Dannve rmit

Page 1

Room10C, Qiaoxiang Community, Qiaoxiang Road, Futian District, Shenzhen 518000, P. R. China Tel:+86-13760221751 dannve219@163.com 01


CONTENTS ACADEMIC CCDI-PRIVATE YACHT CLUB

2013

INNOVATION CENTER

2014

PAVILION-BUILT PROJECT

2013

Intern Architect Participated the Planning Design Be Responsible for the Private Yacht Club of Wuyuan Bay,Xiamen

Fashion Conference Center Project Architect,Graduation Project Base Planning,Landscape Design Architectural Design

Young graduate in the Department of Architecture, Zhuhai College of Jilin University. I am currently working as an assistant architect in a construction company. I am full of enthusiasm and hopeful for architectural design. I hope school can give me a chance to study at my favorable program. The following is my portfolio in four-years program.

Project Architect,Construction Worker Collected the Informations of Site Designed the Pavilion from Concept Generation to Construction Drawings Sketched the Diagrams Material Studies Surface Texture Massing Models Completed the Construction Process with Teammates

SUPPLEMENT CHRONOLOGY VISUAL ARTS

Photography 201 4 Painting Pen Drawing 2010

RESUME

03


PRIVATE YACHT CLUB

This is a club for yacht club membership, and it can also be used for gourmet, leisure entertainment and hotel accommodation. The club is located in Wuyuan Bay, Xiamen. As the club is defined as a leisure entertainment and accommodation, the main users can be divided in two kinds:members and staffs.How to organize these two circulations and how to integrate grey space into the yacht club is the main challenge of the project.

ACADEMIC Intern Architect Participated the Planning Design Be Responsible for the Private Yacht Club of Wuyuan Bay,Xiamen 05


SITE ANALYSIS - Conditions

The landscape around the island is declined dramatically from north to south.At the same time,the privacy is increased considerably from south to north.

The project is located in Wuyuan Bay . The purpose of Wuyuan Bay is to built a vividly ecological Port and elite city. After careful planning, the entire Area is subdivided into a core area and seven functional areas.The Bay center , which is the most characteristic area in Wuyuan Bay .The following diagrams are analyse the actual situation of site.

墩上高尚居住区

环湾中心

墩上高尚居住区

环湾中心 码头中心节点

码头中心节点

商务中心节点

环湾中心区

环湾中心区 五通商务区

商务中心节点

五缘民俗旅游区

下忠综合商住区

五通商务区

五缘民俗旅游区

下忠综合商住区 通屿生态居住区

金山健康养生区

d

d Ro a

Lig ht Ra il T Zh on ran gz sit ha NO i .3 Ro ad

Av en ue ua nB ay

Av en ue ua nB ay

il

Wu y uan

B ay Ave nue

.6

T

BR

NO

ins st J We

han

ny Xia

ad Ro

ue

.2 NO

e

sit an Tr

nu Ave

.2 NO

e nyu Xia

Wu y

Wu y

ng zh ai

d Ro a

Av en ue ua nB ay

Av en ue ua nB ay

Roa

d

d Ro a

Roa

ng zh ai Zh o

d

Wu y

Wu y

Ra

sit an Tr

佐世 保路

t Ligh

il

佐世 保路

nue Ave

Ra

han

t Ligh

ins st J We

e enu

Jinhu Road

B ay Ave nue

ad Ro

明发海湾度假村

v Bay A uan

ge

Wu y uan

uy W

rid nB

oR o ad

Ba y

nue Ave Brid ge

ua Riy

seb

n Wuyua

Ba y

d

Sa

Ro ad

n Wuyua Tia nyu an

Brid ge

a Ro

oR o ad

Open Waters bo u t

Neiwan

an

seb

in

ad Ro

Sa

und a

sh Ji n

顿路

NO.1

惠灵

Ma

Road Transit

顿路

ge

惠灵

五缘湾商务 运营中心

Yunding Rail

R

外海

Jinhu Road

ad Ro

Ro

.6 nue NO T Ave BR

五缘湾商务 运营中心

新景缘

环 外海

han

e enu

rid nB

R

oun dab o ut

Open Waters

ao

明发海湾度假村

B ay Ave nue

ins st J We

v Bay A uan

ua Riy

n

Ea st R

uy W

Ea st

Open Waters

Ro ad

Neiwan

Light

ou We nda llin bou gto t

Open Waters

Water Space

an d

d

gto n

Ea st R

Water Space

in

Hu

a Ro

Landscape Point

Wu y uan

Walking System AnalysisWalking DiagramSystem Analysis Diagram

新景缘

.3

an

Landscape Walking Point Landscape Road

Structural Units

Ma

NO

ad Ro

Walking Landscape Road

Structural Units

ao

T

sh Ji n

Landscape Center

han

ad Ro

NO.1

Landscape CenterAxis Landscape

an d

Road Transit

B ay Ave nue

Yunding Rail

We llin

Landscape Axis

ge

Urban Design Landscape Urban Structure Design Analysis Landscape Diagram Structure Analysis DiagramFunctional Structure Analysis Functional Diagram Structure Analysis Diagram

