-0"
6'-1" 3'-6"
CABINET
2'-8"
4'-921"
EXISTING WALL WILL BE DISMANTLE 3'-1"
4'
D'
B'
CABINET A
2"
6mm GROOVE ON WALL (P.O.P)
WINDOW
toughen glass door
2'-9"
1'-1"
4" SKIRTING
lintel height as per existing fixed glass
SLIDING WINDOW
3'-321" 4'-11"
4" SKIRTING
EXISTING WALL WILL BE DISMANTLE
OFFICE 13'-4" X 12'-0"
3'-2"
3"
TOILET 1 5'-0" X 8'-3"
1'-1"
2'-021"
POOJA
WHITE NEROLAC/DULEX
5'-321"
FILE CABINET
6'-3"
4'-6"
WOODEN POLISH DOOR
9'-8"
1'-10"
9'-8"
8'-1021"
1"
1121"
6mm GROOVE ON WALL (P.O.P)
SLD
"
7'-10"
3'-321"
ng 4"
at 9'
3'-221"
COVE LIGHT
4'-921"
COVE LIGHT
2'-7"
COVE LIGHT
P.O.P FALSE CEILING
6'-221"
3'-5½"
1'-0"
WHITE NEROLAC/DULEX
COVE LIGHT
4'-3"
6'-1"
PLY FALSE CEILING WITH GROOVES AND VENEER
P.O.P FALSE CEILING
1021"
1"
1'-0"
1'-0" 1"
PLY FALSE CEILING WITH GROOVES AND VENEER
1'-1"
3'-1.80"
3"
2'-9"
3"
2'-9"
10.00"
1"
3.00"
3" 3'-1.80"
1"
A
PLY FALSE CEILING WITH GROOVES AND VENEER
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
vl 7' 3'
P.O.P FALSE CEILING PLY FALSE CEILING WITH GROOVES AND VENEER
D
FALSE CEILING
B
LVL +0'-11"
13'-4"
LAYOUT PLAN
GARDEN
OR PLAN
30
03. I N T E R N S H I P India International School, Andal Project Type : Internship / 5th yr (9th sem) Location :Andal, West Bengal, India Project Year : 2016 Area : 3 Acres
31
India International School is located in Andal, West Bengal. The total Site of this project is 3 acres. The construction of the school has been started from 2016 and right now it is 50% completed means half of the school has been completed. The classes of the children are going on. The owner of the school has been taking admission in the school.The school have been serving with the international facilities. The higher studies of the school are from 12th standards from nursery standards right now. Later on, the school would take more admissions of the students in every class standards. What was my role in this project? *Elevation *Presentation *Site Visit 32
Fr
Real Side View
Roof Plan Side Elevation
1st & 2nd Floor Plan
Half-Constructed Building View
Ground Floor Plan 33
Section BB'
Se
ront Elevation
ection AA'
Real Entrance View
BackSide Elevation
Real Side View
34
04. W O R K S H O P Sacred Grooves, Auroville Project Type : Internship / 5th yr (9th sem) Location :Andal, West Bengal, India Project Year : 2016 Area : 3 Acres
35
Sacred Groves is a practical knowledge on sustainability in every aspect and not just in design. As this project provides hands on experience it provides more Room for doubts and ideas. A chance to explore different methods of construction and Expermentation. Learn about different materials and techniques. Many of the problems of earth,soul and society are caused by the high-earning,high pressure, high carbon individualistic urban lifestyle. The aim is to provide low cost, low maintenance, off grid ecological Housing incorporating. Energy self sufficiency using solar wind,pumped storage and bio mass System. water self sufficiency from rain water and grey water harvesting. There is an acute shortage of affordable housing Auroville which deters many good people from joining the community. The sacredgroves project was conceived to alleviate this problem with the construction of 108 new homes for newcomers,Aurovilians and longterm volunteers, in a manner consistent with The Mother’s vision for Auroville.
36
Sacred Groves
Why Sacred Groves? A practical knowledge on sustainability in every aspect and not just in design. As this project provides hands on experience it provides more Room for doubts and ideas. A chance to explore different methods of construction and Expermentation. Learn about different materials and techniques.
37
Ecological community living Many of the problems of earth,soul and society are caused by the high-earning,high pressure, high carbon individualistic urban lifestyle. The aim is to provide low cost, low maintenance, off grid ecological Housing incorporating. Energy self sufficiency using solar wind,pumped storage and bio mass System.water self sufficiency from rain water and grey water harvesting.
