All fire Doors and walls have are designed to handle an hour of resistance.
26787
UP
32 Disabled WC 23 GP Consultancy
24 GP Consultancy
15 m² 158.2 SF
15 m² 158.2 SF
5 m² 49.2 SF
33 Male WC
34 Female WC
7 m² 76.5 SF
7 m² 76.5 SF
Below explain the distance from the furthest point of the arrow
UP
22 GP Consultancy
C
16 m² 169.1 SF
Ground Floor 26 Reception
16 m² 168.8 SF
21 m² 229.5 SF
25 Waiting Area
28 Dispensary
81 m² 872.6 SF
42 m² 452.4 SF
20 GP Consultancy
27 Records Room
16 m² 169.1 SF
7755
18280
21 GP Consultancy
The furthest point from 'A' is 11m in length The further point from 'B' is 17m in length. The furthest point from 'C' is 15m in length
72 m² 771.4 SF
-
First Floor
---
A
19 GP Consultancy
B
12890
16 m² 169.4 SF
29 GP Trainee
5845
30 GP Treatment
24 m² 260.5 SF
25 m² 264.2 SF
31 Multi-Purpose
Rev
48 m² 516.5 SF
1
The furthest point from 'D' is 3m in length The further point from 'E' is 9m in length.
Description
Date
Level 0 1 : 100
---
DN D
41 39 Disabled WC 40 Female WC 3 m² 2 m² 38 32.5 SF Male WC 20.7 SF 2 m² Nurse In.. 20.7 SF
42 Staff Meeting
7 m² 76.5 SF
35 Cleaner/ Plant 13 m² 137.8 SF
CODE
SUITABILITY DESCRIPTION
STATUS
PURPOSE OF ISSUE
36 37 Sluice Specimen 5 m² 56.1 SF
5 m² 56.1 SF
DN
15 m² 162.1 SF
www.autodesk.com/revit
St Mary's Healthcare Centre
PROJECT
E REF.
DW
43 Common Room
44 Practice Manager
25 m² 264.8 SF
13 m² 141.2 SF
45 Nurse Treatment
46 Nurse Treatment
47 Nurse Consulting
48 Nurse Consulting
23 m² 245.8 SF
22 m² 240.4 SF
11 m² 120.3 SF
11 m² 120.2 SF
TITLE
Floor Plans Fire Strategy CLIENT
Danny walcott -
DRAWN BY
---
SCALE (@ A1)
1 : 100 DRAWING NUMBER
2
Level 1 1 : 100
A100 ---
CHECKED BY
DATE
Checker
15/01.2015 PROJECT NUMBER
ARC600 REV
Rev
Description
Date
CODE
SUITABILITY DESCRIPTION
STATUS
PURPOSE OF ISSUE
www.autodesk.com/revit
St Mary's Healthcare Centre
PROJECT
TITLE
3D views CLIENT
Danny walcott DRAWN BY
CHECKED BY
DATE
Author
Checker
01/14/15
SCALE (@ A1)
PROJECT NUMBER
ARC600 DRAWING NUMBER
A101
REV