rid nB

Wu y uan

nbR ooua dt

Tia nyu an

新景缘明发海湾度假村

e

ua Riy

五缘湾商务 新景缘 运营中心

enu

Jinhu Road

ins st J We

新景缘

v Bay A uan

Road

ge

Jinhu Road

明发海湾度假村

uy W

Yunding

rid nB

Jinshan Health Regimen

e

RWoe ullinngd toa

Brid ge

Light

enu

ua Riy

Jinshan Health Regimen

基地 明发海湾度假村

Hu

nue Ave

d

d

Residential Central

Health Center

a Ro

a Ro

Tongyu Ecological Residential Area

v Bay A uan

Road

Health Center

uy W

Tia nyu an

Brid ge

an

an

明发海湾度假村 基地

.3

sh Ji n

sh Ji n

Xiazhong Commercial and Residential Areas

Ea st

BR

NO

Ba y

Tia nyu an

Tongyu Ecological Residential Area Residential Central Wetlands central

Wetlands central

T

Neiwan

Wutong Business District

Wuyuan Folk Tourist Area

Yunding

Xiazhong Commercial and Residential Areas

BR

n Wuyua

Wuyuan Folk Tourist Area

水体空间

We lling ton Roa d

Ro ad

nue Ave

Bay Center Wutong Business District

Open Waters

Ba y

Bay Center

und abo ut

n Wuyua

Wharf Central Business Center

in

ad Ro

Wharf Central Business Center

Ma

Neiwan

ad Ro

Bay Center

ao

Ro

ng zh ai

in

an d

Zh o

Ma

Ea st

Open Waters

Ro ad

d Ro a

ao

Hu

ng zh ai

an d

景观节点

Roa

RWoe ullinngd toan bRooua d t

ebo

d Roa

景观性

Hu

Bay Center

Ea st

ebo

景观性

Dunshang Noble Residential Area

We lling ton Roa d

Zh o

Dunshang Noble Residential Area

私密性

S as

私密性

景观节点 步行景观带

结构单元

水体空间

ebo

步行景观带

功能结构分析图 结构单元

S as

景观轴线

景观中心

S as

SITE ANALYSIS - Diagrams

功能结构分析图

景观中心 景观轴线

Zh o

城市设计景观结构分析图城市设计景观结构分析图

金山健康养生区

ebo

养生中心节点

Lig ht Ra il T Zh on ran gz sit ha NO i .3 Ro ad

养生中心节点

通屿生态居住区

居住中心节点

S as

居住中心节点 湿地中心

湿地中心

五缘湾商务 运营中心

Main Route for Walking

UrbanforGreen Space System Main Route Walking

Walking Route

Walking Route

Road System Analysis Diagram Road System Analysis Diagram Urban Green Space System

Expressway

City Main Roads Expressway

Rail Transport

City RoadsRail Transport

BranchCity Main Roads Rail transport City Station Roads

Branch Rail transport Station

07 37


分割

利用三条视觉通廊形成的场地景观轴,以及各地块南北方向分布的地块景观轴,分割场地,形成初步 道路以及景观轴网

SITE ANALYSIS - Diagrams

堆砌

以不同地块所对应的模块堆砌各自建筑形态,自然形成丰富生动的立面以及城市和谐天际线,不遮蔽基地 周边观景面。

DESIGN CONCEPT - Diagrams Project’s Layout

This project is divided into five parts, with a total of 93236.914 square metres. I am responsible for the design of private yacht club. The form of club must be coherent with other architecture in this project, by unifing the form in to the planning. Our team considered that it is important to use the landscape resources reasonably and create a green, energy-saving, environmental protection as well as ecological construction. Further more, architectural form cater to the urban fabric, 分割 利用三条视觉通廊形成的场地景观轴,以及各地块南北方向分布的地块景观轴,分割场地,形成初步 堆砌 以不同地块所对应的模块堆砌各自建筑形态,自然形成丰 道路以及景观轴网 周边观景面。 geographical,cultural and climate. Meanwhile I must focus on the SHIFT user's communication and provide a private space. Moving the blocks to enrich the landscape platform and the space effects. 冲刷 模块化打碎场地体块,形成丰富的场地空间,又可意喻为以自然之力冲刷形同岸边岩石的体块,形成散落 错动 不同地块上模块的错动,形成更丰富的景观平台以及里面效果。

