EGOR
ENTER
"The basic ideas underlying all science are simple."
"The universe is regular and predictable."
YEGOR CENTER Client:
Dr. Rubik Yegoryan
Design Team:
NYM, Inc. Dan Lubel Felipe Rodriguez
Builder:
DLB CA Lic. 936890
These documents have been prepared specifically for the project indicated on the project title. They are not suitable for the use on other projects or in other locations without the approval or participation of the Architect. Reproduction is prohibited. Copyright 2010 New Young Management, Inc. / Design Landmarks Builders, Inc.
Proposed Sections
Objectives + Principles
Morphology
Initial Scheme
Envelope + Structure
Proposed Floor Plans
Table of Contents
Atmosphere
Program + Circulation Analysis
UC Berkeley
Potential Sites Cal Tech
Site Performance + Integration
Georgia Tech MiT
Objectives To provide an environment for an array of scientists to converge on the discourse and speculation of the sciences studied today, tomorrow and beyond. To facilitate an intense learning environment for future scientists and Olympic candidates. To stand as a symbol of scientific advancement in the public eye.

Design Principles Envelope as structure to generate open floor plans. Energy efficiency by material selection and placement. Transparency at gound level for public engagement.
Initial Schemes
Geometry Extruded
Access
Concept Physics Mathematics Biology Chemistry
Shifts Proportions Cycles Collisions
Circulation
Envelope
Morphology
Morphology
Morphology
Morphology
Elemental Composition
Program Analysis
Total Area = 95,000 SF
Pool Area Garden Space Offices Library Suites
Offices Classes/ Labs Classes/ Labs
Playing/ Reading Area Lobby, Cafeteria
Auditorium
Conference Rooms Reception Waiting Room, Cafe, Book Store
Building Analysis Total Area: 126,000 SF Program: Academic: Hospitality: Public Amenities:
37,000 SF 31,500 SF 33,000 SF
Open Areas and Circulation:
25,000SF
Swimming Pool:
2,000SF
Structure: Steel frame Anodyzed Aluminum Metal Frame
Amenities: Atrium Below Structure Shuttle Elevator Restaurant, Coffee Shop Book Store, Library Back of the House: Loading Dock Delivery Plaza Waste Area Fire Suppression System: Throughout Envelope Approximate Cost Per SF: $166.00
Skin:
Glass, Double Panels, Fins, Polycarbonate Shades
Systems: Environmentally Friendly HVAC, Electrical and Plumbing
Construction Budget: $20.9 Million
Floor Plans
Building Comparison Case Study, Walt Disney Concert Hall Los Angeles, California Program:
Music Hall
Materials Used
Built:
1999-2003
Titanium Stainless Steel
Architect:
Frank Gehry
Total Program Area:
200,000 SF
Construction Cost:
$274 Million, with $110M Parking garage paid for by Los Angeles County
Building Comparison Case Study, Cahill Center for Astronomy and Astrophysics at Caltech Pasadena, California Program:
Academic Science Building
Materials Used
Built:
Completed December 2008
Architect:
Red Fiber Reinforced Concrete
Morphosis Stainless Steel
Total Program Area:
100,000 SF
Construction Cost:
$42 Million
Envelope + Structure
Circulation Strand
PROPOSED SITES
UC Berkeley
MIT
Caltech
Georgia Tech
UC Berkeley
Hearst Ave
ity Dr
Univers
d
S Hall Rd
Oxford St Bancroft Way
0
28
300
600ft
N
yR yle Ga
University Ave
Shattuck Ave
Durant Ave
1
Hearst Ave
ity Dr
Univers
d
S Hall Rd
Oxford St
3
2
Bancroft Way
0
300
600ft
N
yR yle Ga
University Ave
Shattuck Ave
Durant Ave
Hearst Ave
ity Dr
Univers
d
S Hall Rd
Oxford St Bancroft Way
0
300
600ft
N
yR yle Ga
University Ave
Shattuck Ave
Durant Ave
Pasadena City College
E Del Mar Blvd
600ft
N
S Hill Ave
300
S Wilson Ave
0
S Lake Ave
E California Blvd
1 Pasadena City College
E Del Mar Blvd
600ft
N
S Hill Ave
300
S Wilson Ave
0
S Lake Ave
2
3 E California Blvd
Caltech
Pasadena City College
E Del Mar Blvd
600ft
N
S Hill Ave
300
S Wilson Ave
0
S Lake Ave
E California Blvd
34
10th St NW
State St NW
Ferst Dr NW
yN W
600ft
w Pk
300
h
0
c Te
Ma
riet
ta S tN
W
N North Ave NW
3
10th St NW
State St NW
Ferst Dr NW
yN W
600ft
w Pk
300
h
0
c Te
1
2
Ma
riet
ta S tN
W
N North Ave NW
Georgia
Tech
10th St NW
State St NW
Ferst Dr NW
600ft
W yN
300
w Pk
0
38
ch Te
Ma
riet
ta S tN
W
N North Ave NW
. l St
ar Pe
Ma
. Ave tts use
. Albany St
t. Vasaar S
Memorial Drive
0
300
600ft
ali oG Ga
lile
in S t.
lei
Ma
N
ay dw oa Br
Wa y
Po r
tla
nd
St .
Wi nd
St.
ch ssa
ine
okl Bro
so rS t
M
t. eS
zin
a ag
M
t. eS
zin
a ag
2 . l St
ar Pe
Ma . Ave tts use
. Albany St
t. Vasaar S
3
Memorial Drive
0
300
600ft
ali oG Ga
lile
in S t.
lei
Ma
N
ay dw oa Br
Wa y
Po r
tla
nd
St .
Wi nd
St.
ch ssa
ine
okl Bro
so rS t
1
MIT
. l St
ar Pe
Ma
. Ave tts use
ali oG Ga
lile
in S t.
lei
Ma
ay dw oa Br
Wa y
Po r
tla
nd
St .
Wi nd
St.
ch ssa
ine
okl Bro
so rS t
M
t. eS
zin
a ag
. Albany St
t. Vasaar S
Memorial Drive
0
300
600ft
N
42
McCambridge Park Burbank, California
r.
st D
her
t Rd
Am
Scot
San Fernando Blvd
Ferraro Soccer Field Glendale, California
EGOR
ENTER