Ecological living on a budget There is an acute shortage of affordable housing Auroville which deters many good people from joining the community. The sacredgroves project was conceived to alleviate this problem with the construction of 108 new homes for newcomers,Aurovilians and long-term volunteers, in a manner consistent with The Mother’s vision for Auroville.
Ecological-Construction The sacred groves project offers an alternative model of construction by using the following elements:-reusing waste building rubble to construct house made of earth concrete - a much less cement. -intensive material. -recycling wood from packing crates. -reusing discarded petrol pump pipes for shuttering. -reusing tetra-pack cartons to make innovative furniture. -being mindful of our own construction waste by reusing, recycling and composting as much as possible. 38
39
1.Soil TEST is initially done to find out the amount of clay and sand in the soil The required amount of clay must be 5-20% whereas sand is around 60% The earthen walls are made of cob Cob is a earth containing proper amounts of sand, silt and clay that is mixed with straw for tensile strength The bottom plinth is made of earthcrete which is followed by cob from the sill above The walls start out at 2’ thickness and reduce by 6 on each floor above.
There are two main ways of laying the cob:-Normal method where the chunks are laid side by side perpendicular to the wall -Rib and spine method where the gaps are filled with rubble
2.Cob is prepared and premix is made by stamping on the tarps The cob is then subjected to three tests before the batch is declared to be usable
Crunch test The premix is made into a ball and crunched This indicates the presence of enough sand Drop test The premix is rolled into a ball which is then droppen on a spf surface from a height of 1 metre The ball should not crack or lose it shape completely Cigar test A cigar shape is rold both ends are held twisted and pulled Resistance indicates enough straws 40
Flooring
Earthen flooring The floor is the area in a house with which we have the most daily physical contact. An earthen floor is both functional and beautiful. The earthen floor we did has been adapted from both the europeanearth building traditions and the north american adobe tradition. Earthen floors are beautiful, non-toxic, extremely durable, easily repairable, inexpensive, kind to the planet, and can be tailor-made with local coloured clays.
41
Aquaponics
Aquaponics is essentially the tion of Aquaculture and Hyd Aquaculture, also known as ing, is the farming of aquatic such as fish, crustaceans, mo aquatic plants. Hydroponics is a method of plants using mineral nutrien in water, without soil. The id making an aquaponics syste collaboration with people fro ation. The plants are potted in A pl with holes at the base. The s placed with coco peit and co provides a light ground for th to grow. The water is checke for the ph levels, ammonia, nitrates. Because of the low of fishes the nitrate levels m which is compensated by ad high in nitrate contents for t being. There are about 300es in the pool which can eas 2000 fishes for this sort of sy fishes required for this syste ones that produce more exc this is used to produce the n the water. The fishes we are using are catfish.Tilapia and
s
e combinadroponics. aqua farmc organisms ollusks and
Lime Chucky The story behind the lime is there are two type of lime extraction one is hydraulic lime (sea shell) and non hydraulic (stones).The non hydraulic ones are those we use for construction because it’s really stable .you need to heat the lime stones in 700 - 900 celcius and allow it to cool.
growing nt solutions, dea of em came up om aurocre-
lastic pot soil is reoir which he plants ed regulrly nitrites and population may be low dding water the time -400 fishsily house ystem. The em are the creta as nitates in e currently common
lime is eco friendly and it recquires less energy to produce than cement. The strength of the lime starts to increase after 70 years of the construction over.life span of building is more than 300 years. Which is also hihger than concrete. The walls for the trench is made of earthcrete. The flooring for the trench is made by broken tile peaces and earthcrete. Tetrapack sheets were used for the shuttering The lime plastering is very smooth even an ant can’t climb over it Example- Golkonde in pondicherry 42
05. F R E E L A N C I N G Salauddin House Project Type : Own Client Project Location : Andal, West Bengal, India Project Year : 2017 Area : 720 Sq.Ft
Fahad Residence Project Type : Own Client Project Location : Lucknoe, Uttar Pradesh, India Project Year : 2018 Area : 1800 Sq.Ft
43
44
SALAU D D I N R E S I D E N C E
45
Elevation
Plan
Section
46
The site is 715 Sq.Ft in which 3 rooms including with kitchen, toilet, dining area and staircase connected to terrace. The construction has been started in which the foundation and layout of the residence are finished and now the wall, staircase constructions are going on. All images have been click on the site of the Salauddin's house which is under construction.