Project Content

EFC Creative Office Building

EFC Creative Office Building

71160㎡

Lower Ecological Office

Lower Ecological Office

20000㎡

Headquarters Office

20000㎡

0㎡ 24900㎡

Yacht Support Office Private Yacht Club

15000㎡

Exhibition Square

5000㎡

Total Construction Area

158180㎡

Exhibition Square Yacht Industry Business Community Supporting Business Leisure Boutique Business Public Toilet

12000-15000㎡

Yacht Industry Business Community Supporting Business Leisure Boutique Business Public Toilet

0㎡

的海边卵石,融入海边氛围,从而独具一格。

4000㎡ 4000㎡ 9000㎡ 120㎡

Headquarters Office

*Private Yacht Club

SCHEMA - Site Plan

Yacht Supporting Office

EROSION

抽离 局部的抽离改善建筑生态效果,提供良好的空间尺度,并创造适宜的视线通廊。 DISSOCIATION

The running water erodes many gullys.This phenomenon seems to see a force of The blocks局部的抽离改善建筑生态效果,提供良好的空间尺度,并创造适宜的视线通廊。 are dissociate, in order to improve the ecological effects, provide good 抽离 冲刷 eroding 模块化打碎场地体块,形成丰富的场地空间,又可意喻为以自然之力冲刷形同岸边岩石的体块,形成散落 nature the rocks and forming a loose pebble beach.Seaside atmosphere spatial scales, and create a suitable sight corridor. 错动 不同地块上模块的错动,形成更丰富的景观平台以及里面 integrates的海边卵石,融入海边氛围,从而独具一格。 with these small blocks is unique. 抽离 局部的抽离改善建筑生态效果,提供良好的空间尺度,并创造适宜的视线通廊。

N

TRAVERSING ROTATION AFFORESTING 穿越 退让酒店入口空间的观海界面,并根据城市道路关系留出视觉通廊,形成本项目的地块分区。 扭转 将局部体块45°角度扭转,最大化获得并延长观景面,同时创造合理的朝向巧妙避免了与周边建筑的对视 In order to keep more landscape of the sea ,the site is divided into three parts and Blocks rotate in order to acquire maximum landscape surface, while creating a The lifted大平台的使用,抬高视线基点,优化基地观景效果,形成相应灰空间。 platform and the courtyard form a passable shortcut beneath the 抬升 building,which is a better way to link up the square and surrounding buildings.Clothing let the seascape traverse the whole site. reasonable orientation to avoid the existing buildings. 穿越 退让酒店入口空间的观海界面,并根据城市道路关系留出视觉通廊,形成本项目的地块分区。 扭转 将局部体块45°角度扭转,最大化获得并延长观景面,同时创造合理的朝向巧妙避免了与周边建筑的对视 the platform with greenery integrate the building with the green belt, the square.The 穿越 退让酒店入口空间的观海界面,并根据城市道路关系留出视觉通廊,形成本项目的地块分区。 扭转 将局部体块45°角度扭转,最大化获得并延长观景面,同时创造合理的朝向巧妙避免了与周边建筑的对视 抬升 大平台的使用,抬高视线基点,优化基地观景效果,形成相应灰空间。 穿越 退让酒店入口空间的观海界面,并根据城市道路关系留出视觉通廊,形成本项目的地块分区。 扭转 将局部体块45°角度扭转,最大化获得并延长观景面,同时创造合理的朝向巧妙避免了与周边建筑的对视 two terraces on both corners of the platform provide a recreation space. 抬升 大平台的使用,抬高视线基点,优化基地观景效果,形成相应灰空间。

DIVISION

0 10 30

分割 分割

80(M)

PILE

CONNECTION

Three visual channels formed venue landscape axis.Perceiving the building as a Blocks are piled up to form a rich and vivid facade and the harmonious city skyline.No Use the bridge to connect private yacht clubs and headquarters office. It is easy for 分割 利用三条视觉通廊形成的场地景观轴,以及各地块南北方向分布的地块景观轴,分割场地,形成初步 entity made up of 7 separate portions,excavate the central part and make it into shelter around the base viewing surface is堆砌 benefit以不同地块所对应的模块堆砌各自建筑形态,自然形成丰富生动的立面以及城市和谐天际线,不遮蔽基地 for ecological development. people to pass through and create active space. a courtyard,so that every other part will gain venue landscape and sunlight from 道路以及景观轴网 周边观景面。 连系 地块内部及地块之间提供一定连廊空间,使基地连系紧密,形成有机整体。 landscape axis . 分割 利用三条视觉通廊形成的场地景观轴,以及各地块南北方向分布的地块景观轴,分割场地,形成初步 堆砌 以不同地块所对应的模块堆砌各自建筑形态,自然形成丰富生动的立面以及城市和谐天际线,不遮蔽基地

利用三条视觉通廊形成的场地景观轴,以及各地块南北方向分布的地块景观轴,分割场地,形成初步 道路以及景观轴网 利用三条视觉通廊形成的场地景观轴,以及各地块南北方向分布的地块景观轴,分割场地,形成初步 道路以及景观轴网 道路以及景观轴网

堆砌 堆砌

连系 连系

以不同地块所对应的模块堆砌各自建筑形态,自然形成丰富生动的立面以及城市和谐天际线,不遮蔽基地 周边观景面。 以不同地块所对应的模块堆砌各自建筑形态,自然形成丰富生动的立面以及城市和谐天际线,不遮蔽基地 周边观景面。 周边观景面。

地块内部及地块之间提供一定连廊空间,使基地连系紧密,形成有机整体。

地块内部及地块之间提供一定连廊空间,使基地连系紧密,形成有机整体。

09


11

4

2

5

1.LOBBY(Visitor) 2.RECEPTION 3.ATRIUM 4.VIP ELEVATOR HALL 5.CIGAR BAR 6.BAR 7.TOILET 8.CAFE 9.CHINESE RESTAURANT 10.KITCHEN 11.OFFICE 12.OUTDOOR CAFE 13.OUTDOOR BAR 14.SPA 15.GYM 16.STOREROOM 17.SWIMMING POOL 18.GUEST ROOM 19.LOUNGE 20.BOUTIQUE 21.FUNCTION ROOM 22.VIP ROOM 23.BANQUET HALL 24.ANTECHAMBER 25.INDOOR PLAYGROUND

1

10 3

6

13 11

ANT

4

2 1

7

5

7

10

8

3

6

13

7

UND

7

8 12

12

SCHEMA - Private Yacht Club

SECTION 1-1

LEVEL-4 PLAN

LEVEL-1 PLAN

14

18

18

18

ELEVATION1

18

18

3 15 3

14 18

16 7

16 18 18

18

15 3

LEVEL-2 PLAN

17

7

16

LEVEL-3 PLAN

ELEVATION2 11


SCHEMA - Private Yacht Club platform bridge

11

2

1

21

20

19 22 7

16

19

22

VERTICAL TRANSPORTATION

Vertical space of the building is increased with elevators and stairs.Different people use different vertical transpotation and it is beneficial to the circulation.

23

24

25 19

LEVEL - 4 PLAN GREY SPACE

Deep floor plate leads to dark building interior.Excavating the central part and make it into a courtyard, so that every other part will gain sunlight from four sides.Architecture grey space refers to the transitional space between interior meets exterior.Plant is cultivated in this area to bring more vitality indoors.

127

VISITORS' CIRCULATION

Visitors will enter into the building by the entrance through platform bridge from the headquarters office.In accordance with the loop floorplan,they will form a wellordered circulation,and the special elevator design will bring various visit experience.

STAFFS' CIRCULATION

Staffs working in the building are more likely to enter the building from the entrance below the platform bridge, avoiding conflict with the visitors flow .While the staffs and visitors can still meet inside the building. 13


INNOVATION CENTER

This is a graduation project include eight students from three classes. Each student has an opportunity to design an unique innovation center by myself in the Hefei Chuangkai Technopark. According to the actual site and specific requirements of tutor and client, the main task of this project is to design an artistic construction with advanced ideas and technology, and to reflect Chinese cultural peculiarities and national characteristics. I choose the fashion research and design as the building theme.

ACADEMIC Graduation Project Individual Work Client:Hefei Urban Planning Department Tutor:Yale Li 15


FIELD RESEARCH ZHENGZHOU

MOUNTAIN

?

NGZHOU

OPERA

?

NANJING

ARCHITECTURE

COTTONOCRACY

KIRIGAMI

HEFEI

WUHAN

The formation of Chinese city is usually based on a "coast to inland" process, which can satisfy the fundamental requirement of the human activities.A picture of the skyline of coastal city is magnificent, while the situation of inland city is backward. Therefore, in order to accelerate the pace of development in the area, the city of Anhui is building a high-tech park. Our project is focus on one of innovation centers in the high-tech park,which will provide collabrative environment for top innovators and enterprises.