47
Salauddin House is Under Construction.........
48
FAHAD R E S I D E N C E The site area is 1800 Sq.Ft. The building has G+2 floor. What was my role? My role was to design the elevation of the building. The brick work is used as an element to exposed the building. The construction has been started of the front elevation. All images have been click on the site of the Fahad's house which is under construction.
49
BALCONY 0'-0"X0'-0"
6" BRICK WORK
2" DIA M.S. CIRCULAR PIPE
2" DIA M.S. CIRCULAR PIPE
Fahad House is Under Construction....
6"
3'-0"
3/4" DIA M.S. CIRCULAR PIPE WELDED WITH 2" DIA M.S CIRCULAR PIPE
3'-6"
3"
3/4" DIA M.S. CIRCULAR PIPE WELDED WITH 2" DIA M.S CIRCULAR PIPE
6" BRICK WORK
50
06. P R O D U C T D E S I G N Cupboard Leather Satchel Camera Stabilizer Light House / Light Box
51
52
CUPBOARD Cupboard is made up of recycled materials. Cartons, woods, black cartridge paper are used as materials for this cupboard. This D.I.Y is cheap in cost and easy to make for any one.
53
54
LEATH E R SATC H E L Handle
Leather Satchel is a bag which always fully made up of pure leather. Leather Satchel is very important for workers who carry their personel use of things like laptops, small clothes, foods, documents, etc. Being an architect my job is to design Leather Satchel which can carry my all stuffs in one place. So this Leather Satchel is designed by me and it is fully made up of pure leather.
Belt Holder on bo
Pocket Cover
Left Side Pocket 55
Front Middle Pocket Right Side Pocket
In
oth Sides
Satchel Leather Belt
nternal look
56
CAM E RA STAB I LI Z E R Camera Stabilizer is very important for those who record videos for their filmmaking or else for their personal use. Camera Stabilizers avoid the shaky from the hand of the cinematographer and makes the videos more stable. So as an architect it is also very important for me to record our environment to learn from this. So this camera stabilizer is designed by me which is cheap in price and easy to carry everywhere and it is also easy to make this by everyone.
1/2” Metal Flange 1/2” Basic Joint Tee
2 x 1kg weight
Mach 3 x 3/4" Screws
1/2” Metal End Cap 1" Thick Wood
57
Step 1
2
Step 2
Step 3
2 x Leather Handle Grips
Joint Tee
3 x 1/2� Steel pipe
hine Bolt
Step 4
Step 5
Step 6
58
LIGHT BOX/LIGHT HOUSE Lightbox is box which is used for product photography It is very useful and easy to carry in home for product photography. How does it work? Well, a photographer snaps a shot for his/her images but it's not easy to click a nice shot without a good background so for that photographer makes their studios for photoshoot either that can be for a portrait mode or landscape mode of photography. But it's not easy for everyone to make his/her studios for photography because it’s unfordable. So this lighthouse easy to make at home with cheap price and it helps to take professional images like a photographer clicks on his /her studios or either a perfect background. What’s new? Most of the people made this types of the lighthouse but being an architect it's important to make something new which will be more attractive and useful. 59
The material used in this lightbox are cardboard, white cartridge paper, tracing paper, cello tape and glue. The lightbox is open from front side because to click the images of the product and had been cut it from all sides and covered all the cut it sides with tracing paper. Here are the formation and final images of the lighthouse and also the final results from this lightbox.
And the final result....... 60
07. E X T R A Structural Model Making Photography Sketches
61
62
STRUCTURAL MODEL MAKING
Acqueduct A bridge that is Constructed to Convey water over An obstacle such as A ravine or valley. The material used For this model are Thermocol,water Colour,tissue paper. The bridge, mountains Are made up of Thermocol and the River made up of Tissue paper with Water colour Coating. It is prismatic System (surface Active).
63
64
PHOTOGRAPHY Amer Fort, Rajasthan
65
66
St.Mary Church, Pune
67
Diwan-I-Khas, Jodha Palace, Agra
Jetty of W
Infosys Campus, Pune
Willingdon Island, Kochi
Quli Qutub Shahi Tombs, Hyderabad
Victoria Memorial, Kolkata
68
SKETCHES
69
70
THANK YOU
Kolkata,West Bengal India +91 8948897938 dencesid@gmail.com