SHANGHAI 上海 SHANGHAI

NANJING

HEFEI HANGZHOU 杭州 HANGZHOU

SHANGHAI 上海 SHANGHAI

WUHAN HANGZHOU 杭州 HANGZHOU

NANCHANG

SITE PLANNING

CHANGSHA

i ka

g an

u Ch of rk e 1 Pa ag e St ienc Sc

NANCHANG

SITE

至淮南

至阜阳

至徐州

d an

dL an es re ticl ua Ar Sq ture n c e Op chite Ar

pe

a sc

ai

gk

n ua Ch of rk e 2 Pa ag nce t S ie Sc

St Sc age ien 3 o ce f C Pa hu rk an g

i

至徐州 SITE

合肥火车站

至徐州

北区

Xinqiao International 老城区 Airport

3号线

东区

至徐州 1号线

2号线

2号线

至南京

老城区

35KM

至芜湖

西区

高新区

Hi Zo gh-t ne ech Ma In in dus Ro tr ad y

ka

3号线

至淮南

Even today,Hui style architecture, Huangmei opera, textile processing, Huang Mountain and kirigami are still the most distinctive things in Anhui province. So. the second idea is to integrate these local characteristics into the innovation center. Clothing design industry is the theme of public building. Innovation center provids designers a working place for research, development, prototyping and making up. It also can hold a large fashion show and clothing exhibition.

至南京

南区 合肥火车站

北区

地铁 铁路

老城区

老城区

经济开发区

东区

骆岗机场

1号线

2号线

滨湖新区

公共设施

Modern satellite city is located in the urban fringe , with 至芜湖 a certain distance from the metropolis, with a certain amount 西区 高新区 of population size, and keep close touch with city. In order 至南京 to broaden the field of Hefei 南区city, the government planned to move the high-tech industry zone to 35 kilometers from the central city. As we know, satellite city always takes the lead 地铁 in cultural activities because of the tight connection with 铁路 the central city in economy, politics and society. Govern公共设施 ment promote innovation development by supporting re骆岗机场 search and providing right-of-way such as roadways and new airport.

经济开发区

滨湖新区

Innovation Center lies beside the main road of the area. Most of original villages have vanished, replaced by big scale blocks which better fit for cars. Even if renowned as Hui style architecture, it’s difficult to stay or enjoy the special forms of architecture. So, the first idea was to create an ambient, a public space where people would like to stay, visit and communicate.

2号线

至南京 至芜湖

Hefei hightech industry development zone

11KM

至芜湖

HEFEI

5KM

Old Airport Economictech development zone (ETDZ)

17


SHAPE FORMATION Street

Yard

Square

Slope

Sunlight

Mountain

Facade

SECTION STUDY_PRACTICAL MEANS TO SLOVE SPACE PROBLEM

Thinking with section is a practical mean to explore possible connections between interior and exterior space. Varied forms of outdoor spaces are all developed from the base forms.By studying the different situations, I can better hold the different functions in the same space. BASIC

NEGATIVE SECTION - 1

POSITIVE

Outdoor Scene

Terrace

Ventilation

Safety Protection

Continuous

I hope people might be attracted into the innovation center by the view at the entrance. Their eyes would follow the fall of the stairs coming from the ground all the way down to the atrium. People could choose getting into the space either through the ramp of roof or the atrium with trees and stage on the negative layer. They would stay and chat under the tree in the atrium, or, see the fashion show by the stage. Meanwhile, they could enjoy clothing artworks and watch other people lingering inside the building through glass curtain wall. The glass curtain wall implies people to the other side of the building, and introduces them to come to the public stairs-plaza on the roof, where people could sit and enjoy sunshine, or look down to the atrium, or even do some activities with people.

SECTION - 2

SECTION - 3

SECTION - 4

FORM A CONDITION

DAILY SITUATION

SPECIAL TIME SITUATION

19


LEVEL-1 PLAN

Wide accessibility makes the innovation center a cultural container.Various activities can be held here. The purpose of using the building can be divided into two categories,public and private. Iarranged different function blocks in different floors according to the function classification and using ratio which is a clearer and more logical way.

N Parking

SECTION 2

SECTION 3

Underground Parking

Small Square DOWN

USER CATAGORY

USER TYPE

PUBLIC

VISITOR FASHION iCON ARTIST BUSINESSMAN STUDENT TEACHER CITIZEN

PRIVATE

PERFORMER PHOTOGRAPHER DESIGNER EXECUTOR TECHNICIAN CLERK PUBLISHER

UP

2

Entrance Plaze

19

2 UP

DOWN

20 1

UP

UP

DOWN

18

23

DOWN

UP

-0.450

DOWN

22

±0.000

7 7

17

5 ±0.000

16

5

UP

CULTURE

21

LEISURE

-4.000

EXHIBITION

4

CREATION

3

SECTION 1

-0.450

DOWN

MANUFACTURE

SECTION 1

FUNCTION CATAGORY

DOWN

DOWN

12

6

DOWN UP

6 7 100

90

80

70

DOWN UP

UP

10

10

11

11

11

11

7

7

6

12

DOWN

14

Entrance Plaze 5

LOCATION FLOOR

4

3

SECTION 3

FUNCTION

HOTEL ATRIUM MULTIFUCTIONAL HALL

CLASSROOM READING ROOM RESTAURANT STORE

LOUNGE LIBRARY CLOTHES STUDIO

21.Atrium 22.Elevated Garden 23.Lobby

SECURITY ROOM MEETING ROOM OFFICE CONFERENCE ROOM GYM&SHOWER CAFE RECREATION

16.Store 17.Dressing Room 18.Coffee Shop 19.Arrange Room 20.SnackBar

PROCESSING ROOM STORAGE EQUIPMENT EXHIBITON HALL

11.Regular Office 12.Reading Room 13.Courtyard 14.Kitchen 15.Restaurant

2

SECTION 2

1

-1

Underground Parking

6.Pantry 7.Washroom 8.Management Office 9. Conference Room 10.Leadership Office

60

±0.000

23

8

1.Exhibition Hall 2.Storage 3.Reception Room 4.Security Room 5.Lounge

50

15

13

9

40

9

30

9

20

9

DOWN

10

UP

FREQUENCY

7

21


LEVEL-2 PLAN

1.Atrium 2.Storage 3.Gallery 4.Makeup Room 5.Photographic Studio 6.Dressing Room 7.Lobby 8.Platform 9.Material Room 10.Processing Room 11.Clothes Studio 12.Pantry 13.Upper Courtyard 14.Auxiliary Room 15.Design Salon 16.Store 17.Coffee Shop 18.Arrange Room 19.Ramp Roof 20.Equipment Room 21.Classroom 22.Multimedia Room 23.Multifuctional Hall 24.Backstage 25.Creative Design Studio 26.Dormitory 27.Gym 28.Shower

N

19 2 UP

DOWN

18

1

UP

DOWN

17 3 DOWN

6

5 1 4 6

DOWN

UP

15

16

8

UP

7

DOWN

14

UP

DOWN

12 DOWN DOWN

DOWN

13

11 DOWN UP

DOWN

9

10

11

DOWN

12

Slope Level 3

21 20

The stairs of each layer,the entrance atrium and each floor platform are combined to form the core of building space. LOBBY SPATIAL COMPOSITION Equipment Room Level 5

Equipment Room Level 4 Lobby Roof Garden

Multifuctional Hall

LEVEL-3 PLAN

UP

As a innovation center, the entrance atrium of the centre has a mixing cultural function, super-imposing gallery, processing room, exhibition halls, clothes studios, etc. These functions, together with the platform and lobby of each layer, make up the public space of the center.

21

21

Platform

19

21

DOWN

12

22

UP

DOWN

2

2

8

UP

23

8

Clothes Studio Level 2

Design Salon

6 25

6

28

Exhibition Hall Level 1 上

18

1

18

Atrium

15 27

UP

24 DOWN

DOWN

12

UP

7 26

26

26

7

Core Tube Negative Layer

Stair

1 9

10

26

26

26

26

2

DOWN

UP

26

26

23


LEVEL-4 PLAN

Building structure is the traditional frame structure which keeps the space plasticity and effectively controls the construction cost. In the whole design, the space in the entrance atrium is the most abundant and wonderful.

N

2 UP

In such a multilayer space, one can see clearly what is going on in each function blocks. The entrance atrium on the negative layer can hold various types of exhibitions, such as fashion show,research and development of the clothing as well as enterprise culture.

3

DOWN

1

UP

4

5

6

7

UP

DOWN

SECTION 2-2 does embody the public of the innovation center, while SECTION 3-3 shows the private of the dormitories and hotels.

DOWN

8 6

5 11

DOWN

11

10

6

11 11 11

9

9

7

5 9

9

10

9

9

LEVEL-5 PLAN 6

10

6

SECTION 2-2

11 UP

1

DOWN

7

11 UP

11 DOWN UP

6

9 7

6

10

DOWN UP

9

9

LEVEL-6 PLAN 6

10

6

11 11 UP

6 11

DOWN

DOWN UP

11

DOWN UP

9

7

1.Equipment Room 2.Office 3.Chairman Office 4.Lounge

5.Platform 6.Atrium 7.Lobby 8.Roof Garden

9.Dormitory 10.Utility Room 11.Hotel 12.Bar

12

6

10

DOWN UP

9

9

DOWN UP

SECTION 3-3

25


PERSPECTIVE

NEGATIVE LAYER PLAN N

20

21

22

3 UP

DOWN

1

4

2

UP

5

UP

UP

23

UP

6 UP

7

-4.000

14

-3.550

SECTION 1-1

8 UP

UP

19

9 UP

4 10

11

11

11

13 UP

2 12

1.Processing Room 2.Storage 3.Electrical Room 4.Equipment Room 5.Makeup Room 6.Dressing Room

SECTION 1-1

12

12

12

7.Lounge 8.Lobby 9.Pantry 10.Control Center 11.VIP Lounge 12.Back-office

12

12

15

13.Waiting Space 14.Atrium 15.Waste Collecting Room 16.Discharge Room 17.Power Room 18.Transformer Room

16

17

18

19.Underground Garage 20.Wather Room 21.Pump House 22.Refrigerating Station 23.Underground Garage

27


ACADEMIC

Pavilion(Built Project) Department of Architecture, Zhuhai College of Jilin University,Zhuhai Academic Design Studio,Teamwork,2013 Tutor:Professor Jason

29


SITE ELEVATIONS The pavilion we built is located in our university and it is between two dark red campus buildings. One can see the project from the classroom window.After we finished the pavilion, it became a good place for students to rest.

The Initial Ideas of Our Group Thoughts regarding external stimuli is peaceful.I want to design a pavilion for students to relax and take a nap. It is likely to be a harbor to warm a person.

PROSPECTUS 1. What are you going to design? You are not designing a building. 2. What is the thing you are trying to design? (Start with the definition.) 3. What is your first thought about the thing you are trying to design? (What do you think about the thing you want to design?) 4. Why are you going to design this thing? (What is your purpose not the function)? 5. Where will the think you design be placed (located/ sited)?

Idea about my thought is wall. The utilization of strategies are contrast, volume and this order to conceptualize, organize thoughts, in order to design a pavilion.Wall is the expression of thoughts regarding dependence.The articulation of expression is bound to a maker's ability to express thoughts (The System of Ideas)regarding forms within the immediacy of a corresponding moment.You can hear the calling from the wall and self-blessing as long as you stay in the pavilion. We need a pavilion to let us enjoy sunshine in a pleasant day.School require a relatively quiet space for people to think and enjoy.Thoughts regarding external stimuli is container. It can absorb the essence of the outside world while shielding interference.

SE

EE

NE

I hope that the pavilion is an extension of the environment. Extending from one space to another space. Converting from one space to another space allows students to have different feelings. I will take the concept deeply into the design. Let them feel this process.

WE

31


SITE ANALYSIS - Conditions SITE PLAN 100M

SITE ANALYSIS-Forces From the questions,we measured the pavilion site and block paving as well as the position of trees.Three times measurements can ensure the data accurately.We can easily build the pavilion to avoid moving trees.

SITE PLAN 10M

HYDROPS

EDGES 100M

Then we began to analyze traffic flow and people flow.We researched the walking routes of students through the site and sketched site analysis diagrams about forces. 33


DIAGRAMING

MASSING formation of interior

IDENTITY PROJECT Movement Through the Form Our first thought is about peace, which is a state of mind.It is difficult to create state deliberately, so we need to create a peaceful atmosphere through pavilion in the site. If you have peace, you are not being disturbed, and you are in calm, quiet surroundings.This kind of surrounding will lead you feel content and calm.Our pavilion provides a place for people at peace and calm down. We chose the wall as the idea because it has welloriented characteristic and easy to break up a space. Exterior space provides people to communicate with others, while interior space bring themselves the feeling of calmness. Meanwhile, oriented wall guides people to the peaceful environment from the noisy space. During the process of design, it is necessary to make a point of not only the entity form itself, but also the spaces around which defined by the entity.

35


IDENTITY PROJECT

Sketches of the form of the massing model

How shadows would be cast around/thru the pavilion

This is the massing plan. This diagram illustrates the pavilion among its more depth to go, the stronger the sense of enclosure. This space can effectively avoid any interference in order to bring people the feeling of calmness in a independent space.

8:00

10:00

12:00

14:00

16:00

18:00

the Vernal Equinox

the Summer Solstice

the Autumnal Equinox

This is the massing elevation.Wall has well-oriented characteristic.It helps people reach two spaces which are created by us.They are internal and external space. the Winter Solstice

This diagram is massing with perspective effect. We use comparative methods to express the oriented force.When people come into the internal space,they will find the oriented force increases dramatically.

37


IDENTITY PROJECT

SCHEMA Structure Diagram

Bubble Diagram

Site Plan

Spatial Diagram

WORKING PROCESS

Structure Plan

Search of the wood We went to the market of wood to search for a kind of wood which will have best constructibility to the pavilion.We selected the structure solid wood and board.Thirty-one large solid wood columns upheld the pavilion's heavy roof. We used board to cover the whole solid wood columns and surrounding a curve space.

Final Circulation

39


SCHEMA

BASE COURSE STRUCTURE PLAN

DETAIL SECTION

SECTION

BUDGET surface

81,878,640 mm2

5mm board 2348*148*38mm structure solid wood stainless steel fastener 30mm 70mm Ф10mm 1100mm rebar white paint 10mm board rocks under the pavilion path FOUNDATION SECTION

28.43pieces 31pieces

1054 86 31 81m2 one layer 24not acurate 10.5m2 15m2

41


WORKING PROCESS

THE RESULT

WINTER

Finally,it didn't come out exactly as what i expected,but what i learnt during the whole period came far more than i had expected. As to the construction of pavilion in the last month, it turned out the biggest challenge to test members'capabilities. It was the first time for me to cut wood by electric motor saw and paint wood against corrosion as well as fix wood by electric drill. All those efforts of the first time refreshed my understandings of the divergence between theory and practice. From then on, I formed the clear knowledge that architecture should not end up with theoretical study or paperwork but get upgraded in frequent practice.

SUMMER 43


SUPPLEMENT CHRONOLOGY VISUAL ARTS Photography Painting Pen Drawing

RESUME

CHRONOLOGY

45


Washington D.C/2013

Washington D.C/2013

Chicago/2013

PHOTOGRAPHY Photography is one of my hobbies. In period of university, I spend a lot of time visiting many places in vacations.Capturing the details of construction and the moment through the lens is the most enthusiastic thing in my traveling. It makes me come into contact with different culture and meet a variety of architecture styles.This part of the photography is mainly from the process of accumulation during tourism and practice.

VISUAL ARTS

47


MOHE/2014

VISUAL ARTS

MOHE/2014

49


Water Painting/2013

Water Painting/2012

Gouache/2012

PAINTING I have 4 years of professional educational experience in painting. When I was a child, i liked painting the Carton.After I study in the university I fell in love with taditional Chinese watercolor painting. In this part, I would like to represent the watercolor painting and the pen drawing of architecture during my university period as well as excellent drawing skill and capability in three-dimensional form controlling.

VISUAL ARTS

51


Pen Drawing/2013

Sketch/2011

Pen Drawing/2014

Pen Drawing/2011

DRAWING Sketch/2010

VISUAL ARTS

53


RESUME EDUCATION SEPTEMBER.2010-2014

Department of Architecture,Zhuhai College of Jilin University Zhuhai,Guangdong Prov,China Major:Architecture

ACADEMIC RECORDS GPA: Overall Major Ranking

3.34/4 3.65/4 5/88

WORK EXPERIENCE AUGEST.2013-OCTOBER.2013

CCDI GROUP, Shenzhen, China PUBLIC CONSTRUCTION DEPARTMENT Project: Completed the Wuyuan Bay project bidding Jinan Han Yu preliminary design

AUGEST.2014-PRESENT (Assistant Architect)

Architectural Architectural Design Institute Co., Ltd., Shenzhen China Responsibilities: Assist the creative architect of public buildings in general, civil design and site design. Independently auxiliary design work. Cartography and computer skills program Complete text conception and design

ACADEMIC EXPERIENCE SEPTEMBER.2011

2nd class scholarship of Zhuhai College of Jilin University

JUNE.2012

Participated in the 2012 World University Architectural Design Competition

SEPTEMBER.2012

2nd class scholarship of Zhuhai College of Jilin University

FEBRUARY.2013

Shanchang Residential Planning and Design

SEPTEMBER.2013

2nd class scholarship of Zhuhai College of Jilin University

COMPUTING SKILLS

AutoCAD, Sketch up,Vary, Adobe Photoshop, Illustrator, InDesign, Lumion,Keyshot, Rhinoceros,Grasshopper Microsoft Word, PowerPoint

INTEREST

Calligraphy An skilled painter been trained for 4 years,specially good at watercolour painting and pen drawing Other:Interior Design,Model Making, Photography,Travelling RESUME

55


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.